FY Transportation Improvement Program Funding Summary: State Match for Federal Funds

Similar documents
FY Transportation Improvement Program Funding Summary: Federal Highway Funds

METROPOLITAN PLANNING ORGANIZATION SERVING LAS CRUCES, DOÑA ANA, AND MESILLA

Environmental Impact Statement (EIS)/ Section 106 Public Meeting Level 1 Concept Screening. May 16, 2017

City of Palm Coast 2016 Capital Projects Timeline - 1st Quarter

>> By Jason R. Kack, LS

Brief History of the MUTCD

The MUTCD: Where It s. Gene Hawkins

The MUTCD: Its History and Future

Appendix 6 St. Bernard Basin

Back to the MUTCD Future

Marathon County COUNTY SURVEYOR RECORDS GUIDE

Attendees: First Name Last Name Company Attended. Marguerite Carnell Archaeological and Historical Services, Inc.

Attachment 7: 5/9/13 Neighborhood Meeting Summary

Kane County Transportation Planning Area Study. Existing Transportation Conditions and Forecasts of Future Travel Demand

Roadway/Structure Widening Project MP A30.30 to MP A Lansdale Montgomery County, PA NOISE ANALYSIS REPORT FINAL. August 2006.

D R A F T DENVER STRATEGIC TRANSPORTATION PLAN TRANSPORTATION MODEL DEVELOPMENT TECHNICAL REPORT. Prepared for: City and County of Denver

AREMA 2015 ANNUAL CONFERENCE. NYSDOT / Amtrak. Hudson Line Improvement Program. David W. Emerich, PE CHA. Minneapolis, MN October 4-7, 2015

I-85 Collapse, Atlanta, Georgia

Yorkdale Station Easier Access Project Public Open House

MACOMB COUNTY DEPARTMENT OF ROADS TRAFFIC OPERATIONS CENTER

Old Business. TEO Signal Committee Meeting Minutes Waters Edge Conf. Room C September 16, 2004

Brief History of the MUTCD

MESILLA VALLEY METROPOLITAN PLANNING ORGANIZATION TECHNICAL ADVISORY COMMITTEE The following are minutes for the meeting of the

TRAFFIC SIGNAL DESIGN GUIDELINES

October 13, Absentee voting by machine begins next Wednesday, October 18 th.

Preliminary Transportation Recommendations for. Presentation to Sector Plan Work Group/WRAC October 5, 2009

LEE COUNTY BOARD OF COUNTY COMMISSIONERS

TEO Work Zone Safety Committee Meeting January 25, 2006 Minutes

Evaluation of Construction Zone Pavement Marking Materials

Greater Minneapolis External Origin-Destination Survey Draft Report Metropolitan Council Cambridge Systematics, Inc.

Major department stores anchoring Hillsdale Shopping Center are Macy s and Nordstrom.

Welcome SIGN CODE UPDATE

The National Traffic Signal Report Card: Highlights

Warwick Gates w Leamington w University of Wa

Processes for the Intersection

400 TRAFFIC SIGNALS Traffic Engineering Manual

ENGINEERING PROJECTS (INDIA) LTD. (A Govt. of India Enterprise) TENDER NO. ERO/MMD/BDD/Road/1084C

Hollywood Bowl Union Station Shuttle

Lesson 79: Land Transport (20-25 minutes)

EVALUATION OF DATA COLLECTION TECHNIQUES & METHODS FOR ROADSIDE STATION ORIGIN-DESTINATION STUDIES

City Council Report 915 I Street, 1 st Floor

WiFi. Warwick Gates Leamington. University. of Warwick U17. Sydenham Leamington University of Warwick U2 U12 U17. to & from.

