Lineside Signals, Indicators and Layout of Signals

Size: px
Start display at page:

Download "Lineside Signals, Indicators and Layout of Signals"

Transcription

1 To be part superseded by GKRT0045 Iss 4, GKRT0057 Iss 1 and GKRT0058 Iss 1 published on 06/12/2014 Lineside Signals, Indicators and Layout of Signals Synopsis This document defines the format, presentation and layout of lineside signalling equipment that is used to display movement authority information to infrastructure managers operating stations, and railway undertaking personnel. This document contains requirements that are amended under the Railway Group Standards Code ( ) as a small scale change. Reference to the amended requirements is made in the record. All other parts of the document are unchanged from the previous issue. [This document contains one or more pages which contain colour] Copyright in the s is owned by Rail Safety and Standards Board Limited. All rights are hereby reserved. No (in whole or in part) may be reproduced, stored in a retrieval system, or transmitted, in any form or means, without the prior written permission of Rail Safety and Standards Board Limited, or as expressly permitted by law. Members are granted copyright licence in accordance with the Constitution Agreement relating to Rail Safety and Standards Board Limited. In circumstances where Rail Safety and Standards Board Limited has granted a particular person or organisation permission to copy extracts from Railway Group Standards, Rail Safety and Standards Board Limited accepts no responsibility for, nor any liability in connection with, the use of such extracts, or any claims arising therefrom. This disclaimer applies to all forms of media in which extracts from s may be reproduced. Published by: Block 2 Angel Square 1 Torrens Street London EC1V 1NY Copyright 2012 Rail Safety and Standards Board Limited

2 record Date Comments One 06 February 2010 Original document Two 03 March 2012 Replaces issue one Small scale change amendment to issue two necessitated by revision of and to permit the use of a bar of light or a line of five lunar white light points to display the indication of route 01 December 2012 Replaces issue two Clauses 9.1.1, 9.1.2, 9.1.3, and relating to identity of signals and indicators were removed from issue two as these were transferred to GK/RT0009 issue four which was published in June 2011 Small scale change amendment to clause c) to allow the use of the X alphanumeric route indicator to additionally denote a movement along a bi-directional line in the opposite direction to the normal flow of traffic Amended or additional parts and/or sections of revised pages have been marked by a vertical black line in the adjacent margin. Superseded documents The following Railway Group documents are superseded, either in whole or in part as indicated: Superseded documents, issue two, Lineside Signals, Indicators Sections superseded Date when sections are superseded All 02 March 2013 Supply, issue two,, ceases to be in force and is withdrawn as of 02 March The authoritative version of this document is available at Uncontrolled copies of this document can be obtained from Communications,, Block 2, Angel Square, 1 Torrens Street, London EC1V 1NY, telephone or enquirydesk@rssb.co.uk. Other Standards and associated documents can also be viewed at Page 2 of 72

3 Contents Section Description Page Part 1 Purpose and Introduction Purpose Introduction Approval and authorisation of this document 7 Part 2 Requirements for Signalling Equipment Display of operational information using the signalling system Specification of lineside signals Specification of route indicators Specification of lineside indicators Specification of lineside signs and buffer stops used as signals 30 Part 3 Layout of Signals: Requirements for Stop Signals Provision of stop signals and signalling indicators 33 Part 4 Layout of Signals: Aspect Sequences Requirements for cautionary aspect sequences Requirements for banner repeating signal aspects 42 Part 5 Layout of Signals: Junction Signalling Requirements for route indications Junction signalling: colour light signal aspect sequences Junction signalling: semaphore signal aspect sequences Junction signalling: AWS requirements Junction signalling: prohibited aspects 54 Part 6 Layout of Signals: Bi-directional Signalling Bi-directional signalling 56 Part 7 Layout of Signals: Combinations of Signal Aspects and Indications Combinations of signal aspects (including ERTMS level 2 operated lines) Combinations of signal aspects and route indications Signalling indications displayed in association with signal aspects 58 Part 8 Degraded Signalling Degraded colour light signalling 60 Part 9 Application of this document Application - infrastructure managers Application - railway undertakings Health and safety responsibilities 62 Appendices Appendix A Signals and Indicators: Emitted Light Parameters 63 Appendix B Signals and Indicators: Structure Requirements 64 Appendix C Signals and Indicators: Standard Performance Categories 65 Appendix D Positioning Criteria for Stop Signals on Electrified Lines 66 Definitions 69 References 72 Page 3 of 72

4 Tables Table 1 Colour light signal ON and OFF aspects 8 Table 2 Banner repeating signals ON and OFF aspects 12 Table 3 Independent position light signals ON and OFF aspects 13 Table 4 Subsidiary position light signals associated with a colour light signal: ON and OFF aspects 14 Table 5 Independent position light signals (limit of shunt) aspect 14 Table 6 Semaphore main stop signal ON and OFF aspects 15 Table 7 Semaphore distant signal ON and OFF aspects 17 Table 8 Semaphore subsidiary signal ON and OFF aspects 18 Table 9 Semaphore shunting signal ON and OFF aspects 19 Table 10 Position light junction indicator: displayed route indications 21 Table 11 Preliminary route indicators: displayed indications 23 Table 12 Points indicator: displayed indications 23 Table 13 Driver s level crossing indicator: displayed indications 24 Table 14 Loading / unloading indicator: displayed indications 25 Table 15 SPAD indicator: displayed indications 25 Table 16 OFF indicator: displayed indications 27 Table 17 CD and RA indicators: displayed indications 27 Table 18 BU indicators: displayed indications 28 Table 19 TPWS indications 28 Table 20 Permitted combinations of TPWS, points and / or LC indications 30 Table 21 Stop board: permitted dimensions 31 Table 22 Methods of junction signalling 47 Table 23 Speed ranges for flashing aspect sequences 48 Table 24 Permitted combinations of signal aspects 57 Table 25 Permitted combinations of signals and route indicators 58 Table 26 Permitted combinations of signals and route indicators 59 Table A.1 Colour classes for signal lights 63 Table C.1 Standard performance categories 65 Figures Figure 1 Example of a 4-aspect colour light splitting distant signal (left-hand divergence) mounted on the left-hand side of the line 10 Figure 2 Banner repeating signal aspect meeting standard performance category 2 12 Figure 3 Semaphore main stop signal arm 15 Figure 4 Distant signal arm 16 Figure 5 Semaphore subsidiary signal arm 17 Figure 6 Semaphore shunting signals 18 Figure 7 Figure 8 Position light junction indicator using five lunar white lights (example shows position 1) 19 Position light junction indicator using a bar of light (example shows position 1) 20 Figure 9 Orientation of position light junction indications relative to diverging routes 21 Figure 10 SPAD indicator 26 Figure 11 Stop board 30 Figure 12 Distant board 31 Figure 13 Buffer beam: format and colour 32 Figure 14 Example of a 3-aspect to 4-aspect transition using transition method 1 39 Figure 15 Example of a 3-aspect to 4-aspect transition using transition method 2 39 Figure 16 Example of a 3-aspect to 4-aspect transition using transition method 3 40 Figure 17 Figure 18 Semaphore junction signal: examples of main signals displaying stepped multiple semaphore arms 53 Semaphore junction signal: examples of main signals displaying stacked multiple semaphore arms 53 Page 4 of 72

5 Part 1 Purpose and Introduction 1.1 Purpose The purpose of this document is to specify the parameters and application of lineside signalling equipment that is used to display information about movement authorities, equipment status and required operations to infrastructure managers at stations and railway undertaking personnel. This document mandates the requirements for: a) The format and presentation of signals and their displayed aspects. b) The format and presentation of indicators and their displayed indications. c) The permitted combinations of signals and indicators. d) The criteria for positioning signals within the layout. e) The permitted type(s) of lineside signal and their application constraints. f) The permitted sequences of signal aspects and indications displayed to drivers. g) The forms of signal identification necessary to support communication of safety related operational messages between train crew and signallers Parts 2, 3, 4, 5, 6, 7, 8 and 9 of this document are applicable to areas where train movements are controlled using lineside signalling Parts 2, 4 and 7 of this document include some requirements (set out in 2.4.5, and 7.1) applicable to areas where train movements are controlled using the European Rail Traffic Management System (ERTMS) Level 2 without lineside signals. Where this is the case, the particular applicability to ERTMS is described in the section heading and the applicable clause(s). 1.2 Introduction Background Lineside signals and indicators are provided by the infrastructure manager where it is necessary to display information about movement authorities, equipment status and / or required operations to railway undertaking personnel, including train crew (for example, drivers, shunters and guards) and station staff (for example, train dispatchers) Movement authority information displayed by lineside signalling equipment includes information about: a) The extent of the movement authority issued by the signaller or ground frame operator (depicted by the sequence of signal aspects). b) The route that is set and the destination (depicted by combinations of signal aspects and route indications) At some locations, movement authority information is supplemented by additional information relating to the train operation, typically: a) Infrastructure equipment status (for example, locally monitored level crossings), and Page 5 of 72

6 b) Operational information (for example, Close doors ) Railway undertaking personnel are able to: a) Understand the operational rules that are associated with the aspects and indications displayed by signalling equipment. b) Understand the movement authorities issued by the infrastructure manager using: i) The sequence of displayed signal aspects and indications. ii) iii) Knowledge of the route and the geographical location. Knowledge of the required train movement Principles c) Control the movement of trains within the limits of the movement authority. d) Identify and report signal aspect and indication irregularities This document provides for infrastructure managers and railway undertakings compatibility in terms of understanding the information conveyed by signal aspects and indications. Incompatibility is a causal factor of an operational irregularity such as a signal passed at danger (SPAD) The GE/RT8000 Rule Book sets out: a) The operational meaning of signal aspects and indications displayed by the infrastructure manager. b) The rules for train driving, which include the requirement to control the speed of the train with respect to the aspects and indications displayed by signals. c) The rules for shunting. d) The rules for train dispatch. e) The rules for reporting signalling system failures The lineside signalling equipment is compatible with the operating rules, so that operating personnel can correctly interpret the information displayed by the signalling system The standard performance requirements applicable to lineside signals and indicators are specified, so that displayed aspects and indications are visible to the driver The layout of signalling equipment is specified so that, when train movements take place, drivers are given sufficient and appropriate movement authority information Related requirements in other documents The following s contain requirements that are relevant to the scope of this document: GC/RT5021 GE/RT8000 Track System Requirements Rule Book Page 6 of 72

