MISO Reliability Coordination expansion 6/1/2013

Size: px
Start display at page:

Download "MISO Reliability Coordination expansion 6/1/2013"

Transcription

1 NERC Resources Subcommittee MISO BA Integration Update April 2013 MISO Reliability Coordination expansion 6/1/2013 # Acronym BA Name CWAY 215 MW NLR 245 MW WMU 95 MW SME 1,601 MW 1 CLEC CLECO 2 SME South Mississippi Electric Power Association 3 LAGN Louisiana Generating, LLC 4 LAFA Lafayette Utilities System 5 LEPA Louisiana Energy and Power Authority 6 WMU City of West Memphis, AR 7 CWAY City of Conway, AR 8 NLR Cityof North Little Rock, AR CLEC 2,209 MW LEPA 231 MW LAGN 2,247 MW LAFA 495 MW 2 1

2 MISO Balancing Authority Expansion 12/19/2013 # Acronym BA Name 2 9 BA s expected to dissolve on 12/19/2013 BRAZ 87 MW CWAY 215 MW NLR 245 MW PLUM MW PUPP 1 2,267 MW CLEC LEPA 231 MW BUBA 80 MW DERS 69 MW 2,209 MW WMU 95 MW OMLP 38 MW EES (incl. EAI) 23,211 MW BBA MW SME 1,601 MW LAGN 2,247 MW LAFA 495 MW EES Entergy (Louisiana, Texas, Mississippi, New Orleans, Arkansas*) 1 * Entergy also committed to Arkansas Commission to split off Entergy Arkansas into a separate LBA (EAI) 2 CLEC CLECO 3 SME South Mississippi Electric Power Association 4 LAGN Louisiana Generating, LLC 5 LAFA Lafayette Utilities System 6 LEPA Louisiana Energy and Power Authority 7 BRAZ Brazos Electric Cooperative 8 DERS City of Ruston, LA 9 OMLP Cityof Osceola, AR 10 PUPP Union Power Partners, L.P. 11 PLUM Plum Point Energy Associates, LLC 12 WMU City of West Memphis, AR 13 BUBA City of Benton, AR 14 CWAY City of Conway, AR 15 NLR City of North Little Rock, AR 16 BBA Batesville Generation merging into SME 6/1/13. 1 Generaton only Balancing Authorities. 2 Several BAs plan to dissolve BAs and integrate 12/19/ BA Area Interfaces- Existing OKGE EDE AECI MISO PLUM CWAY OMLP TVA CSWS SPA NLR PUPP WMU BUBA BBA EES DERS SME ERCO SOCO CLEC BRAZ LEPA LAFA LAGN AEC 4 2

3 MISO Balancing Authority (BA) / Local Balancing Authorities Areas 12/19/2013 # Acronym LBA Name MISO BA EAI EES SME EES Entergy (Louisiana, Texas, Mississippi, New Orleans, Arkansas*) 1 * Entergy also committed to Arkansas Commission to split off Entergy Arkansas into a separate LBA (EAI) 2 EAI Entergy Arkansas 3 CLEC CLECO 4 SME South Mississippi Electric Power Association 5 LAGN Louisiana Generating, LLC 6 LAFA Lafayette Utilities System 7 LEPA Louisiana Energy and Power Authority CLEC LAGN LEPA LAFA 5 RC and BA Integration Schedule # Acrony m BA Name RC BA/Market 1 EES Entergy (Louisiana, Texas, Mississippi, New Orleans, Arkansas*) * Entergy also committed to Arkansas Commission to split off Entergy Arkansas into a separate LBA Area (EAI) MISO 12/1/2012 MISO 12/19/ CLEC CLECO MISO 6/1/2013 MISO 12/19/ SME South Mississippi Electric Power Association MISO 6/1/2013 MISO 12/19/ LAGN Louisiana Generating, LLC MISO 6/1/2013 MISO 12/19/ LAFA Lafayette Utilities System MISO 6/1/2013 MISO 12/19/ LEPA Louisiana Energy and Power Authority MISO 6/1/2013 MISO 12/19/ BRAZ Brazos Electric Cooperative SPP until dissolving BA dissolving 12/19/ DERS City of Ruston, LA SPP until dissolving BA dissolving 12/19/ OMLP Cityof Osceola, AR SPP until dissolving BA dissolving 12/19/ PUPP Union Power Partners, L.P. SPP until dissolving BA dissolving 12/19/ PLUM Plum Point Energy Associates, LLC SPP until dissolving BA dissolving 12/19/ WMU City of West Memphis, AR MISO 6/1/2013 BA dissolving 12/19/ BUBA City of Benton, AR SPP until dissolving BA dissolving 12/19/ CWAY City of Conway, AR MISO 6/1/2013 BA dissolving 12/19/ NLR City of North Little Rock, AR MISO 6/1/2013 BA dissolving 12/19/ BBA Batesville Generation BA dissolving into SME 6/1/

4 Summary MISO is merging a number of BA Areas into its BA Area. Several BAs are dissolving. Certification Team will verify MISO will have necessary tools, procedures, and training to perform RC and BA functions for the expanded footprint. There will be separate certifications for the RC footprint expansion and the BA Area expansion. Working with Certification Team on NERC s Housekeeping Tasks for New, Reconfigured or Retiring Balancing Authorities that need to be done if there is a change in Balancing Authority footprints or names. Coordinated Functional Registration (CFR ID#: *JRO00001) details division of responsibilities detween MISO BA and Local BAs- No gaps in coverage will be updated to reflect new Local BAs 7 4

5 Wind Generators Providing Primary and Secondary Control Resources Subcommittee April 24 and 25, 2013 Sydney Niemeyer Wind Generators and Primary Frequency Response 6465 MW of Wind Generation capacity has Primary Frequency Response active. Present maximum dead band of +/ Hz. Reduces to +/ Hz under BAL 001 TRE 1. Droop at 5% of Real Time Pmax based on available wind. Approximately 200 MW/0.1 Hz from fleet when full wind is available. No requirement to hold spinning reserve MW of Wind Generation capacity has been granted a PFR requirement waiver MW of Wind Generation capacity has unknown PFR status. 1

6 Wind Generator Primary Frequency Response Challenges Load Reference while operating at maximum output and responding to high frequency. Once grid frequency exceeds the governor dead band on the high side what load reference can be used to determine how many MW of response is appropriate? Calculate a pseudo Load Reference using Production Potential calculation that is smoothed over a short time period. While not operating at maximum output the Load Reference will be similar to traditional generators. Wind Resources and Primary Frequency Response EVIDENCE OF PERFORMANCE 2

7 Response to a High Frequency Period ERCOT TOTAL WIND GENERATION Friday, April 12, 2013 Unit:Wind Fleet Initial P.U. Performance Sustained P.U. Performance Frequency Hz MW Evaluation based on 6465 MW of Wind Farm capacity available that has Primary Frequency Response :58:22 7:58:32 7:58:42 7:58:52 7:59:02 7:59:12 7:59:22 7:59:32 7:59:42 7:59:52 8:00:02 8:00:12 8:00:22 Hz Average Frequency MW Average MW "EPFR" ESPFR(Final@T(+46)) 3

8 Friday, April 12, 2013 Unit:Wind Fleet 7:59:22 Time of t(0) 7:59:28 Model Period Ending Time Primary Frequency Response provided during sudden increase in grid frequency Frequency Hz MW Wind Fleet ramping down due to loss of wind. Dropping about 30 MW/min on average :58:227:59:228:00:228:01:228:02:228:03:228:04:228:05:228:06:228:07:228:08:228:09:228:10:228:11:228:12:228:13:228:14:22 Hz Unit:Wind Fleet MW Model Period Target MW Model Period Ramp MW /29/2013 Frequency high during early morning off peak to on peak transition. Total Wind Generation Primary Frequency Response provided during gradual increase in grid frequency. Output of fleet dropped about 175 MW during the high frequency. Output returned to normal as frequency returned to schedule :43:00 5:45:05 5:47:10 5:49:15 5:51:20 5:53:25 5:55:30 5:57:35 5:59:40 6:01:45 6:03:50 6:05:55 6:08:00 Hz Wind Generation 4

