ATF2 project in the ATF international collaboration, including coordination issues

Similar documents
Andrei Seryi, Toshiaki Tauchi. December 15-18, 2008

Focus of efforts. ILC 2010, Mar/27/10 A. Seryi, BDS: 2

SLAC ILC Accelerator R&D Program

ATF2 COMMISSIONING. IP β x/y, mm 4 / / 0.4 IP η, rad σ E, % ~0.1 ~0.1

Development of beam-collision feedback systems for future lepton colliders. John Adams Institute for Accelerator Science, Oxford University

SLAC ILC program, International BDS Design, ATF2 facility

Beam-based Feedback Systems

Nick Walker DESY MAC

STATUS OF THE INTERNATIONAL LINEAR COLLIDER

SPEAR 3: Operations Update and Impact of Top-Off Injection

PEP II Design Outline

Status and Plans for PEP-II

ANKA Status Report. N.Smale, A.-S. Müller, E. Huttel, M.Schuh Slides courtesy of A.-S. Müller and C.Heske.

LHC Beam Instrumentation Further Discussion

Equipment Installation, Planning, Layout, organisation and updates

Accelerator Instrumentation RD. Monday, July 14, 2003 Marc Ross

Present Status and Future Upgrade of KEKB Injector Linac

TTF / VUV-FEL. Schedule 2005 and Project Management Issues. Schedule 2005 Project Organisation Budget & Controlling

Monthly Progress Report Stanford Synchrotron Radiation Laboratory

Availability and Reliability Issues for the ILC

NLC - The Next Linear Collider Project NLC R&D. D. L. Burke. DOE Annual Program Review SLAC April 9-11, 2003

Production of quasi-monochromatic MeV photon in a synchrotron radiation facility

ILC Damping Ring Lattice Status Report. Louis Emery and Aimin Xiao Argonne National Laboratory Presented at KEK workshop Dec 18th, 2007

ABORT DIAGNOSTICS AND ANALYSIS DURING KEKB OPERATION

CONSTRUCTION AND COMMISSIONING OF BEPCII

PRESENT STATUS OF J-PARC

Control of Intra-Bunch Vertical Motion in the SPS with GHz Bandwidth Feedback

PEP-II IR-2 Alignment

ATF Energy Spectrometer Experiments

2008 JINST 3 S LHC Machine THE CERN LARGE HADRON COLLIDER: ACCELERATOR AND EXPERIMENTS. Lyndon Evans 1 and Philip Bryant (editors) 2

Feedback Control of SPS E-Cloud/TMCI Instabilities

Challenges in Accelerator Beam Instrumentation

The Elettra Storage Ring and Top-Up Operation

Program Risks Risk Analysis Fallback Plans for the. John T. Seeman DOE PEP-II Operations Review April 26, 2006

LCLS RF Reference and Control R. Akre Last Update Sector 0 RF and Timing Systems

November 5,1999. The NLC Injector UCRL-JC

Precision measurements of beam current, position and phase for an e+e- linear collider

AARHUS UNIVERSITET November, ASTRID2 Status. Heine Dølrath Thomsen on behalf of the ASTRID2 Team

Digital BPMs and Orbit Feedback Systems

Diamond RF Status (RF Activities at Daresbury) Mike Dykes

Suggested ILC Beam Parameter Range Rev. 2/28/05 Tor Raubenheimer

The SPEAR 3 Upgrade Project Close-out Report April 2004

Status of Elettra, top-up and other upgrades

Phase (deg) Phase (deg) Positive feedback, 317 ma. Negative feedback, 330 ma. jan2898/1638: beam pseudospectrum around 770*frev.

Cooperation Activities for Linear Colliders

COMMISSIONING RESULTS OF BEAM DIAGNOSTICS FOR THE PETRA III LIGHT SOURCE

PICS IN THE INJECTOR COMPLEX WHAT ARE WE TALKING ABOUT?

SUMMARY OF THE ILC R&D AND DESIGN

SuperTRISTAN. A possibility of ring collider for Higgs factory. 13 Feb K. Oide (KEK)

Status of SOLARIS Arkadiusz Kisiel

P. Emma, et al. LCLS Operations Lectures

STATUS AND FUTURE PROSPECTS OF CLIC

CLIC Feasibility Demonstration at CTF3

Development of a Compact Load Lock System and a New Tuning Structurer for a Cs2Te Cathode RF Gun. Yoshio Kamiya, Waseda Univ.

