MINNEHAHA COUNTY ON-SITE WASTEWATER TREATMENT SITE EVALUATION WORKSHEET Form #1. Land Owner. Legal Description

Similar documents
Tab 10 - The NESC and Underground Applications. Restricted Siemens Industry, Inc All rights reserved.

ALDEN COMPUTATIONAL ANALYSIS OF WESTFALL S OPEN CHANNEL MIXER FOR THE COLBORNE SEWAGE TREATMENT PLANT. Solving Flow Problems Since 1894

Page Number Official Detail Name Contact Title Primary Contact E mail Secondary Contact E mail

TruePlate Structural Plate

Task-based Activity Cover Sheet

Cover Sheet. Scanning Report of Flexible Riser Pipe Section EVI /7/2005. Inspection Report

MTS FiON. for Multiple Dwelling Units (MDUs) Brownfield

T10 Float Level Switch

Standard Trench/Embankment Installation

Table of Contents. Introduction...1 Welcome to the World of WeatherTRAK...1

Delta College Middle School Math Competition Practice Test A 2018

P Output Ratings. Dimensions and Weights. Prime Rating

P Output Ratings. Dimensions and Weights. Prime Rating

P88-3. Output Ratings. Dimensions and Weights. Prime Rating

P Output Ratings. Dimensions and Weights. Prime Rating

P Output Ratings. Dimensions and Weights. Prime Rating

Structural Plate Design Guide. 5 th Edition MULTI-PLATE. Aluminum Structural Plate. Aluminum Box Culvert SUPER-SPAN SUPER-PLATE.

P Output Ratings. Dimensions and Weights. Prime Rating

P550-3L. Output Ratings. Dimensions and Weights. Prime Rating

P65-5. Output Ratings. Dimensions and Weights. Prime Rating

P400-3L. Output Ratings. Dimensions and Weights. Prime Rating

P Output Ratings. Dimensions and Weights. Prime Rating

In the proposed amendment below, text shown with underline is proposed to be added and text shown with strikethrough is proposed to be removed.

Split System Air Conditioner

Ratings at 0.8 power factor. Please refer to the output ratings technical data section for specific generator set outputs per voltage.

MODIFIED ASTM E814/UL 1479 FIRE RESISTANCE FOR FEDERAL CONSERVATION INC. ON AIRKRETE WALL PANEL TESTED: February 21, 2008 VTEC #

P1000P1/P1100E1 50Hz

P Output Ratings. Dimensions and Weights. Prime Rating

Model KBF 115 Constant climate chambers with large temperature / humidity range

P800P1/P900E1. Output Ratings. Dimensions and Weights. Prime Rating

P Output Ratings. Dimensions and Weights. Prime Rating

Valugrind tm tool grinding system

P1350P1/P1500E1 50Hz

The MTS FiON Network. for Multiple Dwelling Units (MDUs) Greenfield/Brownfield Renovations

BELLEFONTE BOROUGH AUTHORITY MEETING MINUTES January 3, :00 p. m. 236 West Lamb Street, Bellefonte, PA www. bellefonte.

Model KBF 1020 Constant climate chambers with large temperature / humidity range

SHALER TOWNSHIP PLANNING COMMISSION April 18, 2016

DISCLAIMER. This document is current at the date of downloading. Hunter Water may update this document at any time.

MXE " 3 Cell MXC "

DEEPFRAME BASIC KIT- USER MANUAL VERSION ORIGINAL USER MANUAL

The One Penny Whiteboard

TECHNICAL GUIDE 95.5% AFUE SINGLE STAGE RESIDENTIAL GAS FURNACES MULTI-POSITION MODELS: TG9S

Analyzing Numerical Data: Using Ratios I.B Student Activity Sheet 4: Ratios in the Media

Pulp and Paper Screens

Township of Egg Harbor August 15, 2011 Planning Board

City. Faribault. Small Town Pride Big City Opportunities! March 20, 2017 Public Hearing

Measuring Variability for Skewed Distributions

Appendix 1 CLOSED-CIRCUIT TELEVISION INSPECTION

SECTION 25 CLOSED CIRCUIT TELEVISION INSPECTION OF SEWER LINES

TEK-LCD 7801A. NEMA 4X Loop-Powered Feet and Inches Level Meter. ACCESSORIES. Technology Solutions

Application Note 11 - Totalization

1. Entries must be received or post-marked no later than 5:00 p.m., NOVEMBER 25, Faxed, or late entries will not be accepted.

