1 EXHIBIT JC- BEFORE THE NEW JERSEY BOARD OF PUBLIC UTILITIES IN THE MATTER OF THE PETITION OF JERSEY CENTRAL POWER & LIGHT COMPANY PURSUANT TO N.J.S.A. 0:D-1 FOR A DETERMINATION THAT THE MONTVILLE - WHIPPANY 0 KV TRANSMISSION PROJECT IS REASONABLY NECESSARY FOR THE SERVICE, CONVENIENCE OR WELFARE OF THE PUBLIC Direct Testimony of John T. Toth Re: Project Overview {0:1}
2 I. INTRODUCTION AND BACKGROUND Q. Please state your name and business address. A. My name is John T. Toth. My business address is South Main Street, Akron, Ohio 0. Q. By whom are you employed and in what capacity? A. I am employed by FirstEnergy Service Company as a Supervisor in the Transmission Engineering Department. My responsibilities include providing guidance, leadership and supervision to a staff of professionals in the Transmission Engineering Group that are responsible for the siting and regulatory approvals for modified and new transmission facilities in New Jersey. In this position, I provide support for efforts to site new transmission facilities, by supervising the group s efforts in developing transmission line route siting studies, transmission substation siting studies and associated regulatory filings. Q. Please describe your professional experience and educational background. A. In June 00, I began working for FirstEnergy as an Assistant Engineer in its rotational engineering program. As part of the rotational engineering program, I worked in the following departments: (i) transmission planning; (ii) transmission protection; (iii) substation engineering; and (iv) transmission engineering. I also worked for Cleveland Electric Illuminating Company s distribution engineering department and the substation maintenance department. In July 00, I started working in FirstEnergy s Transmission Engineering Department. While working in FirstEnergy s Transmission Engineering Department I received the following promotions: (i) Associate Engineer (April {0:1} 1
3 ); (ii) Engineer (May 00); (iii) Advanced Engineer (July 0); and (iv) Supervisor Transmission Siting (May 0). In September 01, I moved to my current position as Supervisor, Transmission Engineering Design within the Transmission Engineering Department. I have a Bachelor of Electrical Engineering degree from Cleveland State University s Fenn College of Engineering (December, 00). My education, experience and qualifications are fully set forth in Appendix A to my testimony. Q. Have you previously testified in Board of Public Utilities ( Board or BPU ) proceedings? A. Yes, I provided testimony on the Oceanview 0 kv Transmission Project, BPU Docket Number EO01. Q. Have you testified in proceedings before other utility regulatory commissions? A. Yes. I have provided testimony before the Pennsylvania Public Utility Commission. In Pennsylvania, I provided testimony on the Bedford North Osterburg East kv Transmission Line Project, Docket Number A-0-. I have also provided testimony before the Ohio Power Siting Board regarding the Chamberlin Shalersville Transmission Line Project, Docket No EL-BTX. Q. Would you describe the purpose of your testimony? A. I am testifying on behalf of petitioner Jersey Central Power & Light Company ( JCP&L or the Company ) in support of its petition seeking a determination {0:1}
4 that the Montville - Whippany 0 kv transmission line project (the Project ) is necessary for the service, convenience or welfare of the public. I provide an overview of the Project. I also introduce the other witnesses who are filing II. testimony in support of the Company s petition. PROJECT OVERVIEW Q. Please briefly describe the Project. A. The Montville Substation, located in Montville Township, New Jersey, is currently supplied by two 0 kv circuits, the Montville Roseland 0 kv (E0) and the Montville Newton 0 kv (N1) transmission lines. During its Regional Transmission Expansion Planning Process ( RTEP ), PJM Interconnection, L.L.C. ( PJM ) identified the need for a third 0 kv circuit into the Montville Substation. The third 0 kv circuit is needed to mitigate the existing NERC Category C contingencies. As discussed in detail in the testimony of Dave Kozy Jr., the proposed route for the Project begins in a northerly direction from JCP&L s Whippany Substation, which is located in East Hanover Township, New Jersey, within an existing transmission line Right-of-Way ( ROW ) for approximately 0. miles to approximately 0. miles north of Troy Road. This section proposes to rebuild the existing double circuit. kv steel lattice tower structures with a new monopole that will incorporate the proposed 0 kv transmission line above the two. kv circuits, as shown in Exhibits DRK-01 and DRK-0. The route continues to in a northeast direction for approximately. miles, paralleling existing double circuit steel lattice tower structures in new and existing ROW that varies in width {0:1}
5 from feet to 1 feet, as shown in Exhibit DRK-0. The route then proceeds in a northern direction approximately 0. miles in order to cross Interstate 0 and State Route in new and existing ROW, as shown in Exhibit DRK-0. The route continues to the northeast approximately 0. miles in a new proposed wide right-of-way to Vail Road/Stiles Lane. The route continues to the north northwest approximately 0. miles to John Henry Drive in an existing right-ofway, this is shown in Exhibit DRK-0. The route continues to the north, with the proposed new structures adjacent to an existing double circuit. kv transmission line, in an existing right-of-way for approximately 0. miles, this is shown in Exhibit DRK-0. The route continues in a northeastern direction to Changebridge Substation in an existing ROW, as shown in Exhibit DRK-0. The route in a northeastern direction from Changebridge Substation to north of Old Changebridge Road, a distance of approximately 0. miles, rebuilding the existing. kv tap structures as shown in Exhibit DRK-0. The route continues in a northern direction approximately 1. miles adjacent to existing structures in an existing ROW to the existing Montville Substation. Preliminary engineering along the proposed approximately mile long route will have structures from approximately 0 feet to approximately 1 feet tall. The tallest structures are expected to be required for State Route and Interstate 0 highway crossings. The structures for this segment, Segment, are expected to be approximately 1 to 1 feet tall. {0:1}
