) ) ) ) CASE NO. ) ) )

Similar documents
Rooftop RF Signage - reducing risk or creating mass confusion?

Verizon NY Section 2 Network Services Issue C, December, 2001

PUP Zoning R-2 R-2 C-1 R-2 R-5 R-6 C-1 R-5 B-2C B-3C B-2 B-1 O-2C B-1 R-2 R-1 C-1 C-1. R-2A Tuckahoe District Patterson West EXISTING TOWER

Chairman Rolfsen called the Public Hearing to order at 7:37 P.M. and introduced the first item on the Agenda:

In this document, the Office of Management and Budget (OMB) has approved, for a

STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS DIVISION OF PUBLIC UTILITIES AND CARRIERS

REPORT TO THE PLANNING COMMISSION

RADIO STATION AUTHORIZATION Current Authorization : FCC WEB Reproduction

New Structure 7050 W. Palmetto Park Road #15-652

Property No

Property No

Reconfiguration Along the U.S.-Mexico Border Meeting in NPSPAC Region 3: Arizona May 16, 2013

Agenda Date: 12/19/17 Agenda Item: 1118 OFFICE OF CABLE TELEVISION & TELECOMMUNICATIONS

WIRELESS PLANNING MEMORANDUM

This Chapter does not apply to applications and decisions on, development on land reserved in corridor maps.

Broadcasting Decision CRTC and Broadcasting Orders CRTC , , , , and

Resolution Calling on the FCC to Facilitate the DTV Transition through Additional Consumer Education Efforts

Federal Communications Commission

VERIZON MARYLAND INC.

INSTRUCTIONS FOR FCC 387

47 USC 534. NB: This unofficial compilation of the U.S. Code is current as of Jan. 4, 2012 (see

FOR PUBLIC VIEWING ONLY INSTRUCTIONS FOR FCC 387 DTV TRANSITION STATUS REPORT. All previous editions obsolete. transition. GENERAL INSTRUCTIONS

RECOMMENDED AMENDMENTS TO OFF-PREMISE SIGN REGULATIONS

ALTERNATIVE BROADCAST INSPECTION PROGRAM

Technical Aspects of Small Wireless Facilities

Before the FEDERAL COMMUNICATIONS COMMISSION Washington, D.C

e-con Systems India Pvt Ltd. esomwb1 User guide

In November, the Federal

About the Presenter. Robert C. May III Partner Telecom Law Firm, PC

ORDER NO * * * * * * * * * On December 21, 2018, the Maryland Public Service Commission

SEC ANALOG SPECTRUM RECOVERY: FIRM DEADLINE.

11. PUBLIC HEARING CONDITIONAL USE PERMIT VERIZON WIRELESS OPENING STATEMENT

FCC 302-FM APPLICATION FOR FM BROADCAST STATION LICENSE

COURT & FCC DEVELOPMENTS IMPACTING LOCAL GOVERNMENTS

CLASSIFICATION OF FILING

Town of Salem, NH Planning Board 33 Geremonty Drive Salem, NH December 22, 2015

Date. James W. Davis, PhD James W. Davis Consultant Inc.

Before the FEDERAL COMMUNICATIONS COMMISSION Washington, D.C

March 10, Re: Notice of Ex parte presentation in MB Docket No.07-57

Property No

BALLER STOKES & LIDE A PROFESSIONAL CORPORATION 2014 P STREET, N.W. SUITE 200 WASHINGTON, D.C (202) FAX: (202)

[MB Docket Nos , ; MM Docket Nos , ; CS Docket Nos ,

January 11, Re: Notice of Ex parte presentation in MB Docket No.07-57

ADVANCED TELEVISION SYSTEMS COMMITTEE, INC. CERTIFICATION MARK POLICY

Agenda Date: 3/18/16 Agenda Item: 38 CABLE TELEVISION

Voice Messaging Outcalling Quick Reference

Analysis of Potential Repacking Issues Affecting KSAT Channel 12 San Antonio, TX January 18, 2013

February 22, To whom it may concern:

UTILITIES (220 ILCS 5/) Public Utilities Act.