7 GE/RT8030 GE/RT8035 GE/RT8037 GE/RT8071 GK/RT0075 GK/RT0044 GO/RT3215 Requirements for a Train Protection and Warning System (TPWS) Automatic Warning System Signal Position and Visibility Control Facilities for use during Lineside Signalling Failures Lineside Signal Spacing and Speed Signage Controls for Signalling a Train onto an Occupied Line Requirements for the Weekly Operating Notice, Periodical Operating Notice and Sectional Appendix Supporting documents The following Railway Group documents support this : GK/GN0645 Guidance on and Layout of Signals 1.3 Approval and authorisation of this document The content of this document was approved by Control Command and Signalling (CCS) Standards Committee on 13 September This document was authorised by on 26 October Page 7 of 72

8 Part 2 Requirements for Signalling Equipment 2.1 Display of operational information using the signalling system Signalled movement authorities shall: a) Be displayed only by the lineside signals and route indicators set out in this standard (see 2.2, 2.3 and 2.5), except where lineside operational signs are used to display information about movement authorities in accordance with GK/RT0055, and b) Be displayed only using the sequences and combinations of signal aspects and indications set out in this standard (see Parts 3, 4, 5, 6, 7 and 8) Signalling indications shall be displayed only by the lineside indicators set out in this standard (see 2.4) The observed colour of light emitted by lineside signals and indicators shall comply with specified parameters (see Appendix A) Lineside signal and indicator structures shall comply with specified parameters (see Appendix B) Lineside signals shall be identified (see Part 9). 2.2 Specification of lineside signals Colour light signal Colour light signals shall only display the signal aspects set out in Table 1. Signal aspect (see Appendix A) One signal red light One signal yellow light Two signal yellow lights displayed vertically One signal yellow flashing light Two signal yellow flashing lights displayed vertically One signal green light Table 1 Description MA information Remarks RED End of MA For application requirements see 3.1 SINGLE YELLOW End of MA ahead For application requirements see 4.1 DOUBLE YELLOW FLASHING SINGLE YELLOW FLASHING DOUBLE YELLOW GREEN Colour light signal ON and OFF aspects Approaching end of MA Diverging route set at the next signal Approaching a diverging junction Line clear For application requirements see 4.1 For application requirements see For application requirements see Colour light signals shall display the relevant signal aspect at all times, except: a) For those signals that are configured as approach lit signals (see 4.1.8), and Page 8 of 72

9 b) Where the signalling technology used incorporates self-testing functionality that requires a brief interruption of the displayed aspect at defined intervals, in which case each interruption shall not exceed 250 ms Except for splitting distant signals (see 2.2.2) and co-acting signals (see 2.2.3): a) Each colour light signal shall display only one signal aspect at a time, and b) No other combination of colour light signal lights shall be displayed by colour light signals Colour light signal lights that are designed to flash shall comply with the following criteria: a) Flash at a frequency of 60 (+/-10) cycles per minute. b) Have a mark:space ratio that provides visibility of the signal light for 50% - 66% of each flashing cycle when observed in accordance with the relevant standard performance category (see Appendix C). c) Flash in synchronism within the signal head when the flashing double yellow aspect is displayed. d) Flash in synchronism throughout the primary and co-acting signal heads when flashing aspects are displayed by co-acting signals Each colour light signal light shall have an apparent light source that: a) Has a diameter of 210 mm (-10mm/+20 mm), and b) Meets the colour requirements set out in Appendix A Where the colour light signal head incorporates multiple signal light sources (for example, to display a double yellow aspect), the two illuminated signal light apertures shall be vertically aligned with a centre to centre separation of 510 (+20/-10 mm) Except where signal sighting can be consistently achieved without a backboard (for example, where a signal is positioned in a dark environment), a backboard shall be provided with each colour light signal (see Appendix C) Where the backboard is incorporated into the signal head, it shall have the following dimensions: a) 300 mm (minimum) from the centre of the top signal light aperture to the top edge of the signal backboard. b) 300 mm (minimum) from the centre of the signal light aperture to the left and right side edges of the signal backboard. c) 180 mm (minimum) from the centre of the bottom signal light aperture to the bottom edge of the signal backboard Where a separate backboard is provided behind the signal head, it shall be of sufficient size to appear no smaller than a signal head mounted backboard Long-range colour light signals shall comply with standard performance category 1 (see Appendix C). Page 9 of 72

10 Short-range colour light signals shall comply with standard performance category 2 (see Appendix C) Colour light signal configured as a splitting distant signal The application requirements for splitting distant signals are set out in Splitting distant signals shall incorporate two colour light signal heads (see 2.2.1), referred to as the primary head and the offset head The primary head and offset head shall: a) Be mounted so that the horizontal separation between signal light centres in the two signal heads is 600 mm 900 mm, and b) Be positioned and aligned so that horizontally displayed signal lights appear level to the train driver (see example in Figure 1) The splitting distant signal shall be positioned so that the primary head is located as near as practicable to the driver s line of sight, that is to say: a) For signals mounted on the left-hand side of the line, the primary head shall be mounted to the right-hand side of the offset head (see example in Figure 1), and b) For signals mounted on the right-hand side of the line, the primary head shall be mounted to the left-hand side of the offset head. Figure 1 Example of a 4-aspect colour light splitting distant signal (left-hand divergence) mounted on the left-hand side of the line Splitting distant colour light signals shall comply with standard performance category 1 (see Appendix C). Page 10 of 72

11 2.2.3 Co-acting signals (colour light signal and semaphore signal) Co-acting signals shall incorporate: a) Primary signal and, where relevant, route indicator equipment that is positioned to provide the required long-distance signal sighting and readability, as set out in GE/RT8037, and b) Co-acting signal and route indicator equipment that displays the same form (that is to say, colour light or semaphore) of signal aspect and route indication as the primary equipment, and positioned to provide the required close-up signal sighting and readability, as set out in GE/RT The primary and co-acting signal and route indicator equipment shall meet the same standard performance requirements (see Appendix C), except where there is insufficient space to provide compatible equipment, in which case: a) The primary signal and route indicator equipment shall meet the appropriate standard performance requirement compatible with the long-distance signal sighting and readability, and b) The co-acting signal head and route indicator equipment shall meet the standard performance requirement that is appropriate for close-up signal sighting and readability The same main signal aspect and route indication shall be displayed by the primary and co-acting signals at all times The same subsidiary / shunting aspect and route indication shall be displayed by the primary and co-acting signals at all times, except at signals where subsidiary / shunting aspects and route indications are omitted from the primary signal Subsidiary / shunting signal aspects and route indications shall only be omitted from the primary signal if the co-acting signal equipment, on its own, provides the required sighting and readability for these aspects Signals shall only display movement authorities towards co-acting signals when both the primary and co-acting signals are detected to be displaying the correct signal aspect, except when a failure of the second yellow light of a double yellow aspect in either the primary signal or co-acting signal means results in one signal displaying a more restrictive single yellow aspect in error Banner repeating signal Banner repeating signals shall consist of a rectangular black or unlit bar, contrasted against a circular illuminated background state banner repeating signals shall comply with standard performance category 2 (see Appendix C), except at locations where the signal sighting and readability requirement (as set out in GE/RT8037) is compatible with the use of a standard performance category 3 banner repeating signal (for example, in a station platform where all trains start from rest) state banner repeating signals shall comply with (see Appendix C): a) Standard performance category 1 in terms of distinguishing a green OFF aspect from a white OFF aspect, and b) Standard performance category 2 in terms of readability of the white ON and white OFF aspect. Page 11 of 72

12 The format and dimensions of a standard performance category 2 banner repeating signal that displays an aspect using direct transmission of light (for example, fibre-optic and light-emitting diode (LED) signals), shall be as shown in Figure 2. ILLUMINATED AREA BAR (BLACK OR UNLIT) ILLUMINATED AREA All dimensions in millimetres. Figure 2 Banner repeating signal aspect meeting standard performance category Category 3 banner repeating signals shall display the same relative proportions of black and illuminated areas as performance category 2 banner repeating signals, as shown in Figure 2, and meet the performance requirement for signal readability (see Appendix C) Where white light is reflected or used to silhouette a moveable black bar (2-state banner signal only), the banner repeating signal shall comply with the equipment performance requirement for signal readability (see Appendix C) Banner repeating signal ON and OFF aspects shall be as set out in Table 2. Aspect (see Appendix A) Description MA information Remarks A horizontal black bar against a signal white background A black bar angled at 45 o +/- 5 o in the upper quadrant position against a signal white background Banner ON White Banner OFF The associated signal is the end of the MA 2-state banner repeating signal The associated signal is OFF 3-state banner repeating signal The associated signal is displaying a cautionary aspect See b and c See a See b A black bar angled at 45 o +/- 5 o in the upper quadrant position against a signal green background Table 2 Green Banner OFF Line clear Banner repeating signals ON and OFF aspects See a Page 12 of 72

