HVAC Controls Upgrade FPT: Scheduling, Override & Night Setback; End to End ( )

Similar documents
An Overview of Commercial Building Retuning

Comfort System T-32-P Universal Thermostat. Operation Manual

Retrocommissioning (RCx) Siebel Center for Computer Science. Damon E. McFall EIT, LEED AP

All real signals have scale factor 10. Integer, Index and Logic has always scale factor 1.

Modbus Flexio Configuration Properties

Innovative Air Systems ABN When Calling For Support Quote:.doc

THE MODERN HVAC SYSTEM. J. Michael Carson P.E. Senior Mechanical Engineer Purdue University

SINGLE ZONE CLIMATE ZONING SYSTEM. Technical Manual. Polyaire Pty Ltd

User Guide. Color Touchscreen Programmable Thermostat. ComfortSense Model: 13H /2017 Supersedes

2 Verify that the green light

Sample BD Tech Concepts LLC

Operation Guide 6022 ENGLISH

ComfortChoice Touch Thermostat. Designed for ZigBee R Wireless Technology USER GUIDE

engineering guide TVS Parallel Flow, Fan-Powered, 50/60 Hz VAV Terminals

Operations. BCU Operator Display BMTW-SVU02C-EN

VT8300 Series User Interface Guide Commercial and Hotel HVAC Fan Coil Applications

User interface. Abbreviations / Meanings

SAUTER flexotron RDT405 Manual

OP5. Preprogrammed, configurable controller for simple applications

Thank you for purchasing this product. If installing for someone else, please ensure that the instructions are handed to the householder.

OJ Air Pressure. full-range pressure and ventilation control FLOOR HEATING HYDRONIC HVAC CONTROLS & POWER FLOOR HEATING ELECTRIC

T775L Series 2000 Electronic Stand-Alone Staging Controller

ORM0022 EHPC210 Universal Controller Operation Manual Revision 1. EHPC210 Universal Controller. Operation Manual

USER & ENGINEER INSTRUCTION MANUAL

Installation and Operation Instructions

Simon XT/XTi/XTi-5 LTE Module INSTALLATION GUIDE

Chinook Gas Furnace Multi-Position High Efficiency Condensing Furnace

T775U Series 2000 Electronic Stand-Alone Controller

VTR8300 Series User Interface Guide Commercial and Hotel/Lodging HVAC Fan Coil Applications

Section C Recorders. DPR mm Digital Strip Chart Recorder

T775U Series 2000 Electronic Stand-Alone Controller

Thank you for purchasing this product. If installing for someone else, please ensure that the instructions are handed to the householder.

User Guide Stand-Alone Metering for OptiPlant

Installation Operation Maintenance

Sample BD Tech Concepts LLC

RT505TX Programmable. The RT505TX can be used with any of these receivers RXBC605 RXWBC605 RXVBC605 RXST MHz

Room thermostat Instructions for Use. For the user. Instructions for Use. geotherm

CALIBRATION OF SOLUTION SECONDARY CURRENT FOR 9180 controls with SC software PAGE 1 OF 5

MARK SCHEME for the November 2004 question paper 9702 PHYSICS

TUC: Universal thermostat

This document is a reference document that shows the menus in the 5500sc, 9610sc and 9611sc analyzers. There are 3 top-level menus:

Configuring and Troubleshooting Set-Top Boxes

COMFORT COMFORT CALL OWNER S MANUAL CALL SYSTEM P/N P BASE STATION & RF WIRELESS MODULE. Complete Control from TOTALINE

Compatibility mode. rev. 0.1, 10/09/2015. Compatibility mode Sx tool manual 1

Ambiflex MF620 USER GUIDE

Coherence Measurement between two Signals regarding Timing, Phase and Gain Application Note

PowPak Dimming Module with 0 10 V Control

4TVH0040B btu/h or 3.41 Tr TVH0048B btu/h or 3.98 Tr

Digital signature documents on Sourcing Tender System

PC-250. SMD Taped Parts Counter Operator s Manual. ISO 9001:2008 Certified. V-TEK, Incorporated 751 Summit Avenue Mankato, MN USA

Danfoss Icon Programmable Room Thermostats, 230 V

AEROTRAK PORTABLE AIRBORNE PARTICLE COUNTER MODEL 9110 QUICK START GUIDE

Product Catalog. Packaged Rooftop Air Conditioners IntelliPak II S*HJ 90 to 150Tons Air-Cooled Condensers 100 to 162Tons Evaporative Condensers

