INFN School on Electron Accelerators. RF Power Sources and Distribution

Similar documents
XFEL High Power RF System Recent Developments

L-Band RF R&D. SLAC DOE Review June 15 th, Chris Adolphsen SLAC

A HIGH POWER LONG PULSE HIGH EFFICIENCY MULTI BEAM KLYSTRON

Detailed Design Report

WG2 Group Summary. Chris Adolphsen Terry Garvey Hitoshi Hayano

RF plans for ESS. Morten Jensen. ESLS-RF 2013 Berlin

The TESLA RF System. S. Choroba. for the TESLA Collaboration. DESY Notkestr. 85, D Hamburg, Germany

DESIGN AND PERFORMANCE OF L-BAND AND S-BAND MULTI BEAM KLYSTRONS

ILC RF System R&D. Chris Adolphsen, SLAC. Section of 1.3 GHz SC Linac. June 29, 2007 PAC07 Talk FRYC01

Pulsed Klystrons for Next Generation Neutron Sources Edward L. Eisen - CPI, Inc. Palo Alto, CA, USA

RF Solutions for Science.

IOT OPERATIONAL EXPERIENCE ON ALICE AND EMMA AT DARESBURY LABORATORY

RF Power Generation II

TECHNICAL SPECIFICATION Multi-beam S-band Klystron type BT267

RF considerations for SwissFEL

DEVELOPMENT OF A 10 MW SHEET BEAM KLYSTRON FOR THE ILC*

X-Band Klystron Development at

Pulses inside the pulse mode of operation at RF Gun

Spear3 RF System Sam Park 11/06/2003. Spear3 RF System. High Power Components Operation and Control. RF Requirement.

Nick Walker DESY MAC

Next Linear Collider. The 8-Pack Project. 8-Pack Project. Four 50 MW XL4 X-band klystrons installed on the 8-Pack

Introduction: CW SRF linac types, requirements and challenges High power RF system architecture

3 cerl. 3-1 cerl Overview. 3-2 High-brightness DC Photocathode Gun and Gun Test Beamline

Evaluation of Performance, Reliability, and Risk for High Peak Power RF Sources from S-band through X-band for Advanced Accelerator Applications

RF Upgrades & Experience At JLab. Rick Nelson

Experience with the Cornell ERL Injector SRF Cryomodule during High Beam Current Operation

NEW METHOD FOR KLYSTRON MODELING

4.4 Injector Linear Accelerator

Towards an X-Band Power Source at CERN and a European Structure Test Facility

STATUS OF THE SWISSFEL C-BAND LINEAR ACCELERATOR

Working Group 2 Introductory presentation. Convenors C. Adolphsen, T. Garvey, H. Hayano

DEVELOPMENT OF X-BAND KLYSTRON TECHNOLOGY AT SLAC

Status of BESSY II and berlinpro. Wolfgang Anders. Helmholtz-Zentrum Berlin for Materials and Energy (HZB) 20th ESLS-RF Meeting

Solid State Modulators for X-Band Accelerators

Karin Rathsman, Håkan Danared and Rihua Zeng. Report from RF Power Source Workshop

Current status of XFEL/SPring-8 project and SCSS test accelerator

High-power klystrons. The benchmark in scientific research. State-of-the-art RF sources for your accelerator

The Elettra Storage Ring and Top-Up Operation

J/NLC Progress on R1 and R2 Issues. Chris Adolphsen

5 Project Costs and Schedule

Development of Multiple Beam Guns for High Power RF Sources for Accelerators and Colliders

CLIC Feasibility Demonstration at CTF3

18 GHz, 2.2 kw KLYSTRON GENERATOR GKP 24KP 18GHz WR62 3x400V

PULSED POWER FOR FUTURE LINEAR ACCELERATORS

ILC-LNF TECHNICAL NOTE

SUMMARY OF THE ILC R&D AND DESIGN

Operating Experience and Reliability Improvements on the 5 kw CW Klystron at Jefferson Lab