9 /30/2013 Total Wind Generation Provided similar Primary Frequency Response during the next day s high frequency period :48:00 5:50:05 5:52:10 5:54:15 5:56:20 5:58:25 6:00:30 6:02:35 6:04:40 6:06:45 6:08:50 6:10:55 6:13:00 Hz Wind Generation Low Frequency Event while the Wind Farm is curtailed to zero MW output due to transmission congestion. WIND FARM DELIVERY OF PRIMARY FREQUENCY RESPONSE 5

10 At all times the generator is Released for Dispatch ERCOT PROTOCOLS REQUIRE GOVERNORS TO BE IN SERVICE Friday, December 14, Unit: Wind Farm 5% +/ Hz dead band Initial P.U. Performance Sustained P.U. Performance Frequency Hz Wind Farm curtailed to zero MW output with 111 MW of wind available. Governor in service and free to respond to all frequency deviations outside dead band MW :12:10 16:12:20 16:12:30 16:12:40 16:12:50 16:13:00 16:13:10 16:13:20 16:13:30 16:13:40 16:13:50 16:14:00 16:14:10 Hz Average Frequency MW Average MW "EPFR" ESPFR(Final@T(+46)) 6

11 Friday, December 14, 2012 Unit: Wind Farm 5% +/ Hz dead band 16:13:10 Time of t(0) 16:16:56 Model Period Ending Time Frequency Hz As grid frequency returned to 60 Hz the governor provided proportional Primary Frequency Control. Frequency returned to normal in 3.5 minutes MW Hz Unit: Langford MW Model Period Target MW Model Period Ramp MW WIND FARM AND SECONDARY CONTROL 7

12 17-FEB-13 00:15:00 UDBP Output ROC MW Wind Farm MW/min avg Frequency Hz MW Wind Farm receives a curtailment from the ISO. 5 minute Economic Base Point steps down. AGC of Wind Farm follows 4 second ramped base point Cyan :15:00 0:20:00 0:25:00 0:30:00 0:35:00 0:40:00 0:45:00 0:50:00 0:55:00 1:00:00 1:05:00 1:10:00 1:15:00 Frequency BP UDBP Target MW 17-FEB-13 00:15:00 UDBP Output ROC MW Wind Farm Cyan is the target, Magenta is the MW output of the wind farm. Target ramps for four minutes to the next 5 minute Economic Base Point. The target includes expected Primary Frequency Response MW/min avg Control Error - MW MW Average Control Error - 5 minute. Limit is 10 MW over-production. The Control Error is the difference between the Target and the Actual MW output :15:00 0:20:00 0:25:00 0:30:00 0:35:00 0:40:00 0:45:00 0:50:00 0:55:00 1:00:00 1:05:00 1:10:00 1:15:00 Langford Control Error BP UDBP Target MW 8

13 Questions? 9

14 Primary and Secondary Control Interaction Resources Subcommittee April 24 & 25, 2013 Sydney Niemeyer Primary and Secondary Control Interaction Concern that if a resource is providing Primary Frequency Control it could impact the BA s As performance and recovery during a DCS or BAAL event. Valid concern when ACE Bias setting does not match actual Primary Frequency Response of the BA. BAL allows for a gradual reduction of the overbias of the Interconnections and also allows for the use of a Variable Bias Setting. Bias setting in the ACE equation that closely matches actual Primary Frequency Response minimizes interaction of Control. 1

15 Droop Implementation Correct implementation of the droop function at the resource. Proportional control to frequency change that is bidirectional. Reducing governor dead bands will reduce frequency movement of the Interconnection. This will reduce resource movement due to Primary Frequency Control. Elimination i of step t response of the governor at the dead band. Incorrect implementation of droop at the resource will impact Secondary Control and DCS and BAAL performance. Governor Droop Governor droop implementation. Slope = MW PMAX /(3.0 Hz Governor Dead Band Hz) For 5% droop Result is MW/Hz change of generator output. Slope = MW PMAX /(2.4 Hz Governor Dead Band Hz) For 4% droop Result is MW/Hz change of generator output. 2

16 For Frequency below 60 Hz and below governor dead band MW Pr imarycontrol Primary Frequency Control HZ actual 60 DB *( Re )*( 1) 60* Frequency sponsivecapacity Droop DB Droop expressed as 0.05 for 5% droop. Dead band in Hz. Generator Output MW = Load Set point MW + MW Pi PrimaryControl Where Load Set point is the Economic Dispatch Base Point or Plant Load Reference and may include any Regulation Ancillary Service. For Frequency Above 60 Hz and Above Governor Dead band MW Pr imarycontr ol Primary Frequency Control HZ 60 actual DB *( Re )*( 1) 60* Frequency sponsivecapacity Droop DB Droop expressed as 0.05 for 5% droop. Dead band in Hz. Generator Output MW = Load Set point MW + MW PrimaryControl Where Load Set point is the Economic Dispatch Base Point or Plant Load Reference and may include any Regulation Ancillary Service. 3

17 750 MW Steam 5% Droop with Mechanical Governor Primary Control Frequency Secondary Control MW :10:00 0:15:00 0:20:00 0:25:00 0:30:00 0:35:00 0:40:00 0:45:00 0:50:00 0:55:00 1:00:00 1:05:00 1:10:00 Frequency Actual MW Perfect Target Minimum Target 750 MW Steam 5% Droop with Mechanical Governor Primary Control Frequency MW Secondary Control :25:00 0:26:00 0:27:00 0:28:00 0:29:00 0:30:00 0:31:00 0:32:00 0:33:00 0:34:00 0:35:00 0:36:00 0:37:00 0:38:00 0:39:00 0:40:00 Frequency Actual MW Perfect Target Minimum Target 4

18 Consortium for Electric Reliability Technology Solutions NERC Applications Status NERC Applications Status for Resources Subcommittee Gil Tam San Diego, CA April 24-25, 2013 Agenda NERC Application Status Summary Implemented 2013 CPS 2 Bounds Report values in all NERC applications 2012 ARR Yearly Report Highlights Review Draft WECC Interconnection Frequency Performance Report for Year 2012 per RS Request at Last Meeting. Apr 2013 Page 1 1

19 NERC Applications Status Summary Application Resource Adequacy (ACE Frequency) Inadvertent Area Interchange Error (AIE) NERC Applications Status and Authorized Users (Many companies have several authorized users) Release 7.0 Current Production version 171 authorized users. Release 3.5 Current Production version 281 authorizedusers users Completion of new website design to resolve existing application interface with Window 7 is ongoing. Release 1.0 Current production version 122 authorized users Intelligent Alarms Frequency Monitoring and Analysis (FMA) Automated Reliability Reports (ARR) Release 1.0 Current production version 140 authorized users Release 2.5 Current production version 121 authorized users Release 1.0 Current production version 64 authorized users Monthly reports through March 2013, Seasonal reports through Winter 2013 and 2012 Yearly Report have been posted in ARR website. Apr 2013 Page 2 Interconnections Annual Reliability Report ARR 2012 Report Highlights: Number of hours during which Interconnections Epsilon Variability Exceeded Statistical Process Control (SPC) Criteria increased from year 2011 for the EI and WI, and decreased dfor ERCOT Eastern, increased from 4 to 5 ERCOT, decreased from 7 to 1 Western, increased from 3 to 6 Interconnections CPS1 and CPS2 Trend: All three Interconnections operated above CPS1 threshold Eastern and Western operated below CPS2 threshold; ERCOT operated above CPS2 threshold (ERCOT is exempted from CPS2) Graph for 6 years attached Number of Events when Frequency > FTL Low/High Limits: FTL Low limit All three interconnections decreased from 2011 FTL High limit All three interconnections decreased from 2011 Apr 2013 Page 3 2

