ESS Linac WP8 Radio Frequency Systems and Test Facilities

Similar documents
ESS Linac WP8 Radio Frequency Systems and Test Facilities

2 Work Package and Work Unit descriptions. 2.8 WP8: RF Systems (R. Ruber, Uppsala)

The ESS Accelerator. For Norwegian Industry and Research. Oslo, 24 Sept Håkan Danared Deputy Head Accelerator Division Group Leader Beam Physics

ESS: The Machine. Bucharest, 24 April Håkan Danared Deputy Head Accelerator Division. H. Danared Industry & Partner Days Bucharest Page 1

RF plans for ESS. Morten Jensen. ESLS-RF 2013 Berlin

The European Spallation Source

Workshop on Accelerator Operations August 6-10, 2012 Glen D. Johns Accelerator Operations Manager

Karin Rathsman. Calculations on the RF Source and Distribution

SRS and ERLP developments. Andrew moss

The SPL at CERN. slhc. 1. Introduction 2. Description. 3. Status of the SPL study. - Stage 1: Linac4 - Stage 2: LP-SPL - Potential further stages

Karin Rathsman, Håkan Danared and Rihua Zeng. Report from RF Power Source Workshop

News from HZB / BESSY Wolfgang Anders at ESLS-RF Meeting September 2010 Trieste

Nick Walker DESY MAC

CLIC Feasibility Demonstration at CTF3

5 Project Costs and Schedule

Oak Ridge Spallation Neutron Source Proton Power Upgrade Project and Second Target Station Project

INFN School on Electron Accelerators. RF Power Sources and Distribution

RF Power Klystrons & 20 Year Look. R. Nelson 7/15/15

Examples of Successful Collaboration Between CPI and DOE Labs. Todd Treado CPI December 2013

ILC-LNF TECHNICAL NOTE

XFEL High Power RF System Recent Developments

Design of the linear accelerator for the MYRRHA project

Commissioning of Accelerators. Dr. Marc Munoz (with the help of R. Miyamoto, C. Plostinar and M. Eshraqi)

WG2 Group Summary. Chris Adolphsen Terry Garvey Hitoshi Hayano

Upgrading LHC Luminosity

NSLS-II RF Systems James Rose, Radio Frequency Group Leader PAC 2011

Present Status and Future Upgrade of KEKB Injector Linac

Current status of XFEL/SPring-8 project and SCSS test accelerator

RF considerations for SwissFEL

RF Upgrades & Experience At JLab. Rick Nelson

The PEFP 20-MeV Proton Linear Accelerator

RF Power Generation II

HIGH-INTENSITY PROTON BEAMS AT CERN AND THE SPL STUDY

PRESENT STATUS OF J-PARC

Thoughts on Project Standard in Japan

IOT OPERATIONAL EXPERIENCE ON ALICE AND EMMA AT DARESBURY LABORATORY

L-Band RF R&D. SLAC DOE Review June 15 th, Chris Adolphsen SLAC

Diamond RF Status (RF Activities at Daresbury) Mike Dykes

DELIVERY RECORD. Location: Ibaraki, Japan

LCLS RF Reference and Control R. Akre Last Update Sector 0 RF and Timing Systems

Low Level RF for PIP-II. Jonathan Edelen LLRF 2017 Workshop (Barcelona) 16 Oct 2017

The FAIR plinac RF Systems

Evaluation of Performance, Reliability, and Risk for High Peak Power RF Sources from S-band through X-band for Advanced Accelerator Applications

Experience with the Cornell ERL Injector SRF Cryomodule during High Beam Current Operation

What can be learned from HERA Experience for ILC Availability

BBU threshold current study for 6 GeV beam in 12 GeV beamline setup

Upgrade of CEBAF to 12 GeV

Linac 4 Instrumentation K.Hanke CERN

DESIGN OF 1.2-GEV SCL AS NEW INJECTOR FOR THE BNL AGS*

3 cerl. 3-1 cerl Overview. 3-2 High-brightness DC Photocathode Gun and Gun Test Beamline

Solid State Modulators for X-Band Accelerators

Empirical Model For ESS Klystron Cathode Voltage

III. Proton-therapytherapy. Rome SB - 3/5 1

DESIGN OF 250-MW CW RF SYSTEM FOR APT. Daniel E. Rees. PAC '97 Conference. Vancouver, Canada. May 12-16, 1997 DISCLAIMER

