TEO Signal Committee Meeting Minutes Meeting Date: 05/19/2009 Waters Edge Conference Rm 176 Meeting Time: 9:00am - Noon

Similar documents
TEO Signal Committee Meeting Minutes Meeting Date: 10/6/2016 Water s Edge Conference Rm A Meeting Time: 9:00am Noon

Old Business. TEO Signal Committee Meeting Minutes Waters Edge Conf. Room C September 16, 2004

TEO Signal Committee Meeting Minutes Meeting Date: 3/22/2013 Water s Edge Conference Rm 176 Meeting Time: 9:00am Noon

INTERSECTION TRAFFIC CONTROL COMMITTEE

SECTION 5900 TRAFFIC SIGNALS CITY OF LEE S SUMMIT, MISSOURI DESIGN CRITERIA

CHAPTER 14 WIRING SIGNALS AND LIGHTING FIELD GUIDE Wiring Requirements WIRING

TEO Signal Committee Meeting Minutes Meeting Date: 10/29/2013 Water s Edge Conference Rm 176 Meeting Time: 9:00am Noon

TRAFFIC SIGNAL DESIGN GUIDELINES

Special Specification 6293 Adaptive Traffic Signal Control System

Office of Traffic Operations Signal Design Reference Packet

CONSTRUCTION SPECIFICATION FOR TRAFFIC SIGNAL EQUIPMENT

Work Type Definition and Submittal Requirements. Work Type Definition: Traffic Signal Design

BILOXI PUBLIC SCHOOL DISTRICT. Biloxi Junior High School

DESIGN STANDARD FOR AUDIOVISUAL SYSTEMS

Operating instructions Through-beam sensor. OJ51xx laser / / 2010

Public Works Division Lighting District Fiber Optic Specifications April 2009

Request for Quote E- Rate Eligible Services Scope of Work Network Infrastructure and Structured Cabling

2010ECL / 2018ECL / 2018KCL 33X Cabinet Flashing Yellow Arrow Overview

400 TRAFFIC SIGNALS Traffic Engineering Manual

Operating instructions Retro-reflective sensor. OJ50xx laser / / 2010

TEO Work Zone Safety Committee Meeting January 25, 2006 Minutes

U-verse Outside Plant Cabinets AT&T Knowledge Ventures. All rights reserved. AT&T and the AT&T logo are trademarks of AT&T Knowledge Ventures.

SECTION FIVE COBB COUNTY TRAFFIC SIGNAL SPECIFICATIONS

STX Stairs lighting controller.

SPECIAL SPECIFICATION 6735 Video Optical Transceiver

ADDENDUM NO. 6 PORT OF NOME SECURITY CAMERA PROJECT RFP

MRF-260 Installation Manual

1995 Metric CSJ SPECIAL SPECIFICATION ITEM 6031 SINGLE MODE FIBER OPTIC VIDEO TRANSMISSION EQUIPMENT

-Technical Specifications-

SPECIAL SPECIFICATION 1987 Single Mode Fiber Optic Video Transmission Equipment

MMU2-16LE FYA Overview

Traffic Sign Life Expectancy Investigation LAB943

SITE All work shall be performed at Center Park Substation (1895 Kernan Blvd, Jacksonville, Fl ). DATE: 04/03/2018

Operating instructions Through-beam sensor. OJ51xx / / 2004

Request for Proposals Fiber Optic Network Backbone Upgrades

nroads Fleet Full Size Lightbar Mid-Size Lightbar Mini Lightbar Beacons Accessories

SV-LCD50. Installation and User Guide. Thin-Film Transistor (TFT) Liquid Crystal Display (LCD) Color Rear Vision Monitor. Version 1.

Special Provision Fiber Optic Cable Section 643. The Contractor shall install fiber optic cable in conduit where shown on the plan sheets.

MonitorKey Operation Manual: content/uploads/ MonitorKey Operation Manual.pdf

Challenges of Launching DOCSIS 3.0 services. (Choice s experience) Installation and configuration

Request for Quote E- Rate Eligible Services Scope of Work - Wireless LAN and Cabling for Access Points

City of Winter Springs, FL

USE OF JOHN M. GREENE HALL

HONEYWELL VIDEO SYSTEMS HIGH-RESOLUTION COLOR DOME CAMERA

EVALUATION OF PERFORMANCE OF SOLAR POWERED FLASHING BEACONS AT ROOM TEMPERATURE CONDITIONS

SPECIAL SPECIFICATION 1291 Fiber Optic Video Data Transmission Equipment

POTCSC - Integrated Small Target Detection Radar and Acoustic Deterrence System RFP Questions and Answers

COLOUR CHANGING USB LAMP KIT

SIGNALING PRACTICES ON PROTOTYPE AND MODEL RAILROADS

SECTION 7 -- CROSS-CONNECT SYSTEMS

City of Lafayette. Advanced Transportation Management System (ATMS) Active Traffic Signal Management December 13 th, Agency Case Studies

SPECIAL SPECIFICATION 8540 Telecommunication Cable

A. Section Includes: Division 1 applies to this section. Provide GPS wireless clock system, complete.

Don t let Potential Customers pass you by!

