1 BaBar Grid Tim Adye Particle Physics Department Rutherford Appleton Laboratory PP Grid Team Coseners House 8 th November th November 2002 Tim Adye 1

2 Talk Plan BaBar distributed computing model RAL Tier A Remote job submission BaBar VO and Authorisation Metadata Data distribution 8th November 2002 Tim Adye 2

3 The BaBar Collaboration 9 Countries 74 Institutions 566 Physicists 8th November 2002 Tim Adye 3

4 PEP-II e+e- Ring and BaBar Detector LER (e+, 3.1 GeV), I(e+ )=2.1 A Linear Accelerator HER (e-, 9.0 GeV), I(e- )=1.0 A BaBar PEP-II ring: C=2.2 km BABAR May 26, 1999: 1st events recorded by BaBar

5 BaBar s Distributed Computing Model Goal is to spread computing load much more around the collaboration Simulation production is already distributed 75% in the UK! Now have three new Tier A centres Lyon Objectivity (database) analysis (since last year) RAL Kanga (ROOT microdst) analysis (from May 2002) Padova Reprocessing (just starting) Also several Tier C sites (ie. Universities, 9 in UK) Analysis data format (Kanga vs Objectivity) is a matter of heated debate at the moment Whatever the future of Objectivity, Kanga (championed in UK/Germany) looks set to continue 8th November 2002 Tim Adye 5

6 RAL Tier A UK MoU with BaBar reduces our common fund contributions in exchange for providing Tier A facility RAL has now relieved SLAC of all Kanga analysis Impressive takeup from UK and non-uk users See Andrew s talk It is the primary repository of Kanga data ~20 TB on disk BaBar analysis environment tries to mimic SLAC so external users feel at home Grid job submission should greatly reduce this requirement 8th November 2002 Tim Adye 6

7 Remote Job Submission Short term (this month!) Allow SLAC or University users to submit BaBar analysis jobs to RAL or Lyon Tier A sites from their home machines dg-job-submit Simplifies local development and debugging, while providing access to full dataset and large CPU farms RAL vs IN2P3 selected explicitly by user canned JDLRequirements; dataset selection left to user Why couldn t we do this a year ago? BaBar authorisation (see later) Gatekeeper needed to be able to submit to production farm Define which BaBar configuration files to send with job Developed a procedure to merge all tcl files into one Resource Broker reliability better with EDG th November 2002 Tim Adye 7

8 Remote Job Submission Medium term (early next year) Allow remote submission to UK Farms and SLAC In principle this is already set up Select site (CE) based on user requirements Eg. Dataset available, software release, etc. Split job between sites based on available datasets Already have demonstrator for a canned analysis job 8th November 2002 Tim Adye 8

9 BaBar VO and Authorisation Use certificates from EDG and ESnet CAs for authentication Authorisation required to identify BaBar users Provides access to BaBar-specific facilities and environment Cannot maintain grid-mapfile by hand Doesn t scale to users Use existing SLAC BaBar user registration User provides certificate id at SLAC Automatic procedure checks AFS group and fills VO CEs use VO for authorisation Naturally handles people leaving the experiment 8th November 2002 Tim Adye 9

10 Analysis Metadata Currently have about a million Kanga files in a deep directory tree Need a catalogue to facilitate data distribution and allow analysis datasets to be defined. SQL database Locates ROOT files associated with each dataset Selections based on decay channel, run range, beam energy, reconstruction processing version, etc. Each site has its own (MySQL or Oracle) database Includes a copy of SLAC database with local information (eg. files on local disk, files to import, local tape backups) Some use of SRB for local Objectivity metadata at SLAC and Lyon 8th November 2002 Tim Adye 10

11 Data Distribution Kanga and Objectivity distribution currently handled by homegrown procedures Use bbftp. bbcp soon. Will look at GridFTP Next step is to run transfers using Grid job submission Web control pages under development Authorisation done using Grid certificates Looking at SRB and RLS for data distribution 8th November 2002 Tim Adye 11

12 Summary BaBar already has a highly distributed analysis environment RAL Tier A saves BaBar! Want to use Grid job submission tools now Looking at SRB and RLS 8th November 2002 Tim Adye 12

THE BaBar High Energy Physics (HEP) detector [1] is

THE BaBar High Energy Physics (HEP) detector [1] is IEEE TRANSACTIONS ON NUCLEAR SCIENCE, VOL. 53, NO. 3, JUNE 2006 1299 BaBar Simulation Production A Millennium of Work in Under a Year D. A. Smith, F. Blanc, C. Bozzi, and A. Khan, Member, IEEE Abstract

More information

Using Grid for the Babar Experiment

Using Grid for the Babar Experiment Using Grid for the Babar Experiment C. Bozzi*, T. Adye, D. Andreotti*, E. Antonioli*, R. Barlow, B. Bense?, D. Boutigny?, D. Colling?, R.D. Cowles?, P. Elmer +, A. Forti, G. Grosdidier?, A. Hasan?, E.

More information

Use of the European Data Grid software in the framework of the BaBar distributed computing model

Use of the European Data Grid software in the framework of the BaBar distributed computing model SLAC-PUB-9942 * Use of the European Data Grid software in the framework of the BaBar distributed computing model D. Boutigny Laboratoire de Physique des Particules, F-74941, Annecy-le-Vieux, France D.H.