TOWN OF MORAGA PLANNING COMMISSION MEETING. Moraga Library Meeting Room February 22, St. Mary s Road MINUTES

Techies Will Love New Courts Building. By the Honorable David E. Cain

DESCRIPTION OF TRANSACTION AND PUBLIC INTEREST STATEMENT

Class B digital device part 15 of the FCC rules

STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS DIVISION OF PUBLIC UTILITIES AND CARRIERS 89 JEFFERSON BOULEVARD WARWICK, RHODE ISLAND 02888

11A. PUBLIC HEARING CONDITIONAL USE PERMIT VERIZON WIRELESS

ARNOLD PORTER LLP FCC RELEASES FINAL DTV TRANSITION RULES CLIENT ADVISORY JANUARY 2008 SUMMARY OF DECISION 1


DETERMINATION PUBLIC CONSULTATION ON A PROPOSAL FOR ASSIGNMENT OF SPECTRUM IN THE 700 MHZ BAND (MARCH 2013)

TITLE III--DIGITAL TELEVISION TRANSITION AND PUBLIC SAFETY SEC SHORT TITLE; DEFINITION.

HDMI to Composite Converter. User s Guide

COST SHARING POLICY FOR COMCAST CABLE SYSTEM CONSTRUCTION FOR STREETS WHICH DO NOT MEET MINIMUM DENSITY REQUIREMENTS

FCC 302-FM APPLICATION FOR FM BROADCAST STATION LICENSE

User Guide. Centrex Recording Interface

Accessible Emergency Information (TV Crawls)

The Jon Vickers Film Scoring Award 2017/2019 Entry Form and Agreement

Executive Summary Conditional Use Authorization HEARING DATE: DECEMBER 17, 2015

FCC 303-S APPLICATION FOR RENEWAL OF BROADCAST STATION LICENSE

Radio Frequency Electromagnetic Energy (RF-EME) Compliance Report

UNITED STATES DISTRICT COURT FOR THE NORTHERN DISTRICT OF TEXAS DALLAS DIVISION ) ) ) ) ) ) ) ) ) COMPLAINT FOR PATENT INFRINGEMENT

Before the FEDERAL COMMUNICATIONS COMMISSION Washington, D.C

STATE OF NEW JERSEY Board of Public Utilities Two Gateway Center Newark, NJ

Before the FEDERAL COMMUNICATIONS COMMISSION Washington, DC 20554

X X X Ad in printed event guide Full Page ½ Page ¼ Page Option to purchase additional sponsorship items

ENFORCEMENT DECREE OF THE BROADCASTING ACT

Staff Report: CenturyLink Cable Franchise

Operating Procedure For use of Con Edison Facilities for Wireless Facilities

Agenda Item C.2 DISCUSSION/ACTION Meeting Date: November 15, 2011

Tower Regulations in Calgary (Amateur Radio Services)

GOVERNMENT GAZETTE OF THE REPUBLIC OF NAMIBIA. N$4.00 WINDHOEK - 11 July 2014 No. 5507

Broadcasting Decision CRTC

Broadcasting and on-demand audiovisual services Regulations (No. 153 of 28 February 1997)

LOW-BUDGET INDEPENDENT FEATURE FILM ASSISTANCE PROGRAM GUIDELINES FOR

FCC 396. BROADCAST EQUAL EMPLOYMENT OPPORTUNITY PROGRAM REPORT (To be filed with broadcast license renewal application)

The fundamental purposes of the educational and public access channel are as follows:

TELECOMMUNICATIONS POLICY UPDATE DEVELOPMENTS IN Matthew C. Ames Hubacher & Ames, PLLC November 19, 2014

WISCONSIN LEGISLATIVE COUNCIL INFORMATION MEMORANDUM

Product Guide Verizon Pennsylvania Inc. Section 35D Verizon Pennsylvania Inc. Original Sheet 1 RESIDENCE TWO-POINT MESSAGE TOLL SERVICE

CHARLOTTE MECKLENBURG PUBLIC ACCESS CORPORATION

SUPREME COURT OF COLORADO Office of the Chief Justice DIRECTIVE CONCERNING COURT APPOINTMENTS OF DECISION-MAKERS PURSUANT TO , C.R.S.

