ALBA Newsletter Aug-Sept 2012

Similar documents
Online correlation of data quality and beamline/beam instabilities History and motivation 1.1 Symptoms

SPEAR 3: Operations Update and Impact of Top-Off Injection

Mechanical aspects, FEA validation and geometry optimization

3 cerl. 3-1 cerl Overview. 3-2 High-brightness DC Photocathode Gun and Gun Test Beamline

THE SLS BEAMLINES DATA ACQUISITION AND CONTROL SYSTEM

Hybrid pixel detectors

An X-ray microsource based system for crystal screening and beamline development during synchrotron shutdown periods

Advanced Photon Source - Upgrades and Improvements

AREAL- Phase 1. B. Grigoryan on behalf of AREAL team

Status of SOLARIS. Paweł Borowiec On behalf of Solaris Team

Present Status and Future Upgrade of KEKB Injector Linac

COMMISSIONING OF THE ALBA FAST ORBIT FEEDBACK SYSTEM

Experience with the Cornell ERL Injector SRF Cryomodule during High Beam Current Operation

Transmissive XBPM developments at PSF/BESSY. Martin R. Fuchs

ANKA RF System - Upgrade Strategies

The Elettra Storage Ring and Top-Up Operation

Beam Line Optics at SSRL

KARA and FLUTE RF Overview/status

!"!3

Review Report of The SACLA Detector Meeting

Status and Plans for PEP-II

Synchrotron Light Facility. Operation of ALBA RF. Angela Salom on behalf of RF team: Francis Perez, Bea Bravo and Jesus Ocampo

Australian Synchrotron Virtual Beamline Introduction. VeRSI VBL Development Chris Myers Version 1.0

5 Project Costs and Schedule

ANKA Status Report. N.Smale, A.-S. Müller, E. Huttel, M.Schuh Slides courtesy of A.-S. Müller and C.Heske.

THE NEW LASER FAMILY FOR FINE WELDING FROM FIBER LASERS TO PULSED YAG LASERS

9th ESLS RF Meeting September ALBA RF System. F. Perez. RF System 1/20

LUMIGEN INSTRUMENT CENTER X-RAY CRYSTALLOGRAPHIC LABORATORY: WAYNE STATE UNIVERSITY

PEP-II Overview & Ramp Down Plan. J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007

Current status of XFEL/SPring-8 project and SCSS test accelerator

Production of quasi-monochromatic MeV photon in a synchrotron radiation facility

A Cathode Development Cornell Cultera This scope includes all labor and purchases required produce photocathodes required by CBETA.

Non-Destructive Examination Benches and Analysis Laboratories in support to the Experimental Irradiation Process in the Future Jules Horowitz MTR

Screen investigations for low energetic electron beams at PITZ

Status of BESSY II and berlinpro. Wolfgang Anders. Helmholtz-Zentrum Berlin for Materials and Energy (HZB) 20th ESLS-RF Meeting

Accelerator Instrumentation RD. Monday, July 14, 2003 Marc Ross

ANKA Status Report. N.Smale, on behalf of all ANKA colleagues, Directors : A.-S. Müller, C Heske, T Baumbach.

TEST RESULTS OF THE 84 GHZ / 200 KW / CW GYROTRON

BTC and SMT Rework Challenges

Energy Upgrade Options for the LCLS-I Linac

Semiconductors Displays Semiconductor Manufacturing and Inspection Equipment Scientific Instruments

LLRF at SSRF. Yubin Zhao

MICROFOCUS X-RAY SOURCE PROJECT*

FIRST SIMULTANEOUS TOP-UP OPERATION OF THREE DIFFERENT RINGS IN KEK INJECTOR LINAC

Program Risks Risk Analysis Fallback Plans for the. John T. Seeman DOE PEP-II Operations Review April 26, 2006

Status of the FAIR Project. Jürgen Henschel FAIR Project Leader / Technical Director GSI & FAIR

