PEP-II Status and Outlook

Similar documents
PEP II Design Outline

PEP-II Status. U. Wienands, PEP-II Run Coordinator for the PEP-II team

Status and Plans for PEP-II

PEP II STATUS AND PLANS *

Program Risks Risk Analysis Fallback Plans for the. John T. Seeman DOE PEP-II Operations Review April 26, 2006

LEPTON COLLIDER OPERATION WITH CONSTANT CURRENTS Λ

PEP II Status. H. - Ulrich (UZi) Wienands PEP-II Run Coordinator. SLAGEPAC Meeting November 8,200O. Intro; 11/7/O 19:55

PEP-I1 RF Feedback System Simulation

PEP II Status and Plans

SPEAR 3: Operations Update and Impact of Top-Off Injection

PEP-II Operation and Machine Development. U. Wienands PEP-II Run Coordinator for the PEP-II Team

ABORT DIAGNOSTICS AND ANALYSIS DURING KEKB OPERATION

KEKB Accelerator Physics Report

The Elettra Storage Ring and Top-Up Operation

Phase (deg) Phase (deg) Positive feedback, 317 ma. Negative feedback, 330 ma. jan2898/1638: beam pseudospectrum around 770*frev.

Digital BPMs and Orbit Feedback Systems

LEP OPERATION AND PERFORMANCE WITH ELECTRON-POSITRON COLLISIONS AT 209 GEV

New Filling Pattern for SLS-FEMTO

INTRODUCTION. SLAC-PUB-8414 March 2000

Experience with the Cornell ERL Injector SRF Cryomodule during High Beam Current Operation

Control of Intra-Bunch Vertical Motion in the SPS with GHz Bandwidth Feedback

Characterizing Transverse Beam Dynamics at the APS Storage Ring Using a Dual-Sweep Streak Camera

PEP-II STATUS REPORT *

FINAL DESIGN OF ILC RTML EXTRACTION LINE FOR SINGLE STAGE BUNCH COMPRESSOR

ANKA RF System - Upgrade Strategies

Mechanical aspects, FEA validation and geometry optimization

A HIGH POWER LONG PULSE HIGH EFFICIENCY MULTI BEAM KLYSTRON

The LEP Superconducting RF System

OPERATIONAL EXPERIENCE AT J-PARC

Design Studies For The LCLS 120 Hz RF Gun Injector

LEP Status and Performance in 2000

BUNCH BY BUNCH FEEDBACK SYSTEMS FOR SUPERKEKB RINGS

Development of an Abort Gap Monitor for High-Energy Proton Rings *

P. Emma, et al. LCLS Operations Lectures

North Damping Ring RF

CONSTRUCTION AND COMMISSIONING OF BEPCII

PEP-II IR-2 Alignment

New Results on the Electron Cloud at the Los Alamos PSR

Bunch-by-bunch feedback and LLRF at ELSA

ILC-LNF TECHNICAL NOTE

THE NEXT LINEAR COLLIDER TEST ACCELERATOR: STATUS AND RESULTS * Abstract

2008 JINST 3 S LHC Machine THE CERN LARGE HADRON COLLIDER: ACCELERATOR AND EXPERIMENTS. Lyndon Evans 1 and Philip Bryant (editors) 2

MULTI-BUNCH INSTABILITY DIAGNOSTICS VIA DIGITAL FEEDBACK SYSTEMS AT PEP-II, DAæNE, ALS and SPEAR

FIRST SIMULTANEOUS TOP-UP OPERATION OF THREE DIFFERENT RINGS IN KEK INJECTOR LINAC

45 MW, 22.8 GHz Second-Harmonic Multiplier for High-Gradient Tests*

A Facility for Accelerator Physics and Test Beam Experiments

PEP-II Overview & Ramp Down Plan. J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007

