Riccardo Farinelli. Charge Centroid Feasibility

Similar documents
A Cylindrical GEM Detector with Analog Readout for the BESIII Experiment. Gianluigi Cibinetto (INFN Ferrara) on behalf of the BESIIICGEM consortium

CMS Note Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland

Performance of a double-metal n-on-n and a Czochralski silicon strip detector read out at LHC speeds

li, o p a f th ed lv o v ti, N sca reb g s In tio, F, Z stitu e tests o e O v o d a eters sin u i P r th e d est sezio tefa ectro lity stem l su

R&D on high performance RPC for the ATLAS Phase-II upgrade

ILC Detector Work. Dan Peterson

Review of the CMS muon detector system

The Large TPC Prototype: Infrastructure/ Status/ Plans

Progress Update FDC Prototype Test Stand Development Upcoming Work

Status of GEM-based Digital Hadron Calorimetry

arxiv:hep-ex/ v1 27 Nov 2003

A Review of Tracking Sessions

The Full Scale Prototype of the Cylindrical-GEM as Inner Tracker in Kloe2

Performance and aging of OPERA bakelite RPCs. A. Bertolin, R. Brugnera, F. Dal Corso, S. Dusini, A. Garfagnini, L. Stanco

Drift Tubes as Muon Detectors for ILC

Outline. GEM R&D and assembly facilities at UVa. Cosmic test results. Update on the cm 2 GEM prototype

with Low Cost and Low Material Budget

CGEM-IT project update

Concept and operation of the high resolution gaseous micro-pixel detector Gossip

Tracking Detector R&D at Cornell University and Purdue University

An extreme high resolution Timing Counter for the MEG Upgrade

IPRD06 October 2nd, G. Cerminara on behalf of the CMS collaboration University and INFN Torino

The Cornell/Purdue TPC

Test beam data analysis for the CMS CASTOR calorimeter at the LHC

HAPD and Electronics Updates

SuperFRS GEM-TPC Development Status Report

Commissioning and Performance of the ATLAS Transition Radiation Tracker with High Energy Collisions at LHC

SciFi A Large Scintillating Fibre Tracker for LHCb

TPC R&D by LCTPC. Organisation, results, plans. Jan Timmermans NIKHEF & DESY(2009) On behalf of the LCTPC Collaboration TILC09, Tsukuba

R&D plan for ILC(ILD) TPC in (LC TPC Collaboration)

Silicon Drift Detectors for the NLC

Study of Timing and Efficiency Properties of Multi-Anode Photomultipliers

The field cage for a large TPC prototype

Reading a GEM with a VLSI pixel ASIC used as a direct charge collecting anode. R.Bellazzini - INFN Pisa. Vienna February

Beam Test Results and ORCA validation for CMS EMU CSC front-end electronics N. Terentiev

GEM-TPC development in Canada. Dean Karlen Technology recommendation panel meeting January 16, 2006 KEK

A prototype of fine granularity lead-scintillating fiber calorimeter with imaging read-out

RTPC 12 Simulation. Jixie Zhang Aug 2014

The Time-of-Flight Detector for the ALICE experiment

DEPFET Active Pixel Sensors for the ILC

Note on the preliminary organisation for the design, fabrication and test of a prototype double-sided ladder equipped with MAPS

THE TIMING COUNTER OF THE MEG EXPERIMENT: DESIGN AND COMMISSIONING (OR HOW TO BUILD YOUR OWN HIGH TIMING RESOLUTION DETECTOR )

Monolithic Thin Pixel Upgrade Testing Update. Gary S. Varner, Marlon Barbero and Fang Fang UH Belle Meeting, April 16 th 2004

A new Scintillating Fibre Tracker for LHCb experiment

Performance of the MCP-PMT for the Belle II TOP counter

Beam test of the QMB6 calibration board and HBU0 prototype

Spatial Response of Photon Detectors used in the Focusing DIRC prototype

TPC R&D at Cornell and Purdue

SCT Activities. Nick Bedford, Mateusz Dyndal, Alexander Madsen, Edoardo Rossi, Christian Sander. DESY ATLAS Weekly Meeting 03. Jun.

New gas detectors for the PRISMA spectrometer focal plane

Atlas Pixel Replacement/Upgrade. Measurements on 3D sensors

The ATLAS Pixel Detector

Commissioning of the Transition Radiation Tracker

Front end electronics for a TPC at future linear colliders

Compact Muon Solenoid Detector (CMS) & The Token Bit Manager (TBM) Alex Armstrong & Wyatt Behn Mentor: Dr. Andrew Ivanov

The Scintillating Fibre Tracker for the LHCb Upgrade. DESY Joint Instrumentation Seminar

Recent APS Storage Ring Instrumentation Developments. Glenn Decker Advanced Photon Source Beam Diagnostics March 1, 2010