Technical Procedure for Scanning Electron Microscope/ Energy Dispersive X-Ray System (SEM/EDX) for non-gsr Casework

New Filling Pattern for SLS-FEMTO

Detailed Design Report

Data Collection Using APEX3. March 30, Chemical Crystallography Laboratory

Nick Walker DESY MAC

COMMISSIONING RESULTS OF BEAM DIAGNOSTICS FOR THE PETRA III LIGHT SOURCE

Data Collection at SSRL: practical aspects

Welcome and FRIB Project Status. FRIB Highlights and Plan Ahead

INCA ENERGY EDS TRAINING. System Block Diagram. INCA Energy Software. Xiang Yang EM SMU. Navigators. Point & ID Navigator.

SRS and ERLP developments. Andrew moss

Soft x-ray optical diagnostics, concepts and issues for NGLS

Report on the LCLS Injector Technical Review

Upgrading LHC Luminosity

CEBAF Accelerator Update. Michael Tiefenback CASA Accelerator Physics Experimental Liaison June 14, 2017

Spectroscopy Module. Vescent Photonics, Inc E. 41 st Ave Denver, CO Phone: (303) Fax: (303)

EUROFEL-Report-2007-DS EUROPEAN FEL Design Study

The LEP Superconducting RF System

Effects of the cryogenics operational conditions on the mechanical stability of the FLASH linac modules

High QE Photocathodes lifetime and dark current investigation

IMPROVEMENTS IN LOW POWER, END-WINDOW, TRANSMISSION-TARGET X-RAY TUBES

Design Studies For The LCLS 120 Hz RF Gun Injector

Tender Notification for the procurement of a "Dual beam (FIB - FE SEM) system" at IISc (Last Date for submission of tenders: 31st March 2016)

Commissioning of Accelerators. Dr. Marc Munoz (with the help of R. Miyamoto, C. Plostinar and M. Eshraqi)

Status of SOLARIS Arkadiusz Kisiel

Andrei Seryi, Toshiaki Tauchi. December 15-18, 2008

Review of Diamond SR RF Operation and Upgrades

PUBLICATION. Measurement setup at light source operational: Milestone M4.3

TRIUMF CYCLOTRON MAIN MAGNET POWER SUPPLY REPLACEMENT

Recent APS Storage Ring Instrumentation Developments. Glenn Decker Advanced Photon Source Beam Diagnostics March 1, 2010

2008 JINST 3 S LHC Machine THE CERN LARGE HADRON COLLIDER: ACCELERATOR AND EXPERIMENTS. Lyndon Evans 1 and Philip Bryant (editors) 2

IOT OPERATIONAL EXPERIENCE ON ALICE AND EMMA AT DARESBURY LABORATORY

TWO BUNCHES WITH NS-SEPARATION WITH LCLS*

Non-Invasive Energy Spread Monitoring for the JLAB Experimental Program via Synchrotron Light Interferometers

North Damping Ring RF

Design, Fabrication and Testing of Gun-Collector Test Module for 6 MW Peak, 24 kw Average Power, S-Band Klystron

InSight Pro. Valuable real-time process insight

1.2 Universiti Teknologi Brunei (UTB) reserves the right to award the tender in part or in full.

Digital BPMs and Orbit Feedback Systems

Periodic Seasonal Variation of Magnets Level of the STB ring

Instrument Status Review. GSC Meeting October 2009

PROJECT DESCRIPTION. Longitudinal phase space monitors for the ILC injectors and bunch compressors

Jefferson Lab Experience with Beam Halo, Beam Loss, etc.

ITERATIVE DEVELOPMENT OF THE GENERIC CONTINUOUS SCANS IN SARDANA

EPJ Web of Conferences 95,

HD Review March 30, 2011 Franz Klein

Product Description Sheet Loctite CL10 Quad LED Controller

Safety Considerations For The Top-up Operation Of An 8 GeV Class Synchrotron Radiation Facility

TR-SES-200 High Resolution VUV/UV Transmission and Reflection Evaluation System Manual

Simulations on Beam Monitor Systems for Longitudinal Feedback Schemes at FLASH.

