Endurance Robotics PT-3

Similar documents
Step 1. 2x Kep Nut 1x Left Motor Assembly

Step 1. 1x NXT Ultrasonic Sensor

Challenges. TETRIX Getting Started Guide STEM Challenge Building Guide. Step 1. Parts Needed. Tips

Materials: Programming Objectives:

Bionic Elephant Trunk. Assembly Instructions

Step 1. 1x Single-Servo Motor Bracket. 1x L Bracket


ELLIPTICAL ANTENNA E0851B11

Check what you have received against the component checklist and hardware above.

Safety Rules Parts Check Lists and Photos Cable Diagrams for Various Crane Configurations Step by Step Instructions Tips for Packaging and Storage

Service Parts Diagrams. For Model: 10/20/09 Service Parts Diagrams for the Rear Projection SMART Board 3000i-DV Interactive Whiteboard 1

Instructions for the Webb Air Potato

Check what you have received against the component checklist and hardware above.

HD Flex Patch Panel. ASSEMBLY VIEW (FLEX1UPN** shown) FS128B. CONTENTS: (#) indicates FLEX4UPN** quantity

Snail Fence InteleCell Deployment Guide

Desk Mount Articulating Dual Monitor Arm with Cable Management & Height Adjust

Assembling and Mounting the Presentation Display, Speakers, Speaker Screens, and Table Door

DLMP Installation Instructions

The Haply Development Kit

Ford F Super Duty and E Series Installa4on Instruc4ons

MAGNETIC CARD READER DESIGN KIT TECHNICAL SPECIFICATION

DLMP-45/45R Installation Instructions

AUDIO ROOF KIT P/N , , APPLICATION BEFORE YOU BEGIN KIT CONTENTS. Instr Rev Page 1 of 6

Butterfly Valve Retrofits

Copyright F. Aguerre / PeakHobby. Any distribution or commercial use without the author's opinion strictly prohibited. 1

2) SELECT RASPERRY PI MODEL

Assembly instructions

3M Distribution Box (DDB)

Butterfly Valve Retrofits

INSTALLATION MANUAL FOR THE TIMING LIGHT

Replacing the PanelMate epro PS, PanelMate epro PS EE, and PanelMate epro PS OD 7685x-12 Series Backlight Assembly

Butterfly Valve Retrofits

INSTALLATION INSTRUCTIONS

NewScope-7A Operating Manual

General Wiring and Installation Guidelines. Typical Mounting Installations Electrical Connections General Guidelines Common Questions & Answers

SRV02-Series. Ball & Beam. User Manual

NICHARGE UNIFIX 20. Le support universel (sol, mur, mât, ) 16/04/2018 CO00117

M-8460Se Printer Standard Unit

Turret Replacement Instruction Manual

Optical Distribution Box 300 Installation Guide. Version : R0.0

KIT INSTRUCTIONS. Checkstand Display Mount K039 Issue C

Instruction manual. KUZMA 4POINT 14 inch TONEARM Serial Number:

TV Lift System Model CL-65 Installation Instructions

ipad mini 4 LTE Right Cellular Antenna Replacement

Satellite Dish Installation Manual (Ver. 2) 1

ThingMagic RFID Module INSTALLATION GUIDE. FOR CL e SERIES

Chapter 4. Dish Antenna Installation. Installing a DISH 500 Antenna. Finding the Satellites

Hardware installation

Let s build the EdRoboClaw Difficulty:

FELIX3.1 assemblymanual

Tripod-1 Manual Rev B

HCS - HES Cabling Systems

Remote Tuner Options for the DXE-MBVE-1 Vertical Antenna

KUZMA 4POINT TONEARM

FOSC 450 C6 and D6 Closures

TYPE ASR 650 / 850 FLAT LIST 1/3

#YourGearUpgraded. TV Stand Model EGTV1 INSTRUCTION MANUAL

MAKE AN RGB CONTROL KNOB.

