1 Documents for Block System and for Ground Frames and Shunters Releases New documents Document Document title Issue GK/RT0055 Block System Interface Requirements 1 GK/GN0655 Guidance on Block System Interface Requirements 1 Document Document title Issue GK/RT0077 Ground Frames and Shunters Releases 1 GK/GN0677 Guidance on Ground Frames and Shunters Releases 1 Documents to be withdrawn Document Document title Issue GK/RT0039 Semaphore and Mechanical Signalling 1 GK/RT0041 Track Circuit Block 1 GK/RT0042: Absolute Block 1 GK/RT0051 Single Line Control 1 GK/RT0054 Radio Electronic Token Block 1 GK/RT0060 Interlocking Principles 4 GK/RT0061 Shunters Releases, Ground Frames, Switch Panels and Gate Boxes 2 GK/RT0063 Approach Locking and Train Operated Route Release 1 GK/RT0064 Provision of Overlaps, Flank Protection and Trapping 1 Standards Committee(s): Control Command and Signalling, Traffic Operation and Management, and Infrastructure Issue/withdrawal date: 07 September 2013 Documents come into force/cease to be in force: 07 December 2013 RSSB Briefing Note Page 1 of 13

2 Background This Briefing Note presents the work undertaken under the project proposals 05/028a, b and c relating to the introduction of the new Railway Group Standards (RGSs) GK/RT0055 issue one Block System Interface Requirements and GK/RT0077 issue one Ground Frames and Shunters Releases and their associated guidance notes GK/GN0655 issue one Guidance on Block System Interface Requirements and GK/GN0677 issue one Guidance on Ground Frames and Shunters Releases and the withdrawal of RGSs GK/RT0039, GK/RT0041, GK/RT0042, GK/RT0051, GK/RT0054, GK/RT0060, GK/RT0061, GK/RT0063 and GK/RT0064, as set out above, which they replace. In April 2007 the Control Command and Signalling (CCS) Standards Committee (SC) approved the sub-projects 05/028a and 05/028b for the review of the Interlocking and Block System RGS required under the Strategy for Standards Management. During the review it was identified that a separate RGS addressing ground frames and shunters releases would be appropriate, and in March 2009 this was authorised under the proposal 05/28c by the CCS SC, and the RGS GK/RT0061 was included in the review. RSSB undertook a multi-discipline review of the requirements in GK/RT0039, GK/RT0041, GK/RT0042, GK/RT0051, GK/RT0054, GK/RT0060, GK/RT0061, GK/RT0063 and GK/RT0064 to identify those requirements in scope of RGS to be addressed in the new RGSs GK/RT0055 issue one and GK/RT0077 issue one. The findings of the review are set out in the supporting Impact Assessment. In April 2010 CCS SC approved the consultation comments responses and the documents for publication. However, following a meeting with on 24 March 2010, CCS SC put the projects on hold to allow for the preparation of a new document (RIS-0386-CCS Overrun Risk Assessment project 10/028) to facilitate the risk management and compatibility assessment aspect referred to in the new RGSs. The Rail Industry Standards (RIS) has taken considerable time to be drafted. The new RGSs to cover block working, ground frames and shunters releases and the associated withdrawals were therefore held up by the delay in the withdrawal of GI/RT7006 and development of the RIS. In June 2013 CCS SC agreed to progress projects 05/028a, 05/028b and 05/028c in advance of the production of the RIS on overrun risk assessment. CCS SC agreed that GI/RT7006 (project 05/029d) will remain live and will only be withdrawn following the publication of RIS-0386-CCS. Scope GK/RT0055 issue one mandates the interface requirements between signalling system infrastructure and railway operations for the following block systems: a) Track circuit block (including interlocked absolute block). b) Absolute block. c) Tokenless block. d) Electric token block (excluding no signaller token systems). e) No signaller token block. f) No signaller token block remote. g) One-train system with staff. h) One-train system without staff. RSSB Briefing Note Page 2 of 13

3 i) Radio electronic token block (RETB). The requirements are applicable to routes signalled using lineside signalling in accordance with GK/RT0045: Lineside Signals, Indicators and Layout of Signals, and are not applicable to routes solely operated using the European Rail Traffic Management System (ERTMS). GK/RT0077 issue one mandates requirements for: a) Ground frames where control of a part of the railway infrastructure may be transferred between a signaller and a ground frame operator, who may be an employee of a railway undertaking, and b) Shunters releases where co-operation is required between the signaller and railway undertaking personnel to allow movements into and out of infrastructure controlled by a railway undertaking. This scope does not include the use of emergency panels, standby control centres or gate boxes, which are the responsibility of the infrastructure manager. Key changes No material changes to existing requirements have been made and the key changes are associated with the withdrawal of: GK/RT0039: Semaphore and Mechanical Signalling GK/RT0041: Track Circuit Block GK/RT0042: Absolute Block GK/RT0051: Single Line Control GK/RT0054: Radio Electronic Token Block GK/RT0060: Interlocking Principles GK/RT0061: Shunters Releases, Ground Frames, Switch Panels and Gate Boxes GK/RT0063: Approach Locking and Train Operated Route Release GK/RT0064: Provision of Overlaps, Flank Protection and Trapping. These RGSs are being withdrawn because the in scope requirements they contain duplicate requirements that are mandated elsewhere, either in legislation, the Rule Book or another extant RGS or they have been included in the new RGSs GK/RT0055 issue one and GK/RT0077 issue one. The in and out of scope disposition of each requirement is set out in Table 1 of the supporting Impact Assessment, which includes the reason for the classification. The Impact Assessment concluded that no safety implications have been identified with the withdrawal of the nine RGSs GK/RT0039, GK/RT0041, GK/RT0042, GK/RT0051, GK/RT0054, GK/RT0061, GK/RT0060, GK/RT0063 and GK/RT0064 and the introduction of GK/RT0055 issue one and GK/RT0077 issue one. The only identified costs are those associated with the administrative activities that will be incurred in updating and amending documentation. It is therefore considered that the changes meet the objectives of the Strategy for Standards Management and satisfy the requirements of the Code. All withdrawn documents continue to be available on the RSSB website, in the withdrawn documents section, but will not, in future, be maintained by RSSB. Compliance requirements The RGSs GK/RT0055 issue one and GK/RT0077 issue one and their associated Guidance Notes come into force on 07 December 2013 which is the date on which the nine RGSs GK/RT0039, GK/RT0041, GK/RT0042, GK/RT0051, GK/RT0054, GK/RT0061, GK/RT0060, GK/RT0063 and GK/RT0064 cease to be in force and are withdrawn. RSSB Briefing Note Page 3 of 13