Standard Method of Test for Random Method of Sampling Hot Mix Asphalt (HMA) SCDOT Designation: SC-T-101 (08/13)

Model KBF P 240 Humidity test chambers with ICH-compliant light source

OCC Installation Conduit Guidelines Excerpt from Optical Cable Corporation s INSTALLATION GUIDE

Toronto Hydro - Electric System

Planning Commission Staff Report Street Vacation Hearing Date: December 11, 2013

Twin City Fan & Blower

FILTRATION AREA (MM²) 0.45 x 0.45 x / x 0.51 x /120

Oxymax W COS61. Technical Information. Dissolved oxygen measurement Optical sensor acc. to the fluorescence quenching principle

TENSIONED ELPRO CONCEPT Motorized projection screen for wall or ceiling installations

Upflow/ Horizontal Left/Right, Downflow Two Stage Condensing Gas Fired Furnace

Analogue Inputs Resolution Assignment

Admiss. counterpressure

CHILD SUPPORT GUIDELINES CHART

Level Measurement silometer FMC 420, FMC 423

Minutes of the Planning Board of the Township Of Hanover JULY 28, Board Secretary, Kimberly Bongiorno took the Roll Call.

EVAPORATIVE COOLER. ...Simple Effective Inexpensive to operate Economical. MODEL EC2.5 EC to CFM Nominal Airflow

Fiberglass - Technical Data

WHAT IS MAXCELL 300% MORE CABLE 2X AS FAST CUTS TOTAL PROJECT COSTS

Distribution of Data and the Empirical Rule

SPECIFICATION NO Model 207 Automatic GTAW Welding System

Appendix 6 St. Bernard Basin

Cable installation guidelines

Wall-/Pipe-Mount Level Indicator

Tekna evo. innovation technology future 03

Emerging Subsea Networks

Algebra I Module 2 Lessons 1 19

Water temperature recommended range 5 45 C ( F) UV transmittance 254 nm, 1 cm) min. 45 %

PANEL RADIATORS - TECHNICAL MANUAL

2291 Guided Wave Radar Level Transmitter

x) Graph the function

HYDROLUME LED STRIP LIGHT

Installation instructions Roxtec RM BG systems

THE CITY OF WINNIPEG BY-LAW NO. 36/2013

Installation instructions Roxtec RM ES systems

EOC FINAL REVIEW Name Due Date

ProVu PD6000 Process Meter

Attachment 2 Wastewater

2.0 SOUND SOURCES AT PINE RIDGES INLAND CLAMSHELL OPERATION AREA

ENGINEERING COMMITTEE Interface Practices Subcommittee SCTE

Town of Salem, NH Planning Board 33 Geremonty Drive Salem, NH December 22, 2015

Installation instructions Roxtec RM BG B systems

2178-L/S Series Fiber Optic Splice Case with Gasket

Chinook Gas Furnace Multi-Position High Efficiency Condensing Furnace

ECOQUIP 2 VAPOR ABRASIVE BLASTERS

Wireless Box Permit Block:3783 Lot: 009 Zip: 94103

Model CB 60 CO 2 incubators with hot air sterilization and heat sterilizable CO 2 sensor

Section 2.1 How Do We Measure Speed?

