ICTE TLR 5 Investigation Report Flowgate (West Memphis Xmfr 161/500kv ftlo San Souci Shelby 500kv) TLR Level 5: June 20, 2011 Report Issued:

Size: px
Start display at page:

Download "ICTE TLR 5 Investigation Report Flowgate (West Memphis Xmfr 161/500kv ftlo San Souci Shelby 500kv) TLR Level 5: June 20, 2011 Report Issued:"

Transcription

1 ICTE TLR 5 Investigation Report Flowgate (West Memphis Xmfr 161/500kv ftlo San Souci Shelby 500kv) TLR Level 5: June 20, 2011 Report Issued: 1. Description of purpose/cause of hold/curtailment. This report is submitted in accordance with the NERC Transmission Loading Relief Investigation Procedure for the TLR 5 event that occurred on Flowgate on June 20, Flowgate is an Entergy flowgate. The TLR 5 was in effect from 5:28 PM on June 20, 2011 until 8:30 PM on June 23, On June 22, 2011, the Reliability Coordinator had to close out the TLR due to a problem with NNL calculations in IDC and immediately go back into the TLR 5. This occurred at 2:35 AM on June 22, Projected post-contingent flows on the West Memphis Xmfr 161/500kv ftlo San Souci Shelby 500kv line exceeded the SOL. 2. Facility/flowgate limitations and flows at the time the TLR was initiated. At the time the TLR 5a was issued, the Limiting Element was rated at 200 MVA. Flow on the Limiting Element was 74 MVA. Flow on the Contingent Element was 1426 MVA. The LODF was approximately 20%. Post-contingent flow on the Limiting Element was approximately 353 MVA. 3. TLR levels, timing, and relief requested amounts. TLRs levels, timing and relief requested amounts are shown on pages 7 through Transmission and generation outages or changes from prediction that may have contributed. There was an unplanned outage on the Keo-West Memphis 500kv line in the ICTE system associated with this flowgate. There were no abnormal load changes. There was 0 mw of non-firm service impacting the flowgate day of since the RC was in a TLR 5 event. With the Keo-West Memphis 500 kv out of service due to storm damage, it was determined that the loss of the SanSouci-Shelby 500 kv line could cause possible voltage concerns on the underlying 161 kv system in the area. The normal SOL limit on the West Memphis 500/161 kv transformer is 450 MVA. Due to the current topology with the West Memphis-Keo 500 kv line out of service and the risk of voltage concerns with the loss of the SanSouci-Shelby 500 kv line, the SOL was changed to 200 MVA until the West Memphis-Keo 500 kv line was returned to service. With the current configuration if the contingency occurred on the SanSouci-Shelby 500 kv with the West Memphis-Keo 500 kv out of service, the 500/161 kv transformer at West Memphis would flow 161/500. This would cause a burden on the underlying 161 kv system trying to feed and support the 500 kv system to the East. 5. Procedures implemented prior to hold/curtailment. There were not enough non-firm transactions with greater than 5% TDF available for curtailment to alleviate the flowgate. The system was not re-dispatched to prevent curtailment of firm service. The ICT RC verifies with Entergy s Shift Supervisor before a TLR 5 event is called if there are any re-dispatch options available. The Entergy Shift Supervisor to-date has not offered any re-dispatch solutions to prevent a TLR 5 event.

2 6. The initial investigation shall compare all transaction curtailment lists as generated by the IDC with the list of transactions flowing as determined by the IDC (Whole Transaction Lists) both before and after curtailment. The reasons for any transactions that were excluded from curtailment shall be provided. For those transactions not curtailed, the Reliability Authority will identify those entities and any affiliation with said entities. There were no known transactions excluded from curtailment for this TLR. 7. List of known transactions not in the IDC with Transaction Contribution Factors greater than the curtailment threshold and actions taken to curtail such transactions. There were no known transactions not in the IDC. 8. Excerpts from the RA Operations Log containing information relevant to the TLR event. Information was provided to Reliability Coordinators through the IDC and the RCIS. Also the ICTE Reliability Coordinators logged information describing the actions taken at each issuance of the TLR. 9. Flowgate limitations as identified by security analysis processes conducted by the Reliability Authority for the day prior to the TLR event. In the next day process, we did not see an issue with this flowgate, based off of the peak study. 10. State Estimator snapshots and security analysis, including any contingency analysis or stability analysis, along with any other recorded data indicating need for TLR. The ICTE Reliability Coordinator was monitoring their state estimator for potential issues during this time. Screen shots were taken during each issuance of the TLR level ATC limitations before, during, and after the TLR event. (Requested 7/7) ICT Tariff Administration grants transmission service using an AFC process. This process evaluates each transmission request on a case by case basis. There are no ATC values for individual corridors to or from the Entergy system.

3

4

5

6 12. Description of actions taken to avoid future hold/curtailments. This TLR was caused by a combination of a forced line outage, load, and system flows. Due to this situation, no actions were taken to avoid future hold/curtailments. 13. Provide IDC generated Congestion Management Reports showing transaction curtailment list and Control Area NNL (network and native load) curtailment responsibility. Congestion Management Reports for each issuance of the TLR have been reviewed and kept on file. These screen shots are not being provided to reduce the size of this report. 14. Re-dispatch actions taken. Entergy had 1279 MW of NNL, SME had 100 MW of NNL, TVA had 66 MW of NNL, and AECI had 106 MW of NNL in the first event. During the second event AECI had NNL of 199 MW, EDE had 2 MW, EES had 2262 MW, SME had 229 MW, SPA had 1 MW and TVA had 108 MW of NNL. Additional Information: On July 6, 2011, the ICT Reliability Coordinator received formal communication regarding this event which will be posted in the next Independent Coordinator of Transmission (ICT) for Entergy - Quarterly Performance Report.

7

8

9

10

11

12

13 Log Entries

14 Date Time Category 'Detail' Informed by SPP/ICT planning engineers that the SOL limit on FG changed from 450 to 200 due to Wmemphis-Keo outage due to storm damage. EES TOP informed us that of voltage issues ftlo SanSouci-Shelby in the AR area. Upon informing EES SOC supervisor Kelly that ICT RC would be going to a 5A on FG she asked why? We informed her of new SOL limit from 450 to 200 and she disagreed and said that EES's limit was 450 and they were not 06/20/ Other changing it. Issued TLR 5A PC 103%, NNL EES 6.0, SME 0.4, AECI 1.0, TVA 0.3 REF# /20/ TLR - 5a Initial 06/20/ /20/ Other 06/20/ TLR - 5a Reissue 06/20/ /20/ TLR - 5a Reissue 06/20/ /20/ TLR - 5a Reissue 06/20/ /20/ TLR - 5a Reissue 06/20/ /20/ TLR - 5a Reissue 06/20/ /20/ /20/ TLR - 5a Reissue ICT RC called SPP, MISO, TVA, AECI, and SOCO to inform them of the SOL limit of 200 from 450 on FG due to Wmemphis-Keo outage Reissued TLR 5A PC 108%, NNL EES 8.7, SME 0.6, AECI 1.6, TVA 0.5 Reissued TLR 5A PC 160%, NNL EES 29.6, SME 2.0, AECI 5.4, TVA 1.8 Reissued TLR 5A PC 110%, NNL EES 39.6, SME 2.6, AECI 7.2, TVA 2.3 Reissued TLR 5A PC 97%, NNL EES 40.9, SME 2.6, AECI 7.3, TVA 2.4 re-issued tlr 5a PC 98% EES NNL 43, SME 2.6, AECI 7.3 TVA 2.5 re-issued tlr 5a PC 84% EES NNL 31.8, SME 2.2, AECI 5.1