TV Translator Relocation Grant Program

Before the Federal Communications Commission Washington, D.C ) ) ) ) ) )

BEFORE THE NEW JERSEY BOARD OF PUBLIC UTILITIES

The FCC s Pole Attachment Order is Promoting Broadband at the Expense of Electric Utilities By Thomas B. Magee, Partner, Keller and Heckman LLP

Broadcasting Decision CRTC

Frequently Asked Questions: Cable TV and Next Generation CAP EAS

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ) ) ) ) ) )


Township of Egg Harbor August 15, 2011 Planning Board

Optical Mobile Mouse. User s Manual

Cable Rate Regulation Provisions

Transcription:

COMMONWEAL TH OF KENTUCKY BEFORE THE PUBLIC SERVICE COMMISSION In the Matter of: APPLICATION OF NEW CINGULAR WIRELESS PCS, LLC D/B/A AT&T MOBILITY FOR ISSUANCE OF A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A WIRELESS COMMUNICATIONS FACILITY IN TH E COMMONWEAL TH OF KENTUCKY IN THE COUNTY OF OHIO CASE NO. 2018-00431 ORDER On January 2, 2019, New CingularWireless PSC, LLC d/b/a AT&T Mobility (AT&T Mobility filed an application seeking a Certificate of Public Convenience and Necessity (CPCN to construct and operate a wireless telecommunications facility. The proposed facility consists of a tower not to exceed 270 feet in height, with attached antennas, to be located at 544 Adaburg Tower Lane, Hartford, Ohio County, Kentucky. The coordinates for the proposed facility are North Latitude 37 35'25.53" by West Longitude 86 51 '29.35". AT & T Mobility has provided information regarding the structure of the tower, safety measures, and antenna design criteria fo r the proposed facility. Based upon the application, the design of the tower and foundation conforms to applicable nationally recognized building standards, and a licensed professional engineer has certified the plans. Pursuant to 807 KAR 5:063, AT&T Mobility has filed statements of having provided the required notifications regarding th e proposed construction. Pursuant to 807 KAR 5:063, AT&T Mobility has filed evidence that the county judge/executive and all property

owners within 500 feet and contiguous to the cell site have been notified of the proposed construction. The notices solicited any comments and informed the recipients of their right to request intervention. As of the date of this Order, no public comments or requests for intervention have been received. AT&T Mobility has filed applications with the Federal Aviation Administration (FAA and the Kentucky Airport Zoning Commission (KAZC seeking approval for the construction and operation of the proposed facility. Both applications are pending. The Commission, having considered the evidence of record and being otherwise sufficiently advised, finds that AT&T Mobility has demonstrated that a facility is necessary to provide adequate utility service and, therefore, a CPCN to construct the proposed facility should be granted. Pursuant to KRS 278.280, the Commission is required to determine proper practices to be observed when it finds, upon complaint or on its own motion, that the facilities of any utility subject to its jurisdiction are unreasonable, unsafe, improper, or insufficient. To assist the Commission in its efforts to comply with this mandate, AT&T Mobility should notify the Commission if the antenna tower is not used to provide service in the manner set out in the application and this Order. Upon receipt of such notice, the Commission may, on its own motion, institute proceedings to consider the proper practices, including removal of the unused antenna tower, which should be observed by AT&T Mobility IT IS THEREFORE ORDERED that: 1. AT&T Mobility is granted a CPCN to construct a wireless telecommunications facility. The proposed facility consists of a tower not to exceed 270-2- Case No. 2018-00431

feet in height, with attached antennas, to be located at 544 Adaburg Tower Lane, Hartford, Ohio County, Kentucky. The coordinates fo r the proposed facility are North Latitude 37 35'25.53" by West Longitude 86 51'29.35". 2. AT&T Mobility shall immediately notify the Commission in writing if, after the antenna tower is built and utility service is commenced, the tower is not used for a period of three months in the manner authorized by this Order. 3. AT&T Mobility shall file a copy of the final decision regarding the pending FFA and KAZC applications for the proposed construction within ten days of receiving a decision. 4. Documents filed, if any, in the future pursuant to ordering paragraphs 2 and 3 shall reference this case number and shall be retained in the post-case correspondence fi le. 5. This case is closed and removed from the Commission's docket. -3- Case No. 2018-00431

By the Commission ENTERED JAN 22 2019 KENTUCKY PUBLIC I SERVICE COMMISSinN ATTEST: Executive Director Case No. 2018-00431

*Honorable David A Pike Attorney at Law Pike Legal Group PLLC 1578 Highway 44 East, Suite 6 P. O. Box 369 Shepherdsville, KENTUCKY 40165-0369 *New Cingular Wireless PCS, LLC dba AT&T 1010 N St Mary's Street, 9th Floor San Antonio, TX 78215 *Denotes Served by Email Service List for Case 2018-00431