Category 3 Non-Cab Operated Crane Safety Rev-04 Instructor Guide Revisions

Size: px
Start display at page:

Download "Category 3 Non-Cab Operated Crane Safety Rev-04 Instructor Guide Revisions"

Transcription

1 Category 3 Non-Cab Operated Crane Safety Rev-04 Instructor Guide Revisions Cover Sheet 1. Modified the course number to include the current revision NCC-C3CS-04 Introduction Module 2. In the Welcome topic, modified the wording of the third sentence or paragraph (Removed NAVFAC P-307 familiarization from the topics list, and changed Crane Components to Crane Types and Components. Also, removed the word Gear from Crane and Rigging Gear Accidents. 3. Changed the name of the Learning Objectives topic to Course Learning Objectives. Also, revised the screen text, narration text, and audio (Removed Understand the requirements of NAVFAC P-307 and changed Identify crane components to Identify crane and component types. In addition, removed the word gear after rigging ) 4. Added a Course Information and Navigation topic after the Course Learning Objectives topic. The topic includes the following screens and information: Getting the most out of the course, Navigating the Course, The Reference Area, Knowledge Checks, Exam Directions, Feedback, and Ready to Begin. NAVFAC P-307 Training Overview Module 5. Deleted/Removed this module NAVFAC P-307 Module 6. Deleted/Removed this module. Crane Types and Components Module 7. Changed the title of the module from Crane Components to Crane Types and Components 8. In the Learning Objectives topic, added crane types to the narration and screen text 9. Added three topics after the Learning Objectives topic (Category 1 Crane Examples, Category 4 Crane Examples, and Category 2 and 3 Crane Examples) 10. Added a Knowledge Check containing 5 questions prior to the Types of Power topic 11. In the Types of Power/Category 2 and 3 Crane Power topic, modified/added additional narration and screen text. Added the following narration: Category 2 and 1

2 3 cranes may be manually-operated or power-operated. A manually-operated crane hoist mechanism is driven by pulling an endless chain. The crane travel mechanism is driven in the same manner or by manually moving the load or hook. A poweroperated crane is driven by electric, pneumatic, hydraulic, or internal combustion means. Pneumatic and hydraulic power may be delivered to the crane via pipes and/or hoses. 12. Removed the Knowledge Check section/topic after the Load-controlling topic and moved the 6 questions to the last Knowledge Check at the end of the module 13. Moved/relocated the General Safety Devices topic after the Safety Devices topic and removed bumpers from the narration and screen text (the General Safety Devices topic was previously located after the Operational Safety Devices topic). Also, removed/deleted the screen pictures and added bulleted items to the screen 14. Changed the Load Indicators topic title to Load Moment Indicators and modified the narration and screen text 15. Deleted/removed the Summary topic Category 3 Crane Pre-use Check Module 16. In the Introduction topic, modified and added additional narration and screen text 17. In the Operator s Daily Check List (ODCL) topic, modified and added additional narration and screen text 18. In the Certification topic, added the following sentence prior to the last sentence of the narration: If the crane is not currently certified, this condition shall be reported to the supervisor and the crane shall not be operated. Also, changed the screen picture to include a Certification of Load Test and Condition Inspection sheet 19. In the Who Can Remove These Tags topic, modified the screen text to include the following text: Only authorized personnel may install or remove warning tags. 20. In the Finding Deficiencies topic, modified the narration and screen text 21. In the Structural Integrity topic, modified the narration and screen text 22. In the Walk Around Check 3 section, added an Instructions topic (including narration, and screen text) after the Controls/Controllers topic 23. In the Safety Devices topic, changed the word tested in the second sentence of the narration to checked 24. In the Upper Limit Switch Check topic, changed the word test to check in the first and fifth sentences of the narration. Also, changed the narration in the 3 rd sentence of the narration to: Ensure hoisting stops even though you still have the hoist up button depressed, but do not allow the hook block to two-block (contact the drum) if the switch fails. 25. In the Limit Switches / Lower Limit Switch topic, modified the narration and screen text 2

3 26. Moved/relocated the Checking Bridge and Trolley Functions topic after the Checking Brakes topic and prior to the Knowledge Check section 27. In the Checking Bridge and Trolley Functions topic, changed the word under in the second sentence of the narration to close to. Also, added the following two sentences to the end of the narration: It is not expected that all possible areas of travel be checked during the pre-use check. However, before any area of travel is utilized that has not been checked during the pre-use check, additional attention should be focused on obstacles and potential hazards. Complex and Non-Complex Lifts Module 28. Modified the screen picture and text formatting 29. In the Complex Lifts / Categories topic, added the word certified in front of the word capacity in the narration 30. In the Complex Lifts / Procedures topic, modified and added additional information to the narration and screen text 31. In the Complex Lifts / Lift Exceptions topic, added the word certified in front of capacity in the first bulleted item in the screen text and narration 32. In the first Knowledge Check section, changed the wording of the 2 nd question to: For all complex lifts, a rigger supervisor, operator supervisor, or a rigging or crane operator working leader shall review on-site conditions and shall 33. In the Complex Lift Examples / Hazardous Materials topic, changed the first sentence of the narration to the following: Lifts of hazardous materials, e.g., poisons, corrosives, and highly volatile substances are complex lifts. Also, modified the screen text to similar 34. In the Complex Lift Examples / Lifts over 80% Capacity topic, modified/changed the wording of the first sentence in the narration to: Lifts exceeding 80 percent of the certified capacity of the crane's hoist planned for use (lifts exceeding 50 percent of the hoist capacity for a mobile crane mounted on a barge) are considered complex lifts. Also, modified the screen text. 35. In the Submerged Lifts topic, changed the end of the narration to read: clear of obstructions such as other objects in the water, or underwater cables. 36. In the Lift Requirements for Multiple Crane or Hook Lifts topic, changed/modified the wording of the first sentence in the narration and changed the topic and screen title 37. In the Constrained Loads topic, modified and added additional narration 38. Moved/relocated the Summary topic prior to the last Knowledge Check section 3

4 Determining Load Weight Module 39. In the Welcome topic, replaced the P-307 cover picture and changed the formatting of the screen text/title 40. In the Determining Weight / Load Weight topic, modified/changed the narration Load Weight Distribution Module 41. In the Welcome topic, replaced the P-307 cover picture and changed the formatting of the screen text/title Rigging Gear Test, Inspection, and Marking Requirements Module 42. Changed the name of the title from Rigging Gear Marking and Record Requirements to Rigging Gear Test, Inspection, and Marking Requirements 43. In the Welcome topic, modified the narration, screen text, and the NAVFAC P-307 screen picture 44. In the Learning Objectives topic, modified the screen text (added two additional bulleted items) to cover the narration 45. In the NAVFAC P-307 Section 14 topic, modified/changed the narration, deleted the screen picture and modified the screen text to include bulleted items from the modified narration 46. In the Test and Inspection Program topic, modified the wording of the first sentence in the narration and added an additional sentence: Except for hooks, rigging hardware and load indicating devices do not require load tests or documentation of inspections. Also, added a bulleted item to the screen text 47. In the Why Test and Inspect topic, added an additional paragraph to the end of the narration. Also, deleted the note from the screen and added an additional sentence to the screen text 48. In the Covered Equipment topic, modified the narration and screen text 49. In the Additional Covered Equipment topic, modified the narration and screen text 50. In the Equipment Not Covered topic, added the following wording to the end of the first sentence in the narration: and equipment in an approved test and inspection program (NAVAIR, NAVSEA, Strategic Systems Program, Army, or Air Force approved program). This information was also added to the screen text as a bulleted item 51. In the Equipment Markings topic, modified the narration, screen text, and pictures 52. Deleted/removed the Special Roundsling Markings topic 53. Changed the title of the Specific use Endless Wire Rope Sling Markings topic to Wire Rope Endless Slings. Also, modified the wording of the second sentence in the narration. In addition, the non-specific use and specific applications wording was removed from the screen text. 4

