Technology Challenges for SRF Guns as ERL Sources in View of Rossendorf work

Similar documents
RUNNING EXPERIENCE OF FZD SRF PHOTOINJECTOR

PHIN. Report on the Development of a Radio-Frequency Photo Electron Source with Superconducting Niobium Cavity (SRF Gun Realization)

High Rep Rate Guns: FZD Superconducting RF Photogun

Experience with the Cornell ERL Injector SRF Cryomodule during High Beam Current Operation

SRF-gun Development Overview. J. Sekutowicz 17 th September, 2015 SRF15, Whistler, Canada

STATUS OF THE SUPERCONDUCTING RF PHOTO-INJECTOR DEVELOPMENT*

3 cerl. 3-1 cerl Overview. 3-2 High-brightness DC Photocathode Gun and Gun Test Beamline

DARK CURRENT IN SUPERCONDUCTING RF PHOTOINJECTORS MEASUREMENTS AND MITIGATION

Technology Challenges for SRF Guns as ERL Source in View of BNL Work

High Brightness Injector Development and ERL Planning at Cornell. Charlie Sinclair Cornell University Laboratory for Elementary-Particle Physics

Summary of the 1 st Beam Line Review Meeting Injector ( )

SRF GUN DEVELOPMENT OVERVIEW

IOT OPERATIONAL EXPERIENCE ON ALICE AND EMMA AT DARESBURY LABORATORY

!"!3

Status of BESSY II and berlinpro. Wolfgang Anders. Helmholtz-Zentrum Berlin for Materials and Energy (HZB) 20th ESLS-RF Meeting

INFN School on Electron Accelerators. RF Power Sources and Distribution

News from HZB / BESSY Wolfgang Anders at ESLS-RF Meeting September 2010 Trieste

Photoinjector Laser Operation and Cathode Performance

Diamond RF Status (RF Activities at Daresbury) Mike Dykes

4.4 Injector Linear Accelerator

Current status of XFEL/SPring-8 project and SCSS test accelerator

Activities on FEL Development and Application at Kyoto University

Tutorial: Trak design of an electron injector for a coupled-cavity linear accelerator

RF considerations for SwissFEL

Detailed Design Report

Summary of recent photocathode studies

Photo cathode RF gun -

L-Band RF R&D. SLAC DOE Review June 15 th, Chris Adolphsen SLAC

TESLA FEL-Report

First Results and Future of the Photo Injector Test Facility at DESY Zeuthen PITZ. introduction first measurements future schedule

Design Studies For The LCLS 120 Hz RF Gun Injector

Dark current and multipacting trajectories simulations for the RF Photo Gun at PITZ

STATUS AND COMMISSIONING RESULTS OF THE R&D ERL AT BNL*

30 GHz Power Production / Beam Line

Introduction: CW SRF linac types, requirements and challenges High power RF system architecture

Commissioning program of the 704 MHz SRF gun at BNL

Results of recent photocathode studies at FLASH. S. Lederer, S. Schreiber DESY. L. Monaco, D. Sertore, P. Michelato INFN Milano LASA

SRS and ERLP developments. Andrew moss

Cathode Studies at FLASH: CW and Pulsed QE measurements

Proceedings of the 1997 Workshop on RF Superconductivity, Abano Terme (Padova), Italy

DESIGN OF 1.2-GEV SCL AS NEW INJECTOR FOR THE BNL AGS*

ILC-LNF TECHNICAL NOTE

Jefferson Lab Experience with Beam Halo, Beam Loss, etc.