15 06/21/ /21/ TLR - 5a Reissue 06/21/ TLR - 5a Reissue 06/21/ /21/ /21/ TLR - 5a Reissue 06/21/ TLR - 5a Reissue 06/21/ /21/ TLR - 5a Reissue 06/21/ TVA 1.8 re-issued tlr5a pc 65% NNL EES 11.4, SME 0.8, AECI 1.8, TVA 0.6 re-issued tlr5a pc 97% NNL EES 14.6, SME 0.8, AECI 1.7, TVA 0.6 re-issued tlr5a pc 161% NNL EES 32.8, SME 2.3, AECI 4.8, TVA 1.8 re-issue tlr5a pc143% NNL EES 48.3, SME 3.4, AECI 7.2, TVA 2.7 Re-issued TLR 5A PC 65% (flow has flipped and now feeding the 500 from 161) giving back nnl EES 40.9, SME 3, AECI 6.2, TVA /21/ TLR - 5a Reissue re-issue tlr5a pc97% NNL EES 42.3, SME 3.3, AECI 6.8, TVA /21/ /21/ TLR - 5a Reissue reissued TLR 5 PC 108% 06/21/ /21/ Other 06/21/ TLR - 5a Reissue 06/21/ /21/ Transmission Kelly EES SOC supervisor called to inform that Entergy did not agree with the TLR 5 on FG Reissue TLR. PC 92%. NNL: EES 49.3, SME 3.6, AECI 7.5, TVA 3.0 Eddie Walls from SOCO called to confirm that the FG was built correctly. And that the normal configuration on the XMFR is 500 to 161kv. After double checking the FG summary, did find that FG was built correctly in IDC, which is the 161 to 500kv which is reverse

16 flow from normal due to West Memphis to Keo 500kv line out of service due to strom damage. 06/21/ TLR - 5a Reissue 06/21/ /21/ Transmission 06/21/ TLR - 5a Reissue 06/21/ /21/ /21/ TLR - 5a Reissue 06/21/ /21/ TLR - 5a Reissue 06/21/ /21/ TLR - 5a Reissue 06/21/ /21/ TLR - 5a Reissue Reissue TLR. PC 103%. NNL: EES 49.8, SME 3.7, AECI 7.6, TVA 3.1 Kevin from TVA called to confirm that the Xmfr at West Memphis was flowing from the 161kv to 500kv was the issue in the West memphis area. Reissue TLR. PC 104%. NNL: EES 51.6, SME 3.8 Reissue TLR. NNL:EES 74.3, SME5.7 Reissued TLR. NNL: EES 75.7, SME 5.7 Reissued TLR. NNL: EES 68.5, SME 5.1, AECI 11.1, TVA 4.1. Spoke with Kevin from TVA and he told us that they have 1 Dell unit on and it can only go to 13 MW. So they will hold what they have and instead of providing 11.1 NNL they will only provide Also spoke with Eddy from SME and he advised that he can only provide 3.17 NNL instead of the 5.1. Reissue TLR. NNL:EES 69.5, SME 6.8, AECI 4.9, TVA 5.2 Eddie SOCO called to inform their SME NNL 6.8 would only provide 4.83 of that

17 06/21/ TLR - 5a Reissue 06/21/ /21/ TLR - 5a Reissue 06/21/ /21/ TLR - 5a Reissue 06/21/ /21/ TLR - 5a Reissue 06/21/ Reissued TLR 5A PC 49%, NNL EES 46.6, SME 4.2, AECI 3.3, TVA 3.3 Eddie SOCO called to inform that 4.2 NNL will be provided. Reissued TLR 5A PC 77%, NNL EES 35.9, SME 3.2, TVA 2.5 Reissued TLR 5A PC 88%, NNL EES 27.2, SME 2.3, TVA 2.0 Reissued TLR 5A PC 74%, NNL EES 3.8, SME 0.3, TVA /21/ TLR - 5a Reissue Reissued TLR 5A PC 74%, NNL EES 4.3, SME 0.4, TVA /21/ /21/ TLR - 5a Reissue Reissued TLR 5A PC 96% 06/21/ /21/ TLR - 5a Reissue 06/21/ /21/ TLR - 5a Reissue 06/21/ reissued tlr 5A PC 113% NNl EES 26.8, SME 3.3, AECi 0, TVA 2.7 reissued tlr 5A PC 94% NNl EES 45.4, SME 4.1, AECi 0, TVA 0 reissued tlr 5A PC 138% NNL EES 55.9, SME 3.9, AECi 0, TVA /21/ TLR - 5a Reissue 06/21/ /21/ TLR - 5a Reissue 06/21/ /22/ TVA NNL was 0 previous hr but added 2.7 to the 0.9 issued this hr for a total of 3.6. Told TVA to use the 0.9 for this hr. reissued tlr 5A PC 100% NNl EES 54.0, SME 4.0, AECi 0, TVA 3.8

18 06/22/ TLR - 5a Reissue 06/22/ /22/ TLR - 5a Reissue 06/22/ Other 06/22/ /22/ TLR - 5a Reissue 06/22/ TLR - 5a Reissue 06/22/ /22/ TLR - 5a Reissue 06/22/ /22/ /22/ TLR - 5a Reissue 06/22/ TLR - 5a Reissue 06/22/ /22/ TLR - 5a Reissue 06/22/ /22/ TLR - 5a Reissue 06/22/ /22/ TLR - 5a Reissue 06/22/ /22/ /22/ TLR - 5a Reissue reissued tlr 5A PC 139% NNl EES 51.9, SME 3.7, AECi 0, TVA 3.4 reissued tlr 5A PC 104%% NNl EES 50.4, SME 4.7, AECi 0, TVA 3.4 Ended TLR 5A on FG to correct NNL issues. started new TLR for West Memphis AT1 161/500 kv FTLO SanSouci- Shelby 500 kv starting at top of hour PC 111% NNL EES 49.5, SME 4.7, TVA windfarm offline no NNL issued to them re-issued tlr5a pc 104% NNL EES 49.4, SME 4.7 re-issued tlr5a pc 144% NNL EES 36.9, SME 4.1 re-issued tlr5a pc 152% NNL EES 47.3, SME 4.8 Reissue TLR. NNL: EES 47.2, SME 4.6 Reissue TLR. NNL: EES 47.5, SME 5.0 Reissue TLR. NNL: 47.9, SME 5.2 Reissue TLR. NNL: EES 50.8, SME 5.5 Reissue TLR. NNL: EES 49.9, SME 5.9. Also spoke with Kevin from TVA and he said that next hour when we reissue this TLR-5 that we can go ahead and put the Dell 1,2,and 3 units back in.