More information

THE BaBar experiment [1] at the SLAC PEP-II asymmetric. Using the Grid for the BaBar Experiment

THE BaBar experiment [1] at the SLAC PEP-II asymmetric. Using the Grid for the BaBar Experiment SLAC-PUB-10728 Using the Grid for the BaBar Experiment C. Bozzi, T. Adye, D. Andreotti, E. Antonioli, R. Barlow, B. Bense, D. Boutigny, C. A. J. Brew, D. Colling, R. D. Cowles, P. Elmer, E. Feltresi, A.

More information

PEP-II/BaBar Performance, Accumulated Luminosity. BaBar has submitted over 400 papers for publication (Last year this number was 350)

PEP-II/BaBar Performance, Accumulated Luminosity. BaBar has submitted over 400 papers for publication (Last year this number was 350) BABAR and SuperB Caltech group has put a major effort into the BaBar experiment, from its conception. Caltech group has also been investigating the possibility of a 10 36 cm 2 s 1 SuperB collider, again

More information

GENIUS and GILDA. Roberto Barbera University of Catania and INFN. Grid School, Vico Equense,

GENIUS and GILDA. Roberto Barbera University of Catania and INFN. Grid School, Vico Equense, Grid School, Vico Equense, 19.07.2004 GENIUS and GILDA www.eu-egee.org Roberto Barbera University of Catania and INFN EGEE is a project funded by the European Union under contract IST-2003-508833 Contents

More information

Using Geant4 in the BaBar Simulation. CHEP03 25 March 2003 Dennis Wright (SLAC) on behalf of the BaBar computing group

Using Geant4 in the BaBar Simulation. CHEP03 25 March 2003 Dennis Wright (SLAC) on behalf of the BaBar computing group Using Geant4 in the BaBar Simulation CHEP03 25 March 2003 Dennis Wright (SLAC) on behalf of the BaBar computing group 1 Outline BaBar overview physics building a Geant4-based simulation MC/data comparison

More information

PEP-II Overview & Ramp Down Plan. J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007

PEP-II Overview & Ramp Down Plan. J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007 PEP-II Overview & Ramp Down Plan J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007 Topics Overview of the PEP-II Collider PEP-II turns off September 30, 2008. General list of components and buildings

More information

Using Boosted Decision Trees to Separate Signal and Background

Using Boosted Decision Trees to Separate Signal and Background Using Boosted Decision Trees to Separate Signal and Background in B X s γ Decays James Barber 16 August, 2006 University of Massachusetts, Amherst jbarber@student.umass.edu James Barber p.1/19 PEP II/BaBar

More information

Program Risks Risk Analysis Fallback Plans for the. John T. Seeman DOE PEP-II Operations Review April 26, 2006

Program Risks Risk Analysis Fallback Plans for the. John T. Seeman DOE PEP-II Operations Review April 26, 2006 Program Risks Risk Analysis Fallback Plans for the PEP-II B-FactoryB John T. Seeman DOE PEP-II Operations Review April 26, 2006 OPS Review Topics Are there any PEP-II program risks? Has the laboratory

More information

Status and Plans for PEP-II

Status and Plans for PEP-II Status and Plans for PEP-II John Seeman SLAC Particle and Particle-Astrophysics DOE HEPAP P5 Review April 21, 2006 Topics Luminosity records for PEP-II in October 2005 Fall shut-down upgrades Run 5b turn

More information

Data Quality Monitoring in the ATLAS Inner Detector

Data Quality Monitoring in the ATLAS Inner Detector On behalf of the ATLAS collaboration Cavendish Laboratory, University of Cambridge E-mail: white@hep.phy.cam.ac.uk This article describes the data quality monitoring systems of the ATLAS inner detector.

More information

administration access control A security feature that determines who can edit the configuration settings for a given Transmitter.

administration access control A security feature that determines who can edit the configuration settings for a given Transmitter. Castanet Glossary access control (on a Transmitter) Various means of controlling who can administer the Transmitter and which users can access channels on it. See administration access control, channel

More information

INTRODUCTION. SLAC-PUB-8414 March 2000

INTRODUCTION. SLAC-PUB-8414 March 2000 SLAC-PUB-8414 March 2 Beam Diagnostics Based on Time-Domain Bunch-by-Bunch Data * D. Teytelman, J. Fox, H. Hindi, C. Limborg, I. Linscott, S. Prabhakar, J. Sebek, A. Young Stanford Linear Accelerator Center

More information

THE Collider Detector at Fermilab (CDF) [1] is a general

THE Collider Detector at Fermilab (CDF) [1] is a general The Level-3 Trigger at the CDF Experiment at Tevatron Run II Y.S. Chung 1, G. De Lentdecker 1, S. Demers 1,B.Y.Han 1, B. Kilminster 1,J.Lee 1, K. McFarland 1, A. Vaiciulis 1, F. Azfar 2,T.Huffman 2,T.Akimoto

More information

LCLS Injector Technical Review

LCLS Injector Technical Review LCLS Injector Technical Review Stanford Linear Accelerator Center November 3&4 2003 Review Committee Members: Prof. Patrick O Shea Chair University of Maryland Dr. E. Colby Stanford Linear Accelerator

More information

THE DESIGN OF CSNS INSTRUMENT CONTROL

THE DESIGN OF CSNS INSTRUMENT CONTROL THE DESIGN OF CSNS INSTRUMENT CONTROL Jian Zhuang,1,2,3 2,3 2,3 2,3 2,3 2,3, Jiajie Li, Lei HU, Yongxiang Qiu, Lijiang Liao, Ke Zhou 1State Key Laboratory of Particle Detection and Electronics, Beijing,

