WBS Trigger. Wesley Smith, U. Wisconsin CMS Trigger Project Manager. DOE/NSF Review April 11, 2000

Similar documents
Trigger Cost & Schedule

WBS Calorimeter Trigger. Wesley Smith, U. Wisconsin CMS Trigger Project Manager. DOE/NSF Review April 12, 2000

WBS Trigger. Wesley Smith, U. Wisconsin CMS Trigger Project Manager. DOE/NSF Review February 17, 1999

US CMS Endcap Muon. Regional CSC Trigger System WBS 3.1.1

Trigger Report. Wesley H. Smith CMS Trigger Project Manager Report to Steering Committee February 23, 2004

Status of the CSC Track-Finder

CSC Muon Trigger. Jay Hauser. Director s Review Fermilab, Apr 30, Outline

Local Trigger Electronics for the CMS Drift Tubes Muon Detector

Test Beam Wrap-Up. Darin Acosta

12 Cathode Strip Chamber Track-Finder

ADF-2 Production Readiness Review

Dick Loveless. 20 November 2008 SLHC Workshop. Dick Loveless SLHC Workshop 20 Nov

Global Trigger Trigger meeting 27.Sept 00 A.Taurok

CMS Conference Report

Synchronization of the CMS Cathode Strip Chambers

Design of the Level-1 Global Calorimeter Trigger

CSC Data Rates, Formats and Calibration Methods

S.Cenk Yıldız on behalf of ATLAS Muon Collaboration. Topical Workshop on Electronics for Particle Physics, 28 September - 2 October 2015

GLAST Large Area Telescope:

An Overview of Beam Diagnostic and Control Systems for AREAL Linac

Optical Link Evaluation Board for the CSC Muon Trigger at CMS

BABAR IFR TDC Board (ITB): system design

Level 1 Calorimeter Trigger:

The ATLAS Tile Calorimeter, its performance with pp collisions and its upgrades for high luminosity LHC

ALICE Muon Trigger upgrade

BABAR IFR TDC Board (ITB): requirements and system description

CMS Note Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland

Beam Test Results and ORCA validation for CMS EMU CSC front-end electronics N. Terentiev

Tests of the boards generating the CMS ECAL Trigger Primitives: from the On-Detector electronics to the Off-Detector electronics system

The Pixel Trigger System for the ALICE experiment

LHCb and its electronics. J. Christiansen On behalf of the LHCb collaboration

TTC Interface Module for ATLAS Read-Out Electronics: Final production version based on Xilinx FPGA devices

The CMS Drift Tube Trigger Track Finder

Sector Processor to Detector Dependent Unit Interface

SuperB- DCH. Servizio Ele<ronico Laboratori FrascaA

The Read-Out system of the ALICE pixel detector

Laboratory 4. Figure 1: Serdes Transceiver

Highly Accelerated Stress Screening of the Atlas Liquid Argon Calorimeter Front End Boards

Short summary of ATLAS Japan Group for LHC/ATLAS upgrade review Liquid Argon Calorimeter

Front End Electronics

Paul Rubinov Fermilab Front End Electronics. May 2006 Perugia, Italy

DT9834 Series High-Performance Multifunction USB Data Acquisition Modules

Description of the Synchronization and Link Board

FRONT-END AND READ-OUT ELECTRONICS FOR THE NUMEN FPD

Review of the CMS muon detector system

Status of the LHCb Experiment

Racks, Cabling and Latency

Update on DAQ for 12 GeV Hall C

An FPGA based Topological Processor Prototype for the ATLAS Level-1 Trigger Upgrade

THE DIAGNOSTICS BACK END SYSTEM BASED ON THE IN HOUSE DEVELOPED A DA AND A D O BOARDS

CMS Tracker Synchronization

DT3162. Ideal Applications Machine Vision Medical Imaging/Diagnostics Scientific Imaging

Monthly Progress Report Stanford Synchrotron Radiation Laboratory

Risk Risk Title Severity (1-10) Probability (0-100%) I FPGA Area II Timing III Input Distortion IV Synchronization 9 60