19 06/22/ TLR - 5a Reissue 06/22/ /22/ TLR - 5a Reissue 06/22/ /22/ TLR - 5a Reissue 06/22/ /22/ TLR - 5a Reissue 06/22/ /22/ Generation 06/22/ TLR - 5a Reissue 06/22/ /22/ TLR - 5a Reissue 06/22/ /22/ TLR - 5a Reissue 06/22/ /22/ TLR - 5a Reissue 06/22/ /22/ TLR - 5a Reissue 06/22/ /22/ TLR - 5a Reissue 06/22/ /22/ TLR - 5a Reissue 06/22/ Reissue TLR. NNL: EES 48.4, SME 5.7 Reissue TLR. NNL: EES 47.8, SME 5.8 Reissue TLR. NNL: EES 46.3, SME 5.8, AECI 7.5 Reissue TLR 5A PC 86%. NNL: EES 29.4, SME 3.8, AECI 4.8 TVA Kevin called to inform that upon reissue of FG 17274, include windfarm generator with associated number G172_G Reissue TLR 5A PC 86%. NNL: EES 29.2, SME 3.6, AECI 4.9, TVA 2.0 Reissue TLR 5A PC 86%. NNL: EES33.0, SME 4.4, AECI 5.5, TVA 2.2 Reissue TLR 5A PC 106%. NNL: EES 45.6, SME 5.3, EDE 1.7, SPA 1.1, AECI 7.2, TVA 2.6 Reissue TLR 5A PC 106%. NNL: EES 47.1, SME 5.3, AECI 8.0, TVA 3.2 Reissue TLR 5A PC 105%. NNL: EES 50.9, SME 5.7, AECI8.5, TVA 3.4 Reissue TLR 5A PC 96%. NNL: EES 59.9, SME 6.7, AECI 10.2, TVA 3.9 Reissue TLR 5A PC 105%. NNL: EES 59.5, SME 6.4, AECI 9.5, TVA 3.8

20 06/22/ TLR - 5a Reissue 06/22/ /22/ /22/ TLR - 5a Reissue 06/22/ /23/ TLR - 5a Reissue 06/23/ /23/ TLR - 5a Reissue 06/23/ /23/ TLR - 5a Reissue 06/23/ /23/ TLR - 5a Reissue 06/23/ /23/ TLR - 5a Reissue 06/23/ /23/ TLR - 5a Reissue 06/23/ /23/ /23/ TLR - 5a Reissue 06/23/ /23/ TLR - 5a Reissue 06/23/ TLR - 5a Reissue re-issue tlr 5a pc 155% EES NNL 58.5, SME 5.9, AECI 8.6 TVA 3.4 tva has taken off dell units, dukehinds coming off at top, looking for additional relief NNL tapped out tlr 5 reissue IDC crash at time of re-issue gave AECI NNL which should be 0 due to units off line EES 56.6, SME 5.6, TVA to maintain due to IDC hickup. No NNL avialbe EES looking to buy jonesboro re-issue tlr 5a PC 145% ees:48 sme:4.1 tva 3.2 NNl at max on IDC re-issue PC 150% NNL EES 47, SME 3.9 TVA 3.1 reissue tlr pc 157% NNL EES 46.2, SME 3.9, TVA 3 PC 170% NNL EES 46.3, SME 3.9 TVA 3.1 PC 170 NNL EES 47.4 SME 4.2 TVA 3.2 afc's 0 out till 10:00 PC 167% NNL 48.6 SME 4.6 TVA 3.5 Reissue TLR. PC 162%. NNL: EES 36.7, SME4.0 Reissue TLR. PC 176%. NNL: EES 40.6, SME 3.5, TVA 2.7 Reissue TLR. PC 168%. NNL: EES 45.1, SME 4.2, TVA 3.5

21 06/23/ /23/ TLR - 5a Reissue 06/23/ /23/ TLR - 5a Reissue 06/23/ /23/ /23/ TLR - 5a Reissue 06/23/ TLR - 5a Reissue 06/23/ /23/ /23/ TLR - 5a Reissue 06/23/ TLR - 5a Reissue 06/23/ /23/ TLR - 5a Reissue 06/23/ /23/ TLR - 5a Reissue 06/23/ /23/ TLR - 5a Reissue 06/23/ /23/ TLR - 5a Reissue 06/23/ Reissue TLR. PC 170%. NNL: EES 58.5, SME 5.0, TVA 3.8 Reissue TLR PC 164%. NNL: EES 59.8, SME 5.2, AECI 9.8, TVA 4.5 Reissue TLR. PC 122%. NNL: EES 66.8, SME 5.5, AECI 10.0, TVA 4.3 Reissue TLR. PC 113%. NNL: EES 66.7, SME 5.8, AECI 10.7, TVA 5.1 Reissue TLR. NNL: EES 66.5, SME 5.7, AECI 10.8, TVA 5.2 Reissue TLR. PC 74%. NNL: EES 69.0, SME 6.1, AECI 11.3, TVA 5.2 IDC gave WSC2 0.1 NNL but SPP RC disregarded it. Reissue TLR. PC 76%. NNL: EES 69.1, SME 5.9, AECI 9.7, TVA 4.1 Reissue TLR. PC 74%. NNL: EES 68.3, SME 6.5, AECI 11.9, TVA 5.2 Reissue TLR. PC 77%. NNL: EES 49.3, SME 5.4 Reissue TLR 5A. PC 89%. NNL: EES 53.1, SME 5.1, AECI 9.1, TVA 3.8

22 06/23/ IDC 06/23/ TLR - 5a Reissue 06/23/ /23/ TLR - 5a Reissue 06/23/ /23/ TLR - 5a Reissue 06/23/ /23/ TLR - 4 Initial 06/23/ IDC gave AECI and TVA an NNL of 0.0 for HE 19. For HE 20 IDC uped their NNL to AECI 9.1 and TVA 3.8 as well as showing previous hour of AECI 11.9 and TVA 5.2. Reissue TLR 5A. PC 93%. NNL: EES 62.0, SME 6.0, AECI 10.2, TVA 4.5 Reissue TLR 5A. PC 93%. NNL: EES 64.8, SME 6.0, AECI 10.7, TVA 4.5 Reissue TLR 5A. PC 93%. NNL: EES 60.5, SME 5.5, AECI 9.9, TVA /23/ TA Notification notified tariff of change in tlr level afc's still set to 0 PC 75%upfdated ref /23/ TA Notification notified tariff afc's reloaded 06/23/ TLR - 0 Ended TLR 4 issued TLR 0 W. Memphis-Keo back in service rating reloaded to 450 per EES EMS team (has updated EMS) Ref

FACILITIES STUDY MID AMERICAN TRANSMISSION SERVICE REQUESTS. OASIS Revision: 4

FACILITIES STUDY MID AMERICAN TRANSMISSION SERVICE REQUESTS. OASIS Revision: 4 TRANSMISSION / DISTRIBUTION PROJECTS COMPANY:EAI CUSTOMER: MID AMERICAN ENERGY. FACILITIES STUDY EJO # F4PPAR0422 MID AMERICAN TRANSMISSION SERVICE REQUESTS OASIS 1468288 Revision: 4 Rev Issue Date Description

More information

MISO Reliability Coordination expansion 6/1/2013

MISO Reliability Coordination expansion 6/1/2013 NERC Resources Subcommittee MISO BA Integration Update April 2013 MISO Reliability Coordination expansion 6/1/2013 # Acronym BA Name CWAY 215 MW NLR 245 MW WMU 95 MW SME 1,601 MW 1 CLEC CLECO 2 SME South

More information

Action: Karl Tammar indicated that Lydia Vollmer and Herb Yan had both left PECO and that replacement participants from PECO should be sought.