13 Splitting banner repeating signals shall incorporate two banner repeating signal heads The dimension between the centre of the two signal heads of a splitting banner repeating signal shall be: a) 1000 mm (+/- 100 mm) in the horizontal plane, and b) 500 mm (+/- 50 mm) in the vertical plane, except where there is no obvious straight ahead route at the junction, in which case the two signal heads shall be positioned at the same level Position light signal (including ERTMS level 2 fitted lines) The requirements for provision of stop signals, including position light signals, are set out in Position light signals shall display ON and OFF aspects by means of the position and colour of lights Independent position light signals shall only display one of the aspects set out in Table 3 at a time Independent position light signals that display the ON aspect using two yellow lights shall only be provided by exception and only as a direct replacement for an existing semaphore yellow shunting disc signal or existing yellow/white position light signal. Aspect Description MA information Two signal red lights horizontally displayed Two signal yellow lights horizontally displayed ON ON End of MA End of MA for movements travelling in the direction(s) to which the signal can be cleared Two lunar white lights displayed at an upper OFF Shunting MA quadrant angle of 45 o Two lunar white flashing lights displayed at an upper quadrant angle of 45 o Table 3 OFF Independent position light signals ON and OFF aspects Degraded MA Position light signals associated with a colour light signal shall only display one of the aspects set out in Table 4 at a time. Aspect Description MA information No light displayed ON Obey colour light signal aspect Two lunar white lights displayed at an upper quadrant angle of 45 o in association with a colour light signal red aspect OFF Permissive MA (For calling-on movements, the section ahead is occupied) Page 13 of 72

14 Aspect Description MA information Two lunar white flashing lights displayed at an upper quadrant angle of 45 o with or without a colour light signal red aspect Table 4 OFF Degraded MA Subsidiary position light signals associated with a colour light signal: ON and OFF aspects Position light signals used to mark the limit of shunt for a movement in the opposite direction to the signalled flow of traffic shall continuously display the ON aspect set out in Table 5. Aspect Description MA information Two signal red lights horizontally displayed Table 5 ON Independent position light signals (limit of shunt) aspect End of MA Where independent position light signals that display the aspects set out in Table 3 are to be added to an existing signalling layout that includes independent position light signals that display a different form of ON aspect, the signalling layout shall be designed so that: a) Drivers will not observe the different forms of ON aspect at the same time during train movements, and b) The transition between the different forms of ON aspect is clearly defined Position light signal aspects that are designed to flash shall: a) Flash at a frequency of 60 (+/- 10) cycles per minute, and b) Have a mark:space ratio that provides visibility of the signal light for 50% - 66% of each flashing cycle when observed in accordance with standard performance category 3 (see Appendix C) Position light signals shall comply with standard performance category 3 (see Appendix C) Semaphore main stop signal and distant signal Semaphore main stop signals shall display aspects by means of a rectangular semaphore signal arm and coloured lights Semaphore main stop signals shall comply with standard performance category 4 (see Appendix C), except where a signal is provided to authorise train movements from a goods line or siding(s) onto a passenger line. In such cases the semaphore main stop signal shall comply with either standard performance category 4 or standard performance category 2, whichever is appropriate for the signal sighting and readability requirement The colour, format and dimensions of semaphore main stop signal arms meeting performance category 4 shall be as shown in Figure 3. Page 14 of 72

15 The dimensions of semaphore main stop signal arms meeting performance category 2 shall be as set out in and as shown in Figure 6, except where a larger standard performance category 2 signal arm is provided to maintain consistency with an existing signalling layout mm 318 mm 178 mm 260 mm SIGNAL POST END FRONT VIEW 178 mm 318 mm SIGNAL POST END BACK VIEW RED BS 381C shade 537 BLACK WHITE Tolerance on all dimensions: ± 5% Figure 3 Semaphore main stop signal arm Semaphore main stop signals shall only display the ON and OFF aspects, as set out in Table 6. Aspect Description MA information a) Signal arm horizontal (+5 o /-5 o ) b) Signal red light (see Appendix A) a) Signal arm raised or lowered by an angle of 45 (+20 o /-10 o ) b) Signal green light (see Appendix A) ON OFF End of MA Signal section clear Table 6 Semaphore main stop signal ON and OFF aspects Page 15 of 72

16 Semaphore distant signals shall display aspects by means of a rectangular semaphore signal arm with a fishtail end and coloured lights Semaphore distant signals shall comply with standard performance category 4 (see Appendix C) The colour, format and dimensions of semaphore distant signal arms shall be as shown in Figure mm 241 mm 210 mm 260 mm 25 mm SIGNAL POST END 25 mm 102 mm FRONT VIEW 210 mm 241 mm SIGNAL POST END BACK VIEW 190 mm YELLOW BS 381C shade 356 BLACK WHITE Tolerance on all dimensions: ± 5% Figure 4 Distant signal arm Semaphore distant signals shall only display the ON and OFF aspects set out in Table 7. Page 16 of 72

17 Aspect Description MA information a) Signal arm horizontal (+5o/-5o) b) Signal red light (see Appendix A) c) Signal arm raised or lowered by an angle of 45 (+20 o /-10 o ) d) Signal green light (see Appendix A) ON OFF End of MA ahead Line clear (see b) Table 7 Semaphore distant signal ON and OFF aspects Semaphore subsidiary signal Semaphore subsidiary signals shall be provided in accordance with GK/RT Semaphore subsidiary signals shall display aspects by means of a rectangular semaphore signal arm, and coloured lights, positioned below the main arm of the semaphore stop signal that it is associated with and on the same signal post The colour, format and dimensions of semaphore subsidiary signal arms shall be as shown in Figure mm 77mm 41mm FRONT VIEW 159mm SIGNAL POST END RED BS 381C shade 537 SIGNAL POST END 115mm 152mm BLACK WHITE BACK VIEW Tolerance on all dimensions: ± 5% Figure 5 Semaphore subsidiary signal arm Semaphore subsidiary signals shall comply with standard performance category 3 (see Appendix C) Semaphore subsidiary signals shall display only the ON and OFF aspects, as set out in Table 8. Page 17 of 72

18 Aspect Description MA information a) Signal arm horizontal (+5 o /-5 o ) b) Signal red light (see Appendix A) a) Arm raised or lowered by angle of 45 (+20 o /-10 o ) b) Signal green light (see Appendix A) Table Semaphore shunting signal ON OFF Semaphore subsidiary signal ON and OFF aspects Obey associated semaphore stop signal Permissive MA Semaphore shunting signals shall be provided in accordance with Semaphore shunting signals shall display aspects using either one of the following: a) A miniature rectangular semaphore arm and coloured lights. b) A semaphore disc and coloured lights. c) A semaphore disc illuminated by floodlighting The colour, format and dimensions of semaphore shunting signals shall be as shown in Figure 6, except where a larger standard performance category 3 signal is provided to maintain consistency with an existing signalling layout. 146mm 102mm 146mm FRONT VIEW DISC TYPE BACK VIEW DISC TYPE 533mm 152mm 115mm 159mm FRONT VIEW ARM TYPE SIGNAL POST END RED BS 381C shade mm 152mm BLACK SIGNAL POST END WHITE BACK VIEW ARM TYPE Tolerance on all dimensions: ± 5% Figure 6 Semaphore shunting signals Semaphore shunting signals shall comply with standard performance category 3 (see Appendix C). Page 18 of 72

19 Semaphore shunting signals shall display only the ON and OFF aspects, as set out in Table 9. Aspect Description MA information a) Disc with red bar horizontal (+5 o /-5 o ) or Red and white horizontal (+5 o /-5 o ) arm b) Signal red light displayed (see Appendix A) #1 a) Disc turned 45 (+20 o /-10 o ) or Arm raised or lowered by angle of 45 (+20 o /-10 o ) b) Signal green light displayed (see Appendix A) #1 ON OFF End of MA Shunting MA #1 Not required where a semaphore disc is illuminated by floodlighting Table 9 Semaphore shunting signal ON and OFF aspects 2.3 Specification of route indicators Position light junction indicator Position light junction indicators shall only be provided in association with colour light signals (see 5.1.1) Position light junction indicators shall display the indication of route by means of either: a) A line of five lunar white light points (see Appendix A) orientated as shown in Figure 7, or b) A bar of light, as shown in Figure Max. 704 Min between centreline of lenses Position 1 (45 o ) 600 Min 176 Min Position 4 (45 o ) Position 2 (90 o ) Position 5 (90 o ) Position 3 (135 o ) Position 6 (135 o ) All dimensions are in millimetres Figure 7 Position light junction indicator using five lunar white lights (example shows position 1) Page 19 of 72

20 Position 1 (45 o ) 600 Min 176 Min Position 4 (45 o ) Position 2 (90 o ) Position 5 (90 o ) Position 3 (135 o ) Position 6 (135 o ) All dimensions are in millimetres Figure 8 Position light junction indicator using a bar of light (example shows position 1) Position light junction indicators shall be positioned either above or to one side of the associated colour light signal head to provide the required signal sighting and readability of the combined signal aspects and route indications The separation distance between an illuminated signal light and the nearest lunar white light or bar of light point shall be 550 mm (minimum) and 1230 mm (maximum) Where position light junction indicators are provided for more than one diverging route, they shall be orientated according to the order in which the divergences occur in the manner set out in Figure 9, commencing on each side at positions 1 and 4, as set out in Table 10. Signal Position light junction indication Route information ON None No MA OFF None MA for straight-ahead route OFF Position 1 MA for divergence to left OFF Position 2 MA for divergence to left more extreme than that for position 1 indication OFF Position 3 MA for divergence to left more extreme than that for position 2 indication OFF Position 4 MA for divergence to right Page 20 of 72

21 Signal Position light junction indication Route information OFF Position 5 MA for divergence to right more extreme than that for position 4 indication OFF Position 6 MA for divergence to right more extreme than that for position 5 indication Table 10 Position light junction indicator: displayed route indications POSITION 3 POSITION 2 POSITION 1 NO INDICATION NO INDICATION POSITION 4 POSITION 5 POSITION 6 Figure 9 Orientation of position light junction indications relative to diverging routes Position light junction indicators shall comply with standard performance category 1 (see Appendix C) Alphanumeric route indicator (including ERTMS level 2 operated lines) The requirements for provision of route indicators at junction signals are set out in Alphanumeric route indicators shall display the indication of route in the form of an illuminated alphanumeric display, coloured signal white The alphanumeric character font shall approximate to Gill Sans light Alphanumeric route indicators shall display the indication of route using one or more of the following characters: A B C D E F G H K L M N O P R S T U V W X Y Z The following limitations on the form of alphanumeric indications shall be applied: a) O and V shall only be used in combination with other letters where it is necessary to describe a geographic meaning. b) When used in conjunction with a subsidiary signal, C and S shall be reserved for indicating the class of movement. Page 21 of 72

