XFEL High Power RF System Recent Developments

Similar documents
INFN School on Electron Accelerators. RF Power Sources and Distribution

The TESLA RF System. S. Choroba. for the TESLA Collaboration. DESY Notkestr. 85, D Hamburg, Germany

Detailed Design Report

A HIGH POWER LONG PULSE HIGH EFFICIENCY MULTI BEAM KLYSTRON

L-Band RF R&D. SLAC DOE Review June 15 th, Chris Adolphsen SLAC

Pulses inside the pulse mode of operation at RF Gun

DESIGN AND PERFORMANCE OF L-BAND AND S-BAND MULTI BEAM KLYSTRONS

RF plans for ESS. Morten Jensen. ESLS-RF 2013 Berlin

ILC RF System R&D. Chris Adolphsen, SLAC. Section of 1.3 GHz SC Linac. June 29, 2007 PAC07 Talk FRYC01

IOT OPERATIONAL EXPERIENCE ON ALICE AND EMMA AT DARESBURY LABORATORY

Pulsed Klystrons for Next Generation Neutron Sources Edward L. Eisen - CPI, Inc. Palo Alto, CA, USA

Status of BESSY II and berlinpro. Wolfgang Anders. Helmholtz-Zentrum Berlin for Materials and Energy (HZB) 20th ESLS-RF Meeting

WG2 Group Summary. Chris Adolphsen Terry Garvey Hitoshi Hayano

Introduction: CW SRF linac types, requirements and challenges High power RF system architecture

ILC-LNF TECHNICAL NOTE

A New 4MW LHCD System for EAST

TOSHIBA Industrial Magnetron E3328

RF Upgrades & Experience At JLab. Rick Nelson

CERN EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH. A 50 Hz LOW-POWER SOLID-STATE KLYSTRON-MODULATOR

RF Power Generation II

18 GHz, 2.2 kw KLYSTRON GENERATOR GKP 24KP 18GHz WR62 3x400V

RF considerations for SwissFEL

Spear3 RF System Sam Park 11/06/2003. Spear3 RF System. High Power Components Operation and Control. RF Requirement.

TECHNICAL SPECIFICATION Multi-beam S-band Klystron type BT267

Experience with the Cornell ERL Injector SRF Cryomodule during High Beam Current Operation

!"!3

STATUS OF THE SWISSFEL C-BAND LINEAR ACCELERATOR

PULSED MODULATOR TECHNOLOGY

RF Solutions for Science.

LCLS RF Reference and Control R. Akre Last Update Sector 0 RF and Timing Systems

5 Project Costs and Schedule

Karin Rathsman, Håkan Danared and Rihua Zeng. Report from RF Power Source Workshop

Solid State Modulators for X-Band Accelerators

14 GHz, 2.2 kw KLYSTRON GENERATOR GKP 22KP 14GHz WR62 3x400V

Evaluation of Performance, Reliability, and Risk for High Peak Power RF Sources from S-band through X-band for Advanced Accelerator Applications

4.4 Injector Linear Accelerator

SMTF Beta <1 Front End Linac Infrastructure and Plans

ANKA RF System - Upgrade Strategies

Current status of XFEL/SPring-8 project and SCSS test accelerator

Towards an X-Band Power Source at CERN and a European Structure Test Facility

News from HZB / BESSY Wolfgang Anders at ESLS-RF Meeting September 2010 Trieste

The FLASH objective: SASE between 60 and 13 nm

STATUS OF THE EUROPEAN XFEL CONSTRUCTING THE 17.5 GEV SUPERCONDUCTING LINEAR ACCELERATOR

3 cerl. 3-1 cerl Overview. 3-2 High-brightness DC Photocathode Gun and Gun Test Beamline

Nick Walker DESY MAC

Karin Rathsman. Calculations on the RF Source and Distribution

Examples of Successful Collaboration Between CPI and DOE Labs. Todd Treado CPI December 2013