20 Interconnections CPS1 6 Year Trend Apr 2013 Page 4 Interconnections CPS2 6 Year Trend Apr 2013 Page 5 3

21 Interconnections Frequency Response Trend These Frequency Response values are calculated using 1-second frequency data collected under the BAL field trial process and the reported actual MW loss data. Frequency Response values are calculated by the equation: Fr = MWLoss/10(FreqB - FreqA) Apr 2013 Page 6 WECC Frequency Control & Time Error Correction Report DRAFT Prepared By: Electric PowerGroup For: RESOURCES SUBCOMMITTEE MARCH

22 5

23 6

24 7

25 8

26 9

27 10

28 11

29 12

30 13

31 14

32 THANK YOU. Gil Tam 201 South Lake Avenue, Ste 400 Pasadena, CA Apr 2013 Page 28 15

33 ERCOT Frequency Control & Time Error Correction Report Resources Subcommittee Meeting San Diego, California April 25, 2013 ERCOT Time Error Corrections 2013 Time Corrections Total Hours on Avg Hours Avg Corrections % Time on Year Month Days Fast Slow Count Control Per Correction Per Day Correction 2013 Jan % Feb % Mar % November 1, 2012 ERCOT changed the maximum allowed Time Error to 30 seconds before initiating a TEC. When executing a Time Correction they stopped when a total of 3 seconds were corrected. It took almost 30 days to reach the first TEC. Then in December the corrections occurred at the normal interval. 1

34 November 1, 2012 ERCOT performs TEC at +/ 30 seconds. Jan 8, 2013 ERCOT Load Frequency Control Tuning adjusted. Monthly Hours on Time Correction Total Hours on Correction Hours on Control 2

35 Monthly Time Correction Summary Number of Corrections Slow Fast Frequency Profile, CPS1 & 2, Daily RMS1 & ERCOT Total Energy and Wind Generation. ERCOT FREQUENCY CONTROL PERFORMANCE 3

36 50000 ERCOT Frequency Profile Comparison January through December of each Year One Minute Occurances ERCOT Frequency Control Tuning Adjustments to LFC tuning are scheduled for later in the month of April. ERCOT modification to Generation to be Dispatched to include a portion of average Regulation deployed. Minor LFC tuning changes included. Goal to correct the Up Regulation service deployment bias. Frequency profile skew is above Hz Consistent slow time error corrections. Correctly price energy by minimizing dependence on Regulation. 4

37 170 ERCOT CPS1 12 Month rolling average CPS1 = CPS1 Average e Jan-06 Nov-05 Sep-05 Jul-05 May-05 Mar-05 Jan-05 Nov-04 Sep-04 Jul-04 May-04 Mar-04 Jan-04 Nov-03 Sep-03 Jul-03 May-03 Nov-09 Sep-09 Jul-09 May-09 Mar-09 Jan-09 Nov-08 Sep-08 Jul-08 May-08 Mar-08 Jan-08 Nov-07 Sep-07 Jul-07 May-07 Mar-07 Jan-07 Nov-06 Sep-06 Jul-06 May-06 Mar-06 Mar-13 Jan-13 Nov-12 Sep-12 Jul-12 May-12 Mar-12 Jan-12 Nov-11 Sep-11 Jul-11 May-11 Mar-11 Jan-11 Nov-10 Sep-10 Jul-10 May-10 Mar-10 Jan Monthly Average 12 Month Rolling Average 100 ERCOT CPS2 Score* *ERCOT as a single control area is exempt from CPS2. These scores are For Information Only CPS Jan-09 Oct-08 Jul-08 Apr-08 Jan-08 Oct-07 Jul-07 Apr-07 Jan-07 Oct-06 Jul-06 Apr-06 Jan-06 Oct-05 Jul-05 Apr-10 Jan-10 Oct-09 Jul-09 Apr-09 Jan-13 Oct-12 Jul-12 Apr-12 Jan-12 Oct-11 Jul-11 Apr-11 Jan-11 Oct-10 Jul-10 Month CPS2 5

38 Daily RMS1 of ERCOT Frequency /1/2000 7/1/2000 1/1/2001 7/1/2001 1/1/2002 7/1/2002 1/1/2003 7/1/2003 1/1/2004 7/1/2004 1/1/2005 7/1/2005 1/1/2006 7/1/2006 1/1/2007 7/1/2007 1/1/2008 7/1/2008 1/1/2009 7/1/2009 Daily RMS1 of ERCOT Frequency 1/1/2010 7/1/2010 1/1/2011 7/1/2011 1/1/2012 7/1/2012 1/1/ /1/2004 4/1/2004 7/1/ /1/2004 1/1/2005 4/1/2005 7/1/ /1/2005 1/1/2006 4/1/2006 7/1/ /1/2006 1/1/2007 4/1/2007 7/1/ /1/2007 1/1/2008 4/1/2008 7/1/ /1/2008 1/1/2009 4/1/2009 7/1/ /1/2009 1/1/2010 4/1/2010 7/1/ /1/2010 1/1/2011 4/1/2011 7/1/ /1/2011 1/1/2012 4/1/2012 7/1/ /1/2012 1/1/2013 6

39 Daily RMS1 of ERCOT Frequency /1/2007 4/1/2007 7/1/ /1/2007 1/1/2008 4/1/2008 7/1/ /1/2008 1/1/2009 4/1/2009 7/1/ /1/2009 1/1/2010 4/1/2010 7/1/ /1/2010 1/1/2011 4/1/2011 ERCOT Total Energy 7/1/ /1/2011 1/1/2012 4/1/2012 7/1/ /1/2012 1/1/ ,000,000 40,000,000 35,000,000 30,000,000 MWH 25,000,000 20,000,000 15,000,000 10,000,000 5,000,000 0 January February March April May June July August September October November December

40 4,000,000 ERCOT Total Energy from Wind Generation Peak Wind Generation 9,477 MW Feb 19:08 10,570 MW installed capacity. 3,500,000 3,000,000 2,500,000 MWH 2,000,000 1,500,000 1,000, ,000 0 January February March April May June July August September October November December ERCOT % Energy from Wind Generation 16.00% 14.00% 12.00% 10.00% 8.00% 6.00% 4.00% 2.00% 0.00% January February March April May June July August September October November December

41 Questions? 9

BAL Real Power Balancing Control Performance Standard Background Document

BAL Real Power Balancing Control Performance Standard Background Document BAL-001-2 Real Power Balancing Control Performance Standard Background Document July 2013 3353 Peachtree Road NE Suite 600, North Tower Atlanta, GA 30326 404-446-2560 www.nerc.com Table of Contents Table

More information

BAL Real Power Balancing Control Performance Standard Background Document

BAL Real Power Balancing Control Performance Standard Background Document BAL-001-2 Real Power Balancing Control Performance Standard Background Document February 2013 3353 Peachtree Road NE Suite 600, North Tower Atlanta, GA 30326 404-446-2560 www.nerc.com Table of Contents

More information

Frequency Response and Standard background Overview of BAL-003-1

Frequency Response and Standard background Overview of BAL-003-1 Industry Webinar BAL-003-1 Draft Frequency Response Standard and Supporting Process July 18, 2011 Agenda Frequency Response and Standard background Overview of BAL-003-1 What s changing Field Trial Frequency

More information

RELIABILITY REASON FOR A COMMERCIAL INADVERTENT-INTERCHANGE SETTLEMENT STANDARD.

