CLT17620AVControlRoom-RA.doc Page 1 CENTER FOR LEARNING AND TECHNOLOGY - A/V PRODUCTION ROOM 104 CLT PROD ROOM.doc

Similar documents
PLU-TV & AT&T CATV CLASSROOM/OFFICE BUILDING EQUIPMENT LISTS & DIAGRAMS CLT CATV.doc CENTER FOR LEARNING & TECHNOLOGY (CLT)

UNIVERSITY of NORTH DAKOTA LOW VOLTAGE COMMUNICATIONS STANDARDS FOR CABLING, PATHWAYS, AND SPACE

Tele-Conferencing Rooms

Target Interface / Construction Compliance Inspection Checklist

Church Layout Medium Advanced

California Polytechnic State University ITS Telecommunications PART 1 GENERAL SECTION AUDIO VISUAL STATION CABLES 1.

Minimum qualifications for the Telecommunications Engineer are: A. Texas Licensed Profession Engineer (PE)

EXHIBIT BASIS OF DESIGN REPORT. Space Type: Space Usage: Off-center of room to match side screen. Location

APPENDIX O RECOMMENDED GUIDELINES FOR AUDIO/VISUAL TECHNOLOGIES (AV TECHNOLOGY) TABLE OF CONTENTS E. CATV... 8 F. SECURITY SYSTEM...

UNIFIED FACILITIES GUIDE SPECIFICATIONS

EXHIBIT BASIS OF DESIGN REPORT. Space Type: Space Usage: Approx. 2,000 BTU each. Off-center of room to match side screen.

STRUCTURED CABLE SYSTEM (SCS)

ELECTRICAL LEGEND NOTES AND FIXTURE SCHEDULE

NC-1000 INSTALLATION MANUAL NC-1000 FIBRE OPTIC CROSS-CONNECTION SYSTEM

HCS - HES Cabling Systems

Lyndhurst Secondary Technology Package Addendum # Bid Date: Wednesday, August 30, 1:00PM. Items issued in this addendum:

Queens College Technology Enhanced Classroom (TEC) Specifications 9/2008

Information Technology Services DESIGN AND INSTALLATION STANDARDS

Interview Management System Installation Guide

INSTALLATION AND WIRING OF AUDIO-VISUAL SYSTEMS

A. The requirements of Section govern the work specified in this section.

City of Winter Springs, FL

BILOXI PUBLIC SCHOOL DISTRICT. Biloxi Junior High School

Small System Packages. Strand Dimming Systems

SECTION MEDIUM VOLTAGE CABLE INSTALLATION. 1. Section Underground Ducts and Manholes.

LGX Compatible (LSX) Connector Module) User Manual)

Public Works Division Lighting District Fiber Optic Specifications April 2009

The Uniduct Nonmetallic Latching Raceway

COYOTE CLOSURE FOR UNDERGROUND, AERIAL, AND BURIED SPLICES 6.0" x 22" 8.5" x 22" (15.24 cm x cm cm x cm)

CRESTRON SITE PACK, LAST REVISION: 25/01/2017

CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT

Small System Packages. Strand Dimming Systems

WORLD CLASS MEDIA PRODUCTION/RECORDING STUDIO FOR SALE STUDIOS OF CONCENTRIX MUSIC AND SOUND DESIGN, INC.

ISS New Audio & Visual installations Design and Physical install guidelines v1.5

SECTION COMMUNICATIONS HORIZONTAL CABLING

32 LCD Overhead Video Display Support Specifications (No Electrical required on rear curtain wall)

DESIGN CRITERIA AND REQUIREMENTS FOR CLASSROOMS

42 LCD Overhead Video Display Support Specifications (No Electrical required on rear curtain wall)

Wired Troubleshooting Manual

DESIGN STANDARD FOR AUDIOVISUAL SYSTEMS

SCIR. Infrared Illuminator Powerful Indoor/Outdoor IR Spotlight SCIR

SECTION 683 VIDEO OPTICAL TRANSCEIVER WITH BI-DIRECTIONAL DATA CHANNEL DESCRIPTION

Bravo AV s Structured or Whole-House Wiring Approach

IP-LINX. Installation Guide

Section Communications Optical Fiber Backbone Cabling

November 5, 2001 Pacific Lutheran University SECTION Center for Learning and Technology, Video/Audio Systems Page 1