Production of accelerators and accelerator components in industry

Pulses inside the pulse mode of operation at RF Gun

Status of RF Power and Acceleration of the MAX IV - LINAC

RF Design of the LCLS Gun C.Limborg, Z.Li, L.Xiao, J.F. Schmerge, D.Dowell, S.Gierman, E.Bong, S.Gilevich February 9, 2005

NSLS-II RF Systems James Rose, Radio Frequency Group Leader PAC 2011

STATUS OF THE EUROPEAN XFEL CONSTRUCTING THE 17.5 GEV SUPERCONDUCTING LINEAR ACCELERATOR

PoS(EPS-HEP2015)525. The RF system for FCC-ee. A. Butterworth CERN 1211 Geneva 23, Switzerland

The FLASH objective: SASE between 60 and 13 nm

The basic parameters of the pre-injector are listed in the Table below. 100 MeV

Digital BPMs and Orbit Feedback Systems

SRF PHOTOINJECTOR TESTS AT HOBICAT

SLAC R&D Program for a Polarized RF Gun

The sc cw-linac project TASCA2012, S. Mickat, LINAC

Electron linac photo-fission driver for rare isotope program at TRIUMF

Performance of a DC GaAs photocathode gun for the Jefferson lab FEL

The Construction Status of CSNS Linac

High QE Photocathodes lifetime and dark current investigation

LCLS Injector Technical Review

Effects of the cryogenics operational conditions on the mechanical stability of the FLASH linac modules

Accelerator Instrumentation RD. Monday, July 14, 2003 Marc Ross

STATUS OF THE SWISSFEL C-BAND LINEAR ACCELERATOR

5 Project Costs and Schedule

SUMMARY OF THE ILC R&D AND DESIGN

Thoughts on Project Standard in Japan

ERL 2009 WG1 SUMMARY PAPER: DRIVE LASERS AND RF GUN OPERATION AND CHALLENGES*

Welcome and FRIB Project Status. FRIB Highlights and Plan Ahead

Design and Simulation of High Power RF Modulated Triode Electron Gun. A. Poursaleh

Beam Loss Detection for MPS at FRIB

The ESS Accelerator. For Norwegian Industry and Research. Oslo, 24 Sept Håkan Danared Deputy Head Accelerator Division Group Leader Beam Physics

Design, Fabrication and Testing of Gun-Collector Test Module for 6 MW Peak, 24 kw Average Power, S-Band Klystron

Photocathodes FLASH: Quantum Efficiency (QE)

The Elettra Storage Ring and Top-Up Operation

STATE-OF-THE-ART ELECTRON GUNS AND INJECTOR DESIGNS FOR ENERGY RECOVERY LINACS (ERL)

RF Solutions for Science.

STATUS OF THE EUROPEAN XFEL

reported by T. Shintake KEK / RIKEN Japan Summary of C-band R&D for Linear Collider at KEK New soft-x-ray FEL Project at RIKEN/SPring-8

DEVELOPMENT OF A 10 MW SHEET BEAM KLYSTRON FOR THE ILC*

Present Status and Future Upgrade of KEKB Injector Linac

Basic rules for the design of RF Controls in High Intensity Proton Linacs. Particularities of proton linacs wrt electron linacs

TECHNICAL SPECIFICATION Multi-beam S-band Klystron type BT267

Status of CTF3. G.Geschonke CERN, AB

TITLE PAGE. Title of paper: PUSH-PULL FEL, A NEW ERL CONCEPT Author: Andrew Hutton. Author Affiliation: Jefferson Lab. Requested Proceedings:

TOSHIBA Industrial Magnetron E3328

Status of SOLARIS. Paweł Borowiec On behalf of Solaris Team

A HIGH POWER LONG PULSE HIGH EFFICIENCY MULTI BEAM KLYSTRON

KARA and FLUTE RF Overview/status

Pulsed Klystrons for Next Generation Neutron Sources Edward L. Eisen - CPI, Inc. Palo Alto, CA, USA

P. Emma, et al. LCLS Operations Lectures

Spear3 RF System Sam Park 11/06/2003. Spear3 RF System. High Power Components Operation and Control. RF Requirement.