22 c) An alphanumeric route indication incorporating the letter X shall only be displayed in combination with main or shunting signal OFF aspects when the route is set towards a limit of shunt, or along a bi-directional line in the opposite direction to the normal flow of traffic. Where more than one such route exists, the X indication shall be qualified by a reference to the line concerned. d) Combinations BU, CD, RA and OFF shall not be used Where an alphanumeric indication uses more than one character, the minimum distance between the outermost points on adjacent characters shall be 20% of character height Standard alphanumeric route indicators shall comply with standard performance category 2 (see Appendix C) Miniature alphanumeric route indicators shall comply with standard performance category 3 (see Appendix C) Preliminary route indicator The requirements for provision of preliminary route indicators are set out in The displayed preliminary route indication shall be displayed in the form of a signal white illuminated arrow against a black background, as set out in Table 11. Indication Route information Indication Route information Junction signal is displaying the ON aspect Junction signal is displaying an OFF aspect for the straight-ahead route No indication Junction signal is displaying an OFF aspect for a divergence to the left Position 0 Junction signal is displaying an OFF aspect for a divergence to the right Position 1 Junction signal is displaying an OFF aspect for a divergence to the left more extreme than position 1 Position 4 Junction signal is displaying an OFF aspect for a divergence to the right more extreme than position 4 Position 2 Position 5 Page 22 of 72

23 Indication Route information Indication Route information Table 11 Position 3 Junction signal is displaying an OFF aspect for a divergence to the left more extreme than position 2 Position 6 Preliminary route indicators: displayed indications Junction signal is displaying an OFF aspect for a divergence to the right more extreme than position Only one preliminary route indication shall be displayed at a time Preliminary route indicators shall comply with standard performance category 2 (see Appendix C). 2.4 Specification of lineside indicators Points indicator Points indicators shall be provided in accordance with Points indicators shall display the indications set out in Table 12. Indication Equipment status Signal red flashing light Signal red light (see ) Points not set No indication (see ) Signal yellow light Points are correctly set Table 12 Points indicator: displayed indications The indications displayed by points indicators in combination with a TPWS indicator and stop boards are set out in A points indicator that displays only a yellow light or a steady red light / yellow light shall only be provided on lines where it is necessary to display consistent indications along a line of route already fitted with this form of indication The points indicator red flashing light shall: a) Flash at a frequency of 120 (+/-6) cycles per minute, and b) Emit light for a nominal 100 ms of each flashing cycle Points indicators shall comply with (see Appendix C): a) Standard performance category 3 for the yellow indication, and b) 600 m readability distance for the steady or flashing red light. Page 23 of 72

24 2.4.2 Driver s level crossing indicator (including ERTMS operated lines) The requirements for provision of driver s level crossing indicators are set out in GK/RT Drivers level crossing indicators shall display the indications set out in Table 13. Indication Equipment status Remarks Signal red flashing light Signal white flashing light Level crossing equipment is not operating correctly Level crossing equipment is correctly operating Not provided where the level crossing indication is displayed at a stop board (see 2.4.8) Table 13 Driver s level crossing indicator: displayed indications The indications displayed by drivers level crossing indicators associated with a TPWS indicator at a stop board are set out in The driver s level crossing indicator red flashing light shall: a) Flash at a frequency of 120 (+/-6) cycles per minute, and b) Emit light for a nominal 100 ms of each flashing cycle The driver s level crossing indicator white flashing light shall: a) Flash at a frequency of 60 (min) to 90 (max) cycles per minute, and b) Have a mark:space ratio that provides visibility of the signal light for 50% - 66% of each flashing cycle when observed in accordance with standard performance category 1 (see Appendix C) Drivers level crossing indicators shall comply with: a) Standard performance category 1 for the white flashing light, and b) 600 m readability distance for the red flashing light (see Appendix C) Loading / unloading indicator The requirements for provision of loading / unloading indicators are set out in Loading / unloading indicators shall display the indications set out in Table 14. Indication MA information Indication MA information One signal white light between two signal red lights The operator requires the train to stop white lights vertically aligned The operator requires the train to move slowly in the normal direction for loading or unloading Page 24 of 72

25 Indication MA information Indication MA information white lights angled at 45 o to horizontal The operator requires the train to prepare to stop Indicators are not in use flashing white lights angled at 45 o to horizontal The operator requires the train to move slowly in the opposite direction to that required for loading or unloading No displayed indication Table 14 Loading / unloading indicator: displayed indications Each loading / unloading indicator shall display only one of the permitted indications at a time The loading / unloading indicator flashing aspect shall: a) Flash at a frequency of 60 (+/-10) cycles per minute, and b) Have a mark:space ratio that provides visibility of the signal light for 50% - 66% of each flashing cycle when observed in accordance with standard performance category 3 (see Appendix C) Loading / unloading indicators shall comply with standard performance category 3 (see Appendix C) SPAD indicator SPAD indicators shall only be provided as a means of mitigating the consequence of a signal passed at danger (SPAD) (see GI/RT7006) SPAD indicators shall display the indications set out in Table 15. Indication Description MA information One steady signal red light vertically aligned between two signal red flashing lights Table 15 The signal to which the SPAD indicator applies has been passed without authority Train has passed the end of movement authority No indication No SPAD detected No SPAD detected SPAD indicator: displayed indications Page 25 of 72

26 The two flashing red lamps shall: a) Flash in synchronism at a frequency of 60 (+/-10) cycles per minute, and b) Have a mark:space ratio that provides visibility of the illuminated indication for 50% - 66% of each flashing cycle when observed by a driver The SPAD indicator assembly shall comply with the format and dimensions shown in Figure SPAD indicators shall comply with standard performance category 2 and be capable of attracting the driver s attention: a) When it is on the periphery of a driver s vision at angles to the centre line of 30 o. b) At a distance of 100 m. c) In an environment with other bright background lights. Figure 10 SPAD indicator Where provided, SPAD indicators shall be positioned and aligned so that drivers approaching the point of conflict have a clear view of the indicator and have the greatest opportunity of stopping the train before the point of conflict is reached OFF indicator (including ERTMS level 2 operated lines) OFF indicators shall be provided at stations in accordance with GE/RT OFF indicators shall only display the indications set out in Table 16. Page 26 of 72

27 Indication Operational information Associated signal is displaying an ON aspect UP DN Table 16 OF OFF OFF OFF indicator: displayed indications Associated signal is displaying an OFF aspect The associated up direction signal is displaying an OFF aspect The associated down direction signal is displaying an OFF aspect The illuminated OFF indication shall be coloured signal white The character font shall approximate to Gill Sans light Where lineside signals are provided, an OFF indicator shall display the relevant OFF indication only when the signal(s) to which it applies is displaying an OFF aspect. No indication shall be displayed at all other times In ERTMS operated areas, an OFF indicator shall display 'OFF' only when a train has confirmed that it has received an in-cab movement authority to pass the node to which the OFF indicator applies. No indication shall be displayed at all other times OFF indicators shall comply with standard performance category 5 (see Appendix C) CD indicator and RA Indicator (including ERTMS level 2 operated lines) CD and RA indicators shall be provided at stations in accordance with GE/RT A self-restoring, secure operating device shall be provided for use by train dispatchers The indicator shall display the relevant indication only when the associated control device has been operated In ERTMS operated areas, a right away indicator shall display 'RA' only when a train has confirmed that it has received an in-cab movement authority to pass the node to which the right away indicator applies CD and RA indicators shall only display the relevant indications set out in Table 17. Indication CD RA Operational information Station operations are not complete CLOSE DOORS RIGHT AWAY Table 17 CD and RA indicators: displayed indications Page 27 of 72

28 Where a CD indicator is provided in conjunction with an RA indicator, the RA indication shall supersede the CD indication The illuminated indication shall be coloured signal white The character font shall approximate to Gill Sans light CD indicators and RA indicators shall comply with standard performance category 5 (see Appendix C) BU indicator BU indicators shall be provided in accordance with GK/RT Where provided, BU indicators shall be positioned at a distance beyond the level crossing, so that the BU indication is displayed before the front of the train that has passed over the level crossing passes the BU indicator BU indicators shall only display the indications set out in Table 18. Indication BU Equipment status information The level crossing opening sequence has not operated BARRIERS UP Table 18 BU indicators: displayed indications BU indicators shall display BU only when the associated level crossing barriers are fully raised. No indication shall be displayed at all other times The illuminated indication shall be coloured signal white The character font shall approximate to Gill Sans light BU indicators shall comply with standard performance category 5 (see Appendix C) Train Protection and Warning System (TPWS) indicator Where a TPWS indicator is required at a stop board, it shall be positioned either: a) Underneath the relevant stop board so that it is readable from the driving cab, or b) Remotely from the stop board; only where drivers are required to leave the driving cab to operate signalling equipment (for example, associated with driver operated token exchange equipment) TPWS indicators shall only display the indications set out in Table 19. Indication Steady signal blue light #1 Flashing signal blue light No indication #1 Normal state when no train is present Equipment status information TPWS intervention set TPWS disarmed TPWS failed Table 19 TPWS indications Page 28 of 72