Table 6.1: Level of Service Thresholds for Basic Freeway Segments. Density Range LOS (pc/mi/ln) A 0 11 B >11 18 C >18 26 D > E >35 45 F > 45

WILSHIRE PREMIER RETAIL SPACE AVAILABLE ALONG THE WILSHIRE CORRIDOR IN THE HEART OF FAIRFAX/ MIRACLE MILE DISTRICT

December 9, week I meet the Transportation Department.

Traffic Signal Performance Measures

TABLE OF CONTENTS. Facility Description. Ticketing and Box Office. Seating & Configuration. Rules and Regulations

PUBLIC WORKS COMMITTEE MEETING. September 27, 2000

City of Charlottesville Bicycle and Pedestrian Master Plan Update

MicroPAVER TECHNOLOGY THAT WORKS FOR YOU

TRANSPORTATION COMMITTEE

Office of Traffic Operations Signal Design Reference Packet

GLOUCESTER TOWNSHIP ZONING BOARD OF ADJUSTMENT WEDNESDAY, MARCH 12, 2014

Santa Barbara County Association of Governments 2019 Federal Transportation Improvement Program

BICYCLE ADVISORY COMMITTEE

U-verse Outside Plant Cabinets AT&T Knowledge Ventures. All rights reserved. AT&T and the AT&T logo are trademarks of AT&T Knowledge Ventures.

Do not install and/or operate this safety product unless you have read and understand the safety information contained in this manual.

DIGGERS HOTLINE. Midwest Fiber Networks, LLC. CALL : (414) OR TOLL FREE (800) MIDWESTFIBERNETWORKS

FTA. FTA stands for Fire Traffic Area.

BRAND GUIDELINES. DavidMason.com or CHICAGO SAINT LOUIS CENTER CITY NORRISTOWN

COUNCIL ACTION FORM. The following streets will be within the closed area, but are not part of the race route:

BUNKER THEATRE VISUAL GUIDE. THE BUNKER THEATRE Access Pack

Santa Barbara County Association of Governments 2017 Federal Transportation Improvement Program

City of Newport Park Board Meeting September 22, 2016

BUNKER THEATRE VISUAL GUIDE. THE BUNKER THEATRE Access Pack

Finding Aid for the Charles K. Adams Santa Fe Railroad Collection, No online items

A30 Chiverton to Carland Cross

A Case Study: Complex Accident Reconstruction from Video Footage

Red Light Camera Project

City of Palm Coast Capital Projects Timeline - 2nd Quarter CAPITAL PROJECTS FUND

Taubman Centers, Inc. Beverly Center Los Angeles, Calif. March 7, 2016

September 28, 2018 CITY OF BERKELEY JOHN MUIR SCHOOL CROSSING IMPROVEMENTS SPECIFICATION NO C ADDENDUM NO. 2

Globe Exhibition &Tour. Useful information. for your Group s visit

STATE OF VERMONT ENVIRONMENTAL COURT. } In re: Appeal of Beebe } Docket Nos Vtec (9-lot subdivision) } } Decision on the Merits

Metrotown Station and Exchange Upgrades

Brunswick Town Council Workshop with Rail Officials Town Council Chambers, Brunswick Town Hall Monday, October 30, 2017, 7:00-9:00 PM

VALENCIACOUNTY AMATEURRADIO ASSOCIATION

STRAND ALDWYCH PROPOSALS

A SMART, SAFE AND SMOOTH FUTURE TELESTE FOR CITY TRANSPORT. Video security and passenger information solution for city transport

Sample: A small part of a lot or sublot which represents the whole. A sample may be made up of one or more increments or test portions.

PLANNING COMMISSION MINUTES Regular Meeting June 19, 2014

Darbo-Worthington-Starkweather Neighborhood Plan Community Meal and Open House 6:30pm 8:30pm on Nov 10, 2016 Salvation Army

Traffic Control Device Evaluation Program: FY 2016

Before the FEDERAL COMMUNICATIONS COMMISSION Washington, D.C

Seated Risers. Staging Canadell s Seated Risers use an Executive Stage foundation to create tiered seating for bands, choirs or audiences (see page 3)

ONE DAY in the LIFE. of New Mexico Libraries Compiled by The New Mexico State Library

CASE STUDY. Smart Motorways Project. Temporary CCTV Monitoring Systems for England s Motorway network.