DESIGN STANDARD FOR AUDIOVISUAL SYSTEMS

Film-Tech. The information contained in this Adobe Acrobat pdf file is provided at your own risk and good judgment.

SECTION INTERCOMMUNICATIONS AND PROGRAM SYSTEMS

VERIZON MARYLAND INC.

SECTION MEDIUM VOLTAGE CABLE INSTALLATION. 1. Section Underground Ducts and Manholes.

210E - 210ECL ECL ECL

Reno A & E, 4655 Aircenter Circle, Reno, NV (775)

REPORT TO THE PLANNING COMMISSION

SHUTTLE WITH INFRA-RED DETECTION SAS2-IR

KCRT. Prepared by: Sue Hartman, Director. Assisted by: Cecily McMahan

Figure 1. High Efficiency T8 LED Tube. Figure 3. Full View of Light High Efficiency T8 LED Tube

( InfoSystems Translation )

The National Traffic Signal Report Card: Highlights

SPECIAL SPECIFICATION 8311 LED Countdown Pedestrian Signal Module

SPECIAL SPECIFICATION 6911 Fiber Optic Video Data Transmission Equipment

TRANSCENSION 6-CHANNEL DMX DIMMER PACK (order code: BOTE40) USER MANUAL

1. The contractor shall ensure that: c) Contractor or sub-contractor has at least 5 years experience

Reno A&E Telephone: (775) Aircenter Circle Facsimile: (775)

A.D. Engineering International Pty Ltd - Product Range

Axle Assembly Poke-Yoke

Embedded Systems Lab. Dynamic Traffic and Street Lights Controller with Non-Motorized User Detection

P.S.C. No. 2- Telephone. FRONTIER TELEPHONE OF ROCHESTER, INC. Section 7 Original Page No. 1

SPECIAL SPECIFICATION 6559 Telecommunication Cable

Special Specification 6002 Video Imaging Vehicle Detection System

Be sure to check the camera is properly functioning, is properly positioned and securely mounted, every time you operate your vehicle.

Automotive 72 Exterior Smart Lighting Kit

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 872 LIGHT EMITTING DIODE TRAFFIC SIGNAL LAMP UNITS JULY 19, 2002

Monday, January 7, 2019

Junior Max (JR Max ) Controller

Implementation of LED Roadway Lighting

MILWAUKEE AVENUE CORRIDOR COMMITTEE FEBRUARY 12, 2015 MEETING SUMMARY

FUSION Model # - FN-0116, FN-0216, FN-0416, FN-0616, FN-0816, FN-8816, FN-0117, FN-0217, FN-0417, FN-0617, FN Fusion LIGHT STICKS

LineLight Crosswalk Installation Manual: Solar Panel & Motion Radar

INSTALLATION INSTRUCTIONS FOR. MODEL 2230LED

All Dielectric Self Supporting (ADSS) Fiber Optic Cable Installation

September 28, 2018 CITY OF BERKELEY JOHN MUIR SCHOOL CROSSING IMPROVEMENTS SPECIFICATION NO C ADDENDUM NO. 2

FB10000 Error Messages Troubleshooting

We bring quality to light. SNT 10 DC Power Supply

LED Spot 300W. Please read this user manual before your operation

Troubleshooting Guide 9630 Series

Analog to Digital conversion of HD video. The HD-Now provides a simple method of upgrading ROVs for live HD. Keep existing infrastructure intact.

Traffic Signal Performance Measures

In the proposed amendment below, text shown with underline is proposed to be added and text shown with strikethrough is proposed to be removed.