More information

CERN S PROTON SYNCHROTRON COMPLEX OPERATION TEAMS AND DIAGNOSTICS APPLICATIONS

CERN S PROTON SYNCHROTRON COMPLEX OPERATION TEAMS AND DIAGNOSTICS APPLICATIONS Marc Delrieux, CERN, BE/OP/PS CERN S PROTON SYNCHROTRON COMPLEX OPERATION TEAMS AND DIAGNOSTICS APPLICATIONS CERN s Proton Synchrotron (PS) complex How are we involved? Review of some diagnostics applications

More information

LEPTON COLLIDER OPERATION WITH CONSTANT CURRENTS Λ

LEPTON COLLIDER OPERATION WITH CONSTANT CURRENTS Λ SLAC-PUB-11706 LEPTON COLLIDER OPERATION WITH CONSTANT CURRENTS Λ U. Wienands y, SLAC, Stanford, CA, USA Abstract Electron-positron colliders have been operating in a topup-and-coast fashion with a cycle

More information

Nick Walker DESY MAC

Nick Walker DESY MAC Nick Walker DESY MAC 4.5.2006 XFEL X-Ray Free-Electron Laser DESY ILC Project Group Accelerator Experimentation Behnke, Elsen, Walker (chair) WP 15, 16 WP 4-7 Accelerator Physics and Design WP 6 High Gradient

More information

PEP II Design Outline

PEP II Design Outline PEP II Design Outline Balša Terzić Jefferson Lab Collider Review Retreat, February 24, 2010 Outline General Information Parameter list (and evolution), initial design, upgrades Collider Ring Layout, insertions,

More information

Transportation Process For BaBar

Transportation Process For BaBar Transportation Process For BaBar David C. Williams University of California, Santa Cruz Geant4 User s Workshop Stanford Linear Accelerator Center February 21, 2002 Outline: History and Motivation Design

More information

PEP-II IR-2 Alignment

PEP-II IR-2 Alignment SLAC-PUB-10328 January 2004 PEP-II IR-2 Alignment A. Seryi, S. Ecklund, C. Le Cocq, R. Pushor, R. Ruland, Z. Wolf SLAC, Stanford, CA 94025, USA This paper describes the first results and preliminary analysis

More information

PEP-I1 RF Feedback System Simulation

PEP-I1 RF Feedback System Simulation SLAC-PUB-10378 PEP-I1 RF Feedback System Simulation Richard Tighe SLAC A model containing the fundamental impedance of the PEP- = I1 cavity along with the longitudinal beam dynamics and feedback system

More information

DEVELOPMENT OF A 10 MW SHEET BEAM KLYSTRON FOR THE ILC*

DEVELOPMENT OF A 10 MW SHEET BEAM KLYSTRON FOR THE ILC* DEVELOPMENT OF A 10 MW SHEET BEAM KLYSTRON FOR THE ILC* D. Sprehn, E. Jongewaard, A. Haase, A. Jensen, D. Martin, SLAC National Accelerator Laboratory, Menlo Park, CA 94020, U.S.A. A. Burke, SAIC, San

More information

Oak Ridge Spallation Neutron Source Proton Power Upgrade Project and Second Target Station Project

Oak Ridge Spallation Neutron Source Proton Power Upgrade Project and Second Target Station Project Oak Ridge Spallation Neutron Source Proton Power Upgrade Project and Second Target Station Project Workshop on the future and next generation capabilities of accelerator driven neutron and muon sources

More information

Hall A Simulation & Analysis

Hall A Simulation & Analysis Hall A Simulation & Analysis Ole Hansen Jefferson Lab IT for the 12 GeV Era Internal Review May 20, 2011 Ole Hansen (Jefferson Lab) Hall A Simulation & Analysis May 20, 2011 1 / 9 Hall A 12 GeV Experiments

More information

BABAR A Community Web Site in an Organizational Setting

BABAR A Community Web Site in an Organizational Setting BABAR A Community Web Site in an Organizational Setting SLAC-PUB-9975 July 2003 Ray Cowan Laboratory for Nuclear Science, M.I.T., Cambridge, MA 02139 Yogesh Deshpande University of Western Sydney, Locked

More information

AGENDA. Mendeley Content. What are the advantages of Mendeley? How to use Mendeley? Mendeley Institutional Edition

AGENDA. Mendeley Content. What are the advantages of Mendeley? How to use Mendeley? Mendeley Institutional Edition AGENDA o o o o Mendeley Content What are the advantages of Mendeley? How to use Mendeley? Mendeley Institutional Edition 83 What do researchers need? The changes in the world of research are influencing

More information

Pulsed Klystrons for Next Generation Neutron Sources Edward L. Eisen - CPI, Inc. Palo Alto, CA, USA

Pulsed Klystrons for Next Generation Neutron Sources Edward L. Eisen - CPI, Inc. Palo Alto, CA, USA Pulsed Klystrons for Next Generation Neutron Sources Edward L. Eisen - CPI, Inc. Palo Alto, CA, USA Abstract The U.S. Department of Energy (DOE) Office of Science has funded the construction of a new accelerator-based

More information

!"!3

!!3 Abstract A single-mode 500 MHz superconducting cavity cryomodule has been developed at Cornell for the electronpositron collider/synchrotron light source CESR. The Cornell B-cell cavity belongs to the

More information

College of Arts and Sciences

College of Arts and Sciences Syracuse University SURFACE Physics College of Arts and Sciences 5-29-2003 The BaBar Mini Duncan Brown Department of Physics, Syracuse University, Syracuse, NY Follow this and additional works at: https://surface.syr.edu/phy