4 Where it is considered not reasonably practicable to comply with the requirements, authorisation not to comply should be sought in accordance with the Railway Group Standards Code. s authorised by RSSB The status of all authorised deviations, when RGSs GK/RT0055 issue one and GK/RT0077 issue one come into force, is as set out in Tables 1 and 2: Table 1 - s no longer in force TNC (GK/RT0039) DGN (GK/RT0039) DGN (GK/RT DGN TNC (GK/RT0042 Clause 6) DGN TNC TNC (GK/RT0042 clause 6.1) DGN GK/RT0042) DGN (GK/RT0051) DGN (GK/RT0051) Semaphore signals 27 and 45 and points A/B at Crew Bank Signal Box Abergavenny signal box signals 2 and 7 and points 9A/B. Loss of detection whilst the box is closed will not put the semaphore arm back to danger. Change to detection requirements when a signal box or ground frame is not manned for all relevant movements Relating to Kidderminster 27A points during periods when the controlling signal box is switched out. Decommissioning of Ironbridge Powerstation interlocking in July Replace home and starting signal with stop and telephone boards. Revised signalling instructions for Lightmoor Junction Signalbox. Wateringbury Kent. The inclusion of a block override control to allow an assisting train, not to pass signals at danger Revises signallers instructions for Lightmoor Junction signal box. To not fit an override facility and its associated incremental counter at the MCS VDU display at Rugby SCC. Relating to the renewals of the block circuitry at Cross Newydd. St Albans branch at Watford Yard GF A signal controlling entry to the terminal single line will not be provided. Welsh Highland Crossing on Dovey Junction -Pwllheli line between Minffordd and Porthmadog Ground frames which are not at token exchange points shall be released by an Annetts type key, physically connected to the CDU. Closed 18/5/2006 Not required, as out of scope as predated GK/RT0039 Closed 18/5/2006 Not required, as out of scope as predated GK/RT0039. Withdrawn on 15/01/2008 Superseded by NC Proposal 08/044 Closed 16/12/2005. Expired 01/10/2005 Superseded by TNC 1/12/2005 Expired 31/10/2006 Expired 31/7/2009 Application halted by 27/11/ /8/05 15/2/2007 as not required, as not noncompliant. RSSB Briefing Note Page 4 of 13

5 Table 1 - s no longer in force NC DGN DGN DGN TNC TNC TNC TNC TNC TNC TNC TNC Non provision of separate signaller s control device for different class of route. To use the same control device as that used for the main route. Conditions required for setting Warner Routes Closed. 2/08/2003 Addressed in Interlocking Principles Issue Four of GK/RT0060 June Cancelled May 2003 DGN redundant when GK/RT Interlocking Principles revised to Issue Four with effect from June Setting and locking of routes re clause Cancelled May 2003 DGN redundant when GK/RT Interlocking Principles revised to Issue Four with effect from June Facing shunt signal will be pre-set by main, waning and call on routes only. Shunt class routes will not pre-set facing shunt signals Requirements for foul track locking in clause 6.5 Dorset Coast Resignalling Project. Omission of implementation of foul track locking for separated point ends. Dorset Coast Resignalling Project. Re: Gap in enhanced sequential release between ALSR and TORR 18/01/2007 Expired 30/09/2004 Expired 30/09/2004 SIMIS W logic to be changed Expired 30/09/2004 Interlocking logic with a designable feature to select more than one track section within 10 months. Dorset Coast resignalling Self test routines where two signals share a SOM card. Bournemouth interlocking controlling Bournemouth and Branksome stations. Possible to for a route to be set where a previous conflicting route has been used and is still foul. Expired 30/09/2004 Expired 30/09/2004 Expired 1/02/2005 and superseded by TNC for a further year extension. Interlocking logic update within 6 months Expired 30/09/2004 Request that time of operation locking be omitted for a specific case on the West Coast Route Modernisation where no berth track circuit exists to facilitate it. Expired 31/08/2005 RSSB Briefing Note Page 5 of 13

6 Table 1 - s no longer in force TNC DGN TNC DGN DGN DGN DGN (GK/RT0061) TNC TNC DGN DGN TNC TNC Bournemouth interlocking controlling Bournemouth and Branksome stations. Possible to for a route to be set where a previous conflicting route has been used and is still foul No separate controlling device for signal WB4R at Wateringbury Kent Relating to the Interlocking controls for Stockport nos1 and 2 interlocking control areas. Welsh Highland Crossing on Dovey Junction -Pwllheli line between Minffordd and Porthmadog. The interlocking shall ensure that any movement authority is capable of being withdrawn on demand. Welsh Highland Crossing on Dovey Junction -Pwllheli line between Minffordd and Porthmadog. The signaller shall at all times be able to replace a sop signal to danger. Welsh Highland Crossing on Dovey Junction -Pwllheli line between Minffordd and Porthmadog. Where other than a track circuit block system is provided, the block system shall control the setting of the route (which may involve the release of a token) where opposing locking is necessary. Relating to the acceptable methods of releasing a ground frame, including electrical release from the controlling signal box or release by token. Rugby Station remodelling project works. The form and design of speed warning indicators for reduced clearance. Dorset Coast Resignalling Reduce overlap to overcome interlocking problems Interlocking renewals at Edinburgh Waverley Interlocking renewals at Edinburgh Waverley Switch and crossing renewals Birmingham Moor Street - Overlap not provided on the exit signal SY181. Expired 01/02/2006. Addressed by NC 22/3/2007 as not required. 15/2/2007 as not required, as not noncompliant. 15/2/2007 as not required, as not noncompliant 15/2/2007 as not required, as not noncompliant 15/02/2007 as not noncompliant Withdrawn 09/08/2007 Expired 03/09/ /1/2004 DGN not required 15/1/2004 DGN not required 1/12/2005. TNC not required. 13/4/2006 TNC not required RSSB Briefing Note Page 6 of 13

7 Table 1 - s no longer in force TNC TNC Portsmouth Area Infrastructure Project - Cosham Junction Overlap of signal PW60 reduced by 3m Portsmouth Area Infrastructure Project - Cosham Junction Overlap of signal PW60 reduced by 3m Expired 24/12/06 Extended by TNC Expired 18/01/08 Table 2 - s not applicable to new documents NC (GK/RT0039) Proposal 08/044 Supersedes DGN NC DGN DGN DGN NC (GK/RT0051) DGN (GK/RT0051) Change to detection requirements when a signal box or ground frame is not manned for all relevant movements Allowing the up line exit signal PR112, for the absolute block section from Truro to work automatically. It will not be proved ON in the Line Clear controls to Truro, but it will be proved alight. Derogation against providing distant signals with the capability to be directly replaced by the controlling signal box on the G&SW line in the up and down directions between Kilmarnock and Hurlford. The implementation on the Settle and Carlisle line of consecutive Intermediate Block sections on the up line of the Appleby to Kirby Stephen and Kirby Stephen to Garsdale sections. Allowing the closure of Ashington Signal Box and extending telephone modified block working to Marchey s House Signal Box. For one-train working without staff. Not providing a separate replacement facility on the distant signal which works automatically. Derogation against providing distant signals with the capability to be directly replaced by the controlling signal box on the G&SW line in the up and down directions between Kilmarnock and Hurlford. Single Single Single Addressed in Clause of the Block System Interface Requirements Standard GK/RT0055 and Guidance Note GK/GN0655. Single Single Single RSSB Briefing Note Page 7 of 13

8 Table 2 - s not applicable to new documents DGN (GK/RT0054) DGN (GK/RT0054) DGN DGN NC NC NC NC DGN NC Proposal 05/ NC Proposal 06/128 GK/RT0064 GK/RT NC Proposal 06/053 Changing the emergency keyswitch from a physical key operated switch to a button function on the RETB touch screen keyboard Changing the emergency keyswitch from a physical key operated switch to a button function on the RETB touch screen keyboard Route setting Not to include points required for flank protection in the initial route evaluation but to evaluate them in parallel. Facing shunt signals will be pre-set by main, warning and call on routes only. Shunt class routes will not pre-set facing shunt signals. Additional control will allow route release from the destination signal back to the entrance signal regardless of track occupation. A further release will be provided after an Area Control Computer (ACC) failure. Time of operation locking works with berth tracking sections. Not necessary to provide a separate replacement switch for distant signals reading up to stop signals protecting controlled level crossings. The points 388, 395 and 396 in the overlap of signals P73 and P174 are detected only when the alternative overlap is obstructed. \if all tracks in all alternative overlaps are clear, the points are not detected. Level crossing Crossing Clear is proved only in the aspect level of signalling controls for relay based and electronic interlocking rather than proving it in the locking level. To permit combined berth and overlap track circuits in respect of an automatic signal where shunt or calling-on class moves are routed up to the signal, as long as full track circuit controls are provided. Facing shunt signals will be pre-set by main, warning and call on routes only. Shunt class routes will not pre-set facing shunt signals as described in RT/E/S/10097 chapter 12. Single Single Single Single Single Single Single Single Single Single Single responsibility Addressed in GK/RT0045 clauses b and RSSB Briefing Note Page 8 of 13

