Operation of offshore wind power plants connected with HVDC

Size: px
Start display at page:

Download "Operation of offshore wind power plants connected with HVDC"

Transcription

1 Operation of offshore wind power plants connected with HVDC Trondheim, February 2015 O. omis-bellmunt (IREC / CITCEA-UC) with support from M. de-rada, A. Egea, J.L. Dominguez, E. rieto, J. Sau, F. Diaz and M. Aragüés

2 Agenda Context. Offshore wind power plants connected with VSC-HVDC. Functional requirements for offshore W connected with VSC-HVDC. Coordinated control for power reduction. Conclusions. 2

3 Context. Offshore wind power plants connected with VSC-HVDC. Functional requirements for offshore W connected with VSC-HVDC. Example of coordinated control for power reduction. Conclusions. 3

4 Fix Speed onshore W Energy capture Fault ride-through rid support Other WTs LV 50 Hz MV 50 Hz LV 50 Hz Main grid Other WTs LV 50 Hz MV 50 Hz LV 50 Hz Main grid Variable Speed onshore W Other WTs LV 50 Hz MV 50 Hz LV 50 Hz HVAC Offhore W HV 50 Hz HVAC cable HVAC cable Compensation required Long cables (>50-80 km) not possible Main grid HV 50 Hz Other WTs LV 50 Hz MV 50 Hz HV 50 Hz Same WT DC cables VSC-HVDC technology VSC-HVDC, Offhore W HVDC cable Bard Offshore 1 (BorWin 1) 400 MW First offshore W with VSC-HVDC First WT in 2010 To be completed in 2013 Main grid HV 50 Hz 4

5 Multiterminal VSC-HVDC Other WTs LV 50 Hz MV 50 Hz HV 50 Hz AC grid HV 50 Hz Other WTs LV 50 Hz MV 50 Hz HV 50 Hz Multiterminal HVDC system AC grid HV 50 Hz 5

6 VSC-HVDC grid Other WTs LV 50 Hz MV 50 Hz HV 50 Hz AC grid HV 50 Hz Other WTs LV 50 Hz MV 50 Hz HV 50 Hz HVDC grid AC grid HV 50 Hz 6

7 oint to point VSC-HVDC with an offshore AC hub Mainstream Renewable ower Other WTs LV MV HV oint to point HVDC AC grid HV 50 Hz AC hub AC cable Other WTs LV MV HV oint to point HVDC AC grid HV 50 Hz 7

8 HVDC technology concepts for future transmission systems for offshore wind oint to point HVDC Multiterminal HVDC HVDC grid Offshore AC hubs AC systems with HVDC links All the previous combined ermany Takes the Lead in HVDC, IEEE Spectrum 2013 Siemens Friends of the Supergrid 8

9 W concepts AC W standard/nonstandard frequency AC W variable frequency Cost? Efficiency? Reliability? Availability? Maintainability? DC W Hybrid DC-AC 9

10 AC collection W AC voltage ratings 33 kv 66 kv? 50/60 Hz? non-standard frequency? Variable frequency? Normally with Type 3 (DFI) and Type 4 (FC) Wind Turbines HVDC transmission AC Export cable AC DC Offshore latforms AC DC Mikel de-rada et al. Analysis of DC Collector rid for OW 12th Wind Integration Workshop, London, October 2013 DC AC 10

11 Cluster 1 Substation Offshore Wind Farm 1 rid Connection System Converter Station To WTs Export Cable String 1 String 2 Substation Offshore Wind Farm 2 Converter Tx Rectifier ~ = Inverter ~ = AC rid Emergency ower ONSHORE OFFSHORE Cluster 2 Cigré W B4-55 HVDC connection of offshore wind power plants (under development) 11

12 rojects (W with VSC-HVDC) with AC collection 50 Hz Borwin 1 (Transpower offshore, 2009, +/- 150 kv, 400 MW, km) for BARD Offshore 1-2x1 km DolWin 1 (TenneT, 2013, +/- 320 kv, 800 MW, km) for Meg Offshore 1-2x13 km and Borkum West II - 2x7.5 km DolWin 2 (TenneT, 2015, +/- 320 kv, 900 MW, km) for ode Wind I - 7 km and ode Wind II - 12 km Borwin 2 (Transpower offshore, 2014, +/- 300 kv, 800 MW, km) for Veja Mate 2x10 km and lobaltech 1 2x30 km Helwin 1 (Transpower offshore, 2014, +/- 250 kv, 576 MW, km) for Nordsee Ost 2x4.2 km, Meerwind phase 1 2x7.6 km and 2 2x 20 km Sylwin 1 (TenneT, 2014, +/- 320 kv, 864 MW, km) for Dan Tysk 2x9.7 km, Butendiek 2x40 km and Sandbank 24 2x35 km Helwin 2 (TennetT, 2015, +/- 320 kv, 690 MW, km) for Amrumbank 3x8 km, Hochsee Testfeld Helgoland 2x4 km and Kaskasi 2x3.5 km DolWin 3 (TenneT, 2017, +/- 320 kv, 900 MW, km) for OW Borkum Riffgrund West 1, OW Borkum Riffgrund West 2 and OW Borkum West 2 12

13 Context. Offshore wind power plants connected with VSC-HVDC. Functional requirements for offshore W connected with VSC-HVDC. Example of coordinated control for power reduction. Conclusions. 13

14 W connected to VSC-HVDC Functional requirements Collect the wind power and inject it in the VSC- HVDC cable rovide support to the main AC grid rovide support to the DC grid (if exists) Ensure the proper offshore grid operation Maintain stability in normal and fault conditions 14

15 Specific requirements: W connected to VSC-HVDC Functional requirements Reactive power management. Offshore grid voltage control (HVDC rectifier + WTs) Active power management Offshore grid frequency control (VSC-HVDC rectifier) Start/stop sequence Fault ride-through capability Main grid support: Voltage support Frequency support may be required Virtual (synthetic inertia) may be required ower oscillation damping may be required Control coordination between W control and VSC-HVDC control Operation under communication failure rovide auxiliary power to the W when there is no available generation (no wind or excessively high wind) 15

16 Normal operation Substation Converter Station Emergency ower Offshore Converter ~ = Converter = ~ AC rid Transformer latform 1 Draft from Cigré B4-55 W HVDC connection of offshore W 16