Oak Ridge Spallation Neutron Source Proton Power Upgrade Project and Second Target Station Project

Top-Up Experience at SPEAR3

Future Performance of the LCLS

Standard Operating Procedure II: EDS (Bruker Flat-Quad)

Standard Operating Manual

Transcription:

Letter from the director It is with great pleasure that I write my first communication in the, starting with expressing how much honored I feel by the nomination as Director of the ALBA-CELLS laboratory. My thanks go to the whole ALBA Staff for their warm welcome upon my arrival in the team. I mention with special emphasis my gratitude to Ramon Pascual, CELLS President, to Gastón García, who has been acting as Director in the last period, and to my predecessor Joan Bordas, who has led the construction of the largest Spanish and Catalan Scientific Infrastructure, with passion, technical and scientific competitiveness and strong personal involvement. The year 2012 has meant for ALBA the starting of the user operation, and we are hosting external users since last spring. The accelerator is routinely providing stable photon flux to the seven operating beamlines, with reliable and reproducible beam current. Entering in the scientific production period is a challenge that we are happy to face: it is the realization of a shared dream of many people. The present critical economic situation in Europe requires from us careful focusing and choice prioritization. We will keep the present excellences, lead the synchrotron ring to the nominal design parameters by increasing the beam current and implementing the topping up mode of operation, develop the already advanced programs for new beamlines and always aim at maintaining our laboratory at the front end of the synchrotron radiation science. Finally I want to mention the recognitions that two of our funders are being given in these days. During the 2012-13 Academic Course Inauguration of the Universidad Autónoma de Barcelona (UAB), on 26 th September, Prof. Ramon Pascual has been awarded with the UAB medal by the UAB Rector, Prof. Ferrán Sancho. The academic trajectory of Prof. Pascual was described by Prof. Antoni Méndez, who expressed the indebtedness versus Ramon Pascual not only by the UAB but by the whole country, for his continuous, effective, gently firm action in leading Spanish Scientific community during the last decades. Long and warm applauses underlined the public sharing of these feelings and the great appreciation for Ramon s person. I personally feel fortunate to have now the opportunity of being numbered among his collaborators. Another major character of the ALBA realization, Dieter Einfeld, Head of the Accelerator Division from the very beginning of the project up to few months ago, is being recognized by the Generalitat with the award of the Narcís Monturiol medal, for his scientific and technological contributions to the Catalunya region, in a ceremony which will take place in the Generalitat on 3 rd October. Together with all my ALBA colleagues, I m looking forward for the next future challenges and realizations. Sincerely, Caterina Biscari Director - 1 of 6 -

New staff http://www.cells.es/jobs We are pleased to announce the following new employees who have recently joined the ALBA synchrotron light source: Prof. Miguel A.G. Aranda Head - Experiments division ALBA welcomes Prof. Miguel A.G. Aranda, former Professor of Inorganic Chemistry at University of Malaga, as Head of the Experiments Division for the next five years. José Ángel Aguilar Mena Safety Officer Assistant - Prevention Risks José comes to ALBA from GRUPO-IMAN where he worked as Quality Control Technician. José has a degree in Prevention and Safety (UAB) and also a degree in Technical Engineering of Electricity (UPC). Accelerators http://www.cells.es/divisions/accelerators - During the summer shut down several works have been performed in the accelerators: Replace several waveguides pieces from the LINAC. Exchanged an IOT in the RF system. Open the vacuum in SR10 of the storage ring to replace an absorber. - After all these interventions, two and a half weeks had been scheduled to re-start the beam. On 21st of September the beam was delivered to the beamlines as scheduled, with a reduced current of 60 ma. The current has been increased up to 100 ma along the run and the pressure in SR10 has been continuously monitored, to avoid any sudden increase. - During the first week of the run, the accelerators have run with a 95% of availability and 150 h have been provided to the beamlines. - 2 of 6 -