CABLE MANAGEMENT PRODUCTS Cable Managers & Accessories

Nava Buffet Assembly Instructions

Collator series 300/400, 310B Spare parts list

Installation Guide. NEC InfinityBoard 65 & 84

INSTRUCTION MANUAL. Made in the U.S.A. by USA Dance Floor. Copyright 2017 USA Dance Floor, LLC

Lynx Broadband Installation Manual for Residential Packages with a 35 db Amp Quick Start Guide (first 3 pages)

MP Maker Pro Mk.1. Quick Start Guide

NEWALL MEASUREMENT SYSTEMS LTD

Instruction Manual for Electronic Blowers and Flashboards

Coyote popup display set up instructions

Ten-Tec (865) Service Department:(865)

Field Service Procedure Replacement PCU Kit, Coastal

MOD028 GLOCKENSPIEL TECHNO-MUSIC-OLOGY

Content. The brand walimex pro 4. Aptaris Universal XL 10. Aptaris Blackmagic Cinema 12. Aptaris Blackmagic Pocket 13.

Troubleshooting Guide 9630 Series

PowerBook G4 Aluminum 12" GHz LCD panel upgrade

Cable System Installation Guide

Service manual Cantano W/T

Growmaster Assembly Instructions

TKEY-K16. Touch CW automatic electronic keyer. (No moving parts no contacts) Assembly manual. Last review: March 15, 2018

INSTALLATION INSTRUCTIONS

INSTALLATION GUIDE DYNAMIC TRIM CONTROL SYSTEM SERIES S

UMN_ User Manual Antenna Simplex. TECHNO-MEDIA srl Via IV Novembre 92, Bollate (MB) tel

A449-6S 70 CENTIMETER FM YAGI ANTENNA MHz

M-8400RVe Printer. Parts List. Page 1-1. P/N Rev.B

SRV02-Series. Rotary Pendulum. User Manual

M2 Antenna Systems, Inc. Model No: 23CM35

Panzer 3.0 Assembly Instructions & Checklist

Nava Entertainment Unit Assembly Instructions

WID-DL74 WID-DL74 BLP WID. Designed for. Installation guide for workitdesk interactive table for. BrightLink Pro

QTI Line Follower AppKit for the Boe-Bot (#28108)

easydelta BUILD MANUAL easydelta 3D printer design & documentation by Achatz Industries Haefland 8A 6441 PA Brunssum The Netherlands

How To: Replace the stock Antenna with a CB Antenna A CFans Members Mod Project by coyote

Up to 85% higher Service Life due to efficient sealing method.

.Prompter Kit for Apple ipad. TP-200

OWNER'S MANUAL SIGNAL COMMANDER

12A-969D190 LC-215 (1997) Page 1 of 12 Cables And Pivot Shaft

HE INSTRUCTION MANUAL

Butterfly Valve Retrofits

Cable ISOBUS Active Termination

iphone 7 Plus LCD Screen and Digitizer Replacement

1.8 METER SERIES 1183 Az/El MOUNT ANTENNA SYSTEM

Transcription:

Endurance Robotics PT-3 The Endurance Robotics Pan and Tilt PT-3 base is a rugged pan and tilt system based around standard sized hobby servos. Featuring all around rigid 1/4" ABS laser cut construction, the PT-3 base is perfect for general use R/C, robotics, hobby, and photography applications. The PT-3 is capable of handling most pocket sized cameras as well as larger SLR s and video cameras.

Kit Contents: 2x Pan Bracket 1x Pan Bracket Spacer 2x Tilt Bracket 2x Tilt Hub Support 1x Tripod Mount 1x Tilt Top Plate 1x Bottom Plate 4x Mount Support 1x Pan and Tilt Mounting Bracket 1x Pan Base Plate 72x Socket Head Screws 30x Washers 4x Ball Bearings 4x Ball Bearing Mounts Required Extras: 3x Standard Size Hitec Servos. (Other servos can be used but Hitec is recommended for hub compatibility) R/C Radio System or Computer Based Servo Controller 5-6V Battery

Assembly Instructions Parts required for step 1: 1x Pan and Tilt Mounting Plate 4x Socket Head Screws 12x Washers

1. Orient the Pan and Tilt Mounting Plate with the textured side facing down. Place a washer on to a screw and place it through the bottom side of a servo mounting hole. Use 3x washers to offset the servo and loosely tighten the screw to the plate. Make sure that the servo output shaft is towards the center of the plate. Repeat the process for the remaining three holes. Step 1.

