L-Band RF R&D. SLAC DOE Review June 15 th, Chris Adolphsen SLAC

Similar documents
INFN School on Electron Accelerators. RF Power Sources and Distribution

Working Group 2 Introductory presentation. Convenors C. Adolphsen, T. Garvey, H. Hayano

ILC RF System R&D. Chris Adolphsen, SLAC. Section of 1.3 GHz SC Linac. June 29, 2007 PAC07 Talk FRYC01

WG2 Group Summary. Chris Adolphsen Terry Garvey Hitoshi Hayano

XFEL High Power RF System Recent Developments

SLAC ILC Accelerator R&D Program

Solid State Modulators for X-Band Accelerators

RF plans for ESS. Morten Jensen. ESLS-RF 2013 Berlin

Detailed Design Report

Next Linear Collider. The 8-Pack Project. 8-Pack Project. Four 50 MW XL4 X-band klystrons installed on the 8-Pack

Evaluation of Performance, Reliability, and Risk for High Peak Power RF Sources from S-band through X-band for Advanced Accelerator Applications

RF considerations for SwissFEL

DESIGN AND PERFORMANCE OF L-BAND AND S-BAND MULTI BEAM KLYSTRONS

2 Work Package and Work Unit descriptions. 2.8 WP8: RF Systems (R. Ruber, Uppsala)

DEVELOPMENT OF A 10 MW SHEET BEAM KLYSTRON FOR THE ILC*

A HIGH POWER LONG PULSE HIGH EFFICIENCY MULTI BEAM KLYSTRON

5 Project Costs and Schedule

SUMMARY OF THE ILC R&D AND DESIGN

Modulator Overview System Design vs. Tunnel Topologies. Snowmass Workshop August 16, 2005 Ray Larsen for the SLAC ILC Group

The TESLA RF System. S. Choroba. for the TESLA Collaboration. DESY Notkestr. 85, D Hamburg, Germany

Pulses inside the pulse mode of operation at RF Gun

Nick Walker DESY MAC

IOT OPERATIONAL EXPERIENCE ON ALICE AND EMMA AT DARESBURY LABORATORY

Towards an X-Band Power Source at CERN and a European Structure Test Facility

J/NLC Progress on R1 and R2 Issues. Chris Adolphsen

Experience with the Cornell ERL Injector SRF Cryomodule during High Beam Current Operation

Pulsed Klystrons for Next Generation Neutron Sources Edward L. Eisen - CPI, Inc. Palo Alto, CA, USA

X-Band Klystron Development at

STATUS OF THE SWISSFEL C-BAND LINEAR ACCELERATOR

SRS and ERLP developments. Andrew moss

3 cerl. 3-1 cerl Overview. 3-2 High-brightness DC Photocathode Gun and Gun Test Beamline

RF Upgrades & Experience At JLab. Rick Nelson

!"!3

Current status of XFEL/SPring-8 project and SCSS test accelerator

THE NEXT LINEAR COLLIDER TEST ACCELERATOR: STATUS AND RESULTS * Abstract

Overview of the X-band R&D Program

Oak Ridge Spallation Neutron Source Proton Power Upgrade Project and Second Target Station Project

SLAC ILC program, International BDS Design, ATF2 facility

Spear3 RF System Sam Park 11/06/2003. Spear3 RF System. High Power Components Operation and Control. RF Requirement.

Introduction: CW SRF linac types, requirements and challenges High power RF system architecture

Overview of NLC/JLC Collaboration *

NLC - The Next Linear Collider Project NLC R&D. D. L. Burke. DOE Annual Program Review SLAC April 9-11, 2003

STATUS OF THE INTERNATIONAL LINEAR COLLIDER

Development of Multiple Beam Guns for High Power RF Sources for Accelerators and Colliders

PULSED MODULATOR TECHNOLOGY

RF Solutions for Science.