6 Associated substation work that is to take place within the existing Whippany Substation includes constructing a new 0 kv transmission line terminal and adding one breaker, along with carrier equipment that includes a wave trap, CVT and carrier cabinet 1. The cost associated with the work at the Whippany substation is approximately $1,1,0.00. The existing Montville Substation will add one 0 kv breaker, along with carrier equipment that includes a wave trap, CVT and carrier cabinet. The cost associated with the work at the Montville substation is approximately $1,1, Q. What is the estimated cost of the Project? A. The total project cost is approximately $,,00, which includes construction work at two () existing substations - Montville Substation (approximately $1,1,000) and Whippany Substation (approximately $1,1,0). Q. What is the required in service date of the Project? A. The required in-service date established by PJM is June 1, 01. Q. Please describe the time-frame for this Project? A. JCP&L expects to submit applications for permits in the third quarter of 01. Many of the permits for the Project require that final detailed engineering be complete. Detailed engineering is scheduled to start in February, 01 and will be completed in May, 01. JCP&L anticipates that construction will begin in 01 and is estimated to take approximately to 1 months. 1 Carrier equipment allows substations to communicate with each other in order to coordinate protection of the substation and transmission lines from outages on the system. This cost estimate includes overhead costs. This cost estimate includes overhead costs. This cost estimate includes overhead costs. {0:1}
7 Q. Please identify the other witnesses who will be providing direct testimony on behalf of JCP&L in this proceeding. A. There will be nine other witnesses providing testimony on JCP&L s behalf in this proceeding: David Kozy Jr., General Manager Transmission Design, FirstEnergy Service Company. Mr. Kozy s testimony discusses the design, engineering, construction, operation and maintenance of the Project, and issues associated with underground installation of 0 kv Transmission lines; Lawrence A. Hozempa, Supervisor, Transmission Planning, FirstEnergy Service Company. Mr. Hozempa s testimony addresses the electrical need for the Project and describes the planning process that led to the Project; Paul F. McGlynn, Senior Director in the System Planning Division, PJM. Mr. McGlynn s testimony addresses the Regional Transmission Organization s regional planning process and the electric need for the Montville Whippany 0 kv Transmission Line Project; Peter W. Sparhawk, Director Transmission Services Power and Energy Business Unit. The Louis Berger Group, Inc. Mr. Sparhawk s testimony describes the siting methodology, including the route evaluation and selection process. Mr. Sparhawk s testimony includes the Siting Report for the Project; {0:1}
8 Kirsty Cronin, Principal Environmental Scientist, The Louis Berger Group, Inc. Ms. Cronin s testimony explains the environmental permitting process for the Project; Tracey Janis, Manager Right-Of-Way Services, FirstEnergy Service Company. Ms. Janis s testimony addresses the real estate and right-ofway aspects of the Project; Jerome J. McHale, President of J. McHale & Associates, Inc. Mr. McHale s testimony discusses the real estate impacts and appraiser s conclusions; Kyle King, President of K&R Consulting, LLC. Mr. King s testimony discusses the issues related to electric and magnetic fields in relation to the Project; and William H. Bailey, Ph.D., Principal Scientist at Exponent Inc. Dr. Bailey s testimony discusses the environmental and occupational health issues related to electric and magnetic fields. 1 1 Q. Does this conclude your direct testimony? A. Yes, it does. 1 {0:1}
9 Appendix A Resume: Education and Experience of John T. Toth Education: 00 Bachelor of Electrical Engineering, Cleveland State University s Fenn College of Engineering, Cleveland, Ohio 1 Ohio Diesel Technical Institute, Cleveland, Ohio Experience: 1 Master Mechanic Various Employers Assistant Engineer, Rotational Engineer Program FirstEnergy Service Company Associate Engineer, Transmission Engineering Group FirstEnergy Service Company 00 0 Advanced Engineer, Transmission Engineering Group FirstEnergy Service Company 0 01 Transmission Siting Supervisor, Transmission Engineering Group FirstEnergy Service Company 01 Present Supervisor Transmission Engineering Design, Transmission Engineering Group FirstEnergy Service Company Prepared and presented testimony in the following siting-related cases: Ohio Power Siting Board Case: Docket No EL-BTX, Chamberlin Shalersville Transmission Line Project Pa P.U.C. Case: Docket No. A-0-, Bedford North Osterberg East kv HV Transmission Line Project NJ B.P.U. Case: Docket No. EO01, Oceanview 0 kv Transmission Project {00:1}
Alberta Electric System Operator
Decision 21038-D01-2016 Downtown Calgary 138-kV Transmission System Reinforcement June 1, 2016 Alberta Utilities Commission Decision 21038-D01-2016 Downtown Calgary 138-kV Transmission System Reinforcement
More informationAltaLink Management Ltd.