STATUS OF THE EUROPEAN XFEL CONSTRUCTING THE 17.5 GEV SUPERCONDUCTING LINEAR ACCELERATOR

Introduction: CW SRF linac types, requirements and challenges High power RF system architecture

The TESLA RF System. S. Choroba. for the TESLA Collaboration. DESY Notkestr. 85, D Hamburg, Germany

KEKB INJECTOR LINAC AND UPGRADE FOR SUPERKEKB

ACCELERATOR R&D FOR THE EUROPEAN ADS DEMONSTRATOR*

A New High Intensity Proton Source. The SCRF Proton Driver. (and more!) at Fermilab. July 15, Bill Foster SRF2005

Detailed Design Report

ANKA RF System - Upgrade Strategies

Pulsed Klystrons for Next Generation Neutron Sources Edward L. Eisen - CPI, Inc. Palo Alto, CA, USA

The LEP Superconducting RF System

Proton Engineering Frontier Project

DESIGN AND PERFORMANCE OF L-BAND AND S-BAND MULTI BEAM KLYSTRONS

LLRF at SSRF. Yubin Zhao

Linac3 experience for LHC ion runs

The Elettra Storage Ring and Top-Up Operation

Status of the FAIR Project. Jürgen Henschel FAIR Project Leader / Technical Director GSI & FAIR

TITLE PAGE. Title of paper: PUSH-PULL FEL, A NEW ERL CONCEPT Author: Andrew Hutton. Author Affiliation: Jefferson Lab. Requested Proceedings:

CLIC Feasibility Demonstration at CTF3

RUNNING EXPERIENCE OF FZD SRF PHOTOINJECTOR

Status of JRA-SRF in CARE

STATUS OF THE SwissFEL C-BAND LINAC

Concept and R&D Plans for Project X

STATUS OF THE EUROPEAN XFEL

RF Solutions for Science.

4.4 Injector Linear Accelerator

Next Linear Collider. The 8-Pack Project. 8-Pack Project. Four 50 MW XL4 X-band klystrons installed on the 8-Pack

Tuner, Coupler WP & specification

First Simultaneous Top-up Operation of Three Different Rings in KEK Injector Linac

mtca.4 Q & A MicroTCA Review Committee June 5, 2012 SLAC MicroTCA Standards Review Q&A-RSL June 4-5, 2012

!"!3

TTF / VUV-FEL. Schedule 2005 and Project Management Issues. Schedule 2005 Project Organisation Budget & Controlling

SMTF Beta <1 Front End Linac Infrastructure and Plans

Linac strategies for the lower beam energies. U. Ratzinger

RF Power Upgrade at Jefferson Lab

PEP-II Overview & Ramp Down Plan. J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007

A HIGH-POWER SUPERCONDUCTING H - LINAC (SPL) AT CERN

Working Group 2 Introductory presentation. Convenors C. Adolphsen, T. Garvey, H. Hayano

PoS(EPS-HEP2015)525. The RF system for FCC-ee. A. Butterworth CERN 1211 Geneva 23, Switzerland

Welcome and FRIB Project Status. FRIB Highlights and Plan Ahead

Towards an X-Band Power Source at CERN and a European Structure Test Facility

Jae-Young Choi On behalf of PLS-II Linac team

Activities on FEL Development and Application at Kyoto University

Basic rules for the design of RF Controls in High Intensity Proton Linacs. Particularities of proton linacs wrt electron linacs

A Fifteen Year Perspective on the Design and Performance of the SNS Accelerator

High Brightness Injector Development and ERL Planning at Cornell. Charlie Sinclair Cornell University Laboratory for Elementary-Particle Physics

Beam Loss Detection for MPS at FRIB

Transcription:

ESS Linac WP8 Radio Frequency Systems and Test Facilities ESS/SPL Collaboration Meeting Lund, 29 June 2010 Roger Ruber (Uppsala University) for the ESS Linac RF Team

ESS Linac WP8: RF Systems Outline Work package description objectives organization work breakdown structure Development challenges design baseline critical design requirements development steps Strategy for test facilities Scientific collaboration 30-Jun-2010 ESS/SPL Collaboration Meeting 2