5 54. In the Chain Slings topic, modified/changed the wording of the narration and the wording of the second bulleted item in the screen text 55. In the Lashing topic, changed/replaced the screen picture 56. In the Multi-Part Equipment topic, modified/changed the narration and screen text. Also, removed the screen pictures. 57. Changed the title of the Multi-Part Wire Rope Slings topic to Braided Wire Rope Slings. In addition, modified/changed the wording of the narration. 58. In the Illegible/Missing Markings topic, removed one of the screen pictures and added text to the screen 59. In the Required Records topic, replaced the screen picture showing a test record card with bulleted items or text 60. In the Matching Gear to Record topic, removed the following wording from the narration: For example, S could represent shackles. If you have 50 shackles they could each be individually identified S1, S2, S3, etc. Also, replaced the screen picture and modified the screen text and bulleted items. 61. In the Knowledge Check section, modified the wording of the question and changed the possible answers in the first question. Rigging Gear Inspection Module 62. In the Welcome topic, replaced the P-307 cover picture and changed the formatting of the screen text/title 63. In the Inspection Types topic, added the following to the end of the narration and to the screen text: Note: Documentation is not required for inspections of rigging hardware covered by ASME B30.26 (shackles, adjustable hardware, compression hardware, links, rings, swivels, rigging blocks, and portable load indicating devices). Post-use inspections are recommended to ensure no damage has occurred during the weight handling operation. 64. In the Periodic Inspection topic, added the following wording to the narration: Note: Documentation is not required for inspections of rigging hardware covered by ASME B30.26 (shackles, adjustable hardware, compression hardware, links, rings, swivels, rigging blocks, and portable load indicating devices). Similar information was added to the screen text. 65. In the Annual Inspection topic, modified the narration and removed the screen pictures and text. Items or equipment that requires annual inspections were added to the screen. 66. In the Biennial Inspection topic, changed/modified the narration to the following: Periodic inspections are required every 2 years for crane structures that do not have permanently mounted hoists, portable gantry/a-frames and portable floor cranes, and trolleys. Also, removed the screen picture and text and added text and bulleted items to the screen. 5

6 67. In the Damaged Rigging Gear topic, changed/modified the wording of the second sentence in the narration to the following: For a suspected accident, the activity shall follow the investigation and reporting requirements of NAVFAC P-307, section 12, promptly perform a comprehensive investigation, and prepare a Crane and Rigging Accident Report and forward a copy to the Navy Crane Center (Code 06) within 30 days of the accident. The screen text was also modified. 68. Added a Deficiencies topic (with narration and screen text) after the Damaged Rigging Gear topic. 69. In the first Knowledge Check section, changed the wording of the first question to: Documented records are required for periodic inspection of all rigging equipment. The correct answer was changed to false. 70. Changed the title of the Chain Link Wear topic to Chain Sling Rejection Criteria and modified the narration and screen text. In addition, this topic was moved/relocated after the Link Stretch topic. 71. Changed the Inspect Hammer Link topic title to Inspect Coupling Link. The word hammer was also changed to coupling in the narration and screen text. 72. In the Wire Rope Sling Rejection Criteria IV topic, added the following note to the screen text: Note: Pay close attention to the outside area on each eye of the sling. This area wears more due to dragging the sling on concrete/paved surfaces. 73. In the Wire Rope Slings Rejection Criteria VII topic (Strand Laid Wire Rope Slings), revised the narration and removed or two broken wires within one lay length of the end connection. This wording was also removed from the screen text along with the associated picture. 74. In the Wire Rope Sings Rejection Criteria VIII topic (Braided Wire Rope Slings Rejection Criteria), replaced the word lay with braid in the narration. The screen text was also modified. 75. In the Metal Mesh Slings Rejection Criteria topic, revised the narration and screen text, and removed one of the pictures. 76. In the Synthetic Sling Rejection Criteria topic, added the following wording to the narration and screen text: Remove the sling from service if the sling identification is missing or illegible. 77. In the Synthetic Sling Rejection Criteria 2 topic, added addition wording and bulleted items to the narration and screen text. 78. In the Synthetic Sling Rejection Criteria 3 topic, removed one of the screen pictures and modified the screen text. 79. In the Synthetic Sling Rejection Criteria 4 topic, modified the wording of screen text. 80. In the Synthetic Rope Sling Removal Criteria topic, revised the narration and screen text. 81. In the second Knowledge Check Section, removed the following question: Two broken wires within one lay length of the end connection would remove a wire rope sling from service. True or False 6

7 82. Removed/deleted the 5% Wear Reduction Removal Criteria topic. 83. In the Portable Load Indicating Devices topic, revised and added additional narration. Also, the screen text was revised and additional bulleted items were added. 84. In the last Knowledge Check section, revised the wording of the second question to: Rigging hardware such as eyebolts, links, rings, and shackles are required to have a periodic inspection every 2 years. The correct answer was also changed to False. Rigging Gear General Use Module 85. In the Welcome topic, replaced the P-307 cover picture and changed the formatting of the screen text/title 86. In the NAVFAC P-307 Section 14 topic, replaced the screen picture and removed the linked pages from the screen. 87. In the Protective Materials topic, removed and revised the narration and screen text. 88. Changed the Using Chafing Gear topic to Sling Protection. Changed/modified the narration and removed the pictures and text from the screen. Bulleted text was then added to the screen. 89. In the Hoist and Crane References topic, modified/changed the narration and screen text. 90. In the Hoists and Crane Usage topic, modified/changed the wording of the second sentence in the narration to: Load indicating devices may be used in conjunction with hoists to help prevent overload of the hoist and related gear when leveling, rotating, or tilting objects. Also, added a picture to the screen and revised the wording of the screen text. 91. Deleted/removed the Using Hoists to Distribute Sling Loading topic. 92. In the Usage Do s or Using Hoists and Cranes topic, modified the narration and screen text 93. Added a new topic with narration, pictures and screen text Additional Chain Hoist Requirements after the Usage Don ts/using Hoists and Cranes topic. 94. Added a new topic Additional Rigging Practices topic after the Additional Chain Hoist Requirements topic. 95. In the Knowledge Check section, changed the correct answer to question #4 from Chafing Gear to Appropriate Sling Protection 7

8 Rigging Hardware Module 96. In the Welcome topic, replaced the P-307 cover picture and changed the formatting of the screen text/title 97. In the Side Loading Shackles topic, modified the wording of the last two sentences in the narration 98. In the Eyebolt Types topic, modified/changed the wording of the last sentence to: All eyebolts shall be selected and used in accordance with ASME B30.26 and OEM recommendations. The pictures on the screen were also changed. 99. In the Shouldered Eyebolts topic, modified the wording of the narration (removed or machinery from the first sentence, and changed table 14-5 to 14-4 and added whichever is more restrictive in the last sentence) 100. In the Installing Shouldered Eyebolts topic, changed/replaced the screen picture 101. In the Backing Nuts topic, changed the text in red font on the screen to: Pulls at angles greater than 5 degrees from vertical are not permitted! 102. Added a new topic (Threaded Attachment Point) after the Backing Nuts topic 103. Changed the screen title of the Shim Use Overview topic to Shims May Be Used to Align Eyebolts 104. In the Side Pulls topic, modified the narration and changed the wording of the screen text next to the top picture 105. In the Eye Nuts topic, modified the narration and screen text, and replaced the picture 106. In the Swivel Hoist Rings topic, modified/changed the narration and screen text 107. In the second Swivel Hoist Rings topic, modified/changed the narration and screen text In the Turnbuckles topic, modified/changed the narration wording Removed the Threaded Attachment Point topic prior to the Knowledge Check section Sling Use Module 110. In the Welcome topic, replaced the P-307 cover picture and changed the formatting of the screen text/title 111. In the Wire Rope Sling Use topic, added the following sentence to the end of the narration: Except for braided slings, wire rope slings shall not be used in single leg vertical hitches, unless a method is used to prevent unlaying of the rope. Also, changed the screen title from Chafing Protection to Wire Rope (Cont) 112. In the Chain Sling Use topic, modified/changed the narration and screen text 113. In the Chain Sling Temperature Restrictions topic, changed the narration to: The sling manufacturer should be consulted when the slings are to be used in 8