Status of BESSY II and berlinpro. Wolfgang Anders. Helmholtz-Zentrum Berlin for Materials and Energy (HZB) 20th ESLS-RF Meeting

45 MW, 22.8 GHz Second-Harmonic Multiplier for High-Gradient Tests*

RF Power Generation II

ILC-LNF TECHNICAL NOTE

High Brightness Injector Development and ERL Planning at Cornell. Charlie Sinclair Cornell University Laboratory for Elementary-Particle Physics

Diamond RF Status (RF Activities at Daresbury) Mike Dykes

Chapter 4. Rf System Design. 4.1 Introduction Historical Perspective NLC Rf System Overview

Karin Rathsman, Håkan Danared and Rihua Zeng. Report from RF Power Source Workshop

Present Status and Future Upgrade of KEKB Injector Linac

PULSED POWER FOR FUTURE LINEAR ACCELERATORS

IOT RF Power Sources for Pulsed and CW Linacs

RUNNING EXPERIENCE OF FZD SRF PHOTOINJECTOR

TITLE PAGE. Title of paper: PUSH-PULL FEL, A NEW ERL CONCEPT Author: Andrew Hutton. Author Affiliation: Jefferson Lab. Requested Proceedings:

The PEFP 20-MeV Proton Linear Accelerator

reported by T. Shintake KEK / RIKEN Japan Summary of C-band R&D for Linear Collider at KEK New soft-x-ray FEL Project at RIKEN/SPring-8

SMTF Beta <1 Front End Linac Infrastructure and Plans

A New High Intensity Proton Source. The SCRF Proton Driver. (and more!) at Fermilab. July 15, Bill Foster SRF2005

TECHNICAL SPECIFICATION Multi-beam S-band Klystron type BT267

CLIC Feasibility Demonstration at CTF3

Overview of RF Distribution System and Cost Drivers

DEVELOPMENT OF X-BAND KLYSTRON TECHNOLOGY AT SLAC

Accelerator Instrumentation RD. Monday, July 14, 2003 Marc Ross

Examples of Successful Collaboration Between CPI and DOE Labs. Todd Treado CPI December 2013

Technology Challenges for SRF Guns as ERL Sources in View of Rossendorf work

The ESS Accelerator. For Norwegian Industry and Research. Oslo, 24 Sept Håkan Danared Deputy Head Accelerator Division Group Leader Beam Physics

ESS Linac WP8 Radio Frequency Systems and Test Facilities

ESS Linac WP8 Radio Frequency Systems and Test Facilities

Status of CTF3. G.Geschonke CERN, AB

Operating Experience and Reliability Improvements on the 5 kw CW Klystron at Jefferson Lab

Status of RF Power and Acceleration of the MAX IV - LINAC

KEKB INJECTOR LINAC AND UPGRADE FOR SUPERKEKB

4.4 Injector Linear Accelerator

US-ILC Waveguide Industrialization Study. Marc Ross, Chris Nantista and Chris Adolphsen

Low Level RF for PIP-II. Jonathan Edelen LLRF 2017 Workshop (Barcelona) 16 Oct 2017

Jae-Young Choi On behalf of PLS-II Linac team

ESS: The Machine. Bucharest, 24 April Håkan Danared Deputy Head Accelerator Division. H. Danared Industry & Partner Days Bucharest Page 1

PEP II Design Outline

CERN EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH. A 50 Hz LOW-POWER SOLID-STATE KLYSTRON-MODULATOR

Linac 4 Instrumentation K.Hanke CERN

The Elettra Storage Ring and Top-Up Operation

Thoughts on Project Standard in Japan

SLS RF operation report 2003

SLAC X-band Technology R&D. Tor Raubenheimer DOE Briefing June 11 th, 2010

DESIGN OF 1.2-GEV SCL AS NEW INJECTOR FOR THE BNL AGS*

NSLS-II RF Systems James Rose, Radio Frequency Group Leader PAC 2011

High Rep Rate Guns: FZD Superconducting RF Photogun

KARA and FLUTE RF Overview/status

High Power Solid State Modulator Development at SLAC. Craig Burkhart Power Conversion Department March 5, 2010

North Damping Ring RF

18 GHz, 2.2 kw KLYSTRON GENERATOR GKP 24KP 18GHz WR62 3x400V

Upgrade of CEBAF to 12 GeV

ANKA RF System - Upgrade Strategies

Status of KEK X-band Test Facility and its future plans

DELIVERY RECORD. Location: Ibaraki, Japan

Transcription:

L-Band RF R&D SLAC DOE Review June 15 th, 2005 Chris Adolphsen SLAC

International Linear Collider (ILC) RF Unit (TESLA TDR Layout) Gradient = 23.4 MV/m Bunch Spacing = 337 ns Fill Time = 420 µs Train Length = 950 µs Rep Rate = 5 Hz

Focus of Efforts at SLAC Focus of Efforts at JLab and FNAL FNAL-Based SMTF Proposal: It is anticipated that, with coordination from the ILC-Americas collaboration, SLAC will lead the ILC rf power source efforts...

