SPS BPM system renovation. Roadmap & Milestones

Similar documents
Equipment Installation, Planning, Layout, organisation and updates

RF considerations for SwissFEL

PICS IN THE INJECTOR COMPLEX WHAT ARE WE TALKING ABOUT?

LHC Beam Instrumentation Further Discussion

PEP-II longitudinal feedback and the low groupdelay. Dmitry Teytelman

Prospect and Plan for IRS3B Readout

Antenna system Status & progress report

GALILEO Timing Receiver

Next Linear Collider. The 8-Pack Project. 8-Pack Project. Four 50 MW XL4 X-band klystrons installed on the 8-Pack

INSTALLATION AND OPERATION INSTRUCTIONS EVOLUTION VIDEO DISTRIBUTION SYSTEM

MOST - Roadmap Physical Layer & Connectivity from 150Mbps to 5Gbps

Trigger Cost & Schedule

GT Dual-Row Nano Vertical Thru-Hole High Speed Characterization Report For Differential Data Applications

1 Digital BPM Systems for Hadron Accelerators

2 Work Package and Work Unit descriptions. 2.8 WP8: RF Systems (R. Ruber, Uppsala)

ISSN: ISO 9001:2008 Certified International Journal of Engineering Science and Innovative Technology (IJESIT) Volume 2, Issue 4, July 2013

Features OBSOLETE. = +25 C, As a Function of LO Drive. LO = +10 dbm. IF = 70 MHz

Session 07 - What did we learn with beam in 2008? LHC Performance Workshop Chamonix Rhodri Jones on behalf of BE/BI & all our collaborators

Fast Orbit Feedback at the SLS. Outline

Scintillation Tile Hodoscope for the PANDA Barrel Time-Of-Flight Detector

GT Dual-Row Nano Vertical SMT High Speed Characterization Report For Differential Data Applications

MULTIDYNE INNOVATIONS IN TELEVISION TESTING & DISTRIBUTION DIGITAL VIDEO, AUDIO & DATA FIBER OPTIC MULTIPLEXER TRANSPORT SYSTEM

Technical Data. HF Tuner WJ-9119 WATKINS-JOHNSON. Features

Senior Project Manager / AEO

!! 1.0 Technology Brief

GaAs MMIC Double Balanced Mixer

Precision measurements of beam current, position and phase for an e+e- linear collider

GaAs MMIC Double Balanced Mixer

RF upgrade program in LHC injectors and LHC machine

Feedback Control of SPS E-Cloud/TMCI Instabilities

Low Level RF for PIP-II. Jonathan Edelen LLRF 2017 Workshop (Barcelona) 16 Oct 2017

Summary of CBETA Independent Cost Reviews. R. Michnoff January 19, 2017

NanoCom ADS-B. Datasheet An ADS-B receiver for space applications

Measures over 2 GHz with Eaton MT7552b 26 GHz extension. F5DQK February 2009 part 3/4 Eaton MT7552b GHz extension

Status of SOLARIS. Paweł Borowiec On behalf of Solaris Team

Development of BPM Electronics at the JLAB FEL

Surge-Gap Drop Amplifier 1 GHz with 42/54 MHz Split

TransitHound Cellphone Detector User Manual Version 1.3

RF (Wireless) Fundamentals 1- Day Seminar

AREAL- Phase 1. B. Grigoryan on behalf of AREAL team

White Paper. Performance analysis: DOCSIS 3.1 cable TV headend combining systems

PicoScope 9300 Series migration guide

Installation of a DAQ System in Hall C

Features. = +25 C, IF= 1 GHz, LO= +13 dbm* Parameter Min. Typ. Max. Units

LLRF at SSRF. Yubin Zhao

US-ILC Waveguide Industrialization Study. Marc Ross, Chris Nantista and Chris Adolphsen

HDMI TO DVB-T Modulator

LIGHT PROTON THERAPY PROJECT

Development of beam-collision feedback systems for future lepton colliders. John Adams Institute for Accelerator Science, Oxford University