A MTCA.4 Clock and Control System for the EuXFEL 2-D Detectors: Tests and Further Development

EECS150 - Digital Design Lecture 12 - Video Interfacing. Recap and Outline

Electronics procurements

ATLAS muon spectrometer varia, status, and upgrades. Gerjan Bobbink Steenwijk 16-june-2017

HPS Slow Controls Overview

Installation of a DAQ System in Hall C

GREAT 32 channel peak sensing ADC module: User Manual

The Cornell/Purdue TPC

Large Area, High Speed Photo-detectors Readout

Rome group activity since last meeting (4)

Update on DAQ for 12 GeV Hall C. Brad Sawatzky

PIXEL2000, June 5-8, FRANCO MEDDI CERN-ALICE / University of Rome & INFN, Italy. For the ALICE Collaboration

IPRD06 October 2nd, G. Cerminara on behalf of the CMS collaboration University and INFN Torino

DT Trigger Server: Milestone D324 : Sep99 TSM (ASIC) 1st prototype

The CMS Detector Status and Prospects

The Silicon Pixel Detector (SPD) for the ALICE Experiment

Electronics for the CMS Muon Drift Tube Chambers: the Read-Out Minicrate.

Design and Implementation of an AHB VGA Peripheral

The ATLAS Level-1 Central Trigger

A Serializer ASIC at 5 Gbps for Detector Front-end Electronics Readout

KEK. Belle2Link. Belle2Link 1. S. Nishida. S. Nishida (KEK) Nov.. 26, Aerogel RICH Readout

Design, Realization and Test of a DAQ chain for ALICE ITS Experiment. S. Antinori, D. Falchieri, A. Gabrielli, E. Gandolfi

READOUT ELECTRONICS FOR TPC DETECTOR IN THE MPD/NICA PROJECT

Pre-bid Supplement #01 Communications Specifications and Additional Scope Project Bid: CM Date: 05/26/2017

Zebra2 (PandA) Functionality and Development. Isa Uzun and Tom Cobb

LSD Review December 2012 Schedule, Re-Baseline, & Resource Analysis

CGEM-IT project update

PEP-II longitudinal feedback and the low groupdelay. Dmitry Teytelman

The AuroraScience Project

Mosaic 1.1 Progress Report April, 2010

BILOXI PUBLIC SCHOOL DISTRICT. Biloxi Junior High School

bug, although this was still not quite clear. The problem seems to occur when there is an interrupt during a read cycle. Changing interrupt vectors an

A new Scintillating Fibre Tracker for LHCb experiment

The TRIGGER/CLOCK/SYNC Distribution for TJNAF 12 GeV Upgrade Experiments

li, o p a f th ed lv o v ti, N sca reb g s In tio, F, Z stitu e tests o e O v o d a eters sin u i P r th e d est sezio tefa ectro lity stem l su

LHCb TFC Installation

LHCb and its electronics.

SPECIAL SPECIFICATION :1 Video (De) Mux with Data Channel

SciFi A Large Scintillating Fibre Tracker for LHCb

Conceptual Design of the Readout System for the Linear Collider Digital HCAL Prototype Detector

Advanced Training Course on FPGA Design and VHDL for Hardware Simulation and Synthesis. 26 October - 20 November, 2009

GLAST Large Area Telescope:

Front End Electronics

DAQ Systems in Hall A

HDMI Technology. HDMI Over Category 6 HDBaseT Signal Extenders

arxiv: v1 [physics.ins-det] 1 Nov 2015

Transcription:

WBS 3.1 - Trigger Wesley Smith, U. Wisconsin CMS Trigger Project Manager DOE/NSF Review April 11, 2000 US CMS DOE/NSF Review, April 11-13, 2000 1

Outline Overview of Calorimeter Trigger Calorimeter Trigger Status & Technical Progress Overview of Muon Trigger Muon Trigger Status & Technical Progress Scope and Contingency Since Last Review Committee Concerns and Issues Plans Summary and Conclusions US CMS DOE/NSF Review, April 11-13, 2000 2

