GLX Project Green Line Extension Project. March 2, 2016 Public Meeting

Size: px
Start display at page:

Download "GLX Project Green Line Extension Project. March 2, 2016 Public Meeting"

Transcription

1 GLX Project Green Line Extension Project

2 Presentation Overview Project Status Redesign Constraints Key Areas of Redesign Focus Q&A - Discussion Past Future Present 2

3 The Clock is Ticking... Day 36 and counting Redesign Stakeholder Coordination s Re-Procurement Analysis Right-of-Way Re-Analysis Repricing Ongoing Ongoing March 2 May 4 March 15 Late April Ongoing March 15 Late April MAY 2016 FINAL REPORT 3

4 Products of GLX Review Effort Revised design with reduced capital cost Revised overall program cost Procurement method recommendation Revised project schedule COST 4

5 Scope and Process of Redesign Extensive List of Cost Saving Ideas Concept Initial Screen Vetting Summary of feasible ideas will be shared publicly Is it Worth Pursuing? Cost Effectiveness Feasibility Fatal Flaw Analysis Today Stakeholder Engagement Feedback New Design New Estimate 5

6 Framework for Review Process Full Funding Grant Agreement State Environmental Impact Report Federal Environmental Assessment Accessibility Requirements Re-Design MBTA Requirements MassDOT Requirements Public Input 6

7 Key Areas of Focus Station Redesign Vehicle Maintenance Facility Redesign Community Path Reconsideration Construction Work Hour Limitations Retaining and Sound Walls Power and Signals 7

8 GLX Redesign Areas of Focus Major Efficiency Targets 1) Reduced Station Designs* 2) Community Path Options* 3) Summertime Rail/Street Closures 4) Reduced Vehicle Maintenance Facility Design* 5) Lechmere Viaduct Redesign* 6) Relocation of Proposed Gilman Traction Power Station 7) Raise Medford Street Bridge* 8) Re-Evaluate Power / System / Substation Needs 9) Match Light Rail Transit Proposed Elevations w/ Existing Grades 10) Fitchburg Eliminate WB Viaduct and Single Track to McGrath* * Tonight s discussion focus 8

9 Station Redesign Draft Confidential For MBTA Fiscal & Management Control Board Review Only Brookline Village Minimize Cost Maintain Core Functionality Maintain Accessibility 9

10 Station Redesign Draft Confidential For MBTA Fiscal & Management Control Board Review Only Boston University Central Minimize Cost Maintain Core Functionality Maintain Accessibility 10

11 Lechmere Station (Previous) 11

12 Lechmere Station (Base Rev. 0) 12

13 Washington Street Station (Previous) View From The East 13

14 Washington Street Station (Base Rev. 0) 14

15 Union Square Station (Previous) Draft Confidential For MBTA Fiscal & Management Control Board Review Only Approach From Union Square 15

16 Union Square Station (Base Rev. 0) 16

17 Gilman Square Station (previous) Medford Street Headhouse 17

18 Gilman Square Station (Baseline Rev. 0) 18

19 Lowell Street Station (Previous) Plaza from Vernon Street 19

20 Lowell Street Station (Base Rev. 0) 20

21 Ball Square Station (Previous) 21

22 Ball Square Station (Base Rev. 0) 22

23 College Avenue Station (Previous) 23

24 College Avenue Station (Base Rev. 0) 24

25 Community Path Considerations 25

26 Bridge Rationalization Washington Street Cross Street Walnut Street School Street Sycamore Street Central Street Lowell Street Broadway Harvard Street College Avenue New Recommendation Bridge Treatment Replace? Modify? Previous Design New Station Design Reduced Impact on Bridges 26

27 Vehicle Maintenance Facility (Previous) 27

28 VMF Redesign 28

29 Upcoming s March 23, :30 8:00 PM Tufts University 51 Medford Street Medford April 13, :30 8:00 PM Argenziano School 290 Washington Street Somerville April 27, :30 8:00 PM St. Anthony s Parish Hall 400 Cardinal Medeiros Avenue Cambridge May 5, :30 8:00 PM St. Clement s Parish Hall 579 Boston Avenue Medford For more info: info@glxinfo.com 29

30 Draft Confidential For MBTA Fiscal & Management Control Board Review Only 30

Environmental Impact Statement (EIS)/ Section 106 Public Meeting Level 1 Concept Screening. May 16, 2017

Environmental Impact Statement (EIS)/ Section 106 Public Meeting Level 1 Concept Screening. May 16, 2017 Environmental Impact Statement (EIS)/ Section 106 Public Meeting Level 1 Concept Screening May 16, 2017 Today s Agenda Project Overview Project Schedule Purpose and Need Level 1 Concept Screening Results