SCS318. User Instructions. SCS318 comprising of SCS317 7 Day Wireless Programmable Room Thermostat and SSR303 Receiver

Software Wizard Makes Configuring the 2301E Easier Configuration Wizard Now Included in 2301E Service Tool

Tech Support: Customer Service: General Tech Questions: Tech Docs:

PowPak Dimming Module with 0 10 V- Control

Software Manual Control Panel for Professional Single Booster Units Models: MM3 BW3

Silver Mountain Targets V2 Software Reference Guide. July 22, 2015

External RF programmable room thermostat 411

Codes and instructions on how to use the shift selector to read oil level and diagnostic codes

Waterline Room Controller - Type WLCT3

Modular Lube Lubrication Systems System Controls

Radio Thermostat Clock

Adaptive HVAC Operation To Reduce Disruptive Fan Noise Levels During Noise-Sensitive Events

APM CALIBRATION PROCEDURE Rev. A June 3, 2015

DICKSON ES120/ES120A DICKSON. Electronic Signal Data Logger. Specifications. Applications, Features, & Getting Started. Instructions / Operating

LGH-25RX4-E LGH-35RX4-E LGH-150RX4-E LGH-65RX4-E LGH-80RX4-E LGH-100RX4-E LGH-15RX4-E LGH-200RX4-E

Index. - Registration assistant of momit Home 1 - Start of session/registration 2 - Registration of devices. - momit Home App 1.

Instruction Manual PT Series v1 PT 150

24 Hour & 7 Day Digital Immersion Heater Timeswitch Article

HEVAC HTC DIGITAL SERIES STEP BY STEP GUIDE FOR COMMON PROGRAMMING

TP7001 Range Electronic 7 Day Programmable Room Thermostat. Danfoss Heating. Installation Guide

Table of contents 1. INTRODUCTION GENERAL CONTENTS OF PACKAGE GENERAL USE OF THE EQUFLOW 6100 D/A CONVERTER STORAGE..

(12) Patent Application Publication (10) Pub. No.: US 2016/ A1

XR47-24 Models 24 W/ F (43 W/ C)

XR47-24 Models 24 W/ F (43 W/ C)

WCHE BTU/Hr Watts

XR47-24 Models 24 W/ F (43 W/ C)

AHP-1200CPV Cold/Warm Plate Product Manual Volume 1.3

THANK YOU FOR PURCHASING HANYOUNG PRODUCT. PLEASE READ THIS MANUAL CAREFULLY.

Roof-mounted Blue e+ cooling unit Integration solution VX25

WaveLinx Mobile. WaveLinx Mobile Quick Start Guide. Programming Steps

Instruction Manual

WELDING CONTROL UNIT: TE 450 USER MANUAL

MF-PFT. Programmable differential pressure transmitter for pressure or flow measurement and control. DIL1 Output/Utsignal

User s Manual. 4X1 HDMI Switcher Part #: DL-HDS41

MRX1 1. Getting to know your MRX1 wireless controller

RWL11X2 GREENHOUSE CONTROLLER. Operation Manual

Student resource files

How to Order. Flow rate (l/min) Applicable models PFA710, PFA750. Nil

Analysis and Recommendations:

Complete Part Number = MIL 72A or E Followed by Suffix Code and Voltage. Example: MIL 72A STuZ-24

LM-79 Test Report. Relevant Standards IES LM IES TM CIE Product SKU DI-24V-ES30-BK 3000K BLACK.

Max. temp. of sensor C. Capillary tube mm. Switching difference K. Sensor cartridge mm

Switching Power Module

ELECTRICAL TESTING FOR:

Battery Operated Controllers

Blown Film Extrusion. Line Control. 5 Layers CD Series IBC Temperature USER MANUAL

WCHE BTU/Hr Watts

Transcription:

REQUIRED SEQUENCES CONTROLS/FEATURES: Indicate that the specific feature is installed and record the date it was verified to work correctly. Indicate NA if not required by grant. Installed? Date Tested General Description End to End Y / NA 1. Each point on the DDC GUI represents the correct equipment and state (end to end verification) Y / NA 2. OA sensor(s) are calibrated and located in shady area representative of OA equipment intake temperature Schedules and Override Y / NA 3. Schedules for all air handlers (supply and exhaust) match occupied hours by zone Y / NA 4. Zone boxes are grouped by Tenant (or ) for Scheduling and for override functions Y / NA 5. Overrides for each box/zone are programmed with a time limit (maximum 2 hours) Y / NA 6. Easy way to change box grouping to match changing tenants/zones does not require reprogramming by controls contractor Y / NA 7. 7 day scheduling and holiday schedules are set up for the first year Y / NA 8. GUI: Schedule name is on VAV box schedule and on AHU graphic; name changes when schedule changes Night Setback Unoccupied Mode Y / NA 9. Night/Unoccupied zone temperatures: cooling 80F or higher; heating 58F or lower. Actual / Y / NA 10. Outside air damper is closed in unoccupied mode unless cooling is needed Y / NA 11. Night Heating VAV system: VAV fan boxes only come on. AHU stays off for those zones where VAV box can be used to heat. Zones in constant need of heating are not keeping system on continuously. Y / NA 12. Night Cooling: AHU uses outside air with no mechanical cooling. A minimum number of boxes come on to prevent over pressurization of ducts. Boxes in constant need of cooling are not keeping system on continuously. Y / NA 13. Override for each zone is programmed with time limit (maximum 2 hours). Actual Time Limit Notes (if required by grant and marked NA explain, if installed differently than required explain, etc.): Page 1 of 9 FPT Example.docx

END to END VERIFICATION & SEQUENCE VERIFICATION 1. Start with all equipment in the occupied mode. 2. Indicate the schedule name and which zone and VAV boxes the schedule serves. 3. For each major piece of equipment complete this entire set of tests prior to moving onto the next piece of equipment. Use multiple pages as needed to cover all equipment. a. Fill in at column head Equipment ID#s controlled by the schedule. (Example: AHU 1) b. For each test indicate P if passed test and F if failed. If the test failed and the condition cannot be corrected, provide notes at the bottom of the tests to indicate what the issue was. If filling out by hand it is okay to cross out F and put in P if system failed initially, was corrected and then passed. SCHEDULE NAME: For Zone/Area: List Boxes & Other equipment on schedule: Hours of Occupancy: Type of Occupants: EQUIP ID: EQUIP ID: EQUIP ID: EQUIP ID: Test Procedure & Results (perform tests in order) Each piece of equipment circle if passed (P) or failed (F) or NA. If failed provide details in notes then cross out F and circle P when corrected. 1. OA Temperature: Only do once per OA sensor. Measure OA temp right next to sensor and at the same time observe value on DDC GUI. Verify the values are within 2 degrees. For each piece of equipment verify that the OAT indicated on the equipment screen matches the values on all equipment screens tested for OA calibration. 2. Occupied: Verify that the schedule shows occupied on scheduling screen, unit graphics and graphic for all VAV boxes and equipment (i.e. EFs) tied to that schedule. 3. Supply Fan (SF): DDC equipment graphic shows running and fan is actually running 4. Exhaust Fan (EF): DDC equipment graphic shows running and fan is actually running 5. Return Fan (RF): DDC equipment graphic shows running and fan is actually running 6. Outside Air (OA) damper: Override damper fully open and fully closed. DDC equipment graphic reflects actual damper positon and the damper fully opens and closes. 7. Return Air (RA) damper: Override damper fully open and fully closed. DDC equipment graphic reflects actual damper positon and the damper fully opens and closes. 8. Exhaust Air (EA) damper: Override damper fully open and fully closed. Verify DDC equipment graphic reflects actual damper positon and the damper fully opens and closes. 9. Supply Air (SA) & Mixed Air (MA) Temperature: With OA damper fully open and unit heating and cooling off, verify the SA temp reading on DDC GUI is within 2 degrees of MA temperature Page 2 of 9 FPT Example.docx