North Damping Ring RF

Linac upgrade plan using a C-band system for SuperKEKB

The PEFP 20-MeV Proton Linear Accelerator

KEKB INJECTOR LINAC AND UPGRADE FOR SUPERKEKB

Diamond RF Status (RF Activities at Daresbury) Mike Dykes

Improvements to the APS LINAC and SR/Booster klystron HVPS, and Accomplishments of the 352MHz RFTS

Oak Ridge Spallation Neutron Source Proton Power Upgrade Project and Second Target Station Project

Next Linear Collider. The 8-Pack Project. 8-Pack Project. Four 50 MW XL4 X-band klystrons installed on the 8-Pack

RF Power Upgrade at Jefferson Lab

PULSED POWER FOR FUTURE LINEAR ACCELERATORS

Klystron Lifetime Management System

A New High Intensity Proton Source. The SCRF Proton Driver. (and more!) at Fermilab. July 15, Bill Foster SRF2005

2 Work Package and Work Unit descriptions. 2.8 WP8: RF Systems (R. Ruber, Uppsala)

Dark current and multipacting trajectories simulations for the RF Photo Gun at PITZ

PoS(EPS-HEP2015)525. The RF system for FCC-ee. A. Butterworth CERN 1211 Geneva 23, Switzerland

ESS Linac WP8 Radio Frequency Systems and Test Facilities

DEVELOPMENT OF A 10 MW SHEET BEAM KLYSTRON FOR THE ILC*

High Brightness Injector Development and ERL Planning at Cornell. Charlie Sinclair Cornell University Laboratory for Elementary-Particle Physics

The LEP Superconducting RF System

Operating Experience and Reliability Improvements on the 5 kw CW Klystron at Jefferson Lab

Development of klystrons with ultimately high - 90% RF power production efficiency

Empirical Model For ESS Klystron Cathode Voltage

The Elettra Storage Ring and Top-Up Operation

NSLS-II RF Systems James Rose, Radio Frequency Group Leader PAC 2011

KARA and FLUTE RF Overview/status

X-band Solid State Modulator Development. Craig Burkhart Power Conversion Department January 5, 2011

Low Level RF for PIP-II. Jonathan Edelen LLRF 2017 Workshop (Barcelona) 16 Oct 2017

Status of RF Power and Acceleration of the MAX IV - LINAC

DEPARTMENT OF ELECTRONICS AND COMMUNICATION ENGINEERING QUESTION BANK

Upgrade of CEBAF to 12 GeV

SRF-gun Development Overview. J. Sekutowicz 17 th September, 2015 SRF15, Whistler, Canada

Development of Multiple Beam Guns for High Power RF Sources for Accelerators and Colliders

LLRF at SSRF. Yubin Zhao

CLIC Feasibility Demonstration at CTF3

9th ESLS RF Meeting September ALBA RF System. F. Perez. RF System 1/20

Jae-Young Choi On behalf of PLS-II Linac team

Design and Simulation of High Power RF Modulated Triode Electron Gun. A. Poursaleh

GA A26497 SOLID-STATE HIGH-VOLTAGE CROWBAR UTILIZING SERIES-CONNECTED THYRISTORS

THE NEXT LINEAR COLLIDER TEST ACCELERATOR: STATUS AND RESULTS * Abstract

ADVANCED HIGH-POWER MICROWAVE VACUUM ELECTRON DEVICE DEVELOPMENT

Status of the X-ray FEL control system at SPring-8

J/NLC Progress on R1 and R2 Issues. Chris Adolphsen

CEBAF 8 kw CW KLYSTRON SPECIFICATION EE0043, Rev. H January 15, 1998

SRS and ERLP developments. Andrew moss

IOT RF Power Sources for Pulsed and CW Linacs

reported by T. Shintake KEK / RIKEN Japan Summary of C-band R&D for Linear Collider at KEK New soft-x-ray FEL Project at RIKEN/SPring-8

STATUS OF THE SwissFEL C-BAND LINAC

X-Band Klystron Development at

US-ILC Waveguide Industrialization Study. Marc Ross, Chris Nantista and Chris Adolphsen