FLUTE FESTIVAL INFORMATION & PROCEDURES

Symmes Township 9323 Union Cemetery Road Loveland, OH Tel.: Fax: EXPLORE YOUR TOWNSHIP

MILWAUKEE AVENUE CORRIDOR COMMITTEE FEBRUARY 12, 2015 MEETING SUMMARY

FINAL CONTRACT REPORT IMPROVEMENT OF CONSPICUITY OF TRAILBLAZING SIGNS: PHASE III-EVALUATION OF FLUORESCENT COLORS VICKI L. NEALE, RICHARD L.

2nd Aesthetics Committee Meeting March 1, Tarpon Springs Yacht Club. Beckett Bridge

Houston METRO Rail Expansion Program

CROCODILE AUSTRIA VIDEOSYSTEM

Work Type Definition and Submittal Requirements. Work Type Definition: Traffic Signal Design

February Every 2 nd Tuesday of the Month is the Car Club Meeting at 7 pm January Notes: 1 2

Getting Ready for Redevelopment

Wabash Bridge Competition. Bridge Engineering. Todd Wilson, B.S., E.I.T. Traffic Engineer - DMJM Harris

BUNKER THEATRE VISUAL GUIDE. KILLYMUCK Access Pack

Non Fouling Monitoring and Performance of Railway Track and Transitions

Transcription:

CMAQ-Flex ITS Incident Management & Signal Oper. Enhancements 50 A300971 MRCOG ITS $151,665 $151,665 Subcomm (1 CMAQ-Flex Project) $151,665 $151,665 FLAP-Federal Lands Access Old Highway 60- Bridge Replacement 196 A301800 NMDOT D-3 $971,880 $971,880 (1 FLAP-Federal Lands Access Project) $971,880 $971,880 HPP US 550 Reconstruction & Widening 386.3 A301232 NMDOT CRDC Central $44,000 $44,000 Widening Phase 1 386.4 A301233 NMDOT CRDC $135,286 $135,286 (2 HPP Projects) $179,286 $179,286 HPP RPF1 Widening Phase 2 386.5 A301234 NMDOT CRDC $975,332 $975,332 (1 HPP RPF1 Project) $975,332 $975,332 HPP RPF9 Widening Phase 2 386.5 A301234 NMDOT CRDC $1,196,925 $1,196,925 (1 HPP RPF9 Project) $1,196,925 $1,196,925 Page 1 of 10

HPP RPS9 Widening Phase 2 386.5 A301234 NMDOT CRDC $2,950,733 $2,950,733 (1 HPP RPS9 Project) $2,950,733 $2,950,733 IM-Discretionary I-25 / Montgomery Blvd. Interchange Reconstruction 250.3 A301900 NMDOT CRDC $136,856 $136,856 (1 IM-Discretionary Project) $136,856 $136,856 Page 2 of 10

