GammaSafe System. Exertus Selen Circa Projectors. Emergency Source Retrieval

Similar documents
SIM 5 series Lamp Kit

Operation and Maintenance Guide Electric Needle Scalers

3M SLiC 530/533/733-2 Port 0.61 Cable Entry Bracket 3M SLiC 530/533/733-2 Port-MSM 0.61 Cable Entry Bracket

In-Ceiling Electric Motorized Front Projection Screen Evanesce Series. User s Guide

AirWave. Communication Module. Installation. Operations Manual PR&E Revision B 1/01

Instruction for Locking Tuner s Carriage(s) before Shipping

8753E, 8753ET, and 8753ES Network Analyzer Option 1D5 High Stability Frequency Reference Upgrade Kit. Applicable Upgrade Kit Model Number

Setup Guide. Read me BefoRe unpacking!

Assembly instructions

LED Backlight for Technics amplifiers

CNK221/241/261/321/341/361 Cable-Nook Jr. User s Guide

Electric Wall/Ceiling Projection Screen Saker Tab-Tension Series User s Guide

DREAMOC DIAMOND 4K - ASSEMBLY GUIDE VERSION ORIGINAL ASSEMBLY GUIDE

Electric Motorized Projection Screen Spectrum Tab-Tension Series User s Guide

Vibratory Deck Sieves 15 in. (380 mm)

Electric Wall/Ceiling Projection Screen Saker Series User s Guide

Power Rack with Lat Pull

TV Lift System Model CL-65 Installation Instructions

AS-300D Series Smart Bench Scales Owner s Manual

3M Fiber Optic Splice Closure 2178-XSB/XSB-FR & 2178-XLB/XLB-FR 3M Cable Addition Kit 2181-XB/XB-FR

2000i. Projector Replacement Guide. for Projector Replacement Kits. NEC MT1060R ( ) and NEC MT860R ( ) Interactive Whiteboard

FOSC-600 C and D I N S T A L L A T I O N I N S T R U C T I O N

IPad 4 REPAIR GUIDE. Version Edition

Magelis XBT ZG43 Backlight Replacement Kit Quick Reference Guide

Precision TNC Coaxial Calibration Kit

IPad 3 (glass) REPAIR GUIDE. Version Edition

A3U5 Replacement 1705A Spectrum Monitor

Getting Started Guide

Electric Motorized Projection Screen PowerMax Tension Series

Model 1421 Distribution Amplifier

Check what you have received against the component checklist and hardware above.

P-2 Installing the monitor (continued) Carry out as necessary

PLL1920M LED LCD Monitor

Backlight Replacement

OPERATION AND MAINTENANCE MANUAL

SCdefault. 900 Installation instructions. Accessories Part No. Group Date Instruction Part No. Replaces :36-29 Sep

HCS - HES Cabling Systems

3. Electronics and MMU2 unit assembly

USER MANUAL. 22" Class Slim HD Widescreen Monitor L215DS

APSPB PUSH BUTTON ZERO Installation Manual

USER MANUAL. 27" 2K QHD LED Monitor L27HAS2K

2100/2200/4100/6200 & MPB Series Bottom Mount Drive Pack. for Standard Load Parallel Shaft 60 Hz Gearmotors

K Service Source. Apple High-Res Monochrome Monitor

The Mambo Twist LED Screen System

3M Fiber Optic Splice Closure 2178-XL & 2178-XL/FR

USER MANUAL. 28" 4K Ultra HD Monitor L28TN4K

3M Fiber Optic Splice Closure 2178-XL & 2178-XL/FR 3M Cable Addition Kit 2181-XL and 2181-XL/FR

2000 Series Weather Stations Analog Temperature / RH Sensor Upgrade Kit PRODUCT MANUAL KIT # 3613WDU

Step 1. 1x NXT Ultrasonic Sensor

DL-AR2 Technical Specifications Universal HDMI Adapter Ring Rev

GE Interlogix Fiber Options S700V & S702V. Instruction Manual FIBER-OPTIC VIDEO TRANSMISSION SYSTEM