More information

from ocean to cloud ADAPTING THE C&A PROCESS FOR COHERENT TECHNOLOGY

from ocean to cloud ADAPTING THE C&A PROCESS FOR COHERENT TECHNOLOGY ADAPTING THE C&A PROCESS FOR COHERENT TECHNOLOGY Peter Booi (Verizon), Jamie Gaudette (Ciena Corporation), and Mark André (France Telecom Orange) Email: Peter.Booi@nl.verizon.com Verizon, 123 H.J.E. Wenckebachweg,

More information

Request for Proposals

Request for Proposals Request for Proposals Reference: ERDFIAI2012-4006A Caring First Ltd, is a limited liability company providing healthcare services. The company is currently commissioning a private new-build hospital complete

More information

Diamond RF Status (RF Activities at Daresbury) Mike Dykes

Diamond RF Status (RF Activities at Daresbury) Mike Dykes Diamond RF Status (RF Activities at Daresbury) Mike Dykes ASTeC What is it? What does it do? Diamond Status Linac Booster RF Storage Ring RF Summary Content ASTeC ASTeC was formed in 2001 as a centre of

More information

PEP II Status and Plans

PEP II Status and Plans SLAC-PUB-6854 September 1998 PEP II Status and Plans By John T. Seeman Invited talk presented at the 16th IEEE Particle Accelerator Conference (PAC 95) and International Conference on High Energy Accelerators,

More information

V9A01 Solution Specification V0.1

V9A01 Solution Specification V0.1 V9A01 Solution Specification V0.1 CONTENTS V9A01 Solution Specification Section 1 Document Descriptions... 4 1.1 Version Descriptions... 4 1.2 Nomenclature of this Document... 4 Section 2 Solution Overview...

More information

The digital revolution and the future of scientific publishing or Why ERSA's journal REGION is open access

The digital revolution and the future of scientific publishing or Why ERSA's journal REGION is open access The digital revolution and the future of scientific publishing or Why ERSA's journal REGION is open access Gunther Maier REGION the journal of ERSA Tim Berners-Lee and the World Wide Web March 1989 proposal

More information

4.4 Injector Linear Accelerator

4.4 Injector Linear Accelerator 4.4 Injector Linear Accelerator 100 MeV S-band linear accelerator based on the components already built for the S-Band Linear Collider Test Facility at DESY [1, 2] will be used as an injector for the CANDLE

More information

BaBar-Belle Legacy Book White Paper

BaBar-Belle Legacy Book White Paper BaBar-Belle Legacy Book White Paper The BaBar and Belle collaborations have together published about six hundred journal articles over the last eight years and at least another one hundred will come out

More information

IOT RF Power Sources for Pulsed and CW Linacs

IOT RF Power Sources for Pulsed and CW Linacs LINAC 2004 Lübeck, August 16 20, 2004 IOT RF Power Sources H. Bohlen, Y. Li, Bob Tornoe Communications & Power Industries Eimac Division, San Carlos, CA, USA Linac RF source property requirements (not

More information

Phase (deg) Phase (deg) Positive feedback, 317 ma. Negative feedback, 330 ma. jan2898/1638: beam pseudospectrum around 770*frev.

Phase (deg) Phase (deg) Positive feedback, 317 ma. Negative feedback, 330 ma. jan2898/1638: beam pseudospectrum around 770*frev. Commissioning Experience from PEP-II HER Longitudinal Feedback 1 S. Prabhakar, D. Teytelman, J. Fox, A. Young, P. Corredoura, and R. Tighe Stanford Linear Accelerator Center, Stanford University, Stanford,

More information

Australian Synchrotron Virtual Beamline Introduction. VeRSI VBL Development Chris Myers Version 1.0

Australian Synchrotron Virtual Beamline Introduction. VeRSI VBL Development Chris Myers Version 1.0 Australian Synchrotron Virtual Beamline Introduction VeRSI VBL Development Chris Myers Version 1.0 What is a VBL The VBL will provide a multimedia nexus through which users can collaborate using voice,

More information

The CALICE test beam programme

The CALICE test beam programme Journal of Physics: Conference Series The CALICE test beam programme To cite this article: F Salvatore 2009 J. Phys.: Conf. Ser. 160 012064 View the article online for updates and enhancements. Related

More information

AIDA Update. presented by Tom Davinson on behalf of the AIDA collaboration (Edinburgh Liverpool STFC DL & RAL)

AIDA Update. presented by Tom Davinson on behalf of the AIDA collaboration (Edinburgh Liverpool STFC DL & RAL) AIDA Update presented by Tom Davinson on behalf of the AIDA collaboration (Edinburgh Liverpool STFC DL & RAL) Tom Davinson School of Physics & Astronomy The University of Edinburgh AIDA: Introduction Advanced

More information

North Damping Ring RF

North Damping Ring RF North Damping Ring RF North Damping Ring RF Outline Overview High Power RF HVPS Klystron & Klystron EPICS controls Cavities & Cavity Feedback SCP diagnostics & displays FACET-specific LLRF LLRF distribution

More information

A Facility for Accelerator Physics and Test Beam Experiments

A Facility for Accelerator Physics and Test Beam Experiments A Facility for Accelerator Physics and Test Beam Experiments U.S. Department of Energy Review Roger Erickson for the FACET Design Team February 20, 2008 SLAC Overview with FACET FACET consists of four