ATND Series White Paper

INSTALLATION INSTRUCTIONS MODEL VSBX-236 LED 3 X 8 INDOOR SCOREBOARD

RG NDT INTERNATIONAL INC

Transcription:

TEO Signal Committee Meeting Minutes Meeting Date: 05/19/2009 Waters Edge Conference Rm 176 Meeting Time: 9:00am - Noon Meeting Attendees: Kile Holm Sue Zarling Curt Krohn Mike Schroeder Tim Bangsund Jeff Knofczynski Mike Wolf Peter Skweres Mike Gerbensky Jerry Kotzenmacher Linda Heath Les Bjerketvedt Jim Deans Mike Posch Bob Emineth Ed Andrajack Tod Becker Tom Dumont Old Business- Battery Backup New prototype should be completed in about 2 weeks. This cabinet will be called type SSB or (Signal Service Battery Backup) cabinet. EVP lamp The halogen lamp currently used by ESU for maintenance replacement EVP lamps will now be used on new signal design. The lamp has been proven in the field for the past two years. This smaller halogen lamp doesn t have the bulkiness that the flood lamps have, therefore do not shake as much as the larger flood lamps. 60 to 80 mast arm The consultant has been chosen and is currently working on preliminary design of mast arm lengths between 60 and 80. Progress meetings have been held with a completion date of June 30, 2009. Preliminary design highlights: 1) Foundation depth for the larger poles will likely be between 24 and 35 deep. 2) Spread footing may be an option. 3) Soil borings will be required for the larger foundations. 4) Weight of the pole will be 10,000 and 20,000 pounds requiring a crane to place. 5) Cost estimates between $40,000 to $80,000 just for material for one pole/mast arm. 6) The arm will look similar to our current double truss arm, only round. These preliminary numbers reflect the range of mast size between 60 and 80. The numbers are substantially higher because we will meet the current 2001 AASHTO ratings. Our current mast arms (15 to 55 ) do not meet the 2001 AASHTO ratings but have been grandfathered in because of a proven track record of no known fatigue failures in the past several decades. Snow Shields No conditions existed over the snow season for any conclusive recommendation. No other problems reported. Mike Shroeder still has a few in the shop that can be placed in the field. Contact Mike if you want to place a couple in your district. ADA Pedestrian accommodations A preliminary tech memo is currently being routed with APS installation recommendations for new and major re-construction of traffic signals. APS Tech Memo 09-08T 01 will be officially posted soon. This memo will state MN/DOTs current practice for APS installations.

The APS study sponsored by OTST for each district is nearing completion. Many districts have already received there intersection and approach rankings for the APS. Just Metro and Willmar remain incomplete. Completion date of the project is expected before the end of June. The ranking numbers do not have a threshold to install the APS, but only reflect how each signal is ranked relative to other signals in each district. Each district will determine which signal will get APS depending on funding availability. An estimated cost for a full 8 button system is about $5700. This cost does not include any other related cost such as ped stations or ramps but only the buttons and APS controller. Single APS buttons currently cost around $400. This cost does not include the APS controller unit that must be installed in the cabinet when using APS buttons. The APS control unit which goes inside the cabinet costs around $2200. This cost must be included on any number of buttons installed at a signal, even if only 1 button is installed. Pedestrian guidelines attached. Enforcement light The TEO Executive Committee has recommended that the light be utilized when requested. MN/DOT recommendations and guidelines will be as follows: 1) Will consider all requests 2) No blanket installations 3) Light should be wired to overlap or concurrent phase (phase 9) 4) Agreement/memo of understanding will be written 5) Signal Staff and enforcement agency must meet 6) MN/DOT funding based on availability 7) Light color should be blue. Guidelines will be posted on the OTST website once there is agreement on installation/maintenance costs and agreement language. Fortran Bracket The manufacturer will not modify the bracket to meet our needs. The bracket will be available for maintenance use only and will not be used on new design. Flashing Yellow Arrow Surveys are being conducted with other state agencies to see how they are using the FYA. Cost Agreements A sub committee was established at the 2-10-09 Signal TEO Meeting. The following was written in the meeting minutes: Battery backup systems/ batteries A sub committee will meet to discuss battery backup systems and the cost/maintenance issues involved with batteries. Members will be, Sue Z(chair), Ben O, Linda H, Mike G, Tom D, Jim D, Jeff K, Bob, Mike P. The committee will decide the best direction for maintenance and cost agreements for battery backup systems and report back to the signal committee. New Business Tomar EVP The committee discussed the issues with regard to limited range sensitivity. The TEO signal committee recommends the following requirements for the product: 1. Effective immediately all new products sold in Minnesota must have the new long tube lens.