Decision 21317-D01-2016 Central Alberta Underground Fibre Optic Build July 12, 2016 Alberta Utilities Commission Decision 21317-D01-2016 Central Alberta Underground Fibre Optic Build Proceeding 21317 Application
More informationORDER NO * * * * * * * * * On December 21, 2018, the Maryland Public Service Commission
ORDER NO. 88999 IN THE MATTER OF THE APPLICATION OF TRANSOURCE MARYLAND LLC FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT TWO NEW 230 KV TRANSMISSION LINES ASSOCIATED WITH THE INDEPENDENCE
More informationMarc Richter Vice President Regulatory Services. June 3, 2015 CONTAINS CRITICAL ENERGY INFRASTRUCTURE INFORMATION. By Electronic Delivery
Marc Richter Vice President Regulatory Services CONTAINS CRITICAL ENERGY INFRASTRUCTURE INFORMATION By Electronic Delivery Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888
More informationLawrence Township Planning Board Regular Meeting Monday, August 3, 2015
Regular Meeting Present: Excused Absence: Absent: Also Present: Christopher Bobbitt Ian Dember Philip Duran Richard S. Krawczun, Municipal Manager Terrence Leggett James Kownacki, Councilman Stephanie
More informationDefinitions. Common Corridor:
Definitions Common Corridor: Contiguous right-of-way or two parallel right-of-ways with structure centerline separation less than the longest span length of the two transmission circuits at the point of
More informationBPA s Network Open Season
May 2009 Summary Welcome to the Twenty Second National Wind Coordinating Collaborative (NWCC) Transmission Update! Kevin Porter of Exeter Associates, Inc. led the April 21, 2009, Transmission Update conference
More information3 Resolution of the Board of Supervisors, acting as responsible agency with respect to
FILE NO. 070314 RESOLUTION NO. Lf /3-01 1 [CEQA Findings in Connection with the Trans Bay Cable Project] 2 3 Resolution of the Board of Supervisors, acting as responsible agency with respect to 4 the Trans
More informationSUMMARY REPORT. Consultation Summary Report. January 2016
SUMMARY REPORT BC Hydro Public Consultation: Transmission Line Relocation George Massey Tunnel November 2 20, 2015 Consultation Summary Report January 2016 Prepared by Kirk & Co. Consulting Ltd. About
More information10/13/2011 Planning Coordination Committee. Standards
Document name Category System Performance Regional Criterion ( ) Regional Reliability Standard (X) Regional Criterion ( ) Policy ( ) Guideline ( ) Report or other Document date 12/01/2011 Adopted/approved
More informationAgenda Date: 12/19/17 Agenda Item: 1118 OFFICE OF CABLE TELEVISION & TELECOMMUNICATIONS
Agenda Item: 1118 STATE OF NEW JERSEY 44 South Clinton Avenue, 3r
More informationVAR Generator Operation for Maintaining Network Voltage Schedules
Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed
More information) ) ) ) CASE NO. ) ) )
COMMONWEAL TH OF KENTUCKY BEFORE THE PUBLIC SERVICE COMMISSION In the Matter of: APPLICATION OF NEW CINGULAR WIRELESS PCS, LLC D/B/A AT&T MOBILITY FOR ISSUANCE OF A CERTIFICATE OF PUBLIC CONVENIENCE AND
More informationSTATE OF NEW JERSEY Board of Public Utilities Two Gateway Center Newark, NJ
Agenda Date: 8/4/10 Agenda Item: IIIG STATE OF NEW JERSEY Board of Public Utilities Two Gateway Center Newark, NJ 07102 www.ni.aov/bdu/ IN THE MATTER OF CABLEVISION OF NEWARK FOR THE CONVERSION TO A SYSTEM-WIDE
More informationREPORT TO THE PLANNING COMMISSION
REPORT TO THE PLANNING COMMISSION Meeting Date: May 13, 2015 Application: Design Review PDR15-0006 Location / APN: Near 19700 Prospect Road / 386-35-070 Owner / Applicant: Staff Planner: City of Saratoga
More informationVERIZON MARYLAND INC.
VZ MD 271 Attachment 207 VERIZON MARYLAND INC. Methods and Procedures for Access To Poles, Ducts, Conduits and Rights-of-Way for Telecommunications Providers VERIZON MARYLAND INC. Methods and Procedures
More informationFACILITIES STUDY MID AMERICAN TRANSMISSION SERVICE REQUESTS. OASIS Revision: 4
TRANSMISSION / DISTRIBUTION PROJECTS COMPANY:EAI CUSTOMER: MID AMERICAN ENERGY. FACILITIES STUDY EJO # F4PPAR0422 MID AMERICAN TRANSMISSION SERVICE REQUESTS OASIS 1468288 Revision: 4 Rev Issue Date Description
More informationSTATE OF NEW JERSEY Board of Public Utilities Two Gateway Center, Suite 801 Newark, NJ
Agenda Date: 3/9/11 Agenda Item: IIIV STATE OF NEW JERSEY www.ni.qov/bdu/ CABLE TELEVISION IN THE MATTER OF VERIZON NEW JERSEY, INC. CERTIFICATION OF CAPABILITY TO PROVIDE CABLE TELEVISION SERVICE TO 60
More informationSOUTHWESTERN BELL TELEPHONE COMPANY TARIFF F.C.C. NO. 73 1st Revised Page 9-1 Cancels Original Page 9-1
1st Revised Page 9-1 Cancels Original Page 9-1 9. Directory Assistance Access Service 9-2 9.1 General Description 9-2 9.2 Service Description 9-3 9.3 Service Provisioning 9-4 Page 9.3.1 Manner of Provisioning
More informationBEFORE THE PENNSYLVANIA PUBLIC UTILITY COMMISSION DIRECT TESTIMONY OF JAMES J. GARDLER ON BEHALF OF COMMUNICATIONS WORKERS OF AMERICA
CWA Statement BEFORE THE PENNSYLVANIA PUBLIC UTILITY COMMISSION Petition of Communications Workers of America for a Public, On-the-Record Commission Investigation of the Safety, Adequacy, and Reasonableness
More informationThis SOP is applicable to all WMATA personnel working on the Rail System, contractors performing the work and WMATA contractor escorts.