17 Restricted operation Draft from Cigré B4-55 W HVDC connection of offshore W 17

18 Main AC grid fault Substation Converter Station Emergency ower Offshore Converter ~ = Converter = ~ HVDC chopper actuation AC rid Fault Transformer latform 1 Draft from Cigré B4-55 W HVDC connection of offshore W 18

19 W fault Substation Converter Station Emergency ower Offshore Converter ~ = Converter = ~ AC rid Fault Transformer latform 1 Draft from Cigré B4-55 W HVDC connection of offshore W 19

20 Export cable fault Substation Converter Station Fault Emergency ower Wind turbine power reduction Offshore Converter ~ = Converter = ~ AC rid Transformer latform 1 Draft from Cigré B4-55 W HVDC connection of offshore W 20

21 Frequency response using W control ower reduction Substation W CONTROL frequency / W required active power RID OERATOR Converter Station Emergency ower Offshore Converter ~ = Converter = ~ AC rid Transformer latform 1 Draft from Cigré B4-55 W HVDC connection of offshore W 21

22 Frequency response using VSC-HVDC converters Transformer latform 1 Substation Converter Station frequency / W required active power Emergency ower Offshore Converter ~ = Converter = ~ AC rid Frequency Change Draft from Cigré B4-55 W HVDC connection of offshore W 22

23 Context. Offshore wind power plants connected with VSC-HVDC. Functional requirements for offshore W connected with VSC-HVDC. Example of coordinated control for power reduction. Conclusions. 23

24 Example coordination for power reduction How can we provide power reduction (without fast communication between offshore and onshore VSC-HVDC)? VSC-HVDC DBR, fast but available limited time. (not offshore ->footprint!) Wind turbine DBR, fast but available limited time. itch angle. Slow response but good for steady-state. Fast wind turbine torque reduction with the power converter? Electrically possible, but not allowed. (Turbine loads) itch angle Wind turbine DBR VSC-HVDC DBR 24

25 Example coordination for power reduction θ g d/dt i wtabc. θ g T[θ] i wtabc v wtabc v wtqd i wtqd β pitch itch controller WC T[θ] -1 Inner loop * iwtqd MT * wt wt E wt v pabc T[γ] -1 v pqd Inner loop i* pqd DC loop i pabc hd thesis, Agustí Egea (CITCEA-UC) wt-ch ower reduction WTC v pabc v rabc γ LL γ v rqd i pqd E* wt E wt T[γ] v rabc v rqd i pqd wt DETAILED WIND TURBINE COMMUNICATION BUS min E 2 min E 1 E DC max E 2 max E 1 OFFSHORE LATFORM i nabc i cabc vcabc i cabc i nabc red WF ω δ δ v cabc T[δ] δ WFC v tabc T[δ] -1 v i tqd cqd v cqd Inner loop i* cqd i nqd Voltage v cqd * loop min E 1 WF power controller E 1 WINF FARM CONTROL Cable 1 E 1 2ch SC chopper E 2 SC-DBR CONTROL I 1 E 2 v labc v lqd SC Inner loop i lq * Droop control v lqd i lqd * E 2 E 2 ONSHORE STATION i labc v labc ϕ T[ϕ] -1 LL ϕ T[ϕ] SC CONTROL v zabc vlabc i labc v zabc nom E 2 E 2 DC 25

26 Example coordination for power reduction θ g d/dt i wtabc. θ g T[θ] i wtabc v wtabc v wtqd i wtqd β pitch itch controller WC T[θ] -1 Inner loop * iwtqd MT * wt wt E wt wt-ch ower reduction v pabc WTC T[γ] -1 v pqd Inner loop i* pqd DC loop i pabc v pabc v rabc γ LL γ v rqd i pqd E* wt E wt T[γ] v rabc v rqd i pqd wt DETAILED WIND TURBINE COMMUNICATION BUS OFFSHORE LATFORM i nabc i cabc vcabc i cabc i nabc red WF ω δ δ v cabc T[δ] δ WFC v tabc T[δ] -1 v i tqd cqd v cqd Inner loop i* cqd i nqd Voltage v cqd * loop min E 1 WF power controller E 1 WINF FARM CONTROL Cable 1 E 1 2ch SC chopper E 2 SC-DBR CONTROL I 1 E 2 v labc v lqd SC Inner loop i lq * Droop control v lqd i lqd * E 2 E 2 ONSHORE STATION i labc v labc ϕ T[ϕ] -1 LL ϕ T[ϕ] SC CONTROL v zabc vlabc i labc v zabc hd thesis, Agustí Egea (CITCEA-UC) 26

27 Context. Offshore wind power plants connected with VSC-HVDC. Functional requirements for offshore W connected with VSC-HVDC. Example of coordinated control for power reduction. Conclusions. 27

28 Conclusions Offshore wind power plants connected with VSC-HVDC have special characteristics: The VSC-HVDC converter needs to create an offshore grid where the frequency can be freely chosen. As the offshore grid is an only power electronics grid, the protections need to be carefully designed. Standard approaches may not be useful. The interactions between wind turbines and VSC-HVDC converters need to be studied. Offshore wind power plants need to: Collect the wind power and inject it in the HVDC cable rovide support to the main AC grid and DC grid. Maintain stability in normal and fault conditions 28

29 Thanks for your attention!

Simulation of DFIG and FSIG wind farms in. MATLAB SimPowerSystems. Industrial Electrical Engineering and Automation.

