HPS Slow Controls Overview

Similar documents
Front End Electronics

Hall-B Beamline Commissioning Plan for CLAS12

SVT DAQ. Per Hansson Adrian HPS Collaboration Meeting 10/27/2015

ECAL LED system update. A. Celentano

An Overview of Beam Diagnostic and Control Systems for AREAL Linac

Update on DAQ for 12 GeV Hall C. Brad Sawatzky

Front End Electronics

Update on DAQ for 12 GeV Hall C

DAQ Systems in Hall A

DEVICE CONTROL AT. Witherspoon, and M. Wise, Continuous Electron Beam Accelerator Facility, Newport News, VA, USA

DX-10 tm Digital Interface User s Guide

A Cathode Development Cornell Cultera This scope includes all labor and purchases required produce photocathodes required by CBETA.

Manual for HPS ECal v2.2

THE DESIGN OF CSNS INSTRUMENT CONTROL

Supply Connection Plans of the PANDA Cluster- Jet Target, Beam Dump and its Interface with other Modules

ORM0022 EHPC210 Universal Controller Operation Manual Revision 1. EHPC210 Universal Controller. Operation Manual

AREAL- Phase 1. B. Grigoryan on behalf of AREAL team

C8000. switch over & ducking

Condition Monitoring Custom Products

THE UPGRADE PATH FROM LEGACY VME TO VXS DUAL STAR CONNECTIVITY FOR LARGE SCALE DATA ACQUISITION AND TRIGGER SYSTEMS

B. The specified product shall be manufactured by a firm whose quality system is in compliance with the I.S./ISO 9001/EN 29001, QUALITY SYSTEM.

MTL Software. Overview

DT9857E. Key Features: Dynamic Signal Analyzer for Sound and Vibration Analysis Expandable to 64 Channels

Advanced Synchronization Techniques for Data Acquisition

Teaching Plasma Nanotechnologies Based on Remote Access

HD Review March 30, 2011 Franz Klein

Contents. 1. System Description 3. Overview 3 Part Names 3 Operating Conditions 7 Start-up Procedure 7. 2.

Detailed Design Report

5620 SAM SERVICE AWARE MANAGER AAA GNE Driver Version Guide

... A COMPUTER SYSTEM FOR MULTIPARAMETER PULSE HEIGHT ANALYSIS AND CONTROL*

A new Interlock Design for the TESLA RF System

PEP-II longitudinal feedback and the low groupdelay. Dmitry Teytelman

Ensemble. Multi-Axis Motion Controller Software. Up to 10 axes of coordinated motion

BEPCII Libera Control System

SIL-2 8-Ch Analog Input Series Thermocouple, High Level, Low Level

GERDA GeDDAQ. Status, operation, integration. INFN Padova INFN & University Milano. Calin A. Ur

5620 SERVICE AWARE MANAGER. NTP Driver Version Guide

Major Differences Between the DT9847 Series Modules

Status of the X-ray FEL control system at SPring-8

C8188 C8000 1/10. digital audio modular processing system. 4 Channel AES/EBU I/O. features. block diagram. 4 balanced AES inputs

Silicon PhotoMultiplier Kits

Fast Orbit Feedback at the SLS. Outline

COMMISSIONING OF THE ALBA FAST ORBIT FEEDBACK SYSTEM

Progress Update FDC Prototype Test Stand Development Upcoming Work

Installation of a DAQ System in Hall C

INDIAN INSTITUTE OF TECHNOLOGY KHARAGPUR NPTEL ONLINE CERTIFICATION COURSE. On Industrial Automation and Control

(Cat. No IJ, -IK)

8 DIGITAL SIGNAL PROCESSOR IN OPTICAL TOMOGRAPHY SYSTEM

Rome group activity since last meeting (4)

Brilliance. Electron Beam Position Processor

SPG700 Multiformat Reference Sync Generator Release Notes

Lecture 14: Computer Peripherals

PBS Products from Pyramid

BABAR IFR TDC Board (ITB): requirements and system description

TASKI Service Tool Edition: V5.10/2014

Diamond detectors in the CMS BCM1F

Therapy Control and Patient Safety for Proton Therapy

li, o p a f th ed lv o v ti, N sca reb g s In tio, F, Z stitu e tests o e O v o d a eters sin u i P r th e d est sezio tefa ectro lity stem l su

HS-509 VIBRATION TRIP MODULE

RSSL1:1-KuXER. Outdoor Unit (ODU) Ku Ext Ref LNB Redundancy System with external 10 MHz Reference System. Mux/Tee. Coax cable