DESIGN AND DEVELOPMENT OF CONFIGURABLE BPM READOUT SYSTEM FOR ILSF

Electronics procurements

Bunch-by-bunch feedback and LLRF at ELSA

RF Upgrades & Experience At JLab. Rick Nelson

Features. = +25 C, 50 Ohm System

Features. = +25 C, IF= 1 GHz, LO= +13 dbm* Parameter Min. Typ. Max. Units

GaAs DOUBLE-BALANCED MIXER

DEPFET Active Pixel Sensors for the ILC

Analog Devices Welcomes Hittite Microwave Corporation NO CONTENT ON THE ATTACHED DOCUMENT HAS CHANGED

Electron Clouds in the SPS: progress in the analysis of cures/mitigations measures and potential schedule of implementation J.M.

ANKA Status Report. N.Smale, A.-S. Müller, E. Huttel, M.Schuh Slides courtesy of A.-S. Müller and C.Heske.

Features. Parameter Min. Typ. Max. Min. Typ. Max. Units

GaAs DOUBLE-BALANCED MIXER

GaAs MMIC Double Balanced Mixer

Linac3 experience for LHC ion runs

Optical Communications Mainframe - Laser Transmitter Module

Status of CTF3. G.Geschonke CERN, AB

GaAs DOUBLE-BALANCED MIXER

Calibrate, Characterize and Emulate Systems Using RFXpress in AWG Series

ADF-2 Production Readiness Review

Chapter 6 Tuners. How is a tuner build: In it's most simple form we have an inductor and a capacitor. One in shunt and one in series.

GaAs DOUBLE-BALANCED MIXER

9th ESLS RF Meeting September ALBA RF System. F. Perez. RF System 1/20

Parameter Input Output Min Typ Max Diode Option (GHz) (GHz) Input drive level (dbm)

FCPM-6000RC. Mini-Circuits P.O. Box , Brooklyn, NY (718)

Digital BPMs and Orbit Feedback Systems

COMMISSIONING OF THE ALBA FAST ORBIT FEEDBACK SYSTEM

The Hmc869LC5 is ideal for: Point-to-Point and Point-to-Multi-Point Radio. Parameter Min. Typ. Max. Units

The 2011 LHC Run - Lessons in Beam Diagnostics

Commissioning of Accelerators. Dr. Marc Munoz (with the help of R. Miyamoto, C. Plostinar and M. Eshraqi)

DPD80 Visible Datasheet

Features. Parameter Min. Typ. Max. Units

6 GHz to 26 GHz, GaAs MMIC Fundamental Mixer HMC773A

Trigger Report. Wesley H. Smith CMS Trigger Project Manager Report to Steering Committee February 23, 2004

OBSOLETE HMC908LC5 MIXERS - I/Q MIXERS, IRMS & RECEIVERS - SMT. GaAs MMIC I/Q DOWNCONVERTER 9-12 GHz. Typical Applications. Functional Diagram

Beam Position Monitor Developments at PSI

Model /29S RF Splitter

Dish Diversity Switch

USB Smart Power Sensor

Basic RF Amplifier Measurements using the R&S ZNB Vector Network Analyzer and SMARTerCal. Application Note

DVM-3000 Series 12 Bit DIGITAL VIDEO, AUDIO and 8 CHANNEL BI-DIRECTIONAL DATA FIBER OPTIC MULTIPLEXER for SURVEILLANCE and TRANSPORTATION

HDMI Extender By Coaxial

SingMai Electronics SM06. Advanced Composite Video Interface: HD-SDI to acvi converter module. User Manual. Revision 0.

AIDA Advanced European Infrastructures for Detectors at Accelerators. Milestone Report. Pixel gas read-out progress

Broadband System - K

Global Trigger Trigger meeting 27.Sept 00 A.Taurok

Oak Ridge Spallation Neutron Source Proton Power Upgrade Project and Second Target Station Project

DPD80 Infrared Datasheet

Brilliance. Electron Beam Position Processor

GaAs MMIC Double Balanced Mixer

Practical De-embedding for Gigabit fixture. Ben Chia Senior Signal Integrity Consultant 5/17/2011

Transcription:

SPS BPM system renovation Roadmap & Milestones

Synopsis Introduction and Overview: Andrea Infrastructures Fibres: Simao Cables: Joel Electronics Analogue Front-End: Manfred Digital Front-End: Manoel Back-End: Andrea GW: Andrea & Manoel SW: Athanasios Integration and commissioning: Andrea 2

Introduction MOPOS (Multi Orbit POsition System) 228 BPMs in 216 locations (12 double planes) System obsolescent Cables continuous degradation requires recalibration and replacements Too many gain stages Need to set the gain before the injection ALPS (A Logarithmic Position System) Based on BI new standard boards Digitalization in the tunnel (rad-tolerant design needed) Use of Logarithmic amplifiers to compress the dynamic range 3 sensitivity ranges, but acquired in parallel 3

Overview: ALPS The original plan Extensive tests in 2017 Commissioning in parallel to MOPOS in 2018 4

Overview: ALPS What happened in 2016 The last prototype tested in November 2016 Met the resolution requirements Could not cover the full dynamic range The radiation working group reviewed the radiation distribution and levels 5

Fibres: Simao 6

Cables: Joel 7

Arcs & LSS: Short coaxial cables RG 58 coaxial cables. 1000 cables (1.2m to 10m) Delivery in progress (today ~ 700@ CERN, 100% for the end of the year). Due to quality problems in the past (assembly of the connector, manufacturer side) we proceed to a reflectometry test for a lot of them. installation at the same time with front end electronic. 8

Straight sections: Long coaxial cables CMC 50 coaxial cables.(20m up to 160m) Remains to be installed : TS2 Left (-). 12 cables. Expected during LS2. Reflectometry test by BI/QP to be done during YETS 9

Analogue FE: Manfred 10

ALPS RF Frond-end Layout (1 Ch.) BPM Absorptive LPF 2x per plane X-bar switch Not shown: Output stages Anti-aliasing LPF Details of the CAL system Log Amps To ADC channels 3 50 m coaxial cable IN 6 db coupler Hairpin BPF ext. RF PCB 6 db coupler 20 db coupler diode limiter high sensitivity range: -45-5dBm DOROS OUT 20 db coupler medium sensitivity range: -25 15dBm CAL signal CTRL PWR low sensitivity range: -5 35dBm Logic I/O Main RF Front-end PCB Log Σ-signal 11

Required Hardware Status Nov. 2017 500x absorptive 400 MHz low-pass filter & impedance matching section Directly connected (no cables!) to the BPM pickup electrodes Reuse of already manufactured housings Need minor modifications PCB layout finalized, ready for prototype manufacturing All filters need to be characterized (S-parameter measurement) and matched in pairs Version with 3 db power splitter for sextant test MOPOS and ALPS can run in parallel 250x X-bar relay switch For calibration purposes 500x 200 MHz hairpin band-pass filter PCB layout for 10 MHz BW prototype filter is finalized Quote for prototype manufacturing (10 units) at hand Rogers substrate and prepreg are ordered, expected delivery end of November 250x main RF front-end PCB Design is finalized Schematics for prototype manufacturing ready for final review Majority of electronics components in house Need radiation tests for a few new RF components, all GaAs HEMT technology, no surprises expected 12

December February March May June September November Milestones 2018 Prep cables in SPS for sext. test rad. tolerance verification of 2017 2018 new RF components (in CHARM) 2019 Development of a verification and calibration test system A-FE design frozen Procurement of missing electronics components 13

January March June February Milestones LS2 2019 2020 2021 Calibration test stand fully operational Characterization of all 200 MHz BPFs Pair matching of the filters 14

Remarks The R&D of the RF front-end electronics experienced some major delays! Lab and beam test showed that the prototype electronics could not fulfill all requirements Lead engineer retired, switch of manpower in Spring 2017 The 200 MHz band-pass filter is mission critical! Filters with 5 and 7.5 MHz bandwidth will be developed as alternative to the 10 MHz baseline design Pro: This will improve the single bunch response (longer ringing) Con: This will reduce the signal level sensitivity (less energy) In-house manufacturing coordination The main RF PCB manufacturing will be coordinated by Betty and her team RF and exotic electronics components will be provided by BI-QP Most (but not all) components are already in-house for full quantity production Check out of the hardware Filters will be characterized with a VNA Followed by pair matching Main RF PCB requires a fully automatized calibration test stand Control and DAQ using the digital front-end Signal generation with RF/pulse-generator and precision step attenuators (in procurement) 15