RELIABILITY REASON FOR A COMMERCIAL INADVERTENT-INTERCHANGE SETTLEMENT STANDARD. RELIABILITY REASON FOR A COMMERCIAL INADVERTENT-INTERCHANGE SETTLEMENT STANDARD. Attached are 2 graphs of monthly average frequency error on the Eastern Interconnection back to 1994. The error is the deviation

More information

I. History of Time Error Correction and Reduced Reliance On Manual TEC Today

I. History of Time Error Correction and Reduced Reliance On Manual TEC Today Time Error Correction and Reliability White Paper Recommendation of the Balancing Authority Reliability-based Controls 2.2 Standard Drafting Team to Retire BAL-004-0 Time Error Correction The Balancing

More information

Project Reliability-based Control

Project Reliability-based Control Project 2007-18 - Reliability-based Control EXCEL WORKBOOK INFORMATION February 03, 2010 The Excel workbooks use a calculation of the Balancing Authority ACE Limit as defined in the draft Standard BAL-007.

More information

Frequency Response Initiative Generator Event Survey. NERC Resources Subcommittee North American Generator Forum December 8, 2016

Frequency Response Initiative Generator Event Survey. NERC Resources Subcommittee North American Generator Forum December 8, 2016 Frequency Response Initiative Generator Event Survey NERC Resources Subcommittee North American Generator Forum December 8, 2016 Why Primary Frequency Response Is Important Essential for Reliability of

More information

Primary Frequency Response Ancillary Service Market Designs

Primary Frequency Response Ancillary Service Market Designs Engineering Conferences International ECI Digital Archives Modeling, Simulation, And Optimization for the 21st Century Electric Power Grid Proceedings Fall 10-24-2012 Primary Frequency Response Ancillary

More information

ICTE TLR 5 Investigation Report Flowgate (West Memphis Xmfr 161/500kv ftlo San Souci Shelby 500kv) TLR Level 5: June 20, 2011 Report Issued:

ICTE TLR 5 Investigation Report Flowgate (West Memphis Xmfr 161/500kv ftlo San Souci Shelby 500kv) TLR Level 5: June 20, 2011 Report Issued: ICTE TLR 5 Investigation Report Flowgate 17274 (West Memphis Xmfr 161/500kv ftlo San Souci Shelby 500kv) TLR Level 5: June 20, 2011 Report Issued: 1. Description of purpose/cause of hold/curtailment. This

More information

Attachment A to Primary Frequency Response Reference Document. Initial Primary Frequency Response Methodology for BAL-001-TRE-1

Attachment A to Primary Frequency Response Reference Document. Initial Primary Frequency Response Methodology for BAL-001-TRE-1 Attachment A to Primary Frequency Response Reference Document Initial Primary Frequency Response Methodology for BAL-001-TRE-1 Page 1 Primary Frequency Response Measurement and Rolling Average Calculation

More information

WESTERN ELECTRICITY COORDINATING COUNCIL. WECC Interchange Tool Overview

WESTERN ELECTRICITY COORDINATING COUNCIL. WECC Interchange Tool Overview INNOVATIVE SOLUTIONS FOR THE DEREGULATED ENERGY INDUSTRY WESTERN ELECTRICITY COORDINATING COUNCIL WECC Interchange Tool Overview Version 2.0 September 2006 Open Access Technology International, Inc. 2300

More information

Reliability Guideline: Generating Unit Operations During Complete Loss of Communications

Reliability Guideline: Generating Unit Operations During Complete Loss of Communications Reliability Guideline: Generating Unit Operations During Complete Loss of Communications Preamble It is in the public interest for the North American Electric Reliability Corporation (NERC) to develop

More information

Hornsdale 2 Wind Farm. FCAS Capability Test Plan

Hornsdale 2 Wind Farm. FCAS Capability Test Plan Hornsdale 2 Wind Farm FCAS Capability Test Plan Prepared by Siemens Wind Power Pty Ltd 885 Mountain Highway Bayswater VIC 3153 tristan.raysonhill@siemens.com daniel.gallagher@siemens.com Revision History

More information

BATTERY ENERGY STORAGE SYSTEM REQUIREMENTS FOR CONTINGENCY FCAS REGISTRATION

BATTERY ENERGY STORAGE SYSTEM REQUIREMENTS FOR CONTINGENCY FCAS REGISTRATION BATTERY ENERGY STORAGE SYSTEM REQUIREMENTS FOR CONTINGENCY FCAS REGISTRATION PREPARED BY: AEMO Operations Department Systems Performance & Commercial VERSION: 1.0 EFFECTIVE DATE: 14 January 2019 STATUS:

More information

FACILITIES STUDY MID AMERICAN TRANSMISSION SERVICE REQUESTS. OASIS Revision: 4

FACILITIES STUDY MID AMERICAN TRANSMISSION SERVICE REQUESTS. OASIS Revision: 4 TRANSMISSION / DISTRIBUTION PROJECTS COMPANY:EAI CUSTOMER: MID AMERICAN ENERGY. FACILITIES STUDY EJO # F4PPAR0422 MID AMERICAN TRANSMISSION SERVICE REQUESTS OASIS 1468288 Revision: 4 Rev Issue Date Description

More information

Notes Generator Verification SDT Project

Notes Generator Verification SDT Project Notes Generator Verification SDT Project 2007-09 FERC Office 888 First Street, NE Washington, DC 20426 1. Administration a. The following were in attendance: Bob Snow, Cynthia Pointer, Lim Hansen, Keith

More information

of New York, Inc. Original Sheet No. 81 SCHEDULE 3 Black Start Capability

of New York, Inc. Original Sheet No. 81 SCHEDULE 3 Black Start Capability SCHEDULE 3 Black Start Capability This service allows the transmission system to be restored from a blackout condition by repowering steam powered generators at various locations in Con Edison. These units

More information

ELIGIBLE INTERMITTENT RESOURCES PROTOCOL

ELIGIBLE INTERMITTENT RESOURCES PROTOCOL FIRST REPLACEMENT VOLUME NO. I Original Sheet No. 848 ELIGIBLE INTERMITTENT RESOURCES PROTOCOL FIRST REPLACEMENT VOLUME NO. I Original Sheet No. 850 ELIGIBLE INTERMITTENT RESOURCES PROTOCOL Table of Contents

More information

These restrictions, also called Network Constraints, are characterized by:

These restrictions, also called Network Constraints, are characterized by: Subject: Congestion management on the Belgian transmission grid Date: 1 September 2016 Contact: Steven Harlem Phone: 0032 2 500 85 89 Mail: steven.harlem@febeg.be Introduction To guarantee the security,

More information

MISO Market Participant Cutover Briefing #5: Notable Market Developments. December 19, 2013

MISO Market Participant Cutover Briefing #5: Notable Market Developments. December 19, 2013 MISO Market Participant Cutover Briefing #5: Notable Market Developments December 19, 2013 Market Participant Cutover Briefing #5 Disclaimer The following presentation is for informational purposes only

More information

KPI and SLA regime: September 2015 performance summary

KPI and SLA regime: September 2015 performance summary OB31 Paper 07 KPI Report (September) KPI and SLA regime: September 2015 performance summary Ref Jul 15 Aug 15 Sep 15 Target Description KPI A 100% 99.87% 100% 99% green 98% amber Service Restoration within

More information

Trigger Cost & Schedule

Trigger Cost & Schedule Trigger Cost & Schedule Wesley Smith, U. Wisconsin CMS Trigger Project Manager DOE/NSF Review May 9, 2001 1 Baseline L4 Trigger Costs From April '00 Review -- 5.69 M 3.96 M 1.73 M 2 Calorimeter Trig. Costs

More information

Mitigation of Cascading Outages and Prevention of Blackouts:System-Wide Corrective Control