9 Table 2 - s not applicable to new documents DGN DGN DGN DGN DGN DGN DGN DGN DGN DGN DGN Transfer the replacement facilities to the four automatic signals (UR45, DR43, UM45 and DM43) in advance of the existing replaced signals. Preston PSB area Signal Replacement Facilities. The emergency replacement associated with specified ground frame recoveries on the Preston PSB Area are provided in a non-guaranteed manner. The provision of a common E button replacing two signals simultaneously. Signals PN3 and PN4 will operate to the principles current at the time Preston PSB and its respective interlocking were brought into service. To remove the requirement to prove the detection of points for swinging overlap. Works providing Intermediate Block signals for the Settle-Carlisle, Annan-Mauchline and Blackburn Hellifield that lever locks are not to be provided with the new signals. Emergency replacement facilities. Use of existing facilities as specified locations. Non-provision of signallers replacement facility. The new signal at GJ436 will not be provided with a signaller s replacement facility. Signallers to be fully briefed on how the signals will operate. To remove the requirement for the detection of points for swinging overlap (except in other routes which require the points in a given position for flank protection). Basis for retaining historic controls when minor amendments are being made or the signalling arrangement is being recontrolled. Basis for retaining historic controls when minor amendments are being made or the signalling arrangement is being recontrolled. Relates to Cambrian ERTMS level 2 early deployment scheme interlocking principles. Single Single Single responsibility Single Single Single responsibility Single Single Single Single Single New RGS GK/RT0055 does not address ERTMS RSSB Briefing Note Page 9 of 13

10 Table 2 - s not applicable to new documents DGN NC Proposal 08/040 (GK/RT0061) DGN (GK/RT0063) DGN (GK/RT0063) DGN DGN DGN NC DGN NC DGN DGN New NX-Panel at South Tottenham Station Junction Signal Box. Renewal of, alteration to, a control panel or lever frame, at either the controlling signal box or gate box, to not trigger the need to retrospectively bring the protecting signals up to full compliance. Train operated route release. Requirements for releasing route locking on a track section. ERTMS Project Relates to approach locking and Train Operated Route Release(TORR) for Cambrian ERTMS level 2. Clause 4.3Relating to the calculation of the length of overlaps based upon approach speed to ramp top not 400m point on approach to signal. Operation of track circuit interrupter shall only place or maintain main running signals at danger and not shunt/subsidiary signals. Operation of the railway between Heathrow CTA and T4 stations without protection from headshunt by trap points (or equivalent). Restoring points to a suitable safety position instead of to the normal position in all circumstances. A visual and/or audible indication, over and above provision of the key indication, to remind the signaller to restore trap points shall not be provided To amend section B4.8.4(b) to permit combined berth and overlap track circuits in respect of an automatic signal where shunt or calling-on class moves are routed up to the signal, as long as full track circuit controls are provided. For the Waverley scheme (mid-platform signals E453 and E455), it is proposed that the permitted speed commences 325m on the approach to the signals Acceptance of achievable overlap length of 179m instead of 180m at signal S208 on platform 1 of Meadowhill Interchange station. On the up main protecting Wincobank Junction. Single Single Withdrawn 18/01/2007 Single Single New RGS GK/RT0055 does not address ERTMS Single Single Single Single Single Single Single Single RSSB Briefing Note Page 10 of 13

11 Table 2 - s not applicable to new documents DGN DGN DGN DGN TNC Proposals Alloa Town to Longannet Trap points will not be provided at Longannet power station and West Departure lines 664 points at Plumpton. Non provision of alarm or self-normalisation. Basis for retaining historic controls when minor amendments are being made or the signalling arrangement is being re-controlled Single Single responsibility Single Provision of overlaps for ERTMS level 2. Single New RGS GK/RT0055 does not address ERTMS Reduce overlap on VS366 at Blackfriars. To reduce the overlap to 60m with a speed profile of 45mph on the approach, reducing to 25mph 260m from the signal and immediately on the approach to the signal. Single Table 3 Proposals closed and addressed Proposal 1. Proposal 02/158 GK/RT0051 and GK/RT0041 and Proposal 05/ Proposal 05/028 99/094H Proposer Standards Review Requiremen t RSSB pp Railway Industry Proposal for 5 year review and to combine GK/RT0051 and GK/RT0041 in a single RGS Proposal for review of interlocking and block working RGS 3. Proposal 05/049 Network rail To require the proving of level crossing crossing clear controls in the aspect level (rather than in the locking level as currently required by the standard 4. Proposal 09/015 Amendment & Clarifications to current documents (GK/RT0054) Catalogue RETB Working Group Correction to clarify that: the display shall be blank when no token message is present rather than displaying a No Token message. Addressed through production of new RGS GK/RT0055. Addressed by production of GK/RT0055. Single responsibility See NC relating to GK/RT0060 Addressed in clauses in GK/RT0055. RSSB Briefing Note Page 11 of 13

12 Table 3 Proposals closed and addressed Proposal 5. Proposal 00/ Proposal 06/ Proposal 08/ Proposal 09/005 Small scale change proposal 9. Proposal 09/006 Small scale change proposal 10. Proposal 09/ NC Proposal 06/128 GK/RT0064 GK/RT Proposal 09/032 in relation to GK/RT0064, GK/RT0060 Proposal also applies to other RGS 13. Proposal 04/065 Proposer Control Facilities for use during Lineside Signalling failures Degraded Mode Operation. Facing shunt signals will be pre-set by main, warning and call on routes only. Shunt class routes will not pre-set facing shunt signals as described in RT/E/S/10097 chapter 12 To remove the requirement to prove the detection of facing overlap points for swinging overlap. Amend so that train detection section commences as soon as possible beyond the TSS. The joint should be as close to the signal as possible for early SPAD detection. With the provision of TPWS imposing predictable overrun distances the provision of flank protection of overlaps is no longer appropriate under certain circumstances To remove the requirement to prove the detection of points for swinging overlap. To permit combined berth and overlap track circuits in respect of an automatic signal where shunt or calling-on class moves are routed up to the signal, as long as full track circuit controls are provided. To change the compliance of this and other standards to allow application of the standards of the day when the interlocking is replaced with no track based alteration to the signalling. Addressed in GK/RT8071 Issued Feb 2006 See NC Addressed in GK/RT0045 clauses b and Single Single Single Single Single responsibility Addressed in compliance clauses in both GK/RT0055 and GK/RT0077 Controls for flank protection. Single 14. Proposal 08/001 ERTMS Programme (). No detailed ERTMS 15. Proposal 08/002 requirements identified 16. Proposal 08/009 ERTMS excluded from 17. Proposal 08/010 the new RGS GK/RT Proposal 98/029 Related to overdue 5 year review of BR1654 BR1654 to be retained as a legacy specification document. Being progressed under Train Radio package 05/032 RSSB Briefing Note Page 12 of 13