9 temperatures of minus or negative 40 degrees Fahrenheit (F). For slings exposed to temperatures of 400 degrees Fahrenheit or above, follow ASME B30.9 requirements for rated load reduction. The screen text was also changed 114. In the Metal Mesh Sling Temperature Restrictions topic, changed the last sentence in the narration to: Metal mesh slings shall be used in accordance with ASME B30.9 and OEM recommendations. The screen picture was also replaced In the Synthetic Sling Use topic, modified/changed the narration and screen text In the Synthetic Web Sling Use topic, modified/changed the wording of the first two sentences in the narration In the Using Shackles with Web Slings topic, modified/changed the wording of the narration and screen text 118. In the Synthetic Web Sling Temperature Restrictions topic, modified/changed the wording of the narration and screen text. Also, replaced the picture 119. In the Synthetic Rope Use topic, modified/changed the wording of the narration and screen text. The screen title was also changed from Minimum D/d Ratio for Synthetic Rope Sling Use to Synthetic Rope Sling Use 120. In the Synthetic Rope Sling Temperature Restrictions topic, changed the narration to the following: Polyester and nylon rope slings shall not be used in contact with an object or at temperatures in excess of 194 degrees or below negative 40 degrees Fahrenheit. The screen text was also changed 121. In the Roundsling Use topic, modified the narration and screen text Added a Other Roundslings topic after the Roundsling Use topic 123. In the Roundsling Temperature Restrictions topic, modified the narration and screen text 124. Changed the Common Sling Use Rules topic to Sling Use Considerations. Also, replaced the picture and modified the wording of the narration and screen text In the Included Angle topic, modified the wording of the narration and screen text In the Hitch Types topic, changed the wording of the first sentence in the narration to: Slings are used in straight-line, choker, and basket hitches. A straight-line hitch is commonly referred to as a vertical hitch. In addition, the word vertical in the screen text was changed to straight-line Changed the name of the Rated Loads of Vertical Hitches topic to Rated Loads of Straight-Line Hitches. In addition, the word vertical was replaced with straightline in the narration and screen text In the Use 2 Legs for Vertical Hitches topic, changed the name of the topic to Use 2 legs for Straight-Line Hitches. Changed the wording of the first sentence in the narration to: To prevent unlaying of wire rope (except for braided slings) or stranded synthetic rope slings, the slings shall not be used in a single part straightline (vertical hitch) or choker hitch, unless a method is used to prevent unlaying of the rope. Also, changed the word Vertical to Straight-Line in the screen title. 9

10 129. In the Rated Loads of Choker Hitches topic, changed 120 degrees to 121 degrees in the narration and screen text. Also, deleted/removed the third bulleted item from the screen text 130. In the Choker Hitch Efficiency topic, changed the wording of the narration and screen text. The narration/topic title was changed to Wire and Synthetic Sling Choker Hitch Efficiencies. Sling Angle Stress Module 131. In the Welcome topic, replaced the P-307 cover picture and changed the formatting of the screen text/title 132. In the Choosing Your Gear topic, removed the word stress from the last sentence in the narration and changed the word stress to factor in the screen text. D/d Ratio Module 133. In the Welcome topic, replaced the P-307 cover picture and changed the formatting of the screen text/title 134. In the D/d Ratio topic, changed the word fourteen-three to fourteen-two in the last sentence of the narration Hoists Module 135. In the Welcome topic, replaced the P-307 cover picture and changed the formatting of the screen text/title 136. In the Hoist Types topic, changed the words Chain Ratchets or Tugits to Lever Hoists in the narration and screen text In the Marking and Inspection topic, added the following sentence to the narration: Post-use inspections are recommended to ensure no damage has occurred during the weight handling operation. A bulleted item stating: Post-use inspections are recommended, was also added to the screen text. Crane Communications Module 138. In the Welcome topic, replaced the P-307 cover picture and changed the formatting of the screen text/title 139. In the Crane Communication Methods topic, changed the word constant to continuous in the narration 140. In the Hand Signal Rules topic, changed the wording of the last sentence in the narration to: Only one rigger or signaler shall communicate with the crane operator at a time (except for the stop and emergency stop signals which may be given at any time by any team member). 10

11 141. In the first Knowledge Check section, changed the wording of the third question to: How many signalers shall communicate with the crane operator at the same time? 142. In the Raise the Boom Lower the Load topic, changed the word Flex to Flexing in the screen text 143. In the Lower the Boom Raise the Load topic, changed the word Flex to Flexing in the screen text 144. In the Dog Everything topic, added the following sentence to the beginning of the narration: The signal to dog everything is given to the operator when crane operations are complete, or when the crane needs to be secured. The second sentence was also modified In the last Knowledge Check section, changed the Dog everything possible answer to Trolley Travel in question number 10. Safe Operations Module 146. In the Welcome topic, replaced the P-307 cover picture and changed the formatting of the screen text/title 147. In the Understanding the Crane topic, modified the narration and screen text 148. In the Operator Training topic, modified the wording of the fourth sentence in the narration and added the following to the end of the narration: Note: a license is not required for operators of category 3 non-cab operated cranes. The note was also added to the screen text In the Posted Information topic, added the following to the screen text: Note: Hand signal charts or placards are not normally posted on non-cab operated category 3 cranes In the Pre-Operational Check topic, modified/changed the wording of the first two sentences in the narration. The screen text was also changed In the Overhead Lines topic, changed the word signaler to spotter, and paragraphs through to through in the narration and screen text. Also, Figure 10-3 was changed/modified 152. In the Traveling topic, modified/changed the narration and screen text Crane and Rigging Accidents 153. Changed the name of the Crane and Rigging Gear Accidents module to Crane and Rigging Accidents 154. In the Welcome topic, replaced the P-307 cover picture and changed the formatting of the screen text/title. Also, removed the word Gear from the narration and screen title 11

12 155. In the Learning Objectives topic, modified the wording of the narration and screen text In the Accident Categories topic, modified the wording of the narration and screen text Added a new topic Significant Accidents after the Accident Categories topic In the Crane Operating Envelope topic, modified the wording of the narration and screen text 159. Changed the title of the Rigging Gear Operating Envelope topic to Rigging Operating Envelope. Also, changed/revised the wording of the narration and screen text In the first Knowledge Check section, changed the wording of the 2 nd questions to: The rigging operating envelope contains the rigging gear and miscellaneous equipment covered by P-307 section 14, the load itself and Changed the Near Misses topic title to Near Miss. Also, modified/revised the wording of the narration and screen text 162. Added an Unplanned Occurrence and a Reporting topic after the Near Miss topic 163. In the Crane Accident topic, revised and added additional wording to the narration 164. Changed the title of the Rigging Gear Accident topic to Rigging Accidents. Also, modified/revised the narration and screen text In the Damaged Rigging Gear topic, modified the wording of the second sentence in the narration and the third bulleted item in the screen text In the Accident Exception topic, revised the wording of the narration and screen text 167. In the Accident Causes topic, revised the wording of the narration 168. Changed the title of the Reporting topic to Notification and Reporting. Also, revised the narration and screen text In the Contractor Accident Reporting Procedures topic, revised the wording of the narration and screen text In the Contracting Officer Reporting Procedures topic, revised the wording of the narration and screen text 171. In the last Knowledge Check section, changed the correct answer in the 3 rd question to rigging accident 172. In the 4 th question, changed one of the possible answers from a rigging gear accident to a rigging accident 173. In the 6 th question, removed the word gear from the question. 12