Superconducting Module Test Facility (SMTF) at FNAL Main Goal: Develop U.S. Capabilities in fabricating and operating with Beam High gradient (35 MV/m or Greater) and high Q (~0.5-1e10) Superconducting accelerating cavities and cryomodule in support of the International Linear Collider. 1.3 GHz ILC Cryomodule 4 Cavities US Built/purchased 4 Cavities KEK Built/US processed Shekhar Mishra

Electron Beam Welding Facility at SLAC May collaborate with FNAL to electron beam weld niobium cavities with the 500 kw, 3 M$ SLAC EBW facility used for PEP-II components.

Cavity Wakefields and Alignment Doing extensive 3-D wakefield modeling of the baseline cavity design and the proposed low-loss design. Uses 768 processors and requires 300 GB memory. Look for high Q modes trapped within and between 9 cell cavities. Computing the effect of dipole mode polarizations on x-y jitter coupling in the ILC linacs. Using HOM signals to measure cavity-to-beam alignment (discussed in instrumentation talk).

ILC RF Sources Overview Industry built modulators and 5 MW and 10 MW klystrons are available although baseline 10 MW tube not fully proven. Would need about 600 rf units for the ILC. The SC linac for the X-ray FEL (XFEL) project at DESY requires 35 rf units but: 10 MW klystrons will be run at 5 MW and the modulator voltage will be reduced to yield 8 MW max klystron power (although at 10 Hz). Not enough units to prompt significant cost reduction programs by industry: DESY needs to start soon, so will basically use current designs. Initial SLAC program will focus on: Establishing a 1.3 GHz test stand to gain experience with L-band technology and to test NC structures and cavity power couplers. Developing alternatives to the baseline modulator and klystron to reduce cost and improve efficiency and reliability.

TESLA TDR Cost Estimates (RF Sources ~ 1/3 Linac Cost)

Modulators for ILC Requirements RF Pulse Length 1.37 ms Modulator Rise/Fall Time 0.2 ms max Modulator Pulse Length 1.7 ms max Klystron Gun Voltage 120 kv max Klystron Gun Current @120kV 140 A max Pulse Flatness +/- 0.5% Total Energy per Pulse 25 kj Repetition Rate 5 Hz Modulator Efficiency 85% AC Power per RF Station 120 kw Number of Modulators ~ 600 ILC baseline choice is the FNAL/DESY/PPT Pulse Transformer modulator. SLAC is evaluating alternative designs (SNS HVCM, DTI Series Switch and Marx Generator).

ILC Baseline Modulator IGCT s

Pulse Transformer Modulator Status 10 units have been built, 3 by FNAL and 7 by industry (PPT with components from ABB, FUG, Poynting). IGCT Stack 8 modulators are in operation. 10 years operation experience. Working towards a more cost efficient and compact design. HVPS and Pulse Forming Unit FNAL will build two more, one each for ILC and Proton Driver programs SLAC will provide switching circuits.

New Switch Design Provided by SLAC Two IGBT s stacks similar to that above Light triggered Water cooled Snubbers not shown 10 kv Nominal operation >2.5 Voltage safety factor 1700 Amp pulsed current >2.4 Current safety factor 5.1 msec pulse @ 3 PPS IGBT s cycling life time >10 9 Pulses @ 99% confidence Redundant pulse input control Detection and opening of switch in case of a single fault Snubbers designed to prevent cascade failures during turn off Switch Schematic Redundant drive Independent snubbers

Alternative ILC Modulators SNS High Voltage Converter Modulator (Recently Acquired a Production Unit from SNS) RECTIFIER TRANSFORMER AND FILTERS SCR REGULATOR ENERGY STORAGE SWITCHING BOOST TRANS- FORMER HV RECTIFIER AND FILTER NETWORK 13.8KV 3Ø 50mH CØ BØ 3Ø (ON/OFF) 4mH 400A 6 EACH RTN -HV -HV -HV 10ohm 20mH.03uF.03uF AØ BØ CØ.05uF VMON INPUT LINE CHOKE 5 th HARMONIC TRAP 7 th HARMONIC TRAP AØ 4mH 400A 6 EACH HV OUTPUT RECTIFIER TRANSFORMER AND FILTERS SCR REGULATOR HVCM EQUIPMENT CONTROL RACK

Series Switch Modulator (Diversified Technologies, Inc. ) IGBT Series Switch 140kV, 500A switch shown at left in use at CPI As a Phase II SBIR, DTI will produce a 120 kv, 130 A version to be delivered to SLAC for the Klystron Program