Mitigation of Cascading Outages and Prevention of Blackouts:System-Wide Corrective Control 10th Mediterranean Conference on Power Generation, Transmission, Distribution and Energy Conversion 6-9 November 2016 Belgrade, Serbia Mitigation of Cascading Outages and Prevention of Blackouts:System-Wide

More information

AMERICAN NATIONAL STANDARD

AMERICAN NATIONAL STANDARD Interface Practices Subcommittee AMERICAN NATIONAL STANDARD ANSI/SCTE 108 2018 Test Method for Dielectric Withstand of Coaxial Cable NOTICE The Society of Cable Telecommunications Engineers (SCTE) / International

More information

NERC Reliability Standard PRC-024 Generator Frequency and Voltage Protective Relay Settings

NERC Reliability Standard PRC-024 Generator Frequency and Voltage Protective Relay Settings NERC Reliability Standard PRC-024 024-1 Generator Frequency and Voltage Protective Relay Settings Rick Terrill Luminant Power Generation Compliance NERC Standards Drafting Team Member Reliability Standard

More information

RCOA Mandatory Contestability for Phase 1 Customers. 16 December 2016

RCOA Mandatory Contestability for Phase 1 Customers. 16 December 2016 RCOA Mandatory Contestability for Phase 1 Customers 16 December 2016 TOPICS 1 2 3 4 RCOA Updates RCOA Timeline General Procedures on Mandatory Migration Requirements RCOA Updates 420 Contestable Customers

More information

3 Resolution of the Board of Supervisors, acting as responsible agency with respect to

3 Resolution of the Board of Supervisors, acting as responsible agency with respect to FILE NO. 070314 RESOLUTION NO. Lf /3-01 1 [CEQA Findings in Connection with the Trans Bay Cable Project] 2 3 Resolution of the Board of Supervisors, acting as responsible agency with respect to 4 the Trans

More information

Grid Code Modification Register. March 2018

Grid Code Modification Register. March 2018 Grid Code Modification Register ch Issue: 1.0 Date of Issue: 26 ch Proposal to Grid Code Review Panel Meeting Publish Workgroup Consultation Workgroup Consultation Closing Date Workgroup Report to Grid

More information

KPI and SLA regime: August 2015 performance summary Ref Jun 15 Jul 15 Aug 15 Target Description KPI A 100% 100% 99.87% 99% green

KPI and SLA regime: August 2015 performance summary Ref Jun 15 Jul 15 Aug 15 Target Description KPI A 100% 100% 99.87% 99% green OB30 paper 07 KPI Report (August 2015) KPI and SLA regime: August 2015 performance summary Ref Jun 15 Jul 15 Aug 15 Target Description KPI A 100% 100% 99.87% 99% green 98% amber Service Restoration within

More information

KPI and SLA regime: June 2015 performance summary Ref Apr 15 May 15 Jun 15 Target Description KPI A 100% 100% 100% 99% green

KPI and SLA regime: June 2015 performance summary Ref Apr 15 May 15 Jun 15 Target Description KPI A 100% 100% 100% 99% green KPI and SLA regime: June 2015 performance summary Ref Apr 15 May 15 Jun 15 Target Description KPI A 100% 100% 100% 99% green 98% amber Service Restoration within 10 working days where household is a primary

More information

Failure Modes, Effects and Diagnostic Analysis

Failure Modes, Effects and Diagnostic Analysis Failure Modes, Effects and Diagnostic Analysis Project: United Electric One Series Electronic Switch Customer: United Electric Watertown, MA USA Contract No.: UE 05/10-35 Report No.: UE 05/10-35 R001 Version

More information

Satellite Services and Interference: The current situation. ITU International Satellite Communication Symposium Geneva, June 2016

Satellite Services and Interference: The current situation. ITU International Satellite Communication Symposium Geneva, June 2016 1 Satellite Services and Interference: The current situation ITU International Satellite Communication Symposium Geneva, 13-14 June 2016 Ruben D. Marentes Director, RF Operations Center 2 Current impact

More information

Unofficial Comment Form Project Establish and Communicate System Operating Limits (SOL and SOL Exceedance Definitions)

Unofficial Comment Form Project Establish and Communicate System Operating Limits (SOL and SOL Exceedance Definitions) Unofficial Comment Form Project 2015-09 Establish and Communicate System Operating Limits (SOL and SOL Exceedance Definitions) Do not use this form for submitting comments. Use the electronic form to submit

More information

John Stankey President and CEO AT&T Operations

John Stankey President and CEO AT&T Operations John Stankey President and CEO AT&T Operations Bank of America Media, Communications, & Entertainment Conference September 9, 2009 Cautionary Language Concerning Forward-Looking Statements Information

More information

Real Time Monitoring for SMART Grid Initiatives Synchronized Measurement & Analysis in Real Time SMART program by

Real Time Monitoring for SMART Grid Initiatives Synchronized Measurement & Analysis in Real Time SMART program by Real Time Monitoring for SMART Grid Initiatives Synchronized Measurement & Analysis in Real Time SMART program by Bharat Bhargava Armando Salazar Southern California Edison Co. IEEE PES General Meeting

More information

SWITCHED INFINITY: SUPPORTING AN INFINITE HD LINEUP WITH SDV

SWITCHED INFINITY: SUPPORTING AN INFINITE HD LINEUP WITH SDV SWITCHED INFINITY: SUPPORTING AN INFINITE HD LINEUP WITH SDV First Presented at the SCTE Cable-Tec Expo 2010 John Civiletto, Executive Director of Platform Architecture. Cox Communications Ludovic Milin,

More information

OB35 Paper 06 KPI Report

OB35 Paper 06 KPI Report OB35 Paper 06 KPI Report KPI and SLA regime: January 2016 performance summary Ref Nov 15 Dec 15 Jan 16 Target Description KPI A 99.90% 100% 99.87% 99% green 98% amber Service Restoration within 10 working

More information

KPI and SLA regime: September 2014 performance summary Reference Outcome Result Target Description KPI A Green 100% 99% green

KPI and SLA regime: September 2014 performance summary Reference Outcome Result Target Description KPI A Green 100% 99% green OB19 Paper 07 KPI Report KPI and SLA regime: September 2014 performance summary Reference Outcome Result Target Description KPI A Green 100% 99% green 98% amber Service Restoration within 10 working days

More information

Telecommunication Development Sector

Telecommunication Development Sector Telecommunication Development Sector Study Groups ITU-D Study Group 1 Rapporteur Group Meetings Geneva, 4 15 April 2016 Document SG1RGQ/218-E 22 March 2016 English only DELAYED CONTRIBUTION Question 8/1:

More information

Training Note TR-06RD. Schedules. Schedule types

Training Note TR-06RD. Schedules. Schedule types Schedules General operation of the DT80 data loggers centres on scheduling. Schedules determine when various processes are to occur, and can be triggered by the real time clock, by digital or counter events,

More information

National Grid Residential Demand Response Demonstration Project Update. MA EEAC October 2016

National Grid Residential Demand Response Demonstration Project Update. MA EEAC October 2016 National Grid Residential Demand Response Demonstration Project Update MA EEAC October 2016 National Grid s Connected Vision Why What How 60% of customers are interested in connected home solutions Integrated

More information

10/13/2011 Planning Coordination Committee. Standards

10/13/2011 Planning Coordination Committee. Standards Document name Category System Performance Regional Criterion ( ) Regional Reliability Standard (X) Regional Criterion ( ) Policy ( ) Guideline ( ) Report or other Document date 12/01/2011 Adopted/approved