ULTRA-TRAC APL INSTRUCTION MANUAL. Read and understand instructions before use. Patented. 851 Transport Drive Valparaiso, IN

Transcription:

MINNEHAHA COUNTY ON-SITE WASTE TREATMENT SITE EVALUATION WORKSHEET Form #1 Land Owner Legal Description Type of Structure (check one): Residence Commercial Industrial Accessory Building Other If Residence: - No. of bedrooms (include both planned and potential) - Total sq. ft. of residence (finished and unfinished area) - Sq. ft. of residence per bedroom - Water Use Appliances (number of each appliance planned for house) Automatic Washer Dishwasher Garbage Disposal Hot Tub or Spa Water Softener Self Cleaning Humidifier in Furnace - Type I or Type II house Type I (sq. ft. of residence per bedroom is 800 or higher, or 4 or more water use appliances are planned) Type II (sq.ft. of residence per bedroom is less than 800 or less than 4 water use appliances planned) Existing Land Slope Percentage Is site in Water Source Protection District yes no Private well? yes no Depth of well casing SOIL BORING The locations of all percolation test holes and the soil boring hole shall be noted on the site plan on the reverse of the system design worksheet. Date Hole Made Soil Data From Test Hole: Method of Digging Hole depth, inches soil texture soil color Bottom of boring at feet. Standing water table: Present in hole no yes, present at inches of depth, hours after boring. Bedrock: Present in hole no yes, at inches of depth Mottled soil: Present in hole no yes, at inches of depth I, the undersigned, do affirm that I am a certified septic installer, that all the above information and the attached percolation test data is correct, and that the soil boring and perc test data is representative of the soils over the whole of the wastewater treatment site. Installer Signature: date Installer Company: Form # 1, Page 1 of 8

PERCOLATION TEST LOG SHEET Hole # 1 Date test hole was prepared Depth of hole bottom inches Diameter of hole inches Percolation test conducted by Method of digging holes Method of scratching sidewalls Date/Time of initial water filling Depth of pea gravel in hole bottom: inches TIME INTERVAL (minutes) DEPTH (fraction) (decimal) PERC RATE CALCULATION (time divided by drop in decimals) A B C D E F G H decimal conversions: 1/8 = 0.13 1/4 = 0.25 3/8 = 0.38 2 = 0.5 5/8 = 0.63 3/4 = 0.75 7/8 = 0.88 Ten Percent Calculation* (No more than 10% difference between the largest and smallest readings when averaging to find perc. rate for hole.) A, B, C - B, C, D Largest of A, B, C Smallest of A, B, C Largest of B, C, D Smallest of B, C, D Largest of A, B, C Largest of B, C, D C, D, E - D, E, F Largest of C, D, E Smallest of C, D, E Largest of D, E, F Smallest of D, E, F Largest of C, D, E Largest of D, E, F E, F, G - F, G, H Largest of E, F, G Smallest of E, F, G Largest of F, G, H Smallest of F, G, H Largest of E, F, G Largest of F, G, H * If the top number in each set of boxes is larger than the bottom number then take another reading. When the top number is equal or smaller than the bottom number then average the last three readings to compute the average perc rate for the hole. Average percolation rate for this hole = Form # 1, Page 2 of 8

PERCOLATION TEST LOG SHEET Hole # 2 Date test hole was prepared Depth of hole bottom inches Diameter of hole inches Percolation test conducted by Method of digging holes Method of scratching sidewalls Date/Time of initial water filling Depth of pea gravel in hole bottom: inches TIME INTERVAL (minutes) DEPTH (fraction) (decimal) PERC RATE CALCULATION (time divided by drop in decimals) A B C D E F G H decimal conversions: 1/8 = 0.13 1/4 = 0.25 3/8 = 0.38 2 = 0.5 5/8 = 0.63 3/4 = 0.75 7/8 = 0.88 Ten Percent Calculation* (No more than 10% difference between the largest and smallest readings when averaging to find perc. rate for hole.) A, B, C - B, C, D Largest of A, B, C Smallest of A, B, C Largest of B, C, D Smallest of B, C, D Largest of A, B, C Largest of B, C, D C, D, E - D, E, F Largest of C, D, E Smallest of C, D, E Largest of D, E, F Smallest of D, E, F Largest of C, D, E Largest of D, E, F E, F, G - F, G, H Largest of E, F, G Smallest of E, F, G Largest of F, G, H Smallest of F, G, H Largest of E, F, G Largest of F, G, H * If the top number in each set of boxes is larger than the bottom number then take another reading. When the top number is equal or smaller than the bottom number then average the last three readings to compute the average perc rate for the hole. Average percolation rate for this hole = Form # 1, Page 3 of 8

