Status of BESSY II and berlinpro. Wolfgang Anders. Helmholtz-Zentrum Berlin for Materials and Energy (HZB) 20th ESLS-RF Meeting

Similar documents
News from HZB / BESSY Wolfgang Anders at ESLS-RF Meeting September 2010 Trieste

3 cerl. 3-1 cerl Overview. 3-2 High-brightness DC Photocathode Gun and Gun Test Beamline

Status of SOLARIS. Paweł Borowiec On behalf of Solaris Team

Experience with the Cornell ERL Injector SRF Cryomodule during High Beam Current Operation

IOT Charakterization at BESSY ( HZB)

IOT OPERATIONAL EXPERIENCE ON ALICE AND EMMA AT DARESBURY LABORATORY

ILC-LNF TECHNICAL NOTE

SRS and ERLP developments. Andrew moss

Spear3 RF System Sam Park 11/06/2003. Spear3 RF System. High Power Components Operation and Control. RF Requirement.

Detailed Design Report

INFN School on Electron Accelerators. RF Power Sources and Distribution

Diamond RF Status (RF Activities at Daresbury) Mike Dykes

RUNNING EXPERIENCE OF FZD SRF PHOTOINJECTOR

The Elettra Storage Ring and Top-Up Operation

STATUS OF THE SWISSFEL C-BAND LINEAR ACCELERATOR

XFEL High Power RF System Recent Developments

RF considerations for SwissFEL

Status of SOLARIS Arkadiusz Kisiel

NSLS-II RF Systems James Rose, Radio Frequency Group Leader PAC 2011

!"!3

RF Upgrades & Experience At JLab. Rick Nelson

Present Status and Future Upgrade of KEKB Injector Linac

LLRF at SSRF. Yubin Zhao

Proceedings of the 1997 Workshop on RF Superconductivity, Abano Terme (Padova), Italy

Program Risks Risk Analysis Fallback Plans for the. John T. Seeman DOE PEP-II Operations Review April 26, 2006

SLS RF operation report 2003

Status of RF Power and Acceleration of the MAX IV - LINAC

9th ESLS RF Meeting September ALBA RF System. F. Perez. RF System 1/20

KEKB INJECTOR LINAC AND UPGRADE FOR SUPERKEKB

High Brightness Injector Development and ERL Planning at Cornell. Charlie Sinclair Cornell University Laboratory for Elementary-Particle Physics

PEP II Design Outline

SRF-gun Development Overview. J. Sekutowicz 17 th September, 2015 SRF15, Whistler, Canada

High Rep Rate Guns: FZD Superconducting RF Photogun

Operating Experience and Reliability Improvements on the 5 kw CW Klystron at Jefferson Lab

RF plans for ESS. Morten Jensen. ESLS-RF 2013 Berlin

ANKA RF System - Upgrade Strategies

North Damping Ring RF

5 Project Costs and Schedule

Current status of XFEL/SPring-8 project and SCSS test accelerator

30 GHz Power Production / Beam Line

The LEP Superconducting RF System

TECHNICAL SPECIFICATION Multi-beam S-band Klystron type BT267

Tutorial: Trak design of an electron injector for a coupled-cavity linear accelerator

Availability and Reliability Issues for the ILC

PoS(EPS-HEP2015)525. The RF system for FCC-ee. A. Butterworth CERN 1211 Geneva 23, Switzerland

Next Linear Collider. The 8-Pack Project. 8-Pack Project. Four 50 MW XL4 X-band klystrons installed on the 8-Pack

Status of CTF3. G.Geschonke CERN, AB

The basic parameters of the pre-injector are listed in the Table below. 100 MeV

KARA and FLUTE RF Overview/status

Operational experience with the SOLEIL LINAC and Status of the ThomX LINAC project

Synchrotron Light Facility. Operation of ALBA RF. Angela Salom on behalf of RF team: Francis Perez, Bea Bravo and Jesus Ocampo