Action: Karl Tammar indicated that Lydia Vollmer and Herb Yan had both left PECO and that replacement participants from PECO should be sought. Meeting Attendees: Final Meeting Minutes Lake Erie Security Process Working Group Meeting Thursday-Friday, December 6-7, 2001 Crowne Plaza-Detroit Metro Airport Romulus, Michigan Karl Tammar (Chair) NYISO

More information

MISO Market Participant Cutover Briefing #5: Notable Market Developments. December 19, 2013

MISO Market Participant Cutover Briefing #5: Notable Market Developments. December 19, 2013 MISO Market Participant Cutover Briefing #5: Notable Market Developments December 19, 2013 Market Participant Cutover Briefing #5 Disclaimer The following presentation is for informational purposes only

More information

WESTERN ELECTRICITY COORDINATING COUNCIL. WECC Interchange Tool Overview

WESTERN ELECTRICITY COORDINATING COUNCIL. WECC Interchange Tool Overview INNOVATIVE SOLUTIONS FOR THE DEREGULATED ENERGY INDUSTRY WESTERN ELECTRICITY COORDINATING COUNCIL WECC Interchange Tool Overview Version 2.0 September 2006 Open Access Technology International, Inc. 2300

More information

Notes Generator Verification SDT Project

Notes Generator Verification SDT Project Notes Generator Verification SDT Project 2007-09 FERC Office 888 First Street, NE Washington, DC 20426 1. Administration a. The following were in attendance: Bob Snow, Cynthia Pointer, Lim Hansen, Keith

More information

NERC Reliability Standard PRC-024 Generator Frequency and Voltage Protective Relay Settings

NERC Reliability Standard PRC-024 Generator Frequency and Voltage Protective Relay Settings NERC Reliability Standard PRC-024 024-1 Generator Frequency and Voltage Protective Relay Settings Rick Terrill Luminant Power Generation Compliance NERC Standards Drafting Team Member Reliability Standard

More information

Unofficial Comment Form Project Establish and Communicate System Operating Limits (SOL and SOL Exceedance Definitions)

Unofficial Comment Form Project Establish and Communicate System Operating Limits (SOL and SOL Exceedance Definitions) Unofficial Comment Form Project 2015-09 Establish and Communicate System Operating Limits (SOL and SOL Exceedance Definitions) Do not use this form for submitting comments. Use the electronic form to submit

More information

VAR Generator Operation for Maintaining Network Voltage Schedules

VAR Generator Operation for Maintaining Network Voltage Schedules Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed

More information

This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective.

This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. PRC-026-1 Relay Performance During Stable Power Swings Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the

More information

MISO Market Participant Cutover Briefing #2: Offer Parameter Overview. December 13, 2013

MISO Market Participant Cutover Briefing #2: Offer Parameter Overview. December 13, 2013 MISO Market Participant Cutover Briefing #2: Offer Parameter Overview December 13, 2013 Market Participant Cutover Briefing #2 Agenda Introduction and Schedule (5 minutes) Focus Topic: Offer Parameter

More information

These restrictions, also called Network Constraints, are characterized by:

These restrictions, also called Network Constraints, are characterized by: Subject: Congestion management on the Belgian transmission grid Date: 1 September 2016 Contact: Steven Harlem Phone: 0032 2 500 85 89 Mail: steven.harlem@febeg.be Introduction To guarantee the security,

More information

Real Time Monitoring for SMART Grid Initiatives Synchronized Measurement & Analysis in Real Time SMART program by

Real Time Monitoring for SMART Grid Initiatives Synchronized Measurement & Analysis in Real Time SMART program by Real Time Monitoring for SMART Grid Initiatives Synchronized Measurement & Analysis in Real Time SMART program by Bharat Bhargava Armando Salazar Southern California Edison Co. IEEE PES General Meeting

More information

A. Introduction 1. Title: Automatic Underfrequency Load Shedding Requirements

A. Introduction 1. Title: Automatic Underfrequency Load Shedding Requirements DRAFT 6 V4 Standard PRC-006- RFC-01 01/11/11 A. Introduction 1. Title: Automatic Underfrequency Load Shedding Requirements Deleted: Deleted: 10 Deleted: 20 9 2. Number: PRC 006 RFC 01. Purpose: To establish

More information

FINAL REPORT LOAD SHEDDING IN TASMANIA ON 20 DECEMBER 2016 REVIEWABLE OPERATING INCIDENT REPORT FOR THE NATIONAL ELECTRICITY MARKET

FINAL REPORT LOAD SHEDDING IN TASMANIA ON 20 DECEMBER 2016 REVIEWABLE OPERATING INCIDENT REPORT FOR THE NATIONAL ELECTRICITY MARKET FINAL REPORT LOAD SHEDDING IN TASMANIA ON 20 DECEMBER 2016 REVIEWABLE OPERATING INCIDENT REPORT FOR THE NATIONAL ELECTRICITY MARKET Published: 6 April 2017 IMPORTANT NOTICE Purpose AEMO has prepared this

More information

Reliability Guideline: Generating Unit Operations During Complete Loss of Communications

Reliability Guideline: Generating Unit Operations During Complete Loss of Communications Reliability Guideline: Generating Unit Operations During Complete Loss of Communications Preamble It is in the public interest for the North American Electric Reliability Corporation (NERC) to develop

More information

Standard Development Timeline

Standard Development Timeline Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard is adopted by the NERC Board of Trustees (Board).

More information

Incorrect Temperature Measurements: The Importance of Transmissivity and IR Viewing Windows

Incorrect Temperature Measurements: The Importance of Transmissivity and IR Viewing Windows Incorrect Temperature Measurements: The Importance of Transmissivity and IR Viewing Windows Abstract IR viewing windows save lives. Most Thermographers today are thankful to perform their scans without

More information

Standard IRO Reliability Coordination Responsibilities and Authorities

Standard IRO Reliability Coordination Responsibilities and Authorities A. Introduction 1. Title: Reliability Coordination Responsibilities and Authorities 2. Number: IRO-001-3 3. Purpose: To establish the authority of Reliability Coordinators to direct other entities to prevent

More information

Evaluation of Performance, Reliability, and Risk for High Peak Power RF Sources from S-band through X-band for Advanced Accelerator Applications

Evaluation of Performance, Reliability, and Risk for High Peak Power RF Sources from S-band through X-band for Advanced Accelerator Applications Evaluation of Performance, Reliability, and Risk for High Peak Power RF Sources from S-band through X-band for Advanced Accelerator Applications Michael V. Fazio C. Adolphsen, A. Jensen, C. Pearson, D.