STATUS OF THE INTERNATIONAL LINEAR COLLIDER

Working Group 2 Introductory presentation. Convenors C. Adolphsen, T. Garvey, H. Hayano

Commissioning of Accelerators. Dr. Marc Munoz (with the help of R. Miyamoto, C. Plostinar and M. Eshraqi)

Present Status and Future Upgrade of KEKB Injector Linac

Transcription:

XFEL High Power RF System Recent Developments for the XFEL RF Group

Outline XFEL RF System Requirements Overview Basic Layout RF System Main Components Multibeam Klystrons Modulator RF Waveguide Distribution RF Interlock Preamplifier 2

RF System Requirements Number of sc cavities: 928 total Power per cavity: 122 kw Gradient at 20GeV: 23.6 MV/m Power per 32 cavities (4 cryo modules): 3.9MW Power per RF station: 5.2MW (including 10% losses in Number of RF stations: Number of RF stations for injectors: 2 (5) Macro beam pulse duration: RF pulse duration: Repetition rate: Average RF power per station: 29 (26 active) 600μs 1.38ms 10Hz (30Hz) 72kW (150kW) waveguides and circulators and a regulation reserve of 15%) 3

RF System Requiremets Overview Layout of the RF Station Accelerator Tunnel Modulator Modulator Hall 4

RF System Requirements XFEL Layout of the RF Station in the Accelerator Tunnel Tunnel components (klystrons, pulse transformers, aux. power supplies etc.) will be installed under the cryo module. The waveguide distribution will be installed on the side of the cryo module. These components are not accessible during accelerator operation. 5

RF System Requirements Layout of the RF Station in the Modulator Hall XFEL The modulators will be installed in the modulator hall. 7x5 modulators in one hall. Maintenance and repair is possible during accelerator operation. 6

Multibeam Klystrons DESY asked 3 klystron vendors to develop MBK THALES TH1801 CPI VKL8301 TOSHIBA E3736 7

THALES TH1801 Operation Frequency: 1.3GHz Cathode Voltage: < 120 kv Beam Current: < 140 A Max. RF Peak Power: 10MW RF Pulse Duration: 1.5ms Repetition Rate: 10Hz RF Average Power: 150kW Efficiency: ce cy 65% Solenoid Power: < 5.5kW Length: 2.5m 8

Status of the THALES TH1801 prototype: 20,000000 hours operation since May 2000, stored at DESY series tube #003 in operation at FLASH since March 2006 (total operation time: ca: 6500+2100h) #001 was in operation at PITZ in Zeuthen till November 2006, now in operation at the klystron test stand in Hamburg #002 under reconstruction at Thales #004 fully tested at klystron test stand in Hamburg (250 hours), now in operation at PITZ, Zeuthen #005 new tube with modification in test at Thales 11 10 9 TH1801-SN5 500µs RF 1300 MHz- 578µs 27 Hz 118kV-142A HV Summary: all tubes which are now in operation do not show signs of degradation (no arcing, no 0 perveance drops) (MW) Ps 8 7 6 5 4 3 2 1 0 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Pd (W) 9

Multi Beam Klystron CPI VKL-8301 Design Features: 6 beams HOM input and output cavity Cathode loading: <2.5A/cm 2 lifetime prediction: >100000h Status: Data taken at the klystron test stand at DESY 9 MW at 300 μs and 10Hz 8.1 MW at 1.3 ms and 10Hz 55 ) Efficiency (% 50 45 40 35 30 2 4 6 8 Pout (MW) 10

The TOSHIBA E3736 MBK Design Features: 6 beams Ring shaped cavities Cathode loading: <2.1 A/cm 2 Status: June 8 - October 12, 2006 10.4 MW, 1500 μs, 10 Hz, 116.1 kv, h ~ 66% 750h at full power, at present stored at DESY Pout (MW) 11 10 9 8 7 6 5 4 3 2 1 Toshiba MBK, June 2006 U =115,8kV, I = 134A, Trf = 1500μS 0 0 25 50 75 100 125 150 175 200 Pin (W) W) Output power (M 10 9 8 7 6 5 4 3 Toshiba MBK (saturation mode) 2 80 85 90 95 100 105 110 115 Beam Voltage (kv) 11