COGGING & FINE ADJUST OF THE BEAM BEAM PHASE

Status of the Front Tracker GEM and INFN Electronics

arxiv: v3 [astro-ph.im] 2 Nov 2011

Studies of large dynamic range silicon photomultipliers for the CMS HCAL upgrade

Study of the performances of the ALICE muon spectrometer

BEAMAGE 3.0 KEY FEATURES BEAM DIAGNOSTICS PRELIMINARY AVAILABLE MODEL MAIN FUNCTIONS. CMOS Beam Profiling Camera

PHGN 480 Laser Physics Lab 4: HeNe resonator mode properties 1. Observation of higher-order modes:

Large Size GEM for Super Bigbite Spectrometer (SBS) Polarimeter for Hall A 12 GeV program at JLab

The CALICE test beam programme

TORCH a large-area detector for high resolution time-of-flight

TitleLarge strip RPCs for the LEPS2 TOF. Author(s) Chu, M.-L.; Chang, W.-C.; Chen, J.- Equipment (2014), 766:

Updates on the Central TOF System for the CLAS12 detector

Study of the Z resolution with Fit Method for Micromegas TPC

The Alice Silicon Pixel Detector (SPD) Peter Chochula for the Alice Pixel Collaboration

Tutorial: Trak design of an electron injector for a coupled-cavity linear accelerator

The CMS Detector Status and Prospects

Digital Hadron Calorimetry for the Linear Collider using GEM based Technology University of Texas at Arlington, University of Washington

Using Geant4 in the BaBar Simulation. CHEP03 25 March 2003 Dennis Wright (SLAC) on behalf of the BaBar computing group

Digital BPMs and Orbit Feedback Systems

High ResolutionCross Strip Anodes for Photon Counting detectors

TRT Alignment. John Alison Aart Heijboer Joel Heinrich Joe Kroll. Outline: What we're trying to do. How we're doing it. Results. Plans for the future.

TRT Software Activities

The hybrid photon detectors for the LHCb-RICH counters

Glast beam test at CERN

Pseudospark-sourced Micro-sized Electron Beams for High Frequency klystron Applications

Muon Forward Tracker. MFT Collaboration

The trigger for the New Electromagnetic Calorimeter NewCal

ALICE Muon Trigger upgrade

Laser Beam Analyser Laser Diagnos c System. If you can measure it, you can control it!

Imaging TOP (itop), Cosmic Ray Test Stand & PID Readout Update

Focusing DIRC R&D. J. Va vra, SLAC

Commissioning of the ATLAS Transition Radiation Tracker (TRT)

The Silicon Pixel Detector (SPD) for the ALICE Experiment

STUDY OF ANODE SELF-TRIGGER ABILITY OF ME1/1 CMS ENDCAP CATHODE STRIP CHAMBER

The Status of the ATLAS Inner Detector

In-process inspection: Inspector technology and concept

THE ATLAS Inner Detector [2] is designed for precision

Status of the Timing Detector Plastic+SiPM Readout Option

Mechanical aspects, FEA validation and geometry optimization

New Results on the Electron Cloud at the Los Alamos PSR

Gated mode operation with Hybrid 5

Time Resolution Improvement of an Electromagnetic Calorimeter Based on Lead Tungstate Crystals

Sensors for the CMS High Granularity Calorimeter

Transcription:

Riccardo Farinelli Charge Centroid Feasibility

Outline Prototype and TB setup Data set studied Analysis approch Results Charge Centroid Feasibility Ferrara July 07, 2015 R.Farinelli 2

Test chambers Conversion gap To understand the detector behavior two 10x10 cm 2 triple-gem prototypes have been tested with a muon beam inside a magnetic field. For the purpose of this analysis the main difference between them is the conversion gap. In this way we can test simultaney different geometry: 3 and 5 mm. Charge Centroid Feasibility Ferrara July 07, 2015 R.Farinelli 3

TB setup Charge Centroid Feasibility Ferrara July 07, 2015 R.Farinelli 4

TB data set HV scan @ B=0T in ArCO2 HV scan @ B=1T in ArCO2 B scan in ArCO2 Drift field scan @ B=0/1T in ArCO2 Induction f.scan @ B=1T in ArCO2 Incident angle scan in ArCO2 HV scan @ B=0T in ArIso HV scan @ B=1T in ArIso B scan in ArIso Drift field scan @ B=0/1T in ArIso Induction f.scan @ B=1T in ArIso Incident angle scan in ArIso Drift f. scan @ 45 in ArIso Charge Centroid Feasibility Ferrara July 07, 2015 R.Farinelli 5

TB data set HV scan @ B=0T in ArCO2 HV scan @ B=1T in ArCO2 B scan in ArCO2 Drift field scan @ B=0/1T in ArCO2 Induction f.scan @ B=1T in ArCO2 Incident angle scan in ArCO2 HV scan @ B=0T in ArIso HV scan @ B=1T in ArIso B scan in ArIso Drift field scan @ B=0/1T in ArIso Induction f.scan @ B=1T in ArIso Incident angle scan in ArIso Drift f. scan @ 45 in ArIso Charge Centroid Feasibility Ferrara July 07, 2015 R.Farinelli 6

