ANKA Status Report. N.Smale, A.-S. Müller, E. Huttel, M.Schuh Slides courtesy of A.-S. Müller and C.Heske.

Similar documents
ANKA Status Report. N.Smale, on behalf of all ANKA colleagues, Directors : A.-S. Müller, C Heske, T Baumbach.

ANKA RF System - Upgrade Strategies

The Elettra Storage Ring and Top-Up Operation

New Filling Pattern for SLS-FEMTO

Status of SOLARIS. Paweł Borowiec On behalf of Solaris Team

Diamond RF Status (RF Activities at Daresbury) Mike Dykes

KARA and FLUTE RF Overview/status

PEP II Design Outline

Status of Elettra, top-up and other upgrades

Digital BPMs and Orbit Feedback Systems

PEP-II Overview & Ramp Down Plan. J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007

Present Status and Future Upgrade of KEKB Injector Linac

Production of quasi-monochromatic MeV photon in a synchrotron radiation facility

SPEAR 3: Operations Update and Impact of Top-Off Injection

ALBA. Libera Workshop 16 A. Olmos

Program Risks Risk Analysis Fallback Plans for the. John T. Seeman DOE PEP-II Operations Review April 26, 2006

Status of SOLARIS Arkadiusz Kisiel

North Damping Ring RF

CLIC Feasibility Demonstration at CTF3

ABORT DIAGNOSTICS AND ANALYSIS DURING KEKB OPERATION

LHC Beam Instrumentation Further Discussion

Control of Intra-Bunch Vertical Motion in the SPS with GHz Bandwidth Feedback

A Cathode Development Cornell Cultera This scope includes all labor and purchases required produce photocathodes required by CBETA.

Experience with the Cornell ERL Injector SRF Cryomodule during High Beam Current Operation

Sérgio Rodrigo Marques

COMMISSIONING OF THE ALBA FAST ORBIT FEEDBACK SYSTEM

2008 JINST 3 S LHC Machine THE CERN LARGE HADRON COLLIDER: ACCELERATOR AND EXPERIMENTS. Lyndon Evans 1 and Philip Bryant (editors) 2

EPJ Web of Conferences 95,

LCLS RF Reference and Control R. Akre Last Update Sector 0 RF and Timing Systems

Bunch-by-bunch feedback and LLRF at ELSA

Fast Orbit Feedback at the SLS. Outline

IOT OPERATIONAL EXPERIENCE ON ALICE AND EMMA AT DARESBURY LABORATORY

Top-Up Experience at SPEAR3

1 Digital BPM Systems for Hadron Accelerators

2 Work Package and Work Unit descriptions. 2.8 WP8: RF Systems (R. Ruber, Uppsala)

Status and Plans for PEP-II

!"!3

SRS and ERLP developments. Andrew moss

Status of CTF3. G.Geschonke CERN, AB

Recent APS Storage Ring Instrumentation Developments. Glenn Decker Advanced Photon Source Beam Diagnostics March 1, 2010

LLRF at SSRF. Yubin Zhao

Precision measurements of beam current, position and phase for an e+e- linear collider

AREAL- Phase 1. B. Grigoryan on behalf of AREAL team

EUROFEL-Report-2007-DS EUROPEAN FEL Design Study

Brilliance. Electron Beam Position Processor

PEP-II longitudinal feedback and the low groupdelay. Dmitry Teytelman

PICS IN THE INJECTOR COMPLEX WHAT ARE WE TALKING ABOUT?

5 Project Costs and Schedule

Detailed Design Report

Synchrotron Light Facility. Operation of ALBA RF. Angela Salom on behalf of RF team: Francis Perez, Bea Bravo and Jesus Ocampo

3 cerl. 3-1 cerl Overview. 3-2 High-brightness DC Photocathode Gun and Gun Test Beamline

Libera Hadron: demonstration at SPS (CERN)

Pulsed Klystrons for Next Generation Neutron Sources Edward L. Eisen - CPI, Inc. Palo Alto, CA, USA

Introduction to Synchrotron Radiation and Storage Ring Light Sources.

