The University of Texas at Austin September 30, 2011

Similar documents
SECTION COMMUNICATIONS HORIZONTAL CABLING

SECTION TESTING OF COPPER CABLES

DESIGN!!GUIDELINES!!!!!

SECTION TESTING, IDENTIFICATION AND ADMINISTRATION

Category 6A UTP cables shall be tested and proved to conform to TIA-568-C.2 standards.

Pre-bid Supplement #01 Communications Specifications and Additional Scope Project Bid: CM Date: 05/26/2017

Coastal Carolina University RE-BID WILLIAMS BRICE RENOVATION AND REPAIR October 19, 2018 Construction Documents

RCIT Cable Certification Testing Revised 10/2017

Cable Certification. General Testing Criteria (Applies to all cable certification testing) Attachment E Cable Certification

SPECIAL SPECIFICATION :1 Video (De) Mux with Data Channel

Excel recommends Fluke Networks, this section is written around the use of this range of test equipment.

TEST REPORT NO.: CRT-081 RENDERED TO: Hubbell Premise Wiring 14 Lord s Hill Road Stonington, CT

Telecommunication Infrastructure Project September 20, 2002

SECTION COMMUNICATIONS HORIZONTAL CABLING

California Polytechnic State University ITS Telecommunications PART 1 GENERAL SECTION AUDIO VISUAL STATION CABLES 1.

A guide to Woolworths Limited additional requirements. for the testing of twisted pair and fibre installation.

STRUCTURED CABLE SYSTEM (SCS)

What really changes with Category 6

NEMA Standards Publication WC Performance Standard for Twisted Pair Premise Voice and Data Communications Cables

NEMA Standards Publication WC Performance Standard for Twisted Pair Premise Voice and Data Communications Cables

BILOXI PUBLIC SCHOOL DISTRICT. Biloxi Junior High School

OASIS CSI (Certified Security Integrators) Direct Attach Warranty for ESS Devices

Copper Cabling Troubleshooting Handbook

SECTION FIBER OPTIC STATION CABLES

HONEYWELL VIDEO SYSTEMS HIGH-RESOLUTION COLOR DOME CAMERA

Minimum qualifications for the Telecommunications Engineer are: A. Texas Licensed Profession Engineer (PE)

SECTION INTERCOMMUNICATIONS AND PROGRAM SYSTEMS

SPECIAL SPECIFICATION 8540 Telecommunication Cable

SOLICITATION ADDENDUM NO. 1 ITB THE FOLLOWING CHANGES TO THE ABOVE CITED SOLICITATION ARE ANNOUNCED.

Section COMMUNICATION EQUIPMENT ROOM FITTINGS. Section Communications Cable Management and Ladder Rack

1.0 GENERAL. 1.2 SUMMARY.1 Section Includes:

SPECIAL SPECIFICATION 6559 Telecommunication Cable

REQUEST FOR QUOTE: TELECOMMUNICATIONS CABLING Library/Classroom Building, Beltline Campus

SECTION 686 VIDEO DECODER DESCRIPTION

ATTACHMENT 2: SPECIFICATION FOR SEWER CCTV VIDEO INSPECTION

Class B digital device part 15 of the FCC rules

Challenges for testing 10GBASE-T

1993 Specifications CSJ , etc. SPECIAL SPECIFICATION ITEM CCTV Central Equipment

Sapling Synchronous Communication Clock System Section Master Guide Specification Page 1 October 2013

WJHW, Inc. 6 April 2016 Texas Tech University Issue for CD Set Sports Performance Complex Lubbock, Texas

SECTION 5900 TRAFFIC SIGNALS CITY OF LEE S SUMMIT, MISSOURI DESIGN CRITERIA

Salient Systems June, N Mopac Expy, Bldg 3, Ste 700 Austin, Texas FAX

Salient Systems July, N. MoPac Expy. Building 3, Suite 700 Austin, TX FAX

Multi LAN 350 MI 2016 User Manual Version 2.2, Code No

Data Communications Competence Center

Start Up or Shut Down Hunting Function. Using the Receiver. If there is a short circuit in the cable, it will display as follows:

NYULMC AMBULATORY CARE CENTER FIT-OUT PHASE 1 Perkins & Will Architects PC 222 E 41st ST, NYC Project: Issued for GMP March 15, 2017