More information

BPA s Network Open Season

BPA s Network Open Season May 2009 Summary Welcome to the Twenty Second National Wind Coordinating Collaborative (NWCC) Transmission Update! Kevin Porter of Exeter Associates, Inc. led the April 21, 2009, Transmission Update conference

More information

Technical Data Sheet White SMD Surface Mount Device

Technical Data Sheet White SMD Surface Mount Device Technical Data Sheet White SMD Surface Mount Device Features Fluorescence Type High Luminous Intensity High Efficiency Emission Color:x=0.29,y=0.30 Descriptions The white LED which was fabricated using

More information

Definitions. Common Corridor:

Definitions. Common Corridor: Definitions Common Corridor: Contiguous right-of-way or two parallel right-of-ways with structure centerline separation less than the longest span length of the two transmission circuits at the point of

More information

Recommended Land Pattern: [mm]

Recommended Land Pattern: [mm] Dimensions: [mm] Recommended Land Pattern: [mm] Absolute Maximum Ratings (Ambient Temperature 25 C): Properties Test conditions Value Unit Power Dissipation (Red) P Diss R 48 mw 2 3 1 4 2,2,5 Cathode Mark

More information

Mitigation of Cascading Outages and Prevention of Blackouts:System-Wide Corrective Control

Mitigation of Cascading Outages and Prevention of Blackouts:System-Wide Corrective Control 10th Mediterranean Conference on Power Generation, Transmission, Distribution and Energy Conversion 6-9 November 2016 Belgrade, Serbia Mitigation of Cascading Outages and Prevention of Blackouts:System-Wide

More information

Recommended Land Pattern: [mm]

Recommended Land Pattern: [mm] Dimensions: [mm] Recommended Land Pattern: [mm] Absolute Maximum Ratings (Ambient Temperature 2 C): Properties Test conditions Value Unit,6 u,1 3 1 2,2 u,1 6 4 2 2,7 u,1,84 u,1 4,2 1,8 1,2 1 2 3 4 6,6

More information

Technical Data Sheet 0805 Package White Chip LED

Technical Data Sheet 0805 Package White Chip LED Technical Data Sheet 0805 Package White Chip LED Features Package in 8mm tape on 7 diameter reel. Compatible with automatic placement equipment. Compatible with infrared and vapor phase reflow solder process.

More information

Alberta Electric System Operator

Alberta Electric System Operator Decision 21038-D01-2016 Downtown Calgary 138-kV Transmission System Reinforcement June 1, 2016 Alberta Utilities Commission Decision 21038-D01-2016 Downtown Calgary 138-kV Transmission System Reinforcement

More information

10/13/2011 Planning Coordination Committee. Standards

10/13/2011 Planning Coordination Committee. Standards Document name Category System Performance Regional Criterion ( ) Regional Reliability Standard (X) Regional Criterion ( ) Policy ( ) Guideline ( ) Report or other Document date 12/01/2011 Adopted/approved

More information

I. History of Time Error Correction and Reduced Reliance On Manual TEC Today

I. History of Time Error Correction and Reduced Reliance On Manual TEC Today Time Error Correction and Reliability White Paper Recommendation of the Balancing Authority Reliability-based Controls 2.2 Standard Drafting Team to Retire BAL-004-0 Time Error Correction The Balancing

More information

Top view LEDs 45-21UMC/XXXXXXX/TR8

Top view LEDs 45-21UMC/XXXXXXX/TR8 Top view LEDs Features Top View White LEDs Lead frame package with individual 2 pins Wide viewing angle Soldering methods: IR reflow soldering Pb-free The product itself will remain within RoHS compliant

More information

Visualization and Human Factors in Electric Power System Operation

Visualization and Human Factors in Electric Power System Operation Visualization and Human Factors in Electric Power System Operation Sushil Kumar Soonee, Devendra Kumar, Samir Chandra Saxena and Sunil Kumar Abstract--Optimal and effective operation of a large power system

More information

OWL micro+ WIRELESS ELECTRICITY MONITOR

OWL micro+ WIRELESS ELECTRICITY MONITOR COS T NOW TARIFF 3A SENDER 30 25 20 15 10 5 0 SETTING UP YOUR OWL Index of pages 2. Setting up date and time 3. Tariff setting 4. To set up a single tariff 5. To set up a two tiered time tariff 6. To set

More information

Technical Data Sheet 0805 Package Chip LED (0.8mm Height)

Technical Data Sheet 0805 Package Chip LED (0.8mm Height) Technical Data Sheet 0805 Package Chip LED (0.8mm Height) Features Package in 8mm tape on 7 diameter reel. Compatible with automatic placement equipment. Compatible with infrared and vapor phase reflow

More information

Toronto Hydro - Electric System

Toronto Hydro - Electric System Toronto Hydro - Electric System FIT Commissioning Requirements and Reports Comments and inquiries can be e-mailed to: FIT@torontohydro.com Customers without e-mail access can submit through regular mail

More information

Q&A OVERVIEW REPORT Q&A OVERVIEW HOLLANDSE KUST (ZUID) Date: 15 December V November 2017 V December 2017

Q&A OVERVIEW REPORT Q&A OVERVIEW HOLLANDSE KUST (ZUID) Date: 15 December V November 2017 V December 2017 Q&A OVERVIEW REPORT Q&A OVERVIEW HOLLANDSE KUST (ZUID) Type: Q&A Overview Date: 15 December 2017 Release version Release date.0 01 November 2017.0 15 December 2017 Disclaimer: the content of this document

More information

EAST16086YA1 SMD B. Applications

EAST16086YA1 SMD B. Applications SMD B Features Package in 8mm tape on 7 diameter reel. Compatible with automatic placement equipment. Compatible with infrared and vapor phase reflow solder process. Mono-color type. Pb-free. The product

More information

Technical Data Sheet 0603 Package Chip LED (0.4mm Height)

Technical Data Sheet 0603 Package Chip LED (0.4mm Height) Technical Data Sheet 0603 Package Chip LED (0.4mm Height) Features Package in 8mm tape on 7 diameter reel. Compatible with automatic placement equipment. Compatible with infrared and vapor phase reflow

More information

0.1. Outage Management Process Summary

0.1. Outage Management Process Summary 0.1 Outage Management Process Summary Issue: 1.0 Issue Date: August 27, 2014 Table of Contents 1. Introduction... 4 1.1 Purpose... 4 1.2 Glossary... 4 State Transition Model... 8 2. Outage Management Processes...

More information

Using Digital Fault Recorders As Phasor Measurement Unit Devices

Using Digital Fault Recorders As Phasor Measurement Unit Devices Using Digital Fault Recorders As Phasor Measurement Unit Devices Notes from Mehta Tech DFR field installations June 2012 NASPI Meeting Jim Kleitsch ATC Harish Mehta, Jim Hackett, and Tony Ranson Mehta

More information

This SOP is applicable to all WMATA personnel working on the Rail System, contractors performing the work and WMATA contractor escorts.