A New 4MW LHCD System for EAST

2 Work Package and Work Unit descriptions. 2.8 WP8: RF Systems (R. Ruber, Uppsala)

PULSED MODULATOR TECHNOLOGY

SMTF Beta <1 Front End Linac Infrastructure and Plans

650MHz/800kW Klystron Development at IHEP

KLYSTRON GUN ARCING AND MODULATOR PROTECTION

A SHEET-BEAM KLYSTRON PAPER DESIGN

reported by T. Shintake KEK / RIKEN Japan Summary of C-band R&D for Linear Collider at KEK New soft-x-ray FEL Project at RIKEN/SPring-8

Development of klystrons with ultimately high - 90% RF power production efficiency

14 GHz, 2.2 kw KLYSTRON GENERATOR GKP 22KP 14GHz WR62 3x400V

High Brightness Injector Development and ERL Planning at Cornell. Charlie Sinclair Cornell University Laboratory for Elementary-Particle Physics

Karin Rathsman. Calculations on the RF Source and Distribution

TOSHIBA Industrial Magnetron E3328

STATUS OF THE INTERNATIONAL LINEAR COLLIDER

Dark current and multipacting trajectories simulations for the RF Photo Gun at PITZ

Status of RF Power and Acceleration of the MAX IV - LINAC

CERN EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH. A 50 Hz LOW-POWER SOLID-STATE KLYSTRON-MODULATOR

RF Power Upgrade at Jefferson Lab

SRS and ERLP developments. Andrew moss

The PEFP 20-MeV Proton Linear Accelerator

Availability and Reliability Issues for the ILC

KEKB INJECTOR LINAC AND UPGRADE FOR SUPERKEKB

RF Power Systems, CLIC Drive Beam

North Damping Ring RF

150-MW S-Band Klystron Program at the Stanford Linear Accelerator Center1

Design and Simulation of High Power RF Modulated Triode Electron Gun. A. Poursaleh

RF POWER GENERATION FOR FUTURE LINEAR COLLIDERS* 1. Introduction

THE NEXT LINEAR COLLIDER TEST ACCELERATOR: STATUS AND RESULTS * Abstract

PEP II Design Outline

Status of CTF3. G.Geschonke CERN, AB

45 MW, 22.8 GHz Second-Harmonic Multiplier for High-Gradient Tests*

Status of SOLARIS. Paweł Borowiec On behalf of Solaris Team

CEPC Klystron Development

DELIVERY RECORD. Location: Ibaraki, Japan

The ESS Accelerator. For Norwegian Industry and Research. Oslo, 24 Sept Håkan Danared Deputy Head Accelerator Division Group Leader Beam Physics

IOT RF Power Sources for Pulsed and CW Linacs

Pseudospark-sourced Micro-sized Electron Beams for High Frequency klystron Applications

The FLASH objective: SASE between 60 and 13 nm

Jae-Young Choi On behalf of PLS-II Linac team

Empirical Model For ESS Klystron Cathode Voltage

TITLE PAGE. Title of paper: PUSH-PULL FEL, A NEW ERL CONCEPT Author: Andrew Hutton. Author Affiliation: Jefferson Lab. Requested Proceedings:

w. B. HERRMANNSFELDT and K. R. EPPLEY

A New High Intensity Proton Source. The SCRF Proton Driver. (and more!) at Fermilab. July 15, Bill Foster SRF2005

Diamond RF Status (RF Activities at Daresbury) Mike Dykes

!"!3

Final Report. U.S. Department of Energy Grant Number DE-FG02-04ER83916

NLC - The Next Linear Collider Project NLC R&D. D. L. Burke. DOE Annual Program Review SLAC April 9-11, 2003

5 th Modulator Klystron Workshop MDK2001. Session 1-2 Chairman : G. Caryotakis (SLAC) Klystron Technology

Overview of RF Distribution System and Cost Drivers

Design, Fabrication and Testing of Gun-Collector Test Module for 6 MW Peak, 24 kw Average Power, S-Band Klystron