X-ray BPM-Based Feedback System at the APS Storage Ring. O. Singh, L. Erwin, G. Decker, R. Laird and F. Lenkszus

Advanced Photon Source - Upgrades and Improvements

Equipment Installation, Planning, Layout, organisation and updates

CERN S PROTON SYNCHROTRON COMPLEX OPERATION TEAMS AND DIAGNOSTICS APPLICATIONS

SLS RF operation report 2003

Status of BESSY II and berlinpro. Wolfgang Anders. Helmholtz-Zentrum Berlin for Materials and Energy (HZB) 20th ESLS-RF Meeting

An Operational Diagnostic Complement for Positrons at CEBAF/JLab

1. General principles for injection of beam into the LHC

PEP-I1 RF Feedback System Simulation

Nick Walker DESY MAC

The FAIR plinac RF Systems

Summary of CBETA Independent Cost Reviews. R. Michnoff January 19, 2017

Development of an Abort Gap Monitor for High-Energy Proton Rings *

COMMISSIONING RESULTS OF BEAM DIAGNOSTICS FOR THE PETRA III LIGHT SOURCE

AARHUS UNIVERSITET November, ASTRID2 Status. Heine Dølrath Thomsen on behalf of the ASTRID2 Team

An Overview of Beam Diagnostic and Control Systems for AREAL Linac

FIR Center Report. Development of Feedback Control Scheme for the Stabilization of Gyrotron Output Power

NSLS-II RF Systems James Rose, Radio Frequency Group Leader PAC 2011

Characterizing Transverse Beam Dynamics at the APS Storage Ring Using a Dual-Sweep Streak Camera

Oak Ridge Spallation Neutron Source Proton Power Upgrade Project and Second Target Station Project

Status of RF Power and Acceleration of the MAX IV - LINAC

Challenges in Accelerator Beam Instrumentation

Trigger-timing signal distribution system for the KEK electron/positron injector linac

Status of the FAIR Project. Jürgen Henschel FAIR Project Leader / Technical Director GSI & FAIR

III. Proton-therapytherapy. Rome SB - 3/5 1

FIRST SIMULTANEOUS TOP-UP OPERATION OF THREE DIFFERENT RINGS IN KEK INJECTOR LINAC

Accelerator Instrumentation RD. Monday, July 14, 2003 Marc Ross

RF Upgrades & Experience At JLab. Rick Nelson

P. Adamson, Fermi National Accelerator Laboratory, Batavia, IL 60510, USA. Abstract

Beam Loss Detection for MPS at FRIB

Report on the LCLS Injector Technical Review

The ESRF Radio-frequency Data Logging System for Failure Analysis

A Facility for Accelerator Physics and Test Beam Experiments

30 GHz Power Production / Beam Line

LEP OPERATION AND PERFORMANCE WITH ELECTRON-POSITRON COLLISIONS AT 209 GEV

SUMMARY OF THE ILC R&D AND DESIGN

Operational Status of PF-Ring and PF-AR after the Earthquake

The basic parameters of the pre-injector are listed in the Table below. 100 MeV

Upgrading LHC Luminosity

P. Emma, et al. LCLS Operations Lectures

First Simultaneous Top-up Operation of Three Different Rings in KEK Injector Linac

PEP-II STATUS REPORT *

Accelerator Systems of the TPS

News from HZB / BESSY Wolfgang Anders at ESLS-RF Meeting September 2010 Trieste

Status of the X-ray FEL control system at SPring-8

Phase (deg) Phase (deg) Positive feedback, 317 ma. Negative feedback, 330 ma. jan2898/1638: beam pseudospectrum around 770*frev.

Transcription:

ANKA Status Report N.Smale, A.-S. Müller, E. Huttel, M.Schuh Slides courtesy of A.-S. Müller and C.Heske. KIT - University of the State of Baden-Wuerttemberg and National Laboratory of the Helmholtz Association www.kit.edu

Outline ANKA today and tomorrow Science fields, construction and new beam lines Operation Operation status and statistics Hardware/software Moving from old to new hardware The future super conducting insertion device development Consolidation Plans Summary See tomorrows presentation by M.Schuh for some nice beam studies and diagnostic equipment. 2

ANKA today and tomorrow Normal users (2.5GeV) Other users Approx 10% of machine running time is left for: Machine studies Single bunch Low alpha Low Energy 3 3 ANKA Synchrotron Light Source at KIT

ANKA today and tomorrow ANKA Hall Extension Programm Complete ANKA Hall Labs KNMF FELIG Actinide beamline extention 4 4 ANKA Synchrotron Light Source at KIT

ANKA today and tomorrow Reality: Construction on all sides! North-west corner October 12, 2011 5 5 ANKA Synchrotron Light Source at KIT

ANKA today and tomorrow New Beamlines UVCD-CD12, transferred from Daresbury, now commissioned IR2, with nanoscope, now in commissioning Flute, now funded. Allow small-scale tests of THz generation, compression, radiation transport and instrumentation, T-Bone, proposal for a linac-based coherent radiation source in the THz to Mid-IR range Image/X-MIC, twin beam line in construction Visible light diagnostic port proving very usefull 6