29 The TPWS indicator blue flashing light shall: a) Flash at a frequency of 120 (+/-6) cycles per minute, and b) Emit light for a nominal 100 ms of each flashing cycle TPWS indicators shall comply with standard performance category 3 (see Appendix C) Where a TPWS indicator at a stop board is combined with a points indicator (for example, at the exit of a passing loop on a single line operated using the nosignaller token remote block system), the points indicator shall be positioned next to the TPWS indicator, so that the points indication is closest to the driver s line of sight Where a TPWS indicator at a stop board is associated with a points indicator and a driver s level crossing indicator: a) The points indicator shall be positioned next to the TPWS indicator, so that the points indication is closest to the driver s line of sight, and b) The driver s level crossing indicator shall be positioned adjacent to the stop board separately from the points / TPWS indication so that concurrently displayed indications are both readable as separate indications Where a TPWS indication is associated with a points indicator and / or a level crossing indicator: TPWS indicator Steady blue (#1) Steady blue (#1) a) The combinations of displayed indications shall comply with Table 20, and b) The indications shall be consistently displayed in a logical sequence at each location along a line of route. Points indicator LC indicator Equipment status information No indication No indication TPWS intervention set LC not operating No indication Flashing white TPWS intervention set LC correctly operating No indication Flashing red No indication Points not set (or points moving) LC not operating Flashing blue No indication No indication TPWS disarmed LC not operating Flashing blue No indication Flashing white No indication Flashing red Flashing white TPWS disarmed LC correctly operating Points not set (points moving) LC correctly operating Page 29 of 72

Lineside Signals, Indicators and Layout of Signals

Lineside Signals, Indicators and Layout of Signals Lineside Signals, Indicators and Layout of Signals Synopsis This document defines the format, presentation and layout of lineside signalling equipment that is used to display movement authority information

More information

Lineside Signal Aspect and Indication Requirements

Lineside Signal Aspect and Indication Requirements Lineside Signal Aspect and Indication Requirements Synopsis This document mandates the appearance of lineside signalling system displays and the information they convey. This document contains one or more

More information

Guidance on Lineside Signals, Indicators and Layout of Signals. Rail Industry Guidance Note for GK/RT0045

Guidance on Lineside Signals, Indicators and Layout of Signals. Rail Industry Guidance Note for GK/RT0045 GN Published by Block 2 Angel Square 1 Torrens Street London EC1V 1NY Copyright 2012 Rail Safety and Standards Board Limited GK/GN0645 Issue Two: March 2012 Rail Industry Guidance Note for GK/RT0045 Issue

More information

GK/GN0658. Guidance on Lineside Signal Aspect and Indication Requirements. Rail Industry Guidance Note for GK/RT0058

GK/GN0658. Guidance on Lineside Signal Aspect and Indication Requirements. Rail Industry Guidance Note for GK/RT0058 GN This document contains one or more pages which contain colour Published by: Block 2 Angel Square 1 Torrens Street London EC1V 1NY Copyright 2014 Rail Safety and Standards Board Limited GK/GN0658 Issue

More information

Lineside Signal Aspects and Indications

Lineside Signal Aspects and Indications Supersedes Iss 1 (to correct formatting) and supersedes Lineside Signal Aspects and Indications Synopsis This document specifies the appearance of lineside signal aspects and s and the information they

More information

Block System Interface Requirements

Block System Interface Requirements Block System Interface Requirements Synopsis This document mandates the requirements for block systems interfaces between signalling infrastructure and railway operations. Copyright in the s is owned by

More information

Ground Frames and Shunters Releases

Ground Frames and Shunters Releases Ground Frames and Shunters Synopsis This document mandates the interface requirements for ground frames and shunters releases that may be operated by railway undertaking personnel. Copyright in the s is

More information

Lineside Signal Aspect Sequences

Lineside Signal Aspect Sequences ailway roup Standard K/T0032 Lineside Signal Aspect Sequences Synopsis This standard defines the sequence in which lineside signal aspects shall be presented to train drivers. This document is the property

More information

Fixed Signals - Rules 1 to 23

Fixed Signals - Rules 1 to 23 Applicability VIC Publication Requirement External Only Document Status Issue/Revision # Effective from 1 07 August 2011 0 04 October 2015 1 01 July 2018 Australian Rail Track Corporation Limited (ARTC)

More information

Signal Sighting. Withdrawn Document Uncontrolled When Printed. Railway Group Standard. Issue Two Date February 1996

Signal Sighting. Withdrawn Document Uncontrolled When Printed. Railway Group Standard. Issue Two Date February 1996 Railway Group Standard Signatures removed from electronic version Submitted by: Philip Wiltshire, Nominated Responsible Manager Approved by: Robin Nelson, Chairman, Train Control and Communications Subject

More information

Running Signals ANSG 600. Applicability. Publication Requirement. Document Status NSW SMS. External Only October 2015.

Running Signals ANSG 600. Applicability. Publication Requirement. Document Status NSW SMS. External Only October 2015. Applicability NSW SMS Publication Requirement External Only Document Status Issue/Revision # Effective from 3.0 11 October 2015 Australian Rail Track Corporation Limited (ARTC) Disclaimer This document

More information

Guidance on Signal Positioning and Visibility

Guidance on Signal Positioning and Visibility Guidance on Signal Positioning and Visibility Synopsis This document provides guidance on the requirements for positioning signals and indicators to ensure adequate viewing and clarity of meaning for drivers.

More information

British Signalling What the driver sees

British Signalling What the driver sees Railway Technical Website Background Paper No. 1 One of a series of papers originally published as pages on RTWP and updated for RTW. Introduction British Signalling What the driver sees by Piers Connor

More information

Network Safeworking Rules and Procedures

Network Safeworking Rules and Procedures Network Safeworking Rules and Procedures Fixed Signals Rule Number: 6005 Version 1.0, 31 March 2016 Fixed Signals Rule Number: 6005 Document Control Identification Document title Number Version Date 6005

More information

Responding to Signals and Signs

Responding to Signals and Signs Applicability NSW SMS Publication Requirement External Only Document Status Issue/Revision # Effective from 4.0 11 October 2015 Australian Rail Track Corporation Limited (ARTC) Disclaimer This document

More information

Signalling Cable Equivalent Sizes

Signalling Cable Equivalent Sizes Signalling Cable Equivalent Sizes Signatures removed from electronic version Submitted by... Jim Harper Nominated Responsible Manager Synopsis This Standard Authorises the use of cables to GS/ES 0872 as

More information

Signal Sighting Standard

Signal Sighting Standard Engineering Standard Signals L1-CHE-STD-004 Signal Sighting Standard Version: 1 Issued: June 2016 Owner: Engineering Approved By: Phil Ellingworth Chief Engineer PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO

More information

Withdrawn Document. Title of Rule Book SECTION N SINGLE LINE WORKING. Page Date Index

Withdrawn Document. Title of Rule Book SECTION N SINGLE LINE WORKING. Page Date Index Uncontrolled Railway When Group Printed Standard Title of Rule Book : GO/RT3000 : Master SECTION N SINGLE LINE WORKING Page Date Index Page No. Latest Issue N.1/N.2 December 2002 N.3/N.4 December 2002

More information

Transportation Engineering -II Dr. Rajat Rastogi Department of Civil Engineering Indian Institute of Technology - Roorkee

Transportation Engineering -II Dr. Rajat Rastogi Department of Civil Engineering Indian Institute of Technology - Roorkee Transportation Engineering -II Dr. Rajat Rastogi Department of Civil Engineering Indian Institute of Technology - Roorkee Lecture - 22 Signals part - 1 Dear students, I welcome you back to the lecture

More information

Signalling Cable Equivalent Sizes (formerly RT/E/C/11213)

Signalling Cable Equivalent Sizes (formerly RT/E/C/11213) NR/GN/SIG/11213 Ref Date (formerly RT/E/C/11213) This temporary front sheet facilitates change to the new Network Rail Standards referencing nomenclature. The Ref above will be formally allocated to this

More information

Where was the location of the incident?

Where was the location of the incident? Note: All mention of SPAD in this form refers to provisional SPAD. PART 1 INCIDENT DETAIL 1.1 1.2 What was the date of the incident? (dd/mm/yy) What was the time of the incident? (24 hour clock) 1.3 Where

More information

Mitigation measures for tool C - rail infrastructure managers

Mitigation measures for tool C - rail infrastructure managers Mitigation measures for tool C - rail infrastructure managers Mitigation measures for tool C rail infrastructure managers Instructions This tool links to tool C Appendix D SPAD data collection tool C for

More information

2 Layout and Use of Signals

2 Layout and Use of Signals Issued May 2 Layout and Use of Signals 2. General Signals are provided to control the movement of trains and to inform the driver whether it is safe to proceed. Their location is dictated largely by the

More information

Briefing Note Publication

Briefing Note Publication Documents for Block System and for Ground Frames and Shunters Releases New documents Document Document title Issue GK/RT0055 Block System Interface Requirements 1 GK/GN0655 Guidance on Block System Interface

More information

Handbook 8. Handbook 8. IWA, COSS or PC blocking a line. GE/RT8000/HB8 Rule Book

Handbook 8. Handbook 8. IWA, COSS or PC blocking a line. GE/RT8000/HB8 Rule Book GE/RT8000/HB8 Rule Book Handbook 8 IWA, COSS or PC blocking a line Handbook 8 Issue 1 Valid from December 2010 Published by: RSSB Block 2 Angel Square 1 Torrens Street London EC1V 1NY. Contents approved

More information

The Joys of Life Model Railway Club OPERATING THE RAILWAY. Not To Be Taken Away

The Joys of Life Model Railway Club OPERATING THE RAILWAY. Not To Be Taken Away The Joys of Life Model Railway Club OPERATING THE RAILWAY Not To Be Taken Away Operating the Joys of Life Railway Will High 1. Introduction The Joys of Life Railway is a 600 yard long, 5in gauge ground

More information

Signal Sighting and Position

Signal Sighting and Position Discipline: Engineering (Signalling) Category: Standard Signal Sighting and Position ESC-04-01 Applicability ARTC Network Wide CRIA (NSW CRN) Primary Source PP-165, SC 08 01, SCP 06, SCP 15 Document Status

More information

BURNLEY GROUP OPERATING PROCEDURES

BURNLEY GROUP OPERATING PROCEDURES The Operating Procedures contained in this document titled Burnley Group Operating Procedures refer to the area bounded by Richmond, Glen Waverley, Alamein, Belgrave & Lilydale. Approval Amendment Record

More information

INTERIM ADVICE NOTE 109/08. Advice Regarding the Motorway Signal Mark 4 (MS4)

INTERIM ADVICE NOTE 109/08. Advice Regarding the Motorway Signal Mark 4 (MS4) INTERIM ADVICE NOTE 109/08 Advice Regarding the Motorway Signal Mark 4 (MS4) Summary This document provides advice on usage of MS4 signal and when they can be used to replace MS3 signals. Instructions

More information

In the proposed amendment below, text shown with underline is proposed to be added and text shown with strikethrough is proposed to be removed.