NHPP I-40 Louisianna Westbound Ramps 197.1 A300079 NMDOT D-3 $588,880 $588,880 I-25 Rio Bravo Interchange Reconstruction I-25 S-Curve Pavement Preservation 448.6 A300280 NMDOT CRDC Central $2,528,060 $2,528,060 651.6 A300376 NMDOT D-3 $655,200 $655,200 I-25 NB Widening 448.7 A300377 NMDOT D-3 $436,800 $436,800 NM 528 Rio Rancho Blvd Improvements (Upper Section) NM 6 Bridge Replacement ( Rio Grande Bridge #7453) ITS - District 3 Deployment of ITS ITS - District 3 Deployment of ITS AMPA Wide Motorist Assistance Courtesy Patrols 493.4 A300381 NMDOT CRDC Central $1,597,830 $1,263,240 $2,861,070 6.8 A300423 NMDOT D-3 District 3 $684,236 $684,236 104.8 A300768 NMDOT D-3 District 3 $145,600 $145,600 104.9 A300769 NMDOT D-3 District 3 $109,200 $145,600 $145,600 $400,400 568.9 A300799 NMDOT D-3 District 3 $291,200 $36,400 $57,400 $36,400 $421,400 I-25 Widening PHASE II 485 A301011 NMDOT D-3 District 3 $1,022,969 $1,022,969 Southern Blvd Reconstruction Phase I US 550 Reconstruction & Widening Widening Phase 1 Widening Phase 2 District 3 Bridge Repairs - Mateo Overpass Bridge Replacement 9.1 A301041 City of Rio DPW $305,760 $305,760 Rancho 386.3 A301232 NMDOT CRDC Central $6,612 $6,612 386.4 A301233 NMDOT CRDC $364,000 $364,000 386.5 A301234 NMDOT CRDC $102,588 $102,588 114 A301343 NMDOT D-3 $436,800 $436,800 Page 3 of 10

District 3 Bridge Replacement- FR 4058 116 A301345 NMDOT D-3 $829,920 $829,920 District 3 Bridge Replacement- Algadones I-25 / Montgomery Blvd. Interchange Reconstruction District 3 Pavement Preservation - I-40 West of Coors District 3 Pavement Preservation: I-25 SB Lanes District 3 Pavement Preservation - I-40 and I-25 (Big I) District 3 Pavement Preservation - I-25 North of Algodones Bridge I-40 Canyon Pavement Rehabilitation AMPA Wide Corridor Study Interstate and other NHS routes 75.8 A301801 NMDOT D-3 $291,200 $291,200 250.3 A301900 NMDOT CRDC $2,284,790 $4,279,800 $6,564,590 260 A302100 NMDOT D-3 $291,200 $1,237,600 $1,528,800 651.4 A302101 NMDOT D-3 $436,800 $436,800 651.5 A302102 NMDOT D-3 $2,184,000 $2,184,000 651.7 A302103 NMDOT D-3 $457,800 $457,800 359.2 A302120 NMDOT D-3 $2,184,000 $2,184,000 160.1 A302141 NMDOT D-3 $145,600 $145,600 I-25 FDR Phase 2 265.1 A302161 NMDOT D-3 $145,600 $145,600 I-25 FDR Phase 3 265.2 A302162 NMDOT D-3 $145,600 $145,600 (26 NHPP Projects) $4,478,300 $3,257,586 $4,570,999 $4,570,999 $4,570,999 $4,425,400 $25,874,285 NHPP (Non-Chargeable) District 3 Bridge Deck Overlays 115 A301344 NMDOT D-3 $181,075 $181,075 District 3 Bridge Preservation 117 A301346 NMDOT D-3 District 3 $200,000 $200,000 District 3 Bridge Preservation (Bridge Deck Overlays) 117.1 A301347 NMDOT D-3 $260,513 $260,513 I-25 FDR Phase 1 265 A302160 NMDOT D-3 $1,528,800 $1,528,800 (4 NHPP (Non-Chargeable) Projects) $181,075 $200,000 $1,789,313 $2,170,389 Page 4 of 10

Rail Xing Haz Elim (Sect 130) Railroad Crossing Improv - Avenida Bernalillo and NMRX RR (Crossing 013758J) 172 A301780 NMDOT Transit Transit Rail $40,000 $40,000 Rail Division Railroad Crossing Improv - Lucero Rd and NMRX RR (Crossing 013760D) Railroad Crossing Improv - Ortega Rd and NMRX RR (Crossing 013773E) Railroad Crossing Improv - 8th Street Albuquerque and NMRX/BNSF RR (Crossing 019679L) 172.1 A301781 NMDOT Transit Transit Rail $16,000 $16,000 Rail Division 172.2 A301782 NMDOT Transit Transit Rail $16,500 $16,500 Rail Division 172.3 A301783 NMDOT Transit Transit Rail $15,000 $15,000 Rail Division (4 Rail Xing Haz Elim (Sect 130) Projects) $16,000 $55,000 $16,500 $87,500 Page 5 of 10