Digital FE: Manoel 16

Digital FE Bpm Digital Front-end (BDF) BDF ALPS specific rad-hard ADC-based board Digitizes the analogue signals from the ALPS Analogue Front-End Status: Already in production stage: 228 operational, 42 spares Components for 200 more in stock Gbt-based Expandable Front-End (GEFE) Standard rad-tolerant digital Front-End card for BI projects Interfaces the ALPS Front-End electronics with the Back-End Status: 40 pieces already produced for a sextant Production foreseen for 228 operational, 42 spares Components in stock for 80 more boards but redesigned due to changes in the expected radiation levels 17

Digital FE: the Split GEFE (S-GEFE) The Split GEFE (S-GEFE) is an evolution of the GEFE board: Provides the same functionality but split in two boards: Link GEFE (L-GEFE): Mezzanine card featuring exotic components from CERN EP Carrier GEFE (C-GEFE): Carrier card featuring COTS components The L-GEFE and C-GEFE may be used independently: The L-GEFE is rad-hard by design up to TID levels of MGy The C-GEFE is rad-tolerant up to TID levels of 750 Gy Status: First two prototypes already ordered S-GEFE + 18

November February March April July October End 2017 2018: Digital FE roadmap to LS2 2017 2018 2019 19

Back-End: Andrea 20

Status in October 2017 VFC-HD 75 boards to produce for ALPS (1 process 4 BPMs) 57 operational 18 spares BI will produce 900 boards: contract to be awarded in December Test performed during production at the assembly premises 4 boards already available for the project 21

December January May December End 2017 2018: VFC roadmap to LS2 2017 2018 2019 22

GW: Manoel & Andrea 23

Status in October 2017 FPGA code (GW) GEFE (Front-End): Up transmission: done Calibration interface: to be defined Porting from GEFE to L&C-GEFE: to be done (pin assignment) VFC (Back-End): Communication with the analogue FE: done Memory map already defined Orbit, Injection Trajectory, and Capture modules: done FIFO module: to be done Data storing in the large external memory (DDR3): to be done Interlock process module: to be done (functionality to be rediscussed) 24

December January February March May End 2017 2018: GW roadmap to LS2 2017 2018 2019 Time available for tuning to the beam conditions 25

SW: Athanasios 26

Status in October 2017 - SW FESA SW and Expert GUI for qualifying the analogue front-end 27

December January February March May September End 2017 2018: roadmap to LS2 - SW 2017 2018 2019 28

Integration and commissioning: Andrea 29

February March May July September December Integration, Installation, and Tests in 2018 Qualification of the A-FE with beam GW/SW algorithms tuning and Integration tests Sextant test 2017 2018 2019 30

February September February April Integration, Installation, and Tests in LS2 2019 2020 2021 Installation of the Back-End GW/SW integration test with simulated data (depending on controls infrastructure availability) 31

February September February April Integration, Installation, and Tests in LS2 2018 2019 Readiness assessment and SPS recommissioning plans 2020 2021 Installation of the Back-End GW/SW integration test with simulated data (depending on controls infrastructure availability) 32

February September February April Integration, Installation, and Tests in LS2 2018 2019 Readiness assessment and SPS recommissioning plans 2020 2021 Option to restart with MOPOS Installation of the Back-End GW/SW integration test with simulated data (depending on controls infrastructure availability) 33

Summary There are delays on the original schedule due to Analogue front-end redesign required after the tests with beam of 2016 Digital front-end redesign required after changes in the expected radiation distribution and levels Extensive simulation shows that the redesigned A-FE will meet the requirements The integration test on a full sextant from September 2018 to LS2 There is the possibility to install ALPS in parallel to MOPOS Faster SPS recommissioning BUT CO should keep support for LynxOs! 34