PERCOLATION TEST LOG SHEET Hole # 3 Date test hole was prepared Depth of hole bottom inches Diameter of hole inches Percolation test conducted by Method of digging holes Method of scratching sidewalls Date/Time of initial water filling Depth of pea gravel in hole bottom: inches TIME INTERVAL (minutes) DEPTH (fraction) (decimal) PERC RATE CALCULATION (time divided by drop in decimals) decimal conversions: 1/8 = 0.13 1/4 = 0.25 3/8 = 0.38 2 = 0.5 5/8 = 0.63 3/4 = 0.75 7/8 = 0.88 A B C D E F G H Ten Percent Calculation* (No more than 10% difference between the largest and smallest readings when averaging to find perc. rate for hole.) A, B, C - B, C, D Largest of A, B, C Smallest of A, B, C Largest of B, C, D Smallest of B, C, D Largest of A, B, C Largest of B, C, D C, D, E - D, E, F Largest of C, D, E Smallest of C, D, E Largest of D, E, F Smallest of D, E, F Largest of C, D, E Largest of D, E, F E, F, G - F, G, H Largest of E, F, G Smallest of E, F, G Largest of F, G, H Smallest of F, G, H Largest of E, F, G Largest of F, G, H * If the top number in each set of boxes is larger than the bottom number then take another reading. When the top number is equal or smaller than the bottom number then average the last three readings to compute the average perc rate for the hole. Average percolation rate for this hole = Average Site Percolation Rate (average the readings from all three holes). ( + + ) 3 = Form # 1, Page 4 of 8

MINNEHAHA COUNTY ON-SITE WASTE TREATMENT SYSTEM DESIGN WORKSHEET Form #2 WASTE FLOW A. Estimated gpd (see Table 4-1) measured x 1.5 = gpd SEPTIC TANK VOLUME B. gallons (see Table 5-1) SOILS (site evaluation data) C. Depth to restricting layer = feet D. Maximum depth of system (C-4 ft. = feet E. Percolation rate mpi F. Soil sizing factor sq ft/gpd (see Table 7-1) TRENCH BOTTOM AREA G. For trenches with 6 inches of rock below the pipe: A x F = x = sq ft of bottom area, or H. For trenches with 12 inches of rock below the pipe: A x F X 0.8 = x x 0.8 = sq ft, or I. For trenches with 18 inches of rock below the pipe: A x F x 0.66 = x x 0.66 = sq ft, or J. For trenches with 24 inches of rock below the pipe: A x F x 0.6 = x x 0.6 = sq ft DISTRIBUTION (Check one based on slope) Bed (less than 6% slope) Trenches Interconnecting pipes (level to slightly sloping) Drop boxes (any slope) Distribution box (level to slightly sloping) TRENCH LENGTH K. Select trench width = ft L. Divide bottom area by trench width (G,H,I, or K) = lineal feet TRENCH SPACING M. Distance of undisturbed soil between trenches (min. of 6 ft) feet Table 4-1 Estimated Residential Wastewater Flows in Gallons per day (gpd) Number of Type I House Type II House Bedrooms 2 300 240 3 450 360 4 600 480 5 750 600 6 900 720 7 1050 840 8 1200 960 Number of Bedrooms Table 5-1 Minimum Septic Tank Capacities (in gallons) Minimum Liquid Capacity Minimum Liquid Capacity w/ garbage disposal 2 1000 1200 3 1000 1200 4 1250 1500 5 1500 1800 6 1750 2100 7 2000 2400 8 2250 2700 Table 7-1 Soil Characteristics and Sizing Factors for Absorption Systems Perc rate in m.p.i. Soil texture Sq.Ft. per gallons per day 1-5.9 Sand see section 7.02 6-15.9 Sandy Loam 1.27 16-30.9 Loam 1.67 31-45.9 Silt Loam 2.00 46-55.9 Clay Loam 2.50 56-60 Clay see section 7.03 SITE PLAN (Use other side) 1. Show any lakes, streams, wetlands, etc. 2. Show pertinent property boundaries, right-of-way, easements 3. Show location of house, garage, driveway, and all other improvements, existing or proposed 4. Show location and layout of sewage treatment system 5. Show location of water supply well(s) 6. Dimension all set backs and separation distances 7. Show locations of percolation holes and soil data hole Form #2, page 5 of 8