Simulation of DFIG and FSIG wind farms in. MATLAB SimPowerSystems. Industrial Electrical Engineering and Automation. CODEN:LUTEDX/(TEIE-7235)/1-007/(2009) Industrial Electrical Engineering and Automation Simulation of DFIG and FSIG wind farms in MATLAB SimPowerSystems Francesco Sulla Division of Industrial Electrical

More information

Mitigation of Cascading Outages and Prevention of Blackouts:System-Wide Corrective Control

Mitigation of Cascading Outages and Prevention of Blackouts:System-Wide Corrective Control 10th Mediterranean Conference on Power Generation, Transmission, Distribution and Energy Conversion 6-9 November 2016 Belgrade, Serbia Mitigation of Cascading Outages and Prevention of Blackouts:System-Wide

More information

Expert Workgroup on Fast Fault Current Injection stage 1 Terms of Reference

Expert Workgroup on Fast Fault Current Injection stage 1 Terms of Reference Expert Workgroup on Fast Fault Current Injection stage 1 Terms of Reference Governance 1. The need case to establish a Next Steps Expert Technical Workgroup Supporting Fast Fault Current Injection (FFCI)

More information

1. EXPERT MEETING EXPERT MEETING EXPERT MEETING Feedback from the meeting attendees...

1. EXPERT MEETING EXPERT MEETING EXPERT MEETING Feedback from the meeting attendees... FEEDBACK REPORT STAKE HOLDER CONSULTATION PROCESS OFFSHORE GRID NL Type: Feedback report Work stream Technical Topics: P.01 Planning Filename ONL 15-149 P01_Planning_FBRe_v2 Version 2 public release Pages

More information

Annexes to Realisation Agreement

Annexes to Realisation Agreement PAGE 1 of 35 Disclaimer: the content of this draft is disclosed for information purposes only. In no way does this draft constitute rights for (potential) connected parties, or bind TenneT legally. Annexes

More information

Detailed Design Report

Detailed Design Report Detailed Design Report Chapter 4 MAX IV Injector 4.6. Acceleration MAX IV Facility CHAPTER 4.6. ACCELERATION 1(10) 4.6. Acceleration 4.6. Acceleration...2 4.6.1. RF Units... 2 4.6.2. Accelerator Units...

More information

The effect of converter configurations of HVDC links on sub- and super-synchronous disturbances to turbine units

The effect of converter configurations of HVDC links on sub- and super-synchronous disturbances to turbine units Electric Power Systems Research 74 (2005) 427 433 The effect of converter configurations of HVDC s on sub- and super-synchronous disturbances to turbine units Chi-Hshiung Lin Department of Electrical Engineering,

More information

Intelligent solutions for Onshore Power Supply

Intelligent solutions for Onshore Power Supply Intelligent solutions for Onshore Power Supply Dipl. Ing. H.-E. Schmidt Account Manager OPS SIEMENS AG GER IC 20099 Hamburg September 2012 Siemens AG 2012 Ship to shore connection Nordlandkai Lübeck, Germany

More information

Research on Control Strategy of Complex Systems through VSC-HVDC Grid Parallel Device

Research on Control Strategy of Complex Systems through VSC-HVDC Grid Parallel Device Sensors & Transducers, Vol. 75, Issue 7, July, pp. 9-98 Sensors & Transducers by IFSA Publishing, S. L. http://www.sensorsportal.com Research on Control Strategy of Complex Systems through VSC-HVDC Grid

More information

Real Time Monitoring for SMART Grid Initiatives Synchronized Measurement & Analysis in Real Time SMART program by

Real Time Monitoring for SMART Grid Initiatives Synchronized Measurement & Analysis in Real Time SMART program by Real Time Monitoring for SMART Grid Initiatives Synchronized Measurement & Analysis in Real Time SMART program by Bharat Bhargava Armando Salazar Southern California Edison Co. IEEE PES General Meeting

More information

Maschinenfabrik Reinhausen Germany Power Quality

Maschinenfabrik Reinhausen Germany Power Quality Maschinenfabrik Reinhausen Germany Power Quality Power Quality and Reliability Dr.-Ing. Mike Ifland / MR PQ Germany Israel/ Dec. 4 st 2014 Page 1 of 23 Agenda I MR Introduction I MR PQ Fields of activity

More information

PERFORMANCE ANALYSIS OF DFIG WIND TURBINES WITH CROWBAR PROTECTION UNDER SHOR CIRCUIT

PERFORMANCE ANALYSIS OF DFIG WIND TURBINES WITH CROWBAR PROTECTION UNDER SHOR CIRCUIT PERFORMANCE ANALYSIS OF DFIG WIND TURBINES WITH CROWBAR PROTECTION UNDER SHOR CIRCUIT Patel Poonam J 1, Prof. Hardik Raval 2, Prof. A.M.Patel 3 1 PG scholar, 2,3 Assistant Professor Electrical Department,

More information

640 kv extruded HVDC cable system

640 kv extruded HVDC cable system 640 kv extruded HVDC cable system World s most powerful extruded cable system Pehr Bergelin, Marc Jeroense, Tobias Quist, Hans Rapp NKT Summary In this paper, NKT s new 640 kv extruded DC cable system

More information

Q&A OVERVIEW REPORT Q&A OVERVIEW HOLLANDSE KUST (ZUID) Date: 15 December V November 2017 V December 2017

Q&A OVERVIEW REPORT Q&A OVERVIEW HOLLANDSE KUST (ZUID) Date: 15 December V November 2017 V December 2017 Q&A OVERVIEW REPORT Q&A OVERVIEW HOLLANDSE KUST (ZUID) Type: Q&A Overview Date: 15 December 2017 Release version Release date.0 01 November 2017.0 15 December 2017 Disclaimer: the content of this document

More information

3 Resolution of the Board of Supervisors, acting as responsible agency with respect to

3 Resolution of the Board of Supervisors, acting as responsible agency with respect to FILE NO. 070314 RESOLUTION NO. Lf /3-01 1 [CEQA Findings in Connection with the Trans Bay Cable Project] 2 3 Resolution of the Board of Supervisors, acting as responsible agency with respect to 4 the Trans

More information

16 th Annual PQSynergy International Conference and Exhibition 2016

16 th Annual PQSynergy International Conference and Exhibition 2016 16 th Annual PQSynergy International Conference and Exhibition 2016 Er. Muhammad Najmi Bin Bohari MSc(Power Eng), B.Eng (EEE) P.Eng, MIES, M-CIGRE najmi@powerquality.sg Professional Engineer (Singapore).