13 Table 3 Proposals closed and addressed Proposal Proposer 19. Proposal 09/029 Relating to what lineside telephony should remain after the introduction of GSM-R TOM lead Standards Committee for Guidance Note RSSB Briefing Note Page 13 of 13

Block System Interface Requirements

Block System Interface Requirements Block System Interface Requirements Synopsis This document mandates the requirements for block systems interfaces between signalling infrastructure and railway operations. Copyright in the s is owned by

More information

Ground Frames and Shunters Releases

Ground Frames and Shunters Releases Ground Frames and Shunters Synopsis This document mandates the interface requirements for ground frames and shunters releases that may be operated by railway undertaking personnel. Copyright in the s is

More information

Lineside Signal Aspect and Indication Requirements

Lineside Signal Aspect and Indication Requirements Lineside Signal Aspect and Indication Requirements Synopsis This document mandates the appearance of lineside signalling system displays and the information they convey. This document contains one or more

More information

GK/GN0658. Guidance on Lineside Signal Aspect and Indication Requirements. Rail Industry Guidance Note for GK/RT0058

GK/GN0658. Guidance on Lineside Signal Aspect and Indication Requirements. Rail Industry Guidance Note for GK/RT0058 GN This document contains one or more pages which contain colour Published by: Block 2 Angel Square 1 Torrens Street London EC1V 1NY Copyright 2014 Rail Safety and Standards Board Limited GK/GN0658 Issue

More information

Lineside Signals, Indicators and Layout of Signals

Lineside Signals, Indicators and Layout of Signals To be part superseded by GKRT0045 Iss 4, GKRT0057 Iss 1 and GKRT0058 Iss 1 published on 06/12/2014 Lineside Signals, Indicators and Layout of Signals Synopsis This document defines the format, presentation

More information

Guidance on Lineside Signals, Indicators and Layout of Signals. Rail Industry Guidance Note for GK/RT0045

Guidance on Lineside Signals, Indicators and Layout of Signals. Rail Industry Guidance Note for GK/RT0045 GN Published by Block 2 Angel Square 1 Torrens Street London EC1V 1NY Copyright 2012 Rail Safety and Standards Board Limited GK/GN0645 Issue Two: March 2012 Rail Industry Guidance Note for GK/RT0045 Issue

More information

Lineside Signals, Indicators and Layout of Signals

Lineside Signals, Indicators and Layout of Signals Lineside Signals, Indicators and Layout of Signals Synopsis This document defines the format, presentation and layout of lineside signalling equipment that is used to display movement authority information

More information

Lineside Signal Aspects and Indications

Lineside Signal Aspects and Indications Supersedes Iss 1 (to correct formatting) and supersedes Lineside Signal Aspects and Indications Synopsis This document specifies the appearance of lineside signal aspects and s and the information they

More information

Lineside Signal Aspect Sequences

Lineside Signal Aspect Sequences ailway roup Standard K/T0032 Lineside Signal Aspect Sequences Synopsis This standard defines the sequence in which lineside signal aspects shall be presented to train drivers. This document is the property

More information

Guidance on Signal Positioning and Visibility

Guidance on Signal Positioning and Visibility Guidance on Signal Positioning and Visibility Synopsis This document provides guidance on the requirements for positioning signals and indicators to ensure adequate viewing and clarity of meaning for drivers.

More information

Fixed Signals - Rules 1 to 23

Fixed Signals - Rules 1 to 23 Applicability VIC Publication Requirement External Only Document Status Issue/Revision # Effective from 1 07 August 2011 0 04 October 2015 1 01 July 2018 Australian Rail Track Corporation Limited (ARTC)

More information

BURNLEY GROUP OPERATING PROCEDURES

BURNLEY GROUP OPERATING PROCEDURES The Operating Procedures contained in this document titled Burnley Group Operating Procedures refer to the area bounded by Richmond, Glen Waverley, Alamein, Belgrave & Lilydale. Approval Amendment Record

More information

Withdrawn Document. Title of Rule Book SECTION N SINGLE LINE WORKING. Page Date Index

Withdrawn Document. Title of Rule Book SECTION N SINGLE LINE WORKING. Page Date Index Uncontrolled Railway When Group Printed Standard Title of Rule Book : GO/RT3000 : Master SECTION N SINGLE LINE WORKING Page Date Index Page No. Latest Issue N.1/N.2 December 2002 N.3/N.4 December 2002

More information

Specification. NGTS Issue 1 October 1993

Specification. NGTS Issue 1 October 1993 The Electrical Standards for SHE Transmission s area are non-maintained versions of National Grid Technical Specifications that are applicable to the SHE Transmission System only. These specific versions

More information

Signalling Cable Equivalent Sizes (formerly RT/E/C/11213)

Signalling Cable Equivalent Sizes (formerly RT/E/C/11213) NR/GN/SIG/11213 Ref Date (formerly RT/E/C/11213) This temporary front sheet facilitates change to the new Network Rail Standards referencing nomenclature. The Ref above will be formally allocated to this

More information

Signalling Cable Equivalent Sizes

Signalling Cable Equivalent Sizes Signalling Cable Equivalent Sizes Signatures removed from electronic version Submitted by... Jim Harper Nominated Responsible Manager Synopsis This Standard Authorises the use of cables to GS/ES 0872 as

More information

Network Safeworking Rules and Procedures

Network Safeworking Rules and Procedures Network Safeworking Rules and Procedures Fixed Signals Rule Number: 6005 Version 1.0, 31 March 2016 Fixed Signals Rule Number: 6005 Document Control Identification Document title Number Version Date 6005

More information

2 Layout and Use of Signals

2 Layout and Use of Signals Issued May 2 Layout and Use of Signals 2. General Signals are provided to control the movement of trains and to inform the driver whether it is safe to proceed. Their location is dictated largely by the

More information

Where was the location of the incident?

Where was the location of the incident? Note: All mention of SPAD in this form refers to provisional SPAD. PART 1 INCIDENT DETAIL 1.1 1.2 What was the date of the incident? (dd/mm/yy) What was the time of the incident? (24 hour clock) 1.3 Where

More information

Signal Sighting Standard

Signal Sighting Standard Engineering Standard Signals L1-CHE-STD-004 Signal Sighting Standard Version: 1 Issued: June 2016 Owner: Engineering Approved By: Phil Ellingworth Chief Engineer PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO

More information

Signal Sighting. Withdrawn Document Uncontrolled When Printed. Railway Group Standard. Issue Two Date February 1996

Signal Sighting. Withdrawn Document Uncontrolled When Printed. Railway Group Standard. Issue Two Date February 1996 Railway Group Standard Signatures removed from electronic version Submitted by: Philip Wiltshire, Nominated Responsible Manager Approved by: Robin Nelson, Chairman, Train Control and Communications Subject

More information

Sunbury SUNBURY (23 3/4 MILES)

Sunbury SUNBURY (23 3/4 MILES) Sunbury SUNBURY (23 3/4 MILES) Sunbury was the terminus of the first country section of the Victorian Railways to be opened in 1859 and the line was extended to the north two years later. The curious three

More information

Uncontrolled When Printed Document comes into force on 05/12/2015 Supersedes GERT8000-HB2 Iss 1 on 05/12/2015

Uncontrolled When Printed Document comes into force on 05/12/2015 Supersedes GERT8000-HB2 Iss 1 on 05/12/2015 GE/RT8000/HB2 Rule Book Uncontrolled When Printed Handbook 2 Instructions for track workers who use emergency protection equipment Handbook 2 Issue 2 September 2015 Comes into force 05 December 2015 This