Receiver Card (WBS 3.1.2.8) Electron Identification Card (WBS 3.1.2.9) Jet Summary Card (WBS 3.1.2.10) DAQ Proc. (WBS 3.1.2.12) 19 X VME R O C Monitor (WBS 3.1.2.13) Clock/Control (WBS 3.1.2.7) C E M US CMS DOE/NSF Review, April 11-13, 2000 Regional Calorimeter Crate (WBS 3.1.2) L T T C EI EI EI EI JS EI EI EI EI Prototypes (WBS 3.1.2.1) Preprod. ASICs (WBS 3.1.2.2) Test Facilities (WBS 3.1.2.3) Power Supplies (WBS 3.1.2.4) Crate (WBS 3.1.2.5) Backplane (WBS 3.1.2.6) Data from calorimeter FE on Cu links @ 1.2 Gbaud (ptyp. tstd.) Into 152 rear-mounted Receiver Cards (ptyp. tstd. w/ ASICs) 160 MHz point to point backplane (ptyp. tstd.) 19 Clock&Control (ptyp. tstd.), 152 Electron ID (ptyp. tstd.) 19 Jet/Summary, Receiver Cards operate @ 160 MHz 3

Cal. Trigger Dataflow Test REAR Functional Proof of Principle Prototype Crate with 160 MHz Backplane Proto. Receiver Card (rear) incl. Adder ASICs Proto. Clock Card (front) Proto. Electron ID Card (front) 160 MHz function/dataflow verified FRONT US CMS DOE/NSF Review, April 11-13, 2000 4

Copper Cable Gbit Link Tests Receiver Mezzanine Card Compare Data - Record errors VME Control Equivalization Circuitry for 3/4 channels Receiver (top view) Transmitter Mezzanine Card Memory Transmitter (top view) 120 MHz output to Receiver Card Receiver (bottom view) 120 MHz input Serial Link Test Card includes VME, memories & comparison circuitry to fully test serial links @ 120 MHz TTL from Mezzanine Cards. (U. Wisconsin) US CMS DOE/NSF Review, April 11-13, 2000 Transmitter (bottom view) Mezzanine Transmit & Receive Cards convert 4 x 1Gb/s links to 120 MHz TTL w/ Vitesse 7214 & cable equalization 5

GBit Data Transmission Tests over 20 m copper cable PRELIMINARY! Vitesse 7214 4 x Gigabit Interconnect chip twisted pair cables (Belden 9182 (150 ohm, 22AWG, foamed dielectric,twinax) grouped by fours & terminated with 8-pin DIN style connectors $318 per 500 foot spool ($2.10 per meter). US CMS DOE/NSF Review, April 11-13, 2000 6

Strip FE cards FE (OSU) FE (UCLA) (CMU) Wire LCT card Wire FE cards On chamber LCT CSC Front End &Trigger EMU System Trigger System RIM (Rice) RPC Interface Module Strip LCT + Motherboard card LCT (UCLA) TMB (Rice) In peripheral crate Port Card WBS 3.1.1.1 US CMS DOE/NSF Review: April 11-13, 2000 7 PC (Rice) 2µ / chamber In counting house RPC 4µ Sector Receiver WBS 3.1.1.2 OPTICAL DT Global µ Trigger (Vienna) CSC Track-Finder SR 3µ / port card 4µ (UCLA) 3µ / sector CSC Muon Sorter (Rice) 4µ 4µ Sector Processor WBS 3.1.1.3, 3.1.1.4 SP (Florida) Global L1