More information

Federal Transit Administration s New Starts Process. Circle Line Alternatives Analysis Study

Federal Transit Administration s New Starts Process. Circle Line Alternatives Analysis Study Federal Transit Administration s New Starts Process Circle Line Alternatives Analysis Study September, 26 Tonight s Speakers Darud Akbar Moderator Chicago Transit Authority Jeffrey Sriver Project Manager

More information

FACILITIES STUDY MID AMERICAN TRANSMISSION SERVICE REQUESTS. OASIS Revision: 4

FACILITIES STUDY MID AMERICAN TRANSMISSION SERVICE REQUESTS. OASIS Revision: 4 TRANSMISSION / DISTRIBUTION PROJECTS COMPANY:EAI CUSTOMER: MID AMERICAN ENERGY. FACILITIES STUDY EJO # F4PPAR0422 MID AMERICAN TRANSMISSION SERVICE REQUESTS OASIS 1468288 Revision: 4 Rev Issue Date Description

More information

Country Experience On Satellite Service Regulatory Framework

Country Experience On Satellite Service Regulatory Framework Country Experience On Satellite Service Regulatory Framework Danang City, Vietnam, 30 September, 2015 1 Outline Brief about Participant Regulatory Framework Overall Regulatory Framework Broadcasting Services

More information

TRANSPORTATION COMMITTEE

TRANSPORTATION COMMITTEE Meeting 2007 October 15 COUNCIL REPORT TRANSPORTATION COMMITTEE HIS WORSHIP, THE MAYOR AND COUNCILLORS SUBJECT: METROTOWN TRANSIT VILLAGE STUDY RECOMMENDATIONS: 1. THAT Council approve in principle the

More information

SUMMARY REPORT. Consultation Summary Report. January 2016

SUMMARY REPORT. Consultation Summary Report. January 2016 SUMMARY REPORT BC Hydro Public Consultation: Transmission Line Relocation George Massey Tunnel November 2 20, 2015 Consultation Summary Report January 2016 Prepared by Kirk & Co. Consulting Ltd. About

More information

KCRT. Prepared by: Sue Hartman, Director. Assisted by: Cecily McMahan

KCRT. Prepared by: Sue Hartman, Director. Assisted by: Cecily McMahan Prepared by: Sue Hartman, Director Assisted by: Cecily McMahan Television MISSION: Get Richmond s Voice Heard throughout Richmond, throughout the East Bay, and around the world. The Cable Television Division

More information

Franchise Broadcast Info

Franchise Broadcast Info Franchise Broadcast Info Overview Important notes Specifications Example How to schedule the Broadcast Info Collection Overview The Broadcast Info collection allows you to display that your franchise shows

More information

1. EXPERT MEETING EXPERT MEETING EXPERT MEETING Feedback from the meeting attendees...

1. EXPERT MEETING EXPERT MEETING EXPERT MEETING Feedback from the meeting attendees... FEEDBACK REPORT STAKE HOLDER CONSULTATION PROCESS OFFSHORE GRID NL Type: Feedback report Work stream Technical Topics: P.01 Planning Filename ONL 15-149 P01_Planning_FBRe_v2 Version 2 public release Pages

More information

Attendees: First Name Last Name Company Attended. Marguerite Carnell Archaeological and Historical Services, Inc.

Attendees: First Name Last Name  Company Attended. Marguerite Carnell Archaeological and Historical Services, Inc. Route 7-15 Norwalk Route 7-15 Interchange State Proj. No. 102-358 Subject: Date/Time: Location: 06:30 PM Norwalk City Hall- Community Room Attendees: First Name Last Name Email Company Attended Yolanda

More information

Alberta Electric System Operator

Alberta Electric System Operator Decision 21038-D01-2016 Downtown Calgary 138-kV Transmission System Reinforcement June 1, 2016 Alberta Utilities Commission Decision 21038-D01-2016 Downtown Calgary 138-kV Transmission System Reinforcement

More information

Start Recording on Site

Start Recording on Site Speaker notes: webinar 800 MHz Rebanding March 30, 2010 Abstract: The NLECTC Communications Technologies Center of Excellence (CoE) will host a webinar on the 800 MHz transition affecting many public safety

More information

Set-Top-Box Pilot and Market Assessment

Set-Top-Box Pilot and Market Assessment Final Report Set-Top-Box Pilot and Market Assessment April 30, 2015 Final Report Set-Top-Box Pilot and Market Assessment April 30, 2015 Funded By: Prepared By: Alexandra Dunn, Ph.D. Mersiha McClaren,