2. Mn/DOT will now be testing all installations to verify the 1800 foot sensitivity requirement. 3. If the geometries of the intersection support the 1800 foot range requirements and the product does not perform it will be rejected. 4. Any sensitivity issues must be resolved with the Contractor, Brown Traffic and Tomar. 5. Mn/DOT will no longer be able to provide resources to solve any future problems as they relate to sensitivity issues. 6. If the sensitivity issue is not completely solved Tomar will be removed from the Mn/DOT Approved Products List (APL) for Signals until such time Tomar can demonstrate that standard product meets all of MN/DOT's requirements. 7. Something in writing from Tomar on how to handle upgrading all in place systems that have the "defective" lenses. 8. A complete list of vehicle mounted optical emitters that have been used to test and pass the 1800 foot sensitivity require. All districts should be checking the range of all currently installed sensors and work with the vendor/manufacturer to replace defective lenses. Any unresolved problems should be reported to OTST. Tests must be completed by a properly mounted vehicle emitter. For new signals, a key time to address any range issue is at the signal turn on. The contractor is responsible (along with the manufacturer) to meet minimum range requirements. Mast arm mid mount re-location - What generally initiates the need to re-locate midmounts is a signal mast arm length change after fabrication. Millerbernd has in the past, agreed to credit the cost of the original mast arm and replace it with the revised mast arm with minimal re-stock and re-work charges applied. As new orders are entered, there is an attempt to use the re-stock mast arms on the new orders. Mast arms that do not require rework are chosen if available. The manufacturer tries to avoid the re-work as much as possible, but at some point, as these re-stock mast arms accumulate, a re-work is necessary. With the old painted mast arms, the plugged area of the re-located mount would not be noticeable once re-painted. With the new galvanized mast arms this will not be the case. Although structurally sound, the plugged area will show up cosmetically after galvanizing. The weld area tends to attract more galvanizing and will often result in a slightly different coloration than the surrounding material especially when freshly galvanized. The manufacturer s concern is that this may cause rejection of the mast arm by the project engineer. It is also thought that the cosmetic coloration will diminish as the mast arm ages/weathers. The manufacturer has asked that the signal committee consider this option and advise them of committee decision. If this option and practice is acceptable, they would appreciate a letter stating the conditions. If this is not acceptable, the manufacturer will no longer issue credit for mast arm changes after fabrication. The committee recommends that the current practice continues and has no issues with the modification and relocation of the mid arm mounts. No mast arms will be rejected based on the relocation of the mid arm mounts. These meeting minutes serves as official notice of acceptance of these modified mast arms. Signal and Lighting certification/inspection The current class instructors (Howard Lee, Marlin Renardy, Mike Wolf) have given notice of their intent to discontinue as class instructors after the 2010 class offerings. A meeting will be held June 22 to determine the

direction of the class. The committee believes the class to be worth while and to continue the class with new instructors after the current instructors depart. On a related note, certifications are not always being checked which leads other certified contractors to complain on the non certified contractors getting signal work. Sue will get the certification issue on the MN/DOT construction agenda for them to be aware of the issue. A current list of names and certification expiration dates is on the OTST web site. Solar Pedestrian Crossing - D7 has installed a solar powered ped crossing in Waseca. It uses a microwave and infa red detection. The sign has imbedded LED s along the perimeter of the sign. The system components cost $7400. Contact Bob or Tod for more information. Optically Programmed Signal Indication - With limited use of this type of signal indication, the performance spec will be omitted from the 2010 standard specifications for construction book. When required or needed, the indications will be state furnished. EVP Detectors On Wood Poles EVP detectors on span wires have diminished range, likely from the movement the span wires create. Its recommended that the sensors be placed on the pole when practical. The conformation light should be shown on the span wire. The wood pole span wire detail has been updated and posted on the OTST web site. On short term wood pole systems, installation of EVP systems should be questioned. Round Robin: Jerry HAWK System The first HAWK system will be installed in St Cloud on TH 23/Division Street. Mike W Any comments for the new 2010 spec book, send to Mike. Ed A. Metro is adding additional conduit to the cabinet pad detail. A 1 ½ conduit for fiber and another for the battery backup Tom D. Bus priority should be paid by the local bus company. Mike S. stated that it is not an issue to put the cost on the controller purchase. Cost sharing may be difficult to work out. EVP lights for hearing impaired pedestrian A pedestrian within D3 requested EVP conformation lights to aid her when an emergency vehicle was approaching. The committee recommended that the pedestrian should be advised to use the pedestrian indications, not EVP conformation lights. Next meeting: Waters Edge Conference Room 323 September 24 th, 2009 9:00 am to 12:00 noon. Send agenda items to Jerry K. Attachment: Pedestrian Guidelines