RFP: FQ13024/WJG CONTRACT NO. FQ13024 APPENDIX C STANDARD OPERATING PROCEDURES (SOP) SOP #33 REMOVAL AND RESTORATION OF THIRD RAIL POWER FOR WORK BY CONTRACTOR S FORCES MAINLINE, REVENUE SYSTEM PURPOSE
More informationTownship of Egg Harbor August 15, 2011 Planning Board
Township of Egg Harbor August 15, 2011 Planning Board Solicitor: Engineer: Planner: Christopher Brown, Esq.(Ted Strickland, Esq., in attendance for Solicitor Brown) James Mott, P.E. (Mott and Associates),
More informationAgenda Date: 3/18/16 Agenda Item: 38 CABLE TELEVISION
Agenda Date: 3/18/16 Agenda Item: 38 STATE OF NEW JERSEY Board of Public Utilities 44 South Clinton Avenue, 3"' Floor, Suite 314 Post Office Box 350 Trenton, New Jersey 08625-0350 www.nj.gov/bpu/ CABLE
More informationVillage of Glenview Appearance Commission
Village of Glenview Appearance Commission STAFF REPORT February 6, 2013 TO: Chairman and Appearance Commissioners FROM: Planning & Economic Development Department CASE MANAGER: Michelle House, Planner
More informationREFURBISHMENT OF SECONDARY SYSTEMS IN HIGH VOLTAGE SUBSTATIONS LESSONS LEARNED IN VENEZUELA
21, rue d'artois, F-75008 Paris http://www.cigre.org B3-110 Session 2004 CIGRÉ REFURBISHMENT OF SECONDARY SYSTEMS IN HIGH VOLTAGE SUBSTATIONS LESSONS LEARNED IN VENEZUELA by E. PADILLA * L. CEDEÑO E. PELAYO
More informationSTATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS DIVISION OF PUBLIC UTILITIES AND CARRIERS 89 JEFFERSON BOULEVARD WARWICK, RHODE ISLAND 02888
STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS DIVISION OF PUBLIC UTILITIES AND CARRIERS 89 JEFFERSON BOULEVARD WARWICK, RHODE ISLAND 02888 IN RE: RULES GOVERNING COMMUNITY : ANTENNA TELEVISION SYSTEMS
More informationSpecification. NGTS Issue 1 October 1993
The Electrical Standards for SHE Transmission s area are non-maintained versions of National Grid Technical Specifications that are applicable to the SHE Transmission System only. These specific versions
More informationElectrical Depth CAL IT 2. Brian Smith. Introduction
Electrical Depth Introduction The University of California, San Diego Cal IT 2 Building was electrically designed for a lot of future growth. With my changes in the lighting system and control zones, a
More informationUnofficial Comment Form Project Establish and Communicate System Operating Limits (SOL and SOL Exceedance Definitions)
Unofficial Comment Form Project 2015-09 Establish and Communicate System Operating Limits (SOL and SOL Exceedance Definitions) Do not use this form for submitting comments. Use the electronic form to submit
More informationTransmission Cables Overhead/Underground Guidance
Transmission Cables Overhead/Underground Guidance There are two ways of transporting electricity around the country. 1. Overhead conductors 2. Underground cables. To identify ScottishPower apparatus in
More informationSECTION MEDIUM VOLTAGE CABLE INSTALLATION. 1. Section Underground Ducts and Manholes.
SECTION 33 71 49.23 MEDIUM VOLTAGE CABLE INSTALLATION PART 1 GENERAL 1.1 SCOPE A. Work included in this Section: Medium Voltage Cable (4 kv and 12 kv) Installation and Termination. Removal and return of
More informationSUPPLEMENTAL TESTIMONY OF ELIZABETH STANTON. A. My name is Elizabeth A. Stanton. I am a Principal Economist at Synapse Energy
COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF ENERGY & ENVIRONMENTAL AFFAIRS DEPARTMENT OF ENVIRONMENTAL PROTECTION THE OFFICE OF APPEALS AND DISPUTE RESOLUTION In the Matter of Brockton Power Co.,
More informationThe fundamental purposes of the educational and public access channel are as follows:
II:01:05 COLLEGE CABLE TV The Volunteer State Community College Cable TV access channel shall operate on Comcast Channel 19, or other channel numbers designated by Comcast and shall use the designation
More informationWiFi RF Measurements and Compliance with the FCC RF Safety Limit
Pinnacle Telecom Group Professional and Technical Services WiFi RF Measurements and Compliance with the FCC RF Safety Limit Ridgewood Public Schools April 14, 2015 14 Ridgedale Avenue - Suite 209 Cedar
More informationIdentification - electrical services
Identification - electrical services Aesthetic All live phase cable sheathing to be brown coloured and neutral phase cable sheathing to be blue coloured, all labelled L1, L2, L3 & N respectively in accordance
More information>> By Jason R. Kack, LS
hen the Utah Department of Transportation (UDOT) set out to rebuild Interstate 15 south of Salt Lake City, the department needed accurate one-foot contour interval mapping and a digital terrain model (DTM).