US-ILC Waveguide Industrialization Study. Marc Ross, Chris Nantista and Chris Adolphsen

Summary of the 1 st Beam Line Review Meeting Injector ( )

Studies on an S-band bunching system with hybrid buncher

Transcription:

INFN School on Electron Accelerators 12-14 September 2007, INFN Sezione di Pisa Lecture 7b RF Power Sources and Distribution Carlo Pagani University of Milano INFN Milano-LASA & GDE

The ILC Double Tunnel scheme The Second Tunnel is mainly occupied by the RF Power Plants Three RF/cable penetrations every rf unit Safety crossovers every 500 m 34 kv power distribution Carlo Pagani 2

Linear Colliders are pulsed LCs are pulsed machines to improve efficiency. As a result: duty factors are small pulse peak powers can be very large <1 µs-1ms <10-200 ms RF Pulse 100 m - 300 km 1-300 nsec... Bunch Train accelerating field pulse: gradient with further input without input Beam Loading filling loading Carlo Pagani 3

High Power RF System Tasks Task: Conversion of AC Line Power to Pulsed RF Power and distribution of the Pulsed RF Power to the cavities of the Linear Collider Structure: Several RF Station consisting of certain components make up the RF System of a linear collider The number of station depends on the maximum power which can be handledreliablybyonestation( and of courseon availablityof components, costs etc) ILC Numbers: Pulse Power per Station: 10MW RF Pulse Width: 1.5 ms Repetition Rate: 5 Hz Average power per Station: ~100kW Carlo Pagani 4

2200 0-2200 0 80 2200 0-2200 0 80 2200 0-2200 0 80 2200 0-2200 0 80 RF Station Components (1) 220 12 12 120 0 0 80-220 3 phase AC 0 0 0 0 80 0 80 0 80 DC HV Pulsed HV Pulsed HV HVPS Pulse Generating Unit Pulse Transformer (opt.) Klystron Auxiliary PS Interlock Control Modulator LLRF Preamplifier 22000 0 0 80-22000 Pulsed RF RF Waveguide Distribution 2200 2200 2200 0 0 0 0 80 0 80 0 80-2200 -2200-2200 SC Cavities Carlo Pagani 5

RF Station Components (2) Modulator: HVPS: Conversion of AC line voltage (~400V AC) to DC HV (~1-10kV (100kV)) Pulse Generating Unit: Conversion of DC HV (~1-10kV (100kV)) to Pulsed HV (~1-10kV (100kV)) Pulse Transformer: Transformation of Pulsed HV (typ. ~10kV) to higher Pulsed HV (~100kV) Klystron: Conversion of Pulsed HV (~100kV) to pulsed RF (~10MW) RF Waveguide Distribution: Distribution of RF power (~10MW) to the cavities (~100kW) Other Auxiliary PS: Certain voltages for the klystron ion pumps or the klystron solenoid Interlock and Controls: Protection and Control LLRF: Control of phase, shape and amplitude (other lecture this school) Preamplifier: Amplification of ~1mW RF to ~100W RF Carlo Pagani 6

ILC Main Linac RF Unit (1 of 560) Gradient = 31.5 MV/m Rep Rate = 5 Hz # of Bunches = 2670 Bunch Spacing = 363 ns Beam Current = 9.0 ma Input Power = 284 kw Fill Time = 596 μs Train Length = 969 μs (9-8-9 Cavities per Cryomodule) Carlo Pagani 7

TESLA 500 RF Requirements TDR 2001 (ILC Baseline is similar) Number of sc cavities: 21024 total Frequency: 1.3 GHz (L-Band) Power per cavity: 231 kw Gradient at 500GeV: 23.4 MV/m Power per 36 cavities (3 cryo modules): 8.3 MW Power per RF station: 9.7MW (including 6% losses and a 10% reserve) Number of RF stations: 572 Macro beam pulse duration: 950 μs RF pulse duration: 1.37 ms Repetition rate: 5Hz Average RF power per station: 66.5 kw For TESLA 800 the number of stations must be doubled. The gradient is 35MV/m. Carlo Pagani 8

