TRT Software Activities

Size: px
Start display at page:

Download "TRT Software Activities"

Transcription

1 TRT Software Activities - 08/14/2009 SPLASH EVENT IN THE TRT I will mainly focus on the activities where the Duke group is more directly involved 1

2 TRT SW Offline Duke Group heavily involved in several aspects of the TRT Offline since the end of TRT construction/assembly (about 2006) The TRT Offline encompasses a wide range of activities Bytestream converter Rt and T0 calibration Alignment Monitoring and Run Time Tester (RTT) Simulation and Digitalization Conditions and Database Data/MC Validation Trigger... 2

3 TRT SW Offline Duke Group heavily involved in several aspects of the TRT Offline since the end of TRT construction/assembly (about 2006) The TRT Offline encompasses a wide range of activities Bytestream converter Rt and T0 calibration (Bocci, NBI, Penn) Alignment (Bocci, Kruse, Penn) Monitoring and Run Time Tester (RTT) (Klinkby,Benjamin, Penn, Yale) Simulation and Digitalization (Klinkby, NBI) Conditions and Database (Bocci, Klinkby, Indiana) Data/MC Validation (Duke, All) Trigger Duke Group Direct Involvement... 3

4 TRT SW Offline The TRT Offline encompasses a wide range of activities Bytestream converter Rt and T0 calibration Alignment Monitoring and Run Time Tester (RTT) Simulation and Digitalization Conditions and Database Data/MC Validation Trigger Other tasks for the Coordinator and the Deputy Supervision of all the activities Provide adequate coverage of all critical area Prioritization of the work Coordination with the ID (ATLAS) SW Management of the code/releases/tags etc.. 4

5 TRT SW Offline The TRT Offline encompasses a wide range of activities Bytestream converter Rt and T0 calibration Alignment Monitoring and Run Time Tester (RTT) Simulation and Digitalization Conditions and Database Data/MC Validation Trigger Here I will focus only on activities correlated with the TRT commissioning In the last two years ATLAS engaged in a rapid transition from a set of semiindependent sub-detectors to global combined experiment We had to because we were told to be ready for data by Sep. 2008!! Duke group has been a major player to make this transition successful 5

6 Commissioning in SR1 Commissioning started just after the assembly in surface, in building SR1 Cosmics triggered by scintillators 6

7 Commissioning in SR1 Commissioning started just after the assembly in surface, in building SR1 Cosmics triggered by scintillators First Performance Analysis with Built Detector Duke (Bocci, Kruse, student) active on studies of efficiency, noise cross talk, alignment, module deformation 7

8 Efficiency with SR1 See Esben talk for more on efficiency 2 mm ~ 0% (noise) ~ 97% less 8

9 Efficiency with SR1 2 mm ~ 0% (noise) ~ 97% less 9

10 Cross-talk in SR1 Cosmics Data MC Cross-talk (correlated noise) from straws belonging to the same HV pad 10

11 Cross-talk in SR1 Cosmics Data MC Cross-talk (correlated noise) from straws belonging to the same HV pad Similar work on new cosmics data ongoing (Klinkby and CERN summer student) It will be revisited with collision data for electrons for which higher cross-talk is expected 11

12 Alignment with SR1 data and beyond TRT alignment framework started to be built for the SR1 data taking One of the major Duke contribution to offline (AB co-author of the code) Subsequently expanded to full barrel, endcap, collision data and entire ID First measurement of the misalignment between the SCT and TRT (Level 1) L1 TRT (w.r.t Silicon) 12

13 Alignment with SR1 data and beyond TRT alignment framework started to be built for the SR1 data taking Subsequently expanded to full barrel, endcap, collision data and entire ID One of the major Duke contribution to offline (AB co-author of the code) First measurement of the misalignment between the SCT and TRT (Level 1) TRT Aligned by module (Level 2) First study for deformation with SR1 data 13

14 Commissioning with Milestone Cosmics Runs Once in the pit the TRT commissioned as long as the RODs integration proceeded Dec M4 14

15 Commissioning with Milestone Cosmics Runs Once in the pit the TRT commissioned as long as the RODs integration proceeded Mar M6 15

16 Commissioning with Milestone Cosmics Runs Once in the pit the TRT commissioned as long as the RODs integration proceeded Aug M8 16

17 Commissioning with Milestone Cosmics Runs Once in the pit the TRT commissioned as long as the RODs integration proceeded Mar M6 17

18 Commissioning with Milestone Cosmics Runs Once in the pit the TRT commissioned as long as the RODs integration proceeded Mar M6 Alignment constants from M6 runs was taken as baseline for the first collision data in Sep (sic!) 18

19 Alignment with CSC MC Physics events were simulated with a misaligned geometry to emulate an as built detector. For the alignment group the challenge was to restore the perfect geometry 19

20 Alignment with CSC MC Physics events were simulated with a misaligned geometry to emulate an as built detector. For the alignment group the challenge was to restore the perfect geometry Movement of the order of order of mm (mainly radial) Before alignment 20

21 Alignment with CSC MC Physics events were simulated with a misaligned geometry to emulate an as built detector. For the alignment group the challenge was to restore the perfect geometry Very challenging but huge improvement in the development of alignment techniques Movement of the order of order of mm (mainly radial) Before alignment After alignment 21

22 Alignment with FDR Final Dress Rehearsal exercised the software of the complete ATLAS data taking chain, from the trigger sub farm output (SFO) to the physics analysis at Tier 2 22

23 Alignment with FDR Final Dress Rehearsal exercised the software of the complete ATLAS data taking chain, from the trigger sub farm output (SFO) to the physics analysis at Tier 2 For the alignment (and calibration) it meant to exercise the 24 hours operation scheme 23

24 Alignment with FDR For the alignment (and calibration) it meant to exercise the 24 hours operation scheme 3 days of data taking with event simulated with the CSC geometry 24

25 Alignment with FDR For the alignment (and calibration) it meant to exercise the 24 hours operation scheme 3 days of data taking with event simulated with the CSC geometry Bocci coordinated the Inner Detector alignment and the TRT calibration part 25