13 Final Exam Questions and Answers 174. Removed 4 questions from the Final Exam and revised several questions and answers 13

Category 2 and Cab-Operated Category 3 Crane Safety Rev03 Instructor Guide Revisions

Category 2 and Cab-Operated Category 3 Crane Safety Rev03 Instructor Guide Revisions Category 2 and Cab-Operated Category 3 Crane Safety Rev03 Instructor Guide Revisions Instructor Information 1. Modified the wording and information in the Instructor Information section Introduction Module

More information

Category 2 Crane Safety Refresher Instructor Guide Revisions

Category 2 Crane Safety Refresher Instructor Guide Revisions Category 2 Crane Safety Refresher Instructor Guide Revisions Instructor Information 1. Modified the wording and information in the Instructor Information section Introduction Module 2. In the Welcome topic,

More information

Category 4 Crane Safety Instructor Guide Changes

Category 4 Crane Safety Instructor Guide Changes Category 4 Crane Safety Instructor Guide Changes Instructor Information 1. Modified the Instructor Information section in the Instructor Guide (IG) on pages 5 and 6. Introduction Module 2. Added an Introduction

More information

INSTRUCTOR Signal Person Package

INSTRUCTOR Signal Person Package INSTRUCTOR Signal Person Package F 31 2012 Included in Package: C 31 2012 (Signal Person CD (Video Clips Demonstrating Hand Signals)) Protocol for Signaling Written Test and Practical Evaluations Roster

More information

MAXIMUM REACH ENTERPRISES 1853 Wellington Court Henderson, NV Ph: cox.net 20 December 2018

MAXIMUM REACH ENTERPRISES 1853 Wellington Court Henderson, NV Ph: cox.net   20 December 2018 MAXIMUM REACH ENTERPRISES 1853 Wellington Court Henderson, NV 89014 Ph: 702 547 1564 kent.goodman @ cox.net www.maximumreach.com 20 December 2018 BUSINESS CARDS In my early years as a rigging engineer,

More information

Installing a Wire Mesh Pulling Grip on All-Dielectric DX Armored Fiber Optic Cables

Installing a Wire Mesh Pulling Grip on All-Dielectric DX Armored Fiber Optic Cables revision history Issue Date Reason for Change Related literature SRP-004-136 Accessing All-Dielectric DX Armored Fiber Optic Cables Admonishments 1. General This procedure provides instructions for installing

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT A PLUS INDUSTRIES LIMITED. Plot-28, Milk Vita Rd., Section-07, Mirpur, Dhaka Factory List: 1. A Plus Industries Ltd. Inspected by: Yoon Report Generated by: Nezar Inspected

More information

Stage Rigging Handbook Edition File Type

Stage Rigging Handbook Edition File Type We have made it easy for you to find a PDF Ebooks without any digging. And by having access to our ebooks online or by storing it on your computer, you have convenient answers with stage rigging handbook

More information

SCREEN WINCH SYSTEM INSTALLATION MANUAL FOR SCREENS FROM 300 cm. UP TO 450 cm. of width

SCREEN WINCH SYSTEM INSTALLATION MANUAL FOR SCREENS FROM 300 cm. UP TO 450 cm. of width SCREEN WINCH SYSTEM INSTALLATION MANUAL FOR SCREENS FROM 300 cm. UP TO 450 cm. of width Before installing the screen winch system, please read the following instructions carefully: The screen winch system

More information

Installation Manual Original Instructions - IW4001

Installation Manual Original Instructions - IW4001 Installation Manual Original Instructions - IW4001 Installation Manual 1 General Operator and Supervisor Information Signal Word Definition Signal Word Panel Table of Contents Operator and Supervisor Information

More information

C A R G O C O N T R O L. By Fritz Dahlin

C A R G O C O N T R O L. By Fritz Dahlin C A R G O C O N T R O L By Fritz Dahlin What Our TESTING & RESEARCH Shows Note: Please be aware that this testing was done with new product under controlled conditions. NO product should EVER be used above

More information

All Dielectric Self Supporting (ADSS) Fiber Optic Cable Installation

All Dielectric Self Supporting (ADSS) Fiber Optic Cable Installation All Dielectric Self Supporting (ADSS) Fiber Optic Cable Installation Underground Installation M P - 1012 Issue #3 March 2011 DISCLAIMER OF WARRANTIES AND LIMITATION OF LIABILITIES The practices contained

More information

Winch Adjustable Feed Level Tubes for the Adult Turkey Feeder Installation & Operator s Instruction Manual MF /99

Winch Adjustable Feed Level Tubes for the Adult Turkey Feeder Installation & Operator s Instruction Manual MF /99 Winch Adjustable Feed Level Tubes for the Adult Turkey Feeder Installation & Operator s Instruction Manual MF7-8 6/99 June 999 MF7B Chore-Time Warranty Winch Adjustable Feed Level Tubes for ATF Chore-Time

More information

Aerial Cable Installation Best Practices

Aerial Cable Installation Best Practices Aerial Cable Installation Best Practices Panduit Corp. 2007 BEST PRACTICES Table of Contents 1.0 General... 3 2.0 Introduction... 3 3.0 Precautions... 4 4.0 Pre-survey... 5 5.0 Materials and Equipment...

More information

SIGNALPERSON REFERENCE MANUAL

SIGNALPERSON REFERENCE MANUAL NATIONAL COMMISSION FOR THE CERTIFICATION OF CRANE OPERATORS (NCCCO) SIGNALPERSON REFERENCE MANUAL SGP RM 10/10 This page intentionally left blank Hold Harmless/Release/Disclaimer Agreement The reading

More information

What you need to know to plan a successful meeting, conference, or tradeshow at Boise Centre. EVENT GUIDE

What you need to know to plan a successful meeting, conference, or tradeshow at Boise Centre. EVENT GUIDE What you need to know to plan a successful meeting, conference, or tradeshow at Boise Centre. EVENT GUIDE WELCOME TO BOISE CENTRE Contents AUDIO / VISUAL GUIDE Thank you for selecting Boise Centre for

More information

NDT Supply.com P.O. BOX 7350 Shawnee Mission, KS USA

NDT Supply.com P.O. BOX 7350 Shawnee Mission, KS USA NDT Technologies, Inc. Wire Rope Inspection Using proven MFL Technology. NDT Technologies has over 30 years of experience dedicated to developing and improving Wire Rope Inspection equipment and methods.

More information

SUPERFLEX CABLE. What is Superflex Cable? Why make cable this way? Where Superflex Cable originated

SUPERFLEX CABLE. What is Superflex Cable? Why make cable this way? Where Superflex Cable originated SUPERFLEX CABLE What is Superflex Cable? Why make cable this way? Where Superflex Cable originated How it is made Other Advantages of this type of cable Interesting things about it Usage in present rigging

More information

Round Traveling Cable Installation by Douglas Babcock and Dillard Green

Round Traveling Cable Installation by Douglas Babcock and Dillard Green CERTIFIED ELEVATOR TECHNICIAN Continuing Education Round Traveling Cable Installation by Douglas Babcock and Dillard Green Learning Objectives After reading this article, you should have learned about:

More information

3 Cleaning. 4 Technical data

3 Cleaning. 4 Technical data EXC+ EXC- Sig- SIG+ SEN- SEN+ 2.4 Attaching cable to the analog board Attaching cable of the weighing cell to the system solution Connect the cable to the appropriate terminal strip of the Ex1 system solution

More information

ELECTRICAL SAFETY INSPECTION REPORT. MTM Garments Ltd.