This SOP is applicable to all WMATA personnel working on the Rail System, contractors performing the work and WMATA contractor escorts. RFP: FQ13024/WJG CONTRACT NO. FQ13024 APPENDIX C STANDARD OPERATING PROCEDURES (SOP) SOP #33 REMOVAL AND RESTORATION OF THIRD RAIL POWER FOR WORK BY CONTRACTOR S FORCES MAINLINE, REVENUE SYSTEM PURPOSE

More information

DPS Telecom Your Partners in Network Alarm Management

DPS Telecom Your Partners in Network Alarm Management Subject: How to Setup Analog Sensors on a NetGuardian Platforms: Netguardian 832A, 16S, 216, 216T, and NetDog G2 How are your remote sites doing? Too hot? Too cold? Too humid? Low battery voltage? Low

More information

REDUCING THE RISK OF MAJOR BLACKOUTS THROUGH IMPROVED POWER SYSTEM VISUALIZATION

REDUCING THE RISK OF MAJOR BLACKOUTS THROUGH IMPROVED POWER SYSTEM VISUALIZATION REDUCING THE RISK OF MAJOR BLACKOUTS THROUGH IMPROVED POWER SYSTEM VISUALIZATION Thomas J. Overbye Douglas A. Wiegmann Department of Electrical and Computer Engineering Aviation Human Factors Division

More information

Hornsdale 2 Wind Farm. FCAS Capability Test Plan

Hornsdale 2 Wind Farm. FCAS Capability Test Plan Hornsdale 2 Wind Farm FCAS Capability Test Plan Prepared by Siemens Wind Power Pty Ltd 885 Mountain Highway Bayswater VIC 3153 tristan.raysonhill@siemens.com daniel.gallagher@siemens.com Revision History

More information

emedical Frequently Asked Questions (FAQs) Guide

emedical Frequently Asked Questions (FAQs) Guide emedical Frequently Asked Questions (FAQs) Guide USFS Fire & Aviation Mangement emedical August 2017 Table of Contents 1. Overview...3 2. Purpose...3 3. FAQs...3 3.1 What is emedical?... 3 3.2 How do I

More information

SMD B 23-22B/R7G6C-A30/2T

SMD B 23-22B/R7G6C-A30/2T Features Package in 8mm tape on 7 diameter reel. Compatible with automatic placement equipment. Compatible with infrared and vapor phase reflow solder process. Multi-color type. Pb-free. The product itself

More information

42-21/BHC-AUW/1T SMD B

42-21/BHC-AUW/1T SMD B SMD B Features Package in 8mm tape on 7 diameter reel. Compatible with automatic placement equipment. Compatible with infrared and vapor phase reflow solder process. Mono-color type. Pb-free. The product

More information

19-217/B7C-ZL2N1B3X/3T

19-217/B7C-ZL2N1B3X/3T Features Package in 8mm tape on 7 diameter reel. Compatible with automatic placement equipment. Compatible with infrared and vapor phase reflow solder process. Mono-color type. Pb-free. The product itself

More information

Impact on Providers. Page 1 of 11

Impact on Providers. Page 1 of 11 News Flash - March is National Colorectal Cancer Awareness Month! In conjunction with National Colorectal Cancer Awareness Month, the Centers for Medicare & Medicaid Services (CMS) reminds health care

More information

Simulation of DFIG and FSIG wind farms in. MATLAB SimPowerSystems. Industrial Electrical Engineering and Automation.

Simulation of DFIG and FSIG wind farms in. MATLAB SimPowerSystems. Industrial Electrical Engineering and Automation. CODEN:LUTEDX/(TEIE-7235)/1-007/(2009) Industrial Electrical Engineering and Automation Simulation of DFIG and FSIG wind farms in MATLAB SimPowerSystems Francesco Sulla Division of Industrial Electrical

More information

Phase 2 of System Protection Coordination (Requirement revisions to PRC ) Hydro Québec TransÉnergie

Phase 2 of System Protection Coordination (Requirement revisions to PRC ) Hydro Québec TransÉnergie Project 2007-06.2 Phase 2 of System Protection Coordination (Requirement revisions to PRC-001-1.1) Industry Webinar March 24, 2015 Standard Drafting Team Member Mark Peterson, Chair Michael Cruz Montes,

More information

17-21SYGC/S530-E2/TR8

17-21SYGC/S530-E2/TR8 SMD B Features Package in 8mm tape on 7 diameter reel. Compatible with automatic placement equipment. Compatible with infrared and vapor phase reflow solder process. Mono-color type. Pb-free. The product

More information

New York MX700 Room. PWD-NY5-MX700-P60 List Price: $11, SLA Price: $1,100.00/year (Other options available See Appendix B)

New York MX700 Room. PWD-NY5-MX700-P60 List Price: $11, SLA Price: $1,100.00/year (Other options available See Appendix B) New York MX700 Room PWD-NY5-MX700-P60 List Price: $11,000.00 SLA Price: $1,100.00/year (Other options available See Appendix B) Statement of Work (SoW) Project Summary RoomReady will install the following

More information

Product Specification PE613050

Product Specification PE613050 PE63050 Product Description The PE63050 is an SP4T tuning control switch based on Peregrine s UltraCMOS technology. This highly versatile switch supports a wide variety of tuning circuit topologies with

More information

PQ-Box 100 Quick Start Instructions

PQ-Box 100 Quick Start Instructions PQ-Box 100 Quick Start Instructions These instructions are provided for the purpose on providing a quick start to PQ-Box 100 installation and operation. Please refer to the user handbook for full details.

More information

Intra-Day Trading Cutover Workshop. Belfast 27 th June 2012 Dublin 28 th June 2012

Intra-Day Trading Cutover Workshop. Belfast 27 th June 2012 Dublin 28 th June 2012 Intra-Day Trading Cutover Workshop Belfast 27 th June 2012 Dublin 28 th June 2012 Welcome & Housekeeping Welcome to this workshop in relation to cutover to Intra-Day Trading (IDT) arrangements in the SEM.

More information

SMD B /BHC-YJ2K2TX/3T

SMD B /BHC-YJ2K2TX/3T Features Package in 8mm tape on 7 diameter reel. Compatible with automatic placement equipment. Compatible with infrared and vapor phase reflow solder process. Mono-color type. Pb-free. ESD Protection.

More information

EVERLIGHT ELECTRONICS CO.,LTD.

EVERLIGHT ELECTRONICS CO.,LTD. Technical Data Sheet 1206 Package Chip LED with Inner Lens Features Package in 8mm tape on 7 diameter reel. Compatible with automatic placement equipment. Compatible with infrared and vapor phase reflow

More information

Verizon NY Section 2 Network Services Issue C, December, 2001

Verizon NY Section 2 Network Services Issue C, December, 2001 Verizon NY Section 2 Evaluating Requests 2.01 While inquiries for information will be accepted in any form, requests for licensing agreements regarding Pole Attachments, Conduit Occupancy and/or (private

More information

Frequency Response Initiative Generator Event Survey. NERC Resources Subcommittee North American Generator Forum December 8, 2016

Frequency Response Initiative Generator Event Survey. NERC Resources Subcommittee North American Generator Forum December 8, 2016 Frequency Response Initiative Generator Event Survey NERC Resources Subcommittee North American Generator Forum December 8, 2016 Why Primary Frequency Response Is Important Essential for Reliability of

More information

Preparing for a Transition from an FI/Carrier to a Medicare Administrative Contractor (MAC) Provider Types Affected

Preparing for a Transition from an FI/Carrier to a Medicare Administrative Contractor (MAC) Provider Types Affected News Flash - November is American Diabetes Month ~ The American Diabetes Association has designated American Diabetes Month as a time to communicate the seriousness of diabetes and the importance of proper

More information

BAL Real Power Balancing Control Performance Standard Background Document

BAL Real Power Balancing Control Performance Standard Background Document BAL-001-2 Real Power Balancing Control Performance Standard Background Document February 2013 3353 Peachtree Road NE Suite 600, North Tower Atlanta, GA 30326 404-446-2560 www.nerc.com Table of Contents

More information

LITE-ON TECHNOLOGY CORPORATION

LITE-ON TECHNOLOGY CORPORATION Features * Lead (Pb) free product RoHS compliant. * Low power consumption. * High efficiency. * Versatile mounting on p.c. board or panel. * I.C. compatible/low current requirement. * Popular T-1 diameter.