More information

67. LEVEL TRANSITION FROM LEVEL NTC TO LEVEL 1 (SYSTEM VERSION 2.Y)

67. LEVEL TRANSITION FROM LEVEL NTC TO LEVEL 1 (SYSTEM VERSION 2.Y) 123-133 Rue Froissart, 1040 Brussels, Belgium Tel: +32 (0)2 673.99.33 - TVA BE0455.935.830 Website: www.ertms.be E-mail: info@ertms.be ERTMS USERS GROUP - ENGINEERING GUIDELINE 67. LEVEL TRANSITION FROM

More information

SIGNALING PRACTICES ON PROTOTYPE AND MODEL RAILROADS

SIGNALING PRACTICES ON PROTOTYPE AND MODEL RAILROADS SIGNALING PRACTICES ON PROTOTYPE AND MODEL RAILROADS Bill Ataras September 30, 2013 PROTOTYPE SIGNALING PRACTICE 1. Many different types of signals A. Block signals B. Interlocking signals C. Whistles

More information

British Signalling What the driver sees

British Signalling What the driver sees Railway Technical Website Background Paper No. 1 One of a series of papers originally published as pages on RTWP and updated for RTW. Introduction British Signalling What the driver sees by Piers Connor

More information

Infrastructure Projects Shared Learning

Infrastructure Projects Shared Learning Infrastructure Projects Shared Learning Issue 17/01: January June 2017 1-Sep-17 / 1 Introduction This Shared Learning document details key issues and incidents that have occurred on Signalling Projects

More information

DIRECTORATE-GENERAL III INDUSTRY Legislation and standardization and telematics networks Standardization

DIRECTORATE-GENERAL III INDUSTRY Legislation and standardization and telematics networks Standardization EUROPEAN COMMISSION DIRECTORATE-GENERAL III INDUSTRY Legislation and standardization and telematics networks Standardization M/083 Standardization mandate to CEN and CENELEC concerning the revision of

More information

2. SUPERPATH Mbps Digital Service 2.1. General

2. SUPERPATH Mbps Digital Service 2.1. General Page 1 Rates and charges for services explained herein are contained in Part M, Section 3, Service Charges referred to herein are explained in Part A, Section 3 and contained in Part M, Section 1. 2.1

More information

Transportation Engineering - II Dr. Rajat Rastogi Department of Civil Engineering Indian Institute of Technology - Roorkee

Transportation Engineering - II Dr. Rajat Rastogi Department of Civil Engineering Indian Institute of Technology - Roorkee Transportation Engineering - II Dr. Rajat Rastogi Department of Civil Engineering Indian Institute of Technology - Roorkee Lecture 25 Interlocking of Track Dear students, welcome you back to the lecture

More information

Policy on the syndication of BBC on-demand content

Policy on the syndication of BBC on-demand content Policy on the syndication of BBC on-demand content Syndication of BBC on-demand content Purpose 1. This policy is intended to provide third parties, the BBC Executive (hereafter, the Executive) and licence

More information

Tokenless Block System Basic layout and operation

Tokenless Block System Basic layout and operation Tokenless Block System Basic layout and operation This document is not endorsed by Network Rail. It is NOT for installation, commissioning, testing or maintenance purposes, it is for information only.

More information

Layout Design For Signaling

Layout Design For Signaling Layout Design For Signaling 2014, Rodney Black h t t p : / / h o m e.c o mca st.n e t / ~ kb 0o ys June 29, 2014 7/5/2014 1 Download 7/5/2014 Layout Design for Signaling 2 Outline 1. Why Signal a Layout

More information

Engineering Instruction

Engineering Instruction Engineering Instruction Electrical Distribution Unit Approved by: Paul Poynton, A/Professional Head Electrical Engineering, Sydney Trains Authorised by: Jonathon McKinnon, Engineering Technical Publications

More information

Mandate to CEN and CENELEC for standardization in the field of machines

Mandate to CEN and CENELEC for standardization in the field of machines EUROPEAN COMMISSION DIRECTORATE-GENERAL III INDUSTRY Legislation and standardization and telematics networks Standardization M/079 Mandate to CEN and CENELEC for standardization in the field of machines

More information

Layout Design For Signaling

Layout Design For Signaling Layout Design For Signaling 2 0 1 5, Ro d n e y B l a c k N o v e m b e r 1 5, 2 0 1 5 11/15/2015 1 Download This Presentation 11/15/2015 Layout Design for Signaling 2 Outline 1. Why Signal a Layout 2.

More information

Running Signals ANSG 600. Applicability. Publication Requirement. Document Status NSW SMS. External Only October 2015.

Running Signals ANSG 600. Applicability. Publication Requirement. Document Status NSW SMS. External Only October 2015. Applicability NSW SMS Publication Requirement External Only Document Status Issue/Revision # Effective from 3.0 11 October 2015 Australian Rail Track Corporation Limited (ARTC) Disclaimer This document

More information

Contents INFORMATION FLOW TRACK - TRAIN

Contents INFORMATION FLOW TRACK - TRAIN 2017-05-12 3. INFORMATION FLOW TRACK-TRAIN Page 1 (159) Chapter 3: INFORMATION FLOW TRACK - TRAIN Contents 3. INFORMATION FLOW TRACK - TRAIN 5 3.1 INTRODUCTION 5 3.1.1 Scope 5 3.2 INFORMATION FLOW TRACK

More information

Withdrawn Document. SECTION F (Part ii) YOUR DUTIES IF YOU ARE ACTING AS A HANDSIGNALLER

Withdrawn Document. SECTION F (Part ii) YOUR DUTIES IF YOU ARE ACTING AS A HANDSIGNALLER Uncontrolled When Printed SECTION F (Part ii) YOUR DUTIES IF YOU ARE ACTING AS A HANDSIGNALLER Updated to October 1998 (Formatted for CD use) Rule Book No. 13 Page F(ii).1 Uncontrolled When Printed This

More information

Responding to Signals and Signs

Responding to Signals and Signs Applicability NSW SMS Publication Requirement External Only Document Status Issue/Revision # Effective from 4.0 11 October 2015 Australian Rail Track Corporation Limited (ARTC) Disclaimer This document

More information

Track Work Authority ANWT 306. Applicability. Publication Requirement. Document Status NSW SMS. External Only October 2015.

Track Work Authority ANWT 306. Applicability. Publication Requirement. Document Status NSW SMS. External Only October 2015. Applicability NSW SMS Publication Requirement External Only Document Status Issue/Revision # Effective from 2.0 11 October 2015 Australian Rail Track Corporation Limited (ARTC) Disclaimer This document

More information

ITU-T Y.4552/Y.2078 (02/2016) Application support models of the Internet of things

ITU-T Y.4552/Y.2078 (02/2016) Application support models of the Internet of things I n t e r n a t i o n a l T e l e c o m m u n i c a t i o n U n i o n ITU-T TELECOMMUNICATION STANDARDIZATION SECTOR OF ITU Y.4552/Y.2078 (02/2016) SERIES Y: GLOBAL INFORMATION INFRASTRUCTURE, INTERNET

More information

Status Date Prepared Reviewed Endorsed Approved

Status Date Prepared Reviewed Endorsed Approved Discipline Engineering Standard NSW Category Signalling Title Reference Number SMP 39 (RIC Standard: SC 00 52 00 39 SI) Document Control Status Date Prepared Reviewed Endorsed Approved Issue 1 Revision

More information

STANDARD FOR TELECOMMS WIRING AND TERMINATIONS

STANDARD FOR TELECOMMS WIRING AND TERMINATIONS GTlEH H802 Date MR 94 Paae I Part Synopsis This standard defines the Board's policy for the maintenance of Telecomms cable terminations. lthough the standard is centered on maintenance issues its provisions

More information

NMRA 2013 Peachtree Express Control Panel Editor - B

NMRA 2013 Peachtree Express Control Panel Editor - B NMRA 2013 Peachtree Express Control Panel Editor - B Dick Bronson RR-CirKits, Inc. JMRI Control Panel Editor for Automatic Train Running Using Warrants Items Portal Table The 'Portal Table' is part of

More information

This SOP is applicable to all WMATA personnel working on the Rail System, contractors performing the work and WMATA contractor escorts.