More information

EXECUTIVE SUMMARY. MARKET DYNAMICS CHINA CINEMATIC rd QUARTER

EXECUTIVE SUMMARY. MARKET DYNAMICS CHINA CINEMATIC rd QUARTER Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov MARKET DYNAMICS CHINA EXECUTIVE SUMMARY In Q3 2016, box office of Chinese film market was 10.86 billion with year-on-year drop of 13.5%. Of which, box office

More information

Case analysis: An IoT energy monitoring system for a PV connected residence

Case analysis: An IoT energy monitoring system for a PV connected residence Case analysis: An IoT energy monitoring system for a PV connected residence Marcus André P. Oliveira, 1, Wendell E. Moura Costa 1, Maxwell Moura Costa 1, 1 IFTO Campus Palmas marcusandre@ifto.edu.br, wendell@ifto.edu.br,

More information

Demonstration of geolocation database and spectrum coordinator as specified in ETSI TS and TS

Demonstration of geolocation database and spectrum coordinator as specified in ETSI TS and TS Demonstration of geolocation database and spectrum coordinator as specified in ETSI TS 103 143 and TS 103 145 ETSI Workshop on Reconfigurable Radio Systems - Status and Novel Standards 2014 Sony Europe

More information

ENGINEERING COMMITTEE

ENGINEERING COMMITTEE ENGINEERING COMMITTEE Interface Practices Subcommittee SCTE STANDARD SCTE 45 2017 Test Method for Group Delay NOTICE The Society of Cable Telecommunications Engineers (SCTE) Standards and Operational Practices

More information

Operating Committee Conference Call and Webinar Meeting Minutes

Operating Committee Conference Call and Webinar Meeting Minutes Operating Committee Conference Call and Webinar Meeting Minutes October 10, 2012 1:00 p.m. 3:00 p.m. (EDT) The Operating Committee (OC) met by conference call and webinar on October 10, 2012 at 1:00 p.m.

More information

IMPLEMENTATION OF SIGNAL SPACING STANDARDS

IMPLEMENTATION OF SIGNAL SPACING STANDARDS IMPLEMENTATION OF SIGNAL SPACING STANDARDS J D SAMPSON Jeffares & Green Inc., P O Box 1109, Sunninghill, 2157 INTRODUCTION Mobility, defined here as the ease at which traffic can move at relatively high

More information

Definitions. Common Corridor:

Definitions. Common Corridor: Definitions Common Corridor: Contiguous right-of-way or two parallel right-of-ways with structure centerline separation less than the longest span length of the two transmission circuits at the point of

More information

MISO Market Participant Cutover Briefing #2: Offer Parameter Overview. December 13, 2013

MISO Market Participant Cutover Briefing #2: Offer Parameter Overview. December 13, 2013 MISO Market Participant Cutover Briefing #2: Offer Parameter Overview December 13, 2013 Market Participant Cutover Briefing #2 Agenda Introduction and Schedule (5 minutes) Focus Topic: Offer Parameter

More information

KPI and SLA regime: October 2014 performance summary Reference Outcome Result Target Description KPI A Green 100% 99% green

KPI and SLA regime: October 2014 performance summary Reference Outcome Result Target Description KPI A Green 100% 99% green Paper 06 OB20 KPI Report KPI and SLA regime: October 2014 performance summary Reference Outcome Result Target Description KPI A Green 100% 99% green 98% amber Service Restoration within 10 working days

More information

1. Can companies based outside of the United States respond to this RFP?

1. Can companies based outside of the United States respond to this RFP? University of West Florida Procurement and Contracts 11000 University Parkway Bldg. 20W, Rm 159 Pensacola, FL 32514 June 20, 2017 ADDENDUM NUMBER # 1 16ITN-10BP Pay-For-Print Kiosk Solution for Student

More information

Load Frequency Control Structure for Ireland and Northern Ireland

Load Frequency Control Structure for Ireland and Northern Ireland Load Frequency Control Structure for Ireland and Northern Ireland EirGrid TSO & TSO consultation on a proposal for the determination of LFC blocks in accordance with Article 141(2) of the Commission Regulation

More information

Pre-Processing of ERP Data. Peter J. Molfese, Ph.D. Yale University

Pre-Processing of ERP Data. Peter J. Molfese, Ph.D. Yale University Pre-Processing of ERP Data Peter J. Molfese, Ph.D. Yale University Before Statistical Analyses, Pre-Process the ERP data Planning Analyses Waveform Tools Types of Tools Filter Segmentation Visual Review

More information

Power Consumption Trends in Digital TVs produced since 2003

Power Consumption Trends in Digital TVs produced since 2003 Power Consumption Trends in Digital TVs produced since 2003 Prepared by Darrell J. King And Ratcharit Ponoum TIAX LLC 35 Hartwell Avenue Lexington, MA 02421 TIAX Reference No. D0543 for Consumer Electronics

More information

Village of Glenview Appearance Commission

Village of Glenview Appearance Commission Village of Glenview Appearance Commission STAFF REPORT February 6, 2013 TO: Chairman and Appearance Commissioners FROM: Planning & Economic Development Department CASE MANAGER: Michelle House, Planner

More information

South Australian Energy Transformation

South Australian Energy Transformation South Australian Energy Transformation PSCR Supplementary Information Paper ElectraNet Corporate Headquarters 52-55 East Terrace, Adelaide, South Australia 5000 PO Box 7096, Hutt Street Post Office, Adelaide,

More information

SIDRA INTERSECTION 8.0 UPDATE HISTORY

SIDRA INTERSECTION 8.0 UPDATE HISTORY Akcelik & Associates Pty Ltd PO Box 1075G, Greythorn, Vic 3104 AUSTRALIA ABN 79 088 889 687 For all technical support, sales support and general enquiries: support.sidrasolutions.com SIDRA INTERSECTION

More information

MODE FIELD DIAMETER AND EFFECTIVE AREA MEASUREMENT OF DISPERSION COMPENSATION OPTICAL DEVICES

MODE FIELD DIAMETER AND EFFECTIVE AREA MEASUREMENT OF DISPERSION COMPENSATION OPTICAL DEVICES MODE FIELD DIAMETER AND EFFECTIVE AREA MEASUREMENT OF DISPERSION COMPENSATION OPTICAL DEVICES Hale R. Farley, Jeffrey L. Guttman, Razvan Chirita and Carmen D. Pâlsan Photon inc. 6860 Santa Teresa Blvd

More information

A Parametric Autoregressive Model for the Extraction of Electric Network Frequency Fluctuations in Audio Forensic Authentication

A Parametric Autoregressive Model for the Extraction of Electric Network Frequency Fluctuations in Audio Forensic Authentication Journal of Energy and Power Engineering 10 (2016) 504-512 doi: 10.17265/1934-8975/2016.08.007 D DAVID PUBLISHING A Parametric Autoregressive Model for the Extraction of Electric Network Frequency Fluctuations

More information

Scan. This is a sample of the first 15 pages of the Scan chapter.