ANKA today and tomorrow Visible Light Diagnostics Port Dedicated visible light beam diagnostics beam line operational since October 2010 Significantly increased flux allows measurements for small currents Optimised for Streak camera operation 7

Operation Beamtime Storage ring operates for about 4500 h / a no 24/7 operation possible due to limited resources (personnel) several operation modes offered availability on average 92 % 2008: Less availability due to e-gun vacuum leaks and longer start-up time (SUL-wiggler-AL-vac.-chamber) availability in UO 2009: Less beamtime due to built-up of IR2 and NANO Frontend 2011: Less availability mainly due to control system failures and resulting damage to machine vacuum & RF hours year 8

Operation Storage Ring Pressure & Lifetime May: Control system failure caused miss-steering of e- beam, production of whisker in beam path, no turns, venting of sector 4 With beam Without beam Sept.: Leak in Diagnostik front end (bellow) (first leak in SR vacuum system since 2002) 9

Operation A whisker example from U139, not from ANKA 10

Hardware/software Radio Frequency System Problems and solutions in 2011 3 GHz preamplifier failed (replacement from BESSY, new one built up) 500 MHz low-level calibrated with C.Pasotti (ELETTRA) 500 MHz klystron input failed (cabling replaced) 500 MHz preamplifier failed (RFT ) Cavity cooling failed (now digital PID regulators) RF expert hired in Feb.11 (Andreas Böhm) Actions exchange of klystron due in 2012 implementation of RF lab refurbishing of components 11

Hardware/software Power Supplies Onset of failures since mid 2011 Injection kicker, MOSFET dead, but box ALIVE Dipole extraction line (transistor board) Dipole booster (DC overload) Bumper with no spare Extraction septum (HV regulation module) Actions Successive replacement of power supplies foreseen Electronics expert urgently needed (position soon to be opened) 12

Hardware/software New (fast) BPM System for ANKA Replacement of old BPM electronic by LIBERA-Brilliance First batch (20 units) in 2011, next batch end of the year Advantage: first turn option (injection optimization) turn-by-turn option (instability studies) 1 khz acquisition (slow instability studies) Stable control interface Diagnostics expert urgently needed Thanks go to Guenther Rehm, Diamond. 13

Hardware/software Bunch-by-Bunch Feedback System 1D system (vertical) installed at ANKA now routinely used at 2.5 GeV to damp vertical instabilities analyzing tool: identification of unstable modes Take care the y-scales are different feedback OFF feedback ON 14

Hardware/software Control System ACS (only @ ANKA) became less reliable after an upgrade Transition to more commonly used systems foreseen PVSS for PLC based hardware (used already at accelerator and beamlines) Decision: EPICS or TANGO? TANGO used by beam lines cooperation contract with ESRF/SOLEIL EPICS preference for accelerators easier to implement more established in a larger community not CORBA based Control system expert needed (position to be opened soon) 15

The future Superconducting IDs for ANKA scids for the ANKA storage ring: SCU15 Demo, SCU2-15 and SCU20 for NANO beamline SCUW for IMAGE beamline Understanding the scid needs of light sources around the world COLDDIAG experiment is presently being installed at DIAMOND ANKA as test bed for CLIC damping rings additional benefit: wiggler for IMAGE beamline (starting 2012/13) cooperation with CERN & BINP (BMBF call) 16

The future Consolidation Plans for ANKA Hardware measures Fast orbit feedback & bunch by bunch feedback system to reduce low frequency oscillations improved current, stability,... New RF amplifiers replace klystrons Replacement of the present control system (SCADA) enhanced reliability and modularity when adding further components Installation of new superconducting insertion devices Strategic upgrades Considerable increase of the machine personnel sustain a critical mass, implement upgrades & develop future projects 17

Summary Accelerator components age problems & solutions: upgrade program started adequate operation funding & continuous investment funds required Active and competitive R&D program in cooperation with other accelerator labs (e.g. ARD) 11 PhD students and 7 Postdocs (mostly 3rd party funded) upgrade to state-of-the-art Ressources needed, in particular manpower recruiting started, needs to be further intensified 18

Thank you for your attention 19

ANKA today and tomorrow IMAGE/X-MIC Twin-Beamlines First beamline is monochromatic with resolution E/E=10-4 for high resolution transmission microscopy Second beamline is operational in three modes: white, pink & monochromatic beam, 240mmH and 36mmV 2 beamlines placed side by side 20 20 ANKA Synchrotron Light Source at KIT