This SOP is applicable to all WMATA personnel working on the Rail System, contractors performing the work and WMATA contractor escorts. RFP: FQ13024/WJG CONTRACT NO. FQ13024 APPENDIX C STANDARD OPERATING PROCEDURES (SOP) SOP #33 REMOVAL AND RESTORATION OF THIRD RAIL POWER FOR WORK BY CONTRACTOR S FORCES MAINLINE, REVENUE SYSTEM PURPOSE

More information

(LONDON MIDLAND REGION) SPECIAL NOTICE 1855 G.

(LONDON MIDLAND REGION) SPECIAL NOTICE 1855 G. PRIVATE and not for Publication BRITISH RAILWAYS (LONDON MIDLAND REGION) SPECIAL NOTICE 1855 G. N01-ICE TO DRIVERS, GUARDS, SIGNALMEN AND OTHERS CONCERNED RESPEC1-ING THE INTRO DUC1-ION OF MULTIPLE ASPECT

More information

Magnetic tape storage sgstem for m rπr

Magnetic tape storage sgstem for m rπr Magnetic tape storage sgstem for m rπr Contents Page 1.0 GENERAL 3 2.0 BASIC PRINCIPLES 3 3.0 OPERATION. 4 4.0 READING AND WRITING. 5 5.0 PARITY CHECKING. 6 6.0 CONSTRUCTION 6 7.0 OPERATING SPEEDS 6 1

More information

AS/NZS :2011

AS/NZS :2011 AS/NZS 62087.2.2:2011 Incorporating Amendment Nos 1 and 2 Australian/New Zealand Standard Power consumption of audio, video and related equipment Part 2.2: Minimum energy performance standards (MEPS) and

More information

PRIVATE and not for Publication NOTICE No. S.2649 BRITISH RAILWAYS. (WESTERN REGION) (For the use of employees only) Notice to Trainmen, etc.

PRIVATE and not for Publication NOTICE No. S.2649 BRITISH RAILWAYS. (WESTERN REGION) (For the use of employees only) Notice to Trainmen, etc. PRIVATE and not for Publication NOTICE No. S.2649 BRITISH RAILWAYS (WESTERN REGION) (For the use of employees only) Notice to Trainmen, etc. MULTIPLE ASPECT SIGNALLING BRISTOL (Stage 3.C.-Bristol Temple

More information

The Joys of Life Model Railway Club OPERATING THE RAILWAY. Not To Be Taken Away

The Joys of Life Model Railway Club OPERATING THE RAILWAY. Not To Be Taken Away The Joys of Life Model Railway Club OPERATING THE RAILWAY Not To Be Taken Away Operating the Joys of Life Railway Will High 1. Introduction The Joys of Life Railway is a 600 yard long, 5in gauge ground

More information

RAILWAY INVESTIGATION REPORT R12D0063 UNPROTECTED OVERLAP OF AUTHORITY

RAILWAY INVESTIGATION REPORT R12D0063 UNPROTECTED OVERLAP OF AUTHORITY RAILWAY INVESTIGATION REPORT R12D0063 UNPROTECTED OVERLAP OF AUTHORITY AGENCE MÉTROPOLITAINE DE TRANSPORT TRAINS AMT 94 AND AMT 93 MILE 40.8, ADIRONDACK SUBDIVISION ADIRONDACK JUNCTION MONTRÉAL, QUEBEC

More information

DATED day of (1) THE BRITISH BROADCASTING CORPORATION

DATED day of (1) THE BRITISH BROADCASTING CORPORATION DATED day of.. 2017 BBC IP COMMISSIONING AGREEMENT BETWEEN (1) THE BRITISH BROADCASTING CORPORATION (2). LIMITED [PROGRAMME TITLE] THIS PROGRAMME PRODUCTION AGREEMENT FOR A BBC-OWNED FORMAT/PROGRAMME Dated...

More information

9I273 01/10/2012 COU-03/0 AUTOMATIC CHANGEOVER UNIT TO BACK-UP AMPLIFIER

9I273 01/10/2012 COU-03/0 AUTOMATIC CHANGEOVER UNIT TO BACK-UP AMPLIFIER 9I273 01/10/2012 COU-03/0 1 CONTENTS 1. SPECIFICATIONS... 3 2. BLOCKS DIAGRAM... 3 3. FRONT VIEW... 4 4. REAR VIEW... 4 5. CONTROL MODULE... 4 6. ZONE CARD (COU-03FC or COU-03EC)... 6 6.1. Diagram... 6

More information

Draft for Public Comment

Draft for Public Comment Draft for Public Comment Form 36 Version 6.1 DPC: 03/302646 DC Head Office 389 Chiswick High Road London W4 4AL Telephone: +44(0)20 8996 9000 Fax: +44(0)20 8996 7001 Date: 27 March 2003 Origin: National

More information

IRSE NEWS ISSUE 214 SEPTEMBER 2015

IRSE NEWS ISSUE 214 SEPTEMBER 2015 IRSE NEWS ISSUE 214 SEPTEMBER 2015 NO BARRIERS TO YOUR FUTURE WE PROVIDE THE SOLUTION TO YOUR TRAINING IN LEVEL CROSSINGS Discover our range of Design, Maintenance and Testing Courses on our website. We

More information

The Telecommunications Act Chap. 47:31

The Telecommunications Act Chap. 47:31 The Telecommunications Act Chap. 47:31 4 th September 2013 Presentation Overview Legislative Mandate Limitations of Telecommunications Act Proposed Amendments to Telecommunications Act New Technological

More information

Simplified Signaling for Modelers

Simplified Signaling for Modelers Simplified Signaling for Modelers Rule 281 Clear 1 Author: Gary Evans North Central Region, Division 3 garytrain47@frontier.com Revision: May 05, 2014 Handout: NORAC Signal Aspects Sheet 2 Introduction

More information

Capital Works process for Medium Works contracts

Capital Works process for Medium Works contracts Capital Works process for Medium Works contracts Guidance Notes Contracts valued between $50k-$500k Please note this process only applies to Ministry-led Medium Works projects. These notes provide further

More information

Broadcasting Decision CRTC

Broadcasting Decision CRTC Broadcasting Decision CRTC 2012-550 PDF version Route reference: 2012-224 Additional reference: 2012-224-1 Ottawa, 10 October 2012 Radio 710 AM Inc. Niagara Falls, Ontario Application 2011-0862-1, received

More information

Arrangements for: National Progression Award in. Music Performing (SCQF level 6) Group Award Code: G9L6 46. Validation date: November 2009

Arrangements for: National Progression Award in. Music Performing (SCQF level 6) Group Award Code: G9L6 46. Validation date: November 2009 Arrangements for: National Progression Award in Music Performing (SCQF level 6) Group Award Code: G9L6 46 Validation date: November 2009 Date of original publication: January 2010 Version 02 (September