More information

Dynamic Performance Requirements for Phasor Meausrement Units

Dynamic Performance Requirements for Phasor Meausrement Units Dynamic Performance Requirements for Phasor Meausrement Units 2010 February NAPSI Meeting Dmitry Kosterev Transmission Planning Bonneville Power Administration dnkosterev@bpa.gov Slide 1 BPA Plans for

More information

OPTICAL DISTRIBUTION STATION -

OPTICAL DISTRIBUTION STATION - optical distribution station is a high performance, four individual outputs node. With high output levels and performance to 862MHz, it provides an ideal platform for support of the evolving technologies

More information

Flicker Caused by Operation of Industrial Technology

Flicker Caused by Operation of Industrial Technology Flicker Caused by Operation of Industrial Technology Martin KASPIREK 1, Petr KREJCI 2, Pavel SANTARIUS 3, Karel PROCHAZKA 4 1 Management of Grid, E.ON, F. A. Gerstnera 2151/6, 37001 Ceske Budejovice, Czech

More information

Primary Frequency Response Ancillary Service Market Designs

Primary Frequency Response Ancillary Service Market Designs Engineering Conferences International ECI Digital Archives Modeling, Simulation, And Optimization for the 21st Century Electric Power Grid Proceedings Fall 10-24-2012 Primary Frequency Response Ancillary

More information

A Unified Control Strategy in Grid-Tied and Islanded Operations in Distributed Generation for 3-Phase Inverter

A Unified Control Strategy in Grid-Tied and Islanded Operations in Distributed Generation for 3-Phase Inverter International Journal of Engineering and Technical Research (IJETR) ISSN: 2321-0869 (O) 2454-4698 (P), Volume-3, Issue-7, July 2015 A Unified Control Strategy in Grid-Tied and Islanded Operations in Distributed

More information

ALM-6813/6812 INSTALLATION AND PROGRAMMING MANUAL

ALM-6813/6812 INSTALLATION AND PROGRAMMING MANUAL ALM-6813/6812 INSTALLATION AND PROGRAMMING MANUAL Installation and programming Manual v2.2 1 MARSS Solar Defender SYSTEM This guidebook provides the essential instructions to install and configure the

More information

18 GHz, 2.2 kw KLYSTRON GENERATOR GKP 24KP 18GHz WR62 3x400V

18 GHz, 2.2 kw KLYSTRON GENERATOR GKP 24KP 18GHz WR62 3x400V 18 GHz, 2.2 kw KLYSTRON GENERATOR GKP 24KP 18GHz WR62 3x400V With its characteristics of power stability whatever the load, very fast response time when pulsed (via external modulated signal), low ripple,

More information

14 GHz, 2.2 kw KLYSTRON GENERATOR GKP 22KP 14GHz WR62 3x400V

14 GHz, 2.2 kw KLYSTRON GENERATOR GKP 22KP 14GHz WR62 3x400V 14 GHz, 2.2 kw KLYSTRON GENERATOR GKP 22KP 14GHz WR62 3x400V With its characteristics of power stability independent of the load, very fast response time when pulsed (via external modulated signal), low

More information

PRINCIPLES AND APPLICATIONS

PRINCIPLES AND APPLICATIONS GENERATION & NETWORK Digital Automation Measuring and Control Devices AMS7000 PROCOM The optimum operation of an electrical network depends particularly on the reliability and the availability of the protection,

More information

DC Motors & Controls. DC2 DC Drives for 1/4 thru 2 Hp PMDC and Shunt Wound Motors. 1/4-2 Hp 115/230 VAC 1 Phase 50/60 Hz.

DC Motors & Controls. DC2 DC Drives for 1/4 thru 2 Hp PMDC and Shunt Wound Motors. 1/4-2 Hp 115/230 VAC 1 Phase 50/60 Hz. HVAC Farm Duty Brake 200 & 575 Volt & Controls DC 310 DC2 DC Drives for 1/4 thru 2 Hp PMDC and Shunt Wound DC & Controls 1/4-2 Hp 115/ 1 Phase 50/60 Hz. Applications: General purpose industrial use with

More information

King Fahd University of Petroleum and Minerals Electrical Engineering Department 1. Homework 5 - SOLUTION KEY

King Fahd University of Petroleum and Minerals Electrical Engineering Department 1. Homework 5 - SOLUTION KEY Electrical Engineering Department 1 Homework 5 - SOLUTION KEY EE-306 Electromechanical Devices - Semester 162 Electrical Engineering Department 2 Problem 1 Consider a Europeon city, it is necessary to

More information

Hornsdale 2 Wind Farm. FCAS Capability Test Plan

Hornsdale 2 Wind Farm. FCAS Capability Test Plan Hornsdale 2 Wind Farm FCAS Capability Test Plan Prepared by Siemens Wind Power Pty Ltd 885 Mountain Highway Bayswater VIC 3153 tristan.raysonhill@siemens.com daniel.gallagher@siemens.com Revision History

More information

Stage 05: Draft Final Modification Report

Stage 05: Draft Final Modification Report Stage 05: Draft Final Modification Report Grid Code GC0101: EU Connection Codes GB Implementation Mod 2 This proposal seeks to modify the Grid Code to comply with the obligations in the EU Connection Codes:

More information

Inter-Area Oscillation Damping by PDCI Modulation from PMU Feedback

Inter-Area Oscillation Damping by PDCI Modulation from PMU Feedback Inter-Area Oscillation Damping by PDCI Modulation from PMU Feedback BPA Presenters: Hamody Hindi, Gordon Matthews Sandia National Labs: David Schoenwald Montana Tech: Dan Trudnowski BPA: Jisun Kim (PM)

More information

Linear flow controls VFC Linear flow controls with actuator IFC

Linear flow controls VFC Linear flow controls with actuator IFC Linear flow controls VFC Linear flow controls with actuator Product brochure GB 3 Edition 01.16 Linear relationship between adjustment angle and flow rate Large control ratio of 25:1 Actuators IC 20 or

More information

KRF EMC Filters Installation, Operation and Maintenance Manual

KRF EMC Filters Installation, Operation and Maintenance Manual KRF EMC Filters Installation, Operation and Maintenance Manual KRF EMC Filters limit high frequency noise, as well as: Reduce interference Protect sensitive equipment Eliminate drive cross-talk Meet FCC

More information

Digital SWIR Scanning Laser Doppler Vibrometer

Digital SWIR Scanning Laser Doppler Vibrometer Digital SWIR Scanning Laser Doppler Vibrometer Scan-Series OptoMET Scanning SWIR Laser Doppler Vibrometer (SLDV) is used for non-contact measurement, visualization and analysis of structural vibrations.