Status of the vertical MBK development XFEL 6 THALES TH1801 have been built (10MW, 1.5ms, 10Hz, 63% for #3), 1 is in test at THALES klystrons in use at FLASH, PITZ, MBK test stand, several thousends of operation hours under different conditions, now stable operation 1 TOSHIBA E3736 at DESY (10.4MW, 1.5ms, 10Hz, 66%), 750h operation hours 1 CPI VKL8301 at DESY (8.1MW, 1.3ms, 10Hz, 53%) 12

Horizontal MBK prototypes 2900 75 0 Horizontal klystron, side view D 600 1200 Top view Horizontal versions of MBKs by all 3 vendors (THALES, CPI, TOSHIBA) are under construction First klystron is expected in second half of 2007 13

Modulator Modulator Requirements Modulators must generate HV pulses up to 120kV and 140A, 1.57ms pulse length and 10Hz (30Hz) repetition rate The top of the pulse must be flat within 1% The bouncer type modulator with its simple circuit diagram was chosen CHARGING L1 10 kv S1 3 H 1.4 ms 70 kj + 1400 µf 100 µf 80Ω MOV Klystron U C1 U C2 19% t ΔU tot 1% C2 2 mf + L2 330 µh 1:12 Pulse Transformer 14

Modulator 3 bouncer modulators have been developed, built and delivered to TTF by FNAL since 1994 They are continuosly in operation under different operation conditions Industry made subunits (PPT, ABB, FUG, Poynting) Constant power power supply for suppression of 10Hz repetition rate disturbances in the mains Compact storage capacitor bank with self healing capacitors IGCT Stack (ABB); 7 IGCTs in series, 2 are redundant Low leakage inductance pulse transformer (ABB) L<200μH resulting in shorter HV pulse rise time of <200μs Light Triggered Thyristor crowbar avoiding mercury of ignitrons 15

Modulator for Pulse Cable Tests Bouncer at high potential Modulator in hall 2 Low leakage inductance circuit 16

HV Pulse Cable Test Pulse transmission has been successful tested at TTF/FLASH Modulator 5. EMI caused by cable required modification of modulator internal layout (lower leakage inductances, EMC cabinets, bouncer at high potential) New modified modulator is installed at DESY hall 2 and will supply HV pulses via a 1.5km long cable to PT/Klystron in hall 3 (FLASH) during part of the next operation period of FLASH Primary Current 1.1kA 1kA Klystron Voltage 128kV Primary Voltage 10.6kV 17

Qualification of additional modulator vendors 2 additional XFEL prototype modulators have been ordered to qualify additional vendors besides the already know vendors of bouncer modulator components like PPT, ABB, FUG, Poynting One modulator is a bouncer modulator by Imtech/Vonk NL The other modulator is a PSM modulator by Thomson BM CH: Much experience of about 20years exists with PSM modulators for SLS, fusion or radio station applications Test of these devices is planned for 2008 at the modulator test facility at DESY Zeuthen. 18

Modulator Planned Modulator Test Facility at DESY in Zeuthen 19

Bouncer Modulator Test Installation at DESY Zeuthen is foreseen for spring 2008 20

PSM Modulator PSM Modulator by Thomson BM Installation at DESY Zeuthen is foreseen for spring 2008 21

Modulator Status Modulator 11 Bouncer Modulators have been built, 3 by FNAL and 8 together with industry 11 modulators are in operation (FLASH, PITZ, XFEL Teststands) 10 years operation experience exists Modulator foreseen for waveguide tests will be installed in DESY hall 2 and connected to PT and klystron in hall 3 (Bouncer type plus improvements) and used for pulse cable tests Order for more XFEL prototypes has been placed (1 Bouncer plus 1 PSM) Test of prototypes in Zeuthen starting spring 2008 22

