S67: PRE-CYCLE & RAMP

Similar documents
LHC Machine check out

WHAT WE WILL DO FOR BEAM PREPARATION IN 2009 : BEAM INTERLOCKS

Beam systems without failures what can be done?

LHC Nominal injection sequence

LHC COMMISSIONING PLANS

LHC Beam Instrumentation Further Discussion

Injectors. Injectors ready

Session 07 - What did we learn with beam in 2008? LHC Performance Workshop Chamonix Rhodri Jones on behalf of BE/BI & all our collaborators

Procedures for the Commissioning of the Beam Interlock System for the CNGS and SPS-LHC Transfer Lines

MACHINE PROTECTION WORKSHOP REVISITED OPEN ISSUES, PROGRESS AND DECISIONS ON MAJOR TOPICS

REVIEW OF LHC OPERATION

Friday 05/03/ :00 13:00 : Establishing reference orbit golden Jorg Wenninger. Problems Wrong polarity on MCBXH3.L8 Polarity flag changed in DB

1. General principles for injection of beam into the LHC

INITIAL BEAM COMMISSIOMING OF INJECTION AND BEAM DUMP

2008 JINST 3 S LHC Machine THE CERN LARGE HADRON COLLIDER: ACCELERATOR AND EXPERIMENTS. Lyndon Evans 1 and Philip Bryant (editors) 2

beam dump from P2 losses this morning

OPERATIONAL EXPERIENCE WITH CIRCULATING BEAM

RF PERFORMANCE AND OPERATIONAL ISSUES

Equipment Installation, Planning, Layout, organisation and updates

Linac3 experience for LHC ion runs

The 2011 LHC Run - Lessons in Beam Diagnostics

LHC_MD292: TCDQ-TCT retraction and losses during asynchronous beam dump

What can be learned from HERA Experience for ILC Availability

Full IEFC workshop Feb.

A Fast Magnet Current Change Monitor for Machine Protection in HERA and the LHC

RF upgrade program in LHC injectors and LHC machine

A Cathode Development Cornell Cultera This scope includes all labor and purchases required produce photocathodes required by CBETA.

Bunch-by-bunch feedback and LLRF at ELSA

PICS IN THE INJECTOR COMPLEX WHAT ARE WE TALKING ABOUT?

3 cerl. 3-1 cerl Overview. 3-2 High-brightness DC Photocathode Gun and Gun Test Beamline

ANKA RF System - Upgrade Strategies

SUMMARY OF SESSION 4 - UPGRADE SCENARIO 2

Proceedings of the 1997 Workshop on RF Superconductivity, Abano Terme (Padova), Italy

Commissioning and Performance of the ATLAS Transition Radiation Tracker with High Energy Collisions at LHC

100g cfp Health check Jean-Marie Vilain, Product Specialist, Transport and Datacom

!"!3

THE ARCHITECTURE, DESIGN AND REALISATION OF THE LHC BEAM INTERLOCK SYSTEM

Assembly of the HIE-ISOLDE accelerator cavities in a clean room.

AREAL- Phase 1. B. Grigoryan on behalf of AREAL team

The Elettra Storage Ring and Top-Up Operation

SLS RF operation report 2003

HD Review March 30, 2011 Franz Klein

5 Project Costs and Schedule

First LHC Beams in ATLAS. Peter Krieger University of Toronto On behalf of the ATLAS Collaboration

Future Circular Collider Study

P. Adamson, Fermi National Accelerator Laboratory, Batavia, IL 60510, USA. Abstract

LESSONS LEARNT FROM BEAM COMMISSIONING AND EARLY BEAM OPERATION OF THE BEAM LOSS MONITORS (INCLUDING OUTLOOK TO 5 TEV)

Electron Clouds in the SPS: progress in the analysis of cures/mitigations measures and potential schedule of implementation J.M.

Beam Loss Detection for MPS at FRIB

New Filling Pattern for SLS-FEMTO

Status of the X-ray FEL control system at SPring-8

FILLING SCHEMES AND E-CLOUD CONSTRAINTS FOR 2017

A new Interlock Design for the TESLA RF System

Status of SOLARIS. Paweł Borowiec On behalf of Solaris Team

LCLS RF Reference and Control R. Akre Last Update Sector 0 RF and Timing Systems

High Power Cyclotrons

STATUS OF THE SWISSFEL C-BAND LINEAR ACCELERATOR

Linac 4 Instrumentation K.Hanke CERN

Review of Diamond SR RF Operation and Upgrades

LLRF at SSRF. Yubin Zhao

The FAIR plinac RF Systems

Detailed Design Report

arxiv:hep-ex/ v1 27 Nov 2003

Challenges in Accelerator Beam Instrumentation

The LEP Superconducting RF System

Accelerator Controls Part2: CERN central timing system

Application Note DT-AN-2115B-1. DTA-2115B Verification of Specifations

Lessons Learnt from LEP/LHC ML

SPEAR 3: Operations Update and Impact of Top-Off Injection

arxiv: v1 [physics.acc-ph] 9 Aug 2016

Study of the performances of the ALICE muon spectrometer

Experience with the Cornell ERL Injector SRF Cryomodule during High Beam Current Operation

CLIC Feasibility Demonstration at CTF3

FIR Center Report. Development of Feedback Control Scheme for the Stabilization of Gyrotron Output Power

Operations of ewelink APP

Andrei Seryi, Toshiaki Tauchi. December 15-18, 2008

North Damping Ring RF

P. Emma, et al. LCLS Operations Lectures

Control of Intra-Bunch Vertical Motion in the SPS with GHz Bandwidth Feedback

A FOUR GAIN READOUT INTEGRATED CIRCUIT : FRIC 96_1

UNIT-3 Part A. 2. What is radio sonde? [ N/D-16]

BTV Tuesday 21 November 2006

ANKA Status Report. N.Smale, on behalf of all ANKA colleagues, Directors : A.-S. Müller, C Heske, T Baumbach.