More information

Definitions. Common Corridor:

Definitions. Common Corridor: Definitions Common Corridor: Contiguous right-of-way or two parallel right-of-ways with structure centerline separation less than the longest span length of the two transmission circuits at the point of

More information

GRIDCON POCOM POCOS POCOL MeDIUM VOLTAGe COMPeNSATION SySTeMS IN CABINeT DeSIGN. POWeR QUALITy

GRIDCON POCOM POCOS POCOL MeDIUM VOLTAGe COMPeNSATION SySTeMS IN CABINeT DeSIGN. POWeR QUALITy GRDCON POCOM POCOS POCOL MeDUM VOLTAGe COMPeNSATON SySTeMS N CABNeT DeSGN POWeR QUALTy 1 GRDCON POCOM POCOS POCOL GRDCON POCOM, POCOS, POCOL Compensation systems in a cabinet design GRDCON POCOM, POCOS

More information

INFN School on Electron Accelerators. RF Power Sources and Distribution

INFN School on Electron Accelerators. RF Power Sources and Distribution INFN School on Electron Accelerators 12-14 September 2007, INFN Sezione di Pisa Lecture 7b RF Power Sources and Distribution Carlo Pagani University of Milano INFN Milano-LASA & GDE The ILC Double Tunnel

More information

640 kv XLPE HVDC cable system

640 kv XLPE HVDC cable system 640 kv XLPE HVDC cable system World s most powerful extruded cable system enables utilization of renewable energy resources nkt.com Demand for higher voltages NKT s new 640 kv XLPE DC cable system is the

More information

EM1. Transmissive Optical Encoder Module Page 1 of 9. Description. Features

EM1. Transmissive Optical Encoder Module Page 1 of 9. Description. Features Description Page 1 of 9 The EM1 is a transmissive optical encoder module designed to be an improved replacement for the HEDS-9000 series encoder module. This module is designed to detect rotary or linear

More information

Digital SWIR Scanning Laser Doppler Vibrometer

Digital SWIR Scanning Laser Doppler Vibrometer Digital SWIR Scanning Laser Doppler Vibrometer Scan-Series OptoMET Scanning SWIR Laser Doppler Vibrometer (SLDV) is used for non-contact measurement, visualization and analysis of structural vibrations.

More information

Experiences of CESC in Smart Grid Initiatives LT Network Automation. Anjan Mitra / Arka Ghosh

Experiences of CESC in Smart Grid Initiatives LT Network Automation. Anjan Mitra / Arka Ghosh Experiences of CESC in Smart Grid Initiatives LT Network Automation Anjan Mitra / Arka Ghosh CESC An Overview About 120 year old fully Integrated Energy Utility Oldest private electricity utility in India

More information

EE273 Lecture 11 Pipelined Timing Closed-Loop Timing November 2, Today s Assignment

EE273 Lecture 11 Pipelined Timing Closed-Loop Timing November 2, Today s Assignment EE273 Lecture 11 Pipelined Timing Closed-Loop Timing November 2, 1998 William J. ally Computer Systems Laboratory Stanford University billd@csl.stanford.edu Copyright (C) by William J. ally, All Rights

More information

Improved Synchronization System for Thermal Power Station

Improved Synchronization System for Thermal Power Station Improved Synchronization System for Thermal Power Station Lokeshkumar.C 1, Logeshkumar.E 2, Harikrishnan.M 3, Margaret 4, Dr.K.Sathiyasekar 5 UG Students, Department of EEE, S.A.Engineering College, Chennai,

More information

THE GARABI 2000 MW INTERCONNECTION BACK-TO-BACK HVDC TO CONNECT WEAK AC SYSTEMS

THE GARABI 2000 MW INTERCONNECTION BACK-TO-BACK HVDC TO CONNECT WEAK AC SYSTEMS THE GARABI 2000 MW INTERCONNECTION BACK-TO-BACK HVDC TO CONNECT WEAK AC SYSTEMS John Graham Birger Jonsson R.S. Moni Brazil Sweden India ABB Utilities AB, SE-771 80 Ludvika, Sweden SUMMARY The Argentina

More information

Frequency Response Initiative Generator Event Survey. NERC Resources Subcommittee North American Generator Forum December 8, 2016

Frequency Response Initiative Generator Event Survey. NERC Resources Subcommittee North American Generator Forum December 8, 2016 Frequency Response Initiative Generator Event Survey NERC Resources Subcommittee North American Generator Forum December 8, 2016 Why Primary Frequency Response Is Important Essential for Reliability of

More information

Transient Stability Events & Actions

Transient Stability Events & Actions ETAP TIP No. 009 Transient Stability Events & Actions Applicable ETAP Versions: 5.5.0, 5.5.5, 5.5.6 (For lower versions, some of the descriptions and procedures below may differ in some ways) Event is

More information

Process Transmitter RMA 422

Process Transmitter RMA 422 Technical Information TI 072R/24/ae Process Transmitter RMA 422 Multi-functional 1-2 channel top hat DIN rail unit with loop power supply, alarm set point monitoring, mathematics function and 1-2 analog

More information

BPA s Network Open Season

BPA s Network Open Season May 2009 Summary Welcome to the Twenty Second National Wind Coordinating Collaborative (NWCC) Transmission Update! Kevin Porter of Exeter Associates, Inc. led the April 21, 2009, Transmission Update conference

More information

Grid Code Modification Register. March 2018

Grid Code Modification Register. March 2018 Grid Code Modification Register ch Issue: 1.0 Date of Issue: 26 ch Proposal to Grid Code Review Panel Meeting Publish Workgroup Consultation Workgroup Consultation Closing Date Workgroup Report to Grid

More information

A Unique Power Supply for the PEP II Klystron at SLAC*

A Unique Power Supply for the PEP II Klystron at SLAC* I : SLAC-PUB-7591 July 1997 A Unique Power Supply for the PEP II Klystron at SLAC* R. Case1 and M. N. Nguyen Stanford Linear Accelerator Center Stanford University, Stanford, CA 94309 Presented at the

More information

GCC Interconnection Grid: Operational Studies for the GCC Interconnection with United Arab Emirates (UAE) N. AL-SHAHRANI GCCIA Saudi Arabia