More information

Reconfiguration Along the U.S.-Mexico Border Meeting in NPSPAC Region 3: Arizona May 16, 2013

Reconfiguration Along the U.S.-Mexico Border Meeting in NPSPAC Region 3: Arizona May 16, 2013 Reconfiguration Along the U.S.-Mexico Border Meeting in NPSPAC Region 3: Arizona May 16, 2013 Agenda Program Overview Recent Developments Preparing for Reconfiguration Phases of Reconfiguration Planning

More information

The National Traffic Signal Report Card: Highlights

The National Traffic Signal Report Card: Highlights The National Traffic Signal Report Card: Highlights THE FIRST-EVER NATIONAL TRAFFIC SIGNAL REPORT CARD IS THE RESULT OF A PARTNERSHIP BETWEEN SEVERAL NTOC ASSOCIATIONS LED BY ITE, THE AMERICAN ASSOCIATION

More information

Appendix 6 St. Bernard Basin

Appendix 6 St. Bernard Basin Appendix 6 St. Bernard Basin The St. Bernard (STB) basin is defined by the protection system along the GIWW to the north, MRGO to the east, Caernarvon Canal to the south, and the Mississippi River and

More information

6. Institutional Planning and Budgeting Processes

6. Institutional Planning and Budgeting Processes 6. Institutional Planning and Budgeting Processes 1702 1703 1704 1705 1706 1707 1708 1709 1710 1711 1712 1713 1714 1715 1716 1717 1718 1719 1720 1721 1722 1723 1724 1725 1726 1727 1728 1729 1730 1731 1732

More information

AREMA 2015 ANNUAL CONFERENCE. NYSDOT / Amtrak. Hudson Line Improvement Program. David W. Emerich, PE CHA. Minneapolis, MN October 4-7, 2015

AREMA 2015 ANNUAL CONFERENCE. NYSDOT / Amtrak. Hudson Line Improvement Program. David W. Emerich, PE CHA. Minneapolis, MN October 4-7, 2015 NYSDOT / Amtrak Hudson Line Improvement Program Craig O. Weed A Amtrak David W. Emerich, PE CHA Project Partners NYSDOT High Speed Intercity Passenger Rail Program Sustained Effort to Secure Funding Total

More information

Digital Signage in Healthcare

Digital Signage in Healthcare in Healthcare What we will discuss.. Overview Components of Digital Signage Benefits of Digital Signage Convergence with existing TV Systems Return on Investment & Return on Objective Best Practices Digital

More information

Switch off of Analogue Terrestrial Broadcasting. Standardization

Switch off of Analogue Terrestrial Broadcasting. Standardization Switch off of Analogue Terrestrial Broadcasting Standardization Talk overview DSO Relevant legislation Administrative capacity Demographic card, TV platforms in the RS Current and future activities in

More information

City of Bellingham, Washington Cable Television Franchise Renewal Informal Needs Assessment Report

City of Bellingham, Washington Cable Television Franchise Renewal Informal Needs Assessment Report , Washington Cable Television Franchise Renewal Informal Needs Assessment Report Prepared by City staff with input from Moss & Barnett As part of Comcast Cable Franchise Renewal Project AUGUST 10, 2010

More information

Switchover to Digital Broadcasting

Switchover to Digital Broadcasting Switchover to Digital Broadcasting Enio Haxhimihali INTRO EU countries have progressed in their implementation of digital networks and switch-off of analogue broadcasting. Most of them have now switched

More information

AltaLink Management Ltd.

AltaLink Management Ltd. Decision 21317-D01-2016 Central Alberta Underground Fibre Optic Build July 12, 2016 Alberta Utilities Commission Decision 21317-D01-2016 Central Alberta Underground Fibre Optic Build Proceeding 21317 Application

More information

OREGON STATE UNIVERSITY LIBRARIES' COLLECTION ASSESSMENT PROJECT

OREGON STATE UNIVERSITY LIBRARIES' COLLECTION ASSESSMENT PROJECT OREGON STATE UNIVERSITY LIBRARIES' COLLECTION ASSESSMENT PROJECT Introduction: Janet Webster Guin Library Hatfield Marine Science Center Oregon State University 2030 Marine Science Drive Newport, OR 97365