A New 4MW LHCD System for EAST

WBS Trigger. Wesley Smith, U. Wisconsin CMS Trigger Project Manager. DOE/NSF Review April 11, 2000

Simple motion control implementation

Press Publications CMC-99 CMC-141

C8000. sync interface. External sync auto format sensing : AES, Word Clock, Video Reference

DT9834 Series High-Performance Multifunction USB Data Acquisition Modules

CGEM-IT project update

GuardPLC Certified Function Blocks -- Basic Suite

MAXTECH, Inc. BRC-1000 Series. C-Band Redundant LNB Systems. Technology for Communications. System Block Diagrams

DPS Telecom Your Partners in Network Alarm Management

Next Linear Collider. The 8-Pack Project. 8-Pack Project. Four 50 MW XL4 X-band klystrons installed on the 8-Pack

Special Applications Modules

User Manual for ICP DAS WISE Monitoring IoT Kit -Microsoft Azure IoT Starter Kit-

DT9837 Series. High Performance, USB Powered Modules for Sound & Vibration Analysis. Key Features:

Trigger Cost & Schedule

ECE Real Time Embedded Systems Final Project. Speeding Detecting System

DIVERSITY DVB-T RECEIVER (DDR)

THE ASTRO LINE SERIES GEMINI 5200 INSTRUCTION MANUAL

EECS145M 2000 Midterm #1 Page 1 Derenzo

Data Acquisition Networks. Installing and Configuring the DM01 Hardware

A Fast Magnet Current Change Monitor for Machine Protection in HERA and the LHC

DIRECT DRIVE ROTARY TABLES SRT SERIES

Ocean Sensor Systems, Inc. Wave Staff, OSSI F, Water Level Sensor With 0-5V, RS232 & Alarm Outputs, 1 to 20 Meter Staff

ECE 372 Microcontroller Design

Zebra2 (PandA) Functionality and Development. Isa Uzun and Tom Cobb

Improving EPICS IOC Application (EPICS user experience)

application software

Pulsed Klystrons for Next Generation Neutron Sources Edward L. Eisen - CPI, Inc. Palo Alto, CA, USA

Supercam Spectrometer Synchronization at the SMT 7 February 2007 Craig Kulesa

Cryostat Instrumentation Cabling Grounding and Shielding. Eric Hazen Boston University 12/15/08 1

ANKA Status Report. N.Smale, on behalf of all ANKA colleagues, Directors : A.-S. Müller, C Heske, T Baumbach.

RF Upgrades & Experience At JLab. Rick Nelson

Operating Instructions

FalconX1/X4/X8 Quick Start Guide

Agilent Technologies. N5106A PXB MIMO Receiver Tester. Error Messages. Agilent Technologies

Operating Instructions for Throttle Valves Using VRC Valve Positioner

Klystron Lifetime Management System

INSTRUCTION MANUAL. J800 Weld Controller. 3/25/2018 Revision

HIGH POWER BEAM DUMP AND TARGET / ACCELERATOR INTERFACE PROCEDURES *

application software

Transcription:

HPS Slow Controls Overview Hovanes Egiyan 6/18/2014 Hovanes Egiyan HPS Collaboration Meeting 1

Content Introduction HPS SVT Controls ECAL Controls Hall B controls Summary 6/18/2014 Hovanes Egiyan HPS Collaboration Meeting 2

HPS Slow Controls Group Pelle Hanssen SLAC Sho Uemura SLAC Takashi Maruyama SLAC Bryan McKinnon Glasgow Ken Livingston Glasgow Nerses Gevorgyan Yerevan Ani Simonyan Yerevan Levon Hakobyan Yerevan Valery Sytnik CLAS12 Krister Bruhwel JLAB Hovanes Egiyan JLAB Sergey Boiarinov JLAB Wesley Moore JLAB Andrea Celentano INFN 6/18/2014 Hovanes Egiyan HPS Collaboration Meeting 3

SVT Voltage Controls Requires two EPICS IOC: for MPOD and for DAQ interfaces. We borrowed an MPOD chassis with 3 bias and 3 LV boards from CLAS12 SVT group. We can have an IOC running on a Hall B clonioc2 server communicating with the MPOD using SNMP. Configured using the Hall D scheme and software. Detector configuration and the mapping is stored in a SQLite DB which can be used by both IOC initialization and by alarm handler configuration. Detector to board/channel mapping in DB is arbitrary for now. Pelle and Sho started work on DAQ EPICS IOC for low voltages for hybrids. Can successfully read the SVT temperatures into EPICS. Bryan McKinnon (Glasgow) has created GUIs for voltage controls. Made a presentation on status of SVT voltage GUIs on controls meetings. All bias voltages and low voltages boards are implemented. Voltage overview screen and the screens with voltage parameters are ready. 6/18/2014 Hovanes Egiyan HPS Collaboration Meeting 4