Technology Challenges for SRF Guns as ERL Sources in View of Rossendorf work

CEBAF Accelerator Update. Michael Tiefenback CASA Accelerator Physics Experimental Liaison June 14, 2017

STATUS AND COMMISSIONING RESULTS OF THE R&D ERL AT BNL*

Status of Elettra, top-up and other upgrades

Upgrading LHC Luminosity

PHIN. Report on the Development of a Radio-Frequency Photo Electron Source with Superconducting Niobium Cavity (SRF Gun Realization)

Pulses inside the pulse mode of operation at RF Gun

Dark current and multipacting trajectories simulations for the RF Photo Gun at PITZ

RF Power Klystrons & 20 Year Look. R. Nelson 7/15/15

Linac upgrade plan using a C-band system for SuperKEKB

Introduction: CW SRF linac types, requirements and challenges High power RF system architecture

CLIC Feasibility Demonstration at CTF3

CEPC Klystron Development

III. Proton-therapytherapy. Rome SB - 3/5 1

EUROFEL-Report-2007-DS EUROPEAN FEL Design Study

The ESS Accelerator. For Norwegian Industry and Research. Oslo, 24 Sept Håkan Danared Deputy Head Accelerator Division Group Leader Beam Physics

4.4 Injector Linear Accelerator

Photo cathode RF gun -

ARIEL Buildings Construction and Electron Linac Photo-Fission Driver for the Rare Isotope Program at TRIUMF

Towards an X-Band Power Source at CERN and a European Structure Test Facility

Status and Plans for PEP-II

STATUS OF THE EUROPEAN XFEL CONSTRUCTING THE 17.5 GEV SUPERCONDUCTING LINEAR ACCELERATOR

RF Power Generation II

Evaluation of Performance, Reliability, and Risk for High Peak Power RF Sources from S-band through X-band for Advanced Accelerator Applications

DELIVERY RECORD. Location: Ibaraki, Japan

Jae-Young Choi On behalf of PLS-II Linac team

Status of KEK X-band Test Facility and its future plans

LCLS RF Reference and Control R. Akre Last Update Sector 0 RF and Timing Systems

The FLASH objective: SASE between 60 and 13 nm

DESIGN OF 1.2-GEV SCL AS NEW INJECTOR FOR THE BNL AGS*

CEBAF 8 kw CW KLYSTRON SPECIFICATION EE0043, Rev. H January 15, 1998

The PEFP 20-MeV Proton Linear Accelerator

The FAIR plinac RF Systems

A New 4MW LHCD System for EAST

CLEX (CLIC Experimental Area)

Low Level RF for PIP-II. Jonathan Edelen LLRF 2017 Workshop (Barcelona) 16 Oct 2017

45 MW, 22.8 GHz Second-Harmonic Multiplier for High-Gradient Tests*

A HIGH POWER LONG PULSE HIGH EFFICIENCY MULTI BEAM KLYSTRON

TEST RESULTS OF THE 84 GHZ / 200 KW / CW GYROTRON

IOT RF Power Sources for Pulsed and CW Linacs

L-Band RF R&D. SLAC DOE Review June 15 th, Chris Adolphsen SLAC

AREAL- Phase 1. B. Grigoryan on behalf of AREAL team

The Construction Status of CSNS Linac

THE NEXT LINEAR COLLIDER TEST ACCELERATOR: STATUS AND RESULTS * Abstract

AARHUS UNIVERSITET November, ASTRID2 Status. Heine Dølrath Thomsen on behalf of the ASTRID2 Team

STATUS OF THE SwissFEL C-BAND LINAC

Electron linac photo-fission driver for rare isotope program at TRIUMF

Commissioning of Accelerators. Dr. Marc Munoz (with the help of R. Miyamoto, C. Plostinar and M. Eshraqi)

Linac 4 Instrumentation K.Hanke CERN

Transcription:

Status of BESSY II and berlinpro Wolfgang Anders Helmholtz-Zentrum Berlin for Materials and Energy (HZB) 20th ESLS-RF Meeting 16.-17.11.2016 at PSI

Outline BESSY II Problems with circulators Landau cavity leakage HOM cavity vacuum problems SSA experience after one year of operation BERLinPro Status of the building Klystron problems Gun module production BESSY VSR Status SSA dreams Wolfgang Anders Status BESSY II and berlinpro 20th ESLS-RF Meeting 16.-17.11.2016 PSI 2

BESSY II problems with AFT circulators We bought new temperature compensation units (TCU) because of aging problems All circulators are sent to AFT for adaption New TCU units do not work. TCUs switch off transmitters at a temperature slightly too low Potentiometers on maximum setting AFT circulator with RF shielding No support by AFT, but they offered a software for a high price to get better settings. We decided not to buy and run with lower performance We detected RF radiation from circulators adapted a shielding Wolfgang Anders Status BESSY II and berlinpro 20th ESLS-RF Meeting 16.-17.11.2016 PSI 3

BESSY II Landau Cavity Leakage I Due to fail of the control system landau cavity 2 has been on 18 kw power for half an hour (water return temperature 48 deg.) Typical operation 2 kw! Interlock 20 kw In the beamline of the straight section of the landau cavities and a sc wave length shifter magnet high radiation levels were detected since this event. Radiation officer says it is radiation by bad vacuum Vacuum gauges few meters away show good vacuum, leak detection negative In shutdown we opened landau cavities and looked into the cavities Landau cavities with waveguide HOM dampers Landau cavities in BESSY II Ring Wolfgang Anders Status BESSY II and berlinpro 20th ESLS-RF Meeting 16.-17.11.2016 PSI 4

BESSY II LANDAU CAVITY LEAKAGE II In the cavities we saw broken ferrite (C48) tiles Some small ferrite pieces from upper waveguide have been fallen into the cavity body broken ferrite tiles in HOM dampers Carefully performed search for leakages detected a vacuum leak between body and lit of landau cavity #2 impossible to repair History: Starts at production by SDMS Pot and lit have been brazed at 780 C Was leaky, second brazing at 600 C. Solder contains cadmium making the copper brittle. Still not leak tight. More brazing by hand. Due to the high power load it opened a vacuum leakage 5

Landau cavity leakage counter measures Counter measures in preparation: Bended upper HOM waveguides to prevent ferrite pieces to fall into the cavity body Smaller ferrite tiles with rounded edges, same as the 500 MHz HOM cavity Ports for vacuum pumping and vacuum measurement Ports for in situ optical / infrared inspection One waveguide with vacuum valve planned as a test station for different absorbers sizes and material (SiC) for berlinpro and Bessy VSR New setup for landau cavities New HOM absorber with rounded edges HOM absorber of 500 MHz cavity Wolfgang Anders Status BESSY II and berlinpro 20th ESLS-RF Meeting 16.-17.11.2016 PSI 6

HOM Cavity vacuum problem 2013 two HOM cavities were installed at BESSY II No in situ bake out Poor vacuum in section (10-8 mbar) Vacuum reading in cavity section 10-8 mbar range 2015 next two cavities installed Bake out Vacuum stays bad for the old cavities New installed cavities 10-9 mbar 2016 section opened. Look with endoscope and intensive leak detection nothing detected Spare cavity still in production at RI Four HOM Cavities in BESSY II storage ring Now spare cavity is delivered 2017 still open, if we exchange cavity #2 and section between cavities Wolfgang Anders Status BESSY II and berlinpro 20th ESLS-RF Meeting 16.-17.11.2016 PSI 7