Special Specification 6293 Adaptive Traffic Signal Control System

A. All communications equipment rooms shall be installed in a neat and workmanlike manner.

Datasheet: MultiFiber Pro

TEST REPORT NO.: CRT-001b RENDERED TO:

UNIFIED FACILITIES GUIDE SPECIFICATIONS

MIDDLESEX COUNTY COLLEGE WIRE AND CABLE NETWORK REQUIREMENTS BH, CB, CH, ED, MH, LH, Camera Project

ADS Basic Automation solutions for the lighting industry

DSP-4000 Series. CableAnalyzer. Users Manual

How to Implement PoE in Your Harsh Industrial Environment

ENGINEERING COMMITTEE

Request for Proposal (RFP)

How to accelerate your cabling system approvals

Class E A / Cat.6A Screened Coupler

UCR 2008, Change 3, Section 5.3.7, Video Distribution System Requirements

Work Type Definition and Submittal Requirements. Work Type Definition: Traffic Signal Design

University Center AV Integration Construction Documents February 8, 2012

Mar11 Rev E

CASS COUNTY, MICHIGAN CASSOPOLIS, MI REQUEST FOR PROPOSAL SPECIFICATIONS

Datasheet: CertiFiber Pro Optical Loss Test Set

TELSYS Cable Mapping System

GIGALAN CAT.6 U/UTP 23AWGx4P - LSZH (EXP)

SECTION 683 VIDEO OPTICAL TRANSCEIVER WITH BI-DIRECTIONAL DATA CHANNEL DESCRIPTION

SPECIAL SPECIFICATION 1291 Fiber Optic Video Data Transmission Equipment

UNM IT/Telecommunications Guide Specification Labeling 11/07/

Michigan State University Construction Standards EXTERIOR FIBER OPTIC CABLE SYSTEM PAGE

The Road to Single Mode: Direction for choosing, installing and testing single mode fiber

ENGINEERING COMMITTEE Interface Practices Subcommittee SCTE

If you want to get an official version of this User Network Interface Specification, please order it by sending your request to:

Do not remove screws, cover, or cabinet. There are no user serviceable parts inside. Refer servicing to qualified service personnel.

LITWARRANTY Rev. 5 W a r r a n t y P r o g r a m S t r u c t u r e d C a b l i n g S y s t e m s

SECTION COMMUNICATIONS HORIZONTAL CABLING

Datasheet: SimpliFiber Pro

The need for Encircled Flux, real or imaginary?

Table of Contents. Section E: Inspection and Acceptance

-Technical Specifications-

Liberty Mutual Structured Cabling Specification Bid and Build Structured Cabling Technical Specification for:

CASS COUNTY, MICHIGAN CASSOPOLIS, MI REQUEST FOR PROPOSAL SPECIFICATIONS

UNIVERSITY of NORTH DAKOTA LOW VOLTAGE COMMUNICATIONS STANDARDS FOR CABLING, PATHWAYS, AND SPACE

VERIZON MARYLAND INC.

Technical Specifications Florida Gulf Coast University

Sapling Wireless Clock System Section Master Guide Specification Page 1 October 2013

PERFORMANCE SPECIFICATION SHEET CONNECTORS, PLUGS, ELECTRICAL, COAXIAL, RADIO FREQUENCY (SERIES SMA (CABLED) - PLUG, PIN CONTACT, CLASS 2)

technicalreport MegaLine Connect100 Class E A links over 100 metres in length Data communication technology 09/2018 Classic structure 2-connector link

PHYSICAL FACILITIES Consultant s Handbook Specifications Division 27 Communication 0553 Identification for Communications Systems

Information & Communications Technology Network Infrastructure Group. Network Infrastructure Standards June 2008

Sapling IP Clock System Section Master Guide Specification Page 1 October 2013

Journal of Japan Academy of Midwifery Instructions for Authors submitting English manuscripts

OLP-87/87P. SmartClass Fiber PON Power Meter and Microscope

SPECIAL SPECIFICATION 1987 Single Mode Fiber Optic Video Transmission Equipment

Belden IBDN System 10GX Enabling Technologies

This Service Bulletin may be distributed only to those groups indicated below with a check mark: End-use customers, owners and operators