Interview Management System Installation Guide. (303) x500

Room Recommendations for the Cisco TelePresence System 3210

Church Layout Small. Specifier Product Information

B. All work shall be in accordance with Building Industry Consulting Services International (BICSI) guidelines.

Telecommunications Cabling System Technical Specification for the K-12 Educational Environment Enhanced Category 5

GUIDELINES FOR CABLE LAYING (PEM ELECTRICAL)

UNM IT/Telecommunications Guide Specification Labeling 11/07/

Service Parts Diagrams. For Model: 10/20/09 Service Parts Diagrams for the Rear Projection SMART Board 3000i-DV Interactive Whiteboard 1

CABLING STANDARDS FOR

Simplified A/V Infrastructure Design. Carol E. Oliver, RCDD, ESS Training and Contractor Manager Legrand North America Data Communications Division

SECTION INTERCOMMUNICATIONS AND PROGRAM SYSTEMS

Family Health Centers, Inc. Request for Proposal. for. Family Health Centers East Broadway Data and Communications Cabling Project

Integrated Systems Proposal

The MTS FiON Network. for Multiple Dwelling Units (MDUs) Greenfield/Brownfield Renovations

DESIGN STANDARD FOR AUDIOVISUAL SYSTEMS

Installation Evaluation Form

RACKS, ENCLOSURES AND CABLE MANAGEMENT

ACADEMIC SUCCESS CENTER THE COLLEGE AT BROCKPORT STATE UNIVERSITY OF NEW YORK PROJECT NO

IP-LINX Fiber :: X-XXXX

HONEYWELL VIDEO SYSTEMS HIGH-RESOLUTION COLOR DOME CAMERA

FIST-MB2-S. FIST Medium Box for Cable Splicing Only. 4 Cable installation. 1 Introduction. Contents. 2 General. 5. Fiber routing to individual trays

University Center AV Integration Construction Documents February 8, 2012

Northwestern University Information Technology Building Infrastructure Requirements for Communication Facilities ( January 2010)

42 LCD Overhead Video Display Support Specifications Electricity required on the rear curtain wall

SECTION COMMUNICATIONS HORIZONTAL CABLING

SECTION MASTER TELEVISION ANTENNA SYSTEM (MTAS)

Camden Technology Center. Smart Classroom Guide A/V Sympodium

INSTALLATION INSTRUCTIONS WIRED REMOTE CONTROL USING COAX CABLE U-WRC-C

INSTALLATION INSTRUCTIONS WIRED REMOTE CONTROL USING TWISTED PAIR AND COAX CABLE U-WRC-U-x

Camera Control Unit 55D-BS VOLUME OPEN CABLE MIC OFF GND 2W CAMERA CABLE TALLY. Camera Adapter 55D-CA 9.39" 7.40" 5.2"

ELECTRICAL LEGEND NOTES AND FIXTURE SCHEDULE

2.1 Kit Contents 2.2 Elements needed from the FIST installation kit 2.3 Tools 2.4 Cable preparation table

ADRIAN PHILLIPS BALLROOM INFORMATION AND SPECS

Standards & Specifications

HD A/V MATRIX SWITCHER HDMX-1104

The following products are used in these packages:

complete, versatile and cost effective

Medium Box for Cable Termination

INSTALLATION INSTRUCTIONS MO023A

SkyVision Hybrid II Digital Integration System powered by

Site Installation Model MP-8433

SECTION FIBER OPTIC STATION CABLES

PROSPER INDEPENDENT SCHOOL DISTRICT TECHNOLOGY DEPARTMENT 605 E. SEVENTH STREET PROSPER, TX NOTICE TO BIDDERS RFP IFP

Projector Project Installation of Boards and Projectors

Panel-Mounted Thermostat

Stage Manager s Guide

The FiberMark1 offers an ideal solution for

Site Installation Model MP-8424

SECTION 5900 TRAFFIC SIGNALS CITY OF LEE S SUMMIT, MISSOURI DESIGN CRITERIA

19" TiRAX cabinet system. from page 3. 19" NETcell cabinet system from page 31. Open 19" racks from page 43