More information

ITU-T Y Functional framework and capabilities of the Internet of things

ITU-T Y Functional framework and capabilities of the Internet of things I n t e r n a t i o n a l T e l e c o m m u n i c a t i o n U n i o n ITU-T Y.2068 TELECOMMUNICATION STANDARDIZATION SECTOR OF ITU (03/2015) SERIES Y: GLOBAL INFORMATION INFRASTRUCTURE, INTERNET PROTOCOL

More information

HV/SG/0027 N/A HV/SG/0027 Technical Note Level 10 201 Kent Street PO Box 76 Millers Point Sydney 2000 Australia www.arup.com t +61 2 9320 9320 f +61 2 9320 9321 d +61 2 9320 9593 Project title cc Newcastle

More information

Broadcasting Authority of Ireland Guidelines in Respect of Coverage of Referenda

Broadcasting Authority of Ireland Guidelines in Respect of Coverage of Referenda Broadcasting Authority of Ireland Guidelines in Respect of Coverage of Referenda March 2018 Contents 1. Introduction.3 2. Legal Requirements..3 3. Scope & Jurisdiction....5 4. Effective Date..5 5. Achieving

More information

A. Introduction 1. Title: Automatic Underfrequency Load Shedding Requirements

A. Introduction 1. Title: Automatic Underfrequency Load Shedding Requirements DRAFT 6 V4 Standard PRC-006- RFC-01 01/11/11 A. Introduction 1. Title: Automatic Underfrequency Load Shedding Requirements Deleted: Deleted: 10 Deleted: 20 9 2. Number: PRC 006 RFC 01. Purpose: To establish

More information

BERMUDA STATUTORY INSTRUMENT BR 25/1987 TELEVISION BROADCASTING SERVICE REGULATIONS 1987

BERMUDA STATUTORY INSTRUMENT BR 25/1987 TELEVISION BROADCASTING SERVICE REGULATIONS 1987 Laws of Bermuda Title 24 Item 11(a) BERMUDA STATUTORY INSTRUMENT BR 25/1987 TELEVISION BROADCASTING SERVICE REGULATIONS 1987 [made under section 11 of the Broadcasting Commissioners Act 1953 [title 24

More information

If you want to get an official version of this User Network Interface Specification, please order it by sending your request to:

If you want to get an official version of this User Network Interface Specification, please order it by sending your request to: This specification describes the situation of the Proximus network and services. It will be subject to modifications for corrections or when the network or the services will be modified. The reader is

More information

ENGINEERING COMMITTEE Energy Management Subcommittee SCTE STANDARD SCTE

ENGINEERING COMMITTEE Energy Management Subcommittee SCTE STANDARD SCTE ENGINEERING COMMITTEE Energy Management Subcommittee SCTE STANDARD SCTE 237 2017 Implementation Steps for Adaptive Power Systems Interface Specification (APSIS ) NOTICE The Society of Cable Telecommunications

More information

Technical requirements & conditions for hirers

Technical requirements & conditions for hirers Technical requirements & conditions for hirers This form is designed as the basis for a pre-production meeting between the Stage Manager/Hirer and the Mechanics Technical Manager at which production details

More information

ETCS INTERFACE WITH THE EXISTING SIGNALLING SYSTEMS

ETCS INTERFACE WITH THE EXISTING SIGNALLING SYSTEMS ETCS INTERFACE WITH THE EXISTING SIGNALLING SYSTEMS Massimo Ferrettino *, Luca Prini ** Abstract The installation of ETCS systems ensures the interoperability of the trains, but on the other hand shows

More information

The General Tariff 2019

The General Tariff 2019 The General Tariff 2019 The General Tariff applies to Music Usage in the form of performances of music by one (or more) performing artist(s) and/or through Sound Equipment, even if that Music Usage takes

More information

OECD COMMUNICATIONS OUTLOOK 2001 Broadcasting Section

OECD COMMUNICATIONS OUTLOOK 2001 Broadcasting Section OECD COMMUNICATIONS OUTLOOK 2001 Broadcasting Section Country: HUNGAR Date completed: 13 June, 2000 1 BROADCASTING Broadcasting services available 1. Please provide details of the broadcasting and cable

More information

THE MINACK THEATRE. Notes for Playing Companies. Please note 2016 amendment to Section 5 - Public Liability & Employer Liability Insurance

THE MINACK THEATRE. Notes for Playing Companies. Please note 2016 amendment to Section 5 - Public Liability & Employer Liability Insurance THE MINACK THEATRE Notes for Playing Companies 2018 Please note 2016 amendment to Section 5 - Public Liability & Employer Liability Insurance Please note 2017 amendment to Section 9 Child Performers Please

More information

Transportation Engineering -II Dr. Rajat Rastogi Department of Civil Engineering Indian Institute of Technology - Roorkee

Transportation Engineering -II Dr. Rajat Rastogi Department of Civil Engineering Indian Institute of Technology - Roorkee Transportation Engineering -II Dr. Rajat Rastogi Department of Civil Engineering Indian Institute of Technology - Roorkee Lecture - 22 Signals part - 1 Dear students, I welcome you back to the lecture

More information

APPROVED for connection to Telecommunication systems specified in the instructions for use subject to the conditions set out in them.

APPROVED for connection to Telecommunication systems specified in the instructions for use subject to the conditions set out in them. TM COMSPHERE 3900 Series Modems Models 3910 and 3911 Government Requirements for Great Britain Document Number 3910-A2-GK42-10 November 1996 Overview This document highlights government requirements, safety

More information

PSC300 Operation Manual

PSC300 Operation Manual PSC300 Operation Manual Version 9.10 General information Prior to any attempt to operate this Columbia PSC 300, operator should read and understand the complete operation of the cubing system. It is very

More information

CONTROL PANEL ENGLISH INSTRUCTIONS MOTORLINE MC 2 / SEAV LRS 2150 SET

CONTROL PANEL ENGLISH INSTRUCTIONS MOTORLINE MC 2 / SEAV LRS 2150 SET CONTROL PANEL ENGLISH INSTRUCTIONS MOTORLINE MC 2 / SEAV LRS 2150 SET 230 Volt Single Phase logic control panel for twin motors pair of swinging gates and single leaf swing gate Integral radio receiver,

More information

Feasibility Study: Telecare in Scotland Analogue to Digital Transition

Feasibility Study: Telecare in Scotland Analogue to Digital Transition - Feasibility Study: Telecare in Scotland Analogue to Digital Transition Product 2 and 3 Report (Executive Summary) April 2016 NHS 24, Scottish Centre for Telehealth and Telecare Copyright 2016 This report

More information

Broadcasting Authority of Ireland Rule 27 Guidelines General Election Coverage

Broadcasting Authority of Ireland Rule 27 Guidelines General Election Coverage Broadcasting Authority of Ireland Rule 27 Guidelines General Election Coverage November 2015 Contents 1. Introduction.3 2. Legal Requirements..3 3. Scope & Jurisdiction....5 4. Effective Date..5 5. Achieving

More information

M150SP USER S AND INSTALLER S MANUAL. v2.0 REV. 03/2017

M150SP USER S AND INSTALLER S MANUAL. v2.0 REV. 03/2017 M150SP USER S AND INSTALLER S MANUAL v2.0 REV. 03/2017 00. CONTT 01. SAFETY INSTRUCTIONS INDEX 01. SAFETY INSTRUCTIONS STANDARDS TO FOLLOW 02. THE DEVICE TECHNICAL SPECIFICATIONS VISUAL ASPECT CONNECTORS