Scan. This is a sample of the first 15 pages of the Scan chapter. Scan This is a sample of the first 15 pages of the Scan chapter. Note: The book is NOT Pinted in color. Objectives: This section provides: An overview of Scan An introduction to Test Sequences and Test

More information

Story Tracking in Video News Broadcasts. Ph.D. Dissertation Jedrzej Miadowicz June 4, 2004

Story Tracking in Video News Broadcasts. Ph.D. Dissertation Jedrzej Miadowicz June 4, 2004 Story Tracking in Video News Broadcasts Ph.D. Dissertation Jedrzej Miadowicz June 4, 2004 Acknowledgements Motivation Modern world is awash in information Coming from multiple sources Around the clock

More information

Analysis of WFS Measurements from first half of 2004

Analysis of WFS Measurements from first half of 2004 Analysis of WFS Measurements from first half of 24 (Report4) Graham Cox August 19, 24 1 Abstract Described in this report is the results of wavefront sensor measurements taken during the first seven months

More information

Draft Baseline Proposal for CDAUI-8 Chipto-Module (C2M) Electrical Interface (NRZ)

Draft Baseline Proposal for CDAUI-8 Chipto-Module (C2M) Electrical Interface (NRZ) Draft Baseline Proposal for CDAUI-8 Chipto-Module (C2M) Electrical Interface (NRZ) Authors: Tom Palkert: MoSys Jeff Trombley, Haoli Qian: Credo Date: Dec. 4 2014 Presented: IEEE 802.3bs electrical interface

More information

Form C: Type Test Verification Report

Form C: Type Test Verification Report Form C: Type Test Verification Report Type Approval and Manufacturer declaration of compliance with the requirements of G98. This form should be used when making a Type Test submission to the Energy Networks

More information

Form C: Type Test Verification Report

Form C: Type Test Verification Report Form C: Type Test Verification Report Type Approval and Manufacturer declaration of compliance with the requirements of G98. This form should be used when making a Type Test submission to the Energy Networks

More information

A Parametric Autoregressive Model for the Extraction of Electric Network Frequency Fluctuations in Audio Forensic Authentication

A Parametric Autoregressive Model for the Extraction of Electric Network Frequency Fluctuations in Audio Forensic Authentication Proceedings of the 3 rd International Conference on Control, Dynamic Systems, and Robotics (CDSR 16) Ottawa, Canada May 9 10, 2016 Paper No. 110 DOI: 10.11159/cdsr16.110 A Parametric Autoregressive Model

More information

FCP Project Summary report

FCP Project Summary report Evert Agneholm (DNV-GL), Erik Alexander Jansson (Statnett) v 1.0 11 May 2017 Document version Draft Ver 1.0 11-05-2017 List of contents 1. Introduction... 3 1.1. Background...3 1.2. Aim...3 2. Constraints...

More information

Interface Practices Subcommittee SCTE STANDARD SCTE Composite Distortion Measurements (CSO & CTB)

Interface Practices Subcommittee SCTE STANDARD SCTE Composite Distortion Measurements (CSO & CTB) Interface Practices Subcommittee SCTE STANDARD Composite Distortion Measurements (CSO & CTB) NOTICE The Society of Cable Telecommunications Engineers (SCTE) / International Society of Broadband Experts

More information

Alcatel-Lucent 5620 Service Aware Manager. Unified management of IP/MPLS and Carrier Ethernet networks and the services they deliver

Alcatel-Lucent 5620 Service Aware Manager. Unified management of IP/MPLS and Carrier Ethernet networks and the services they deliver Alcatel-Lucent 5620 Service Aware Manager Unified management of IP/MPLS and Carrier Ethernet networks and the services they deliver [The Alcatel-Lucent 5620 SAM] was the most cost-effective and the shortest

More information

SCTE OPERATIONAL PRACTICE

SCTE OPERATIONAL PRACTICE Energy Management Subcommittee SCTE OPERATIONAL PRACTICE SCTE 245 2018 Use Cases for Adaptive Power Using APSIS NOTICE The Society of Cable Telecommunications Engineers (SCTE) / International Society of

More information

Diamond RF Status (RF Activities at Daresbury) Mike Dykes

Diamond RF Status (RF Activities at Daresbury) Mike Dykes Diamond RF Status (RF Activities at Daresbury) Mike Dykes ASTeC What is it? What does it do? Diamond Status Linac Booster RF Storage Ring RF Summary Content ASTeC ASTeC was formed in 2001 as a centre of

More information

The Zendesk Benchmark. The ROI case for omnichannel support

The Zendesk Benchmark. The ROI case for omnichannel support The Zendesk Benchmark The ROI case for omnichannel support Table of contents 01 02 03 04 05 06 07 Executive summary Key findings Customers now expect an omnichannel approach Live channels aren t just growing

More information

Employment Cost Index Original Data Value Series Id: Seasonally adjusted Series Title: Ownership: Component: Occupation: Industry: Subcategory:

Employment Cost Index Original Data Value Series Id: Seasonally adjusted Series Title: Ownership: Component: Occupation: Industry: Subcategory: Employment Cost Index Original Data Value Series Id: Seasonally adjusted Series Title: Ownership: Component: Occupation: Industry: Subcategory: Area: Periodicity: Years: Total compensation for Private

More information

Application Note #63 Field Analyzers in EMC Radiated Immunity Testing

Application Note #63 Field Analyzers in EMC Radiated Immunity Testing Application Note #63 Field Analyzers in EMC Radiated Immunity Testing By Jason Galluppi, Supervisor Systems Control Software In radiated immunity testing, it is common practice to utilize a radio frequency

More information

HIGH POWER BEAM DUMP AND TARGET / ACCELERATOR INTERFACE PROCEDURES *

HIGH POWER BEAM DUMP AND TARGET / ACCELERATOR INTERFACE PROCEDURES * HIGH POWER BEAM DUMP AND TARGET / ACCELERATOR INTERFACE PROCEDURES * J. Galambos, W. Blokland, D. Brown, C. Peters, M. Plum, Spallation Neutron Source, ORNL, Oak Ridge, TN 37831, U.S.A. Abstract Satisfying

More information

Analysis of Background Illuminance Levels During Television Viewing

Analysis of Background Illuminance Levels During Television Viewing Analysis of Background Illuminance Levels During Television Viewing December 211 BY Christopher Wold The Collaborative Labeling and Appliance Standards Program (CLASP) This report has been produced for

More information

Action: Karl Tammar indicated that Lydia Vollmer and Herb Yan had both left PECO and that replacement participants from PECO should be sought.

Action: Karl Tammar indicated that Lydia Vollmer and Herb Yan had both left PECO and that replacement participants from PECO should be sought. Meeting Attendees: Final Meeting Minutes Lake Erie Security Process Working Group Meeting Thursday-Friday, December 6-7, 2001 Crowne Plaza-Detroit Metro Airport Romulus, Michigan Karl Tammar (Chair) NYISO

More information

WHITEPAPER. Customer Insights: A European Pay-TV Operator s Transition to Test Automation

WHITEPAPER. Customer Insights: A European Pay-TV Operator s Transition to Test Automation WHITEPAPER Customer Insights: A European Pay-TV Operator s Transition to Test Automation Contents 1. Customer Overview...3 2. Case Study Details...4 3. Impact of Automations...7 2 1. Customer Overview

More information

Level 1 Mathematics and Statistics, 2011

Level 1 Mathematics and Statistics, 2011 91037 910370 1SUPERVISOR S Level 1 Mathematics and Statistics, 2011 91037 Demonstrate understanding of chance and data 9.30 am onday Monday 1 November 2011 Credits: Four Achievement Achievement with Merit

More information

Before the FEDERAL COMMUNICATIONS COMMISSION Washington DC ) ) ) ) ) ) ) ) COMMENTS OF

Before the FEDERAL COMMUNICATIONS COMMISSION Washington DC ) ) ) ) ) ) ) ) COMMENTS OF Before the FEDERAL COMMUNICATIONS COMMISSION Washington DC 20554 In the Matter of Amendment of Part 101 of the Commission s Rules to Facilitate the Use of Microwave for Wireless Backhaul and Other Uses

More information

REFURBISHMENT OF SECONDARY SYSTEMS IN HIGH VOLTAGE SUBSTATIONS LESSONS LEARNED IN VENEZUELA

REFURBISHMENT OF SECONDARY SYSTEMS IN HIGH VOLTAGE SUBSTATIONS LESSONS LEARNED IN VENEZUELA 21, rue d'artois, F-75008 Paris http://www.cigre.org B3-110 Session 2004 CIGRÉ REFURBISHMENT OF SECONDARY SYSTEMS IN HIGH VOLTAGE SUBSTATIONS LESSONS LEARNED IN VENEZUELA by E. PADILLA * L. CEDEÑO E. PELAYO