More informationTown Hall Use Policy Established February 22, 1999 rev. June 22, 2007
Town Hall Use Policy Established February 22, 1999 rev. June 22, 2007 Purpose: The Hudson Town Hall houses the various governmental departments and their employees, and elected and appointed boards. Space:
More informationFORENSIC CASEBOOK. By Bob Huddleston, Eastman Chemical Co. One of the most common. reasons for marriage failure
The Case of the Energized Cable Cutting Incident How miscommunication leads to an electrical helper slicing through live 13.8kV cable and miraculously walking away to tell about it By Bob Huddleston, Eastman
More informationA. Introduction 1. Title: Automatic Underfrequency Load Shedding Requirements
DRAFT 6 V4 Standard PRC-006- RFC-01 01/11/11 A. Introduction 1. Title: Automatic Underfrequency Load Shedding Requirements Deleted: Deleted: 10 Deleted: 20 9 2. Number: PRC 006 RFC 01. Purpose: To establish
More informationThis section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective.
PRC-026-1 Relay Performance During Stable Power Swings Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the
More informationCHIEF BROADCAST ENGINEER
PERSONNEL COMMISSION Class Code: 5150 Salary Range: 45 (M2) CHIEF BROADCAST ENGINEER JOB SUMMARY Under general direction, plan, organize, manage and participate in the on-air/technical operations and maintenance
More informationBEFORE THE FEDERAL COMMUNICATIONS COMMISSION Washington, D.C
BEFORE THE FEDERAL COMMUNICATIONS COMMISSION Washington, D.C. 20554 In the Matter of ) ) Amendment of the Commission's ) Rules with Regard to Commercial ) GN Docket No. 12-354 Operations in the 3550 3650
More informationTown of Salem, NH Planning Board 33 Geremonty Drive Salem, NH December 22, 2015
C Squared Systems, LLC 65 Dartmouth Drive Auburn, NH 03032 Phone: (603) 644 00 support@csquaredsystems.com Town of, NH Planning Board 33 Geremonty Drive, NH 03079 December 22, 2015 SUBJECT: SUPPLEMENTAL
More informationUNITED STATES DEPARTMENT OF LABOR MINE SAFETY AND HEALTH ADMINISTRATION Metal and Nonmetal Mine Safety and Health REPORT OF INVESTIGATION
MAI-2011-10 UNITED STATES DEPARTMENT OF LABOR MINE SAFETY AND HEALTH ADMINISTRATION Metal and Nonmetal Mine Safety and Health REPORT OF INVESTIGATION Surface Nonmetal Mine (Sand and Gravel) Fatal Slip/
More informationPARTICIPANT INVOLVEMENT PROGRAM (PIP)
APPENDIX C PARTICIPANT INVOLVEMENT PROGRAM (PIP) Red Deer Region Participant Involvement Program From February to May 2011, the AESO conducted a participant involvement program (PIP) as part of preparing
More informationSECTION 5900 TRAFFIC SIGNALS CITY OF LEE S SUMMIT, MISSOURI DESIGN CRITERIA
SECTION 5900 TRAFFIC SIGNALS CITY OF LEE S SUMMIT, MISSOURI DESIGN CRITERIA TABLE OF CONTENTS Section Title Page 5901 GENERAL... 2 5902 DESIGN CRITERIA... 2 5902.1 Codes and Standards... 2 5902.2 Signal
More informationPlanning Commission Staff Report Street Vacation Hearing Date: December 11, 2013
Planning Commission Staff Report Street Vacation Hearing Date: December 11, 2013 ITEM 3* Tara Riddle, as agent for Provo City Corporation, requests approval of a street vacation of North 250 West from
More informationFCC 302-FM APPLICATION FOR FM BROADCAST STATION LICENSE
DBS Print Federal Communications Commission Washington, D.C. 20554 Approved by OMB 3060-0506 (June 2002) FCC 302-FM APPLICATION FOR FM BROADCAST STATION LICENSE Read INSTRUCTIONS Before Filling Out Form
More informationB106. OBSOLETE SERVICE OFFERINGS - DATAPHONE DIGITAL SERVICE
AT&T FLORIDA PRIVATE LINE GUIDEBOOK First Revised Page 1 B106. OBSOLETE SERVICE OFFERINGS - DATAPHONE DIGITAL SERVICE CONTENTS B106.1 DataPhone Digital Service 1 B106.1.1 General 1 B106.1.2 Terms and Conditions
More informationNotes Generator Verification SDT Project
Notes Generator Verification SDT Project 2007-09 FERC Office 888 First Street, NE Washington, DC 20426 1. Administration a. The following were in attendance: Bob Snow, Cynthia Pointer, Lim Hansen, Keith
More informationDIRECT EXAMINATION. Q. Go ahead and state and spell your name for the. A. Rick Chambers, R-I-C-K C-H-A-M-B-E-R-S.
1 [Counsel confer.] MS. SHEIN: Your Honor, that s all we have for this witness. MR. MALCOLM: Nothing further for this witness, Your Honor. THE COURT: Can this witness be excused? MS. SHEIN: Yes, he can.