Halsey 106. For assistance and additional equipment, contact Halsey Instructional Technology Services Halsey 259, extension 4979

HighBand 25. TrueNet Category 6 Solutions

March 4 th, Addendum No. 1. Brooklyn College Systems Integrator Broadcast Television Equipment Project No: BY019/

Gel-sealed in-line fiber optic closure

Transcription:

CLT17620AVControlRoom-RA.doc Page 1 CENTER FOR LEARNING AND TECHNOLOGY - A/V PRODUCTION ROOM 104 CLT PROD ROOM.doc The general consensus of the occupants of the CLT is that the following rooms be equiped for Videoconferencing/Distance Learning activities: Public Events Rm. 103, Classroom 105, Multimedia Rm 115, Classroom 108, Seminar Classroom 107, Conference Rm 180 and Lab Classroom 207. The most logical central point for the required equipment 'A/V Production Room' is the A/V Storage room 104. Said equipment will require an area of approximately 7' X 7' square to accommodate 2 equipment racks with 2 operators for the Video, Audio, Intercommunications & Videoconferencing components. PLU Audio Services, Bob Holden, will co-occupy this 7' X 7' space. Room 104 will have a finished wall separating the 7' X 7' storage area Rm 102 from the 7' X 7' A/V Production Room 104. The A/V Production Room will have one door in the South wall, East corner, that opens outward (Southwesterly) into the Lobby for access, and an 8"W X 8"H hatch door (locking) at 2" above floor level on the South wall, West corner, to facilitate temporary cable runs for events in the Lobby area. The A/V Production Room will have adequate clean power, to supply (2) 7 foot tall equipment racks, in the form of 2-20amp circuits on the same phase to separate 4-plex outlets, 2 sets each, mounted on the West wall at 16" above the floor, 1 each on the NW wall and 1 each on the S wall. The A/V Production Room 104 will have adequate ventilation, an open ceiling, Air Conditioning, etc to cool the equipment and operators to 68 degrees F (minimum 2000 BTU's).with a thermostat on the wall. The A/V Production Room 104 will have (20) cabling paths, from each of the Videoconferencing rooms; (2) 3" conduits in the slab from Rm 104 to Rms 103 & 105 (1) each to the 2 Instructors floor pockets; (2) each 2" conduits in the walls from the 6 wall boxes stubbed up to the cable tray above the false ceilings in Rooms 103 & 105 and (1) each 2" conduit in the wall from the 1 wall box stubbed up to the cable tray above the drop ceiling in Room 115; (6) 2" conduits in the slab from Rm 104 to Rms 108, 107 and 180 (1) each to the 3 wall boxes and (1) each to the 3 floor pockets; (4) each 2" conduits in Room 207 from the 3 wall boxes and 1 floor box stubbed down to the cable trays above the first floor false ceiling; All cable paths to A/V Production Room 104 will terminate in (3) 24"H x 12"W x 6"D flush mount boxes in the West wall, Left half, centered at 48" above floor level for Videoconference connector panels. One 24"x 12"x 6" box will have (4) 2" conduits and one 24"x12"x6" box will have (5) 2" conduits exiting the top of the box and stubbed at ceiling level 8' above finished floor and (2) 2" conduit sleeves from box to box. There will also be (2) 24"H x 12" W x 6" D flush mount boxes in the West wall, Right half, centered at 48" above floor level for Audio connector panels one with (6) and one with (4) 2" conduits exiting the top of the box and stubbed at ceiling level 8' above floor level and (2) 2" conduit sleeves from box to box. Each of the (20) cabling paths will provide for a 1-1/2 inch (1.5") diameter bundle of Camera, Video, Tally, Audio, Communications, ISDN, Phone, etc. cables. If conduit is used each 90 degree bend will have a pulling elbow or pull box. Each of the (13) cabling paths to the wallmount boxes will terminate in an 8"H X 8"W X 6"D flush wallmount box in each Videoconferencing room centered at about 16 inches above floor level for connector panels. Rooms 103, 105 and 207 will have three such boxes each. The locations of all such 'Camera Connecton' boxes per PLU-TV Conduit Locations Diagrams. Each of the cabling paths to the Instructors' Console Floor Boxes will terminate in one of two (2) tandem 8"H X 8"W X 6"D flush floor mount box in each Videoconferencing room under the Instructor's console. There will be (1) each additional 2" conduit in the slab from the Instructor floor pocket stubbed up above the drop ceiling for the projector in all classrooms with projectors. PLU will purchase with building funds and supply all Electronic Equipment, Racks, Wall Box and Floor Box Connector Panels, Connectors and associated installations. The Contractor(s) will purchase and supply all Cables, Pulling Lubricant, Velcro Ties, Poly Line Pull String and associated installations.