More information

Performance. Performance

Performance. Performance 2 What do you mean by performance? The importance metric is how does your application perform? How does your mix of applications perform? Speed. is 0.1 seconds different from 0.5 seconds 1% chance of response

More information

Study of Timing and Efficiency Properties of Multi-Anode Photomultipliers

Study of Timing and Efficiency Properties of Multi-Anode Photomultipliers Study of Timing and Efficiency Properties of Multi-Anode Photomultipliers T. Hadig, C.R. Field, D.W.G.S. Leith, G. Mazaheri, B.N. Ratcliff, J. Schwiening, J. Uher, J. Va vra Stanford Linear Accelerator

More information

RADIATION SAFETY SYSTEM OF THE B-FACTORY AT THE STANFORD LINEAR ACCELERATOR CENTER

RADIATION SAFETY SYSTEM OF THE B-FACTORY AT THE STANFORD LINEAR ACCELERATOR CENTER SLAC-PUB-7786 (August 1998) RADIATION SAFETY SYSTEM OF THE B-FACTORY AT THE STANFORD LINEAR ACCELERATOR CENTER J. C. Liu, X. S. Mao, W. R. Nelson, J. Seeman, D. Schultz, G. Nelson, P. Bong, B. Gray Stanford

More information

45 MW, 22.8 GHz Second-Harmonic Multiplier for High-Gradient Tests*

45 MW, 22.8 GHz Second-Harmonic Multiplier for High-Gradient Tests* US High Gradient Research Collaboration Workshop. SLAC, May 23-25, 2007 45 MW, 22.8 GHz Second-Harmonic Multiplier for High-Gradient Tests* V.P. Yakovlev 1, S.Yu. Kazakov 1,2, and J.L. Hirshfield 1,3 1

More information

OVERVIEW OF DATA FILTERING/ACQUISITION FOR A 47r DETECTOR AT THE SSC. 1. Introduction

OVERVIEW OF DATA FILTERING/ACQUISITION FOR A 47r DETECTOR AT THE SSC. 1. Introduction SLAC - PUB - 3873 January 1986 (E/I) OVERVIEW OF DATA FILTERING/ACQUISITION FOR A 47r DETECTOR AT THE SSC Summary Report of the Data Filtering/Acquisition Working Group Subgroup A: Requirements and Solutions

More information

DVR or NVR? Video Recording For Multi-Site Systems Explained DVR OR NVR? 1

DVR or NVR? Video Recording For Multi-Site Systems Explained DVR OR NVR?  1 DVR or NVR? Video Recording For Multi-Site Systems Explained DVR OR NVR? WWW.INDIGOVISION.COM 1 Introduction This article explains the functional differences between Digital Video Recorders (DVRs) and

More information

Advanced Implantation Detector Array (AIDA) Second BRIKEN Workshop RIKEN July 2013

Advanced Implantation Detector Array (AIDA) Second BRIKEN Workshop RIKEN July 2013 Advanced Implantation Detector Array (AIDA) Second BRIKEN Workshop RIKEN 30-31 July 2013 presented by Tom Davinson on behalf of the AIDA collaboration (Edinburgh Liverpool STFC DL & RAL) Tom Davinson School

More information

Instructions to Authors

Instructions to Authors Instructions to Authors European Journal of Psychological Assessment Hogrefe Publishing GmbH Merkelstr. 3 37085 Göttingen Germany Tel. +49 551 999 50 0 Fax +49 551 999 50 111 publishing@hogrefe.com www.hogrefe.com

More information

PEP-II Status. U. Wienands, PEP-II Run Coordinator for the PEP-II team

PEP-II Status. U. Wienands, PEP-II Run Coordinator for the PEP-II team PEP-II Status U. Wienands, PEP-II Run Coordinator for the PEP-II team Outline of Talk Run 4 Synopsis Machine tuning & improvements Issues encountered during Run 4 Other improvements and MD items Outlook:

More information

MULTI CHANNEL VOICE LOGGER MODEL PCVL - 4/8/10/16/32/64. ORIGINAL EQUIPMENT MANUFACTURER OF VOICE LOGGING SYSTEMS Radio and CTI Expert Organisation

MULTI CHANNEL VOICE LOGGER MODEL PCVL - 4/8/10/16/32/64. ORIGINAL EQUIPMENT MANUFACTURER OF VOICE LOGGING SYSTEMS Radio and CTI Expert Organisation MULTI CHANNEL VOICE LOGGER MODEL PCVL - 4/8/10/16/32/64 ORIGINAL EQUIPMENT MANUFACTURER OF VOICE LOGGING SYSTEMS Radio and CTI Expert Organisation Product Information PCVL is a PC based Multi-Channel

More information

Proposal by the Ohio State University High Energy Physics to join the BABAR Collaboration

Proposal by the Ohio State University High Energy Physics to join the BABAR Collaboration Proposal by the Ohio State University High Energy Physics to join the BABAR Collaboration Introduction: The Ohio State University high energy physics group consisting of Profs. Gan, Honscheid, Kagan, and

More information

Explorer Edition FUZZY LOGIC DEVELOPMENT TOOL FOR ST6

Explorer Edition FUZZY LOGIC DEVELOPMENT TOOL FOR ST6 fuzzytech ST6 Explorer Edition FUZZY LOGIC DEVELOPMENT TOOL FOR ST6 DESIGN: System: up to 4 inputs and one output Variables: up to 7 labels per input/output Rules: up to 125 rules ON-LINE OPTIMISATION:

More information

THE INTERNATIONAL REMOTE MONITORING PROJECT RESULTS OF THE SWEDISH NUCLEAR POWER FACILITY FIELD TRIAL

THE INTERNATIONAL REMOTE MONITORING PROJECT RESULTS OF THE SWEDISH NUCLEAR POWER FACILITY FIELD TRIAL L. 1 0 2 5 4 4 4 9 7545V8.C THE INTERNATIONAL REMOTE MONITORING PROJECT RESULTS OF THE SWEDISH NUCLEAR POWER FACILITY FIELD TRIAL C.S. Johnson Sandia National Laboratories Albuquerque, New Mexico USA OSTB

More information

PROJECT DESCRIPTION. Longitudinal phase space monitors for the ILC injectors and bunch compressors

PROJECT DESCRIPTION. Longitudinal phase space monitors for the ILC injectors and bunch compressors PROJECT DESCRIPTION Longitudinal phase space monitors for the ILC injectors and bunch compressors Personnel and Institution(s) requesting funding Philippe Piot Northern Illinois University Dept of Physics,

More information

Hardware Verification after Installation. D0 Run IIB L1Cal Technical Readiness Review. Presented by Dan Edmunds August 2005

Hardware Verification after Installation. D0 Run IIB L1Cal Technical Readiness Review. Presented by Dan Edmunds August 2005 Hardware Verification after Installation D0 Run IIB L1Cal Technical Readiness Review Presented by Dan Edmunds 26-27 August 2005 The purpose of this talk is to describe to the committee how various aspects

More information

WHAT IS THE FUTURE OF TAPE TECHNOLOGY FOR DATA STORAGE AND MANAGEMENT?

WHAT IS THE FUTURE OF TAPE TECHNOLOGY FOR DATA STORAGE AND MANAGEMENT? WHAT IS THE FUTURE OF TAPE TECHNOLOGY FOR DATA STORAGE AND MANAGEMENT? There is news in the field of tape storage: two new products will be launched in 2018 which will change tape technology s offer in

More information

BABAR AND THE HEP PANORAMA ON MATTERS OF DATA PRESERVATION

BABAR AND THE HEP PANORAMA ON MATTERS OF DATA PRESERVATION THE DEVELOPMENT AND USE OF PUBLIC DATA BASES: IT'S COMPLICATED! BABAR AND THE HEP PANORAMA ON MATTERS OF DATA PRESERVATION AND PUBLIC ACCESS Concetta Cartaro SLAC Progress on Statistical Issues in Searches

More information

Evaluation of Performance, Reliability, and Risk for High Peak Power RF Sources from S-band through X-band for Advanced Accelerator Applications

Evaluation of Performance, Reliability, and Risk for High Peak Power RF Sources from S-band through X-band for Advanced Accelerator Applications Evaluation of Performance, Reliability, and Risk for High Peak Power RF Sources from S-band through X-band for Advanced Accelerator Applications Michael V. Fazio C. Adolphsen, A. Jensen, C. Pearson, D.

More information

Development of Multiple Beam Guns for High Power RF Sources for Accelerators and Colliders

Development of Multiple Beam Guns for High Power RF Sources for Accelerators and Colliders SLAC-PUB-10704 Development of Multiple Beam Guns for High Power RF Sources for Accelerators and Colliders R. Lawrence Ives*, George Miram*, Anatoly Krasnykh @, Valentin Ivanov @, David Marsden*, Max Mizuhara*,

More information

HELICAL SCAN TECHNOLOGY: ADVANCEMENT BY DESIGN

HELICAL SCAN TECHNOLOGY: ADVANCEMENT BY DESIGN HELICAL SCAN TECHNOLOGY: ADVANCEMENT BY DESIGN By Curt Mulder And Kelly Scharf Exabyte Corporation THIC Conference Del Mar, CA 1/20/98 1685 38 th Street Boulder, CO 80301 +1-303-442-4333 +1-303-417-7080

More information

Essential EndNote X7.

Essential EndNote X7. Essential EndNote X7 IT www.york.ac.uk/it-services/training it-training@york.ac.uk Essential EndNote X7 EndNote X7 is a desktop application, and as such must be installed. All University of York classroom

More information

Commissioning of Accelerators. Dr. Marc Munoz (with the help of R. Miyamoto, C. Plostinar and M. Eshraqi)

Commissioning of Accelerators. Dr. Marc Munoz (with the help of R. Miyamoto, C. Plostinar and M. Eshraqi) Commissioning of Accelerators Dr. Marc Munoz (with the help of R. Miyamoto, C. Plostinar and M. Eshraqi) www.europeanspallationsource.se 6 July, 2017 Contents General points Definition of Commissioning

More information

COURSE TITLE: ARC-210 RT-1851(C) and 1851A(C) and Remote Control Unit C Level I (Operations and Flightline Maintenance)

COURSE TITLE: ARC-210 RT-1851(C) and 1851A(C) and Remote Control Unit C Level I (Operations and Flightline Maintenance) COURSE TITLE: ARC-210 RT-1851(C) and 1851A(C) and Remote Control Unit C-12561 Level I (Operations and Flightline Maintenance) EQUIPMENT TYPE: EQUIPMENT NOMENCLATURE PART NUMBER Receiver-Transmitter RT-1851(C)

More information

High Performance Raster Scan Displays

High Performance Raster Scan Displays High Performance Raster Scan Displays Item Type text; Proceedings Authors Fowler, Jon F. Publisher International Foundation for Telemetering Journal International Telemetering Conference Proceedings Rights