Telecommunciations Infrastructure Project September 20, A. Broadband radio frequency active and passive components

Agilent 81600B Tunable Laser Source Family

Transcription:

SECTION 27 08 20 COPPER TESTING PART 1 - GENERAL 1.1 SUMMARY A. Test measurements shall be taken for all balanced-twisted pair cabling, including horizontal and backbone copper cables and wall-to-rack cables. Test all category cables in accordance with current TIA measurement specifications for that category of cabling with a field-test instrument meeting or exceeding Level IV accuracy. Provide test measurement results (in electronic format) a minimum of three weeks prior to substantial completion. 1.2 RELATED DOCUMENTS A. The latest versions of the following codes, standards, and guidelines shall be followed. Bring to ITS immediate attention where construction documents or conditions differ from requirements in codes, standards, guidelines and specifications. B. The following standards: 1. ANSI/TIA-568-C.2 Balanced Twisted-Pair Telecommunications Cabling and Components Standard 2. ANSI/TIA-1152 Requirements for Field Test Instruments and Measurements for Balanced Twisted-Pair Cabling C. The following guidelines: 1. BICSI, Telecommunications Distribution Methods Manual (TDMM) 2. BICSI, Information Transport Systems Installation Methods Manual (ITSIMM) 1.3 QUALITY ASSURANCE A. All testing procedures and field-test instruments shall comply with applicable requirements of: 1. ANSI/TIA-568-C.2 2. ANSI/TIA-1152 B. Test measurements shall be performed by trained technicians who have successfully attended manufacturer training or BICSI Installer 2 copper training. C. The Owner or the ITS Representative shall be invited to witness, review or both witness and review field-testing. 1. Notify ITS Representative and Design Engineer of the testing start date, five (5) business days before testing commences. 2. After final test measurements have been completed and submitted, the ITS Representative or Design Engineer will select a random sample of up to 10% of the installed links that the telecommunications contractor is to retest at no cost to the Owner. If more than 2% of the sample results differ in terms of the pass/fail determination, the contractor, under supervision of the ITS Representative, shall repeat 100% of the testing at no cost to the Owner. 1.4 SUBMITTALS Optical Fiber Testing and Measurements 27 08 20-1

A. The following submittals are due at the Pre-Construction Phase, in accordance with submittal requirements in Section 27 00 00 Communications: 1. Names of individuals that will be performing the testing and their training certificates (from BICSI or manufacturer). 2. Manufacturer s cutsheet or specifications sheet for the field-test instrument to be used, along with calibration data sheet. 3. Sample Test Report, which shall show that the field-test instrument software and firmware is up-to-date (the most recent version). This sample test report shall also show all required test parameters as required by the referenced standards. B. The following submittals are due a minimum of three weeks prior to substantial completion, in accordance with the submittal requirements in Section 27 00 00 Communications: 1. Complete test measurement results indicating that all cable permanent links have passed. Submit (2) electronic versions on (2) CD/DVD-R or USB Flash Drive (one for the ITS Representative and one for the Design Engineer): a) Microsoft Excel 2007 (Manifest) b) Test measurement results in their native format and the manufacturer s PC software to read test results. C. The following submittals are due Post-Construction, in accordance with the submittal requirements in Section 27 00 00 Communications: 1. On final electronic file submittal (CD/DVD-R or USB Flash Drive), which is to include record drawings, O&M manuals, etc., also include files for all valid test results (as submitted previously). PART 2 - PRODUCTS 2.1 FIELD-TEST INSTRUMENT A. The field-test instrument shall: 1. Be within the calibration period recommended by the manufacturer. 2. Contain the most recent software and firmware provided by the manufacturer prior to testing. 3. Be a Level IV accuracy (Or greater) B. Administration 1. The test measurement result information for each link shall be recorded in the memory of the field-test instrument upon completion of the test. 2. The test result records saved within the field-test instrument shall be transferred into a Windows -based database utility that allows for the maintenance, inspection and archiving of these test records. C. Manufacturer shall be: 1. Agilent 2. Fluke 3. Or Approved Equivalent Optical Fiber Testing and Measurements 27 08 20-2