GCC Interconnection Grid: Operational Studies for the GCC Interconnection with United Arab Emirates (UAE) N. AL-SHAHRANI GCCIA Saudi Arabia 21, rue d Artois, F-75008 PARIS C4-107 CIGRE 2012 http : //www.cigre.org GCC Interconnection Grid: Operational Studies for the GCC Interconnection with United Arab Emirates (UAE) A. AL-EBRAHIM GCCIA Bahrain

More information

Summary of Meeting and Actions

Summary of Meeting and Actions Meeting Name Frequency Response Working Group Meeting No. 9 Date of Meeting Wednesday, 28 th April 2010 Time Venue 10:00am 3:00pm Conference Room B2-1, National Grid House, Warwick This note outlines the

More information

Diagnostic & Testing Services

Diagnostic & Testing Services Diagnostic & Testing Services Diagnostic & Testing Services Prysmian Cables & System B.V., based in Delft, the Netherlands, provides a full spectrum of pre and post sales services for its customers, including

More information

Process transmitter RMA422

Process transmitter RMA422 Technical information TI072R/09/en Mat. No. 51001905 Process transmitter RMA422 Multifunctional 1-2 channel top hat DIN rail unit with intrinsically safe current input and loop power supply, alarm set

More information

10/13/2011 Planning Coordination Committee. Standards

10/13/2011 Planning Coordination Committee. Standards Document name Category System Performance Regional Criterion ( ) Regional Reliability Standard (X) Regional Criterion ( ) Policy ( ) Guideline ( ) Report or other Document date 12/01/2011 Adopted/approved

More information

Form C: Type Test Verification Report

Form C: Type Test Verification Report Form C: Type Test Verification Report Type Approval and Manufacturer declaration of compliance with the requirements of G98. This form should be used when making a Type Test submission to the Energy Networks

More information

10Gbps SFP+ Optical Transceiver, 10km Reach

10Gbps SFP+ Optical Transceiver, 10km Reach 10Gbps SFP+ Optical Transceiver, 10km Reach Features Optical interface compliant to IEEE 802.3ae 10GBASE-LR Electrical interface compliant to SFF-8431 Hot Pluggable 1310nm DFB transmitter, PIN photo-detector

More information

Modulator Overview System Design vs. Tunnel Topologies. Snowmass Workshop August 16, 2005 Ray Larsen for the SLAC ILC Group

Modulator Overview System Design vs. Tunnel Topologies. Snowmass Workshop August 16, 2005 Ray Larsen for the SLAC ILC Group Modulator Overview System Design vs. Tunnel Topologies Snowmass Workshop August 16, 2005 Ray Larsen for the SLAC ILC Group Outline! I. Modulator Options vs. Topologies! II. Preliminary Cost Estimates!

More information

Basic rules for the design of RF Controls in High Intensity Proton Linacs. Particularities of proton linacs wrt electron linacs

Basic rules for the design of RF Controls in High Intensity Proton Linacs. Particularities of proton linacs wrt electron linacs Basic rules Basic rules for the design of RF Controls in High Intensity Proton Linacs Particularities of proton linacs wrt electron linacs Non-zero synchronous phase needs reactive beam-loading compensation

More information

Form C: Type Test Verification Report

Form C: Type Test Verification Report Form C: Type Test Verification Report Type Approval and Manufacturer declaration of compliance with the requirements of G98. This form should be used when making a Type Test submission to the Energy Networks

More information

MICROMASTER Encoder Module

MICROMASTER Encoder Module MICROMASTER Encoder Module Operating Instructions Issue 01/02 User Documentation Foreword Issue 01/02 1 Foreword Qualified Personnel For the purpose of this Instruction Manual and product labels, a Qualified

More information

Generator protection relay

Generator protection relay Page 1 Issued: April 1999 Status: New Data subject to change without notice Features Off-the-shelf generator protection relay for small and medium sized power generators Three-phase time overcurrent and

More information

C I R E D 19 th International Conference on Electricity Distribution Vienna, May Transition Joints Behaviour. Paper 457 INTRODUCTION

C I R E D 19 th International Conference on Electricity Distribution Vienna, May Transition Joints Behaviour. Paper 457 INTRODUCTION DIAGNOSI FOR ABLE SYSEM ASSE MANAGEMEN AND PREVENIVE MAINENANE A EDF hierry ESPILI Fabrice ZORZI Roger AMBRUN EDF R&D France EDF R&D France EDF EGD - France thierry.espilit@edf.fr fabrice.zorzi@edf.fr

More information

South Australian Energy Transformation

South Australian Energy Transformation South Australian Energy Transformation PSCR Supplementary Information Paper ElectraNet Corporate Headquarters 52-55 East Terrace, Adelaide, South Australia 5000 PO Box 7096, Hutt Street Post Office, Adelaide,

More information

A New 4MW LHCD System for EAST

A New 4MW LHCD System for EAST 1 EXW/P7-29 A New 4MW LHCD System for EAST Jiafang SHAN 1), Yong YANG 1), Fukun LIU 1), Lianmin ZHAO 1) and LHCD Team 1) 1) Institute of Plasma Physics, Chinese Academy of Sciences, Hefei, China E-mail

More information

MX1609. Data Sheet. Thermocouple amplifier. Special features. Block diagram. B en

MX1609. Data Sheet. Thermocouple amplifier. Special features. Block diagram. B en MX1609 Thermocouple amplifier Data Sheet Special features 16 inputs Connection of type K thermo couples to mini thermocouple sockets Measuring point identification via RFID Internal cold junction compensation

More information

Notes Generator Verification SDT Project

Notes Generator Verification SDT Project Notes Generator Verification SDT Project 2007-09 FERC Office 888 First Street, NE Washington, DC 20426 1. Administration a. The following were in attendance: Bob Snow, Cynthia Pointer, Lim Hansen, Keith

More information

EA63-7D. Generator Automatic Voltage Regulator Operation Manual. Self Excited Automatic Voltage Regulator

EA63-7D. Generator Automatic Voltage Regulator Operation Manual. Self Excited Automatic Voltage Regulator EA63-7D Generator Automatic Voltage Regulator Operation Manual Self Excited Automatic Voltage Regulator SP POWERWORLD LTD Willows, Waterside, Ryhall, Stamford, Lincs, PE9 4EY, UK Tel: +44 1780 756872 -