SLAC Marx Generator Modulator 12 kv Marx Cell (1 of 24) IGBT switched No magnetic core Air cooled (no oil) Building prototype (2007)

Prototype Development Approach Start with the highest technical risk items 12kV switch, energy storage capacitors. Assemble, test, debug a complete cell. Work towards developing a short stack. Explore stack-level fault scenarios. Design, test the active regulation control loop. Develop complete modulator, control system, RF station. Integrate with L-Band klystron. 2 m Greg Leyh

Klystrons The 1.3 GHz workhorse tube for operation and testing at FNAL and DESY is the Thales 2104C single beam klystron. It produces 5 MW, 2 ms pulses at up to 10 Hz. Its 46% efficiency is low compared to that achievable (~ 70%) at lower perveance it is not an ILC candidate.

ILC Klystron Development

Other 10 MW Multi-Beam Klystrons Being Developed TOSHIBA E3736 (Collaboration with KEK) Features 6 beams Ring shaped cavities Cathode loading < 2.1 A/cm 2 Expect ~ 100 khour cathode lifetime compared to ~ 40 khours for the Thales tube

VKL-8301 Features Six cathodes with six heater feed-throughs can turn off individual cathodes Six cavities in each beam-line three fundamental-mode with external tuners one second-harmonic two common HOM (input & output) Six isolated collectors can measure intercepted current in each beam-line one main collector water manifold Low cathode loading Expect ~ 100 khour cathode lifetime

Klystron Status / Program DESY 10 MW Klystron Program Three Thales tubes built, five more ordered all 3 tubes developed gun arcing problems two rebuilt to correct problem but not fully tested, the other has run for 18 khour at lower voltage (~ 95 kv). One CPI tube built achieved 10 MW at short pulse length, limited by CPI modulator - was accepted by DESY, may come to SLAC after testing at DESY. One Toshiba tube built and under test 10 MW, 1 ms achieved longer pulses limited by modulator, which is being upgraded. SLAC Klystron Program Developing a 10 MW L-band Sheet-Beam Klystron. If multi-beam program falters, consider lower perveance, single beam, 5 MW tube, possibly with PPM focusing. Buy commercial 5 MW tubes as needed for 1.3 GHz NC structure and coupler program. Possibly collaborate with DESY and CPI on 10 MW tube.

SLAC Sheet-Beam Klystron Developing a 10 MW sheet beam klystron as an alternate to the multi-beam tubes to reduce cost Uses flat beams instead of six beamlets to reduce space charge forces. It is smaller with a planar geometry for easier construction. No solenoid magnet (saves ~ 4 MW of power). Would be plug compatible with baseline design and have similar efficiency. W-band proof-of-principle version in progress using external funding. Multi-beam tube Sheet-beam tube

Collector 10 MW L-Band Sheet-Beam Klystron Output Cavity Wiggler Type Focusing Using Permanent Magnets Gun

W-Band Sheet Beam Klystron Program (Not ILC funded) A 91 GHz, 100 kw peak power sheet-beam klystron (74 kv, 3.6 A beam) has been designed and is being fabricated (plan to test this year). 10 cm

L-Band Test Facility at NLCTA Recently acquired a 10 MW HVCM Modulator from SNS. Buying a 5 MW TH2104C tube from Thales (1 year delivery). In meantime use a SDI-Legacy tube from Titan (TH2104U). All major LLRF and waveguide components on order. SNS Modulator Being Assembled at NLCTA Thales 2104U Klystron

Klystron & WG Layout The klystron will be installed in the unused half of the Eight-Pack Modulator tank and waveguide will be run into the NLCTA beam enclosure. Expect first power in Jan 2006.

Test Facility Program in 2006 Use 5 MW source for coupler and normal-conducting cavity tests (discussed below). Propose to add a second L-band station using ILC prototypes. Based on progress, use Marx Generator, DTI Direct Switch or buy a baseline modulator from PPT. Either buy are borrow a CPI or Toshiba 10 MW klystron from DESY.

Coaxial Power Couplers for the Superconducting Cavities Input Power

Coupler Overview Design challenging due to requirements of tunability, vacuum isolation and low heat loss. Extensive testing of TTF3 coupler at 20-25 MV/m but limited testing at 35 MV/m performance acceptable but RF processing is too slow (~ 100 hr, limited by outgassing; also require ~ 50 hr in-situ processing). Cost too high (want 60% reduction from current cost of 25 k$ each for quantities of ~ 10). Main supplier is the US company CPI Currently building 30 for XFEL cavity evaluation. Will likely bid for at least 500 of the 1000 needed for the XFEL, whose cavities require ~ ½ the input power of those in the ILC. Would need 20,000 for ILC.