18 MUONS FROM NINE TRIGGER MOTHERBOARDS RECEIVER AND PIPELINE RECEIVER AND PIPELINE RECEIVER AND PIPELINE Muon Port Card Design & Optical Link Tests RECEIVER AND PIPELINE RECEIVER AND PIPELINE RECEIVER AND PIPELINE SORTING LOGIC RECEIVER AND PIPELINE RECEIVER AND PIPELINE RECEIVER AND PIPELINE VME INTERFACE J1 CUSTOM BACKPLANE VME ADDRESS DATA CONTROL FROM TTC Muon Proto. Port Card passed design review in Oct. Will be produced for summer pilot test (Rice) 3 MUONS RECEIVER TO SECTOR OPTICAL MODULE OPTICAL MODULE OPTICAL MODULE OPTICAL MODULE OPTICAL MODULE G-LINK G-LINK G-LINK G-LINK G-LINK CONNECTOR MEZZANINE BOARD OPTICAL MODULE G-LINK MUON PORT CARD BLOCK DIAGRAM Optical component test board based on HP G-Link demonstrated synchronous 1 Gbit/sec using 40 MHz clock with bit error rate < 10-14 for connection from Muon Port Card in peripheral crates on detector to Sector Receiver in counting Room track finder crate (Rice) US CMS DOE/NSF Review: April 11-13, 2000 8

Sector Processor Prototype Custom ChannelLink backplane Standard VME VME/JTAG interface (under development) Bunch Crossing Analyzer Extrapolation Units XCV50BG256 XCV400BG560 Track Assembler Units SRAM Final Selection Unit XCV150BG352 XCV50BG256 Assignment Units SRAM Layout complete 12 layers Tests set for 6/1/00 US CMS DOE/NSF Review: April 11-13, 2000 9

$2,000,000 $1,500,000 $1,000,000 Trigger - BCWS and BCWP Cumulative BCWP/BCWS = 85% indicating little schedule slippage. Trigger subsystem has completed BCWP/EAC = 22% of the project. WBS 1.3.1 TRIGGER CUMULATIVE SCHEDULE and OBLIGATIONS VARIANCES Schedule slip for Muon Trigger boards corrected this year by new personnel $500,000 $0 Schedule slip for ASIC development corrected by securing vendor contract Obligation of ASICs under contract, not invoiced J A S O N D J F M A M J J A S O N D J F ($500,000) ($1,000,000) Corrected for DAQ attribution to Trigger ($1,500,000) ($2,000,000) Jul-02 Aug-02 Sep-02 Oct-02 Nov-02 Dec-02 Jan-03 Feb-03 Mar-03 Apr-03 May-03 Jun-03 Jul-03 Aug-03 Sep-03 Oct-03 Nov-03 Dec-03 Jan-04 Feb-04 Schedule Variance ($59,812) ($85,467) ($82,194) ($150,761) ($127,728) ($150,066) ($167,801) ($179,004) ($192,463) ($271,444) ($275,501) ($666,874) ($626,359) ($674,541) ($476,066) ($325,042) ($229,827) ($246,063) ($268,131) ($296,892) Obligation Variance $148,865 $152,313 ($103,757) ($92,267) ($38,738) ($38,826) ($179,056) ($224,512) ($190,622) ($546,367) ($641,297) ($623,003) ($621,036) ($596,546) ($622,509) ($550,431) ($465,684) ($1,048,92 ($1,100,43 ($915,947) Adjusted OV ($622,509) ($622,509) ($622,509) ($622,509) ($622,509) ($639,947) US CMS DOE/NSF Review: April 11-13, 2000 10

Trigger Resource Usage Engineering and Technical resources are compared to the people called out in the annual SOW. This tracking ensures that the needed labor is deployed. Trigger - Resource Usage 5 4.5 4 3.5 3 2.5 2 1.5 1 0.5 0 FY97 FY98 FY99 FY00 FY01 FY02 FY03 FY04 T E US CMS DOE/NSF Review: April 11-13, 2000 11

TRIDAS - Contingency Use 0.02 TRIDAS No significant contingency use thus far (note scale) 0.015 0.01 Obligation of ASICs under contract at small increase over original estimate (EAC - Base)/Base 0.005 0-0.005-0.01-0.015-0.02 Aug-98 Oct-98 Dec-98 Feb-99 Apr-99 Jun-99 Aug-99 Oct-99 Schedule advanced for ASIC purchases, reducing escalation Dec-99 Feb-00-0.025-0.03 US CMS DOE/NSF Review: April 11-13, 2000 12