More information

NCTA Technical Papers

NCTA Technical Papers EXPANDED BANDWIDTH REQUIREMENTS IN CATV APPLICATIONS DANIEL M. MOLONEY DIRECTOR, SUBSCRIBERMARKETING JOHN SCHILLING DIRECTOR, RESIDENTIAL EQUIPMENT ENGINEERING DANIELMARZ SENIOR STAFF ENGINEER JERROLD

More information

CITY OF ISSAQUAH CABLE COMMISSION

CITY OF ISSAQUAH CABLE COMMISSION CITY OF ISSAQUAH CABLE COMMISSION December 4, 2014 Police Facility 6:00 Coho Room MEMBERS PRESENT Max Emrick, Vice Chair Ed Authier Open Robert Gonzales Robert Stephens, Chair (phone) ADMINISTRATIVE STAFF

More information

BRR Tektronix BroadR-Reach Compliance Solution for Automotive Ethernet. Anshuman Bhat Product Manager

BRR Tektronix BroadR-Reach Compliance Solution for Automotive Ethernet. Anshuman Bhat Product Manager BRR Tektronix BroadR-Reach Compliance Solution for Automotive Ethernet Anshuman Bhat Product Manager anshuman.bhat@tektronix.com Agenda BroadR-Reach Automotive Market Technology Overview Open Alliance

More information

60th ASH Annual Meeting and Exposition

60th ASH Annual Meeting and Exposition 60th ASH Annual Meeting and Exposition The premier event in malignant & non-malignant hematology San Diego, CA December 1-4, 2018 2018 Advertising Rates & Specifications ASH News Daily ASH News Daily e-newsletter

More information

Improved Synchronization System for Thermal Power Station

Improved Synchronization System for Thermal Power Station Improved Synchronization System for Thermal Power Station Lokeshkumar.C 1, Logeshkumar.E 2, Harikrishnan.M 3, Margaret 4, Dr.K.Sathiyasekar 5 UG Students, Department of EEE, S.A.Engineering College, Chennai,

More information

ENGINEERING COMMITTEE

ENGINEERING COMMITTEE ENGINEERING COMMITTEE Energy Management Subcommittee SCTE STANDARD SCTE 211 2015 Energy Metrics for Cable Operator Access Networks Title Table of Contents Page Number NOTICE 3 1. Scope 4 2. Normative References

More information

Dynamic Performance Requirements for Phasor Meausrement Units

Dynamic Performance Requirements for Phasor Meausrement Units Dynamic Performance Requirements for Phasor Meausrement Units 2010 February NAPSI Meeting Dmitry Kosterev Transmission Planning Bonneville Power Administration dnkosterev@bpa.gov Slide 1 BPA Plans for

More information

SOUTHWESTERN BELL TELEPHONE COMPANY TARIFF F.C.C. NO. 73 1st Revised Page 9-1 Cancels Original Page 9-1

SOUTHWESTERN BELL TELEPHONE COMPANY TARIFF F.C.C. NO. 73 1st Revised Page 9-1 Cancels Original Page 9-1 1st Revised Page 9-1 Cancels Original Page 9-1 9. Directory Assistance Access Service 9-2 9.1 General Description 9-2 9.2 Service Description 9-3 9.3 Service Provisioning 9-4 Page 9.3.1 Manner of Provisioning

More information

DIGITAL SWITCHOVER & THE BBC S ROLE

DIGITAL SWITCHOVER & THE BBC S ROLE DIGITAL SWITCHOVER & THE BBC S ROLE Dr David Levy Controller, Public Policy BBC OXFORD UNIVERSITY, JULY 2006 1 2 What s special about Digital TV? Changing standards is relatively common Gas, Currencies

More information

A. Introduction 1. Title: Automatic Underfrequency Load Shedding Requirements

A. Introduction 1. Title: Automatic Underfrequency Load Shedding Requirements DRAFT 6 V4 Standard PRC-006- RFC-01 01/11/11 A. Introduction 1. Title: Automatic Underfrequency Load Shedding Requirements Deleted: Deleted: 10 Deleted: 20 9 2. Number: PRC 006 RFC 01. Purpose: To establish

More information

ALA Webinar August 21, 2013

ALA Webinar August 21, 2013 BUSINESS INTELLIGENCE THROUGH FINANCIAL REPORTING ALA Webinar August 21, 2013 Barry Jackson, CLM, CPA President JC4LM LLC www.jc4lm.com BUSINESS INTELLIGENCE THROUGH FINANCIAL REPORTING Dashboard Graphics

More information

Measurement of automatic brightness control in televisions critical for effective policy-making

Measurement of automatic brightness control in televisions critical for effective policy-making Measurement of automatic brightness control in televisions critical for effective policy-making Michael Scholand CLASP Europe Flat 6 Bramford Court High Street, Southgate London, N14 6DH United Kingdom

More information

AN302 Anconda 3BR 3BA

AN302 Anconda 3BR 3BA AN302 Anconda 3BR 3BA Summary 3 BR 3 Bath Condo - sleeps up to 8 Description AN302 Anconda 3BR 3BA -- Short Walk to Super B Chairlift -- Shared Heated Garage -- Outdoor Hot Tub and Laundry -- Gas Fireplace

More information

Achieve Accurate Critical Display Performance With Professional and Consumer Level Displays

Achieve Accurate Critical Display Performance With Professional and Consumer Level Displays Achieve Accurate Critical Display Performance With Professional and Consumer Level Displays Display Accuracy to Industry Standards Reference quality monitors are able to very accurately reproduce video,

More information

DIGITAL INSTRUMENTS S.R.L. SPM-ETH (Synchro Phasor Meter over ETH)

DIGITAL INSTRUMENTS S.R.L. SPM-ETH (Synchro Phasor Meter over ETH) DIGITAL INSTRUMENTS S.R.L. SPM-ETH (Synchro Phasor Meter over ETH) SPM-ETH (Synchro Phasor Meter over ETH) Digital Instruments 1 ver the years, an awareness of the criticality of the Power Grid and Orelated

More information

TEST REPORT. Test Report No. : UL-RPT-RP JD18L V2.0. Manufacturer : Neeo AG. Model No. : 6336-BRAIN FCC ID : 2AKK7-BR633601

TEST REPORT. Test Report No. : UL-RPT-RP JD18L V2.0. Manufacturer : Neeo AG. Model No. : 6336-BRAIN FCC ID : 2AKK7-BR633601 TEST REPORT Test Report No. : UL-RPT-RP11456397JD18L V2.0 Manufacturer : Neeo AG Model No. : 6336-BRAIN FCC ID : 2AKK7-BR633601 Test Standard(s) : FCC Part 15.207 1. This test report shall not be reproduced

More information

ENGINEERING COMMITTEE Energy Management Subcommittee SCTE STANDARD SCTE

ENGINEERING COMMITTEE Energy Management Subcommittee SCTE STANDARD SCTE ENGINEERING COMMITTEE Energy Management Subcommittee SCTE STANDARD SCTE 237 2017 Implementation Steps for Adaptive Power Systems Interface Specification (APSIS ) NOTICE The Society of Cable Telecommunications

More information

STAT 113: Statistics and Society Ellen Gundlach, Purdue University. (Chapters refer to Moore and Notz, Statistics: Concepts and Controversies, 8e)

STAT 113: Statistics and Society Ellen Gundlach, Purdue University. (Chapters refer to Moore and Notz, Statistics: Concepts and Controversies, 8e) STAT 113: Statistics and Society Ellen Gundlach, Purdue University (Chapters refer to Moore and Notz, Statistics: Concepts and Controversies, 8e) Learning Objectives for Exam 1: Unit 1, Part 1: Population

More information