RFP No R VIDEO PRODUCTION SYSTEMS & INSTALLATION FOR ANNE ARUNDEL COUNTY PUBLIC SCHOOLS. ADDENDUM NO. 2 April 21, 2016

Similar documents
March 4 th, Addendum No. 1. Brooklyn College Systems Integrator Broadcast Television Equipment Project No: BY019/

Facilities Management Design and Construction Services

Summary Timeline Selection of bids The mission of PWPL

Questions & Responses Regarding RFP #3070 Audio Video System for Stewart Auditorium

COLUMBIA COUNTY, WISCONSIN COURTROOM VIDEO CONFERENCE & AV SYSTEMS REQUEST FOR PROPOSALS

RFIs AND RESPONSES; ANSWERS ARE IN RED.

REQUEST FOR PROPOSALS UK Audiovisual System to Renovate/Expand the Law Building ADDENDUM #2 1/16/2019

Request for Proposal, 15MCO503 VIDEO VISITATION Date Required: Thursday, Jun 4, 2015 Time Required: 3:00 PM Local Time

Monday, January 7, 2019

CASS COUNTY, MICHIGAN CASSOPOLIS, MI REQUEST FOR PROPOSAL SPECIFICATIONS

CASS COUNTY, MICHIGAN CASSOPOLIS, MI REQUEST FOR PROPOSAL SPECIFICATIONS

RETURN THIS AMENDMENT TO THE ISSUING OFFICE AT: AMENDMENT (1) ONE to RFP

Invitation to Bid SCOREBOARD - WHH

REQUEST FOR PROPOSALS UK Audiovisual System to Renovate/Expand the Law Building ADDENDUM #3 1/17/2019

Purchasing Department Finance Group INVITATION TO BID

Tender Ref.: ELCOT/Networks/OT/33178/VCS/DOTE/

Request for Proposal For BoCC Technology Refresh Project. BoCC Technology Refresh Project

Colorado River Union High School District 1004 Hancock Rd Bullhead City, AZ (928)

Ethernet to VGA over IP Converter

USB C to HDMI Multi-Monitor Adapter - 3-Port MST Hub

STRUCTURED CABLE SYSTEM (SCS)

New York MX700 Room. PWD-NY5-MX700-P60 List Price: $11, SLA Price: $1,100.00/year (Other options available See Appendix B)

California Polytechnic State University ITS Telecommunications PART 1 GENERAL SECTION AUDIO VISUAL STATION CABLES 1.

Meeting Room Packages

ADDENDUM #3. SPECIAL NOTE: Addendum #3 information shall supersede the information contained in the Contract Documents

ADDENDUM NO. 1 CITY OF FREDERICK

REQUEST FOR PROPOSALS: FOR AN INTEGRATED IN-CAR AND BODY-WORN VIDEO MANAGEMENT SYSTEM

HD Network Video Recorder Workstation

Purchasing and Property Services AOC East Fowler Avenue Tampa, Florida (813)

BID # RFP-1441BM. Production Retrofit

City of Winter Springs, FL

BILOXI PUBLIC SCHOOL DISTRICT. Biloxi Junior High School

STAFF REPORT TO THE CITY COUNCIL. The Mayor and Members of the City Council. Margaret Roberts, Administrative Services Director

CREATE. CONTROL. CONNECT.

Mics, DIs, Stands, and Cables

Furnish & Install Video Surveillance System for Lot B. Exhibits

Request for Proposal Classroom Multimedia Presentation System, Intercom, Public Address System New Washington County High School Facility

BID APPENDIX A CITY HALL TELEVISION PRODUCTION SYSTEMS IMPROVEMENTS NARRATIVE

Swiss Timing Service catalogue FIS World Cup Cross Country 2015/2016

Cabling and Completing Assembly of the Cisco TelePresence System 1000

WHITE PAPER. RECOMMENDATIONS FOR SPORTS VENUES: Scoreboard Control Room Infrastructure and Operations

Montclair, NJ ADDENDUM NO. 1 Issue Date: August 11, Request for Proposal # 981 Finley Hall Audio Visual Systems

Introduction and Opening Remarks. 1. Discuss the County s Current System

FD70CV-M-C-9. Installation and Operation Manual. 7 NVG Compatible LCD. Revision Date: 06/16/2017 Page 1 of 12. Rev: A

HDMI / Video Wall over IP Receiver with PoE

Rendering Human Readable Contracts in the Uniform Contract Format from Procurement Data Standard Contract Data Version 2.3