ELECTRICAL SAFETY INSPECTION REPORT. MTM Garments Ltd. ELECTRICAL SAFETY INSPECTION REPORT MTM Garments Ltd. 15934/16004, Chanpara, Medical Road, Uttarkhan, Dhaka, Bangladesh. Factory List MTM Garments Ltd. Inspected by: Hemlal Dahal Report Generated by: Hemlal

More information

Installation Operation Maintenance

Installation Operation Maintenance Installation Operation Maintenance Rooftop Energy Recovery Module for TKD / TKH / WKD / WKH YKD / YKH / DKD / DKH # 125-155-175-200 250 265-290-340 # 275-300-350-400-500-600 April 2011 RT-SVX42B-E4 General

More information

SCREEN WINCH SYSTEM INSTALLATION MANUAL FOR SCREENS UP TO 300 cm. of width

SCREEN WINCH SYSTEM INSTALLATION MANUAL FOR SCREENS UP TO 300 cm. of width SCREEN WINCH SYSTEM INSTALLATION MANUAL FOR SCREENS UP TO 300 cm. of width Before installing the screen winch system, please read the following instructions carefully: The screen winch system must be used

More information

QC Electromagnetic Overhead Crane Specifications

QC Electromagnetic Overhead Crane Specifications YUANTAI CRANE QC Electromagnetic Overhead Crane Specifications Compact structure, new style, beautiful outlooking Good in usability with long service life Bearing high capacity, high working class Flexible

More information

ACADEMIC SUCCESS CENTER THE COLLEGE AT BROCKPORT STATE UNIVERSITY OF NEW YORK PROJECT NO

ACADEMIC SUCCESS CENTER THE COLLEGE AT BROCKPORT STATE UNIVERSITY OF NEW YORK PROJECT NO SECTION 270536 - CABLE TRAYS FOR COMMUNICATIONS SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

Linear flow controls VFC Linear flow controls with actuator IFC

Linear flow controls VFC Linear flow controls with actuator IFC Linear flow controls VFC Linear flow controls with actuator Product brochure GB 3 Edition 01.16 Linear relationship between adjustment angle and flow rate Large control ratio of 25:1 Actuators IC 20 or

More information

Con o t n e t n e t n s t

Con o t n e t n e t n s t Contents Page Item 3 Safety Warnings 4 Glossary 5 Attachment and Removal of Caster Frames 6 Line Array Element Attachment 7 Angle Selection 8 Rigging Frame (Bumper) 9 Electrical connection 10 System Mounting

More information

PULL SUPPORT PROTECT CONNECT

PULL SUPPORT PROTECT CONNECT PULL SUPPORT PROTECT CONNECT CABLE GRIPS, PROTECTORS, CONNECTORS AND ACCESSORIES 2012 A business focused on your needs From the day our family business was founded, we ve dedicated ourselves to designing,

More information

PSC300 Operation Manual

PSC300 Operation Manual PSC300 Operation Manual Version 9.10 General information Prior to any attempt to operate this Columbia PSC 300, operator should read and understand the complete operation of the cubing system. It is very

More information

Linear flow control with actuator IFC

Linear flow control with actuator IFC Linear flow control with actuator Product brochure GB 3 Edition 01.14 Linear relationship between adjustment angle and flow rate Large control ratio of 25:1 EC type-tested and certified Actuators IC 20

More information

Laying of cables and lines in electrical installations and data networks

Laying of cables and lines in electrical installations and data networks Technical bulletin Laying of cables and lines in electrical installations and data networks Date: 08/2006 This technical bulletin provides you with information on specific technical subjects. It is based

More information

Benefits. Applications

Benefits. Applications COINlight Pro - CP51 Preliminary Data Sheet Benefits Fits in MR16 luminare fixtures Usage without additional heat sink possible - 3.6 W with 50,000h @L70/Ta=25 C - 7.5 W with 25,000h @L70/Ta=25 C Life

More information

Safety Rules Parts Check Lists and Photos Cable Diagrams for Various Crane Configurations Step by Step Instructions Tips for Packaging and Storage

Safety Rules Parts Check Lists and Photos Cable Diagrams for Various Crane Configurations Step by Step Instructions Tips for Packaging and Storage EZ CRANE USER MANUAL INCLUDED INSIDE Safety Rules Parts Check Lists and Photos Cable Diagrams for Various Crane Configurations Step by Step Instructions Tips for Packaging and Storage WATCH THE INSTRUCTIONAL

More information

All Dielectric Self Supporting (ADSS) Fiber Optic Cable Installation

All Dielectric Self Supporting (ADSS) Fiber Optic Cable Installation All Dielectric Self Supporting (ADSS) Fiber Optic Cable Installation Underground Installation Install 22 June 23, 2017 DISCLAIMER OF WARRANTIES AND LIMITATION OF LIABILITIES The practices contained herein

More information

with the Field-IQ Crop Input Control System

with the Field-IQ Crop Input Control System with the Field-IQ Crop Input Control System Quick Reference Card CONNECTING THE SYSTEM Ag25 GNSS antenna (P/N 68040-OOS) TNC/TNC right-angle cable (P/N 50449) Cable assembly, display to Field-IQ (P/N 50449)

More information

Cambria County Association for the Blind and Handicapped 175 Industrial Park Road Ebensburg, PA Prepared for: Prepared by:

Cambria County Association for the Blind and Handicapped 175 Industrial Park Road Ebensburg, PA Prepared for: Prepared by: Cable Management in Solar PV Arrays: A Review of Requirements in the National Electrical Code and how CAB Cable Rings and Saddles Meet These Requirements Prepared for: Cambria County Association for the

More information

PERFORMANCE SPECIFICATION SHEET CONNECTORS, PLUGS, ELECTRICAL, COAXIAL RADIO FREQUENCY, (SERIES TNC (CABLED), PIN CONTACT, RIGHT ANGLE, CLASS 2)

PERFORMANCE SPECIFICATION SHEET CONNECTORS, PLUGS, ELECTRICAL, COAXIAL RADIO FREQUENCY, (SERIES TNC (CABLED), PIN CONTACT, RIGHT ANGLE, CLASS 2) INCH-POUND MIL-PRF-39012/30H 15 March 2018 SUPERSEDING MIL-PRF-39012/30H w/amendment 3 15 April 2017 PERFORMANCE SPECIFICATION SHEET CONNECTORS, PLUGS, ELECTRICAL, COAXIAL RADIO FREQUENCY, (SERIES TNC

More information

NAVSEA STANDARD ITEM. 1.1 Title: Shipboard Electrical/Electronic Cable Procedure; accomplish

NAVSEA STANDARD ITEM. 1.1 Title: Shipboard Electrical/Electronic Cable Procedure; accomplish NAVSEA STANDARD ITEM FY-9 ITEM NO: 009-73 DATE: 0 OCT 07 CATEGORY: I. SCOPE:. Title: Shipboard Electrical/Electronic Cable Procedure; accomplish. REFERENCES:. Standard Items. MIL-STD-003, Electric Plant

More information

Vibratory Deck Sieves 15 in. (380 mm)

Vibratory Deck Sieves 15 in. (380 mm) Instruction Sheet P/N 1604433-01 Vibratory Deck Sieves 15 in. (380 mm) Introduction This instruction sheet covers the vibratory deck sieves listed in the following tables. 15-Inch Deck Sieves with 2.5

More information

SCREEN WINCH SYSTEM INSTALLATION MANUAL FOR SCREENS UP TO 300 cm. of width

SCREEN WINCH SYSTEM INSTALLATION MANUAL FOR SCREENS UP TO 300 cm. of width SCREEN WINCH SYSTEM INSTALLATION MANUAL FOR SCREENS UP TO 300 cm. of width Before installing the screen winch system, please read the following instructions carefully: The screen winch system must be used

More information

Identification - electrical services

Identification - electrical services Identification - electrical services Aesthetic All live phase cable sheathing to be brown coloured and neutral phase cable sheathing to be blue coloured, all labelled L1, L2, L3 & N respectively in accordance