OF THIS DOCUMENT IS W8.MTO ^ SF6

TWO BUNCHES WITH NS-SEPARATION WITH LCLS*

LHC Beam Instrumentation Further Discussion

SUMMARY OF THE ILC R&D AND DESIGN

2 Work Package and Work Unit descriptions. 2.8 WP8: RF Systems (R. Ruber, Uppsala)

Precision measurements of beam current, position and phase for an e+e- linear collider

Status of Elettra, top-up and other upgrades

Commissioning the TAMUTRAP RFQ cooler/buncher. E. Bennett, R. Burch, B. Fenker, M. Mehlman, D. Melconian, and P.D. Shidling

Spear3 RF System Sam Park 11/06/2003. Spear3 RF System. High Power Components Operation and Control. RF Requirement.

ILC Damping Ring Lattice Status Report. Louis Emery and Aimin Xiao Argonne National Laboratory Presented at KEK workshop Dec 18th, 2007

beam dump from P2 losses this morning

Suggested ILC Beam Parameter Range Rev. 2/28/05 Tor Raubenheimer

Requirements for the Beam Abort Magnet and Dump

!"!3

Development of beam-collision feedback systems for future lepton colliders. John Adams Institute for Accelerator Science, Oxford University

PoS(EPS-HEP2015)525. The RF system for FCC-ee. A. Butterworth CERN 1211 Geneva 23, Switzerland

Evaluation of Performance, Reliability, and Risk for High Peak Power RF Sources from S-band through X-band for Advanced Accelerator Applications

POLARIZED LIGHT SOURCES FOR PHOTOCATHODE ELECTRON GUNS AT SLAC?

Summary of the 1 st Beam Line Review Meeting Injector ( )

PEP-II longitudinal feedback and the low groupdelay. Dmitry Teytelman

Focus of efforts. ILC 2010, Mar/27/10 A. Seryi, BDS: 2

SLAC R&D Program for a Polarized RF Gun

Performance of a DC GaAs photocathode gun for the Jefferson lab FEL

The PEFP 20-MeV Proton Linear Accelerator

Detailed Design Report

Modeling and simulation of longitudinal dynamics for Low Energy Ring-High Energy Ring at the Positron-Electron Project 1

Present Status and Future Upgrade of KEKB Injector Linac

Accelerator Instrumentation RD. Monday, July 14, 2003 Marc Ross

IOT OPERATIONAL EXPERIENCE ON ALICE AND EMMA AT DARESBURY LABORATORY

Status of SOLARIS Arkadiusz Kisiel

A Fifteen Year Perspective on the Design and Performance of the SNS Accelerator

SuperTRISTAN. A possibility of ring collider for Higgs factory. 13 Feb K. Oide (KEK)

RF Power Klystrons & 20 Year Look. R. Nelson 7/15/15

DESIGN AND PERFORMANCE OF L-BAND AND S-BAND MULTI BEAM KLYSTRONS

KEKB INJECTOR LINAC AND UPGRADE FOR SUPERKEKB

ANKA Status Report. N.Smale, A.-S. Müller, E. Huttel, M.Schuh Slides courtesy of A.-S. Müller and C.Heske.

4.4 Injector Linear Accelerator

LCLS RF Reference and Control R. Akre Last Update Sector 0 RF and Timing Systems

Pulsed Klystrons for Next Generation Neutron Sources Edward L. Eisen - CPI, Inc. Palo Alto, CA, USA

EPJ Web of Conferences 95,

Operational Status of PF-Ring and PF-AR after the Earthquake

arxiv: v1 [physics.acc-ph] 19 Nov 2013

High Brightness Injector Development and ERL Planning at Cornell. Charlie Sinclair Cornell University Laboratory for Elementary-Particle Physics

Proceedings of the 1997 Workshop on RF Superconductivity, Abano Terme (Padova), Italy