More information

DATA SHEET. Synchronisers, FAS-113DG ANSI code 25

DATA SHEET. Synchronisers, FAS-113DG ANSI code 25 DATA SHEET Synchronisers, ANSI code 25 Synchronisation of generator to busbar Circuit breaker time compensation LED indication of status LED for activated control LED for synchronising signal 35 mm DIN

More information

Ethernet Media Converters

Ethernet Media Converters Allied Telesyn AT-MC13, AT-MC14, AT-MC15 and AT-MC16 Media Converters Seite 1 von 5 AT-MC13 Media Converter UTP to Fiber "ST" AT-MC14 Media Converter UTP to Fiber "SC" AT-MC15 Media Converter UTP to BNC

More information

1C.5.1 Voltage Fluctuation and Flicker

1C.5.1 Voltage Fluctuation and Flicker 2 1 Ja n 1 4 2 1 J a n 1 4 Vo l.1 -Ge n e r a l;p a r tc-p o we r Qu a lity 1. Scope This document contains guidelines regarding maximum acceptable levels of voltage fluctuation and light flicker in the

More information

XFEL High Power RF System Recent Developments

XFEL High Power RF System Recent Developments XFEL High Power RF System Recent Developments for the XFEL RF Group Outline XFEL RF System Requirements Overview Basic Layout RF System Main Components Multibeam Klystrons Modulator RF Waveguide Distribution

More information

DIGITAL INSTRUMENTS S.R.L. SPM-ETH (Synchro Phasor Meter over ETH)

DIGITAL INSTRUMENTS S.R.L. SPM-ETH (Synchro Phasor Meter over ETH) DIGITAL INSTRUMENTS S.R.L. SPM-ETH (Synchro Phasor Meter over ETH) SPM-ETH (Synchro Phasor Meter over ETH) Digital Instruments 1 ver the years, an awareness of the criticality of the Power Grid and Orelated

More information

Feedback: Part A - Basics

Feedback: Part A - Basics Feedback: Part A - Basics Slides taken from: A.R. Hambley, Electronics, Prentice Hall, 2/e, 2000 1 Overview The Concept of Feedback Effects of feedback on Gain Effects of feedback on non linear distortion

More information

Kuhnke Technical Data. Contact Details

Kuhnke Technical Data. Contact Details Kuhnke Technical Data The following page(s) are extracted from multi-page Kuhnke product catalogues or CDROMs and any page number shown is relevant to the original document. The PDF sheets here may have

More information

LCLS RF Reference and Control R. Akre Last Update Sector 0 RF and Timing Systems

LCLS RF Reference and Control R. Akre Last Update Sector 0 RF and Timing Systems LCLS RF Reference and Control R. Akre Last Update 5-19-04 Sector 0 RF and Timing Systems The reference system for the RF and timing starts at the 476MHz Master Oscillator, figure 1. Figure 1. Front end

More information

AV-825 HDMI with IR CAT6 Extender Kit Installation Guide

AV-825 HDMI with IR CAT6 Extender Kit Installation Guide AV-825 HDMI with IR CAT6 Extender Kit Installation Guide (April 28, 2016) 1 Package Contents 1 x AV-825T Transmitter, 1 x AV-825R Receiver, 1 x Wideband IR Tx cable, 1 x Wideband IR Rx cable, 1 x DC 5V

More information

HVDC DEVELOPMENT OPTIONS CABLE CAPACITY 27 June 2005

HVDC DEVELOPMENT OPTIONS CABLE CAPACITY 27 June 2005 HVDC DEVELOPMENT OPTIONS CABLE CAPACITY 27 June 2005 1.0 Introduction This paper summarizes the issues which may be relevant when considering the need or otherwise to provide spare submarine cable capacity.

More information

EM1. Transmissive Optical Encoder Module Page 1 of 8. Description. Features

EM1. Transmissive Optical Encoder Module Page 1 of 8. Description. Features Description Page 1 of 8 The EM1 is a transmissive optical encoder module. This module is designed to detect rotary or linear position when used together with a codewheel or linear strip. The EM1 consists

More information

Power Quality Solutions

Power Quality Solutions EPCOS Product Brief 2018 Power Quality Solutions Static Var Generator (SVG) PQvar Series EPCOS has been offering a comprehensive range of key components for Power Factor Correction (PFC) and Power Quality

More information

Arc Detector for Remote Detection of Dangerous Arcs on the DC Side of PV Plants

Arc Detector for Remote Detection of Dangerous Arcs on the DC Side of PV Plants 1 Arc Detector for Remote Detection of Dangerous Arcs on the DC Side of PV Plants Heinrich Haeberlin Berne University of Applied Sciences (BFH-TI), Division of Electrical- and Communication Engineering,

More information

NTE1416 Integrated Circuit Chrominance and Luminance Processor for NTSC Color TV

NTE1416 Integrated Circuit Chrominance and Luminance Processor for NTSC Color TV NTE1416 Integrated Circuit Chrominance and Luminance Processor for NTSC Color TV Description: The NTE1416 is an MSI integrated circuit in a 28 Lead DIP type package designed for NTSC systems to process

More information

PRELIMINARY Sunny Boy 240-US

PRELIMINARY Sunny Boy 240-US PRELIMINARY Sunny Boy 240-US SB 240-US-10 Optimized reliability Simple installation Unrivaled monitoring SMA-backed security Multigate technology allows for reduced component count Private band powerline

More information

These restrictions, also called Network Constraints, are characterized by:

These restrictions, also called Network Constraints, are characterized by: Subject: Congestion management on the Belgian transmission grid Date: 1 September 2016 Contact: Steven Harlem Phone: 0032 2 500 85 89 Mail: steven.harlem@febeg.be Introduction To guarantee the security,

More information

TFT-LCD Module Model Name : LC201V1-A1SO

TFT-LCD Module Model Name : LC201V1-A1SO TFT-LCD Module Model Name : LC201V1-A1SO 27 Jan 2000 Version No. Date Page Description 0.1 7 Jan 2000 - First Draft 0.2 26 Jan 2000 5 10 13 14 amended: B/L Operating Frequency changed : Module Connector