Coupler Processing Studies One concern is that the surface field variations in the bellows and near the windows may lead to excessive mulitpacting. To understand processing limitations, plan in FY06 to process coupler components individually. In particular, determine if bellows or the windows are the source of the long processing time. Coupler Surface Field Brian Rusnak

In FY06, Propose to Setup a Coupler Test Stand at NLCTA to Process Couplers for SMTF Cavities Instrumented Coupler Test Stand at Orsay

NC Structure for ILC Positron Capture Accelerator Goal: Build and test a 1.3 GHz, normal-conducting (NC) cavity of the type that would be used just downstream of the ILC positron target. 60 mm aperture, 15 MV/m gradient, 1 msec pulses, 0.5 T magnetic field. Average heating of 5 kw/cell from rf losses and 7.5 kw per cell from particle losses. Have chosen a π-mode SW design with extensive cooling channels versus DESY s more complex and harder to cool CDS π/2-mode design. Current plan to is build a 5 cell cavity and test at NLCTA in FY06 using the new 5 MW source. The cavity would be operated in a magnetic field and the gradient sustainability and detuning compensation would be evaluated. Status Basic rf design complete and mechanical design started. In process of finalizing coupler, window and flange choices.

SW Cavity Geometry and Heating Effects Pulse Temperature Rise < 20 deg C Average Detuning = 69 khz Pulse Detuning = 17 khz Will require a 5% power adjustment during pulse for detuning compensation. Distortion from Heating (Exaggerated)

ILC Linac SC Quad/BPM Evaluation Goal: Demonstrate Quad/BPM performance required for ILC beam-based alignment: Verify < ~ 5 micron movement of Quad magnetic center with field change. Show ~ 1 micron BPM resolution and < ~ 5 micron Quad-to-BPM stability with a compact, 35 mm aperture rf cavity BPM. For this program, we plan to Acquire the ILC prototype Quad built by CIEMAT in Spain and build a warm-bore cryostat for it at SLAC. Do quad center stability tests with a rotating coil at the SLAC Magnetic Measurements Lab. Develop linac rf cavity BPMs and test with beam at ESA. Integrate Quad and BPMs for a beam-based quad shunting test. Status Quad nearly finished and cryostat and coil engineering underway expect first magnet test in 2/06. BPM design complete test with beam in 2006.

Cos(2Φ) SC Quad (~ 0.7 m long) Field Map S-Band BPM Design (36 mm ID, 126 mm OD) He Vessel SC Coils Iron Yoke Block Al Cylinder

Build Cryostat with Similar Cross-Sectional Geometry as that for Quads in DESY Cryomodules 4K He Reservoir Gas Cooled Power Leads Quad He Vessel Warm Bore

For Magnetic Center Measurements, Adapt Apparatus Developed for NLC NC Quads X Center (microns) -12.4-12.6-12.8-13.0-13.2-13.4-13.6-13.8-14.0 0 50 100 150 200 250 300 350 400 450 500 Series of measurements (8 minutes each) of a 25 cm long NLC prototype quad - shows that sub-micron resolution is possible and systematics are controllable. Currently designing longer, wider coil for SC Quad test will qualify it first with a NC Quad. Measurement

Program Summary Programs started in FY05 Assemble an L-band rf station at NLCTA Build IGBT switching circuits for two SMTF modulators Develop a Marx-generator style modulator Develop an L-band sheet-beam klystron Build and test a 5 cell prototype positron capture cavity Demonstrate linac quad and bpm performance for ILC beam-based alignment. Programs proposed for FY06 Build a second L-band station with ILC prototype modulator and klystron (collaborate with DESY). Systematic study of coupler processing (with LLNL) Assemble and process couplers for SMTF cavities (with FNAL) E-beam weld SMTF cavities (with FNAL)

Summary Have reoriented SLAC rf program to match ILC needs in view of other national and international programs. Strengths of lab in developing high power HV and rf sources. Experience in normal conducting accelerator design and operation. Expertise in wakefield and alignment issues. Off to a good start. Have quickly acquired components for an L-band source that will be used for structure and coupler testing. Are at the forefront on design issues - will help lead program at Snowmass. Well positioned to support the SMTF program and to collaborate with DESY on rf sources. Hope for strong GDE/DOE support to continue momentum from warm linear collider program.