More information

Council of the European Union Brussels, 26 June 2017 (OR. en)

Council of the European Union Brussels, 26 June 2017 (OR. en) Conseil UE Council of the European Union Brussels, 26 June 2017 (OR. en) Interinstitutional File: 2016/0284 (COD) 10551/17 LIMITE NOTE From: To: Presidency Delegations No. prev. doc.: ST 6610/17 No. Cion

More information

ENGINEERING COMMITTEE Interface Practices Subcommittee AMERICAN NATIONAL STANDARD ANSI/SCTE

ENGINEERING COMMITTEE Interface Practices Subcommittee AMERICAN NATIONAL STANDARD ANSI/SCTE ENGINEERING COMMITTEE Interface Practices Subcommittee AMERICAN NATIONAL STANDARD ANSI/SCTE 14 2016 Test Method for Hex Crimp Tool Verification/Calibration NOTICE The Society of Cable Telecommunications

More information

ETSI TS V1.1.1 ( )

ETSI TS V1.1.1 ( ) TS 100 396-10 V1.1.1 (2000-12) Technical Specification Terrestrial Trunked Radio (TETRA); Technical requirements for Direct Mode Operation (DMO); Part 10: Managed Direct Mode Operation (M-DMO) 2 TS 100

More information

PASS. Professional Audience Safety System. User Manual. Pangolin Laser Systems. November 2O12

PASS. Professional Audience Safety System. User Manual. Pangolin Laser Systems. November 2O12 PASS Professional Audience Safety System User Manual November 2O12 Pangolin Laser Systems Downloaded from the website www.lps-laser.com of your distributor: 2 PASS Installation Manual Chapter 1 Introduction

More information

INTERIM ADVICE NOTE 109/08. Advice Regarding the Motorway Signal Mark 4 (MS4)

INTERIM ADVICE NOTE 109/08. Advice Regarding the Motorway Signal Mark 4 (MS4) INTERIM ADVICE NOTE 109/08 Advice Regarding the Motorway Signal Mark 4 (MS4) Summary This document provides advice on usage of MS4 signal and when they can be used to replace MS3 signals. Instructions

More information

Broadcasting Order CRTC

Broadcasting Order CRTC Broadcasting Order CRTC 2012-409 PDF version Route reference: 2011-805 Additional references: 2011-601, 2011-601-1 and 2011-805-1 Ottawa, 26 July 2012 Amendments to the Exemption order for new media broadcasting

More information

TeleHawk Door entry system

TeleHawk Door entry system Veermount Technology Limited TeleHawk Door entry system INSTALLATION MANUAL (For product supplied after January 1st, 2006) IMPORTANT NOTE. Long term system reliability and low maintenance costs can only

More information

14380/17 LK/np 1 DGG 3B

14380/17 LK/np 1 DGG 3B Council of the European Union Brussels, 15 November 2017 (OR. en) Interinstitutional File: 2016/0284(COD) 14380/17 NOTE From: To: Presidency Delegations No. prev. doc.: ST 13050/17 No. Cion doc.: Subject:

More information

PART 17 - ISDN Services Original Sheet 1 SECTION 1 - ISDN Basic Rate Interface (BRI)

PART 17 - ISDN Services Original Sheet 1 SECTION 1 - ISDN Basic Rate Interface (BRI) PART 17 ISDN Services Original Sheet 1 SECTION 1 ISDN Basic Rate Interface (BRI) 1. ISDN Direct A. General ISDN Direct is a local exchange telecommunications service that provides customer access to Circuit

More information

Kyneton KYNETON (40 MILES)

Kyneton KYNETON (40 MILES) Kyneton KYNETON (40 MILES) Kyneton was the terminus of the third section; the line was opened to Kyneton in April 1862 and extended to Castlemaine in October 1862. Kyneton had a small goods yard to serve

More information

ENGINEERING COMMITTEE

ENGINEERING COMMITTEE ENGINEERING COMMITTEE Interface Practices Subcommittee AMERICAN NATIONAL STANDARD ANSI/SCTE 01 2015 Specification for F Port, Female, Outdoor NOTICE The Society of Cable Telecommunications Engineers (SCTE)

More information

Device Management Requirements

Device Management Requirements Device Management Requirements Approved Version 2.0 09 Feb 2016 Open Mobile Alliance OMA-RD-DM-V2_0-20160209-A [OMA-Template-ReqDoc-20160101-I] OMA-RD-DM-V2_0-20160209-A Page 2 (14) Use of this document

More information

Single Axis Position Controller

Single Axis Position Controller SERIES P9511 Single Axis Position Controller Compact Construction Simple Go-to operation Integrated Relay Output Integrated Mains Power Supply ELEKTRO-TRADING sp. Z o.o. 44-109 Gliwice, ul. Mechaników

More information

DM Scheduling Architecture

DM Scheduling Architecture DM Scheduling Architecture Approved Version 1.0 19 Jul 2011 Open Mobile Alliance OMA-AD-DM-Scheduling-V1_0-20110719-A OMA-AD-DM-Scheduling-V1_0-20110719-A Page 2 (16) Use of this document is subject to

More information

Signal Sighting and Position

Signal Sighting and Position Discipline: Engineering (Signalling) Category: Standard Signal Sighting and Position ESC-04-01 Applicability ARTC Network Wide CRIA (NSW CRN) Primary Source PP-165, SC 08 01, SCP 06, SCP 15 Document Status

More information

User Guide. Centrex Recording Interface

User Guide. Centrex Recording Interface User Guide Centrex Recording Interface Table of Contents Introduction... 2 The Meridian Business Set... 3 Key Numbering Plan (18 button add-on)... 4 Key Numbering Plan (36 button add-on)... 5 Key Numbering

More information

IQACO Changeover Switch

IQACO Changeover Switch IQACO Changeover Switch C Module Description The IQACO is a passive changeover switch with composite video presence detection. Both inputs are monitored for sync presence, sync amplitude and line standard.

More information

CH1 CH2 CH3 CH4. Master /Fade CH5. 600s CH6. 60s SC1 SC2 SC4 SC3 SC5. SC6 Off/Pro. AL Fade 6 Pro. User guide

CH1 CH2 CH3 CH4. Master /Fade CH5. 600s CH6. 60s SC1 SC2 SC4 SC3 SC5. SC6 Off/Pro. AL Fade 6 Pro. User guide 1 1 CH1 CH2 1 1 CH4 CH 1 CH3 6s Master /Fade CH6 1 SC1 6s SC4 SC2 SC SC3 SC6 Off/Pro AL Fade 6 Pro User guide CONTENTS INTRODUCTION...2 Welcome 2 Safety 2 Supplied items 3 INSTALLATION...4 Mounting 4

More information

Table of Contents. Section E: Inspection and Acceptance

Table of Contents. Section E: Inspection and Acceptance Table of Contents Section E: Inspection and Acceptance Section Page E.1 52.252-2 Clauses Incorporated by reference (Feb 1998) 1 E.2 Cutover and Acceptance Testing of Services and Systems 1 E.2.1 Cutover

More information

Fig. 2. Typical Point Lay-out.

Fig. 2. Typical Point Lay-out. route- lever s ig n a l l in g, w in c h e s t e r, g r e a t w e s t e r n r a il w a y. By the Ferreira-Insell Route-Lever Signalling the actuation of one lever simultaneously moves, or holds, all the

More information