In the proposed amendment below, text shown with underline is proposed to be added and text shown with strikethrough is proposed to be removed. ZOA-13-07 AN ORDINANCE TO AMEND, REENACT AND RECODIFY ARTICLES 13 AND 18 OF THE ARLINGTON COUNTY ZONING ORDINANCE TO DEFINE LARGE MEDIA SCREENS AS AUTOMATIC CHANGEABLE COPY SIGNS LARGER THAN 12 SQUARE

More information

Simplified Signaling for Modelers

Simplified Signaling for Modelers Simplified Signaling for Modelers Rule 281 Clear 1 Author: Gary Evans North Central Region, Division 3 garytrain47@frontier.com Revision: May 05, 2014 Handout: NORAC Signal Aspects Sheet 2 Introduction

More information

SIGNALING PRACTICES ON PROTOTYPE AND MODEL RAILROADS

SIGNALING PRACTICES ON PROTOTYPE AND MODEL RAILROADS SIGNALING PRACTICES ON PROTOTYPE AND MODEL RAILROADS Bill Ataras September 30, 2013 PROTOTYPE SIGNALING PRACTICE 1. Many different types of signals A. Block signals B. Interlocking signals C. Whistles

More information

STANDARD FOR TELECOMMS WIRING AND TERMINATIONS

STANDARD FOR TELECOMMS WIRING AND TERMINATIONS GTlEH H802 Date MR 94 Paae I Part Synopsis This standard defines the Board's policy for the maintenance of Telecomms cable terminations. lthough the standard is centered on maintenance issues its provisions

More information

M2P. Large Rectangular-bodied Indicators. Indicator (Rectangular) List of Models

M2P. Large Rectangular-bodied Indicators. Indicator (Rectangular) List of Models Indicator (Rectangular) CSM DS_E_3_2 Large Rectangular-bodied Indicators Excellent illumination with even surface brightness. Three-color (green, orange, red; chameleon lighting) included in lineup. Refer

More information

Handbook 8. Issue 6. IWA, COSS or PC blocking a line. GERT8000-HB8 Rule Book. September 2017 Comes into force 02 December 2017

Handbook 8. Issue 6. IWA, COSS or PC blocking a line. GERT8000-HB8 Rule Book. September 2017 Comes into force 02 December 2017 GERT8000-HB8 Rule Book IWA, COSS or PC blocking a line Issue 6 September 2017 Comes into force 02 December 2017 Handbook 8 Uncontrolled when printed Published by: RSSB The authoritative version of this

More information

RESOLUTION MSC.95(72) (adopted on 22 May 2000) PERFORMANCE STANDARDS FOR DAYLIGHT SIGNALLING LAMPS

RESOLUTION MSC.95(72) (adopted on 22 May 2000) PERFORMANCE STANDARDS FOR DAYLIGHT SIGNALLING LAMPS MSC 72/23/Add.1 RESOLUTION MSC.95(72) THE MARITIME SAFETY COMMITTEE, RECALLING Article 28(b) of the Convention on the International Maritime Organization concerning the functions of Committee, RECALLING

More information

M2P. Large Rectangular-bodied Indicators. Indicator (Rectangular) List of Models

M2P. Large Rectangular-bodied Indicators. Indicator (Rectangular) List of Models Indicator (Rectangular) CSM DS_E_4_1 Large Rectangular-bodied Indicators Excellent illumination with even surface brightness. Three-color (green, orange, red; chameleon lighting) included in lineup. Refer

More information

Installation Manual IPT Installation of skillet systems with 125 A track current. MV a-E.

Installation Manual IPT Installation of skillet systems with 125 A track current. MV a-E. www.wampfler.com Page 1 of 27 Index Page 1 Basics...4 2 Basic understanding of an IPT -system...5 3 General rules regarding metal parts in close proximity...6 3.1 Envelope free of ferromagnetic material...6

More information

THE CITY OF WINNIPEG BY-LAW NO. 36/2013

THE CITY OF WINNIPEG BY-LAW NO. 36/2013 THE CITY OF WINNIPEG BY-LAW NO. 36/2013 A By-law of The City of Winnipeg to amend Winnipeg Zoning By-law No. 200/2006 with respect to digital signs and billboards. THE CITY OF WINNIPEG, in Council assembled,

More information

Azatrax Model Railroad Track Signal Control - Single Track

Azatrax Model Railroad Track Signal Control - Single Track Installation Guide Azatrax Model Railroad Track Signal Control - Single Track TS2 What it is: The TS2 operates one or two trackside block signals (one in each direction) on one track to simulate the block

More information

67. LEVEL TRANSITION FROM LEVEL NTC TO LEVEL 1 (SYSTEM VERSION 2.Y)

67. LEVEL TRANSITION FROM LEVEL NTC TO LEVEL 1 (SYSTEM VERSION 2.Y) 123-133 Rue Froissart, 1040 Brussels, Belgium Tel: +32 (0)2 673.99.33 - TVA BE0455.935.830 Website: www.ertms.be E-mail: info@ertms.be ERTMS USERS GROUP - ENGINEERING GUIDELINE 67. LEVEL TRANSITION FROM

More information

Uncontrolled When Printed Document comes into force on 05/12/2015 Supersedes GERT8000-HB2 Iss 1 on 05/12/2015

Uncontrolled When Printed Document comes into force on 05/12/2015 Supersedes GERT8000-HB2 Iss 1 on 05/12/2015 GE/RT8000/HB2 Rule Book Uncontrolled When Printed Handbook 2 Instructions for track workers who use emergency protection equipment Handbook 2 Issue 2 September 2015 Comes into force 05 December 2015 This

More information

Withdrawn Document. SECTION F (Part ii) YOUR DUTIES IF YOU ARE ACTING AS A HANDSIGNALLER

Withdrawn Document. SECTION F (Part ii) YOUR DUTIES IF YOU ARE ACTING AS A HANDSIGNALLER Uncontrolled When Printed SECTION F (Part ii) YOUR DUTIES IF YOU ARE ACTING AS A HANDSIGNALLER Updated to October 1998 (Formatted for CD use) Rule Book No. 13 Page F(ii).1 Uncontrolled When Printed This

More information

Brand Identity Guidelines

Brand Identity Guidelines Brand Identity Guidelines For Organisations offering BPAY services and Member Financial Institutions BPAY Brand Identity Guidelines Introduction 2 This guide should be used in conjunction with the BPAY

More information

User Manual. SafeShield Safety Light Curtain Hardware

User Manual. SafeShield Safety Light Curtain Hardware User Manual SafeShield Safety Light Curtain Hardware Important User Information Because of the variety of uses for the products described in this publication, those responsible for the application and

More information

Gigabit Multi-mode SX to Single Mode LX Converter. User s Manual NGF-728 Series. Warning COPYRIGHT

Gigabit Multi-mode SX to Single Mode LX Converter. User s Manual NGF-728 Series. Warning COPYRIGHT COPYRIGHT Gigabit Multi-mode SX to Single Mode LX Converter User s Manual NGF-728 Series All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted

More information

Bus route and destination displays making it easier to read.

Bus route and destination displays making it easier to read. Loughborough University Institutional Repository Bus route and destination displays making it easier to read. This item was submitted to Loughborough University's Institutional Repository by the/an author.

More information

DISCLAIMER. This document is current at the date of downloading. Hunter Water may update this document at any time.

DISCLAIMER. This document is current at the date of downloading. Hunter Water may update this document at any time. DISCLAIMER This Standard Technical Specification was developed by Hunter Water to be used for construction or maintenance of water and/or sewerage works that are to become the property of Hunter Water.

More information

APPROVED for connection to Telecommunication systems specified in the instructions for use subject to the conditions set out in them.

APPROVED for connection to Telecommunication systems specified in the instructions for use subject to the conditions set out in them. TM COMSPHERE 3900 Series Modems Models 3910 and 3911 Government Requirements for Great Britain Document Number 3910-A2-GK42-10 November 1996 Overview This document highlights government requirements, safety

More information

INTRODUCTION TERMINAL LAYOUTS FX2N-4AD-TC SPECIAL FUNCTION BLOCK USER S GUIDE

INTRODUCTION TERMINAL LAYOUTS FX2N-4AD-TC SPECIAL FUNCTION BLOCK USER S GUIDE FX2N-4AD-TC SPECIAL FUNCTION BLOCK USER S GUIDE JY992D65501A This manual contains text, diagrams and explanations which will guide the reader in the correct installation and operation of the FX2N-4AD-TC

More information

FX-4AD-TC SPECIAL FUNCTION BLOCK USER'S GUIDE

FX-4AD-TC SPECIAL FUNCTION BLOCK USER'S GUIDE FX-4AD-TC SPECIAL FUNCTION BLOCK USER'S GUIDE JY992D55901A This manual contains text, diagrams and explanations which will guide the reader in the correct installation and operation of the FX-4AD-TC special

More information

INTRODUCTION TERMINAL LAYOUTS FX2N-4AD SPECIAL FUNCTION BLOCK USER S GUIDE

INTRODUCTION TERMINAL LAYOUTS FX2N-4AD SPECIAL FUNCTION BLOCK USER S GUIDE FX2N-4AD SPECIAL FUNCTION BLOCK USER S GUIDE JY992D6520B This manual contains text, diagrams and explanations which will guide the reader in the correct installation and operation of the FX2N-4AD and should

More information

Engineering Instruction

Engineering Instruction Engineering Instruction Electrical Distribution Unit Approved by: Paul Poynton, A/Professional Head Electrical Engineering, Sydney Trains Authorised by: Jonathon McKinnon, Engineering Technical Publications

More information

STX Stairs lighting controller.