Parts required for step 2: 1x Bottom Plate 1x Tripod Mount 4x Socket Head Screws

2. You will notice that two sides of the Tripod Mount are beveled. Orient the Tripod Mount to the Bottom Plate with the beveled edges facing towards the plate. Secure the Tripod Mount to the Bottom Plate with 4x Socket Head Screws. Note the orientation of the bevels. This will mark the front/rear of the PT-3. Step 2.

Parts required for step 3: 8x Socket Head Screws 1x Bottom assembly from Step 2.

3. Insert the 4x Mount Supports into the notches on the Bottom assembly. Orient the Mount Supports with the textured side facing out. Attach with 8x Socket Head Screws. Step 3.

Parts required for step 4: 8x Socket Head Screws All Assemblies from previous steps

4. Connect the Top and Bottom assembly with 8x Socket Head Screws. Step 4.

Parts required for step 5: 8x Socket Head Screws 4x Ball Bearings 4x Ball Bearing Mounts

5. Place a Ball Bearing on to each of the 4x Ball Bearing Mounts. Screw each bearing to the Pan assembly. Step 5.

Parts required for step 6: 8x Socket Head Screws 2x Pan Bracket 2x Servos

6. Place one Pan Bracket with the textured side facing down. Insert a servo, output shaft first, through the hole and secure with 4x Socket Head Screws and washers. Repeat for the opposite side. Step 6.

Parts required for step 7: 6x Socket Head Screws 1x Pan Bracket 2x Pan Bracket Assembly from step 6.

7. Place the Pan Bracket with the textured side facing down. Insert the two Servo assemblies from step 6 into the left and right slots. Orient the servos so that the output shafts are facing in and towards the top of the Pan Bracket. Secure each assembly with 3x Socket Head Screws. Step 7.

Parts required for step 8: 3x Socket Head Screws 1x Pan Bracket Spacer 1x Assembly from Step 7.

8. Insert the Pan Bracket Spacer into the bottom of the Tilt Bracket with the textured side facing up towards the servos. Secure with 3x Socket Head Screws. Step 8.

Parts required for step 9: 9x Socket Head Screws 1x Pan Bracket Spacer 1x Assembly from Step 8.

9. Install the opposite side of the Pan Bracket to the existing assembly with 9x Socket Head Screws. Step 9.

Parts required for step 10: 4x Socket Head Screws 1x Pan Base Plate 2x Washers 1x Servo Output Horn

10. Attach a Servo Output Horn to the Pan Base Plate with 4x Socket Head Screws. Use washers on the two thinner arms of the horn. Optionally drill out the holes in the servo horn with a 7/64 bit. Step 10.

Parts required for step 11: 6x Socket Head Screws 1x Assembly from step 9. 1x Assembly from step 10.

11. Connect the Pan Base Plate to the pan assembly with 6x Socket Head Screws. Step 11.

Parts required for step 12: 1x Lower pan assembly from step 5. 1x Upper pan assembly from step 11.

12. Orient the servo output shaft so it is at its center position. Connect the upper pan assembly to the lower pan assembly with the supplied servo screw. Make sure that the front of the upper assembly is in line with the bevels on the bottom of the tripod mount if installed. Once secured rotate the upper assembly to verify it is spinning freely. Step 12.

Parts required for step 13: 8x Socket Head Screws 4x Washers 2x Tilt Support Hubs 2x Servo output horns

13. Before instillation you may optionally cut the servo output horn arms down to the second hole from the shaft center. Drill out holes with a 7/64 bit if desired. Step 13.

Parts required for step 14: 4x Socket Head Screws 1x Tilt Top Plate 2x Tilt Support Hubs from step 13.

14. Orient the Tilt Top Plate with the textured side facing up. Insert the two Tilt Support Hubs into the plate with the output horn side facing out. Secure each hub with 2x Socket Head Screws. Step 14.

Parts required for step 15: 1x Assembly from step 12. 1x Assembly from step 14.

15. Turn each servo output shaft on the upper pan assembly to the center position. Insert one side of the tilt assembly into a servo output shaft. Be sure to insert the tilt assembly at a horizontal position. Slightly bend the upper pan assembly arm and insert the opposite end of the tilt assembly on to the servo output shaft. Verify that the tilt platform rotates to the limits of the servos. Secure with the supplied servo screws. Step 15. Completed PT-3 Pan and Tilt Base