ADDENDUM NO. 6 PORT OF NOME SECURITY CAMERA PROJECT RFP

Lyndhurst Secondary Technology Package Addendum # Bid Date: Wednesday, August 30, 1:00PM. Items issued in this addendum:

DATAVIDEO TP-100 SD STUDIO KIT

(Bidding Documents) F. No. IP-2(1)/ /

Centre Stage and City Room at Surrey City Hall Venue Information

TEXAS LOTTERY COMMISSION REQUEST FOR PROPOSALS FOR DRAWING STUDIO AND PRODUCTION SERVICES # RESPONSES TO PROPOSERS QUESTIONS

Digital OB vans Elvia. 15-cam 8-cam 6-cam 4-cam DSNG ENG

PCIe HDMI Video Capture Card - HDMI, VGA, DVI, or Component Video at 1080p60

Exhibitor Package. Smart Grid Conference. Grounding & Lightning Conference. 10th Annual. 3rd Annual. Oct 2-3, 2018 Co-located Conferences Anaheim, CA

Request for Proposals PIO. Installation of Broadcast System for Community Services Building (CSB) 104

ADDENDUM NUMBER 02 TO THE BID DOCUMENTS. BID DOCUMENT: RFP #G PE Building Audio Visual System San Jose City College

IFB # ADDENDUM #1 & ACKNOWLEDGMENT

Exhibitor & Sponsor Service Kit

SuperSpeed USB 3.0 to HDMI Audio Video Adapter for Windows & Mac up to 2048x1152 / 1920x1200

FLORIDA DEPARTMENT OF TRANSPORTATION

Lite USER GUIDE. 3 Lite. For more information visit

In this issue... NEW! MS input HD PPU Shipping! MCU remote camera controller User story

CENTENNIAL SCHOOL DISTRICT 2015 GRADUATION BROADCAST AND VIDEO SERVICES QUOTE #Q15-005

USER GUIDE 3. For more information visit

ATEM 1 M/E Production Studio 4K

Ponderosa is expandable by 8 input and/or 8 output increments up to 64x64 in a 4RU frame. Typical Configurations:

SWISS TIMING Service catalogue FIS World Cup Cross Country 2017/18

SCOREBOARDS ADDENDUM NO. 2 PROJECT NO PAGE 1 OF 5 MATTOON ILLINOIS April 12, 2018 ADDENDUM NO. 2

2. Are there any outside connectivity requirements? No, we will not have a need to allow outside devices to connect

over 1 CAT6 HX1C6 Extends HDMI 140 feet

SECTION INTEGRATED AUDIO-VIDEO SYSTEMS AND EQUIPMENT

ATEM 2 M/E Production Studio 4K

Oscar & Associates Photography and Video Services

City of Columbia Purchasing

CITY OF DIXON REQUEST FOR PROPOSAL

ADDENDUM NO. 1 FDVA-ITB B ITB TITLE: JENKINS AUDIO/VIDEO SECURITY SYSTEM ISSUE DATE: THURSDAY, JUNE 30, 2016

SECTION INTERCOMMUNICATIONS AND PROGRAM SYSTEMS

Frankfurt MX700 with 90 Display

WORLD CLASS MEDIA PRODUCTION/RECORDING STUDIO FOR SALE STUDIOS OF CONCENTRIX MUSIC AND SOUND DESIGN, INC.

Golden Empire Transit District Addendum #3 to Request for Proposals # G061 On-Board Video Surveillance System

Special Specification 6293 Adaptive Traffic Signal Control System

about us the company synergy Clyde Broadcast are experts in the design, specification and installation of radio studios and radio stations.

AUDIO TECHNOLOGY SOLUTIONS FOR EDUCATION

413 LANCASTER STREET WEST KITCHENER, ONTARIO N2H 4V8 PHONE : (519)

LIVE PRODUCTION SWITCHER. Think differently about what you can do with a production switcher

Marshall Electronics. Pro A/V Communications VMV-402-SH. 3G/HD/SD-SDI Quad-viewer/Switcher with Audio Meter Display. User Manual.