Waveguide Distribution Distribution ib i of klystron output power to the superconducting cavities i Protection of the klystron from reflected power Control of phase Cryomodule 1 Cryomodule 2 Cryomodule 3 Cryomodule 4 RF from klystron to cavity DETAIL Phase shifter circulator loads hybrid 23

Waveguide Distribution Many wave guide components have been developed over the last years and have been used for the operation of TTF/FLASH 3 Stub Tuner (IHEP, Bejing, China) E and H Bends (Spinner) Circulator (Ferrite) Changing phase, degree 60 Impedance matching range 1/3Zw 3Zw Max power, MW 2 * Zw waveguide impedance Hybrid Coupler (RFT, Spinner) Type WFHI 3-4 Peak input power, MW 0.4 Average power, kw 8 Min isolation at 1.3 GHz, db > 30 Max insertion loss at 1.3 GHz, db 0.08 Input SWR at 1.3 GHz 1.1 (for full reflection) RF Load (Ferrite) RF Load (Ferrite) Directivity, db Return loss, db Coupling factor, db (due to tolerance overlapping only 13 different coupling factors instead 18 are nessesary) Accuracy of coupling factor, db 30 35 12.5; 12.0; 11.4; 10.7; 10.1; 9.6; 9.1; 8.5; 7.8; 7.0; 6.0; 4.8; 3.0 0.2 Type WFHLL 3-1 Peak input power, MW 1.0 Average power, kw 0.2 Min return loss at 1.3GHz, db 32 40 Max VSWR at 1.3 GHz 1.05 Max surface temperature, T C 50 (for full average power) Physical length, mm 230 Type WFHL 3-1 WFHL 3-5 Peak input power, M W 2.0 5.0 Average power, kw 10 100 Min return loss at 1.3 GHz, db 32 40 32 40 Max VSWR at 1.3 GHz <1.05 <1.05 Max surface temperature, Δ T C 20 30 (for full average power) Physical length, mm 385 850 24

Waveguide Distribution A New Waveguide Distribution for the XFEL has been developed. It will be tested with ACC6 at TTF/FLASH Standard d FLASH like Distribution ib ti Combined System with shunt tees: less space, less parts, less weight, lower costs, must be tested, planned for ACC6 at FLASH 25

Old and new waveguide distribution XFEL OLD NEW 26

Waveguide distribution in Halle II XFEL FLASH like Combined system 27

Waveguide distribution with shunt tees Shunt tee with integrated phaseshifters Asymmetric shunt tee 3.0 db, 4.77 db, 6.0 db Fixed phaseshifters 28

New Binary Cell with shunt tee with integrated phase shifter 29

Asymmetric shunt tee Coupling ratio 6dB post 1 post 2 70 Post position 60 z1 1, x2, mm 50 40 30 20 1 2 3 4 5 6 7 8 S21 30

Phasing of wavegude distribution XFEL Combined system with asymmetric shunt tees -212º -212º -212º 165,1 12,0 212º 0º 212º 0º 212º 0º 0º Linear system with hybrids - FLASH like 115º -40º -25º -15º a= 165,1 mm -115º 0º 40º 25º 0º 15º 0º 10º 5º -5º 31

RF Interlock Zeuthen/HH development FPGA Based Version #2 installed at FLASH Version #3 installed at PITZ and module test facility, will be tested at FLASH too Version #3 allows setting of interlocks remote controlled 32

Preamplifier Specification reworked Several new amplifiers are ordered, some received and in test Will be used at MBK teststand, FLASH, Zeuthen 33

HV Pulse Cable Transmission of HV pulses (10kV, 1.6kA, 1.57ms, 10Hz (30Hz)) from the pulse generating unit (modulator hall) to the pulse transformer (accelerator tunnel) Maximum length 1.5km Impedance of 25 Ohms (4 cable in parallel will give 6.25 Ohms in total) to match the klystron impedance Triaxial construction (inner conductor at 10kV, middle conductor at 1kV, outer conductor at ground) diameter 30mm dielectric material: XLPE 34