Information here generates the timing configuration and is hence the definitive source. The situation is quite volatile, new events and telegram

Undulator Protection for FLASH and for the European XFEL

Behavior of the TTF2 RF Gun with long pulses and high repetition rates (TESLA note )

TRIUMF CYCLOTRON MAIN MAGNET POWER SUPPLY REPLACEMENT

Sample BD Tech Concepts LLC

Scavenger Extraction. Karen Goldsmith Shawn Alverson

Experimental Results of the Coaxial Multipactor Experiment. T.P. Graves, B. LaBombard, S.J. Wukitch, I.H. Hutchinson PSFC-MIT

CMS Upgrade Activities

FIRST SIMULTANEOUS TOP-UP OPERATION OF THREE DIFFERENT RINGS IN KEK INJECTOR LINAC

HWCommissioning. What else?

Model 5405 Dual Analog Sync Generator Data Pack

TTF / VUV-FEL. Schedule 2005 and Project Management Issues. Schedule 2005 Project Organisation Budget & Controlling

Next Linear Collider. The 8-Pack Project. 8-Pack Project. Four 50 MW XL4 X-band klystrons installed on the 8-Pack

PoS(EPS-HEP2015)525. The RF system for FCC-ee. A. Butterworth CERN 1211 Geneva 23, Switzerland

ARES Status 2004(JFY)

Impacts of SEEs. LHC Performance Workshop Chamonix 2009

Commissioning of Accelerators. Dr. Marc Munoz (with the help of R. Miyamoto, C. Plostinar and M. Eshraqi)

Transcription:

HWC CURRENT STATUS HWC slowly coming to an end (11 circuits remaining) Quench training of RB.A34 resumed (10881 A) Quench training of RB.A45 is slow (10484 A) PGCs ongoing Pre-cycles and ramps being performed on S12, S23, S56, S67 1

S67: PRE-CYCLE & RAMP RB RQD/F without RQ4.R6B1/2 and RCD.A67B1/2 2

S12 + S23 + S56: PRE-CYCLE S12 S23 S56 without inner triplets 3

S12 + S23 + S56: RAMP S12 S23 S56 without RQX.L/R2, RQ4.L6B1/2, RCDs 4

BEAM INSTRUMENTATION Most systems ready except: BLM (issue in SX4 some cards give wrong data) Wirescanners (firmware update) FBCCM (DIDT) BGI, BQMIM, BGV not ready before TS1 5

COLLIMATORS Collimator tests ongoing (ramps and MP validation) MCS issues to be verified after recent CMW/RDA release Last night: 10 successful ramps with all collimators Application programs & sequencer tasks operational 6

RF RF power in good shape RF cavities conditioned to 2MV RFLL commissioning without beam ongoing tuning for 2 days without access to UX45, Thursday + Friday? ADT amplifier exchanged today and new spare underground 7

REMAINING ISSUES SECTOR TEST A few SPS SIS interlocks for the LHC not fully operational yet. Economy mode interlock on PCs in lines has to be removed. SIS interlocks on BI in lines to be reviewed. TI8 BLM upstream interlock not resettable and always FALSE. > intervention on 19/3 (access) Issue with DCCT3_TI8 FEI and FGC (new software release done) > to be tested (Verena) Vacuum valve in front of MSI-TI2 (VVGS.29528) interlock to SPS EXT1 master BIC > to be tested once extraction conditions established LHC probe beam re-phasing issues, stability issues => often BQM interlocks > threshold could be increased TT40.BTV.400.343: switches can t be read > intervention on 19/3 (S.Burger) BTVDD image orientation > on hold until LBDS experts decide on preference MKE4 problem not fixed (instabilities on clipper switch, heater current not stable) > switch replacement on Thursday morning 8

REMAINING ISSUES Controls: issues with CMW/RDA affecting several clients addressed by CO experts; new libraries released, but not yet validated (collimators) CIBDS problem while arming LBDS LBDS-XPOC: Missing BI data: (BCTFR, BSRA, etc..) EN/CV pressure check @ IP5 tunnel/cavern: The air flow is going in the right direction between the different areas but the delta P are worse than before. Investigations and measurements ongoing 9

POSSIBLE ROADMAP Access machine closed Aim for complete machine closure tomorrow late afternoon. o Access still possible if needed after that date. Beam Energy Tracking System (BETS) still on simulation. Proposal: Connection (access) to energy defining circuits on Friday 20 RB 45 56 67 78, Q4 s MSD s at point 6 BETS tests have to be synchronized with training quench campaign in sector 45. Beware: Vacuum sector valves must be closed for any powering tests! BIS inputs Ideally we should activate all BIS inputs of a given point in one step. Proposal: all remaining channels to be fully connected on Monday 23. Access required to activate BIS inputs. 10

ACCESS REQUESTS WHO WHERE WHEN WHAT Duration Cryogenics UX65 19/3 am Problem with valve ~2h ALICE UX24? Intervention on detector ½ day LBDS team P6 18/3 CTRV firmware update 3h LBDS team P6 18/3 CIBU 2-3h LBDS team P6 20/3 pm BETS connection to real E 2h ATLAS UX15 21/3 or 23/3 Magnet temperature check 4h EN/MEF LHC 18/3 Check remaining material? 11

TENTATIVE SCHEDULE 1/2 12

TENTATIVE SCHEDULE 2/2 13

NEXT MEETING Friday 8:30 CCC Conference room 14