More information

Annual Review of Program Data (ARPD) Due Date: February 15, 2015

Annual Review of Program Data (ARPD) Due Date: February 15, 2015 Annual Review of Program Data (ARPD) Due Date: February 15, 2015 Program/Area/Unit Name: Theatre Academic Services Program/Area/Unit Description: The Leeward Theatre was founded on the campus of Leeward

More information

Bankability of PV Power Plants Shanghai, 19 th March Jason Sun ( 孙嵩劼 ), PV Power Plants & Systems

Bankability of PV Power Plants Shanghai, 19 th March Jason Sun ( 孙嵩劼 ), PV Power Plants & Systems Bankability of PV Power Plants Shanghai, 19 th March 2015 Jason Sun ( 孙嵩劼 ), PV Power Plants & Systems Contents 1. Definition Bankability 2. Project stakeholders 3. PV project financing 4. PV project insurances

More information

Plan for Generic Information Collection Activity: Submission for. National Transportation Safety Board (NTSB).

Plan for Generic Information Collection Activity: Submission for. National Transportation Safety Board (NTSB). This document is scheduled to be published in the Federal Register on 10/10/2014 and available online at http://federalregister.gov/a/2014-24234, and on FDsys.gov 7533-01-M NATIONAL TRANSPORTATION SAFETY

More information

800 MHz Band Reconfiguration

800 MHz Band Reconfiguration 800 MHz Band Reconfiguration RPC Meeting February 13, 2009 1 Agenda Reconfiguration Status Update Implementation Planning Session Schedule Monitoring & Management Change Notice Regional Plans Licensing

More information

APPROVED Nashua Region Solid Waste Management District Meeting Minutes June 26, 2008

APPROVED Nashua Region Solid Waste Management District Meeting Minutes June 26, 2008 APPROVED Nashua Region Solid Waste Management District Meeting Minutes June 26, 2008 1) Call to Order The meeting was called to order at 11:42 a.m. with the following representatives present: Steve Williams

More information

City of Charlottesville Bicycle and Pedestrian Master Plan Update

City of Charlottesville Bicycle and Pedestrian Master Plan Update City of Charlottesville Bicycle and Pedestrian Master Plan Update April 3, 2014 CHARLOTTESVILLE BICYCLE/PEDESTRIAN MASTER PLAN UPDATE Welcome and Introductions Project Overview / Presentation Discussion

More information

How many seconds of commercial time define a commercial minute? What impact would different thresholds have on the estimate?

How many seconds of commercial time define a commercial minute? What impact would different thresholds have on the estimate? t: f: e: Tom Ziangas NHI Marketing SVP Sales & Marketing 770 Broadway New York, NY 10003-9595 646.654.8635 646.654.8649 Tom.Ziangas@NielsenMedia@.com August 16, 2006 Ira Sussman VP Research & Insight Cabletelevision

More information

Before the Federal Communications Commission Washington, D.C

Before the Federal Communications Commission Washington, D.C Before the Federal Communications Commission Washington, D.C. 20554 Expanding the Economic and Innovation ) GN Docket No. 12-268 Opportunities of Spectrum Through Incentive ) Auctions ) ) Incentive Auction

More information

ELIGIBLE INTERMITTENT RESOURCES PROTOCOL

ELIGIBLE INTERMITTENT RESOURCES PROTOCOL FIRST REPLACEMENT VOLUME NO. I Original Sheet No. 848 ELIGIBLE INTERMITTENT RESOURCES PROTOCOL FIRST REPLACEMENT VOLUME NO. I Original Sheet No. 850 ELIGIBLE INTERMITTENT RESOURCES PROTOCOL Table of Contents

More information

WM2013 Conference, February 24 28, 2013, Phoenix, Arizona USA

WM2013 Conference, February 24 28, 2013, Phoenix, Arizona USA ABSTRACT Unique Regulatory Approach for Licensing the Port Hope Remediation Project in Canada 13315 M. Kostova, D. Howard and P. Elder Directorate of Nuclear Cycle and Facilities Regulation Canadian Nuclear

More information

Editorial Policy. 1. Purpose and scope. 2. General submission rules

Editorial Policy. 1. Purpose and scope. 2. General submission rules Editorial Policy 1. Purpose and scope Central European Journal of Engineering (CEJE) is a peer-reviewed, quarterly published journal devoted to the publication of research results in the following areas

More information

Preserving Digital Memory at the National Archives and Records Administration of the U.S.