More informationRECEIVED IRRC 2010 NOV 23 P U: 20. November 23,2010
RECEIVED IRRC Suzan DeBusk Paiva _ Assistant General Counsel IKKU 1/^31 ff^ofi Pennsylvania i r ^* * MM tfft 2010 NOV 23 P U: 20 1717 Arch Street, 17W Philadelphia, PA 19103 Tel: (215)466-4755 Fax: (215)563-2658
More informationINSTRUCTIONS FOR FCC 387
Federal Communications Commission Approved by OMB Washington, D.C. 20554 3060-1105 INSTRUCTIONS FOR FCC 387 DTV TRANSITION STATUS REPORT GENERAL INSTRUCTIONS A. FCC Form 387 is to be used by all licensees/permittees
More informationFINAL REPORT LOAD SHEDDING IN TASMANIA ON 20 DECEMBER 2016 REVIEWABLE OPERATING INCIDENT REPORT FOR THE NATIONAL ELECTRICITY MARKET
FINAL REPORT LOAD SHEDDING IN TASMANIA ON 20 DECEMBER 2016 REVIEWABLE OPERATING INCIDENT REPORT FOR THE NATIONAL ELECTRICITY MARKET Published: 6 April 2017 IMPORTANT NOTICE Purpose AEMO has prepared this
More informationDate. James W. Davis, PhD James W. Davis Consultant Inc.
Measurement Report W D C C (FM) Tower Site Sanford, rth Carolina Prepared for Central Carolina Community College Prepared by: James W. Davis, PhD July 30, 2003 I, James W. Davis, contract engineer for
More informationCOST SHARING POLICY FOR COMCAST CABLE SYSTEM CONSTRUCTION FOR STREETS WHICH DO NOT MEET MINIMUM DENSITY REQUIREMENTS
AGENDA ITEM #6.B TOWN OF LOS ALTOS HILLS Staff Report to the City Council August 18, 2016 SUBJECT: FROM: COST SHARING POLICY FOR COMCAST CABLE SYSTEM CONSTRUCTION FOR STREETS WHICH DO NOT MEET MINIMUM
More informationTelecommunications Advisors Since October 6, 2011
7852 Walker Drive, Suite 200 Greenbelt, Maryland 20770 phone: 301-459-7590, fax: 301-577-5575 internet: www.jsitel. com, e-mail: jsi@jsitel.com October 6, 2011 Marlene H. Dortch, Secretary Federal Communications
More informationFOR PUBLIC VIEWING ONLY INSTRUCTIONS FOR FCC 387 DTV TRANSITION STATUS REPORT. All previous editions obsolete. transition. GENERAL INSTRUCTIONS
Federal Communications Commission Approved by OMB Washington, D.C. 20554 3060-1105 INSTRUCTIONS FOR FCC 387 DTV TRANSITION STATUS REPORT GENERAL INSTRUCTIONS transition. A. FCC Form 387 must be filed no
More informationToronto Hydro - Electric System
Toronto Hydro - Electric System FIT Commissioning Requirements and Reports Comments and inquiries can be e-mailed to: FIT@torontohydro.com Customers without e-mail access can submit through regular mail
More informationEDITORIAL SPECIFICATION for SCRIPTED PRODUCTIONS
EDITORIAL SPECIFICATION for SCRIPTED PRODUCTIONS PLEASE COMPLETE ALL RELEVANT SECTIONS GIVING DETAILS OF YOUR COMMISSION PRIOR TO PFC APPROVAL THE COMPLETED DOCUMENT SHOULD BE SUBMITTED TO YOUR SKY1 PRODUCTION
More informationRe: Notice of Oral Ex Parte Communications, WC Docket No
Maggie McCready Vice President Federal Regulatory Affairs September 20, 2013 Ex Parte Marlene H. Dortch Secretary Federal Communications Commission 445 12 th Street, SW Washington, DC 20554 1300 I Street,
More informationTOWNSHIP OF FRANKLIN ZONING BOARD OF ADJUSTMENT COUNTY OF SOMERSET, NEW JERSEY. REGULAR MEETING January 21, 2016
TOWNSHIP OF FRANKLIN ZONING BOARD OF ADJUSTMENT COUNTY OF SOMERSET, NEW JERSEY REGULAR MEETING January 21, 2016 This special meeting of the Township of Franklin Zoning Board of Adjustment was held at 475
More informationRADIO STATION AUTHORIZATION Current Authorization : FCC WEB Reproduction
Nature Of Service: Nature Of Service: Class Of Station: Domestic Fixed Satellite Service Fixed Satellite Service Temporary Fixed Earth Station A) Site Location(s) ) Site ID Address Latitude Longitude Elevation
More informationMANCHESTER TOWNSHIP ZONING BOARD OF ADJUSTMENT REGULAR MEETING. Thursday, July 29, 2010
MANCHESTER TOWNSHIP ZONING BOARD OF ADJUSTMENT REGULAR MEETING Thursday, July 29, 2010 Manchester Township Municipal Building 1 Colonial Drive, Manchester, NJ MINUTES OF MEETING 1. The meeting of the Manchester
More informationPENNSAUKEN TOWNSHIP PUBLIC SCHOOLS Board of Education Administration Building 1695 Hylton Road, Pennsauken, New Jersey 08110
PENNSAUKEN TOWNSHIP PUBLIC SCHOOLS Board of Education Administration Building 1695 Hylton Road, Pennsauken, New Jersey 08110 BOARD OF EDUCATION MEETING ADDENDUM Monday, November 19, 2018 PERSONNEL 1. RECOMMEND
More informationGuide to Courtroom Technology. July 2017
16 th Judicial Circuit Court Macomb County Probate Court 42 nd District Courts July 2017 Written by: Michael Whitacre Technology Liaison 16 th Judicial Circuit Court The courts have made certain technologies
More informationThis Chapter does not apply to applications and decisions on, development on land reserved in corridor maps.