TESLA FEL-Report

Screen investigations for low energetic electron beams at PITZ

Beam Instrumentation for CTF3 and CLIC

DEVELOPMENT OF A 10 MW SHEET BEAM KLYSTRON FOR THE ILC*

Upgrade of CEBAF to 12 GeV

Harmonic Cavities and Longitudinal Beam Stability in Electron Storage Rings. Abstract

Tutorial: Trak design of an electron injector for a coupled-cavity linear accelerator

Design and Simulation of High Power RF Modulated Triode Electron Gun. A. Poursaleh

Status of SOLARIS. Paweł Borowiec On behalf of Solaris Team

Transcription:

PEP-II Status and Outlook H.-U. Wienands, M.E. Biagini, F.-J. Decker, M.H. Donald, S. Ecklund, A. Fisher, R.L. Holtzapple, R.H. Iverson, P. Krejcik, A.V. Kulikov, T. Meyer, J. Nelson, A. Novokhatski, I. Reichel, M. Sullivan, J.T. Seeman, J. Turner, SLAC, Stanford, CA 9439, USA C. Steier, M.S. Zisman, LBNL, Berkeley, CA 9472, USA Abstract PEP-II/BABAR are presently in their second physics run. With machine and detector performance and reliability at an all-time high, almost 51 fb 1 have been integrated by BABAR up to mid-october 21. PEP-II luminosity has reached 4.4 1 33 cm 2 s 1 and our highest monthly delivered luminosity has been above 6 pb 1, exceeding the performance parameters given in the PEP-II CDR by almost 5%. The increase compared to the first run in 2 has been achieved by a combination of beam-current increase and beam-size decrease. In this paper we will summarize the PEP-II performance and the present limitations as well as our plans to further increase machine performance. 1 PERFORMANCE SUMMARY Initially, the startup in 22 was somewhat slower than expected due to difficulties with the rf systems, esp. the low-level rf loops. This held down peak and average luminosity and is reflected in the monthly luminosity, which lagged behind the year-2 performance for several fb -1 6 5 4 3 2 1 Figure 1: Luminosity by month. months (Fig. 1). Continuous machine tuning, vacuum improvements and the addition of more beam-pipe solenoids in the Low Energy Ring (LER) conspired in raising the machine luminosity as did a gradual increase in beam currents. The evolution of the peak luminosity over the year is shown in Fig. 2. Our best achieved machine parameters are summarized in Table 1. Work supported in part by US DOE under contract DE-AC3-76SF515. Figure 2: Peak luminosity (delivered). Energies e / e+ (GeV) 8.973 3.119 Currents e / e+ (A) Single beam currents (A) Design Achieved (delivery).75 2.14.93.95 Number of bunches 1658 728 1.63 2.1 Bunch currents e / e+ (ma).45 1.29 1.24 2.9 Bunch spacing (m) 1.26 2.52 IP spot size σ x * / σ y * (µm) 155 4.7 147 5 Luminosity ( 1 33 /cm 2 /sec) 3. 4.21 Tune shift horiz. e / e+.3.3.59.69 Tune shift vert. e / e+.3.3.27.55 Integrated lumi. / day (pb 1 ) 135 262 Integrated lumi. / week (pb 1 ) 785 1613 Integrated lumi. / 7 days (pb 1 ) 785 1677 Integrated lumi. / month (fb 1 ) 3.3 5.8 Beam crossing angle (head-on) (head-on) Table 1: PEP-II machine parameters. 2 KEY IMPROVEMENTS Everything else being equal, luminosity is proportional to the ratio of beam current over beam size, which determines the specific luminosity, i.e. luminosity per bunch normalized to current. Plotting the luminosity vs the beam-current product for three different 24-hr periods, Fig. 3, shows the increase in luminosity for given beam current product