STX Stairs lighting controller. Stairs lighting controller STX-1795 The STX-1795 controller serves for a dynamic control of the lighting of stairs. The lighting is switched on for consecutive steps, upwards or downwards, depending on

More information

SIGNALPERSON REFERENCE MANUAL

SIGNALPERSON REFERENCE MANUAL NATIONAL COMMISSION FOR THE CERTIFICATION OF CRANE OPERATORS (NCCCO) SIGNALPERSON REFERENCE MANUAL SGP RM 10/10 This page intentionally left blank Hold Harmless/Release/Disclaimer Agreement The reading

More information

FX-2DA SPECIAL FUNCTION BLOCK USER'S GUIDE

FX-2DA SPECIAL FUNCTION BLOCK USER'S GUIDE FX-2DA SPECIAL FUNCTION BLOCK USER'S GUIDE JY992D52801C This manual contains text, diagrams and explanations which will guide the reader in the correct installation and operation of the FX-2DA special

More information

CR Signals Price List (N Gauge & General) April 2010

CR Signals Price List (N Gauge & General) April 2010 Welcome to CR Signals mail order price list price list and order form. Established in 2004, all of our products have been developed over the years and are hand built using the finest materials and latest

More information

SECTION 5900 TRAFFIC SIGNALS CITY OF LEE S SUMMIT, MISSOURI DESIGN CRITERIA

SECTION 5900 TRAFFIC SIGNALS CITY OF LEE S SUMMIT, MISSOURI DESIGN CRITERIA SECTION 5900 TRAFFIC SIGNALS CITY OF LEE S SUMMIT, MISSOURI DESIGN CRITERIA TABLE OF CONTENTS Section Title Page 5901 GENERAL... 2 5902 DESIGN CRITERIA... 2 5902.1 Codes and Standards... 2 5902.2 Signal

More information

Operating instructions Through-beam sensor. OJ51xx laser / / 2010

Operating instructions Through-beam sensor. OJ51xx laser / / 2010 Operating instructions Through-beam sensor OJ5xx laser 70480 / 00 05 / 200 Contents Preliminary note. Symbols used 2 Safety instructions Functions and features 4 4 Installation 4 5 Electrical connection5

More information

MATERIAL SPECIFICATION FOR SIGNAL HEADS

MATERIAL SPECIFICATION FOR SIGNAL HEADS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 2461 NOVEMBER 2007 MATERIAL SPECIFICATION FOR SIGNAL HEADS TABLE OF CONTENTS 2461.01 SCOPE 2461.02 REFERENCES 2461.03 DEFINITIONS 2461.04 DESIGN AND

More information

RECOMMENDED AMENDMENTS TO OFF-PREMISE SIGN REGULATIONS

RECOMMENDED AMENDMENTS TO OFF-PREMISE SIGN REGULATIONS RECOMMENDED AMENDMENTS TO OFF-PREMISE SIGN REGULATIONS The use of electronic, digital or video technology in signs is permitted and allowed, subject to the following limitations and additional restrictions:

More information

The Netherlands. NS signals

The Netherlands. NS signals The Netherlands NS s 5.5. DUTCH RAILWAY SIGNALS The fotos of this chapter on Dutch ling are partly taken from www.nicospilt.com. 5.5.. Signalling SyStem 946 Netherlands rail started light experiments in

More information

Track Work Authority ANWT 306. Applicability. Publication Requirement. Document Status NSW SMS. External Only October 2015.

Track Work Authority ANWT 306. Applicability. Publication Requirement. Document Status NSW SMS. External Only October 2015. Applicability NSW SMS Publication Requirement External Only Document Status Issue/Revision # Effective from 2.0 11 October 2015 Australian Rail Track Corporation Limited (ARTC) Disclaimer This document

More information

Operating instructions Retro-reflective sensor. OJ50xx laser / / 2010

Operating instructions Retro-reflective sensor. OJ50xx laser / / 2010 Operating instructions Retro-reflective sensor OJ50xx laser 70481 / 00 05 / 010 Contents 1 Preliminary note3 1.1 Symbols used 3 Safety instructions 3 4 Installation 4 4.1 Installation of the supplied mounting

More information

C 4000 Palletizer Standard/Advanced Safety Light Curtain

C 4000 Palletizer Standard/Advanced Safety Light Curtain O P E R A T I N G I N S T R U C T I O N S Standard/Advanced Safety Light Curtain Operating Instructions This document is protected by the law of copyright, whereby all rights established therein remain

More information

Gamma instabus. Technical product information

Gamma instabus. Technical product information Gamma instabus Technical product information Universal dimmer N 554D31, 4 x 300 VA / 1x 1000 VA, AC 230 V Universal dimmer N 554D31 Control of dimmable lamps, including LED without minimum load Output

More information

A digital version of this document is available to download and submit online at ADDRESS POST CODE

A digital version of this document is available to download and submit online at   ADDRESS POST CODE CHECK LIST i A digital version of this document is available to download and submit online at www.thorlux.com/commissioning To secure your preferred commissioning date please complete this form and email

More information

ACTIVE IF SPLITTER/COMBINER UHP-IFS

ACTIVE IF SPLITTER/COMBINER UHP-IFS ACTIVE IF SPLITTER/COMBINER UHP-IFS GENERAL DESCRIPTION AND INSTALLATION GUIDE DOCUMENT RELEASE 2 [UHP.IFS.2.EN] JUNE 2016 CONTENT Acronyms and Abbreviations... 4 Introduction... 5 Required level of qualification...

More information

4.0 Description. 2-channel operation D1 and D2 rated at 200 VA each. 1-channel operation D1 rated at 400 VA (see connection chap. 6.

4.0 Description. 2-channel operation D1 and D2 rated at 200 VA each. 1-channel operation D1 rated at 400 VA (see connection chap. 6. _307 238_EN_LUXOR 405_310 410 01_D.qxd 21.09.16 10:54 Seite 1 Operating Manual Dimmer module 4050100 1.0 Designated use The LUXOR dimmer module expands the existing LUXOR series of devices. It switches

More information

INTRODUCTION OF COLOUR LIGHT SIGNALS AND NEW SIGNAL BOX AT MAIDSTONE EAST. On SUNDAY, 8th APRIL, 1962

INTRODUCTION OF COLOUR LIGHT SIGNALS AND NEW SIGNAL BOX AT MAIDSTONE EAST. On SUNDAY, 8th APRIL, 1962 Signal Instruction No. 21 S.E.D. SOUTHERN REGION-SOUTH EASTERN DIVISION Instructions to all concerned as to INTRODUCTION OF COLOUR LIGHT SIGNALS AND NEW SIGNAL BOX AT MAIDSTONE EAST (in place of certain

More information

KNX Dimmer RGBW - User Manual

KNX Dimmer RGBW - User Manual KNX Dimmer RGBW - User Manual Item No.: LC-013-004 1. Product Description With the KNX Dimmer RGBW it is possible to control of RGBW, WW-CW LED or 4 independent channels with integrated KNX BCU. Simple

More information

EBU INTERFACES FOR 625 LINE DIGITAL VIDEO SIGNALS AT THE 4:2:2 LEVEL OF CCIR RECOMMENDATION 601 CONTENTS

EBU INTERFACES FOR 625 LINE DIGITAL VIDEO SIGNALS AT THE 4:2:2 LEVEL OF CCIR RECOMMENDATION 601 CONTENTS EBU INTERFACES FOR 625 LINE DIGITAL VIDEO SIGNALS AT THE 4:2:2 LEVEL OF CCIR RECOMMENDATION 601 Tech. 3267 E Second edition January 1992 CONTENTS Introduction.......................................................

More information

Minimailer 4 OMR SPECIFICATION FOR INTELLIGENT MAILING SYSTEMS. 1. Introduction. 2. Mark function description. 3. Programming OMR Marks

Minimailer 4 OMR SPECIFICATION FOR INTELLIGENT MAILING SYSTEMS. 1. Introduction. 2. Mark function description. 3. Programming OMR Marks OMR SPECIFICATION FOR INTELLIGENT MAILING SYSTEMS Minimailer 4 1. Introduction 2. Mark function description 3. Programming OMR Marks 4. Mark layout requirements Page 1 of 7 1. INTRODUCTION This specification

More information

LINK-RAY TM MODULATORS FOR CONSTANT- VOLTAGE. LinkRay Modulators 12 V / 24 V Constant-voltage Applications MODULATORS

LINK-RAY TM MODULATORS FOR CONSTANT- VOLTAGE. LinkRay Modulators 12 V / 24 V Constant-voltage Applications MODULATORS MUSIUM RESTAURANT SOUVENIR SHOP EXIT LinkRay Modulators 12 V / 24 V Constant-voltage Applications LINK-RAY TM MODULATORS FOR CONSTANT- VOLTAGE LINK-RAY TM MODULATORS FOR CONSTANT-VOLTAGE APPLICATIONS 186755

More information

REDFISH TECHNOLOGIES

REDFISH TECHNOLOGIES REDFISH TECHNOLOGIES CLIENT CCTV PRELIMINARY DESIGN REQUIREMENTS Client Name: Client Address: Client Site: Date Important The more detailed information that can be provided in this form, the more accurate

More information

Introduction. Page 1. Welcome to the signage guidelines for St John Ambulance premises, updated as of May 2013.