SVT Voltage Alarms HPS alarm system will be similar to that of CLAS6 Works well Save labor Ani Simonyan (Yerevan) developed the alarms screens for the SVT voltages. Autoconfiguring the EPICS alarms with Python scripts using the channel mapping information from an SQLite database. No need to manually change the alarms configuration when the SQLite DB changes Can be integrated into a single alarm tree of HPS Alarm tree Guidance button Action/related screen button 6/18/2014 Hovanes Egiyan HPS Collaboration Meeting 5

SVT Motors HPS will require 3 new motorized axis. The 3 new HPS motors will be controlled by a new Newport XPS-Q8 controller. Controller procured, cables manufactured The rest of the standard Hall B stages will be controlled using Hall B scheme Can also move 3 stages to the XPS controller Beam blocker, beam viewer and collimator. XPS Vacuum Stages New beam scanning procedure needs to be developed for SVT motors that use XPS controller Hall D has these controllers and currently developing harp scans using those. Ani Simonyan (Yerevan) is working on the beam scanning software with Hall D on SVT scan development. Ani needs a drawing of wires w.r.t SVT to calculate the geometry. Newport XPS-Q8 6/18/2014 Hovanes Egiyan HPS Collaboration Meeting 6

Beam Scans HPS will use standard Hall B wire scans for regular beam profile harp scans. If time allows, can migrate to XPS-based scan Hall B recent scans used 3-wires for three projections: X, Y, and 45 0 CLAS6 never analyzed the 3-rd wire result Ani Simonyan is working on scans, added the fitting of the third peak Can determine the orientation of the long axis of the beam The HPS SVT scans will need to utilize another procedure Use a TTL pulse from the XPS controller to gate the scaler to synchronize the motor and scaler readout 6/18/2014 Hovanes Egiyan HPS Collaboration Meeting 7

Chillers SVT needs to use two separate chillers Both will have serial communication for remote controls Both will be instrumented for shut-off valve to be used for the SVT interlock system. Wesley Moore (JLAB) will be taking over the chiller EPICS support Wesley has significant experience with the serial communication devices in EPICS One chiller (small SVT chiller for FE boards) is at JLAB. Current being used by ECAL. Wesley will start work on EPICS support probably next week. The second chiller will be implemented when it arrives at JLAB About two weeks of work. Wesley will also implement the ECAL chiller controls in EPICS. HPS SVT FEC chiller 6/18/2014 Hovanes Egiyan HPS Collaboration Meeting 8

SVT Interlocks Operations of SVT requires interlocks: Shutdown MPOD power using FAST_SHUTDOWN (or ENABLE) signal when SVT temperature is high, or Vacuum pressure is high, or Coolant flow is too low in either of the two SVT chillers, or Beam is off in Hall B (FSD feedback) Shutdown both SVT chillers via relay Vacuum pressure is high Interlocks would be latching requiring manual reset We are building a system where the logic would be programmable (provided the inputs are there). PLC hardware has been ordered and received at SLAC Should program it to use in August Chiller interlock PS interlock Need to finalize the decision algorithm to program States of the chiller relay and chiller solenoid valves Whether to use ENABLE or FASTSHUTDOWN on MPOD 6/18/2014 Hovanes Egiyan HPS Collaboration Meeting 9

PLC-based Interlocks The timing requirements from the SVT group are not very strict, on the order of 200ms. Allen-Bradley CompactLogix Current design based on Allen-Bradley CompactLogix PLC chassis Modular system, can easily add more I/O modules. Relatively inexpensive hardware (<$10K for interlocks only). Can program logic at any time if we have a software license. Easily interfaceble with EPICS to see the statuses and values of the inputs. Hall D developed an interlock system based on A-B CompactLogix. Controller Power Supply I/O Modules Functional modules procured Controller Analog input (8x voltage or current channels) [vacuum, flow, beam loss] RTD input (6x RTD channels) [SVT temperature] Digital output (16x 24 VDC channels) [solenoid valves] TTL output (16x TTL ) [MPOD interlock] Relay output (16x relay channels) [solenoid valves] 6/18/2014 Hovanes Egiyan HPS Collaboration Meeting 10

ECAL Voltages and Temperatures Valery Sytnik ported the CAEN SY1527 EPICS driver to the latest version of EPICS. Nerses Gevorgyan is working on moving CLAS6 CAEN HV voltage application to new EPICS Mapping of the channels Control screen generation Alarm configuration file generation EPICS record DB generation CAEN SY1527/SY4527 Bryan McKinnon is developing an overview screen to be used by shift takers Still in progress 6/18/2014 Hovanes Egiyan HPS Collaboration Meeting 11