More information

Status of SOLARIS. Paweł Borowiec On behalf of Solaris Team

Status of SOLARIS. Paweł Borowiec On behalf of Solaris Team Status of SOLARIS Paweł Borowiec On behalf of Solaris Team e-mail: pawel.borowiec@uj.edu.pl XX ESLS-RF Meeting, Villingen 16-17.11.2016 Outline 1. Timeline 2. Injector 3. Storage ring 16-17.11.2016 XX

More information

Re-defining the utility-scale inverter

Re-defining the utility-scale inverter Re-defining the utility-scale inverter We believe in green energy in the ability to meet and contribute to growing power demand while supporting a smart grid that serves a smart society. Solution at a

More information

An environmental way to tackle the voltage dip problems and solutions. Grupo Zigor

An environmental way to tackle the voltage dip problems and solutions. Grupo Zigor An environmental way to tackle the voltage dip problems and solutions Grupo Zigor www.zigor.com AC POWER QUALITY PROBLEMS Reality of a complex AC Distribution AC POWER QUALITY PROBLEMS Electrical equipment

More information

The Three-Phase Inverter Not Only for Your Home...

The Three-Phase Inverter Not Only for Your Home... SUNNY TRIPOWER 5000TL 12000TL STP 5000TL-20 / STP 6000TL-20 / STP 7000TL-20 / STP 8000TL-20 / STP 9000TL-20 / STP 10000TL-20 / STP 12000TL-20 NEW available as 10 kva and 12 kva versions Economical Flexible

More information

Headend Optics Platform (CH3000)

Headend Optics Platform (CH3000) arris.com Headend Optics Platform (CH3000) HT3540H Series Double-Density Full Spectrum DWDM Transmitter System FEATURES DWDM transmitter: up to 40 wavelengths on ITU grid Hot plug in/out, individually

More information

IOT OPERATIONAL EXPERIENCE ON ALICE AND EMMA AT DARESBURY LABORATORY

IOT OPERATIONAL EXPERIENCE ON ALICE AND EMMA AT DARESBURY LABORATORY IOT OPERATIONAL EXPERIENCE ON ALICE AND EMMA AT DARESBURY LABORATORY A. Wheelhouse ASTeC, STFC Daresbury Laboratory ESLS XVIII Workshop, ELLETRA 25 th 26 th November 2010 Contents Brief Description ALICE

More information

EM1. Transmissive Optical Encoder Module Page 1 of 8. Description. Features

EM1. Transmissive Optical Encoder Module Page 1 of 8. Description. Features Description Page 1 of 8 The EM1 is a transmissive optical encoder module designed to be an improved replacement for the HEDS-9000 series encoder module. This module is designed to detect rotary or linear

More information

Synchronization circuit with synchronized vertical divider system for 60 Hz TDA2579C

Synchronization circuit with synchronized vertical divider system for 60 Hz TDA2579C FEATURES Synchronization and horizontal part Horizontal sync separator and noise inverter Horizontal oscillator Horizontal output stage Horizontal phase detector (sync to oscillator) Triple current source

More information

2 MHz Lock-In Amplifier

2 MHz Lock-In Amplifier 2 MHz Lock-In Amplifier SR865 2 MHz dual phase lock-in amplifier SR865 2 MHz Lock-In Amplifier 1 mhz to 2 MHz frequency range Dual reference mode Low-noise current and voltage inputs Touchscreen data display

More information

North Damping Ring RF

North Damping Ring RF North Damping Ring RF North Damping Ring RF Outline Overview High Power RF HVPS Klystron & Klystron EPICS controls Cavities & Cavity Feedback SCP diagnostics & displays FACET-specific LLRF LLRF distribution

More information

MULTIDYNE INNOVATIONS IN TELEVISION TESTING & DISTRIBUTION DIGITAL VIDEO, AUDIO & DATA FIBER OPTIC MULTIPLEXER TRANSPORT SYSTEM

MULTIDYNE INNOVATIONS IN TELEVISION TESTING & DISTRIBUTION DIGITAL VIDEO, AUDIO & DATA FIBER OPTIC MULTIPLEXER TRANSPORT SYSTEM MULTIDYNE INNOVATIONS IN TELEVISION TESTING & DISTRIBUTION INSTRUCTION MANUAL DVM-1000 DIGITAL VIDEO, AUDIO & DATA FIBER OPTIC MULTIPLEXER TRANSPORT SYSTEM MULTIDYNE Electronics, Inc. Innovations in Television

More information

NERC Reliability Standard PRC-024 Generator Frequency and Voltage Protective Relay Settings

NERC Reliability Standard PRC-024 Generator Frequency and Voltage Protective Relay Settings NERC Reliability Standard PRC-024 024-1 Generator Frequency and Voltage Protective Relay Settings Rick Terrill Luminant Power Generation Compliance NERC Standards Drafting Team Member Reliability Standard

More information

HDMI HD Digital Optical Transceiver

HDMI HD Digital Optical Transceiver HDMI HD Digital Optical Transceiver OP-VM-HDMI Shenzhen Optostar Optoelectronics Co., Ltd 2014. 02(Version 1) Description HDMI Optical transmitter & receiver adopts advanced non-compressed digital high-definition

More information

1/3 INCH COLOR HIGH RESO. CAMERA

1/3 INCH COLOR HIGH RESO. CAMERA 1/3 INCH COLOR HIGH RESO. CAMERA S P E C I F I C A T I O N S 1/3 INCH COLOR HIGH RESO. CAMERA MODEL NO.: C4803-01A1 (NTSC) / C4884-01A1 (PAL) (DC12V) C4883-01A2 (NTSC) / C4884-01A2 (PAL) (AC24V) C4803-01A3

More information

Advanced Test Equipment Rentals ATEC (2832)

Advanced Test Equipment Rentals ATEC (2832) Established 1981 Advanced Test Equipment Rentals www.atecorp.com 800-404-ATEC (2832) Test All Products Operating from AC Power Voltage ranges up to 400 V RMS, L-N Standard 135/270 V or optional ranges

More information

Frequency Converter Fv

Frequency Converter Fv 2 Bosch Rexroth AG Electric Drives and Controls Documentation Brake chopper with up to 30 kw continuous braking power Easy to operate and service (detachable fan, LCD operating panel with copy function)

More information