ROOM 103 CLT17620AVControlRoom-RA.doc Page 2 RM 102 A/V PRODUCTION ROOM 104 (6) 2" conduit risers for raceway Audio cables from Rms 103 & 105 (2) 2" sleeves from box to box in both boxes (2) 2" conduits in the slab from Rms 103 & 105 Audio floorboxes (4) 2" conduit risers for raceway Audio cables from Rm 207 (2) 24"H x 12" W x 6" D wall boxes for Audio Wall between Rms 102 & 104 (3) 24"H x 12"W x 6"D wall boxes for Videoconferencing (1) 2" conduit in the slab from Rm 207 Videoconference floor box (3) 2" conduit risers for raceway cables from room 207 Videoconference wall boxes (2) 2" conduit riser for raceway cables from Rm 115 Videoconference wall box (2) 2" sleeves from box to box all 3 boxes (2) 2" conduits in the slab from Rms 103 & 105 Videoconference floorboxes (2) 2" conduit risers for raceway cables from Rm 103 Videoconference wall boxes (2) 2" conduit risers for raceway cables from Rm 105 Videoconference wall boxes EAST ENTRANCE TO ROOM 103 (3) 2" conduits in the slab from Rms 107, 108 & 180 Videoconference floor boxes (3) 2" conduits in the slab from Rms 107, 108 & 180 Videoconference wall boxes

ROOM 103 CLT17620AVControlRoom-RA.doc Page 3 Rm 102 A/V PRODUCTION ROOM 104 (1) 20 Amp clean power circuit to (3) 4-plex boxes (all on same phase) (1) 20 Amp clean power circuit to (3) 4-plex boxes (all on same phase)

ROOM 103 CLT17620AVControlRoom-RA.doc Page 4 Rm 102 A/V PRODUCTION ROOM 104 2000 B.T.U CAPACITY AIR CONDITIONING OUTLET IN OPEN CEILING WITH WHISPER DUCT FOR LOW NOISE OPERATION AND THERMOSTAT ON THE WALL COOLING TO 68 DEGREES FOR 600 WATTS OF ELECTRONIC EQUIPMENT AND 3 OPERATIONS PERSONS (1) 8"x8" hatch thru wall at 2"above floor with locking hinged door on outside wall (hinge at top)

ROOM 103 CLT17620AVControlRoom-RA.doc Page 5 Rm 102 A/V PRODUCTION ROOM 104 EQUIPMENT RACK (on wheels) 24"x 24"x 7' AUDIO OPERATOR EQUIPMENT RACK (on wheels) 24"x 24"x 7' VIDEO OPERATOR