26 Condition Database We (Bocci, Klinkby) involved also in the definition and maintenance of the condition database that includes, besides alignment and calibration constants, dead/hot straw list Conditions are determined in the 24-hour scheme before the data are sent to Tiers 1 26

27 Condition Database We (Bocci, Klinkby) involved also in the definition and maintenance of the condition database that includes, besides alignment and calibration constants, dead/hot straw list Conditions are determined in the 24-hour scheme before the data are sent to Tier 1's Permanently dead (unrecoverable) straws are kept separated to be masked also in simulation 27

28 Combined Cosmic Runs After Sep 19 accident, ATLAS undertook two major combined data taken periods 2009 Runs 2008 Runs First time with solenoid ON and Xe gas mixture for the TRT 28

29 Combined Cosmic Runs After Sep 19 accident, ATLAS undertook two major combined data taken periods 29

30 Cosmic Runs 30

31 Conclusions Duke group involvement in the offline operation of the TRT has been very strong from the beginning Leadership roles in recognition of our expertise 31

32 Conclusions Duke group involvement in the offline operation of the TRT has been very strong from the beginning Leadership roles in recognition of our expertise TRT offline is in excellent shape to cope with the challenge of an efficient data taking under the very demanding LHC conditions Still a lot to understand on the performance though 32

33 Conclusions Duke group involvement in the offline operation of the TRT has been very strong from the beginning TRT offline is in excellent shape to cope with the challenge of an efficient data taking under the very demanding LHC conditions Leadership roles in recognition of our expertise Still a lot to understand on the performance though We plan to continue to play an important role for the TRT commissioning with collision data Continuous operation, high data volume, commission/performance with electrons, etc... 33

34 Conclusions Duke group involvement in the offline operation of the TRT has been very strong from the beginning TRT offline is in excellent shape to cope with the challenge of an efficient data taking under the very demanding LHC conditions Still a lot to understand on the performance though We plan to continue to play an important role for the TRT commissioning with collision data Leadership roles in recognition of our expertise Continuous operation, high data volume, commission/performance with electrons, etc... Our expertise with the TRT detector may be exploited to study physics signature where the TRT can provide extra discriminating power Double charged particle search (TR goes as q4 ) SUSY particle with low β (slow particle leaves longer signal in TRT) 34

35 First Observation of Electrons 35

36 Backup 36

37 Residuals RESIDUAL: Distance between the measured and the extrapolated hit from the track fit Misalignment of a detector element translates in a systematic shift of the residual mean distribution This is what the alignment business is: Minimize: 37

38 First Elecrons 38

39 Residual Is Not All Except for big structure misalignment (L1), residuals does not change so much This is an example of TRT L2 alignment YES IT IS!! 39

40 Weak Modes Weak Modes: Detector configurations that are poorly constrained by tracks Alignment errors (stat. and/or syst.) not negligible w.r.t intrinsic resolution Consequences: poor convergence, biases, etc.. How we identify them? How we deal with them? How will affect the physics? This is the real alignment problem (Don't expect it to be solved anytime soon...) Step 1: Recognize the enemy 40

41 Weak Modes (2) Step 2: Assess the damages Created four global systematic ID misaligned geometry and align them 41

42 Weak Modes (2) Step 2: Assess the damages See the effects on physics after the alignment (if converged) Example: Curl Mode Momentum Bias After Alignment (Blue) 42

43 First Data Misalignment (and its impact on physics) How much the (residual) misalignment will affect my analysis at the beginning? Of course we cannot answer this question before looking at collision data But we can make a educated guess using the cosmics experience Method: introduce random misalignment to match the residuals width with cosmics Assumption 1: Sensitivity of collision data same as of cosmics (conservative) Assumption 2: Only random displacement (optimistic) Two set of constants: Day 1 and Day

44 First Data Misalignment (and its impact on physics) Impact on Z reconstruction 44

TRT Alignment. John Alison Aart Heijboer Joel Heinrich Joe Kroll. Outline: What we're trying to do. How we're doing it. Results. Plans for the future.

TRT Alignment. John Alison Aart Heijboer Joel Heinrich Joe Kroll. Outline: What we're trying to do. How we're doing it. Results. Plans for the future. Outline: What we're trying to do. How we're doing it. Results. Plans for the future. TRT Alignment John Alison Aart Heijboer Joel Heinrich Joe Kroll 1 Why is alignment a problem? Detector positions used

More information

Commissioning of the ATLAS Transition Radiation Tracker (TRT)

Commissioning of the ATLAS Transition Radiation Tracker (TRT) Commissioning of the ATLAS Transition Radiation Tracker (TRT) 11 th Topical Seminar on Innovative Particle and Radiation Detector (IPRD08) 3 October 2008 bocci@fnal.gov On behalf of the ATLAS TRT community

More information

Commissioning of the Transition Radiation Tracker

Commissioning of the Transition Radiation Tracker Commissioning of the Transition Radiation Tracker Second ATLAS Physics Workshop of the Americas Simon Fraser University 17 June 2008 Evelyn Thomson University of Pennsylvania on behalf of Brig Williams,

More information

Commissioning and Performance of the ATLAS Transition Radiation Tracker with High Energy Collisions at LHC

Commissioning and Performance of the ATLAS Transition Radiation Tracker with High Energy Collisions at LHC Commissioning and Performance of the ATLAS Transition Radiation Tracker with High Energy Collisions at LHC 1 A L E J A N D R O A L O N S O L U N D U N I V E R S I T Y O N B E H A L F O F T H E A T L A

More information

arxiv:hep-ex/ v1 27 Nov 2003

arxiv:hep-ex/ v1 27 Nov 2003 arxiv:hep-ex/0311058v1 27 Nov 2003 THE ATLAS TRANSITION RADIATION TRACKER V. A. MITSOU European Laboratory for Particle Physics (CERN), EP Division, CH-1211 Geneva 23, Switzerland E-mail: Vasiliki.Mitsou@cern.ch

