Category 6A UTP cables shall be tested and proved to conform to TIA-568-C.2 standards.

Similar documents
DESIGN!!GUIDELINES!!!!!

Pre-bid Supplement #01 Communications Specifications and Additional Scope Project Bid: CM Date: 05/26/2017

Cable Certification. General Testing Criteria (Applies to all cable certification testing) Attachment E Cable Certification

The University of Texas at Austin September 30, 2011

SECTION TESTING, IDENTIFICATION AND ADMINISTRATION

SECTION TESTING OF COPPER CABLES

What really changes with Category 6

SECTION COMMUNICATIONS HORIZONTAL CABLING

Telecommunication Infrastructure Project September 20, 2002

Robert Burén. Product Manager. Nexans Cabling Solutions. 10G Solutions

RCIT Cable Certification Testing Revised 10/2017

Coastal Carolina University RE-BID WILLIAMS BRICE RENOVATION AND REPAIR October 19, 2018 Construction Documents

Minimum qualifications for the Telecommunications Engineer are: A. Texas Licensed Profession Engineer (PE)

Copper Cabling Troubleshooting Handbook

Multi LAN 350 MI 2016 User Manual Version 2.2, Code No

IEEE 802.3af Power via MDI Standard Compliant Mid-Span Insertion Solution. Presented by PowerDsine: David Pincu -

Volition TM RJ45 K5e Jacks

MIDDLESEX COUNTY COLLEGE WIRE AND CABLE NETWORK REQUIREMENTS BH, CB, CH, ED, MH, LH, Camera Project

REQUEST FOR QUOTE: TELECOMMUNICATIONS CABLING Library/Classroom Building, Beltline Campus

NEMA Standards Publication WC Performance Standard for Twisted Pair Premise Voice and Data Communications Cables

Belden IBDN System 10GX Enabling Technologies

NEMA Standards Publication WC Performance Standard for Twisted Pair Premise Voice and Data Communications Cables

Request for Proposal (RFP)

BILOXI PUBLIC SCHOOL DISTRICT. Biloxi Junior High School

PREMIUM 5e F/UTP PRODUCTS

CATEGORY 6A CABLING SOLUTIONS

How to accelerate your cabling system approvals

Instalaciones de fibra optica en entornos de centro de datos y campus para suportar 40, 100G y mas

TEST REPORT NO.: CRT-081 RENDERED TO: Hubbell Premise Wiring 14 Lord s Hill Road Stonington, CT

Telecommunciations Infrastructure Project September 20, A. Broadband radio frequency active and passive components

Information & Communications Technology Network Infrastructure Group. Network Infrastructure Standards June 2008

Table of Contents. Open Matrix System (OMS) 1-2

Description: Pair Color Code Chart: Pair Color Chart 1 Brown White Brown 2 Orange White Orange 3 Green White Green 4 Blue White Blue.

LITWARRANTY Rev. 5 W a r r a n t y P r o g r a m S t r u c t u r e d C a b l i n g S y s t e m s

PHYSICAL FACILITIES Consultant s Handbook Specifications Division 27 Communication 0553 Identification for Communications Systems

SYSTIMAX GigaSPEED XL Solution

Challenges for testing 10GBASE-T

About Nexans 3. About Berk-Tek 4. LANmark-1000 Cat 6 UTP 5. LANmark-1000 Category 6 Plenum 6. LANmark-1000 Category 6 Riser 11

A guide to Woolworths Limited additional requirements. for the testing of twisted pair and fibre installation.

The Road to Single Mode: Direction for choosing, installing and testing single mode fiber

Installation Effects Upon Alien Crosstalk and Equal Level Far End Crosstalk

Mar11 Rev E

City of Winter Springs, FL

SECTION COMMUNICATIONS HORIZONTAL CABLING

DSP-4000 Series. CableAnalyzer. Users Manual

Data Communications Competence Center

PATCH CORDS, PLUGS & CABLES

Technical Specifications Florida Gulf Coast University

About Nexans 3. About Berk-Tek 4. Hyper Plus 5e Cat 5e UTP 5. HyperPlus 5e Plenum 6. Hyper Plus 5e Riser 10. HyperPlus 5e Patch 14

Tender Report for Supply and installation of LAN in *Biomedical Imaging and Bioinformatics Lab*

CATEGORY 6A CABLING SOLUTIONS

Fiber Optic Testing. The FOA Reference for Fiber Optics Fiber Optic Testing. Rev. 1/31/17 Page 1 of 12

Belden IBDN System 10GX The next level of cabling performance

UNIFIED FACILITIES GUIDE SPECIFICATIONS

SECTION STRUCTURED CABLING SYSTEM

MIDDLESEX COUNTY COLLEGE WIRE AND CABLE NETWORK REQUIREMENTS Projector, Camera and Veteran s Project

LCS2 Cat. 6 RJ 45 Patch panels and units

California Polytechnic State University ITS Telecommunications PART 1 GENERAL SECTION AUDIO VISUAL STATION CABLES 1.