More information

PITZ Introduction to the Video System

PITZ Introduction to the Video System PITZ Introduction to the Video System Stefan Weiße DESY Zeuthen June 10, 2003 Agenda 1. Introduction to PITZ 2. Why a video system? 3. Schematic structure 4. Client/Server architecture 5. Hardware 6. Software

More information

Administrative issues. Sequential logic

Administrative issues. Sequential logic Administrative issues Midterm #1 will be given Tuesday, October 29, at 9:30am. The entire class period (75 minutes) will be used. Open book, open notes. DDPP sections: 2.1 2.6, 2.10 2.13, 3.1 3.4, 3.7,

More information

A Unique Power Supply for the PEP II Klystron at SLAC*

A Unique Power Supply for the PEP II Klystron at SLAC* I : SLAC-PUB-7591 July 1997 A Unique Power Supply for the PEP II Klystron at SLAC* R. Case1 and M. N. Nguyen Stanford Linear Accelerator Center Stanford University, Stanford, CA 94309 Presented at the

More information

Audiovisual archiving in Lithuanian Central State Archive

Audiovisual archiving in Lithuanian Central State Archive JOLĖ STIMBIRYTĖ The Head of the Documents Technical Control Division Lithuanian The biggest on within the state archival system and the only state archive where audiovisual documents are stored Started

More information

Success Providing Excellent Service in a Changing World of Digital Information Resources: Collection Services at McGill

Success Providing Excellent Service in a Changing World of Digital Information Resources: Collection Services at McGill Success Providing Excellent Service in a Changing World of Digital Information Resources: Collection Services at McGill Slide 1 There are many challenges in today's library environment to provide access

More information

PID summary J. Va vra

PID summary J. Va vra PID summary J. Va vra SuperB collaboration meeting in London, 2011 Speakers Barrel FDIRC - Jerry Va vra: Update on FDIRC prototype - Christophe Beigbeder: Barrel electronics status - Jerry Va vra: Comment

More information

Tender Notification for the procurement of a Scanning Electron Microscope" at IISc (Last Date for submission of tenders: 3 rd October 2018)

Tender Notification for the procurement of a Scanning Electron Microscope at IISc (Last Date for submission of tenders: 3 rd October 2018) Tender Notification for the procurement of a Scanning Electron Microscope" at IISc (Last Date for submission of tenders: 3 rd October 2018) Dear Sir/Madam, We are looking for a high-resolution scanning

More information

PEP II STATUS AND PLANS *

PEP II STATUS AND PLANS * PEP II STATUS AND PLANS * John T. Seeman + Stanford Linear Accelerator Center, Stanford University, Stanford, CA 94309 USA The PEP II B-Factory 1 project is an e + e - colliding beam storage ring complex

More information

Detailed Design Report

Detailed Design Report Detailed Design Report Chapter 4 MAX IV Injector 4.6. Acceleration MAX IV Facility CHAPTER 4.6. ACCELERATION 1(10) 4.6. Acceleration 4.6. Acceleration...2 4.6.1. RF Units... 2 4.6.2. Accelerator Units...

More information

OF THIS DOCUMENT IS W8.MTO ^ SF6

OF THIS DOCUMENT IS W8.MTO ^ SF6 fflgh PEAK POWER TEST OF S-BAND WAVEGUIDE SWITCHES A. Nassiri, A. Grelick, R. L. Kustom, and M. White CO/0 ^"^J} 5, t * y ^ * Advanced Photon Source, Argonne National Laboratory» \^SJ ^ ^ * **" 9700 South

More information

Local Trigger Electronics for the CMS Drift Tubes Muon Detector

Local Trigger Electronics for the CMS Drift Tubes Muon Detector Amsterdam, 1 October 2003 Local Trigger Electronics for the CMS Drift Tubes Muon Detector Presented by R.Travaglini INFN-Bologna Italy CMS Drift Tubes Muon Detector CMS Barrel: 5 wheels Wheel : Azimuthal

More information

BABAR IFR TDC Board (ITB): requirements and system description

BABAR IFR TDC Board (ITB): requirements and system description BABAR IFR TDC Board (ITB): requirements and system description Version 1.1 November 1997 G. Crosetti, S. Minutoli, E. Robutti I.N.F.N. Genova 1. Timing measurement with the IFR Accurate track reconstruction

More information

MULTI CHANNEL VOICE LOGGER MODEL: DVR MK I

MULTI CHANNEL VOICE LOGGER MODEL: DVR MK I MULTI CHANNEL VOICE LOGGER MODEL: DVR MK I ORIGINAL EQUIPMENT MANUFACTURER OF VOICE LOGGING SYSTEMS Radio and CTI Expert Organisation Works: C-2 Industrial Estate, Ramnagar, Roorkee (UA) 247667, India

More information

Library s WebOPAC (

Library s WebOPAC ( Library s WebOPAC (http://10.116.2.6:8080/webopac/html/searchform) Library s Web OPAC (Online Public Access Catalogue) facilitates browse and search of database of books available in the Central Library,

More information

Europeana Foundation Governing Board Meeting

Europeana Foundation Governing Board Meeting Paper 9A Public Europeana Foundation Governing Board Meeting 16 November 2016 16h30 18h00 CET Teleconference Call Content Report Action proposed: For information and Q&A Circulation: Europeana Foundation