More information

First LHC Beams in ATLAS. Peter Krieger University of Toronto On behalf of the ATLAS Collaboration

First LHC Beams in ATLAS. Peter Krieger University of Toronto On behalf of the ATLAS Collaboration First LHC Beams in ATLAS Peter Krieger University of Toronto On behalf of the ATLAS Collaboration Cutaway View LHC/ATLAS (Graphic) P. Krieger, University of Toronto Aspen Winter Conference, Feb. 2009 2

More information

Study of the Clocking Effect in the TRT Alignment

Study of the Clocking Effect in the TRT Alignment Draft version 2. Study of the Clocking Effect in the TRT Alignment John Alison Aart Heijboer Joel Heinrich Joe Kroll University of Pennsylvania Andrea Bocci Duke University April 15, 28 Abstract This paper

More information

Data Quality Monitoring in the ATLAS Inner Detector

Data Quality Monitoring in the ATLAS Inner Detector On behalf of the ATLAS collaboration Cavendish Laboratory, University of Cambridge E-mail: white@hep.phy.cam.ac.uk This article describes the data quality monitoring systems of the ATLAS inner detector.

More information

SCT Activities. Nick Bedford, Mateusz Dyndal, Alexander Madsen, Edoardo Rossi, Christian Sander. DESY ATLAS Weekly Meeting 03. Jun.

SCT Activities. Nick Bedford, Mateusz Dyndal, Alexander Madsen, Edoardo Rossi, Christian Sander. DESY ATLAS Weekly Meeting 03. Jun. SCT Activities Nick Bedford, Mateusz Dyndal, Alexander Madsen, Edoardo Rossi, Christian Sander DESY ATLAS Weekly Meeting 03. Jun. 2016 1 Semi-Conductor Tracker Barrel 4 Layers 2112 identical modules Endcaps

More information

IPRD06 October 2nd, G. Cerminara on behalf of the CMS collaboration University and INFN Torino

IPRD06 October 2nd, G. Cerminara on behalf of the CMS collaboration University and INFN Torino IPRD06 October 2nd, 2006 The Drift Tube System of the CMS Experiment on behalf of the CMS collaboration University and INFN Torino Overview The CMS muon spectrometer and the Drift Tube (DT) system the

More information

The ATLAS Tile Calorimeter, its performance with pp collisions and its upgrades for high luminosity LHC

The ATLAS Tile Calorimeter, its performance with pp collisions and its upgrades for high luminosity LHC The ATLAS Tile Calorimeter, its performance with pp collisions and its upgrades for high luminosity LHC Tomas Davidek (Charles University), on behalf of the ATLAS Collaboration Tile Calorimeter Sampling

More information

Review of the CMS muon detector system

Review of the CMS muon detector system 1 Review of the CMS muon detector system E. Torassa a a INFN sez. di Padova, Via Marzolo 8, 35131 Padova, Italy The muon detector system of CMS consists of 3 sub detectors, the barrel drift tube chambers

More information

The Status of the ATLAS Inner Detector

The Status of the ATLAS Inner Detector The Status of the ATLAS Inner Detector Introduction Hans-Günther Moser for the ATLAS Collaboration Outline Tracking in ATLAS ATLAS ID Pixel detector Silicon Tracker Transition Radiation Tracker System

More information

The Silicon Pixel Detector (SPD) for the ALICE Experiment

The Silicon Pixel Detector (SPD) for the ALICE Experiment The Silicon Pixel Detector (SPD) for the ALICE Experiment V. Manzari/INFN Bari, Italy for the SPD Project in the ALICE Experiment INFN and Università Bari, Comenius University Bratislava, INFN and Università

More information

THE ATLAS Inner Detector [2] is designed for precision

THE ATLAS Inner Detector [2] is designed for precision The ATLAS Pixel Detector Fabian Hügging on behalf of the ATLAS Pixel Collaboration [1] arxiv:physics/412138v1 [physics.ins-det] 21 Dec 4 Abstract The ATLAS Pixel Detector is the innermost layer of the

More information

ATLAS Pixel Subsystem and Simulation

ATLAS Pixel Subsystem and Simulation ATLAS Pixel Subsystem and Simulation Charles Young On behalf of the SLAC ATLAS Team Annual DOE HEP Program Review (June 2007) 6/13/07 C. Young (Pixels and Simulation in ATLAS) 1 The Pixel Subsystem Basic

More information

R&D on high performance RPC for the ATLAS Phase-II upgrade

R&D on high performance RPC for the ATLAS Phase-II upgrade R&D on high performance RPC for the ATLAS Phase-II upgrade Yongjie Sun State Key Laboratory of Particle detection and electronics Department of Modern Physics, USTC outline ATLAS Phase-II Muon Spectrometer

More information

Progress on the development of a detector mounted analog and digital readout system

Progress on the development of a detector mounted analog and digital readout system Progress on the development of a detector mounted analog and digital readout system for the ATLAS TRT Curt Baxter, Thurston Chandler, Nandor Dressnandt, Colin Gay, Bjorn Lundberg, Antoni Munar, Godwin

More information

The ATLAS Pixel Detector

The ATLAS Pixel Detector The ATLAS Pixel Detector Fabian Hügging arxiv:physics/0412138v2 [physics.ins-det] 5 Aug 5 Abstract The ATLAS Pixel Detector is the innermost layer of the ATLAS tracking system and will contribute significantly

More information

Progress Update FDC Prototype Test Stand Development Upcoming Work

Progress Update FDC Prototype Test Stand Development Upcoming Work Progress Update FDC Prototype Test Stand Development Upcoming Work Progress Update OU GlueX postdoc position filled. Simon Taylor joins our group July 1, 2004 Position funded jointly by Ohio University

More information

LHC Physics GRS PY 898 B8. Trigger Menus, Detector Commissioning

LHC Physics GRS PY 898 B8. Trigger Menus, Detector Commissioning LHC Physics GRS PY 898 B8 Lecture #5 Tulika Bose Trigger Menus, Detector Commissioning Trigger Menus Need to address the following questions: What to save permanently on mass storage? Which trigger streams