M1, M2GO and M2PC MIDI PCB Module Installation Guide SMPTE PCB Module Installation Guide

DDW36C Advanced Wireless Gateway - Safety and Installation Product Insert. Federal Communications Commission (FCC) Interference Statement

Instruction Manual.... light years ahead. S739DV & S7739DV Video and Up-the-Coax Control Systems

SLiC Fiber Aerial Closure System

PLL2210MW LED Monitor

FIST-GCOG2-Dx6. Follow all local safety regulations related to optical fiber plant elements.

Check what you have received against the component checklist and hardware above.

Move & Store Cart CONTENTS. Assembly Instructions

PL2410W LCD Monitor USER'S GUIDE.

NewScope-7A Operating Manual

PVS (PERSONAL VEIWING SYSTEM) INSTRUCTION MANUAL

AU5800 Every Other Week or Every 3,000 Samples (ISE) Maintenance. AU5800 Weekly (Analyzer and ISE) Maintenance

Yoke Safety cable loop. Up Light Bulb

Industrial Monitor Update Kit

Folding Beauty Dish INSTRUCTIONS

Installation Manual Original Instructions - IW4001

Coyote popup display set up instructions

MF-4000 WEIGHT BENCH OWNER S MANUAL

USER MANUAL. 27 Full HD Widescreen LED Monitor L27ADS

Starling Tab-Tension 2 Series

Safety Rules Parts Check Lists and Photos Cable Diagrams for Various Crane Configurations Step by Step Instructions Tips for Packaging and Storage

Swiveling unit. Smooth and precise swiveling

NEW SWIVELING UNIT RSP-FLEX. Smooth and precise swiveling

2100, 2200, 4100, 6200, MPB Series Side Mount Drive Package for Light Load 60 Hz Gearmotors

PXL2760MW LED LCD Monitor

Installation Note. Agilent 89441A Option AYC Installation Kit

NX APPLICATION NOTE Led Guided Assembly Connector Pinning with Continuity

2178-L/S Series Fiber Optic Splice Case with Gasket

S Regulators. Supplement 1. Contents. Control Replacement Assembly Installation Instructions Supplement

Single sensor setup with NIVEL210

Power Injector 1520 Series

VideoSplitter HDMI 4K PT

Installation instructions, accessories. Subwoofer. Volvo Car Corporation Gothenburg, Sweden. Page 1 / 29

Model#: IN-MDRI3MF. Hardware User Manual. 3MP Indoor Mini Dome with Basic WDR, Fixed lens. (PoE) Ver. 2013/02/04

5374 Series Air Activated Tube Tester (For testing straight-through exchanger without removing both heads.)

Medium Box for Cable Termination

SAFETY INFORMATION. 7. Do not force switched or external connections in any way. They should all connect easily, without needing to be forced.

FIST-MB2-S. FIST Medium Box for Cable Splicing Only. 4 Cable installation. 1 Introduction. Contents. 2 General. 5. Fiber routing to individual trays

Index. Index. 1.0 Introduction...2 This Manual Operation Finger Lift Cable Lift Pneumatic Operation...

apple Service Source Apple Studio Display 17" LCD (ADC) Updated 6 Decenber Apple Computer, Inc. All rights reserved.