Introduction. Page 1. Welcome to the signage guidelines for St John Ambulance premises, updated as of May 2013. Signage guidelines Introduction Welcome to the signage guidelines for St John Ambulance premises, updated as of May 2013. These guidelines provide a signage standard for all St John Ambulance buildings,

More information

Section 1. Appendix A, "Zoning" of the Code of the City of Charlotte is hereby amended as follows:

Section 1. Appendix A, Zoning of the Code of the City of Charlotte is hereby amended as follows: Revised 7-18-11 Petition No. 2011-047 Petitioner: Neighborhood & Business Services ORDINANCE NO. AN ORDINANCE AMENDING APPENDIX A OF THE CITY CODE ZONING ORDINANCE BE IT ORDAINED BY THE CITY COUNCIL OF

More information

Toronto Hydro - Electric System

Toronto Hydro - Electric System Toronto Hydro - Electric System FIT Commissioning Requirements and Reports Comments and inquiries can be e-mailed to: FIT@torontohydro.com Customers without e-mail access can submit through regular mail

More information

8000 Plus Series Safety Light Curtain Installation Sheet ( CD206A/ CD206B )

8000 Plus Series Safety Light Curtain Installation Sheet ( CD206A/ CD206B ) SMARTSCAN 8000 PLUS LIGHT CURTAIN 1 Unpacking 8000 Plus Series Safety Light Curtain Installation Sheet ( CD206A/0160306 CD206B160306 ) Remove all packaging material and retain it Locate and keep the delivery

More information

Chapter 10. Lighting Lighting of Indoor Workplaces 180

Chapter 10. Lighting Lighting of Indoor Workplaces 180 Chapter 10 Lighting 10.1 Lighting of Indoor Workplaces 180 10 10 Lighting 10.1 Lighting of Indoor Workplaces In March 2003, the German version of the European Standard EN 12464-1 Lighting of workplaces,

More information

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 872 LIGHT EMITTING DIODE TRAFFIC SIGNAL LAMP UNITS JULY 19, 2002

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 872 LIGHT EMITTING DIODE TRAFFIC SIGNAL LAMP UNITS JULY 19, 2002 STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 872 LIGHT EMITTING DIODE TRAFFIC SIGNAL LAMP UNITS JULY 19, 02 872.01 Description 872.02 Prequalification 872.03 Material Requirements

More information

General viewing conditions for subjective assessment of quality of SDTV and HDTV television pictures on flat panel displays

General viewing conditions for subjective assessment of quality of SDTV and HDTV television pictures on flat panel displays Recommendation ITU-R BT.2022 (08/2012) General viewing conditions for subjective assessment of quality of SDTV and HDTV television pictures on flat panel displays BT Series Broadcasting service (television)

More information

Instruction manual. DALI Gateway art Installation manual

Instruction manual. DALI Gateway art Installation manual Instruction manual DALI Gateway art. 01544 Installation manual Contents GENERAL FEATURES AND FUNCTIONALITY from page 5 ETS PARAMETERS AND COMMUNICATION OBJECTS from page 6 COMMUNICATION OBJECTS GENERAL

More information

City Council Report 915 I Street, 1 st Floor

City Council Report 915 I Street, 1 st Floor Meeting Date: 4/14/2016 Report Type: Staff/Discussion Report ID: 2016-00333 12 City Council Report 915 I Street, 1 st Floor www.cityofsacramento.org Title: Ordinance Adding Section 15.148.920 to the Sacramento

More information

Rec. ITU-R BT RECOMMENDATION ITU-R BT * WIDE-SCREEN SIGNALLING FOR BROADCASTING

Rec. ITU-R BT RECOMMENDATION ITU-R BT * WIDE-SCREEN SIGNALLING FOR BROADCASTING Rec. ITU-R BT.111-2 1 RECOMMENDATION ITU-R BT.111-2 * WIDE-SCREEN SIGNALLING FOR BROADCASTING (Signalling for wide-screen and other enhanced television parameters) (Question ITU-R 42/11) Rec. ITU-R BT.111-2

More information

Recommendation proposed by Working Group T/WG 10 Data Communications (CD)

Recommendation proposed by Working Group T/WG 10 Data Communications (CD) ob T/f2D05-03E Page 1 Recommendation T/CD 05-03 E (Innsbruck 1981) concerning the specification of a CCllT Group 3 document facsimile terminal Recommendation proposed by Working Group T/WG 10 Data Communications

More information

Luminaire SIGNATURE SERIES

Luminaire SIGNATURE SERIES Luminaire SIGNATURE SERIES SIGNATURE SERIES Luminaire Do you need a lot of light? Is your application a sky sign? With maximum brightness and pitch this is the go-to module for oversized channel letters

More information

Mosaic TM Dimmer 3 x 1000 W

Mosaic TM Dimmer 3 x 1000 W Mosaic TM Dimmer 3 x 1000 W 784 30 Technical characteristics (1) ( * ) 50/60 Hz 240 V~ 100 V~ 1 x 2,5 mm2 2 x 1,5 mm 2 Max. Min. Max. Min. < 2200 W (2) (do not exceed 1000 W per channel) 3 x 40 W < 1100

More information

WP36BHD T-1 (3mm) Blinking LED Lamp

WP36BHD T-1 (3mm) Blinking LED Lamp T-1 (3mm) Blinking LED Lamp DESCRIPTIONS The Bright Red source color devices are made with Gallium Phosphide Red Light Emitting Diode Electrostatic discharge and power surge could damage the LEDs It is

More information

SMPTE STANDARD Gb/s Signal/Data Serial Interface. Proposed SMPTE Standard for Television SMPTE 424M Date: < > TP Rev 0

SMPTE STANDARD Gb/s Signal/Data Serial Interface. Proposed SMPTE Standard for Television SMPTE 424M Date: < > TP Rev 0 Proposed SMPTE Standard for Television Date: TP Rev 0 SMPTE 424M-2005 SMPTE Technology Committee N 26 on File Management and Networking Technology SMPTE STANDARD- --- 3 Gb/s Signal/Data Serial

More information

100Base-FX Multi-mode to 100Base-FX Single Mode Converter. NXF-708 Series User s Manual

100Base-FX Multi-mode to 100Base-FX Single Mode Converter. NXF-708 Series User s Manual 100Base-FX Multi-mode to 100Base-FX Single Mode Converter NXF-708 Series User s Manual COPYRIGHT All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted

More information

IEEE C a-02/26r1. IEEE Broadband Wireless Access Working Group <http://ieee802.org/16>

IEEE C a-02/26r1. IEEE Broadband Wireless Access Working Group <http://ieee802.org/16> Project Title Date Submitted Source(s) Re: Abstract IEEE 802.16 Broadband Wireless Access Working Group P-P and PMP coexistence calculations based on ETSI TR 101 853 v1.1.1 2002-05-22

More information

Introduction to Layout Control with JMRI/PanelPro. Create a Detailed CTC Machine Model with JMRI/PanelPro

Introduction to Layout Control with JMRI/PanelPro. Create a Detailed CTC Machine Model with JMRI/PanelPro Add Signals to your Layout with JMRI/PanelPro Dick Bronson - R R -C irk its, I n c. Other Clinics in this series: Introduction to Layout Control with JMRI/PanelPro 8:30 PM, Sunday, July 13th Create a Detailed

More information

ArteorTM Dimmer 3 x 1000 W / /60

ArteorTM Dimmer 3 x 1000 W / /60 ArteorTM Dimmer 3 x 1000 W / 5740 10/60 Technical characteristics / * ( ) 50/60 Hz 1 x 2.5 mm 2 x 1.5 mm2 2 Max. < 2200 W(2) (do not exceed 1000 W per channel / Special provisions (see page 5) / 240 V~

More information

Kingbright. L-7104YD-12V T-1 (3mm) Solid State Lamp DESCRIPTIONS PACKAGE DIMENSIONS FEATURES APPLICATIONS ATTENTION SELECTION GUIDE

Kingbright. L-7104YD-12V T-1 (3mm) Solid State Lamp DESCRIPTIONS PACKAGE DIMENSIONS FEATURES APPLICATIONS ATTENTION SELECTION GUIDE T-1 (3mm) Solid State Lamp DESCRIPTIONS The Yellow source color devices are made with Gallium Arsenide Phosphide on Gallium Phosphide Yellow Light Emitting Diode Electrostatic discharge and power surge

More information

High Resolution Multicolor Contrast Scanner. Dimensioned drawing

High Resolution Multicolor Contrast Scanner. Dimensioned drawing Specifications and description KRTM 20 High Resolution Multicolor Contrast Scanner Dimensioned drawing en 01-2011/06 50116669 12mm 20mm 50mm 12-30 V DC 50 / 25 khz We reserve the right to make changes

More information

City Council Report 915 I Street, 1 st Floor

City Council Report 915 I Street, 1 st Floor Meeting Date: 8/4/2016 Report Type: Consent Report ID: 2016-00700 03 City Council Report 915 I Street, 1 st Floor www.cityofsacramento.org Title: Ordinance adding Sections 15.148.015 and 15.148.191 to

More information

Sunbury SUNBURY (23 3/4 MILES)

Sunbury SUNBURY (23 3/4 MILES) Sunbury SUNBURY (23 3/4 MILES) Sunbury was the terminus of the first country section of the Victorian Railways to be opened in 1859 and the line was extended to the north two years later. The curious three

More information

Draft for Public Comment

Draft for Public Comment Draft for Public Comment Form 36 Version 6.1 DPC: 03/302646 DC Head Office 389 Chiswick High Road London W4 4AL Telephone: +44(0)20 8996 9000 Fax: +44(0)20 8996 7001 Date: 27 March 2003 Origin: National

More information

Signalist SC1. DCC signal controller user manual Covers configuration for UK signals

Signalist SC1. DCC signal controller user manual Covers configuration for UK signals Signalist SC1 DCC signal controller user manual Covers configuration for UK signals 1 Contents Overview... 3 Connections... 3 Ribbon cable connection... 3 DCC track connection... 5 2-aspect signal connections...

More information