ROOM 103 CLT17620AVControlRoom-RA.doc Page 6 Rm 102 A/V PRODUCTION ROOM 104 (2) 4' x 2 tube light fixtures mounted on wall with (2) separate dimmer switches on the wall

CLT17620AVControlRoom-RA.doc Page 7 FIRST FLOOR CONDUIT LOCATIONS 103 105 FLOOR BOX UNDER INSTRUCTOR CONSOLE FLOOR BOX UNDER INSTRUCTOR CONSOLE 115 FLOOR BOX UNDER INSTRUCTOR CONSOLE 104 (3) 2" CONDUITS IN THE SLAB FROM RM 104 TO RMS 103, 105 & 115 FLOOR BOXES (6) 2" CONDUITS IN THE SLAB FROM RM 104 TO RMS 107, 108 & 180 FLOOR & WALL BOXES FLOOR BOXES UNDER INSTRUCTOR CONSOLES 180 WALL BOXES 108 107

CLT17620AVControlRoom-RA.doc Page 8 FIRST FLOOR CABLE BUNDLES 103 105 WALL BOXES W/ TWO 3" CONDUT RISERS EACH 115 104 DISPLAY CASE (7) 1-1/2" CABLE BUNDLES IN THE CABLE RACEWAYS FROM 104 TO 103, 105, & 115 WALL BOXES VIA (2 EA) 3" CONDUIT RISERS IN WALLS 180 108 107

CLT17620AVControlRoom-RA.doc Page 9 SECOND FLOOR CONDUIT LOCATIONS 207 WALL BOXES (3) 1-1/2" CABLE BUNDLES FROM 104 TO 207 WALL BOXES VIA (2 EA) 3" CONDUITS IN WALLS TO 1 ST FLOOR CABLE RACEWAYS 104 (1) 2" CONDUIT IN THE SLAB FROM RM 104 TO RM 207, FLOOR BOX UNDER INSTRUCTORS CONSOLE

CLT17620AVControlRoom-RA.doc Page 13 8" X 8" WALLPLATES - ROOMS 103 (3), 105 (3), 115 (1), 107 (1), 108 (1), 180 (1), 207 (3) CAM 1 VIDEO CAM 2 VIDEO AUDIO IN LEFT AUDIO IN RIGHT AUDIO OUT LEFT AUDIO OUT RIGHT CAM 1 GNLK CAM 2 GNLK CAM 1 TALLY CAM 2 TALLY PGM PVW CCOM CCOM AT&T

8" X 8" WALLPLATES - ROOMS 103 (3), 105 (3), 115 (1), 107 (1), 108 (1), 180 (1), 207 (3) CLT17620AVControlRoom-RA.doc Page 14 NC3FDL-1-B- NC3FDL-1-B NC3MDL-1-B NC3MDL-1-B SWITCHCRAFT 57HA3F SWITCHCRAFT 57HA3F NC5FDL-1-B NC5FDL-1-B AIM 25-7200 BULKHEAD 'F'

( 8 1) 10 3 (3), 10 5 (3), 11 5 (1), 10 7 (1), 10 8" X 8" W A LL P L A T E S - R O O M S CLT17620AVControlRoom-RA.doc Page 15 1" HORIZ CENTERS 1-1/4" VERT CENTERS 1-1/4" HORIZ CENTERS 1-1/4" VERT CENTERS 1/2" HOLES 15/16" HOLES 5/8" HOLES 1-1/4" HORIZ CENTERS 1-1/4" VERT CENTERS 1-1/2"HORIZ CENTER 3/4" VERT CENTER

CLT17620AVControlRoom-RA.doc Page 16 8" X 8" FLOOR PLATES - ROOMS 103 (1), 105 (1), 115 (1), 107 (1), 108 (1), 180 (1), 207 (1) OBSERVATION CAMERA LEFT AUDIO IN - 1 RIGHT DOCUMENT CAMERA NETWRK FUTURE ISDN 1 ISDN 2 LEFT AUDIO IN - 2 RIGHT PROGRAM VIDEO FUTURE FUTURE ISDN 3 ISDN 4 FUTURE FUTURE PHONE 1 PHONE 2 PREVIEW VIDEO LEFT AUDIO OUT - 1 RIGHT AT&T LEFT AUDIO OUT - 2 RIGHT CLEARCOM CLEARCOM