UNIVERSITY of NORTH DAKOTA LOW VOLTAGE COMMUNICATIONS STANDARDS FOR CABLING, PATHWAYS, AND SPACE

CAT6Plus System. Brand-Rex Limited

Request for Purchase DESIGN AND INSTALLATION OF STRUCTURED COMMUNICATIONS CABLE SYSTEMS

CATEGORY 6 CABLING SOLUTIONS

Kennebec Valley Community College CABLE PLANT SPECIFIC A T IONS

SPECIAL SPECIFICATION 6559 Telecommunication Cable

STRUCTURED CABLE SYSTEM (SCS)

SPECIAL SPECIFICATION 8540 Telecommunication Cable

3M Supported Applications Map 100,000 (2005) Single-mode. Fiber. Multimode. Fiber. Copper

The Newsletter of Delta Automation Inc.

Follow The Leader In Shielded Technology

UCDSB Winchester PS Addition Wireless AP Cabling Specs

GT Dual-Row Nano Vertical SMT High Speed Characterization Report For Differential Data Applications

SOLICITATION ADDENDUM NO. 1 ITB THE FOLLOWING CHANGES TO THE ABOVE CITED SOLICITATION ARE ANNOUNCED.

1.0 GENERAL. 1.2 SUMMARY.1 Section Includes:

NYULMC AMBULATORY CARE CENTER FIT-OUT PHASE 1 Perkins & Will Architects PC 222 E 41st ST, NYC Project: Issued for GMP March 15, 2017

GT Dual-Row Nano Vertical Thru-Hole High Speed Characterization Report For Differential Data Applications

Category 5e F/UTP Euroclass D ca Cables

A. As defined in Section Telecommunications General Requirements

SECTION 7 -- CROSS-CONNECT SYSTEMS

STRUCTURED CABLING SYSTEMS (SCS)

Everything you always wanted to know about HDBaseT*

SECTION COMMUNICATIONS HORIZONTAL CABLING

TB876BSX-3WH Class E A / Cat.6A STP Keystone Jack (Auto press-fit)

SPECIAL SPECIFICATION 6735 Video Optical Transceiver

جامعة مؤتة العطاءات املركزية توريد وتركيب وتشغيل أجهزة شبكات/كلية الزراعة. Central Tenders Mu tah University

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 804 FIBER OPTIC CABLE AND COMPONENTS. July 19, 2013

Volition TM Category 5e cable 100 Ω, FTP

Field Testing and Troubleshooting of PON LAN Networks per IEC Jim Davis Regional Marketing Engineer Fluke Networks

SECTION COMMUNICATIONS STRUCTURED CABLING

SECTION FIBER OPTIC STATION CABLES

SSA Fibre-Optic Extender 160 Fibre Installation Guidelines Version 1.2

Solarstar Electronics Industrial Co.,Ltd. 3/F,58,Junxin Rd.,Guanlan,Longhua,Shenzhen,China

CATEGORY 5e CABLING SOLUTIONS

Request for Quote E- Rate Eligible Services Scope of Work - Wireless LAN and Cabling for Access Points

Connect with the industry s best CAT6 and CAT5e channel solutions!

Excel recommends Fluke Networks, this section is written around the use of this range of test equipment.

Installation Guide AT-HDR-EX-70-2PS

Delaware County Community College Project # Marple Campus Renovation - Phase % Construction Documents November 23, 2011

Special Specification 6242 Special Fiber Optic Cable

CABLING STANDARDS FOR

technicalreport MegaLine Connect100 Class E A links over 100 metres in length Data communication technology 09/2018 Classic structure 2-connector link

Transcription:

27 08 00 Certification and Commissioning of Communication Systems (Revision date: 7/3/12) 1.0 Purpose A. These guidelines provide requirements for designers to incorporate into bid documents. They are part of the University Wiring Standard (UWS), version 3.0. 2.0 General Requirements A. Certification. Certification of cabling is the process of testing the transmission performance of an installed cabling system to a specified standard. All communications cabling installed on the NC State campus is required to be certified prior to its acceptance. This certification shall be completed by qualified personnel using test equipment designed to perform these specified tests. It shall be performed according to current industry and manufacturer performance standards for each type of cable installed. Testing will be completed using industry standard equipment and testing practices. It shall be performed by the contractor with test results provided to NC State ComTech and to Leviton Network Solutions, Inc. B. Commissioning. In addition to the above, personnel from ComTech and from Leviton may perform inspections during and following completion of cabling installation. Also, either ComTech and/or Leviton may, at their discretion, directly observe the cable testing process and perform secondary testing of any installed cables after test results are submitted. 3.0 Cabling Certification Requirements and Standards A. Standards. All work shall be performed in accordance with these guidelines, current industry testing standards, and with the test equipment manufacturer recommendations. Category 6A UTP cables shall be tested and proved to conform to TIA-568-C.2 standards. UTP cable testing equipment will be NRTL certified for EIA/TIA TSB95 and to the manufacturer s specifications. Fiber optic cables shall be tested and proved to conform to TIA-568-C.3 standards. Testing procedures shall be in compliance with TIA TSB-140, TIA-526-7, TIA-526-14A, and OFSTP- 14A. Fiber Optic Cable Test Equipment: Cable tester will be NRTL certified for TIA/EIA TSB95 and to the manufacturer s specifications. B. Horizontal cabling testing CAT6A. All Category 6A UTP horizontal cables installed shall be tested. The following parameters will be tested: wire map, length, attenuation, propagation delay, delay skew, insertion loss, NEXT, PSNEXT, FEXT, PSFEXT, ELFEXT (ACRF), PSELFEXT (PSACRF), and return loss. Testing will be for full channel only. Permanent link tests will not be acceptable. Testing will be conducted to prove compliance with TIA Category 6A standards and with the Leviton NextLAN 10Gc AXi Channel Margin Guarantee parameters as denoted below: TIA parameter Margin vs. TIA 568-C.2-10 Insertion loss 3% NEXT 1dB ACR* 3dB 27 08 00 Certification and Commissioning of Communication Systems Page 1

PSNEXT 2dB PS-ACR* 4dB ACR-F 5dB PSACR-F 6dB Return Loss 3dB *ACR and PSACR margin guarantee is minimum performance margin vs. calculated minimum defined by TIA 568-C.2 for 1 to 500 MHz. All values will be tested 1-500 MHz. Field testing for alien cross talk (AXT) parameters is not required. Cables shall be tested after all jacks are securely inserted into the outlet faceplate and into the patch panel in the BDF/IDF. Cables shall be tested after the outlet faceplate is securely fastened in its final, permanent position onto the outlet box. Only test results completed after jacks and faceplates are secured will be accepted by NCSU. Cables shall be tested from both ends of the cable. Tests shall be based on each pair of conductors and not the aggregate multiple pair results. Testing shall be accomplished using a UL Level IV compliant field tester capable of testing to 500 MHz. The cable tester shall be preprogrammed with the latest software to test the Leviton/Superior Essex Category 6A system employed at NCSU. The contractor shall ensure that the tester has any necessary hardware or software upgrades. The contractor shall provide proof that the tester has been properly calibrated by the tester manufacturer within the previous 12 months. The cable testers currently approved for use at NCSU are: Fluke Networks, Agilent Technologies, and Ideal Industries. Use of any other tester is prohibited unless specifically approved by Leviton. Any cable failing the certification test (Fail, Fail* or, Pass*) must have remedial work done to provide a full pass test result. Remediation may include retermination or replacement of the cable. No cables passing within tolerance only (Conditional Pass*) will be accepted. C. Horizontal cabling testing fiber. All horizontal fiber optic cables installed shall be tested. Following is a summary of horizontal cable testing requirements: 1. One direction. 2. Test multi-mode strands at either 850 nm or 1300 nm. 3. Test single-mode strands at either 1310 nm or 1550 nm. 4. Tier 1 testing with Light Source and Power Meter (LSMP) or Optical Loss Test Set (OLTS). 5. Record attenuation, length, and polarity. Multi-mode 850 1.82 db Multi-mode 1300 1.65 db Single-mode 1310 or 1550 1.59 db 27 08 00 Certification and Commissioning of Communication Systems Page 2