Experiments http://www.cells.es/divisions/experiments http://www.cells.es/beamlines 2013 beam time application call is OPEN The deadline this Wednesday Oct 10 th, 2012 at 23:59 GMT+1 Proposals can be submitted for beam time at: http://useroffice.cells.es/ * BL04-MSPD: Materials Science and Powder Diffraction. - The transfer pipe that connects the High pressure endstation and the Powder diffraction endstation has been installed (See figure 1). - First diffraction data have been acquired with the Mythen detector in the powder diffraction endstation. The experimental set-up is shown in figure 2. - The first official users at the powder diffraction endstation will start their experiment in October 2. Figure 1. BL04-MSPD. Photograph of the experimental hutch as today. - 3 of 6 -

Figure 2. BL04-MSPD. SRM 640b - Silicon X-Ray Diffraction (from NIST) loaded on 1 mm diameter capillary is shown from the top of the experimental set-up. * BL09-MISTRAL: X-Ray Microscopy. - At the end of July we had a problem with a part of the cooling system of the microscope that was repaired last week. We have also had to replace a motor stage that was not working anymore. - We are now in the process of realigning with beam the optics of the microscope again. * BL11-NCD: Non-Crystalline Diffraction. - The beam line received its two first user groups in the month of July, 2012. - During the summer shutdown of ALBA maintenance of the beamline was carried out. Upgrades and repair of the electrometers were also made. Permanent cables that were missing in the optics and experimental hutches were laid and patch panels for signals, motors cables and encoders etc. were installed. - 4 of 6 -

- The synchronization in time of the two detector systems that currently serve as the SAXS and WAXS detectors has been optimized. Together with a temporary WAXS support system the simultaneous SAXS & WAXS data collection will be offered to user groups taking beam during the autumn of 2012. - Shown in the figure below (Figure 1) is a two-dimensional x-ray scattering pattern of silver behenate collected during a 1 second exposure. As can be seen the alignment of the beam stop still needs some refinement. Figure 1. BL11-NCD: A 1 second exposure of silver behenate collected on an ADSC210 CCD detector with a sample to detector distance of ca. 220 mm is illustrated. - In mid-september the water thermal stabilization circuit of the cryo-cooled monochromator failed. This has meant that the beamline is currently off line and will be open to the synchrotron radiation light again on the 17th of October. Repair work has been carried out and currently the monochromator is undergoing a bake-out to improve the vacuum in the vessel. * BL13-XALOC: Macromolecular Crystallography. - In mid-october we will have an upgrade of the software of the automated sample changer and a new gripper that should allow the manipulation of all the current SPINE standard vial/caps. - The detector cover has been installed and is working properly. - 5 of 6 -

- We have successfully resumed user operation after the summer shutdown. * BL22-CLÆSS: Core Level Absorption & Emission Spectroscopies. - The piezo feedback controlling the fine pitch adjustment of the second crystal is now working. It stabilizes the intensity and the spot position of the beam in the experimental station. This function is crucial for real samples (pressed pellets) as it is usually difficult to achieve good thickness homogeneity in them. See the resulting spectra of copper oxides at www.cells.es/beamlines/claess/commissioning.html. * BL24-CIRCE: Photoemission Spectroscopy and Microscopy. * BL29-BOREAS: Resonant Absorption and Scattering. - We have reinstalled the Medium Energy Grating (MEG) & High Energy Grating (HEG) monochromators. - The bakeout of the monochromator has been accomplished successfully. - We have performed the commissioning with X-rays of the MEG/HEG with Ne, obtaining very high resolution and overall good performance up to 3keV. - We have installed the transmission diode detector in the HECTOR station. - We have received the cryo-manipulator of the MARES station and we are currently preparing the site acceptance tests. - Cristina Blanco is a visiting PhD student from the University of Oviedo. - We are expecting next users by mid-october. - 6 of 6 -