More information

Defense Technical Information Center Compilation Part Notice

Defense Technical Information Center Compilation Part Notice UNCLASSIFIED Defense Technical Information Center Compilation Part Notice ADPO1 1739 TITLE: Modelling of Micromachined Klystrons for Terahertz Operation DISTRIBUTION: Approved for public release, distribution

More information

MULTI-BUNCH INSTABILITY DIAGNOSTICS VIA DIGITAL FEEDBACK SYSTEMS AT PEP-II, DAæNE, ALS and SPEAR

MULTI-BUNCH INSTABILITY DIAGNOSTICS VIA DIGITAL FEEDBACK SYSTEMS AT PEP-II, DAæNE, ALS and SPEAR MULTI-BUNCH INSTABILITY DIAGNOSTICS VIA DIGITAL FEEDBACK SYSTEMS AT PEP-II, DAæNE, ALS and SPEAR J. Fox æ R. Larsen, S. Prabhakar, D. Teytelman, A. Young, SLAC y A. Drago, M. Serio, INFN Frascati; W. Barry,

More information

Dead Links? No Problem. We re In This Together

Dead Links? No Problem. We re In This Together University of Kentucky UKnowledge Library Presentations University of Kentucky Libraries 5-30-2014 Dead Links? No Problem. We re In This Together Kathryn Lybarger University of Kentucky, kathryn.lybarger@uky.edu

More information

Monolithic Thin Pixel Upgrade Testing Update. Gary S. Varner, Marlon Barbero and Fang Fang UH Belle Meeting, April 16 th 2004

Monolithic Thin Pixel Upgrade Testing Update. Gary S. Varner, Marlon Barbero and Fang Fang UH Belle Meeting, April 16 th 2004 Monolithic Thin Pixel Upgrade Testing Update Gary S. Varner, Marlon Barbero and Fang Fang UH Belle Meeting, April 16 th 2004 Basic Technology: Standard CMOS CMOS Camera Because of large Capacitance, need

More information

Excel recommends Fluke Networks, this section is written around the use of this range of test equipment.

Excel recommends Fluke Networks, this section is written around the use of this range of test equipment. Testing Excel recommends Fluke Networks, this section is written around the use of this range of test equipment. Twisted Pair Copper This section describes and sets out the requirements for Class D (Cat

More information

RedRat Control User Guide

RedRat Control User Guide RedRat Control User Guide Chris Dodge RedRat Ltd April 2014 For RedRat Control V3.16 1 Contents 1. Introduction 3 2. Prerequisites and Installation 3 3. The First Step Capture of Remote Control Signals

More information

PEP-II Status and Outlook

PEP-II Status and Outlook PEP-II Status and Outlook H.-U. Wienands, M.E. Biagini, F.-J. Decker, M.H. Donald, S. Ecklund, A. Fisher, R.L. Holtzapple, R.H. Iverson, P. Krejcik, A.V. Kulikov, T. Meyer, J. Nelson, A. Novokhatski, I.

More information

Electronic Journals and Electronic Publishing at CERN: A Case Study

Electronic Journals and Electronic Publishing at CERN: A Case Study Electronic Journals and Electronic Publishing at CERN: A Case Study David Dallman Senior Scientific Information Officer, CERN (European Organization for Nuclear Research), Scientific Information Service,

More information

Setup Guide. Flanders Scientific BoxIO. Rev. 1.1

Setup Guide. Flanders Scientific BoxIO. Rev. 1.1 Setup Guide Flanders Scientific BoxIO Rev. 1.1 Introduction CalMAN Required Version CalMAN takes advantage of the features of the Flanders Scientific BoxIO advanced color management device to calibrate

More information

NTSC/PAL. Network Interface Board for MPEG IMX TM. VTRs BKMW-E2000 TM

NTSC/PAL. Network Interface Board for MPEG IMX TM. VTRs BKMW-E2000 TM NTSC/PAL Network Interface Board for MPEG IMX TM VTRs BKMW-E2000 TM A bridge between two worlds merging tape-based recording into an asynchronous network environment Rapid progress in IP-based network

More information

WORLD LIBRARY AND INFORMATION CONGRESS: 75TH IFLA GENERAL CONFERENCE AND COUNCIL

WORLD LIBRARY AND INFORMATION CONGRESS: 75TH IFLA GENERAL CONFERENCE AND COUNCIL Date submitted: 29/05/2009 The Italian National Library Service (SBN): a cooperative library service infrastructure and the Bibliographic Control Gabriella Contardi Instituto Centrale per il Catalogo Unico

More information

Concept and operation of the high resolution gaseous micro-pixel detector Gossip

Concept and operation of the high resolution gaseous micro-pixel detector Gossip Concept and operation of the high resolution gaseous micro-pixel detector Gossip Yevgen Bilevych 1,Victor Blanco Carballo 1, Maarten van Dijk 1, Martin Fransen 1, Harry van der Graaf 1, Fred Hartjes 1,

More information

Pros and cons of direct e - detection with an integrating camera

Pros and cons of direct e - detection with an integrating camera Pros and cons of direct e - detection with an integrating camera Warts and all Scott Stagg Associate Professor Florida State University Outline Comparison of integrating vs counting detectors Potential

More information

High Density Digital Recorder Application Study-The AN/BQH-9(V)1 Program

High Density Digital Recorder Application Study-The AN/BQH-9(V)1 Program High Density Digital Recorder Application Study-The AN/BQH-9(V)1 Program THIC Conference October 13, 14, 1998 CARDEROCK DIVISION NAVAL SURFACE WARFARE CENTER Prepared by John Jester DDL OMNI Engineering

More information