CLT17620AVControlRoom-RA.doc Page 17 8" X 8" FLOOR PLATES - ROOMS 103 (1), 105 (1), 115 (1), 107 (1), 108 (1), 180 (1), 207 (1) NC3FDL-1-B NC3FDL-1-B 15/16" HOLES 1/2 " HOLES 1-5/16" X 2-5/8" CUTOUTS NC3FDL-1-B NC3FDL-1-B LEVITON 41646-W DECORA INSERT LEVITON 41616-W DECORA INSERT MOUNTING HOLES ON 3-13/16" CENTERS NC3MDL-1-B NC3MDL-1-B 15/16" HOLES 3/8" HOLE AIM NC3MDL-1-B NC3MDL-1-B 25-7200 NC5FDL-1-B NC5FDL-1-B

VIDEOCONFERENCING CABLE BUNDLE DESCRIPTIONS & PULLING INSTRUCTIONS CLT17620AVControlRoom-RA.doc Page 18 All cables shall be pulled simultaneously in a loose bundle; With each bundle pulled in conduit there shall be a pull string Graybar Part # 500 5539.9 Poly Line; All cables designated Belden shall be Belden and there will be NO substitutes; Each cable bundle pulled in conduit will be lubricated at the beginning and continuously at the rate of one pint minimum (16 fl. Oz) per 100 feet along the full length of the cables with LUBADUK LPLV 301 available from the Mfgr 800-847- 7661 or at WESTERN STATES ELECTRIC Auburn WA (Marge) 253-333-2430. Each cable bundle will be pulled at no more than the Maximum Pulling Tension of the lowest rated individual cable (BELDEN 1583A DATATWIST 5e CAT5e at maximum pulling tension of 35 Pounds); Each cable bundle will be pulled at no less than the Minimum Bend Radius of the highest rated individual cable (BELDEN 1189A SERIES 6 DUOBOND COAX at minimum bend radius of 3 Inches). See attatched Tech Data Sheets; Each cable bundle shall end in a minimum 6 Foot long loop inside the (3) 24"H x 12" W x 6" D Wall boxes in A/V Production Room 104, and a minimum 3 foot long loop inside the (20) 8" x 8" x 6" Wall Boxes and Floor Boxes in Rooms 103, 105, 115, 107, 108, 180 and 207; All cable bundles not in conduits shall be pulled in the cable raceways and served with Velcro ties every 6 feet. There will be a representative of Pacific Lutheran University Television Services on site as Monitor during ALL cable pulls; Pacific Lutheran University Television Services will terminate all cables at the Wall Boxes and Floor Boxes with the required connectors and solder joints. All the cable bundles from the A/V Production Room 104 to rooms 103, 105, 115, 107, 108, 180 & 207 Wall Boxes shall consist of the following Belden cables. There shall be NO substitutes. All cables will be pulled simultaneously in a loose bundle along with a pull string (see above). Quantity Description PURPOSE 6 EA BELDEN 1505A VIDEO COAX CABLE 4 EA BELDEN 8723 AUDIO CABLE 1 EA BELDEN 1189A CATV RG-6 COAX CABLE All the cable bundles from the A/V Production Room 104 to rooms 103, 105, 115, 107, 108, 180 & 207 Floor Boxes shall consist of the following Belden cables. There shall be NO substitutes. All cables will be pulled simultaneously in a loose bundle along with a pull string (see above). Quantity Description PURPOSE 4 EA BELDEN 1505A VIDEO COAX CABLE 5 EA BELDEN 8723 AUDIO CABLE 1 EA BELDEN 1189A CATV RG-6 COAX CABLE 3 EA BELDEN 1583A DATATWIST CAT5e CABLE