Preliminary analysis data set The drift field scan allows to access to different behaviour of the prototype and to measure its functional limits. The analyzed data are: ArCO2 @ B=0T and drift f. [0.5;2,5] ArCO2 @ B=1T and drift f. [1;2.5] ArIso @ B=0T and drift f. [0.5;2.5] ArIso @ B=1T and drift f. [0.5;2.5] Charge Centroid Feasibility Ferrara July 07, 2015 R.Farinelli 7

Electron avalanche behaviours C G1 G2 G3 A B = 0 T B = 1 T C G1 G2 G3 A B = 0 T B = 1 T B = 1 T Charge Centroid Feasibility Ferrara July 07, 2015 R.Farinelli 8

Preliminary cuts Charge (ADC ch.) Several configuration have been studied to apply a preliminary cut on the charge and time sample of the hit. Trackers have worked in unchanged condition, test chambers changed with the gas mixture Tracker: Q_cut = 50 & 8 < t_sample < 14 Test ArCo2: Q_cut = 50 & 9 < t_sample < 18 Test ArIso: Q_cut = 50 & 12 < t_sample < 22 Time sample Charge Centroid Feasibility Ferrara July 07, 2015 R.Farinelli 9

Tracking approch A preliminary aligment of the chambers (tests and trackers) is perform @ B=0T. A straight line is used to fit the particle track. Meanwhile in magnetic field the tracks are bended and because a.t.m. no alghoritm has been developed to recontruct bended tracks then a second aligment is perform to adjust the shift introduced by the magnetic field. Tracker backward B=0T B=1T Tracker forward Test chamber Charge Centroid Feasibility Ferrara July 07, 2015 R.Farinelli 10

Analysis After the aligment the tracks are reconstructed by a straight line. Only events with 1 cluster per plane are considered The residual, the difference between the position measured by the test chamber and the position extrapolated by the tracking telescope, is calculated for each event. The Gaussian fitting the residual distribution allows to measure the resolution of the chamber. Only the Y coordinate has been studied for this preliminary analysis. Charge Centroid Feasibility Ferrara July 07, 2015 R.Farinelli 11

Y coordinate The Y coordinate is the one that it is perpendicular to the magnetic field. It is the coordinate that it is affected by the magnetic field. Magnetic field Beam direction Electron avalanche direction or Y coordinate Charge Centroid Feasibility Ferrara July 07, 2015 R.Farinelli 12

Efficiency @ B=0T Higher efficiency plateaux is reached by ArIso ArCO2, due lower primary electron production, is less efficent than ArIso at low drift field ArIso shows a flat behaviour Charge Centroid Feasibility Ferrara July 07, 2015 R.Farinelli 13

Resolution @ B=0T ArIso is flat ArCO2 has an higher resolution for low drift filed. Plateaux efficency values are comparable. ArCO2 seems to work better because has lower diffusion. Charge Centroid Feasibility Ferrara July 07, 2015 R.Farinelli 14

Efficiency @ B=1T in ArCO2 Efficiency plateux is about 92%. Geometry shows differences at low drift field. Charge Centroid Feasibility Ferrara July 07, 2015 R.Farinelli 15

Efficiency @ B=1T in ArIso Higher efficiency level is reached in magnetic field No difference gave by the geometry. Charge Centroid Feasibility Ferrara July 07, 2015 R.Farinelli 16

Resolution @ B=1T in ArCO2 The resolution in magnetic field goes from 250 to 320 µm Charge Centroid Feasibility Ferrara July 07, 2015 R.Farinelli 17

Resolution @ B=1T in ArIso Strong dependence of the resolution to the drfit field. The lower values is reached at 2,5kV/cm with a value of 209µm Charge Centroid Feasibility Ferrara July 07, 2015 R.Farinelli 18

Cluster size vs Resolution @ B=1T & 5mm conversion gap Two different behaviour are given by the mixtures. Resolution and cluster size are linear in ArIso Cluster size in ArCO2 is limited and it seems to confine the resolution below that 300µm Charge Centroid Feasibility Ferrara July 07, 2015 R.Farinelli 19

Summary and Conclusion Without magnetic field, ArCO2 gas mixture shows a lower resolution. No significan differents are given by the geometry. With magnetic field, ArCO2 doesn`t show big differences between low and high drift field. It increase the resolution from 250 to 330 microns With magnetic field, ArIso shows a huge dependence by the drift field. At low field the charge centroid gives 1(0,7)mm of resolution and at high field 249(209) microns with 5(3)mm conversion gap. We are far away for the resolution goal with orthogonal tracks, non orthrogonal can be only worst. Charge Centroid Feasibility Ferrara July 07, 2015 R.Farinelli 20

Charge Centroid Feasibility Ferrara July 07, 2015 R.Farinelli 21