Safety (HSIP) Phase II Quiet Zone - NM 314 Widening @ NM 147 422.6 A300083 Pueblo of Isleta Pueblo $95,000 $95,000 Govt NM 314 & Courthouse Rd Intersection Improvements Zuni Rd Improvements NM 314, NM 45 & NM 317 Intersection Improvements & Realignment Delgado Avenue Roadway & Pedestrian Improvements Rio Grande Blvd Intersection Improvements Sunset Rd SW Roadway and Safety Improvements Rail Corridor Pedestrian Safety Improvements Phase II 314 A300191 NMDOT D-3 District 3 $60,000 $35,500 $189,000 $284,500 636 A300655 City of Dept. $300,000 $300,000 Albuquerque- Munic. DMD Devel 82 A301088 Pueblo of Isleta Pueblo $532,111 $532,111 Govt 681 A301700 City of Belen City Govt $10,000 $72,222 $82,222 63.1 A301710 City of Dept. $176,000 $176,000 Albuquerque- Munic. DMD Devel 700 A301740 County of $50,000 $50,000 Bernalillo 262.1 A302111 Town of $209,984 $209,984 Bernalillo (8 Safety (HSIP) Projects) $681,000 $245,484 $199,000 $72,222 $532,111 $1,729,817 STP-Bridge Off Sys NM 6/BNSF Railroad Bridge Preservation 138.5 A301555 NMDOT D-3 District 3 $346,000 $346,000 (1 STP-Bridge Off Sys Project) $346,000 $346,000 Page 6 of 10

STP-Flex I-40 Embudo Channel Improvements 615.7 A300257 NMDOT D-3 District 3 $18,200 $18,200 $36,400 I-25 Rio Bravo Interchange Reconstruction I-25 MLK NB Off Ramp Improvements NM 528 Rio Rancho Blvd Improvements (Upper Section) NM 6 Bridge Replacement ( Rio Grande Bridge #7453) NM 6 Pavement Preservation in Los Lunas NM 6 Pavement Preservation West of I-25 448.6 A300280 NMDOT CRDC Central $10,106 $10,106 250.5 A300375 NMDOT D-3 $29,120 $29,120 493.4 A300381 NMDOT CRDC Central $50,929 $50,929 6.8 A300423 NMDOT D-3 District 3 $1,122,331 $404,509 $1,526,840 260.1 A300424 NMDOT D-3 $182,438 $182,438 260.2 A300425 NMDOT D-3 $145,600 $145,600 Orthophotography 3.4 A300604 NMDOT D-3 District 3 $7,280 $7,280 Orthophotography 3.5 A300605 NMDOT D-3 District 3 $7,280 $7,280 Orthophotography 3.6 A300606 NMDOT D-3 $7,280 $7,280 ITS - District 3 Deployment of ITS AMPA Wide Motorist Assistance Courtesy Patrols District 3 On-Call Planning & Design Support District 3 On-Call Planning & Design Support NM 556 (Tramway Blvd) @ Montgomery Signal Upgrade NM 500 (Rio Bravo) and 98th Street Signal Upgrade 104.9 A300769 NMDOT D-3 District 3 $145,600 $145,600 $291,200 568.9 A300799 NMDOT D-3 District 3 $29,120 $29,120 650.8 A300808 NMDOT D-3 District 3 $72,800 $72,800 650.9 A300809 NMDOT D-3 District 3 $72,800 $43,680 $116,480 41.1 A300922 NMDOT D-3 $43,680 $43,680 42.2 A300944 NMDOT D-3 $43,680 $43,680 Page 7 of 10