Preserving Digital Memory at the National Archives and Records Administration of the U.S. Preserving Digital Memory at the National Archives and Records Administration of the U.S. Kenneth Thibodeau Workshop on Conservation of Digital Memories Second National Conference on Archives, Bologna,

More information

Power-Driven Flip-Flop p Merging and Relocation. Shao-Huan Wang Yu-Yi Liang Tien-Yu Kuo Wai-Kei Tsing Hua University

Power-Driven Flip-Flop p Merging and Relocation. Shao-Huan Wang Yu-Yi Liang Tien-Yu Kuo Wai-Kei Tsing Hua University Power-Driven Flip-Flop p Merging g and Relocation Shao-Huan Wang Yu-Yi Liang Tien-Yu Kuo Wai-Kei Mak @National Tsing Hua University Outline Introduction Problem Formulation Algorithms Experimental Results

More information

PROPOSAL. MCCI MCTV Operational Plan February, Table of Contents

PROPOSAL. MCCI MCTV Operational Plan February, Table of Contents PROPOSAL MCCI MCTV Operational Plan February, 2016 Table of Contents About MCTV and the MCCI Board MCTV Operational Plan Local Programming Outreach Board Development Budget Narrative Access to Programming

More information

Set-Top Box Incentive Programs: The Slippery Frog or A Subliminal Fog?

Set-Top Box Incentive Programs: The Slippery Frog or A Subliminal Fog? Set-Top Box Incentive Programs: The Slippery Frog or A Subliminal Fog? CalPlug Set-Top Box Workshop October 30, 2012 Derek Okada Southern California Edison Customer Energy Efficiency & Solar Division Strategic

More information

MPA Capstone Project. The Literature Review

MPA Capstone Project. The Literature Review MPA Capstone Project The Literature Review 1 Capstone Outline Introduction Problem Assessment Literature Review Stakeholder Assessment Options Specification Options Assessment Recommendation 2 Project

More information

In this submission, Ai Group s comments focus on four key areas relevant to the objectives of this review:

In this submission, Ai Group s comments focus on four key areas relevant to the objectives of this review: 26 March 2015 Mr Joe Sheehan Manager, Services and Regulation Section - Media Branch Department of Communications GPO Box 2154 CANBERRA ACT 2601 Dear Mr Sheehan, DIGITAL TELEVISION REGULATION REVIEW The

More information

Text with EEA relevance. Official Journal L 036, 05/02/2009 P

Text with EEA relevance. Official Journal L 036, 05/02/2009 P Commission Regulation (EC) No 107/2009 of 4 February 2009 implementing Directive 2005/32/EC of the European Parliament and of the Council with regard to ecodesign requirements for simple set-top boxes

More information

Matching Theory and Practice

Matching Theory and Practice and Practice David Delacrétaz The University of Melbourne and The Centre for Market Design Department of Treasury and Finance Public policy Seminar 23 June 2016 David Delacrétaz Matching Theory and Applications

More information

Through a seven-week internship at Thomas Balch Library in Leesburg, Virginia, I was

Through a seven-week internship at Thomas Balch Library in Leesburg, Virginia, I was 1 Mary Zell Galen Internship Experience Paper August 8, 2016 Through a seven-week internship at Thomas Balch Library in Leesburg, Virginia, I was introduced to archival work and historical research. By

More information

VERIZON MARYLAND INC.

VERIZON MARYLAND INC. VZ MD 271 Attachment 207 VERIZON MARYLAND INC. Methods and Procedures for Access To Poles, Ducts, Conduits and Rights-of-Way for Telecommunications Providers VERIZON MARYLAND INC. Methods and Procedures

More information

Proposal Endorsement Signatures

Proposal Endorsement Signatures 2006-2007 Learning Technologies Grants Proposal (COVER PAGE) Project Information Interactive MIDI Workstations for Class Piano and Music Technology Instruction Project Title Dr. Peter Jutras Project Director

More information

ATV-HD Project Executive Summary & Project Overview

ATV-HD Project Executive Summary & Project Overview ATV-HD Project Executive Summary & Project Overview Introduction & Statement of Need Since 2002, ATV has filmed nearly all of its shows in a small television studio attached to the station s offices in

More information

TV Translator Relocation Grant Program

TV Translator Relocation Grant Program TV Translator Relocation Grant Program Contact: Susana M. Lopez Director of Grants Administration TV Translator Relocation (703) 739-5268 1. Guidelines..........................................................................................