RF System Components developed for Tesla and installed at TTF RF Waveguide Distribution Klystron Modulator Pulse Transformer Carlo Pagani 9

Modulator Carlo Pagani 10

BCD and ACD Modulators for ILC (116 kv, 133 A, 1.6 ms, 5 Hz) Baseline: Pulse Transformer Style Modulator Alternative: Marx Generator Modulator Carlo Pagani 11

ILC Baseline Modulator IGCT s Carlo Pagani 12

Pulse Transformer Modulator Status 10 units have been built, 3 by FNAL and 7 by industry (PPT with components from ABB, FUG, Poynting) thru DESY funding. 8 modulators are in operation. 10 years operation experience. Working towards a more cost efficient and compact design. FNAL building two more, one each for ILC and HINS programs SLAC has built switching circuits with more up-to-date technology. Transforme r (red) and Lead Box (black) Containing Klystron 3 m HVPS and Pulse Forming Unit Carlo Pagani 13

Pulse Transformer Modulator Layout Capacitor Banks IGBT Redundant Switch Bouncer Choke Carlo Pagani 14

Klystron Carlo Pagani 15

Klystron Principle Example: 150MW, 3GHz S-Band Klystron The cathode is heated by the heater to ~1000 C. The cathode is then charged (pulsed or DC) > 100kV. Electrons are accelerated form the cathode towards the anode at ground, which is isolated from the cathode by the high voltage ceramics. The electron beam passes the anode hole and drifts in the drift tube to the collector. The beam is focussed by a bucking coil and a solenoid. By applying RF power to the RF input cavity the beam is velocity modulated. On its way to the output cavity the velocity modulation converts to a density modulation. This effect is reinforced by additional buncher and gain cavities. The density modulation in the output cavity excites a strong RF oscillation in the output cavity. RF power is coupled out via the output waveguides and the windows. Vacuum pumps sustain the high vacuum the klystron in. The beam is finally dumped in the collector, Carlo Pagani 16

Klystron Perveance Perveance, p is a quality parameter of the klystron gun, determined by the gun geometry I = klystron current U = Klystron voltage p = IU 3/ 2 Example: THALES TH2104C: 5 MW, 1.3 GHz Klystron U=128kV I = 89 A p = 1.94 10-6 [A/V 3/2 ] (μperveance = 1.94) Carlo Pagani 17

Klystron Output Power P P P RF Beam Beam η =η PRF = ηp = = UI U Beam pu >5/ 2 5/ 2 > 0 ( U ) U Output Power / MW 250 200 150 100 50 0 Output Power versus Cathode Voltage 0 200 400 600 Cathode Voltage / kv Example: RF output power of a 3GHz (S-band) klystron as function of the voltage Carlo Pagani 18

Klystron Efficiency Efficiency of a klystron depends on bunching and therefore on space charge forces Lower space forces allow for easier bunching and more efficiency Decreasing the charge density (current) and increasing the stiffness (voltage) of the beam increase the efficiency Higher voltage and lower current, thus lower perveance would lead to higher efficiency efficiency / % 100 90 80 70 60 50 40 30 20 10 0 Efficiency 0 0,5 1 1,5 2 2,5 3 microperveance Rule of thumb formula from fit to experimental data η =.85 2 10 0 5 p Carlo Pagani 19

Multibeam Klystron Idea Klystron with low perveance: high efficiency but high voltage Klystron with low perveance and low high voltage: low high voltage but low power Solution Klystron with many low perveance beams: low perveance per beam thus high efficiency low voltage compared to klystron with single beam with low perveance Carlo Pagani 20