1560 1561 1562 1563 1564 1565 1566 1567 1568 1569 1570 1571 1572 1573 1574 1575 1576 1577 1578 1579 1580 1581 1582 1583 1584 1585 1586 1587 1588 1589 1590 1591 1592 1593 1594 1595 1596 1597 1598 1599 1600
More informationSIGNALPERSON REFERENCE MANUAL
NATIONAL COMMISSION FOR THE CERTIFICATION OF CRANE OPERATORS (NCCCO) SIGNALPERSON REFERENCE MANUAL SGP RM 10/10 This page intentionally left blank Hold Harmless/Release/Disclaimer Agreement The reading
More informationA Centers for Medicare and Medicaid Services (CMS) Satellite Broadcast and Webcast
Dealing with Organizational Turbulence A Centers for Medicare and Medicaid Services (CMS) Satellite Broadcast and Webcast Friday, April 17, 2009 1:00 PM 2:30 PM EDT PLEASE ADJUST TIMES FOR YOUR TIMEZONE
More informationPOSTGRADUATE RESEARCH PROGRAMME
POSTGRADUATE RESEARCH PROGRAMME MPHIL/ PHD IN MUSIC THERAPY / MPHIL/PHD IN MUSIC, HEALTH, SOCIETY This two-track research degree programme, validated by Goldsmiths University London, allows you to develop
More informationLicensing & Regulation #379
Licensing & Regulation #379 By Anita Gallucci I t is about three years before your local cable operator's franchise is to expire and your community, as the franchising authority, receives a letter from
More informationInternational TRIZ Association. Requirements for Degree theses and Term papers on TRIZ
"Approved" MATRIZ President Appendix 11 International TRIZ Association Requirements for Degree theses and Term papers on TRIZ 2007 1 Introduction... 3 Section 1. General requirements to Degree theses and
More informationBY ELECTRONIC FILING. March 25, 2009
BY ELECTRONIC FILING March 25, 2009 Marlene H. Dortch Office of the Secretary Federal Communications Commission 445 12th Street, SW Suite TW-A325 Washington, DC 20554 Re: Rural Broadband Strategy Comments
More informationELIGIBLE INTERMITTENT RESOURCES PROTOCOL
FIRST REPLACEMENT VOLUME NO. I Original Sheet No. 848 ELIGIBLE INTERMITTENT RESOURCES PROTOCOL FIRST REPLACEMENT VOLUME NO. I Original Sheet No. 850 ELIGIBLE INTERMITTENT RESOURCES PROTOCOL Table of Contents
More informationRooftop RF Signage - reducing risk or creating mass confusion?
Rooftop RF Signage - reducing risk or creating mass confusion? Authored by Jeff Ebihara Introduction As building owners and property management companies continue to lease rooftop space to wireless service
More informationPhase 2 of System Protection Coordination (Requirement revisions to PRC ) Hydro Québec TransÉnergie
Project 2007-06.2 Phase 2 of System Protection Coordination (Requirement revisions to PRC-001-1.1) Industry Webinar March 24, 2015 Standard Drafting Team Member Mark Peterson, Chair Michael Cruz Montes,
More informationTARIFF DISTRIBUTION TARIFF SECTION PAGE NUMBER PAGE REVISION E E E E E
FILE PACKAGE NO.: MO-15-0023 TARIFF DISTRIBUTION DATE: May 20, 2015 STATE: MISSOURI EFFECTIVE DATE: 05/15/2015 TYPE OF DISTRIBUTION: Approved PURPOSE: DA Automation TARIFF SECTION PAGE NUMBER PAGE REVISION
More informationAbout Us. Agenda 11/12/2014. Maximizing Benefits from Telephone and Cable Agreements. Municipal Association of South Carolina November 12, 2014
Maximizing Benefits from Telephone and Cable Agreements Municipal Association of South Carolina November 12, 2014 About Us McLean Engineering Company Established 1936 78 years working to help municipals
More informationEnvironmental Impact Statement (EIS)/ Section 106 Public Meeting Level 1 Concept Screening. May 16, 2017
Environmental Impact Statement (EIS)/ Section 106 Public Meeting Level 1 Concept Screening May 16, 2017 Today s Agenda Project Overview Project Schedule Purpose and Need Level 1 Concept Screening Results
More informationPalo Alto High School Facilities Steering Committee Agenda
Facilities Steering Committee Agenda November 1, 2011 3:30 pm to 4:30 pm Library, ERC Room 1. Performing Arts Center Action 20 min 2. Athletic Stadium Update Information 5 min 3. Construction Update (Gilbane)
More informationSUMMARY. Southwest Zone Transmission Planning Meeting. October 5, 2004
SUMMARY Southwest Zone Transmission Planning Meeting October 5, 2004 The Southwest Zone Transmission Planning Meeting was held on October 5, 2004 at 7:00 p.m. at the Americinn of Marshall, 1406 East Lyon
More informationProperty No
EXHIBIT 2 Property No. 8100422-1 Alyson M. Seigal Area Manager FiOS Franchise Assurance New York City 140 West Street New York, NY 10007 Phone: (888) 364-3467 NYCFiOS@verizon.com March 31, 2016 VIA CERTIFIED
More informationProperty No
EXHIBIT 2 Property No. 7065101-1 Alyson M. Seigal Area Manager FiOS Franchise Assurance New York City 140 West Street New York, NY 10007 Phone: (888) 364-3467 NYCFiOS@verizon.com August 24, 2016 VIA CERTIFIED
More informationBefore the Federal Communications Commission Washington, D.C
Before the Federal Communications Commission Washington, D.C. 20554 Expanding the Economic and Innovation ) GN Docket No. 12-268 Opportunities of Spectrum Through Incentive ) Auctions ) ) Incentive Auction
More informationBased on our maintenance efforts, during the second quarter of 2018, Comcast s plant was 99.9% reliable.