More information

Scintillation Tile Hodoscope for the PANDA Barrel Time-Of-Flight Detector

Scintillation Tile Hodoscope for the PANDA Barrel Time-Of-Flight Detector Scintillation Tile Hodoscope for the PANDA Barrel Time-Of-Flight Detector William Nalti, Ken Suzuki, Stefan-Meyer-Institut, ÖAW on behalf of the PANDA/Barrel-TOF(SciTil) group 12.06.2018, ICASiPM2018 1

More information

arxiv: v1 [physics.ins-det] 1 Nov 2015

arxiv: v1 [physics.ins-det] 1 Nov 2015 DPF2015-288 November 3, 2015 The CMS Beam Halo Monitor Detector System arxiv:1511.00264v1 [physics.ins-det] 1 Nov 2015 Kelly Stifter On behalf of the CMS collaboration University of Minnesota, Minneapolis,

More information

Compact Muon Solenoid Detector (CMS) & The Token Bit Manager (TBM) Alex Armstrong & Wyatt Behn Mentor: Dr. Andrew Ivanov

Compact Muon Solenoid Detector (CMS) & The Token Bit Manager (TBM) Alex Armstrong & Wyatt Behn Mentor: Dr. Andrew Ivanov Compact Muon Solenoid Detector (CMS) & The Token Bit Manager (TBM) Alex Armstrong & Wyatt Behn Mentor: Dr. Andrew Ivanov Part 1: The TBM and CMS Understanding how the LHC and the CMS detector work as a

More information

CMS Note Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland

CMS Note Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland Available on CMS information server CMS NOTE 1999/012 The Compact Muon Solenoid Experiment CMS Note Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland February 23, 1999 Assembly and operation of

More information

Mechanical Considerations in the Outer Tracker and VXD. Bill Cooper Fermilab

Mechanical Considerations in the Outer Tracker and VXD. Bill Cooper Fermilab Mechanical Considerations in the Outer Tracker and VXD Fermilab August 23, 2005 1 Overview I ll describe developments since the SLAC workshop in mechanical design efforts at Fermilab related to SiD tracking.

More information

The CMS Detector Status and Prospects

The CMS Detector Status and Prospects The CMS Detector Status and Prospects Jeremiah Mans On behalf of the CMS Collaboration APS April Meeting --- A Compact Muon Soloniod Philosophy: At the core of the CMS detector sits a large superconducting

More information

Drift Tubes as Muon Detectors for ILC

Drift Tubes as Muon Detectors for ILC Drift Tubes as Muon Detectors for ILC Dmitri Denisov Fermilab Major specifications for muon detectors D0 muon system tracking detectors Advantages and disadvantages of drift chambers as muon detectors

More information

An extreme high resolution Timing Counter for the MEG Upgrade

An extreme high resolution Timing Counter for the MEG Upgrade An extreme high resolution Timing Counter for the MEG Upgrade M. De Gerone INFN Genova on behalf of the MEG collaboration 13th Topical Seminar on Innovative Particle and Radiation Detectors Siena, Oct.

More information

SciFi A Large Scintillating Fibre Tracker for LHCb

SciFi A Large Scintillating Fibre Tracker for LHCb SciFi A Large Scintillating Fibre Tracker for LHCb Roman Greim on behalf of the LHCb-SciFi-Collaboration 14th Topical Seminar on Innovative Particle Radiation Detectors, Siena 5th October 2016 I. Physikalisches

More information

Status of CMS and preparations for first physics

Status of CMS and preparations for first physics Status of CMS and preparations for first physics A. H. Ball (for the CMS collaboration) PH Department, CERN, Geneva, CH1211 Geneva 23, Switzerland The status of the CMS experiment is described. After a

More information

A pixel chip for tracking in ALICE and particle identification in LHCb

A pixel chip for tracking in ALICE and particle identification in LHCb A pixel chip for tracking in ALICE and particle identification in LHCb K.Wyllie 1), M.Burns 1), M.Campbell 1), E.Cantatore 1), V.Cencelli 2) R.Dinapoli 3), F.Formenti 1), T.Grassi 1), E.Heijne 1), P.Jarron

More information

TTC Interface Module for ATLAS Read-Out Electronics: Final production version based on Xilinx FPGA devices

TTC Interface Module for ATLAS Read-Out Electronics: Final production version based on Xilinx FPGA devices Physics & Astronomy HEP Electronics TTC Interface Module for ATLAS Read-Out Electronics: Final production version based on Xilinx FPGA devices LECC 2004 Matthew Warren warren@hep.ucl.ac.uk Jon Butterworth,

More information

CGEM-IT project update

CGEM-IT project update BESIII Physics and Software Workshop Beihang University February 20-23, 2014 CGEM-IT project update Gianluigi Cibinetto (INFN Ferrara) on behalf of the CGEM group Outline Introduction Mechanical development

More information

A new Scintillating Fibre Tracker for LHCb experiment

A new Scintillating Fibre Tracker for LHCb experiment A new Scintillating Fibre Tracker for LHCb experiment Alexander Malinin, NRC Kurchatov Institute on behalf of the LHCb-SciFi-Collaboration Instrumentation for Colliding Beam Physics BINP, Novosibirsk,

More information

ATLAS Raw Data Reading and TRT Low Threshold Optimization

ATLAS Raw Data Reading and TRT Low Threshold Optimization ATLAS Raw Data Reading and TRT Low Threshold Optimization Ryan D. Reece University of Pennsylvania Penn Meeting at CERN July 3, 2007 Ryan D. Reece (U. Penn) Raw Data and TRT Thresholds ryan.reece@gmail.com

More information

Tracking Detector R&D at Cornell University and Purdue University

Tracking Detector R&D at Cornell University and Purdue University Tracking Detector R&D at Cornell University and Purdue University We have requested funding for this research from NSF through UCLC. Information available at the web site: * this presentation Cornell University