More information

KPI and SLA regime: November 2016 performance summary

KPI and SLA regime: November 2016 performance summary KPI and SLA regime: November 2016 performance summary OB46 Paper 06a KPI Report Ref Sep 16 Oct 16 Nov 16 Target Description KPI A 100% 100% 100% 99% green 98% amber Service Restoration within 10 working

More information

Chapter 5 Flip-Flops and Related Devices

Chapter 5 Flip-Flops and Related Devices Chapter 5 Flip-Flops and Related Devices Chapter 5 Objectives Selected areas covered in this chapter: Constructing/analyzing operation of latch flip-flops made from NAND or NOR gates. Differences of synchronous/asynchronous

More information

Service and Technical Support PLEASE CONTACT YOUR NEAREST DISTRIBUTOR If unknown then fax: 44 (0)

Service and Technical Support PLEASE CONTACT YOUR NEAREST DISTRIBUTOR If unknown then fax: 44 (0) Electro-Magnetic Compatibility (EMC) This product complies with Council Directive 2004/108/EC when installed and used in accordance with the relevant instructions. Service and Technical Support PLEASE

More information

11-22SURSYGC/S530-A3/TR8

11-22SURSYGC/S530-A3/TR8 Features Package in 8mm tape on 7 diameter reel. Compatible with automatic placement equipment. Compatible with infrared and vapor phase reflow solder process. Mono-color type. Pb-free. The product itself

More information

LED control gear Compact dimming. Uconverter LCAI 2x38 W 0500 K013 one4all ECO series. Ordering data

LED control gear Compact dimming. Uconverter LCAI 2x38 W 0500 K013 one4all ECO series. Ordering data Product description Dimmable built-in for LED Constant current (with 2 adjustable output channels) Designed for outdoor and street luminaire Output power 2 x 38 W Suitable for mains voltage peaks (burst/surge)

More information

OVERSEAS REVENUE. The value of most overseas performances is determined by the local collection society rather than PRS.

OVERSEAS REVENUE. The value of most overseas performances is determined by the local collection society rather than PRS. OVERSEAS REVENUE Key concepts The value of most overseas performances is determined by the local collection society rather than PRS. Where possible, in the vast majority of cases, revenue received from

More information

MANAGING POWER SYSTEM FAULTS. Xianyong Feng, PhD Center for Electromechanics The University of Texas at Austin November 14, 2017

MANAGING POWER SYSTEM FAULTS. Xianyong Feng, PhD Center for Electromechanics The University of Texas at Austin November 14, 2017 MANAGING POWER SYSTEM FAULTS Xianyong Feng, PhD Center for Electromechanics The University of Texas at Austin November 14, 2017 2 Outline 1. Overview 2. Methodology 3. Case Studies 4. Conclusion 3 Power

More information

SMD B 15-22SURSYGC/S530-A2/TR8

SMD B 15-22SURSYGC/S530-A2/TR8 Features Package in 8mm tape on 7 diameter reel. Compatible with automatic placement equipment. Compatible with infrared and vapor phase reflow solder process. Mono-color type. Pb-free. The product itself

More information

ECAL LED system update. A. Celentano

ECAL LED system update. A. Celentano ECAL LED system update A. Celentano 1 ECAL LMS overview (x 4) Design: individual bi-color LEDs mounted in front of each PbWO4 crystal. Main controllers (2 x) Driver Boards (8 x) Connection boards (4 x)

More information

Features Description Applications

Features Description Applications Features Package in 8mm tape on 7 diameter reel. Compatible with automatic placement equipment. Compatible with infrared and vapor phase reflow solder process. Mono-color type. Pb-free. The product itself

More information

Emergency lighting units EM powerled

Emergency lighting units EM powerled E 15 W CE CPS ED Driver for AC and DC power supplies Product description ED Driver for mains operation with integrated Simple CORRIDOR FUCTIO (CF) For use in central battery systems For luminaire installation

More information

16-213SDRC/S530-A3/TR8

16-213SDRC/S530-A3/TR8 Features Package in 8mm tape on 7 diameter reel. Compatible with automatic placement equipment. Compatible with infrared and vapor phase reflow solder process. Mono-color type. Pb-free. The product itself

More information

TRNSMT Festival Glasgow Green, Scotland. 29 th June 1 st July th July 8th July 2018

TRNSMT Festival Glasgow Green, Scotland. 29 th June 1 st July th July 8th July 2018 Glasgow Green, Scotland 29 th June 1 st July 2018 6th July 8th July 2018 Introduction TRNSMT Festival is this year being designated as a Major Event for the first time, where careful control of frequency

More information

EVERLIGHT ELECTRONICS CO.,LTD.

EVERLIGHT ELECTRONICS CO.,LTD. Technical Data Sheet EVERLIGHT ELECTRONICS CO.,LTD. Chip LEDs with Bi-Color (Multi-Color) Features Package in 8mm tape on 7 diameter reel. Compatible with automatic placement equipment. Compatible with

More information

BAL Real Power Balancing Control Performance Standard Background Document

BAL Real Power Balancing Control Performance Standard Background Document BAL-001-2 Real Power Balancing Control Performance Standard Background Document July 2013 3353 Peachtree Road NE Suite 600, North Tower Atlanta, GA 30326 404-446-2560 www.nerc.com Table of Contents Table

More information

emedical How-to Guide for Health Screening Questionnaire (HSQ) Coordinators

emedical How-to Guide for Health Screening Questionnaire (HSQ) Coordinators emedical How-to for Health Screening Questionnaire (HSQ) Coordinators Forest Service (FS) Fire and Aviation Management (FAM) emedical Last Updated: August, 2017 Table of Contents emedical HSQ Coordinator

More information

BER MEASUREMENT IN THE NOISY CHANNEL

BER MEASUREMENT IN THE NOISY CHANNEL BER MEASUREMENT IN THE NOISY CHANNEL PREPARATION... 2 overview... 2 the basic system... 3 a more detailed description... 4 theoretical predictions... 5 EXPERIMENT... 6 the ERROR COUNTING UTILITIES module...

More information

Jemena Electricity Networks (Vic) Ltd

Jemena Electricity Networks (Vic) Ltd Jemena Electricity Networks (Vic) Ltd Footscray West Zone Substation (FW) Switchgear and Relay Condition Risk RIT-D Stage 1: Non-Network Options Screening Report Public 18 September 2018 An appropriate

More information

1.0X0.5X0.2mm (0402)SMD CHIP LED LAMP. Features. Descriptions. Package Dimensions

1.0X0.5X0.2mm (0402)SMD CHIP LED LAMP. Features. Descriptions. Package Dimensions 1.0X0.5X0.2mm (0402)SMD CHIP LED LAMP ATTENTION OBSERVE PRECAUTIONS FOR HANDLING ELECTROSTATIC DISCHARGE SENSITIVE DEVICES Part Number: APG1005RWF-T-5MAV White Features 1.0mmX0.5mm SMD LED, 0.2mm thickness.