WBS Number Description Trig. - Estimate to Complete EDIA (k$) M&S (k$) Mfg Labor (k$) Estimate at Completion (AY$) 12,983 18,297 FY96-FY99 (AY$) 2,311 2,311 Estimate to Complete (AY$) 3,257 7,404 10 10,671 5,314 50 15,985 Escalation (DOE January 2000 indices) 153 440 0 593 3 Trigger and Data Acquisition 3,105 6,963 10 10,078 5,012 50 15,090 3.1 Trigger 1,972 3,706 10 5,689 2,642 46 8,331 3.1.1 CSC Muon Trigger 856 867 10 1,733 904 52 2,636 3.1.2 Calorimeter Regional Trigger 1,117 2,839 3,956 1,738 44 5,694 3.1.3 Physicist Activity 3.2 Data Acquisition 1,132 3,257 4,389 2,371 54 6,760 Base Cost (k$) Cont (k$) Cont (%) Total Cost (k$) Trigger Cost to Complete: $5.7 M $3,706,467 M&S 35% 65% EDIA $1,972,470 US CMS DOE/NSF Review: April 11-13, 2000 13

Trigger - Yearly BCWS Costs ramp up until production, the bulk of which happens in FY02. M&S costs dominate at 65% of the ETC. Trigger BCWS by FY 3,000,000 2,500,000 2,000,000 1,500,000 1,000,000 500,000 0 FY96 FY97 FY98 FY99 FY00 FY01 FY02 FY03 FY04 FY05 US CMS DOE/NSF Review: April 11-13, 2000 14

Trigger - Milestones Critical Level 1 Milestone is TDR, planned for year end. TDR will have schedule for trigger project with tie points to CMS subsystems approved by CMS management & LHCC. Status: first draft exists. US CMS DOE/NSF Review: April 11-13, 2000 15

Last Review Concerns Increase Physicist Effort Calorimeter Trigger: Wisconsin: Faculty Search involving CMS Trigger Effort Muon Trigger Florida & UCLA: support for postdoc continuing UCLA: Prof. Bob Cousins joins Increase Engineering Effort Wisconsin: add engineer (now 4 FTE available) Florida: add engineer + 3 PNPI visitors (3.5 FTE*) Rice: add 1/2 engineer (2.5 FTE*) (*shared w/emu) UCLA: add engineer + FPGA consultant (1 FTE) US CMS DOE/NSF Review: April 11-13, 2000 16

Issues from Last Review Calorimeter Trigger: Serial link from E/HCAL readout Test results provide proof of principle Vendor Support for ASICs Contract signed with Vitesse for all ASICs Final Algorithms & Tower Geometry Agreed and being written up in TDR Muon Trigger Peripheral Crates: Plan developed: crate electronics & mounting Overlap Region btw. CSC & Drift Tube Agreement with Vienna on design US CMS DOE/NSF Review: April 11-13, 2000 17

Muon Trigger: Plans for this year Construct & test prototype port card, sector receiver, sector processor, clock card, backplane Integration test of above components with each other and EMU prototypes Calorimeter Trigger Complete & test prototype Phase, Boundary Scan, Sort, Electron ID ASIC s w/vitesse Produce and test 2nd prototype Receiver Card, Backplane, Electron ID Cards w/ ASICs Trigger Group Write TDR US CMS DOE/NSF Review: April 11-13, 2000 18

Conclusions - Trigger Calorimeter Trigger Prototype Program Adder ASIC tested and in production Phase, Bscan ASIC passed design review Prototype Receiver Card, Electron ID Card, Backplane tested Muon Trigger Prototype Program Ready by June: Port Card, Sector Receiver, Sector Processor, Backplane, Clock Board Track-finder integration test this summer Project Management: Good cost experience thus far Effective action taken to recover schedule US CMS DOE/NSF Review: April 11-13, 2000 19