ECAL Light Monitoring ECAL will have a light monitoring system with two custom-made controllers. The same type as for CLAS12 Forward Tagger INFN/Genova is developing the firmware for the control module of the CLAS12/HPS pulsing system. Glasgow group developed EPICS support for the CLAS12 Forward Tagger controller and working on a monitoring procedure which we can use for HPS. May need different type of controls screens between CLAS12 and HPS. Will be discussed at the HPS controls meeting next week. The hardware and software are expected to show up at Jefferson Lab ready to be used. 6/18/2014 Hovanes Egiyan HPS Collaboration Meeting 12

Scalers Started work on JLAB discriminator scalers in EPICS (Sergey, Valery) 16 x 4 scalers per board 2 thresholds 2 scalers per threshold Use a server to collect and latch scalers EPICS IOC and other processes can grab scaler counts from the server Prototype for driver already existed FADC250 EPICS driver will follow the same scheme 16 scalers + 16 spectrum waveforms per board Should be simpler than discriminator scalers. No control/configuration from EPISC is required. Need to develop an HPS-specific application (EPICS channel list and GUIs) to display these scalers Use the GlueX SQLite scheme for mapping channels. JLAB Discriminator JLAB FADC250 6/18/2014 Hovanes Egiyan HPS Collaboration Meeting 13

Hall B Controls There are a lot of controls that existed in Hall B before HPS Many system were taken apart during CLAS decommissioning. Many need to be restored, then updated for newer hardware and operating systems. Accelerator division will take care of the beamline vacuum controls. Two new Hall B visitors (Valery Sytnik and Levon Hakobyan) will be working on migrating Hall B applications to newer version of EPICS and VxWorks. A pretty long list of needed application and EPICS drivers have been determined. Krister Bruhwell has been working on magnet controls Frascati magnet power supply controls have already been restored Main dipole (pair spectrometer) power supply is next, should be simpler to restore. Moeller magnet power supplies are considered lower priority for now. Krister is also restoring the motorized stages and the control boxes for the Hall B beamline components. Beam blocker controls restored. Five more stages to go. Krister will be restoring the ECAL temperature monitoring used during test run. We have an agreement with accelerator division to use MYA archiver for all HPS EPICS channels. 6/18/2014 Hovanes Egiyan HPS Collaboration Meeting 14

Schedule The slow controls schedule had to be modified due to Actual manpower availability Schedule changes in SVT and ECAL All controls components should be ready for operations at the end of September. Integration with the rest of the HPS components may last until end of October and even into November. Some of the controls components will require commissioning with or without beam. Should be part of the commissioning plan for parent HPS subsystems. ID WBS Activity End date 1.49.63 Chiller Controls programming 8/30/2014 1.49.64 Sensor readout programming (PLC) 8/30/2014 1.49.65 SVT voltage controls 7/30/2014 1.49.66 ECAL voltage controls 7/30/2014 1.49.67 SVT motor controls 9/30/2014 1.49.68 Target motor controls 8/30/2014 1.49.70 Hardware interlock (PLC) 8/30/2014 1.49.71 Beamline controls screens 9/30/2014 1.49.72 EPICS scalers programming 8/30/2014 1.49.73 Alarm configuration 9/30/2014 1.49.74 Archiving of controls 9/30/2014 1.49.75 Slow Controls ready 9/30/2014 6/18/2014 Hovanes Egiyan HPS Collaboration Meeting 15

Summary The SVT voltage controls development is progressing well. IOC-s, controls screens, alarms are in pretty good shape. Small change of plans regarding the SVT motor controls. Newport XPS controller has been procured, cables for SVT motors have been manufactured. Takashi has learnt a lot regarding the SVT motion system and how to control it Hardware for the SVT interlock system has been procured. Allen-Bradley CompactLogix based system, identifying the person who can program it. Work on EPICS support for chillers will start next week. ECAL voltage controls are essentially the old ECAL controls with different mapping. CLAS12 updated the CAEN EPICS support to new EPICS versions. ECAL LED monitoring controls is progressing well. Still need controls GUIs for HPS. Hall B staff and visitors are actively working on restoration of the existing controls in the hall Frascati magnet controls are mostly restored. Two visitors are working on converting the EPICS applications to new VxWorks. Starting to implement scalers from JLAb modules in EPICS Scheduled for completing the slow controls slipped back by approximately two month. Working with subsystems to ensure that controls are there when needed. 6/18/2014 Hovanes Egiyan HPS Collaboration Meeting 16