Luminosity (133 cm-2s-1) Oct 2 Jly 21 Oct 21 24-hr data sample region.[3] In this way the global beam orbit was reduced in both rings and the dispersion in the LER (which was particularly large) reduced from 2 mm rms to about 6 mm rms without too much change of the machine coupling. This lead to a significant increase ( 1%)inluminosity. Fig. 4 shows the LER orbit after steering. I HER I LER (A 2 ) Figure 3: Luminosity vs bunch-current product (762 bunches). achieved by the end of this run. The key improvements that contributed to this increase in specific luminosity have been: The addition of beam-pipe solenoids in the LER Steering the orbits of both rings flat Removing beta beating in the HER Improved diagnostics allowing better tune management Detailed beam-beam studies have been undertaken and are described at another place in these proceedings[1] 2.1 Beam-pipe solenoids At the beginning of the run, only the six LER straight sections were wrapped with solenoid windings to ameliorate the effect of the electron cloud.[2] During the course of this run we have added solenoids to the exposed parts of the vacuum chambers in Arcs 1, 3, 7 and 11. While the effect of the arc solenoids has been expected to be less than that of the straight-section solenoids due to the antechambers reduction of secondary-electron yield, indication is that the beam size has been further reduced, thus increasing luminosity. At the time of this writing, the Arc-5 solenoids are completed and operational and installation of the Arc-9 solenoids is complete. 2.2 Steering Several attempts to steer the beam orbit flat during the Y2k run were of limited success since the resulting orbit changes in the regions up- and downstream nearby to the BABAR detector led to changes in the compensation of the BABAR solenoid due to the local sextupoles. As a result, luminosity tended to be lower after steering than before. In 21 a new feature was added to the control system allowing us to exclude a certain region (e.g. the interaction region) from steering, thus maintaining the orbit in that Figure 4: LER orbit after steering. 2.3 Magnet Lattices Progress was made in 21 in analyzing the lattice functions of the LER using a new algorithm.[4] Operationally, a significant beat in the HER β x function was uncovered which led to somewhat higher-than-design β x at the IP; this was gradually tuned out during delivery.[5] Attempts were made to lower the β functions at the IP from their present 5 cm and 1.25 cm in x and y, resp. This proved unsuccessful in that operation and luminosity of the machine was not improved and therefore was backed out. An attempt to move the horizontal machine tune closer towards.5 to increase the dynamic β reduction at the IP demonstrated that the machines indeed can run with high beam current at such a working point, however, strong beta beating in the LER prevented us from reaching good luminosity.[6] 2.4 Rf Performance During the Y2k run, an endemic failure of capacitors in the HV power supplies for the klystrons was encountered that led to the replacement of most capacitors in the supplies during the winter 2/21 downtime. In 21, the major limitations encountered were high trip rates in the HER stations at the upstream end of the straight sections and poor performance of the LER low-level rf (LLRF) loops, both limiting the beam currents. The trip rate in the HER was ameliorated by lowering the total the rf voltage to 1.6 MV and redistributing it, thus lowering it to 2. MV in the first station in each straight section (2.2 MV in the other three). To address the LLRF problems a task force was set up with members of both the rf and the longitudinal feedback groups, which tracked down a number of configuration and other issues, gradually improving the performance and stability of the system.[7] An outstanding issue is our