3M Distribution Box (DDB)

PARTS LIST FOR CM-1250-A/C 1.5 HP

In-Ceiling Front Projection Screen. Evanesce Series. User s Guide. Rev JA

Six-Channel TDM Multiplexers for 3G, HD, SDI, and ASI. Installation and Operations. Manual

USER MANUAL. CAMPLEX opticalcon

Installing a Wire Mesh Pulling Grip on All-Dielectric DX Armored Fiber Optic Cables

Technical Information Bulletin

3G-SDI Fiber Optic Digital Extension Modules in 19 1RU Frame

Gigabit Multi-mode SX to Single Mode LX Converter. User s Manual NGF-728 Series. Warning COPYRIGHT

Transcription:

GammaSafe System Exertus Selen Circa Projectors Emergency Source Retrieval The Exertus Selen Circa series of Se.75 Projectors consists of the Circa 40 / 80 / 120 models which are all Tungsten shielded and have straight source channels. The Source Assembly is an articulated link-type design with Tungsten links strategically placed behind and in front of the Source Holder Capsule to prevent rear and forward shine. Tungsten Links Source Holder Capsule Activation Link The Source Assembly locking mechanism is designed to be triggered by an activation link at the front of the Source Assembly, thereby always assuring the Radiographer that the source has returned to the safe position inside the Projector. Failure of the locking mechanism to engage immediately alerts the Radiographer to a potential problem with the Source Assembly and possibly the source itself. The design of the Projector safety interlocks means that, if the Source Assembly locking mechanism fails to engage, the Snap-On fitting, be it the Guide Tube Connector or CP Collimator cannot be disconnected from the Projector. This Work Instruction deals with: 1. Failure of the locking mechanism to engage Source Holder under control 2. Failure of the locking mechanism to engage Source Holder uncontrolled Collimator 3. Failure of the locking mechanism to engage Source Holder uncontrolled Guide Tube NB!! The following procedures are based on the use of standard GammSafe equipment supplied by Gammatec NDT Supplies SOC Ltd only. We shall not be responsible for any injury or loss resulting from any modification, lack of maintenance, foreign or non-standard parts used in conjunction with our equipment, or lack of understanding of the operating procedures of the GammaSafe system by the radiographer. Page 1 of 9

1. Failure of the locking mechanism to engage Source Holder under control. NB!! There are three spring loaded ball bearings protruding into the source channel of the Circa which prevent the Source Assembly from moving out of the source channel under gravity. The following procedure is an additional precaution to prevent any movement of the Source Assembly due to the locking mechanism not activating. In this scenario the radiographer has retracted the Source Assembly into the Projector and the locking mechanism has failed to engage. 1.1 Have your assistant keep retract pressure on the winding mechanism crank handle. 1.2 Approach the Projector whilst monitoring radiation levels. 1.3 Carefully measure radiation levels at the front of the Projector and around the GammaSafe setup to determine whether the source is in or out of the Projector. 1.4 Having determined that the source has indeed returned to the safe position inside the Projector, proceed as follows: 1.4.1 If a Guide Tube is in use, unscrew the Guide Tube from the Guide Tube Connector. (Remember! The Guide Tube Connector cannot be disconnected from the Projector if the locking mechanism has not activated). 1.4.2 Insert the Emergency Shipping Plug (short cable) through the Guide Tube Connector and screw it into place. Page 2 of 9

1.4.3 Loosen the thumbscrew holding the Plug cable and ensure that the cable is pushed in as far as possible. Re-tighten the thumbscrew. 1.4.4 If a CP Collimator is in use, unscrew the Securing Screw and Nut from the front of the Collimator. (Remember! The Collimator cannot be disconnected from the Projector if the locking mechanism has not activated). 1.4.5 Insert the Emergency Shipping Plug (long cable) through the Collimator and screw it into place. 1.4.6 Loosen the thumbscrew holding the Plug cable and ensure that the cable is pushed in as far as possible. Re-tighten the thumbscrew. Page 3 of 9