WP8: Work Package Description Work Package Objectives Baseline design all 352 + 704 MHz RF systems one power source per cavity Issues to be addressed RF system is a major part of the budget must be cost effective 200 cavities/distribution points minor fault might create a major risk R&D focus Overall energy & resource efficiency R&D power generation efficiency, life-time, reliability RF power for 704 MHz SC elliptical cavities investigate two-cavities-per-klystron concept 30-Jun-2010 ESS/SPL Collaboration Meeting 3

WP8: Work Package Description Work Package Organization Technical Board Accelerator PM Mats WP1 Mngmt Coord Mats WP2 Acc. Sci Steve WP3 Infra Serv Josu WP4 Spoke Cav Sebastien WP5 Elliptic Cav Guillaume WP6 NC Linac Santo WP7 HEBT Søren WP8 RF syst Roger WP Project Spec and Detailed Schedule Work Units: Development, Prototyping and Technical Design Report WU8.1 Management & Coordination WU8.2 RF Modelling WU8.3 LLRF WU8.4 RF Power Generation WU8.5 RF Power Distribution WU8.6 RF Test Facilities 30-Jun-2010 ESS/SPL Collaboration Meeting 4

WP8: Work Package Description Work Breakdown Structure Preparing detailed WBS/PBS 30-Jun-2010 ESS/SPL Collaboration Meeting 5

WP8: Development Challenges Design Baseline ESS proton linac: high reliability above 95% 2.5 GeV, 2.3 ms pulses at 20 Hz 50 ma, average 5.0 MW (beam loss <1 W/m) Future upgrade to 75 ma, 7.5 MW Power provided by RF system 352 MHz: 1 RFQ, 3 DTL, 56 SC spoke cavities; buncher cavities 704 MHz: 136 SC elliptical cavities one power source per cavity; peak power up to 1.2 MW 30-Jun-2010 ESS/SPL Collaboration Meeting 6

WP8: Development Challenges Design Baseline 704 MHz High Power RF: klystron amplifier power distribution (A,Φ) power coupler, HOM coupler Low Level RF: RF source, regulate (A,Φ) monitor cavity RF (A,Φ) cavity tuning 30-Jun-2010 ESS/SPL Collaboration Meeting 7

WP8: Development Challenges Critical Design Requirements Baseline with conservative off-the-shelf technology RF system is a major part of the budget construction, operation & maintenance must be cost & resource effective design shall assure efficient heat recovery 200 cavities/distribution points minor fault might create a major risk use reliable technology try to be efficient with spare parts 30-Jun-2010 ESS/SPL Collaboration Meeting 8

WP8: Development Challenges Development Steps Investigate LLRF controls piggy back on existing systems & developments enhancements to decrease power usage? (ideas K. Rathsman) Investigate alternative power sources solid state technology? phase locking magnetrons? (ideas A. Dexter/Lancaster) improve klystron efficiency? (ideas E. Jensen/CERN) Investigate alternative power distribution schemes two-cavities-per-klystron concept 30-Jun-2010 ESS/SPL Collaboration Meeting 9

WP8: Strategy for Test Facilities Overview Needed for development and construction Both 352/704 MHz, if possible back-up facility 352 MHz normal conducting piggy back on existing facilities for NC linac development 352 MHz spoke cavities CEA Saclay: existing IPN Orsay: planned, to be completed by 2012 704 MHz elliptical cavities CEA Saclay: existing, upgrade required for cryomodule CERN: upgrade required, to be completed by 2012 (ESS modulator) DESY: upgrade required, only after completion XFEL (2015) Uppsala: proposed, to be completed by 2012 (focus on RF generation/distribution) 30-Jun-2010 ESS/SPL Collaboration Meeting 10

WP8: Strategy for Test Facilities Uppsala Test Facility (FREIA) Modulator, 704 MHz klystron (4 MW) Refrigerator (140 l/h, 400W with LN 2 precooling) 2 Elliptical cavities in horizontal cryostat (HoBiCat) 30-Jun-2010 ESS/SPL Collaboration Meeting 11

WP8: Scientific Collaboration Timeframe and Planning 30-Jun-2010 ESS/SPL Collaboration Meeting 12

WP8: Scientific Collaboration Partners Collaboration tasks based on WBS/PBS Discussions starting, anybody interested please contact us! 30-Jun-2010 ESS/SPL Collaboration Meeting 13