What can be learned from HERA Experience for ILC Availability

FIRST SIMULTANEOUS TOP-UP OPERATION OF THREE DIFFERENT RINGS IN KEK INJECTOR LINAC

KEKB Accelerator Physics Report

POLARIZED LIGHT SOURCES FOR PHOTOCATHODE ELECTRON GUNS AT SLAC?

Activities on FEL Development and Application at Kyoto University

OPERATIONAL EXPERIENCE AT J-PARC

An Operational Diagnostic Complement for Positrons at CEBAF/JLab

Electron Clouds in the SPS: progress in the analysis of cures/mitigations measures and potential schedule of implementation J.M.

New Filling Pattern for SLS-FEMTO

Linac 4 Instrumentation K.Hanke CERN

PEP-II Status. U. Wienands, PEP-II Run Coordinator for the PEP-II team

Characterizing Transverse Beam Dynamics at the APS Storage Ring Using a Dual-Sweep Streak Camera

A Cathode Development Cornell Cultera This scope includes all labor and purchases required produce photocathodes required by CBETA.

CERN S PROTON SYNCHROTRON COMPLEX OPERATION TEAMS AND DIAGNOSTICS APPLICATIONS

Brilliance. Electron Beam Position Processor

Status of JRA-SRF in CARE

5 Project Costs and Schedule

LCLS Injector Technical Review

THE ANTIPROTON DECELERATOR (AD)

mtca.4 Q & A MicroTCA Review Committee June 5, 2012 SLAC MicroTCA Standards Review Q&A-RSL June 4-5, 2012

PROJECT DESCRIPTION. Longitudinal phase space monitors for the ILC injectors and bunch compressors

Status of the X-ray FEL control system at SPring-8

Status of CTF3. G.Geschonke CERN, AB

EPJ Web of Conferences 95,

Upgrading LHC Luminosity

Suppression of Timing drift between laser and electron beam driven photo-cathode RF gun

KEKB INJECTOR LINAC AND UPGRADE FOR SUPERKEKB

THE NEXT LINEAR COLLIDER TEST ACCELERATOR: STATUS AND RESULTS * Abstract

Overview of the X-band R&D Program

Report from the 3 rd Meeting of the Accelerator Technical Advisory Committee for the Japan Proton Accelerator Research Complex (J-PARC)

TWO BUNCHES WITH NS-SEPARATION WITH LCLS*

Top-Up Experience at SPEAR3

Advanced Photon Source - Upgrades and Improvements

Status of the FAIR Project. Jürgen Henschel FAIR Project Leader / Technical Director GSI & FAIR

DR=>IP<=DR Simulation of Linear Colliders with Ground Motion

Trigger-timing signal distribution system for the KEK electron/positron injector linac

The SPL at CERN. slhc. 1. Introduction 2. Description. 3. Status of the SPL study. - Stage 1: Linac4 - Stage 2: LP-SPL - Potential further stages

Next Linear Collider. The 8-Pack Project. 8-Pack Project. Four 50 MW XL4 X-band klystrons installed on the 8-Pack

1. General principles for injection of beam into the LHC

A Facility for Accelerator Physics and Test Beam Experiments

Capability Improvements: Polarized Photoinjector*

Observation of Transverse-Longitudinal Coupling Effect at UVSOR-II

RF considerations for SwissFEL

PEP-II Overview & Ramp Down Plan. J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007

COMMISSIONING SCENARIOS FOR THE J-PARC ACCELERATOR COMPLEX

Summary of CBETA Independent Cost Reviews. R. Michnoff January 19, 2017

Transcription:

ATF2 project in the ATF international collaboration, including coordination issues 1. Status of ATF collaboration 2. R&D items in ATF 3. Schedule 4. Expectation Junji Urakawa, KEK ATF2-IN2P3-KEK kick-off meeting Annecy, LAPP, for AIL collaboration

ATF Collaboration History and Schedule ATF Construction and R&D s have been started with SLAC from 1993. From 1997, International collaboration started for the R&D s with Damping Ring. ATF MoU was established on 1 st Aug. 2005. New organized ATF international collaboration has been started. (20 Institutes or more were signed.) 1 st ICB meeting in Snowmass, 1 st TB meeting at KEK on Dec.. 2 nd TB meeting at KEK on May. 2 nd ICB meeting in Vancouver on July, 2006. 3 rd TB meeting at KEK will be held on Dec.. From 2008, ATF2 : the final focus test beam line, will be operated. 1