Include a map of your system or draw your own map. Form #2, page 6 of 8

MINNEHAHA COUNTY WASTE TREATMENT SYSTEM INSPECTION Form #3 (TO BE FILLED OUT BY INSPECTOR) Applicant Installer Location Date Site and Establishment Data: Daily Wastewater Flow Percolation Rate Ground Slope Absorption Area (min 400 sq ft) Depth to Limiting Soil Layer Depth of Casing on Well Distance from: To Sewage Tank To Absorption Area Well, Cistern, Reservoir (min 50-75') (min 100-150') Lake, Stream, Impoundment (min 50') (min 100') Pressurized Water Line (min 25') (min 25') Dwelling, Occupied Bldg. (min 10') (min 20') Trees or Dense Shrubs (min 0') (min 10') General System Data: System Depth (max 4') Tank Size (min 1000 gallons) Tank Manhole (max. 6-12" below ground level) Tank Inspection Pipes (at or near ground level) Tons of Rock Barrier Material (fabric, paper, straw/hay) Type of Absorption System (trench, bed, mound, gravelless, chamber system, etc.) Tracer Wire Gravity Distribution System Data (check appropriate item{s}): Interconnected pipes (max 6" surface elevation difference over absorption area) Interconnected chambers (max 6" surface elevation difference over absorption area) Distribution boxes (max 28" surface elevation difference over absorption area) Drop boxes (no slope restrictions) Trench Data: Number of Trenches (min 2) Trench width (max 3') Trench Lengths (max 100' each) Distance Between Trenches (min 6' undisturbed soil) Rock Over Pipe (min 2") Rock Under Pipe (min 6") Absorption Beds Data: Bed Length (max 100') Bed Width (max 15') Number of Laterals Lateral Spacing (max 5') Depth of Rock Below Pipe (min 6", max 30") Depth of Rock Above Pipe (min 2") Distance from Pipe to Edge of Rock Bed (min 12", max 30") Form #3, Page 7 of 8

Holding Tank: Tank Size (min 1000 gal or 7 days flow) Alarm (allows for three day flow after activation) Pressure System Data: Dosing Chamber Gallons Pump Alarm Chamber Manhole (6-12" below ground level) Pump Riser (type and height) Number of Laterals Lateral Spacing (max 5') Perforation Spacing on Laterals Distance from Lateral to Edge of Rock Bed (min 12", max 30") Depth of Rock Below Lateral (min. 9") Depth of Rock Above Lateral (min 2") Mound System Data: side slopes (max 1:3) rock layer width (max 10') rock layer length downslope bank width upslope bank width total mound length method of preparing soil beneath mound separation depth of clean sand below rock bed (min. 12") Deficiencies to be corrected: Date corrections inspected: Certification: This certifies that the installation of the on-site wastewater treatment system has been inspected and, based on that inspection and data provided by the applicant or his installer, conforms to the minimum requirements of South Dakota and Minnehaha County on-site wastewater treatment regulations. This certification does not guarantee, warrant, or in any way insure the operation, reliability or longevity of said system. Inspector Date Form #3, Page 8 of 8