December XX, 2018 Comcast Cable 253 Najoles Road Millersville,MD 21108 Terry Shannon County Administrator 175 Main Street Prince Frederick, MD 20678 Dear Mrs. Shannon, The purpose of this letter is to
More informationDOLORES COUNTY BROADCASTING NETWORK D C B N. Development Progression
DOLORES COUNTY BROADCASTING NETWORK D C B N Development Progression By Dan Fernandez Dolores County DCBN Manager Through the CSUCE Communities in Economic Transition program (Nov. 1995), a community business
More information0.1. Outage Management Process Summary
0.1 Outage Management Process Summary Issue: 1.0 Issue Date: August 27, 2014 Table of Contents 1. Introduction... 4 1.1 Purpose... 4 1.2 Glossary... 4 State Transition Model... 8 2. Outage Management Processes...
More informationBlock System Interface Requirements
Block System Interface Requirements Synopsis This document mandates the requirements for block systems interfaces between signalling infrastructure and railway operations. Copyright in the s is owned by
More informationVerizon Northwest Inc
Verizon Northwest Inc. 20575 NW Von Neumann Dr. Suite 150 Beaverton, Oregon 97006-6982 Mailcode: OR030156 Fax 503 629-0592 June 30, 2008 The Honorable Lee Beyer, Commission Chairman Oregon Public Utility
More informationBefore the FEDERAL COMMUNICATIONS COMMISSION Washington DC ) ) ) ) ) ) ) ) COMMENTS OF
Before the FEDERAL COMMUNICATIONS COMMISSION Washington DC 20554 In the Matter of Amendment of Part 101 of the Commission s Rules to Facilitate the Use of Microwave for Wireless Backhaul and Other Uses
More informationRequest for Proposal Questions and Responses. Request for Proposal: Software Based CMED Radio Console and Associated Equipment
Request for Proposal Questions and Responses Request for Proposal: Software Based CMED Radio Console and Associated Equipment Proposal Due Date: Friday December 14, 2018 All Prospective Proposers: In reference
More informationImplementation of LED Roadway Lighting
Implementation of LED Roadway Lighting Ken Taillon, Principal Investigator Short Elliot Hendrickson, Inc. (SEH ) May 2016 Research Project Final Report 2016-17 To request this document in an alternative
More informationINTERIM ADVICE NOTE 109/08. Advice Regarding the Motorway Signal Mark 4 (MS4)
INTERIM ADVICE NOTE 109/08 Advice Regarding the Motorway Signal Mark 4 (MS4) Summary This document provides advice on usage of MS4 signal and when they can be used to replace MS3 signals. Instructions
More informationTRANSMISSION ENGINEERING STANDARD TES-P , Rev. 0 TABLE OF CONTENTS 1.0 SCOPE 2.0 CABLES SPLICES
1.0 SCOPE TABLE OF CONTENTS 2.0 CABLES SPLICES 2.1 Definitions 2.2 Scope of Specifications and Drawings 2.3 General Requirements 2.4 Routing Cables 2.5 Connectors 2.6 Conductor Connections 2.7 Heat Shrinkable
More informationLoad Frequency Control Structure for Ireland and Northern Ireland
Load Frequency Control Structure for Ireland and Northern Ireland EirGrid TSO & TSO consultation on a proposal for the determination of LFC blocks in accordance with Article 141(2) of the Commission Regulation
More informationPrimex Wireless, Inc. July, Wells Street Lake Geneva, WI
Division 0 0 0 0 Primex Wireless, Inc. July, 00 Wells Street Lake Geneva, WI 00--0 www.primexwireless.com Product Guide Specification Specifier Note: This product specification is written according to
More informationBefore the FEDERAL COMMUNICATIONS COMMISSION Washington, DC 20554
Before the FEDERAL COMMUNICATIONS COMMISSION Washington, DC 20554 In the Matter of Wireless Microphones Proceeding Revisions to Rules Authorizing the Operation of WT Docket No. 08-166 Low Power Auxiliary
More informationCambria County Association for the Blind and Handicapped 175 Industrial Park Road Ebensburg, PA Prepared for: Prepared by:
Cable Management in Solar PV Arrays: A Review of Requirements in the National Electrical Code and how CAB Cable Rings and Saddles Meet These Requirements Prepared for: Cambria County Association for the
More information600 Matters. A vision for collaborating with America s broadcasters
600 Matters A vision for collaborating with America s broadcasters 2017 We re all in! When the Federal Communications Commission (FCC) announced the 600 MHz broadcast spectrum auction, the Un-carrier committed
More informationTransmission Conference
Conference Agenda Transmission Conference HV Cables: Continuous Improvement in Work Practices, Equipment & Design for the Effective Management of Underground Transmission Cable Systems November 27-28,
More information