inability to run the LER with all three rf stations operating: at full voltage the bunches become too short, increasing heating observed in the vertex chamber which already limits our beam current (see below). If we maintain lower total voltage, the rf systems become unstable at high beam current and the stations trip. can produce much less luminosity than others, see Fig. 6. When this phenomenon is observed during operation, the LER x tune is usually moved far down, lowering the luminosity, until the low-luminosity bunches have snapped back, then the tune can be moved back to the normal, highluminosity point. Using the gated camera it has been deter- 2.5 Backgrounds Background spikes caused by the trapping of particulates in the HER beam were the primary limitation in achieving good integrated luminosity at the beginning of the Y2k run. The background spike rate decreased during that run and no significant increase in background spikes was experienced during the startup in 21. Fig. 5 shows the daily trip rate for this run and the Y2k run. (HER) beam blow-up Figure 6: Bunch-by-bunch luminosity. mined that such bunches in the LER have much smaller vertical beam size than regular bunches (Fig. 7). Because the bunch currents are about equal everywhere, this leads us to conclude that the HER beam size for these bunches has become very large. It is thought that moving the LER x tune towards lower values increases the LER x beam size thus lowering the beam-beam strength until the HER bunches have a chance to shrink to their normal size. Figure 5: Background aborts per day for 2 (top) and 21 (bottom) run. 2.6 Beam Diagnostics Interferometric vertical beam-size measurement has been added to the HER, and both HER and LER interferometers are now operating routinely.[8] A new gated camera installed at the LER[9] allows bunch-by-bunch beam size measurements which allows us to determine the beam-size evolution along a fill, thus fine-tuning the fill pattern. It has also helped to analyze the apparent flip-flop behavior we have seen at high beam currents, where certain bunches Figure 7: LER horiz. beam size/bunch vs luminosity/bunch 2.7 Vertex-Chamber Heating A section of the vertex chamber buried deeply in the BABAR detector has been subject to higher-than-expected heating for quite some time. In order to find the source of the heat, a number of experiments and measurements have been done, determining the dependence of the temperature rise on:

both beam currents, the beam-to-beam phase, the bunch pattern, the bunch length, and the time constant of the temperature variation. These measurements indicate that the heat arises mainly from HOM heating with fairly broadband characteristics: Beam-current dependence is predominantly quadratic, lower rf voltage leads to less heating although not as much as one would expect and the temperature rise is relatively insensitive to the bunch pattern. Moderate sensitivity to the beam-to-beam phase indicates a resonance at about 5.4 GHz (Fig. 8).[1] 3.1 Magnet Lattice 3 DEVELOPMENTS Magnet lattices lowering β x to 35 cm and β y to 1. cm have been developed and already tried out once; these will be fully commissioned in 22 to further increase luminosity without raising the beam currents. Using the new latticeanalysis we expect to also commission the low horizontal tune soon The ultimate goal is to bring both ring tunes close to.5, realizing significant predicted gains in luminosity due to the dynamic β-effect.[13] Fig. 9 shows results of a luminosity vs tune scan using a beam-beam simulation code[14]. Figure 8: VTX chamber heating vs rf phase between HEB and LEB. The red curve is a fit of a single sine wave at 5.4 GHz, the green curve that of two sine waves, one at 4.3 and one at 5.5 GHz. Intensive analysis using an ANSYS model of the region has allowed us to reproduce the temperature rise and thermal time constant (2...25 s), from which it is deduced that most likely a short bellows is heated up to several hundred F.[11] A partial source for the energy is thought to be HOM power generated at the crotch where the HER and LER vacuum systems join.[12] The crotches on the two sides of BABAR are of different design; on the hot side, a vertical knife-edge separates the chambers, while on the side experiencing much less heating the transition to two chambers is done with a long taper. The sharp transition causes electromagnetic energy to be reflected and parts of it dissipated in the short bellows. We are building a new crotch chamber to replace the one believed to cause the heating. Another part of the energy may stem from a mode trapped at the s.r. masks just next to the bellows. These masks cannot be replaced; to deal more efficiently with the heat generated by this source we will install additional cooling at the bellows. Figure 9: Luminosity vs working point (simulation); both rings have equal tunes. 3.2 Bunch-by-Bunch Feedback Systems The longitudinal and transverse kickers used in the bunchby-bunch feedback systems are nearing the limits of their beam-handling capacity. Twice a feedthrough on one of the longitudinal kickers was destroyed due to excessive heating. As a short-term measure new feedthroughs have been designed and are being built that use a 7/16 DIN connector with improved power-handling capability compared to the SC connectors in use now. Design of a new longitudinal kicker, based on the over-damped rf cavity structure used at LFN Frascati and other accelerator laboratories, has started