More information

Metrotown Station and Exchange Upgrades

Metrotown Station and Exchange Upgrades Metrotown Station and Exchange Upgrades Welcome to the Metrotown Station and Exchange Upgrade Open House Purpose of the Open House: Inform neighbours, businesses and customers about: the conceptual design

More information

**DRAFT SYLLABUS** Small changes in readings and scheduling possible. CONTEMPORARY SOCIAL THEORY 406-2, Fall 2011

**DRAFT SYLLABUS** Small changes in readings and scheduling possible. CONTEMPORARY SOCIAL THEORY 406-2, Fall 2011 **DRAFT SYLLABUS** Small changes in readings and scheduling possible. CONTEMPORARY SOCIAL THEORY 406-2, Fall 2011 MODERN PROJECTS: CRITICS, MECHANISMS, SKEPTICS WENDY ESPELAND 467-1252, wne741@northwestern.edu

More information

GET YOUR FREQ ON. A Seminar on Navigating the Wireless Spectrum Upheaval

GET YOUR FREQ ON. A Seminar on Navigating the Wireless Spectrum Upheaval GET YOUR FREQ ON A Seminar on Navigating the Wireless Spectrum Upheaval Schedule Introduction and Overview Presentation followed by Q&A by: Lectrosonics Zaxcom Shure Hands on/breakout Sessions Introduction

More information

City of Grand Island

City of Grand Island City of Grand Island Tuesday, September 11, 2007 Council Session Item G14 #2007-223 - Approving Contract with AVI Systems for Master Control & Studio Relocation Staff Contact: Wendy Meyer-Jerke City of

More information

PINE RIDGE ELEMENTARY

PINE RIDGE ELEMENTARY PINE RIDGE ELEMENTARY CALENDAR CHANGE PRESENTATION NOVEMBER 13, 2012 SCOTT SIEGFRIED, PH.D. ASSISTANT SUPERINTENDENT ssiegfried@cherrycreekschools.org AGENDA Provide information regarding the history,

More information

Non Fouling Monitoring and Performance of Railway Track and Transitions

Non Fouling Monitoring and Performance of Railway Track and Transitions 1/50 Non Fouling Monitoring and Performance of Railway Track and Transitions Timothy D. Stark Stephen T. Wilk University of Illinois 34 th Annual Geotechnical Seminar GEO-Omaha 2017 Friday, February 10,

More information

0.1. Outage Management Process Summary

0.1. Outage Management Process Summary 0.1 Outage Management Process Summary Issue: 1.0 Issue Date: August 27, 2014 Table of Contents 1. Introduction... 4 1.1 Purpose... 4 1.2 Glossary... 4 State Transition Model... 8 2. Outage Management Processes...

More information

Escorting / Supervision of service providers and contractors

Escorting / Supervision of service providers and contractors Escorting / Supervision of service providers and contractors PIN020 Operations Directorate 8 The Director of Operations 29/01/14 See Section 5 of this document - - 29/01/2016 29/01/2014 IPS Policy for

More information

Start of DTV Transition 600 MHz repacking

Start of DTV Transition 600 MHz repacking Start of DTV Transition 600 MHz repacking April 21, 2017 Building a prosperous and innovative Canada Brief Recap of Prior Presentations DTV Application Process 600 MHz Repacking (Nov. 21, 2016) Application

More information

Committed to connecting the World ITU ACTIVITIES IN DIGITAL BROADCASTING TRANSITION. JO, GueJo

Committed to connecting the World ITU ACTIVITIES IN DIGITAL BROADCASTING TRANSITION. JO, GueJo ITU ACTIVITIES IN DIGITAL BROADCASTING TRANSITION JO, GueJo Senior Engineer On Spectrum Management and Broadcasting ITU BDT ITU-ASBU REGIONAL SEMINAR on MULTIMEDIA PRODUCTION and DELIVERY SERVICES 31 October

More information

2 Work Package and Work Unit descriptions. 2.8 WP8: RF Systems (R. Ruber, Uppsala)

2 Work Package and Work Unit descriptions. 2.8 WP8: RF Systems (R. Ruber, Uppsala) 2 Work Package and Work Unit descriptions 2.8 WP8: RF Systems (R. Ruber, Uppsala) The RF systems work package (WP) addresses the design and development of the RF power generation, control and distribution

More information

Before the FEDERAL COMMUNICATIONS COMMISSION Washington DC ) ) ) ) ) ) ) ) COMMENTS OF

Before the FEDERAL COMMUNICATIONS COMMISSION Washington DC ) ) ) ) ) ) ) ) COMMENTS OF Before the FEDERAL COMMUNICATIONS COMMISSION Washington DC 20554 In the Matter of Amendment of Part 101 of the Commission s Rules to Facilitate the Use of Microwave for Wireless Backhaul and Other Uses