1.4.7 Disconnect the Winding Mechanism Drive Hose Coupling from the Projector and disconnect the Drive Cable Ballpoint from the Source Assembly female connector. 1.4.8 Secure the Projector and contact Gammatec for further instructions. 1.4.9 Observe all local health and safety regulations and incident reporting requirements. 2. Failure of the locking mechanism to engage - Source Holder uncontrolled - Collimator In this scenario the source holder capsule has become detached from the Source Assembly. The radiographer has retracted part of the Source Assembly into the Projector and the locking mechanism has failed to engage. A CP Collimator is directly attached to the Projector. 2.1 Have your assistant keep retract pressure on the winding mechanism crank handle. 2.2 Approach the Projector whilst monitoring radiation levels. 2.3 Carefully measure radiation levels at the front of the Projector and around the collimator to determine whether the source is in or out of the Projector. 2.4 Having determined that the source has NOT returned to the safe position inside the Projector, proceed as follows: 2.4.1 Shield the projection port of the collimator with lead sheets / lead shot / mats if necessary. Page 4 of 9

2.4.2 Unscrew the Securing Screw and Nut from the front of the Collimator. (Remember! The Collimator cannot be disconnected from the Projector if the locking mechanism has not activated). 2.4.3 Insert the Emergency Shipping Plug (long cable) through the Collimator and use it to push the broken section of the Source Assembly back into the Projector source channel. Screw the Plug into place on the front of the collimator. 2.4.4 Loosen the thumbscrew holding the Plug cable and ensure that the cable is pushed in as far as possible. Re-tighten the thumbscrew. Page 5 of 9

2.4.5 If the broken section of the Source Assembly cannot be pushed all the way back into the Projector source channel, loosen the thumbscrew holding the Plug cable, push the fitting forward and screw it onto the front of the collimator, then re-tighten the thumbscrew. 2.4.6 Disconnect the Winding Mechanism Drive Hose Coupling from the Projector and disconnect the Drive Cable Ballpoint from the Source Assembly female connector. 2.4.7 Secure the Projector using whatever shielding is necessary to reduce the radiation doserate to acceptable levels and contact Gammatec for further instructions. 2.4.8 Observe all local health and safety regulations and incident reporting requirements. 3. Failure of the locking mechanism to engage - Source Holder uncontrolled - Guide Tube In this scenario the Source Holder Capsule has become detached from the Source Assembly. The radiographer has retracted part of the Source Assembly into the Projector and the locking mechanism has failed to engage. A Shielded Guide Tube and Directional Collimator are in use. 3.1 Have your assistant keep retract pressure on the winding mechanism crank handle. 3.2 Approach the Projector whilst monitoring radiation levels. 3.3 Carefully measure radiation levels at the front of the Projector and around the GammaSafe setup to determine whether the source is in or out of the Projector. Page 6 of 9

3.4 Having determined that the source has NOT returned to the safe position inside the Projector, proceed as follows: 3.4.1 Wind out the Source Assembly again and make sure that the Source Holder Capsule is pushed forward into the collimator. Keep Pressure 3.4.2 Have your assistant keep expose pressure on the winding mechanism crank handle. This will reduce shine from the rear of the Source Holder Capsule. 3.4.3 Shield the projection port and the collimator with lead sheets / lead shot / mats and move the assembly onto a flat surface. 3.4.4 Unscrew the Guide Tube from the Guide Tube Connector on the Projector. (Remember! The Guide Tube Connector cannot be disconnected from the Projector if the locking mechanism has not activated). Keep Pressure Page 7 of 9

3.4.5 Carefully retract the drive cable from the Guide Tube whilst monitoring radiation levels. 3.4.6 Position the open end of the Guide Tube inside the Emergency Storage Cavity Pot. 3.4.7 Remove the shielding from the collimator and, using Tongs, lift the collimator and Guide Tube causing the Source Holder Capsule to slide into the Cavity Pot. Page 8 of 9

3.4.8 Disconnect the remaining section of the Source Assembly from the Drive Cable and keep safe for investigation of the incident. 3.4.9 Secure the Emergency Storage Pot and contact Gammatec for further instructions. 3.4.10 Observe all local health and safety regulations and incident reporting requirements. Page 9 of 9