Cables shall be tested after all connectors are securely inserted into the outlet faceplate and into the patch panel in the BDF/IDF. Cables shall be tested after the outlet faceplate is securely fastened in its final, permanent position onto the outlet box. Only test results completed after connectors and faceplates are secured will be accepted by NCSU. The contractor shall ensure that the tester has any necessary hardware or software upgrades. The contractor shall provide proof that the tester has been properly calibrated by the tester manufacturer within the previous 12 months. D. Horizontal cable testing RG6 coax. All horizontal RG6 cables shall be tested using a time domain reflectometer (TDR) tester designed for CATV RG6 cable testing. Tester shall operate at 75 Ohm output impedance with ½ sine test signal output. Continuity testing alone will not be sufficient. E. Horizontal cable testing CAT3. Provision of test results is not required unless requested by NCSU ComTech. If required, the contractor will provide certification of continuity and polarity. F. Intra-building riser cable testing fiber. All fiber optic riser cables installed shall be tested. Following is a summary of horizontal cable testing requirements: 1. One direction. 2. Test multi-mode strands at 850 nm and 1300 nm. 3. Test single-mode strands at 1310 nm and 1550 nm. 4. Tier 1 testing with Light Source and Power Meter (LSMP) or Optical Loss Test Set (OLTS). 5. Record attenuation, length, and polarity. Multi-mode 850 2.20 db Multi-mode 1300 1.80 db Single-mode 1310 1.70 db Single-mode 1550 1.70 db The contractor shall ensure that the tester has any necessary hardware or software upgrades. The contractor shall provide proof that the tester has been properly calibrated by the tester manufacturer within the previous 12 months. G. Intra-building riser cable testing voice. Each cable pair within all UTP riser cables shall be tested for continuity to ensure conductors are terminated in proper sequence and with correct polarity. Provision of test results is not required unless requested by NCSU ComTech. If required, the contractor will provide certification of continuity and polarity. H. Inter-building cabling testing fiber. Fiber optic cables installed between buildings will typically be tested by ComTech technicians. Following is a summary of interbuilding cable testing requirements: 27 08 00 Certification and Commissioning of Communication Systems Page 3

1. One direction. 2. Test multi-mode strands at 850 nm and 1300 nm. 3. Test single-mode strands at 1310 nm and 1550 nm. 4. Tier 2 testing - with Optical Time Domain Reflectometer (OTDR) for tests. 5. Record signature trace, length, and attenuation. Multi-mode 850 2.10 db + (3.5 X length*) Multi-mode 1300 2.10 db + (1.5 X length*) Single-mode 1310 2.10 db + (0.5 X length*) Single-mode 1550 2.10 db + (0.5 X length*) (* length measured in km) 4.0 Documentation/submissions A. As-built drawings. The contractor shall provide ComTech as-builts consisting of building floor plan drawings showing final outlet locations and outlet numbers for all outlets installed. These may be provided in basic form (with legible handwritten outlet numbers on paper copies of the floor plans), or in electronic format (AutoCAD or PDF format). B. UTP cabling test results. Prior to acceptance of construction, the contractor shall submit a copy of all applicable test results (as described above) to Leviton via the Leviton website. The data for each individual cable shall include: data/time stamp info, technician name, building name, and specific termination location information (room number, outlet number, etc. as appropriate to allow Leviton and the Owner to easily determine specific cable origination and termination points). Results shall be in electronic format as follows: in the original tester format and with full plot data to enable detailed analysis. Acceptable file formats for data are:.flw (for Fluke),.SDF or.mdb (for Agilent), and.dbf (for Ideal). All other formats will require approval from Leviton prior to the commencement of testing. C. Fiber cabling test results. Prior to acceptance of construction, the contractor shall submit a copy of all applicable test results (as described above) to ComTech. The data for each individual cable shall include: data/time stamp info, technician name, building name, and specific termination location information (room number, outlet number, etc. as appropriate to allow ComTech to easily determine specific cable origination and termination points). Results shall be provided in electronic format that allows for the inspection and archiving of individual records. 5.0 Commissioning process A. Project registration. The contractor shall register each project prior to the commencement of the installation of the building communications cabling system. This registration will be performed via the Leviton website. 27 08 00 Certification and Commissioning of Communication Systems Page 4

B. Initiation meeting. Upon completion of the above registration, Leviton engineering personnel and ComTech representatives will meet with the communications cabling contractor. The purpose of this meeting will be to complete and review bills of materials, address any questions from the contractor regarding NCSU requirements, and review installation best practices. In addition, the contractor may elect to view mock-ups of all major system components at the ComTech physical layer lab at the Avent Ferry Technology Center. C. Project execution. Leviton will make available an on-call support engineer and on-site specification engineer as required for the duration of the project. These engineers will address any contractor installation questions, communicate with Leviton sales staff for assistance with issues related to materials distribution channels, etc. This support will be provided in coordination with Leviton s manufacturer representative and with ComTech staff. In addition, Leviton may conduct installation audits as work is completed. D. Post installation. Personnel from Leviton and from ComTech will conduct post installation inspections in addition to those conducted by the overall project architectural and engineering design team. These inspections will be to ensure that installation meets published Leviton and NCSU specifications. Leviton may, at the discretion of ComTech, conduct spot testing of AXT performance of the installed system. This will be conducted to prove compliance with Leviton s guaranteed 4dB headroom above TIA requirements for AXT. The contractor shall complete all submissions as required by Leviton in order for Leviton to issue a Lifetime Product and Performance Warranty for the installed system, including compliance with the Leviton NextLAN 10Gc AXi Channel Margin Guarantee. End of Section 27 08 00 Certification and Commissioning of Communication Systems Page 5