More information

SECTION INTERCOMMUNICATIONS AND PROGRAM SYSTEMS

SECTION INTERCOMMUNICATIONS AND PROGRAM SYSTEMS SECTION 27 51 23 SPEC WRITER NOTES: 1. Use this section only for NCA projects. Delete text between // // not applicable to project. Edit remaining text to suit project. 2. Contact Department of Veterans

More information

WARNING VGTWC VGF-1. Model No. Galvanized Steel Thimble and Wire Rope Cable Termination Kit

WARNING VGTWC VGF-1. Model No. Galvanized Steel Thimble and Wire Rope Cable Termination Kit VGTWC WARNING All persons using this equipment must read, understand and follow all instructions. In addition, all instructions provided with the cable and/or lifeline system with which this equipment

More information

Replacing the PanelMate epro PS, PanelMate epro PS Classic, PanelMate epro PS EE, and PanelMate epro PS OD 7685x-15xx Series Backlight Assembly

Replacing the PanelMate epro PS, PanelMate epro PS Classic, PanelMate epro PS EE, and PanelMate epro PS OD 7685x-15xx Series Backlight Assembly Introduction Replacing the PanelMate epro PS, PanelMate epro PS Classic, PanelMate epro PS EE, and PanelMate epro PS OD 7685x-15xx Series Assembly Instruction Leaflet IL04802009E Effective September 2008

More information

User Guide Stand-Alone Metering for OptiPlant

User Guide Stand-Alone Metering for OptiPlant User Guide Stand-Alone Metering for OptiPlant BAS-SVU030A-GB Table of Contents Introduction...4 General Features...5 User Interface...6 Top display area... 6 Bottom display area... 6 Main display area...

More information

Field Instruction. Any registered training organisation UETTDRCJ21A Lay ESI electrical cables. Before commencing work:

Field Instruction. Any registered training organisation UETTDRCJ21A Lay ESI electrical cables. Before commencing work: 6.10 Cable Installation Purpose This field instruction outlines the minimum cable installation requirements for all Horizon Power Workers, including Workers operating, servicing, and/ or maintaining (MPS)

More information

DLP ANTENNA INSTRUCTION MANUAL. Dielectric LLC 22 Tower Road Raymond, Maine Phone:

DLP ANTENNA INSTRUCTION MANUAL. Dielectric LLC 22 Tower Road Raymond, Maine Phone: DLP ANTENNA INSTRUCTION MANUAL Dielectric LLC 22 Tower Road Raymond, Maine 04071 Phone: 800-341-9678 TABLE OF CONTENTS Section Title Page Warnings 1 Return Policy. 1 Factory Tests... 1 Antenna Description....

More information

HONEYWELL VIDEO SYSTEMS HIGH-RESOLUTION COLOR DOME CAMERA

HONEYWELL VIDEO SYSTEMS HIGH-RESOLUTION COLOR DOME CAMERA Section 00000 SECURITY ACCESS AND SURVEILLANCE HONEYWELL VIDEO SYSTEMS HIGH-RESOLUTION COLOR DOME CAMERA PART 1 GENERAL 1.01 SUMMARY The intent of this document is to specify the minimum criteria for the

More information

K Service Source. Apple High-Res Monochrome Monitor

K Service Source. Apple High-Res Monochrome Monitor K Service Source Apple High-Res Monochrome Monitor K Service Source Specifications Apple High-Resolution Monochrome Monitor Specifications Characteristics - 1 Characteristics Picture Tube 12-in. diagonal

More information

SEATING MODULE WIRE ROUTING

SEATING MODULE WIRE ROUTING SEATING MODULE WIRE ROUTING for M-Series Electronics on PRIDE (Quantum) or QUICKIE Power Bases Seating Modules: Base Electronics: System Operation: Tilt Recline Tilt/Elevate Elevate-Only Q-Logic (Pride)

More information

PERFORMANCE SPECIFICATION SHEET

PERFORMANCE SPECIFICATION SHEET INCH-POUND 5 October 2016 SUPERSEDING w/amendment 2 July 2016 PERFORMANCE SPECIFICATION SHEET CONNECTORS, PLUG, ELECTRICAL, COAXIAL, RADIO FREQUENCY, SERIES SMA (CABLED) PIN CONTACT, RIGHT ANGLE, CLASS

More information

DX100 OPTIONS INSTRUCTIONS

DX100 OPTIONS INSTRUCTIONS DX100 OPTIONS INSTRUCTIONS FOR ARM INTERFERENCE WITH SPECIFIED CUBIC AREA CHECK FUNCTION Upon receipt of the product and prior to initial operation, read these instructions thoroughly, and retain for future

More information

Tucker Theatre Policies and Procedures MTSU Department of Theatre 205 Boutwell Dramatic Arts Murfreesboro, TN 37132

Tucker Theatre Policies and Procedures MTSU Department of Theatre 205 Boutwell Dramatic Arts Murfreesboro, TN 37132 Tucker Theatre Policies and Procedures MTSU Department of Theatre 205 Boutwell Dramatic Arts Murfreesboro, TN 37132 GENERAL INFORMATION Tucker Theatre is a proscenium theatre with two side stages. Auditorium

More information

Venue Performance Series VP Array Guide

Venue Performance Series VP Array Guide Venue Performance Series VP Array Guide A Guide to Assist in the Application of JBL Venue Performance Series Loudspeaker Systems Featuring Pre-Designed Arrayed Systems Table of Contents Introduction...

More information

Mediacom Upgrade/Splicing Procedures (based on original document from Corporate dated 4/16/98)

Mediacom Upgrade/Splicing Procedures (based on original document from Corporate dated 4/16/98) Mediacom Upgrade/Splicing Procedures (based on original document from Corporate dated 4/16/98) 1. Splicing specifications are provided by Mediacom, but due to resplice conditions, many locations become

More information

Operating Instructions 07/2007 Edition. SINAMICS G130/G150 Line harmonics filter. sinamics

Operating Instructions 07/2007 Edition. SINAMICS G130/G150 Line harmonics filter. sinamics Operating Instructions 07/2007 Edition SINAMICS G130/G150 Line harmonics filter sinamics s Safety information 1 General 2 SINAMICS SINAMICS G130/G150 Operating Instructions Mechanical installation 3 Electrical

More information

MODELS USIX-024 AND USIX-120 INSTRUCTION SHEET FOR FEDERAL SIGNAL UNISTAT STATUS INDICATOR MODEL USIX

MODELS USIX-024 AND USIX-120 INSTRUCTION SHEET FOR FEDERAL SIGNAL UNISTAT STATUS INDICATOR MODEL USIX 2562089B REV. B 110 Printed in U.S.A. MODELS USIX-024 AND USIX-120 INSTRUCTION SHEET FOR FEDERAL SIGNAL UNISTAT STATUS INDICATOR MODEL USIX Address all communications and shipments to: FEDERAL SIGNAL CORPORATION

More information

MiniXtend Cable with Binderless* FastAccess Technology Jacket and Buffer Tube Removal Procedures. 1. General. 2. Precautions

MiniXtend Cable with Binderless* FastAccess Technology Jacket and Buffer Tube Removal Procedures. 1. General. 2. Precautions MiniXtend Cable with Binderless* FastAccess Technology Jacket and Buffer Tube Removal Procedures 004-273-AEN, Issue 2 Table of Contents 1. General.... 1 2. Precautions.... 1 2.1 Cable Handling Precautions...