More information

US CMS Endcap Muon. Regional CSC Trigger System WBS 3.1.1

US CMS Endcap Muon. Regional CSC Trigger System WBS 3.1.1 WBS Dictionary/Basis of Estimate Documentation US CMS Endcap Muon Regional CSC Trigger System WBS 3.1.1-1- 1. INTRODUCTION 1.1 The CMS Muon Trigger System The CMS trigger and data acquisition system is

More information

A fast and precise COME & KISS* QDC and TDC for diamond detectors and further applications

A fast and precise COME & KISS* QDC and TDC for diamond detectors and further applications A fast and precise COME & KISS* QDC and TDC for diamond detectors and further applications 3 rd ADAMAS Collaboration Meeting (2014) Trento, Italy *use commercial elements and keep it small & simple + +

More information

The hybrid photon detectors for the LHCb-RICH counters

The hybrid photon detectors for the LHCb-RICH counters 7 th International Conference on Advanced Technology and Particle Physics The hybrid photon detectors for the LHCb-RICH counters Maria Girone, CERN and Imperial College on behalf of the LHCb-RICH group

More information

ILC Detector Work. Dan Peterson

ILC Detector Work. Dan Peterson ILC Detector Work Dan Peterson ** Cornell/Purdue TPC development program Large Detector Concept TPC Detector Response Simulation and Track Reconstruction World Wide Study Detector R&D Panel This project

More information

Report from the Tracking and Vertexing Group:

Report from the Tracking and Vertexing Group: Report from the Tracking and Vertexing Group: October 10, 2016 Sally Seidel, Petra Merkel, Maurice Garcia- Sciveres Structure of parallel session n Silicon Sensor Fabrication on 8 wafers (Ron Lipton) n

More information

CMS Upgrade Activities

CMS Upgrade Activities CMS Upgrade Activities G. Eckerlin DESY WA, 1. Feb. 2011 CMS @ LHC CMS Upgrade Phase I CMS Upgrade Phase II Infrastructure Conclusion DESY-WA, 1. Feb. 2011 G. Eckerlin 1 The CMS Experiments at the LHC

More information

Sensors for the CMS High Granularity Calorimeter

Sensors for the CMS High Granularity Calorimeter Sensors for the CMS High Granularity Calorimeter Andreas Alexander Maier (CERN) on behalf of the CMS Collaboration Wed, March 1, 2017 The CMS HGCAL project ECAL Answer to HL-LHC challenges: Pile-up: up

More information

TRANSITION RADIATION TRACKER FOR ATLAS PROJECT

TRANSITION RADIATION TRACKER FOR ATLAS PROJECT TRANSITION RADIATION TRACKER FOR ATLAS PROJECT O.L. Fedin, E.G. Danilevich, A.E. Khristachev, L.G. Kudin, S.N. Kovalenko, V.P. Maleev, A.V. Nadtochy, S.K. Patrichev, Yu.F. Ryabov, D.M. Seliverstov, V.A.

More information

CONTENTS. Troubleshooting 1

CONTENTS. Troubleshooting 1 CONTENTS Introduction...3 Troubleshooting Techniques...3 Preparation...3 Knowledge...3 Tools...4 Spare Parts...4 Backups...4 Troubleshooting Steps...5 Step 1: Identify the Specific Symptoms:...5 Step 2:

More information

Glast beam test at CERN

Glast beam test at CERN Glast beam test at CERN Glast Collaboration Meeting 2005 R. Bellazzini 1 LAT beam test at CERN Main goals LAT-TD-02152, see Steve slides Required beam types and related measurements 1. tagged-photon beam

More information

The ATLAS Beam Conditions and Beam Loss Monitors

The ATLAS Beam Conditions and Beam Loss Monitors RD09 9th International Conference on Large Scale Applications and Radiation Hardness of Semiconductor Detectors The ATLAS Beam Conditions and Beam Loss Monitors Boštjan Maček J. Stefan Institute, Ljubljana

More information

Test beam data analysis for the CMS CASTOR calorimeter at the LHC

Test beam data analysis for the CMS CASTOR calorimeter at the LHC 1/ 24 DESY Summerstudent programme 2008 - Course review Test beam data analysis for the CMS CASTOR calorimeter at the LHC Agni Bethani a, Andrea Knue b a Technical University of Athens b Georg-August University

More information

Trigger Menus and Rates

Trigger Menus and Rates Trigger Menus and Rates Trigger Menu Development Group: Leonard Apanasevich, Anne Fleur Barfuss, Pedram Bargassa, Eric Conte, Sivia Goy Lopez, Jonathan J. Hollar, Chi Nhan Nguyen CMS Physics Week May 13th,

More information

Test Beam Wrap-Up. Darin Acosta

Test Beam Wrap-Up. Darin Acosta Test Beam Wrap-Up Darin Acosta Agenda Darin/UF: General recap of runs taken, tests performed, Track-Finder issues Martin/UCLA: Summary of RAT and RPC tests, and experience with TMB2004 Stan(or Jason or

More information

THE TIMING COUNTER OF THE MEG EXPERIMENT: DESIGN AND COMMISSIONING (OR HOW TO BUILD YOUR OWN HIGH TIMING RESOLUTION DETECTOR )

THE TIMING COUNTER OF THE MEG EXPERIMENT: DESIGN AND COMMISSIONING (OR HOW TO BUILD YOUR OWN HIGH TIMING RESOLUTION DETECTOR ) THE TIMING COUNTER OF THE MEG EXPERIMENT: DESIGN AND COMMISSIONING (OR HOW TO BUILD YOUR OWN HIGH TIMING RESOLUTION DETECTOR ) S. DUSSONI FRONTIER DETECTOR FOR FRONTIER PHYSICS - LA BIODOLA 2009 Fastest

More information

LHC Beam Instrumentation Further Discussion

LHC Beam Instrumentation Further Discussion LHC Beam Instrumentation Further Discussion LHC Machine Advisory Committee 9 th December 2005 Rhodri Jones (CERN AB/BDI) Possible Discussion Topics Open Questions Tune measurement base band tune & 50Hz

More information

Diamond detectors in the CMS BCM1F

Diamond detectors in the CMS BCM1F Diamond detectors in the CMS BCM1F DESY (Zeuthen) CARAT 2010 GSI, 13-15 December 2010 On behalf of the DESY BCM and CMS BRM groups 1 Outline: 1. Introduction to the CMS BRM 2. BCM1F: - Back-End Hardware

More information

University of Oxford Department of Physics. Interim Report

University of Oxford Department of Physics. Interim Report University of Oxford Department of Physics Interim Report Project Name: Project Code: Group: Version: Atlas Binary Chip (ABC ) NP-ATL-ROD-ABCDEC1 ATLAS DRAFT Date: 04 February 1998 Distribution List: A.