EQUIP ID: EQUIP ID: EQUIP ID: EQUIP ID: Test Procedure & Results (perform tests in order) Each piece of equipment circle if passed (P) or failed (F) or NA. If failed provide details in notes then cross out F and circle P when corrected. and OA temperature. 10. Return Air (RA) Temperature: Verify RA temp is within 5 degrees of (average) room temp 11. Unoccupied: Change the schedule using thescheduling screen and verify unit graphics and graphics of all VAV boxes and equipment (i.e. EFs) tied to schedule show the equipment in the unoccupied mode. 12. Supply Fan (SF): DDC equipment graphic shows off and fan is actually off. 13. Exhaust Fan (EF): DDC equipment graphic shows off and fan is actually off. 14. Return Fan (RF): DDC equipment graphic shows off and fan is actually off. 15. Outside Air (OA) damper: damper shows closed on equipment graphic 16. Room Temperature Setback: Verify cooling temp setpoint increases to 80F or higher and heating temp setpoint decreases to 58F or lower. Note boxes tested (at least 3 per AHU). Note setpoints: Day/Night Heating setpoints: Day/Night Cooling setpoints: 17. Night heating/zone Override VAV fan powered box: Verify override time is 2 hrs or less. Set override time limit to a short time. Override the room temp setpoint above room temp. Push override button for box/zone and verify that the box/zone comes on but AHU does not come on. Note VAV boxes tested (at least 3 per AHU). Wait for the override period to end and verify that the box/zone returns back to unoccupied mode with the fan off and the OA damper closed. Release setpoint override. Return override time to original override time limit: hours. Note VAV Boxes tested (at least 3 per AHU). 18. Night heating /Zone Override non VAV/single zone or non fan powered box: Verify override time is 2 hrs or less. Set override time limit to a short time. Override room temp setpoint above room temp. Push override button for box/zone and verify AHU comes on. Wait for the override period to end and verify that the box/zone returns to the unoccupied mode with fan off and the OA damper closed. Release setpoint override. Return override time to original override time limit: hours. Override room temp setpoint above room temp and verify that the AHU comes on and the outside air damper remains closed. Release setpoint override. 19. Night cooling VAV boxes: Override room temp setpoint below room temp and verify that the AHU comes on in economy cooling mode with mechanical cooling locked out and, VAV box comes on to cool. Verify not all VAV boxes come on, only the number needed to prevent over pressurization come on. Note VAV boxes tested (at least 3 per AHU) Page 3 of 9 FPT Example.docx

EQUIP ID: EQUIP ID: EQUIP ID: EQUIP ID: Test Procedure & Results (perform tests in order) Each piece of equipment circle if passed (P) or failed (F) or NA. If failed provide details in notes then cross out F and circle P when corrected. Other on: Other on: Other on: Other on: Note other boxes on for over pressurization protection. Release setpoint override. 20. Night cooling non VAV/single zone: Override room temp setpoint below room temp and verify that the AHU comes on in economy cooling mode (OA damper opens above minimum) with mechanical cooling locked out. Release setpoint override. 21. VAV boxes assigned to a different schedule: Move a VAV box to a different schedule for a unit in the occupied mode. Verify that the box now comes on and is shown to have the new schedule on the VAV box graphics (summary & individual). Note boxes tested (at least one per AHU). Move box back to the original schedule and verify that it turns off and is now associated with the original schedule. 22. Release overrides: Change the schedule back to original. Return systems to normal operation. If all tests are passed, start integrated tests (trends). 23. Integrated tests (trends and GUI screenshots): As a final verification of sequences, trend the following points for 2 weeks in 15 minute intervals and produce the trend graphs shown on next pages (Excel or dated DDC screenshots if points and values can be clearly seen) and provide the dated DDC screen shots listed. Provide a list explaining point names: a. Each AHU: AHU/SF/RF/EF statuses, SF/RF/EF fan %, OA damper % and mode b. Each AHU and each type of box: Screenshot of equipment graphic c. At least 3 boxes per AHU: status (fan if available), CFM, room temp & setpoints, and mode d. Each AHU: Screenshot of scheduler Notes (failures that can not be resolved; test procedures if done differently that listed): Testing Agent Name and Company: I certify the systems have passed the tests and are working per the design intent: (signature & date) Page 4 of 9 FPT Example.docx

TREND GRAPHICS NEEDED (provide back up trends are well): AHU Scheduling Example: Page 5 of 9 FPT Example.docx

AHU Scheduling Example (cont.): Page 6 of 9 FPT Example.docx

AHU Scheduling Example (cont.) staus if no fan speed; do not combine status or voltage/amp (or low number) data with analog (or large number) data Page 7 of 9 FPT Example.docx

ZONE Scheduling Example staus if no fan speed; do not combine status or voltage/amp (or low number) data with analog (or large number) data 1.2 VAV Box Status Example Schedule (Shows equipment on in day, off night and weekends) (0=off; 1=on) VAV 1 Mode 1 0.8 0.6 0.4 0.2 0 Page 8 of 9 FPT Example.docx

ZONE Scheduling example: this could be broken up into two charts to better show setpoints and space temperature Page 9 of 9 FPT Example.docx