More information

LED Thunder S-150 Code 1097

LED Thunder S-150 Code 1097 LED Thunder S-150 Code 1097 User Manual 1 1 SAFETY INSTRUCTIONS This device has left the factory in perfect condition. In order to maintain this condition and to ensure a safe operation, it is absolutely

More information

1.8 METER SERIES 1183 Az/El MOUNT ANTENNA SYSTEM

1.8 METER SERIES 1183 Az/El MOUNT ANTENNA SYSTEM REVISION G January 11, 2002 ASSEMBLY MANUAL 1.8 METER SERIES 1183 Az/El MOUNT ANTENNA SYSTEM PRODELIN CORPORATION 1500 Prodelin Drive Newton NC 28658 1.8 METER SERIES 1183 Az/El MOUNT ANTENNA SYSTEM G

More information

Caution. Hanging the Screen:

Caution. Hanging the Screen: Installation Instructions for Laminar and Laminar XL Projection Screens Caution 1. Read Instructions through completely before proceeding; keep them for future reference. Follow these instructions carefully.

More information

Circulating Feed Delivery System Installation Instructions for Model 55, 75, 90, & HMC FLEX-AUGER Feed Delivery Systems

Circulating Feed Delivery System Installation Instructions for Model 55, 75, 90, & HMC FLEX-AUGER Feed Delivery Systems Circulating Feed Delivery System Installation Instructions for Model 55, 75, 90, & HMC FLEX-AUGER Feed Delivery Systems MA773-06 5/99 May 1999 Chore-Time Warranty Chore-Time Equipment warrants each new

More information

PERFORMANCE SPECIFICATION SHEET CONNECTORS, PLUGS, ELECTRICAL, COAXIAL, RADIO FREQUENCY (SERIES SMA (CABLED) - PLUG, PIN CONTACT, CLASS 2)

PERFORMANCE SPECIFICATION SHEET CONNECTORS, PLUGS, ELECTRICAL, COAXIAL, RADIO FREQUENCY (SERIES SMA (CABLED) - PLUG, PIN CONTACT, CLASS 2) INCH-POUND MIL-PRF-39012/55G 6 February 2008 SUPERSEDING MIL-PRF-39012/55G 6 January 2006 PERFORMANCE SPECIFICATION SHEET CONNECTORS, PLUGS, ELECTRICAL, COAXIAL, RADIO FREQUENCY (SERIES SMA (CABLED) -

More information

ALO 030 MKII. 30 Watt DMX LED scanner. User manual

ALO 030 MKII. 30 Watt DMX LED scanner. User manual ALO 030 MKII 30 Watt DMX LED scanner User manual Safety instructions WARNING! Always keep this device away from moisture and rain! Hazardous electrical shocks may occur! WARNING! Only connect this device

More information

Prescott Park Arts Festival Sound Level Monitoring Report July 31, 2017 August 13, 2017

Prescott Park Arts Festival Sound Level Monitoring Report July 31, 2017 August 13, 2017 10 Vaughan Mall, Suite 201A Portsmouth, NH 03801 603-430-2081 Prescott Park Arts Festival Sound Level Monitoring Report July 31, 2017 August 13, 2017 Prepared by Eric L. Reuter, INCE Bd. Cert. for The

More information

OCT 15 Rev B

OCT 15 Rev B AMP+ HVA280-3pxm XE High-Voltage Plug Connector with 1-Stage Latching Application Specification 114-32125 15 OCT 15 Rev B NOTE All numerical values are in metric units [with U.S. customary units in brackets].

More information

Coastal Carolina University RE-BID WILLIAMS BRICE RENOVATION AND REPAIR October 19, 2018 Construction Documents

Coastal Carolina University RE-BID WILLIAMS BRICE RENOVATION AND REPAIR October 19, 2018 Construction Documents PART 1 - GENERAL 1.1 SUMMARY SECTION 271500 COMMUNICATIONS HORIZONTAL CABLING A. Section Includes: 1. UTP cabling. 2. Telecommunications outlet/connectors. 3. Cabling system identification products. 1.2

More information

USER MANUAL. DE-1 Police-light. CAUTION! Keep this device away from rain and moisture! Unplug mains lead before opening the housing!

USER MANUAL. DE-1 Police-light. CAUTION! Keep this device away from rain and moisture! Unplug mains lead before opening the housing! USER MANUAL DE-1 Police-light CAUTION! Keep this device away from rain and moisture! Unplug mains lead before opening the housing! For your own safety, please read this user manual carefully before you

More information

OCC Installation Figure 8 Guidelines Excerpt from Optical Cable Corporation s INSTALLATION GUIDE

OCC Installation Figure 8 Guidelines Excerpt from Optical Cable Corporation s INSTALLATION GUIDE Installation Figure 8 Guidelines Excerpt from Optical Corporation s INSTALLATION GUIDE Figure 8 A figure 8 fiber optic cable design incorporates a steel or dielectric messenger into the fiber optic cable

More information

CASS TL-3 (Utilizing C-Shaped Post) Maintenance and Repair Manual

CASS TL-3 (Utilizing C-Shaped Post) Maintenance and Repair Manual CASS TL-3 (Utilizing C-Shaped Post) Maintenance and Repair Manual Part No. 620290B Revision March 2007 INDEX Page Introduction 3 General CASS TM Maintenance 3 Pre-stretched Cable 3 Non Pre-stretched Cable

More information

Photovoltaic Module Installation Manual (IEC)

Photovoltaic Module Installation Manual (IEC) Phono Solar Technology Co., Ltd. Add: No. 1 Xinghuo Rd., Nanjing Hi-tech Zone, Nanjing, China Tel: +86 25 5863 8000 Fax: +86 25 5863 8009 E-mail: support@phonosolar.com Website: www.phonosolar.com PHONO

More information

LED Spot 300W. Please read this user manual before your operation

LED Spot 300W. Please read this user manual before your operation LED Spot 300W Please read this user manual before your operation 1. Introduction 2. General Guideline 3. Safety Instructions 4. Cleaning and Maintenance 5. Technical Parameters 6. DMX Channels 7. Remark

More information

UltraTwist. Product Description. Instruction Guide

UltraTwist. Product Description. Instruction Guide UltraTwist Instruction Guide English 7EN111103-01 2009-07-06 Applies to the following models: UltraTwist Slim Prod. No. 3126045 UltraTwist Wide Prod. No. 3126047 UltraTwist Slim UltraTwist Wide Product

More information

Be sure to check the camera is properly functioning, is properly positioned and securely mounted, every time you operate your vehicle.

Be sure to check the camera is properly functioning, is properly positioned and securely mounted, every time you operate your vehicle. Please read all of the installation instructions carefully before installing the product. Improper installation will void manufacturer s warranty. The installation instructions do not apply to all types

More information

Litile34 OPERATION MANUAL

Litile34 OPERATION MANUAL Litile34 OPERATION MANUAL Seamless Tiled Panel Wall Solution for Large Area Digital Signage Display (1st Edition 3/25/2009) All information is subject to change without notice. Approved by Checked by Prepared

More information

Tripod-1 Manual Rev B

Tripod-1 Manual Rev B Tripod-1 Manual 57-6015 Rev B DYACON Tripod-1 Manual 2 Contents NOTICES...3 Copyright 2013 DYACON, Inc...3 Manufacturer...3 Declarations...4 Warranty Information...4 TRIPOD-1 INTRODUCTION...5 Scope...5

More information

SPARK. Swing Manual READ MANUAL FIRST. Version 1.2

SPARK. Swing Manual READ MANUAL FIRST. Version 1.2 SPARK Swing Manual READ MANUAL FIRST Version. Site Checks Site Checks You should setup this swing set in an environment which:. is clear from walls, structures, fences and anything that will cause injuries..