More information

Study of the Z resolution with Fit Method for Micromegas TPC

Study of the Z resolution with Fit Method for Micromegas TPC Study of the Z resolution with Fit Method for Micromegas TPC David Attié, Deb Bhattacharya, Paul Colas, Serguei Ganjour CEA-Saclay/IRFU, Gif-sur-Yvette, France LCTPC-Saclay Working Group Meeting Saclay

More information

The Readout Architecture of the ATLAS Pixel System

The Readout Architecture of the ATLAS Pixel System The Readout Architecture of the ATLAS Pixel System Roberto Beccherle / INFN - Genova E-mail: Roberto.Beccherle@ge.infn.it Copy of This Talk: http://www.ge.infn.it/atlas/electronics/home.html R. Beccherle

More information

Commissioning and Initial Performance of the Belle II itop PID Subdetector

Commissioning and Initial Performance of the Belle II itop PID Subdetector Commissioning and Initial Performance of the Belle II itop PID Subdetector Gary Varner University of Hawaii TIPP 2017 Beijing Upgrading PID Performance - PID (π/κ) detectors - Inside current calorimeter

More information

Status of the CUORE Electronics and the LHCb RICH Upgrade photodetector chain

Status of the CUORE Electronics and the LHCb RICH Upgrade photodetector chain Status of the CUORE Electronics and the LHCb RICH Upgrade photodetector chain Lorenzo Cassina - XXIX cycle MiB - Midterm Graduate School Seminar Day Outline Activity on LHCb MaPTM qualification RICH Upgrade

More information

RTPC 12 Simulation. Jixie Zhang Aug 2014

RTPC 12 Simulation. Jixie Zhang Aug 2014 RTPC 12 Simulation Aug 2014 1 Outline Try to answer the following questions: 1) What is the highest luminosity we can realistically achieve (including trigger and DAQ rates), and how big of a problem will

More information

Riccardo Farinelli. Charge Centroid Feasibility

Riccardo Farinelli. Charge Centroid Feasibility Riccardo Farinelli Charge Centroid Feasibility Outline Prototype and TB setup Data set studied Analysis approch Results Charge Centroid Feasibility Ferrara July 07, 2015 R.Farinelli 2 Test chambers Conversion

More information

Performance of a double-metal n-on-n and a Czochralski silicon strip detector read out at LHC speeds

Performance of a double-metal n-on-n and a Czochralski silicon strip detector read out at LHC speeds Performance of a double-metal n-on-n and a Czochralski silicon strip detector read out at LHC speeds Juan Palacios, On behalf of the LHCb VELO group J.P. Palacios, Liverpool Outline LHCb and VELO performance

More information

Study of the performances of the ALICE muon spectrometer

Study of the performances of the ALICE muon spectrometer Study of the performances of the ALICE muon spectrometer Blanc Aurélien, December 2008 PhD description Study of the performances of the ALICE muon spectrometer instrumentation/detection. Master Physique

More information

BABAR IFR TDC Board (ITB): requirements and system description

BABAR IFR TDC Board (ITB): requirements and system description BABAR IFR TDC Board (ITB): requirements and system description Version 1.1 November 1997 G. Crosetti, S. Minutoli, E. Robutti I.N.F.N. Genova 1. Timing measurement with the IFR Accurate track reconstruction

More information

li, o p a f th ed lv o v ti, N sca reb g s In tio, F, Z stitu e tests o e O v o d a eters sin u i P r th e d est sezio tefa ectro lity stem l su

li, o p a f th ed lv o v ti, N sca reb g s In tio, F, Z stitu e tests o e O v o d a eters sin u i P r th e d est sezio tefa ectro lity stem l su Design and prototype tests of the system for the OPERA spectrometers Stefano Dusini INFN sezione di Padova Outline OPERA Detector Inner Tracker Design Mechanical support Gas & HV Production and Quality

More information

Evaluation of ALICE electromagnetic calorimeter jet event trigger performance for LHC-Run2 by simulation

Evaluation of ALICE electromagnetic calorimeter jet event trigger performance for LHC-Run2 by simulation Evaluation of ALICE electromagnetic calorimeter jet event trigger performance for LHC-Run2 by simulation Pure and Applied Sciences University of Tsukuba Ritsuya Hosokawa,Tatsuya Chujo,Hiroki Yokoyama for

More information

Concept and operation of the high resolution gaseous micro-pixel detector Gossip

Concept and operation of the high resolution gaseous micro-pixel detector Gossip Concept and operation of the high resolution gaseous micro-pixel detector Gossip Yevgen Bilevych 1,Victor Blanco Carballo 1, Maarten van Dijk 1, Martin Fransen 1, Harry van der Graaf 1, Fred Hartjes 1,

More information

Report from the 2015 AHCAL beam test at the SPS. Katja Krüger CALICE Collaboration Meeting MPP Munich 10 September 2015

Report from the 2015 AHCAL beam test at the SPS. Katja Krüger CALICE Collaboration Meeting MPP Munich 10 September 2015 Report from the 2015 AHCAL beam test at the SPS Katja Krüger CALICE Collaboration Meeting MPP Munich 10 September 2015 Goals and Preparation > first SPS test beam with 2nd generation electronics and DAQ