2

3

ICB-Members (18) ICB Members: Bob Kephart kephart@fnal.gov FNAL Brian Foster b.foster1@physics.ox.ac.uk Oxford David Miller djm@hep.ucl.ac.uk UCL Mitsuaki Nozaki mitsuaki.nozaki@kek.jp KEK Gerry Dugan gfd1@cornell.edu Cornell University J.P. Delahaye Jean-Pierre.Delahaye@cern.ch CERN Jai Gao gaoj@ihep.ac.cn IHEP John Corlett jncorlett@lbl.gov LBNL Kaoru Yokoya kaoru.yokoya@kek.jp KEK Nick Walker nicholas-john.walker@desy.de DESY Nobaru Sasao sasao@scphys.kyoto-u.ac.jp Kyoto University Paterson, Ewan jmp@slac.stanford.edu (chair) SLAC Philip Burrows p.burrows@qmul.ac.uk QMUL (Later, to Oxford Univ.) Robert Meller rem@lepp.cornell.edu Cornell University Sachio Komamiya sachio@icepp.s.u-tokyo.ac.jp University of Tokyo Tsutomu Nakanisi nakanisi@spin.phys.nagoya-u.ac.jp Nagoya University Washio Masakazu washiom@waseda.jp Waseda University Jinhyuk Choi jchoi@postech.ac.kr PAL 4

ATF Technical Board (TB) : Total 13 members June, 2006 Europe... Eckhard Elsen, DESY (TB Co-chair) G. Blair, RHUL (Royal Holloway, University of London) P. Burrows, John Adams Institute (University of Oxford) F. Zimmermann, CERN A. Wolski, Cockcroft Institute in UK (TB Co-chair) North America.. T. Raubenheimer, SLAC M. Ross, SLAC (Later, to FNAL) S.Mishra, FNAL Asia K. Yokoya, KEK N. Toge, KEK T. Sanuki, University of Tokyo J. Gao, IHEP E-S. Kim, KNU(Kyungpook National Univ.) 5

ATF SGC (System and Group Coordinators) : Total 18 members Three Deputies (with help of sub-deputies of KEK): Total 6 Members Deputy for Beam operation: S.Kuroda (T.Okugi) Deputy for Hardware maintenance: N.Terunuma (M.Kuriki) Deputy for ATF2: A.Seryi (T.Tauchi) SGCs : Total 18 members H.Weise of DESY, F.Zimmermann of CERN, Philip Burrows of UK, Grahame Blair of UK, M.Ross of SLAC, A.Seryi of SLAC, R.Meller of Cornell University, A.Wolski of UK, J.Gao of IHEP in Beijing, E.S.Kim of KNU, K.Kubo, S.Kuroda, N.Terunuma, M.Kuriki, T.Tauchi, T.Okugi, R.Sugawara of KEK, 6 T.Sanuki of Tokyo University

1. Usually schedule of ATF machine operation is divided to two blocks every year with about four months summer long shutdown. One block is from mid. of Oct. to Dec., and the other is from mid. of Jan. to mid. of June. Since there are many collaborators, we proposed two meetings of TB per year in Dec. and May for review and recommendation of the research programs at ATF. We can allocate following points to TB and SGC Joint Meeting, if necessary. *TB and SGC Joint Meeting in Dec. is mainly devoted for the evaluation on present R&D s. *TB and SGC Joint Meeting in May is mainly devoted for the evaluation on new proposals. Of course, we will discuss both issues on R&D s and new proposal in TB and SGC Joint Meeting. 2. Requests to new proposal : Purpose, Research method, Period of the research, Manpower, Budget plan etc. should be reviewed for the approval. See Template for the new proposal (see http://atf.kek.jp/). 3. Member of ATF operation group : Shift leader is responsible for the safety and should be KEK staff. Since ATF operation group is responsible for beam tuning, making a good beam and required beam by R&D group, ATF operation group can involve many physicists and engineers from overseas countries. 7

Assignment of the ATF Beam Time Beam Tuning Typical ~22 weeks/year Maintenance About 20 % of total will be used for the maintenance and the beam tuning. It is estimated by current results. SP: Approved Studies TB: Approved Studies ~2/3 Guideline for approved studies by SP. 1. Short term study 2. No conflict with approved studies by TB and ICB. 3. Test study for new proposal 4. SP can accept until two shifts/week but it depends on the situation of studies. 8