PART 3 - EXECUTION 3.1 GENERAL A. All outlets, cables, patch panels and associated components shall be fully assembled and labeled prior to field-testing. Any test measurements performed on incomplete systems shall be redone on completion of the work. B. The records for each cable test measurement shall be provided to the owner a minimum of three weeks prior to substantial completion in Excel format (manifest) and the native format to the field-test instrument. The Owner can supply an Excel spreadsheet template (manifest) upon request for the contractor s use. C. The installed twisted-pair links shall be tested from the telecommunications room to the telecommunication wall outlet in the work area for compliance with the Permanent Link performance specification. D. One hundred percent of the installed cabling links shall pass the requirements of the referenced standards. Any failing link shall be diagnosed and corrected. The corrective action shall be noted and followed with a new test measurement to prove that the corrected link meets the performance requirements. The final and passing result of the tests for all links shall be provided in the test measurements results documentation. E. Trained technicians who have successfully attended an appropriate training program and have obtained a certificate as proof thereof shall execute the tests. The test equipment (tester) shall comply with the accuracy requirements for Level IV field-test instruments as defined in ANSI/TIA-1152. The field test instrument, including the appropriate interface adapter, shall meet Level IV accuracy requirements. The accuracy requirements for the permanent link test configuration (baseline accuracy plus adapter contribution) are specified in Table 2 of ANSI/TIA-1152 (Table 2 in this TIA document also specifies the accuracy requirements for the Channel configuration). F. The Pass or Fail condition for the link-under-test is determined by the results of the required individual tests. Any Fail or Fail* result yields a Fail for the link-under-test. In order to achieve an overall Pass condition, the results for each individual test parameter must Pass or Pass*. The * shall not be turned off on the test instrument. G. A Pass or Fail result for each parameter is determined by comparing the measured values with the specified test limits for that parameter. The test result of a parameter shall be marked with an asterisk (*) when the result is closer to the test limit than the accuracy of the field tester. The field-test instrument manufacturer must provide documentation as an aid to interpret results marked with asterisks. To which extent '*' results shall determine approval or disapproval of the element under test shall be defined in the relevant detail specification, or agreed on as a part of a contractual specification. 3.2 PERFORMANCE TEST PARAMETERS A. Test parameters for category 3 Cables: 1. Wire map 2. Length 3. Insertion loss 4. Pair-to-pair near-end crosstalk (NEXT) loss 5. Propagation delay Optical Fiber Testing and Measurements 27 08 20-3

6. Delay skew B. Test parameters for category 5e cables (up to 100MHz) and category 6 cables: 1. Wire Map 2. Length 3. Insertion Loss 4. NEXT loss 5. PSNEXT 6. ACRF 7. PSACRF 8. Return Loss 9. Propagation Delay 10. Delay Skew C. Test parameters for other cables: 1. Continuity to the remote end; 2. Shorts between any two or more conductors; 3. Crossed pairs; 4. Reversed pairs; 5. Split pairs; and, 6. Any other mis-wiring. 3.3 ADMINISTRATION A. Test results documentation 1. Test results saved within the field-test instrument shall be transferred into a Windows -based database utility that allows for the maintenance, inspection and archiving of the test records. These test records shall be uploaded to the PC unaltered, i.e., as saved in the field-test instrument. 2. The test results documentation shall be available for inspection by the Owner or the Owner s representative during the installation period. The contractor shall retain a copy to aid preparation of as-built information. 3. The records for each test shall be provided to the owner a minimum of three weeks prior to substantial completion in Excel format and the native format to the test instrument. The Owner can supply an Excel spreadsheet template upon request for the contractors use. 4. Circuit IDs reported by the field-test instrument shall match the label ID specified by the Owner. 5. The detailed test results documentation data is to be provided in an electronic database for each tested link and shall contain the following information a) The identification of the customer site as specified by the end-user b) The name of the standard selected to execute the stored test results c) The name of the test personnel Optical Fiber Testing and Measurements 27 08 20-4

d) The date and time the test results were saved in the memory of the tester e) The manufacturer, model and serial number of the field-test instrument f) The version of the test software and the version of the test standards database held within the test instrument g) The copper identification number h) The length for each copper cable i) The overall Pass/Fail evaluation of the channel test. END OF SECTION Optical Fiber Testing and Measurements 27 08 20-5