CEBAF Accelerator Update. Michael Tiefenback CASA Accelerator Physics Experimental Liaison June 14, 2017

The PEFP 20-MeV Proton Linear Accelerator

Review of Diamond SR RF Operation and Upgrades

The LEP Superconducting RF System

DELIVERY RECORD. Location: Ibaraki, Japan

2 Work Package and Work Unit descriptions. 2.8 WP8: RF Systems (R. Ruber, Uppsala)

Evaluation of Performance, Reliability, and Risk for High Peak Power RF Sources from S-band through X-band for Advanced Accelerator Applications

The SLAC Polarized Electron Source *

Transcription:

Technology Challenges for SRF Guns as ERL Sources in View of Rossendorf work, Hartmut Buettig, Pavel Evtushenko, Ulf Lehnert, Peter Michel, Karsten Moeller, Petr Murcek, Christof Schneider, Rico Schurig, Friedrich Staufenbiel, Jochen Teichert, Rong Xiang, (FZR, Dresden), Juergen Stephan (IKS Dresden), Wolf-Dietrich Lehmann (IfE Dresden), Thorsten Kamps, Dirk Lipka (BESSY GmbH, Berlin), Vladimir Volkov (BINP SB RAS, Novosibirsk), Ingo Will (MBI, Berlin) 1

Basic Design Normal-conducting cathode inside SC cavity Successful Proof of Principle Experiment, D. Janssen et al., NIM A507(2003)314 Cavity: Niobium 3+½ cell (TESLA Geometry) Choke filter Operation: T = 1.8 K Frequency: 1.3 GHz HF power: 10 kw Electron energy: 10 MeV Average current: 1 ma Cathode: Cs 2 Te thermally insulated, LN 2 cooled Laser: 262 nm, 1W Pulse frequency: 13 MHz & < 1 MHz Bunch charge: 77 pc & 1 nc 2

Main Components of the SRF Photogun in Rossendorf Tuning system RF input coupler Low level rf system Power rf system Control systems Synchronisation He-pressure&level Tuning, rf system, laser Beam line devices PSS, MPS, Vacuum Diagnostic beam line View ports, current, beam shape Energy and energy width Bunch length, emittance 3½-cell cavity test benches for Critical component SRF-Gun ELBE connection beam line Cryostat cathode insert&cooling He-vessel & port LN 2 cooling & port magnetic shield, vacuum diagnostics LHe transfer line & distribution box Driver Laser Laser beam line Photocathode transfer&storage Photocathode preparation equipment 3

Design consideration of the gun cell L1 is mainly determinated by technological conditions (pressure, multipacting, etching) The optimal L2 value follows from the beam properties One dimensional model calculation: E(Φ) max, Ez cath *sin(φ) max Shorted by 5mm 60 0.5 0.6 0.7 0.8 0.9 1.0 1.1 1.2 60 50 α 0 =0.2 50 L1 L1 L2 Ez cath *sinφ [MV/m] 40 30 20 α 0 =0.6 40 30 20 10 α 0 =1 10 0.5 0.6 0.7 0.8 0.9 1.0 1.1 1.2 A0=L2/(λ/4) L=L1+L2 width of the gun cell L1 = α 0 *A0*λ/2π 4

Result of numerical optimization Numerical minimization of the beam emittance by variation of the gun cell shape with the condition, that Bs max < 115mT and Es max < 52MV/m when E acc = 25MV/m Shorted by 5.7mm L1 L1 L2 Obtained result: [mm] L1+L2= λ/4-20 = 37.7 a1=9, b1=16, R1=102.5, r1=11.4, 5

RRR40 and RRR300 cavity of the SRF gun 6

Cavity Design Parameter shortened TESLA cup 1. 3 GHz, 10 kw optimized half cell & 3 TESLA cells E z,max = 50 MV/m (T cells) = 33 MV/m (1/2 cell) E, MV/m 40 30 20 10 0-10 -20 - z E c E r max E z max E z E r 10 Fields are normalized to the accelerating gradient in the TESLA cells of 25 MV/m 0 1 2 3 4 5 z r max z z max z, cm (origin at the back wall plane) r = 1 mm 77 pc 0.5 mm mrad RF focusing in SC gun cavities I av = 1 ma E = 9.5 MeV D. Janssen, V.Volkov, NIM A452(2000)34 1 nc 2.5 mm mrad 7