Paseo del Norte PCCP Intersection Reconstruction 28.1 A301021 NMDOT D-3 District 3 $145,600 $145,600 District 3 Bridge Replacements- NM 165 Widening Phase 1 165.1 A301161 NMDOT D-3 $291,200 $291,200 386.4 A301233 NMDOT CRDC $1,456 $1,456 NM 14 Slope Erosion Mitigation 99.1 A301441 NMDOT D-3 $58,678 $58,678 & Rehab Phase 1 & Rehab Phase 2 & Rehab Phase 3 NM 337 Bridge Replacement in Chilili 99.3 A301443 NMDOT D-3 $109,200 $109,200 99.4 A301444 NMDOT D-3 $91,664 $91,664 99.5 A301445 NMDOT D-3 $409,080 $409,080 671 A301620 NMDOT CRDC Central $257,600 $257,600 NM337 Bridge Replacement 671.1 A301621 NMDOT D-3 District 3 $509,600 $509,600 I-25 / Montgomery Blvd. Interchange Reconstruction AMPA Wide Access Management and Corridor Study Non-Interstate Routes 250.3 A301900 NMDOT CRDC $74,079 $74,079 160 A302140 NMDOT D-3 $58,387 $58,387 (27 STP-Flex Projects) $278,093 $1,604,211 $681,118 $681,118 $681,118 $681,118 $4,606,777 Page 8 of 10

STP-Flex (Non-Chargeable) NM 6 Bridge Replacement ( Rio Grande Bridge #7453) 6.8 A300423 NMDOT D-3 District 3 $103,376 $103,376 I-25 Widening PHASE II 485 A301011 NMDOT D-3 District 3 $103,376 $103,376 US 550 Reconstruction & Widening 386.3 A301232 NMDOT CRDC Central $43,680 $43,680 NM 14 Slope Erosion Mitigation 99.1 A301441 NMDOT D-3 $36,400 $36,400 I-25 / Montgomery Blvd. Interchange Reconstruction NMDOT CRDC On-Call Planning & Design Support 250.3 A301900 NMDOT CRDC $369,903 $369,903 270 A302170 NMDOT CRDC $72,800 $72,800 (6 STP-Flex (Non-Chargeable) Projects) $620,335 $109,200 $729,535 STP-Rural NM 14 Slope Erosion Mitigation 99.1 A301441 NMDOT D-3 $309,984 $309,984 NM14/NM 536/Frost Rd intersection Improvements & Rehab Phase 1 & Rehab Phase 2 & Rehab Phase 3 NM 337 Bridge Replacement in Chilili 99.2 A301442 NMDOT D-3 District 3 $309,984 $309,984 99.3 A301443 NMDOT D-3 $32,888 $32,888 99.4 A301444 NMDOT D-3 $317,836 $228,149 $545,984 99.5 A301445 NMDOT D-3 $259,730 $259,730 671 A301620 NMDOT CRDC Central $44,214 $200,056 $244,270 (6 STP-Rural Projects) $350,724 $228,149 $303,944 $200,056 $309,984 $309,984 $1,702,840 Page 9 of 10

STP-Sm Urb NM 6 Bridge Replacement ( Rio Grande Bridge #7453) 6.8 A300423 NMDOT D-3 District 3 $15,468 $15,468 NM 6 Pavement Preservation in Los Lunas NM 6 Pavement Preservation West of I-25 260.1 A300424 NMDOT D-3 $635,544 $635,544 260.2 A300425 NMDOT D-3 $635,544 $635,544 (3 STP-Sm Urb Projects) $15,468 $635,544 $635,544 $1,286,555 Grand Total of All State Match for Federal Funds $13,000,540 $5,942,296 $5,986,530 $7,368,708 $6,746,256 $6,052,045 $45,096,375 Page 10 of 10