More information

Staff Report: CenturyLink Cable Franchise

Staff Report: CenturyLink Cable Franchise Staff Report: CenturyLink Cable Franchise Presented to: City Council July 24, 2017 Prepared by: Marty Mulholland, Director of I.T. Services Department James Erb, Senior Assistant Attorney, Legal Contents

More information

Arrangements for: National Progression Award in. Music Business (SCQF level 6) Group Award Code: G9KN 46. Validation date: November 2009

Arrangements for: National Progression Award in. Music Business (SCQF level 6) Group Award Code: G9KN 46. Validation date: November 2009 Arrangements for: National Progression Award in Music Business (SCQF level 6) Group Award Code: G9KN 46 Validation date: November 2009 Date of original publication: January 2010 Version: 03 (August 2011)

More information

The Telecommunications Act Chap. 47:31

The Telecommunications Act Chap. 47:31 The Telecommunications Act Chap. 47:31 4 th September 2013 Presentation Overview Legislative Mandate Limitations of Telecommunications Act Proposed Amendments to Telecommunications Act New Technological

More information

Local TV licensing. Consultation on provisional decision not to advertise or re-advertise certain local TV licences

Local TV licensing. Consultation on provisional decision not to advertise or re-advertise certain local TV licences Consultation on provisional decision not to advertise or re-advertise certain local TV licences CONSULTATION: Publication Date: 20 April 2018 Closing Date for Responses: 1 June 2018 About this document

More information

Improving Lightning Protection of Power Systems with Externally Gapped Line Arresters (EGLA)

Improving Lightning Protection of Power Systems with Externally Gapped Line Arresters (EGLA) Improving Lightning Protection of Power Systems with Externally Gapped Line Arresters (EGLA) Jonathan Woodworth ArresterWorks 1 Today's Presentation 1. Real Value of Arresters 2. Improving Distribution

More information

Accessibility Advisory Committee

Accessibility Advisory Committee Accessibility Advisory Committee Bus and Rail Subcommittee Attendees Present: Tino Calabia (Chair), Anthony Oberg (Vice-Chair), Elver Ariza-Silva, Erin Coneys, Charlie Crawford, Steve Kaffen, Mary Kay

More information

Sub-Total Rustin Pavilion $ 6, $ 1, $ INCORRECT PRICE LISTED ON SUBMISSION. VENDOR LISTED $6,823.18

Sub-Total Rustin Pavilion $ 6, $ 1, $ INCORRECT PRICE LISTED ON SUBMISSION. VENDOR LISTED $6,823.18 CITY OF SOUTHLAKE Department: Finance for CS BID TABULATION FORM Proposal Due: 4/13/2017 RFP #: 1701B540JL170003 Form Prepared By: Tim Slifka for CS Date Prepared: 5-9-2017 CHRISTMAS BY ZENITH THE CHRISTMAS

More information

LACEY CITY COUNCIL MEETING December 15, 2016

LACEY CITY COUNCIL MEETING December 15, 2016 LACEY CITY COUNCIL MEETING December 15, 2016 SUBJECT: Amendment to Franchise Agreement with Comcast Cable Communications Management, LLC RECOMMENDATION: Authorize the City Manager to approve an amendment

More information

FCC Releases Proposals for Broadcast Spectrum Incentive Auctions

FCC Releases Proposals for Broadcast Spectrum Incentive Auctions Advisory October 2012 FCC Releases Proposals for Broadcast Spectrum Incentive Auctions by Scott R. Flick and Paul A. Cicelski The FCC released its long-awaited Notice of Proposed Rulemaking (NPRM) to begin

More information

The contribution of UNIFE: NGTC and STARS projects. Peter Gurník Technical Affairs Manager

The contribution of UNIFE: NGTC and STARS projects. Peter Gurník Technical Affairs Manager The contribution of UNIFE: NGTC and STARS projects Peter Gurník Technical Affairs Manager Who we are UNIFE represents the European Rail Supply Industry (rolling stock, infrastructure, sub-systems and signalling)

More information

Author Instructions for submitting manuscripts to Environment & Behavior

Author Instructions for submitting manuscripts to Environment & Behavior Author Instructions for submitting manuscripts to Environment & Behavior Environment & Behavior brings you international and interdisciplinary perspectives on the relationships between physical built and

More information

1. Introduction. 2. Part A: Executive Summary

1. Introduction. 2. Part A: Executive Summary MTN'S RESPONSE TO ICASA'S INQUIRY INTO SUBSCRIPTION TELEVISION BROADCASTING SERVICES IN TERMS OF SECTION 4 B OF THE ICASA ACT 13 OF 2000 IN GORVENMENT GAZETTE NO. 41070 DATED 25 AUGUST 2017 1 P a g e 1.