More information

Maschinenfabrik Reinhausen Germany Power Quality

Maschinenfabrik Reinhausen Germany Power Quality Maschinenfabrik Reinhausen Germany Power Quality Power Quality and Reliability Dr.-Ing. Mike Ifland / MR PQ Germany Israel/ Dec. 4 st 2014 Page 1 of 23 Agenda I MR Introduction I MR PQ Fields of activity

More information

SURFACE MOUNT DISPLAY. Descriptions. Features. Package Dimensions& Internal Circuit Diagram

SURFACE MOUNT DISPLAY. Descriptions. Features. Package Dimensions& Internal Circuit Diagram SURFACE MOUNT DISPLAY ATTENTION OBSERVE PRECAUTIONS FOR HANDLING ELECTROSTATIC DISCHARGE SENSITIVE DEVICES Part Number: ACSC56-41QWA/D-F01 White Features 0.56 inch digit height. Low current operation.

More information

Frequency Response and Standard background Overview of BAL-003-1

Frequency Response and Standard background Overview of BAL-003-1 Industry Webinar BAL-003-1 Draft Frequency Response Standard and Supporting Process July 18, 2011 Agenda Frequency Response and Standard background Overview of BAL-003-1 What s changing Field Trial Frequency

More information

LED Driver Linear / area fixed output

LED Driver Linear / area fixed output Driver LC 10W 350mA fixc lp SNC2 ESSENCE series Product description Fixed output built-in LED Driver Constant current LED Driver Output current 350 ma Max. output power 10.2 W Up to 80 % efficiency For

More information

ELIGIBLE INTERMITTENT RESOURCES PROTOCOL

ELIGIBLE INTERMITTENT RESOURCES PROTOCOL FIRST REPLACEMENT VOLUME NO. I Original Sheet No. 848 ELIGIBLE INTERMITTENT RESOURCES PROTOCOL FIRST REPLACEMENT VOLUME NO. I Original Sheet No. 850 ELIGIBLE INTERMITTENT RESOURCES PROTOCOL Table of Contents

More information

POWER OF CHOICE IMPLEMENTATION PROGRAM INDUSTRY TRANSITION AND CUTOVER PLAN (VERSION 1.5)

POWER OF CHOICE IMPLEMENTATION PROGRAM INDUSTRY TRANSITION AND CUTOVER PLAN (VERSION 1.5) POWER OF CHOICE IMPLEMENTATION PROGRAM INDUSTRY TRANSITION AND CUTOVER PLAN (VERSION 1.5) Published: 24 November 2017 VERSION RELEASE HISTORY Version Date Summary of Changes 0.1 31 August 2017 First draft

More information

Energy Upgrade Options for the LCLS-I Linac

Energy Upgrade Options for the LCLS-I Linac Energy Upgrade Options for the LCLS-I Linac LCLS-II TN-14-10 11/12/2014 John Sheppard, F.J. Decker, R. Iverson, H.D. Nuhn, M. Sullivan, J. Turner November 18, 2014 LCLSII-TN-14-07 LCLS 1 Linac Energy Increase

More information

Shift Tool: Adding a Recurring Shift or Event

Shift Tool: Adding a Recurring Shift or Event Shift Tool: Adding a Recurring Shift or Event Relevant To: Volunteer Administrators Core Concepts Why would I need to add a recurring shift or event? Once you have created a shift tool, you create shifts

More information

ECE 2274 Pre-Lab for Experiment Timer Chip

ECE 2274 Pre-Lab for Experiment Timer Chip ECE 2274 Pre-Lab for Experiment 6 555 Timer Chip Introduction to the 555 Timer The 555 IC is a popular chip for acting as multivibrators. Go to the web to obtain a data sheet to be turn-in with the pre-lab.

More information

SMD B /R6C-AP1Q2B/3T

SMD B /R6C-AP1Q2B/3T Features Package in 8mm tape on 7 diameter reel. Compatible with automatic placement equipment. Compatible with infrared and vapor phase reflow solder process. Mono-color type. Pb-free. The product itself

More information

PRINCIPLES AND APPLICATIONS

PRINCIPLES AND APPLICATIONS GENERATION & NETWORK Digital Automation Measuring and Control Devices AMS7000 PROCOM The optimum operation of an electrical network depends particularly on the reliability and the availability of the protection,

More information

PRODUCT SPECIFICATION Date: VESTEL

PRODUCT SPECIFICATION Date: VESTEL PRODUCT SPECIFICATION Date: 04.01.2017 VESTEL ST65S02 65 SOC BASED 16/7 Full HD DIGITAL SIGNAGE DISPLAY 1 SPECIFICATIONS ST65S02 Panel Mainboard Model System-On-Chip Model: 17MB120DS H-Freq 67.5 Khz Max.

More information

Luckylight Package Warm White Chip LED. Technical Data Sheet. Part No.: S150W-W6-1E

Luckylight Package Warm White Chip LED. Technical Data Sheet. Part No.: S150W-W6-1E 126 Package Warm White Chip LED Technical Data Sheet Part No.: S15W-W6-1E Spec No.: S15 Rev No.: V.3 Date: Jul./1/26 Page: 1 OF 11 Features: Package in 8mm tape on 7 diameter reel. Compatible with automatic

More information

CSE 352 Laboratory Assignment 3

CSE 352 Laboratory Assignment 3 CSE 352 Laboratory Assignment 3 Introduction to Registers The objective of this lab is to introduce you to edge-trigged D-type flip-flops as well as linear feedback shift registers. Chapter 3 of the Harris&Harris

More information

Ecomind Electricity Monitor Kit EM422EM-E-KBTS EM422EM-E-KMTS. Installation Instructions

Ecomind Electricity Monitor Kit EM422EM-E-KBTS EM422EM-E-KMTS. Installation Instructions Ecomind Electricity Monitor Kit EM422EM-E-KBTS EM422EM-E-KMTS Installation Instructions Contents 1.0 Introduction...3 2.0 Safety...3 3.0 In the box...4 4.0 Installation of sensors...5 5.0 Linking transmitter

More information

Audit of Time Warner Communications Cable Franchise Fees

Audit of Time Warner Communications Cable Franchise Fees Audit of Time Warner Communications Cable Franchise Fees Report by the Office of County Comptroller Martha O. Haynie, CPA County Comptroller County Audit Division J. Carl Smith, CPA Director Christopher

More information

Luckylight. 1.10mm Height 0805 Package. Warm White Chip LED. Technical Data Sheet. Part No.: S170W-W6-1E

Luckylight. 1.10mm Height 0805 Package. Warm White Chip LED. Technical Data Sheet. Part No.: S170W-W6-1E 1.1mm Height 85 Package Warm White Chip LED Technical Data Sheet Part No.: S17W-W6-1E Spec No.: S17 Rev No.: V.3 Date: Jul./1/26 Page: 1 OF 11 Features: Luckylight Package in 8mm tape on 7 diameter reel.

More information

16 th Annual PQSynergy International Conference and Exhibition 2016

16 th Annual PQSynergy International Conference and Exhibition 2016 16 th Annual PQSynergy International Conference and Exhibition 2016 Er. Muhammad Najmi Bin Bohari MSc(Power Eng), B.Eng (EEE) P.Eng, MIES, M-CIGRE najmi@powerquality.sg Professional Engineer (Singapore).

More information