Multi Beam Klystron TH1801 by Thales Measured performance Operation Frequency: 1.3GHz Cathode Voltage: 117kV Beam Current: 131A μperveance: 3.27 Number of Beams: 7 Cathode loading: 5.5A/cm 2 Max. RF Peak Power: 10MW RF Pulse Duration: 1.5ms Repetition Rate: 10Hz RF Average Power: 150kW Efficiency: 65% Gain: 48.2dB Solenoid Power: 6kW Length: 2.5m Lifetime (goal): ~40000h Carlo Pagani 21

Multi Beam Klystron VKL-8301 by CPI Specified Operating Parameters Peak Power Output 10 MW (min) Ave. Power Output 150 kw (min) Beam Voltage 114 kv (nom) Beam Current 131 A (nom) μperveance 3.40 Frequency 1300 MHz Gain 47 db (min) Efficiency 67 % (nom) Cathode Loading 2.0 A/cm 2 Dimensions H,Ø: 2.3 by 1.0 meters Weight 2000 lbs Electromagnet Solenoid Power 4 kw (max) Coil Voltage 200 V (max) Weight 2800 lbs Klystron during construction Carlo Pagani 22

Multi Beam Klystron E3736 MBK by Toshiba Measured performance Voltage: 115 kv Current: 135 A mperveance: 3.46 Output Power: 10.4 MW Efficiency: 67 % Pulse duration: 1.5 ms Rep. Rate: 10 Hz Design Layout As biult Carlo Pagani 23

Sheet-Beam Klystron from SLAC Carlo Pagani 24

Beam Transport and RF The elliptical beam is focused in a periodic permanent magnet stack that is interspersed with rf cavities Lead shielding Magnetically shielded from outside world Have done: Electron beam RF cavity Permanent Magnet Cell 3D Gun simulations of a 130 A, 40:1 aspect ratio elliptical beam traversing 30 period structures. 3D PIC Code simulations of rf interaction with the beam. Carlo Pagani 25

RF Waveguide Distribution Carlo Pagani 26

RF Distribution Development Carlo Pagani 27

ILC RF Distribution (for 33 MV/m Max Operation) 10 MW Klystron 33 MV/m * 9.0 ma * 1.038 m = 308 kw (Cavity Input Power) 26 Cavities 1/.93 (Distribution Losses) 1/.86 (LLRF Tuning Overhead) 10.0 MW Carlo Pagani 28

XFEL RF Distribution System Switched from a TTF- Like (3D) System To a Tree-Like (2D) System Carlo Pagani 29

RF Waveguide Components 3 Stub Tuner (IHEP, Bejing, China) E and H Bends (Spinner) Circulator (Ferrite) Changing phase, degree 60 Impedance matching range 1/3Z w 3Z w Max power, MW 2 * Z w waveguide impedance Hybrid Coupler (RFT, Spinner) Type WFHI 3-4 Peak input power, MW 0.4 Average power, kw 8 Min isolation at 1.3 GHz, db >30 Max insertion loss at 1.3 GHz, db 0.08 Input SWR at 1.3 GHz 1.1 (for full reflection) RF Load (Ferrite) RF Load (Ferrite) Directivity, db Return loss, db Coupling factor, db (due to tolerance overlapping only 13 different coupling factors instead 18 are nessesary) Accuracy of coupling factor, db 30 35 12.5; 12.0; 11.4; 10.7; 10.1; 9.6; 9.1; 8.5; 7.8; 7.0; 6.0; 4.8; 3.0 0.2 Type WFHLL 3-1 Peak input power, MW 1.0 Average power, kw 0.2 Min return loss at 1.3GHz, db 32 40 Max VSWR at 1.3 GHz 1.05 Max surface temperature, T C 50 (for full average power) Physical length, mm 230 Type WFHL 3-1 WFHL 3-5 Peak input power, MW 2.0 5.0 Average power, kw 10 100 Min return loss at 1.3 GHz, db 32 40 32 40 Max VSWR at 1.3 GHz <1.05 <1.05 Max surface temperature, ΔT C 20 30 (for full average power) Physical length, mm 385 850 Carlo Pagani 30