Magnetic RF field inside the cavity Surface B-field [T] Axis electric RF field [MV/m] z[m] Axis magnetic RF field [T] z[m] 8

σ x [mm ] Designparameter including the magnetic mode ε[mm mrad] ε[mm mrad] z[m] 180 φ TE [grad] Beam parameter Field parameter Laser parameter ε x [mm mrad] 0.78 0.98 B TMsurf [mt] 115 Puls length [ps] 20 σ x [mm] 3.06 B TEsurf [mt] 136 Raise time [ps] 1 ε z [kev mm] 72.4 B TM + B TE surf [mt] 144 Spot size [mm] 2.6 z[mm] 2.79 E TM,axis [MV/m] 50 Bunch charge[nc] 1 E av [MeV] 8.82 φ TM [grad] 74.6 E rms [kev] 53.9 φ TE [grad] 0-180 9

Dual tuning system gun-cell tuner TESLA-cell tuner TESLA-cell tuner gun-cell tuner Gun cell TESLA cells choke-cell setting range resolution ±0.25mm 2nm ±0.3mm 2nm load ±2250N ±2700N frequency ±137kHz ±286kHz 10

Liquid N 2 Cathode Cooling Test bench LN 2 reservoir cathode cooler thermal conductance measurements, cathode cathode temperature? & test of the cathode transfer system Cone in cooler - centres cathode - cathode is pressed in by spring - thermal contact of cone surface? 11

Test bench for the cathode cooler heater cathode cathode cooler LN 2 reservoir 12

Cavity with cathode tuning system Cathode input End of the cryostat LN 2 reservoir Pic up flange Titanium bridge Cavity tube 13

Beam tube with higher order mode and main coupler HOM coupler (TESLA design) Main coupler Max. power 10kW Design M.Champion Development of HEPL, Stanford 14

RF power input around the cathode Power input LN 2 cooling Bellow for adjustment of Q ext and heat isolation Quater wave choke Tube for cathode exchange cathode cavity Warm RF window Cold RF window L z Power input End of the cryostat 15

External quality factor and head load of a cathode-rf coupler Heat load of the cathode [W], beam power [kw] 66.0 66.2 66.4 66.6 66.8 67.0 67.2 110 100 External Quality Factor Heat load of the cathode 90 Beam Power 80 70 60 50 40 30 20 10 0 66.0 66.2 66.4 66.6 66.8 67.0 67.2 Length L of the choke cell [mm] 1E9 1E8 1E7 External quality factor Heat load of the cathode [W], beam power [kw] 110 100 90 80 70 60 50 40 30 20 10 0 3.6 3.8 4.0 4.2 4.4 External quality factor Heat load of the cathode Beam power 10 9 10 8 10 7 10 6 3.6 3.8 4.0 4.2 4.4 Width z of the choke cell [mm] External quality factor Field parameters for W = 29.755J Ez max (r=0) = 50MV/m, Ur max = 6.5kV Es max = 43.6MV/m, Bs max = 0.11T 16

Cryomodule design of the SRF gun 17

LN 2 cooling shield of the cryostat 18

Present Status and next steps Cavity: Cavity tuners: Fabrication finished Fabrication of 2 (RRR 40 & 300) cavities at ACCEL finished next steps: warm tuning in Rossendorf, BCP, HPR, tests at 2K at DESY Fabrication finished design of a test bench Cathode cooling system: Fabrication finished tests are running Cathode transfer system: Design finished, in the workshop Cathode preparation chamber: Cryomodule: Design and fabrication finished, assembling and tests Design finished, in fabrication 19