Sumerrizing SSA operation first year 500 MHz 80 kw SSA (Cryoelectra) In the shutdown 2015 all modules were resoldered with high temperature solder 11 months of operation: 12 modules failed out of 630 modules (all burned output section in the module) No other failures No beam loss due to the SSA Best support by Cryoelectra Few beam losses by circulator and water Few beam losses by work on our PLC Modules for resoldering Burned output in a module Wolfgang Anders Status BESSY II and berlinpro 20th ESLS-RF Meeting 16.-17.11.2016 PSI 8

berlinpro: high-current, low-emittance technology demonstrator max. beam energy max. current normalized emittance bunch length (straight) rep. rate Basic Parameter 50MeV 100mA (77pC/bunch) < 1 p mm mrad 2 ps or smaller 1.3GHz losses < 10-5 Wolfgang Anders Status BESSY II and berlinpro 20th ESLS-RF Meeting 16.-17.11.2016 PSI 9

Status berlinpro Shell of building is close to finalization Interior construction is ongoing Expected start of accelerator installation: February 2017 Technic hall Klystron gallery Accelerator hall Wolfgang Anders Status BESSY II and berlinpro 20th ESLS-RF Meeting 16.-17.11.2016 PSI 10

Status berlinpro sc gun module Now: sc photo injector gun module mounting Hope to pump vacuum by the end of the year Try to have first electrons from gun module in testing hall in spring 2017 cryogenic feed box module cold string Wolfgang Anders Status BESSY II and berlinpro 20th ESLS-RF Meeting 16.-17.11.2016 PSI 11

berlinpro RF system RF Transmitters berlinpro: three 1.3 GHz 270 kw cw klystron based transmitters for the injector four 15 kw SSA for recovery linac (and one for booster) Prototype transmitter in the testing hall klystron magnet power supply klystron Klystron transmitters: Two power supplies (FUG) 65 kv 9A are delivered, third will be delivered in December First transmitter is installed in a testing hall All klystrons (CPI) are produced All klystrons factory acceptance test o.k. Wolfgang Anders Status BESSY II and berlinpro 20th ESLS-RF Meeting 16.-17.11.2016 PSI 12

Klystron problems berlinpro First klystron was delivered, vacuum o.k. There Klystron is a large problems Swagelock berlinpro water connector at the collector CPI fastened the connector vacuum leakage Second klystron was delivered Difficult to install in the magnet, because there was a little angle between collector and tube CPI assisted to install high body current at different voltage levels Now waiting for the third klystron Wolfgang Anders Status BESSY II and berlinpro 20th ESLS-RF Meeting 16.-17.11.2016 PSI 13

Status BESSY VSR BESSY VSR is a project to install high gradient sc cavities at 1.5 GHz and 1.75 GHz in the BESSY II storage ring to produce long and short bunches simultaneously Project is still not approved Directors give 15 positions and 3 Mio for prototypes and calculations Try to acquire third party money Two cryo-modules with each: 1 x 5 cell @ 1.5 GHz & 1 x 5 cell @ 1.75 GHz operating at 1.8 K LHe temperature active length: 0.93 m with 20 MV/m gradient: 30 MV GHz total gradient: 60 MV GHz ( x 80 ) Wolfgang Anders Status BESSY II and berlinpro 20th ESLS-RF Meeting 16.-17.11.2016 PSI 14

SSA 1.3 GHz, 1.5 GHz and 1.75 GHz There is hope for third party money next year to buy some cryo stuff and the solid state transmitters In this case we would buy SSA for BESSY VSR and berlinpro in parallel to have all transmitters from same company to reduce spare part costs Our shopping list: 3 x 15 kw 1.5 GHz (BESSY VSR) 3 x 15 kw 1.75 GHz (BESSY VSR) 4 x 15 kw 1.3 GHz (berlinpro) Need some luck Wolfgang Anders Status BESSY II and berlinpro 20th ESLS-RF Meeting 16.-17.11.2016 PSI 15

Summary Some problems solved or to be solved Much work on new projects using superconducting cavities Thank you!!! Arc of light between BESSY II (left, present age) and berlinpro (right, future) Wolfgang Anders Status BESSY II and berlinpro 20th ESLS-RF Meeting 16.-17.11.2016 PSI 16