NEW HAVEN UNIFIED SCHOOL DISTRICT REQUEST FOR PROPOSALS #776. Audio Video Systems PROPOSAL SUBMISSION

Instant 802.3af Gigabit Outdoor PoE Converter. Model: INS-3AF-O-G. Quick Start Guide

Alice 5 Diagnostic Sleep System

2800-Series HIGH DEFINITION SWITCHERS

Milestone Leverages Intel Processors with Intel Quick Sync Video to Create Breakthrough Capabilities for Video Surveillance and Monitoring

PURCHASING DEPARTMENT. Project # Addendum # # of pages Original Issue Date Request Doc # April 15, see text below

Technical Information

HVWIP-Series (HVWIP-T + HVWIP-R)

MWC17 Hall 8.0 NEXTech Theatre Package. Theatre F (100pax)

Standard Conference Rooms

The Breen Center for the Performing Arts Saint Ignatius High School

AUDIO VISUAL SERVICES Best Bites Competition

POST DATE: 01/22/19. BID 1407: Projectors and Equipment for Robertson County Schools. Sealed bids must be received by: 02/04/19 at 1:00 PM

Transcription:

County Executive Steven R. Schuh RFP No. 16-058R VIDEO PRODUCTION SYSTEMS & INSTALLATION FOR ANNE ARUNDEL COUNTY PUBLIC SCHOOLS ADDENDUM NO. 2 April 21, 2016 TO ALL BIDDERS: PLEASE NOTE THE FOLLOWING CHANGES: QUESTIONS: 1. Dealer radius clause Does this need to be the main office/headquarters? Does there need to be an office and warehouse facility within that radius? Can Section 2.2.4 be expanded from 60 miles to 125 miles? ANSWER: A warehouse facility or similar location where equipment is rack fabricated and assembly occurs and where technicians report and are dispatched shall be within 60 miles of the Board of Education building. 2. Bid bond and Proposal deposit There is no amount referenced in the proposal deposit. What is the proposal deposit? What is the bid bond? ANSWER: There are no bid/ proposal bond requirements for this RFP. 3. Are there trade-ins anticipated? ANSWER: No 4. There is a reference to some equipment being reused. What equipment is going to be reused? How can we be sure that the reused equipment is up to standard? 1

ANSWER: The re-used equipment is: (1) Telex MS-2001 Intercom base station, (2) Alesis MK-2 Near-field Monitor speakers and (1) ESE ES-391U Countdown clock. AACPS will show the Successful Offeror that the equipment is functional. 5. The RFP references removing existing soundproofing. How is current soundproofing installed? ANSWER: Soundproofing is glued to the surface. 6. Does the wall need to be resurfaced? ANSWER: No. 7. In the control room, is the window included in this project? How does this need to be soundproofed? ANSWER: Yes the window is included. We want the window filled in. Not a panel placed on top of the window. 8. Is permitting necessary? ANSWER: No. 9. Discussed at the pre-bid was for the County to provide a complete full list of all Owner Furnished Equipment by make and model that will be installed by the awardee. ANSWER: See Question 4. 10. In section 2.5.3.2 (page 21), there is no need for a hardware-based Character Generator system since the Compix Linx ID. Is a software-only Character Generator that provides Key & Fill signals via the Network to the TriCaster 8000? (Requirement to run this software is one (1) workstation computer with the following specifications: For 1080i: NVIDIA based chipset equal to or exceeding 80 GB maximum memory bandwidth OS: Windows 7, 8 with NDI. Processor: Intel Core i7 processor, RAM: 8 GB RAM, Gigabit Ethernet connection, Network Cable: CAT 6. ) ANSWER: Yes, the Compix Link ID as a software-only character generator via a network connection to the Tricaster 8000 is an acceptable solution. 11. Please take a look at Page 47 of your documents. The cost proposal form connected here isn t even for this bid. Is the lighting, background and soundproofing bid out separately now? 2

ANSWER: Please see the Revised Cost Proposal form attached. Please remit the Revised form with your Cost Proposal. 12. Are there architectural drawings available for bidders? ANSWER: No 13. What are the cable distances for camera poke throughs? ANSWER: At each camera location, there shall be 10 feet of additional cable for camera movement. 14. What items will you re-use as CFE? ANSWER: See Question 4. 15. Where will the SAN live? Who is responsible for providing the rack for the SAN solution? (Section 2.5.4). ANSWER: The SAN will reside adjacent to master control. The Successful Offeror shall be responsible for providing the rack for the SAN. 16. Will the County be providing a cable drop at the hallway monitor location referenced in Section 2.5.2.7 or is the Successful Offeror required to pull this cable? If the Successful Offeror is required, where does this cable get run from? ANSWER: There is an existing cable drop and cable box within the studio approximately 10 feet from the hallway monitor that may be utilized. The Successful Offeror shall run any additional cable needed to the hallway monitor. 17. In Section 2.5.3.2, it references an HD-SDI connection for the Compix Linx. Are we able to use a network connection between the Tricaster and the CG rather than HD- SDI? ANSWER: Yes. 18. In Section 2.5.3.15, it references that the successful bidder is responsible for wrapping existing equipment for transport and delivering to the TV production staff. Please clarify exactly what these requirements are referencing and where we would be delivering the equipment to. 3