More information

Starling Tab-Tension 2 Series

Starling Tab-Tension 2 Series Electric Wall/Ceiling Projection Screen Starling Tab-Tension 2 Series For: Spectra White FG and CineGrey 5D User s Guide Important Safety & Warning Precautions Make sure to read this user s guide and follow

More information

ISS New Audio & Visual installations Design and Physical install guidelines v1.5

ISS New Audio & Visual installations Design and Physical install guidelines v1.5 ISS New Audio & Visual installations Design and Physical install guidelines v1.5 David Neal 11/05/2018 Contents Background... 3 Installation Standards... 3 Display Screen and Projector positioning... 3

More information

LED IP65 Slimline Par RGBWA +UV 7x12W

LED IP65 Slimline Par RGBWA +UV 7x12W VIS0495.4 LED IP65 Slimline Par RGBWA +UV 7x12W User Manual KEEP THIS MANUAL FOR FURTHER NEEDS Key Features: 7 x RGBAW + UV HEX 12W LED IP65 Weatherproof Die-Cast Housing Slimline, Compact & Stylish Design

More information

Dewatering. Series description Wilo-Drain STS 65. Submersible sewage pump

Dewatering. Series description Wilo-Drain STS 65. Submersible sewage pump Series description Wilo-Drain STS 65 Thermal winding monitoring Max. fluid temperature: 3-40 C Cable length: 10 m Free ball passage: 65 mm Max. immersion depth: 10 m Equipment/function Thermal motor monitoring

More information

Installation Manual SaVi Note Underwater LED Light

Installation Manual SaVi Note Underwater LED Light Installation Manual SaVi Note Underwater LED Light Model Numbers SAVI-NOTE7, SAVI-NOTE0 Table of Contents Safety Precautions...2 SaVi Note Install Instructions...3- M Instructions...- Warnings READ AND

More information

For Review Only No Copying No Saving No Lending No Posting Online

For Review Only No Copying No Saving No Lending No Posting Online The following copyrighted samples are provided as a service for your review only. Copying, saving, lending, posting online or any general use of these files other than for the purpose provided is unlawful

More information

AWT150C/AWT150CS/ AWT151C CCD Camera

AWT150C/AWT150CS/ AWT151C CCD Camera AWT150C/AWT150CS/ AWT151C CCD Camera ISSUED OCTOBER 2018 WARNING Failure to follow all instructions and safety precautions in this manual, in the vehicle and body manufacturers' manuals and on the safety

More information

SQM40/41 Actuators for air and gas dampers

SQM40/41 Actuators for air and gas dampers SQM40/41 Actuators for air and gas dampers Description SQM40/41 actuators are used for the positioning of flow control valves, butterfly valves, dampers or any application requiring rotary motion. The

More information

Underground Installation of Optical Fiber Cable by Pulling

Underground Installation of Optical Fiber Cable by Pulling Application Notes Underground Installation of Optical Fiber Cable by Pulling Authors Prasanna Pardeshi and Sudipta Bhaumik Issued July 2015 Abstract This application note discusses underground fiber optic

More information

Operating Manual. Automated Gear. Apollo Design Technology, Inc Fourier Drive Fort Wayne, IN USA

Operating Manual. Automated Gear. Apollo Design Technology, Inc Fourier Drive Fort Wayne, IN USA Operating Manual Automated Gear Apollo Design Technology, Inc. 4130 Fourier Drive Fort Wayne, IN 46818 USA PH: +01(260)497-9191 FX: +01(260)497-9192 www.apollodesign.net 11-25-09 5-6 POWERING UP THE RIGHT

More information

Design and Manufacture of Video Pipeline Inspection Systems A Full Service Company

Design and Manufacture of Video Pipeline Inspection Systems A Full Service Company Design and Manufacture of Video Pipeline Inspection Systems A Full Service Company www.rstechserv.com Omni III Pan and Tilt Color Camera Modell 10-01610 OPERATIONS MANUAL Made in USA IMPORTANT SAFETY NOTICE

More information

Safe, Accurate, and Repeatable

Safe, Accurate, and Repeatable Safe, Accurate, and Repeatable It is common for high-speed data cable to utilize two or more shielded twisted conductors. This type of cable is common in all digital electronic networks, and it requires

More information

Tube Rotator. User Guide. Version 1.2

Tube Rotator. User Guide. Version 1.2 Tube Rotator User Guide Version 1.2 Figure 1: Fixed Speed Model Tube holder spindle Tilt adjustment wheel IEC power inlet socket (at rear) Power on/off switch Figure 2: Variable Speed Model Tube holder

More information

2.4 METER SERIES 1250 ANTENNA SYSTEM

2.4 METER SERIES 1250 ANTENNA SYSTEM June 1,2009 Revision B Assembly Manual 2.4 METER SERIES 1250 ANTENNA SYSTEM General Dynamics SATCOM Technologies 1500 Prodelin Drive Newton NC 28658 2.4 Meter 2 Piece Az/El Installation Instructions B

More information

COMPULSORY. different learning styles with emphasis on experiential techniques. Therefore, delivery may include workshop-based. Framework.

COMPULSORY. different learning styles with emphasis on experiential techniques. Therefore, delivery may include workshop-based. Framework. COMPULSORY Course: Introduction to Film Industry and Television Industries (compulsory) DURATION: 50 contact hours + 50 self study equivalent to 4 ECTS/ECVET Credits (1 ECTS/ECVET credit = 25 hours). This

More information

CABLE REELS. United Equipment Accessories, and Inc. Solving Challenges from the Inside Out.

CABLE REELS. United Equipment Accessories, and Inc. Solving Challenges from the Inside Out. CABLE REELS United Equipment Accessories, and Inc. TM Solving Challenges from the Inside Out. CABLE REELS United Equipment Accessories unmatched flexibility in slip rings is available in combination with

More information

Cable installation guidelines

Cable installation guidelines The Quality Connection Cable installation guidelines Business Unit Industrial Projects 2 Cable installation guidelines www.leoni-industrial-projects.com GENERAL Installation methods Many different methods

More information

OCC Installation Round Messenger Guidelines Excerpt from Optical Cable Corporation s INSTALLATION GUIDE

OCC Installation Round Messenger Guidelines Excerpt from Optical Cable Corporation s INSTALLATION GUIDE Installation Round Messenger Guidelines Excerpt from Optical Cable Corporation s INSTALLATION GUIDE Round Messenger (ADSS) A round messenger fiber optic cable is designed for use in aerial installations

More information

Signal Person Requirements in OSHA s New Crane Rule

Signal Person Requirements in OSHA s New Crane Rule Signal Person Requirements in OSHA s New Crane Rule September 22, 2010 1. PURPOSE The safety of equipment operations depends in many situations on signals given to the operator. It is critical that the

More information

SHOWLINE SL BAR 640 LINEAR WASH LUMINAIRE SPECIFICATIONS.

SHOWLINE SL BAR 640 LINEAR WASH LUMINAIRE SPECIFICATIONS. GENERAL. A.) Overview. SHOWLINE SL BAR 640 LINEAR WASH LUMINAIRE SPECIFICATIONS. 1.) The luminaire shall be a color mixing luminaire employing twenty-four (24) red, green, blue, and white LED engines.

More information

Photovoltaic Module Installation Manual (IEC)

Photovoltaic Module Installation Manual (IEC) Phono Solar Technology Co., Ltd. Add: No. 1 Xinghuo Rd., Nanjing Hi-tech Zone, Nanjing, China Tel: +86 25 5863 8000 Fax: +86 25 5863 8009 E-mail: support@phonosolar.com Website: www.phonosolar.com PHONO

More information

Operating Instructions and Parts Manual 24383

Operating Instructions and Parts Manual 24383 Please read and save these instructions. Read through this owner s manual carefully before using product. Protect yourself and others by observing all safety information, warnings, and cautions. Failure

More information

Crane Systems Extension Reel Cable Guide Hardware Kit

Crane Systems Extension Reel Cable Guide Hardware Kit Purpose Extension Reel Cable Guide Hardware Kit Greer Number K056005 The Extension Reel Cable Guide Hardware Kit is used to control the reel-off cable along the telescoping boom and the signal cable routed

More information