More information

TORCH a large-area detector for high resolution time-of-flight

TORCH a large-area detector for high resolution time-of-flight TORCH a large-area detector for high resolution time-of-flight Roger Forty (CERN) on behalf of the TORCH collaboration 1. TORCH concept 2. Application in LHCb 3. R&D project 4. Test-beam studies TIPP 2017,

More information

Note on the preliminary organisation for the design, fabrication and test of a prototype double-sided ladder equipped with MAPS

Note on the preliminary organisation for the design, fabrication and test of a prototype double-sided ladder equipped with MAPS Note on the preliminary organisation for the design, fabrication and test of a prototype double-sided ladder equipped with MAPS J.Baudot a, J.Goldstein b, A.Nomerotski c, M.Winter a a IPHC - Université

More information

Precise Digital Integration of Fast Analogue Signals using a 12-bit Oscilloscope

Precise Digital Integration of Fast Analogue Signals using a 12-bit Oscilloscope EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH CERN BEAMS DEPARTMENT CERN-BE-2014-002 BI Precise Digital Integration of Fast Analogue Signals using a 12-bit Oscilloscope M. Gasior; M. Krupa CERN Geneva/CH

More information

Status of CMS Silicon Strip Tracker

Status of CMS Silicon Strip Tracker 1 Status of CMS Silicon Strip Tracker N. Demaria a on behalf of the CMS Tracker Collaboration a INFN Sez. di Torino, v. P.Giuria 1, I-10125 Torino Italy E-mail: Natale.Demaria@to.infn.it The CMS Silicon

More information

Front End Electronics

Front End Electronics CLAS12 Ring Imaging Cherenkov (RICH) Detector Mid-term Review Front End Electronics INFN - Ferrara Matteo Turisini 2015 October 13 th Overview Readout requirements Hardware design Electronics boards Integration

More information

The trigger for the New Electromagnetic Calorimeter NewCal

The trigger for the New Electromagnetic Calorimeter NewCal The trigger for the New Electromagnetic Calorimeter NewCal Feasibility studies (2d version) Charles F. Perdrisat June 21,2012 6/20/2012 1 Assumptions: HERA-B midsection shashlik detectors available, 2128

More information

Synchronization of the CMS Cathode Strip Chambers

Synchronization of the CMS Cathode Strip Chambers Synchronization of the CMS Cathode Strip Chambers G. Rakness a, J. Hauser a, D. Wang b a) University of California, Los Angeles b) University of Florida Gregory.Rakness@cern.ch Abstract The synchronization

More information

Supervision of Analogue Signal Paths in Legacy Media Migration Processes using Digital Signal Processing

Supervision of Analogue Signal Paths in Legacy Media Migration Processes using Digital Signal Processing Welcome Supervision of Analogue Signal Paths in Legacy Media Migration Processes using Digital Signal Processing Jörg Houpert Cube-Tec International Oslo, Norway 4th May, 2010 Joint Technical Symposium

More information

Results on 0.7% X0 thick Pixel Modules for the ATLAS Detector.

Results on 0.7% X0 thick Pixel Modules for the ATLAS Detector. Results on 0.7% X0 thick Pixel Modules for the ATLAS Detector. INFN Genova: R.Beccherle, G.Darbo, G.Gagliardi, C.Gemme, P.Netchaeva, P.Oppizzi, L.Rossi, E.Ruscino, F.Vernocchi Lawrence Berkeley National

More information

SuperFRS GEM-TPC Development Status Report

SuperFRS GEM-TPC Development Status Report SuperFRS GEM-TPC Development Status Report COLLABORATORS F. García, R. Turpeinen, J. Heino, A. Karadzhinova, E. Tuominen, R. Lauhakangas Helsinki Institute of Physics University of Helsinki - Finland R.

More information

PICOSECOND TIMING USING FAST ANALOG SAMPLING

PICOSECOND TIMING USING FAST ANALOG SAMPLING PICOSECOND TIMING USING FAST ANALOG SAMPLING H. Frisch, J-F Genat, F. Tang, EFI Chicago, Tuesday 6 th Nov 2007 INTRODUCTION In the context of picosecond timing, analog detector pulse sampling in the 10

More information

CSC Data Rates, Formats and Calibration Methods

CSC Data Rates, Formats and Calibration Methods CSC Data Rates, Formats and Calibration Methods D. Acosta University of Florida With most information collected from the The Ohio State University PRS March Milestones 1. Determination of calibration methods

More information

Status of GEM-based Digital Hadron Calorimetry

Status of GEM-based Digital Hadron Calorimetry Status of GEM-based Digital Hadron Calorimetry Snowmass Meeting August 23, 2005 Andy White (for the GEM-DHCAL group: UTA, U.Washington, Tsinghua U., Changwon National University, KAERI- Radiation Detector

More information

A Top-down Hierarchical Approach to the Display and Analysis of Seismic Data

A Top-down Hierarchical Approach to the Display and Analysis of Seismic Data A Top-down Hierarchical Approach to the Display and Analysis of Seismic Data Christopher J. Young, Constantine Pavlakos, Tony L. Edwards Sandia National Laboratories work completed under DOE ST485D ABSTRACT

More information

The Pixel Trigger System for the ALICE experiment

The Pixel Trigger System for the ALICE experiment CERN, European Organization for Nuclear Research E-mail: gianluca.aglieri.rinella@cern.ch The ALICE Silicon Pixel Detector (SPD) data stream includes 1200 digital signals (Fast-OR) promptly asserted on

More information

Paul Dauncey For the CALICE-UK electronics group. A. Baird, D. Bowerman, P. Dauncey, R. Halsall, M. Postranecky, M.Warren, O.