ANSWER: The equipment will be wrapped for transport and storage and delivered to the loading dock which is adjacent to the control room. 19. In Section 2.5.3.15, it references disposing of unused cabling and cabinetry. Can we use a dumpster onsite at the location of the studio? ANSWER: Yes. 20. In Section 2.5.3.13, it references remote power switches. Can we make a recommendation for a different type of system here as simply powering on/off the Tricaster by turning off the power is not recommended since it a PC based switcher? ANSWER: Yes as long as the mixer and speakers are sequenced. An acceptable solution would be for the Tricaster to not be on the power sequencers and be powered directly by the UPS. NOTE: THIS ADDENDUM AND ACKNOWLEDGMENT MUST ALSO ACCOMPANY THE RFP BID RESPONSE TO MAKE IT VALID. Return to: Purchasing Agent Anne Arundel County Heritage Office Complex 2660 Riva Road, 3 rd Floor Annapolis, MD 21401 Attention: Coleen Myers, CPPB This will acknowledge receipt of Addendum No. 2 to RFP 16-058R Video Production Systems & Installation for Anne Arundel County Public Schools Date: FIRM/COMPANY NAME: SIGNATURE: TITLE: Signature shall conform to requirements of RFP (reference Section 1.6.11) 4

REVISED COST PROPOSAL FORM (Submit Original and One Duplicate Copy) Purchasing Agent The Heritage Office Complex 2660 Riva Road, 3 rd Floor Annapolis, Maryland 21401 In accordance with your Announcement and Specifications contained herein and dated April 20, 2016, we wish to quote the following: Item # 1 - Equipment Qty Make Model Description Unit Cost Extended Cost 2.5.2.1 Cameras 2.5.2.2 Studio Desk 2.5.2.3 Mac Mini for Studio Desk 2.5.2.4 Countdown Clock 2.5.2.5 Teleprompter System 2.5.2.6 Auxiliary Display Inputs 2.5.2.7 Hallway Monitor 2.5.3.1 Video Processing

Anne Arundel County, Maryland Request for Proposals RFP NO. 16-058R VIDEO PRODUCTION SYSTEMS AND INSTALLATION FOR ANNE ARUNDEL COUNTY PUBLIC SCHOOLS 2.5.3.2 Character Generator 2.5.3.3 Camera Control 2.5.3.4 Video Monitors 2.5.3.5 Audio Processing & Control 2.5.3.6 Audio and Video Monitoring 2.5.3.7 Solid State Drive Video Recorder 2.5.3.10 PA System 2.5.3.11 Wireless Microphone System 2.5.3.12 Cabinetry 2.5.3.13 Uninterruptible Power Supply 2.5.3.14 Editing Station 2 Rev. 12/24/14

Anne Arundel County, Maryland Request for Proposals RFP NO. 16-058R VIDEO PRODUCTION SYSTEMS AND INSTALLATION FOR ANNE ARUNDEL COUNTY PUBLIC SCHOOLS 2.5.4 Storage Area Network Total: Item #2 - Training Item Cost Operational Training for School System Staff (40 Hours) Total: Item #3 Installation Labor Shipping and Delivery Item Cost Installation Labor/Shipping/Delivery Total: Delivery shall be completed within calendar days after receipt of order. Cost Summary Item Item #1 - Required Equipment and Materials Cost Item #2 - Training Item #3 Installation Labor/Shipping/Delivery Grand Total for all Items Inclusive (Items 1 through 3) $ OPTIONAL Hourly Labor Rates Position Hourly Rate 3 Rev. 12/24/14

Anne Arundel County, Maryland Request for Proposals RFP NO. 16-058R VIDEO PRODUCTION SYSTEMS AND INSTALLATION FOR ANNE ARUNDEL COUNTY PUBLIC SCHOOLS The person signing the Cost Proposal shall initial any alterations in figures on this form in ink. [If Offeror is not an individual, enter entity name here] By: (Signature) NAME OF OFFEROR: (Please Print or Type) TITLE OF OFFEROR: (Please Print or Type) DATE: Offeror's Company Name: 4 Rev. 12/24/14