in a collaborative effort together with Frascati, these units are expected to be installed in the summer of 22.[15] The transverse feedback kickers show higher than expected temperatures on the strip-line electrodes. They are monitored by optical pyrometers, and while the pyrometric measurements have a large uncertainty attached to them (in part due to the necessity of using windows), temperature rise of the kicker body and the feedthroughs is consistent with power dissipation on the order of 1 W. Dissipated on the (aluminum) electrodes, 1 W would cause them to heat up well beyond 1 C(212 F). Design of a new transverse kicker structure will start early in 22. 6 5 4 3 2 1 Yearly Lumi Cumulative Lumi Peak Lumi 18 16 14 12 1 8 6 4 2 3.3 Rf Stations An upgrade plan is in place to add rf stations, keeping up with the demand of higher beam currents. Two new stations will be added to the HER in the summer of 22. These will have two cavities per 1.2 MW klystron rather than four because it is power rather than voltage that is required for higher beam current. This upgrade is sufficient to support a max. beam current of about 1.5 A in the HER. The moderate rise (3 MV) in rf voltage will shorten the bunches commensurate with the reduction in β y we anticipate. The three rf stations installed in the LER at present are sufficient to support beam currents up to 3.8 A. 3.4 Abort Kicker Gap In both rings 5% of the circumference is without beam to allow sufficient time for the beam-abort kickers to rise to their full field. This is necessary to prevent beam aborts from creating beam spillage into the BABAR detector. An unwanted side effect of this gap in the beam is a significant phase transient along the fill of about ±13 at 1.6 A beam current in the LER. Even though the transients in the two beams are fairly similar, preventing too much movement of the collision point, the transient causes the gain of the bunch-by-bunch feedback systems to vary along the fill, decreasing significantly for the portions of the beam close to the gap. This is especially serious for the longitudinal feedback system, which detects at 6 f rf. With increasing beam current this effect will become stronger, eventually preventing the bunch-by-bunch feedback systems from working properly. New beam-abort kickers are being readied presently to be added to the existing installation. This allows shortening the rise time of the beam-abort kickers by a factor of two, thus reducing the required length of the kicker gap in the beam correspondingly. 4 OUTLOOK 1999 2 21 22 23 24 25 26 Yearly Lumi 2 23 4 45 62 1 1 17 Cumulative Lumi 2 25 65 11 172 272 372 542 Peak Lumi 1 2 4 5 6 8.5 11 16 Figure 1: PEP-II Luminosity projection. 5 ACKNOWLEDGMENT Year I am indebted to M. Sullivan, the PEP-II Run Coordinator, for much of the material used in this talk. 6 REFERENCES [1] J.T. Seeman et al., these proceedings [2] A. Kulikov et al., Proc. 21 Part. Accel. Conf., Chicago, IL, p. 193. [3] G. White, private communication. [4] U. Wienands and M.E. Biagini, these proceedings. [5] M.E. Biagini, private communication. [6] J. Turner, private communication. [7] The LLRF task force is headed by R. Larsen. [8] A. Fisher, et al. Proc. 21 Part. Accel. Conf., Chicago, IL, p. 547. [9] R. Holtzapple, Proc. Two-Stream Instability Conference, KEK, Tsukuba, JP, Sept. 21 in press. [1] S. Ecklund et al., Proc. 21 Part. Accel. Conf., Chicago, IL, p. 3576. [11] N. Yu, private communication. [12] C. Ng and N. Folwell, private communication. [13] Y. Nosochkov et al., these proceedings. [14] I. Reichel, Proc. 21 Part. Accel. Conf., Chicago, IL, p. 344, and Y. Cai et al.,phys.rev.st-ab4 (21). [15] F. Marcellini et al., Proc.1 th Beam Inst. Workshop, BNL, May 22, in press. The cumulative effect of the improvements outlined above is expected to raise the luminosity of PRP-II significantly. Present projections call for an integrated luminosity delivered to BABAR of about 5 fb 1 by the end of the year 26, see Fig. 1.