Schedule of ATF operation, TB meeting and Long shutdown Feb Apr Jun Aug Oct Dec Feb Apr Jun JFY NEXT JFY ATF Summer shutdown 22 beam weeks / 32 weeks Summer Beam (KEK power contract) Shutdown Schedule Upgrade / Maintenance Installation May Dec. May TB meeting TB meeting TB meeting 9

Mission of ATF 1. Establish the technologies associated with producing the electron beams of the quality required for ILC. 2. Provide such beams to ATF2 in a stable and reliable manner. 3. Serve the mission of providing the young scientists and engineers with training opportunities of participating in R&D programs for advanced accelerator technologies. 10

ATF, Old version Accelerator Test Facility 11

New Version, we fixed the design at 2 nd ATF2 project meeting. 12

R&D items in ATF 1. kicker study for extraction of ILC-like bunch spacing. Multi-pole component of kicker and septum is under study. 2. Fast rise/fall strip-line kicker study for ILC Damping Ring. <3ns rise/fall is under study. 3. High resolution Ring-BPM for more small vertical emittance. application of digital signal process is under study. 4. Coherent Synchrotron Radiation(CSR) study. development of CSR detection is underway. 5. Cavity BPMs. nm resolution BPMs, PAL-BPM at ATF2, IP-BPM at ATF2. 6. Laser Wire beam size monitor. Fast sweep LW at EXT-line, Shintake-monitor at ATF2. 7. Fast orbit feedback for ILC collision point. digital feedback method is under development. 8. Many other instrumentation(odr, XSR, LW@DR) 9. S-band RF-gun study for stable injection into ATF-DR. 10. Pol.. positron generation R&D based on Compton scattering. 11. Fast Ion Instability Measurement 12. Multi-bunch Instability Study 13

Highlight Studies in Extraction Line 1. Stable beam extraction from DR Kick angle compensation for multi-bunch, Double kicker system Multi bunch extraction with ILC like beam spacing (2005~) 3 bunch extraction with 150ns spacing by 300ns flat-top double kicker. Done 2. Instrumentation developments Beam size monitors Optical Diffraction Monitor, Wire scanners (Tungsten, Carbon), Laser wire (UK, 2005~) Nano meter resolution Beam position monitors : Cavity BPM 3. Intra-train beam feedback FONT (UK) / FEATHER (KEK) Feed-forward to Extraction line from DR (UK, 2006~) 4. Other R&D Polarized positron generation Compton scattering with electron beam and polarized laser Stabilization of components, Straightness monitor, StaFF (UK, 2006~) 5. More new R&D s in ATF were proposed. 14

Construction and Beam Commissioning Schedule From 2007.6 to 2007.9, refurbishment of floor. From 2007.10 to 2008.3, installation of magnet system, vacuum system, control system and monitor system. All components for ATF2 will be completed until end of JFY2007(2008.3) except for devices of advanced instrumentations. Precise alignment and tuning of devices from 2008.4 From 2008.6 to 2008.9, realign the existing components of ATF extraction line and connect the extraction line to ATF2. Beam commissioning will be start from 2008.10. Beam Tuning Strategy The optics of ATF2 was designed by Woodley and Seryi. Beam based analysis on all components is essential at first stage. Coordination Issues Andrei and Toshiaki are responsible for this issues as Deputies. We need ATF2 project meeting to understand the situation of the project, to discuss the beam tuning strategy and coordination issues. 15

Schedule of ATF2 project meeting 1st ATF2 project meeting at SLAC, 2006. 2 2nd ATF2 project meeting at KEK, 2006. 5 3rd ATF2 project meeting at KEK, 2006. 12 4th ATF2 project meeting in UK?, 2007. May or June? 5th ATF2 project meeting in USA?, 2007.??? 6th ATF2 project meeting in Asia, 2008.??? 7 th ATF2 project meeting in?, 2008.??? I am expecting enough budget support to collaborating institutes which are understanding ATF2 as the essential research activity for ILC. Your requests are welcome. 16

Prospect of ATF ATF International R&D will demonstrate necessary results for ILC, especially how to control high quality beam, develop many kinds of advanced instrumentation, educate young accelerator physicists and engineers. ILC like beam which means 60 bunches with bunch spacing about 300nsec, in the future. (New idea is under consideration.) Realization of about 35nm beam for long period. 17

From US, EU, Russia, China, Korea, India and Japanese Univ., Many young physicists and engineers are learning and developing advanced accelerator technologies for ILC project. ATF Control Room 2005.3.9 18