Paul Dauncey For the CALICE-UK electronics group. A. Baird, D. Bowerman, P. Dauncey, R. Halsall, M. Postranecky, M.Warren, O. ECAL Readout Paul Dauncey For the CALICE-UK electronics group A. Baird, D. Bowerman, P. Dauncey, R. Halsall, M. Postranecky, M.Warren, O. Zorba 8 December 2004 Paul Dauncey 1 CALICE Readout (ECAL) Card

More information

Status of the Timing Detector Plastic+SiPM Readout Option

Status of the Timing Detector Plastic+SiPM Readout Option SHiP Timing Detector Status of the Timing Detector Plastic+SiPM Readout Option Ruth Bruendler, University of Zurich on behalf of the Timing Detector Group 11th SHIP Collaboration Meeting CERN 7-9 June

More information

Atlas Pixel Replacement/Upgrade. Measurements on 3D sensors

Atlas Pixel Replacement/Upgrade. Measurements on 3D sensors Atlas Pixel Replacement/Upgrade and Measurements on 3D sensors Forskerskole 2007 by E. Bolle erlend.bolle@fys.uio.no Outline Sensors for Atlas pixel b-layer replacement/upgrade UiO activities CERN 3D test

More information

Trigger Cost & Schedule

Trigger Cost & Schedule Trigger Cost & Schedule Wesley Smith, U. Wisconsin CMS Trigger Project Manager DOE/NSF Review May 9, 2001 1 Baseline L4 Trigger Costs From April '00 Review -- 5.69 M 3.96 M 1.73 M 2 Calorimeter Trig. Costs

More information

BitWise (V2.1 and later) includes features for determining AP240 settings and measuring the Single Ion Area.

BitWise (V2.1 and later) includes features for determining AP240 settings and measuring the Single Ion Area. BitWise. Instructions for New Features in ToF-AMS DAQ V2.1 Prepared by Joel Kimmel University of Colorado at Boulder & Aerodyne Research Inc. Last Revised 15-Jun-07 BitWise (V2.1 and later) includes features

More information

Minutes of the ALICE Technical Board, November 14 th, The draft minutes of the October 2013 TF meeting were approved without any changes.

Minutes of the ALICE Technical Board, November 14 th, The draft minutes of the October 2013 TF meeting were approved without any changes. Minutes of the ALICE Technical Board, November 14 th, 2013 ALICE MIN-2013-6 TB-2013 Date 14.11.2013 1. Minutes The draft minutes of the October 2013 TF meeting were approved without any changes. 2. LS1

More information

Precision testing methods of Event Timer A032-ET

Precision testing methods of Event Timer A032-ET Precision testing methods of Event Timer A032-ET Event Timer A032-ET provides extreme precision. Therefore exact determination of its characteristics in commonly accepted way is impossible or, at least,

More information

Threshold Tuning of the ATLAS Pixel Detector

Threshold Tuning of the ATLAS Pixel Detector Haverford College Haverford Scholarship Faculty Publications Physics Threshold Tuning of the ATLAS Pixel Detector P. Behara G. Gaycken C. Horn A. Khanov D. Lopez Mateos See next page for additional authors

More information

with Low Cost and Low Material Budget

with Low Cost and Low Material Budget Gaseous Beam Position Detectors, with Low Cost and Low Material Budget Gyula Bencédi on behalf of the REGaRD group MTA KFKI RMKI, ELTE November 29, 2011, Outline Physics Motivation Newish MWPCs, the Close

More information

Comparison of Mixed-Effects Model, Pattern-Mixture Model, and Selection Model in Estimating Treatment Effect Using PRO Data in Clinical Trials

Comparison of Mixed-Effects Model, Pattern-Mixture Model, and Selection Model in Estimating Treatment Effect Using PRO Data in Clinical Trials Comparison of Mixed-Effects Model, Pattern-Mixture Model, and Selection Model in Estimating Treatment Effect Using PRO Data in Clinical Trials Xiaolei Zhou, 1,2 Jianmin Wang, 1 Jessica Zhang, 1 Hongtu

More information

Front End Electronics

Front End Electronics CLAS12 Ring Imaging Cherenkov (RICH) Detector Mid-term Review Front End Electronics INFN - Ferrara Matteo Turisini 2015 October 13 th Overview Readout requirements Hardware design Electronics boards Integration

More information

Proposal by the Ohio State University High Energy Physics to join the BABAR Collaboration

Proposal by the Ohio State University High Energy Physics to join the BABAR Collaboration Proposal by the Ohio State University High Energy Physics to join the BABAR Collaboration Introduction: The Ohio State University high energy physics group consisting of Profs. Gan, Honscheid, Kagan, and

More information

Electronics procurements

Electronics procurements Electronics procurements 24 October 2014 Geoff Hall Procurements from CERN There are a wide range of electronics items procured by CERN but we are familiar with only some of them Probably two main categories:

More information

Advanced Front End Signal Processing Electronics for ATLAS CSC System: Status And Post Production Performance.

Advanced Front End Signal Processing Electronics for ATLAS CSC System: Status And Post Production Performance. Advanced Front End Signal Processing Electronics for ATLAS CSC System: Status And Post Production Performance. Sachin S Junnarkar, Anand Kandasamy, Paul O Connor Brookhaven National Laboratory, Upton,

More information

Local Trigger Electronics for the CMS Drift Tubes Muon Detector

Local Trigger Electronics for the CMS Drift Tubes Muon Detector Amsterdam, 1 October 2003 Local Trigger Electronics for the CMS Drift Tubes Muon Detector Presented by R.Travaglini INFN-Bologna Italy CMS Drift Tubes Muon Detector CMS Barrel: 5 wheels Wheel : Azimuthal

More information

Design of Fault Coverage Test Pattern Generator Using LFSR

Design of Fault Coverage Test Pattern Generator Using LFSR Design of Fault Coverage Test Pattern Generator Using LFSR B.Saritha M.Tech Student, Department of ECE, Dhruva Institue of Engineering & Technology. Abstract: A new fault coverage test pattern generator

More information

ATLAS muon spectrometer varia, status, and upgrades. Gerjan Bobbink Steenwijk 16-june-2017

ATLAS muon spectrometer varia, status, and upgrades. Gerjan Bobbink Steenwijk 16-june-2017 ATLAS muon spectrometer varia, status, and upgrades Gerjan Bobbink Steenwijk 16-june-2017 Muonspectrometer; large system Magnets (ECT, B-field sensors) Trigger system based on RPC, TGC chambers Precision

More information