The Introduction of New Iran Petroleum Contracts IPC Tehran 2015 Iranian Oil and Gas Upstream Industry; Capabilities and Capacities By: Mohammad Iravani Chairman of the Board of Oil and gas Drilling Assembly Companies in Iran 28-29 November 2015 - Tehran
Iran s Qanat Kariz is the first long horizontal drilling operation in the world
First Discovery of Oil in Iran Islamic Revolution First Offshore Drilling by an Iranian Company Well Service by private companies 1951 1979 ~2000 1902 1979 1989 ~2000 Iran Oil Industry Nationalization Various Exploration and Development Operation by NIOC and its affiliates Geophysical Services by private companies
Exploration Development Production Exploration Drilling Geophysical Services Well Logging Reservoir Studies Development Drilling Surface facilities Well Services Petroleum Product Trading
Bibi-Hakimeh Geophysical service South-Pars Development SIMOPS operation in SPD 15 Deepwater Drilling in Caspian Sea
Field Development Companies Services Providers EPC & GC Subsurface Consultant Co. Surface Facilities Consultant CO. Vendors and Suppliers 100% 75% 50% 25% 0% 28-29 November 2015 - Tehran
Full coverage of seismic and non-seismic geophysical studies (2D & 3D acquisition, processing, & interpretation, onshore & offshore) Discovering new hydrocarbon fields besides preparation of updated field development plans Provide O & G industry with international-level geophysical services Presence in international markets in competition with prominent European and American corporations
LOGGING PERFORATION CEMENTING ACIDIZING DD & DH TOOLS WELL TESTING International Co. Local Co.
1361 1362 1363 1364 1365 1366 1367 1368 1369 1370 1371 1372 1373 1374 1375 1376 1377 1378 1379 1380 1381 1382 1383 1384 1385 1386 1387 1388 1389 1390 1391 1392 1393 Number KM drilled TEHRAN SUMMIT THE INTRODUCTION OF NEW IRAN PETROLEUM CONTRACTS - IPC 350 300 Gov. Drilled Wells Gov. Rig Count Gov. Drilled Meterage Total Drilled Wells Total Rig Count Total Drilled Meterage 900 800 700 250 600 200 500 150 400 100 300 200 50 100 0 0
100 80 86 %1 60 40 20 34 0 %20 1 9 %79 1 1
~ 2700 new wells planned. ~ 140 rigs/year required. 600 500 400 300 200 100 0 Avg. Rig Count Avg. Drilled W. Past 4 Y. Future 5 Y.
Field Development Companies Service providers Subsurface consultancies Surface facilities consultancies EPC & GC Vendors and suppliers 28-29 November 2015 - Tehran time
28-29 November 2015 - Tehran
Exploitations of Tight Carbonates Heavy Oil Drilling Solutions More than 60 MMbbl of recoverable oil Horizontal and Multi lateral wells. Abrasive solids and corrosive gasses content Drilling technology challenges range from wellbore stability in shallow unconsolidated sands to high dogleg
Deepwater reservoirs High Pressure, High Temperature Drilling in Caspian Sea. Hydrates in Oman Sea Undisturbed bottom hole temperature of greater than 300oF and a pore pressure of at least 0.8 psi/ft (~15.3 lbm/gal) or requiring a BOP with a rating in excess of 10,000 psi [68.95 MPa]
Cooperation brings about solid strategic progress Increase our value creation Strengthening efficiency International companies will benefit from Considerable cost reduction Accelerate contractual/execution affairs Iranian companies will have the access To the state of the art technologies To a safe and environmentally friendly technologies