More information

DRAFT Sandown Cable Access Board Meeting Town of Sandown, NH

DRAFT Sandown Cable Access Board Meeting Town of Sandown, NH 1 2 3 DRAFT Sandown Cable Access Board Meeting Town of Sandown, NH 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 Meeting Date: Tuesday, September 24, 2013 Type of Meeting: Public

More information

Become an ISA Author WRITE A BOOK! Questions and answers about publishing with ISA

Become an ISA Author WRITE A BOOK! Questions and answers about publishing with ISA Become an ISA Author WRITE A BOOK! Questions and answers about publishing with ISA What is ISA? Founded in 1945, ISA International Society of Automation is a leading, global, nonprofit organization that

More information

Attachment 7: 5/9/13 Neighborhood Meeting Summary

Attachment 7: 5/9/13 Neighborhood Meeting Summary Attachment 7: 5/9/13 Neighborhood Meeting Summary PA 13-014 Hillsdale Shopping Center North Block Reconfiguration Pre-application Meeting notes from Neighborhood Meeting held 5/9/13 Discussion 1: Groceries,

More information

POCLD Policy Chapter 6 Operations 6.12 COLLECTION DEVELOPMENT. 1. Purpose and Scope

POCLD Policy Chapter 6 Operations 6.12 COLLECTION DEVELOPMENT. 1. Purpose and Scope POCLD Policy Chapter 6 Operations 6.12 COLLECTION DEVELOPMENT 1. Purpose and Scope The Pend Oreille County Library District's Mission Statement guides the selection of materials as it does the development

More information

800 MHz Band Reconfiguration

800 MHz Band Reconfiguration 800 MHz Band Reconfiguration NSMA Spectrum Management 2009 May 19, 2009 1 Agenda Reconfiguration Status Border Region Update Licensing Regional Plans Implementation Planning Session Schedule Management

More information

Heavy Urban Search and Rescue (HUSAR), Emergency Exercises & Joint Emergency Preparedness Program (JEPP) Funding

Heavy Urban Search and Rescue (HUSAR), Emergency Exercises & Joint Emergency Preparedness Program (JEPP) Funding Heavy Urban Search and Rescue (HUSAR), Emergency Exercises & Joint Emergency Preparedness Program (JEPP) Funding Agenda Update on the Johnsons Landing Heavy Urban Search and Rescue Deployment Overview

More information

Next generation digital television: New pathways to grow service

Next generation digital television: New pathways to grow service O V E RVI E W Next generation digital television: New pathways to grow service SUMMAR Y OF OUTCOMES FROM THE PUBLIC M EDIA COM P AN Y C O NFERENC E S ON AT SC 3.0 PREPARED BY Marc Hand, CEO & Co-founder,

More information

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY THIS PRINT COVERS CALENDAR ITEM NO. : 10.2 SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY DIVISION: Capital Programs & Construction BRIEF DESCRIPTION: Authorizing the award of San Francisco Municipal Transportation

More information

21. OVERVIEW: ANCILLARY STUDY PROPOSALS, SECONDARY DATA ANALYSIS

21. OVERVIEW: ANCILLARY STUDY PROPOSALS, SECONDARY DATA ANALYSIS 21. OVERVIEW: ANCILLARY STUDY PROPOSALS, SECONDARY DATA ANALYSIS REQUESTS AND REQUESTS FOR DATASETS... 21-1 21.1 Ancillary Studies... 21-4 21.1.1 MTN Review and Approval of Ancillary Studies (Administrative)...

More information

PART A - Project summary

PART A - Project summary PART A - Project summary A.1 Project identification Programme priority Programme priority specific objective Project acronym Project title ems Project Number Name of the lead partner organisation/original

More information

Join us for our. A Campaign to Evolve, Elevate, and Inspire

Join us for our. A Campaign to Evolve, Elevate, and Inspire Join us for our A Campaign to Evolve, Elevate, and Inspire 2 Evolve. Elevate. Inspire. For 166 years the Fulton Theatre has been a home for the performing arts in Lancaster, PA. Please join us as we continue

More information

Finding Aid for the Charles K. Adams Santa Fe Railroad Collection, No online items

Finding Aid for the Charles K. Adams Santa Fe Railroad Collection, No online items http://oac.cdlib.org/findaid/ark:/13030/kt6h4nc93m No online items Processed by Manuscripts Division staff; machine-readable finding aid created by Caroline Cubé 2004 The Regents of the University of California.

More information

Digital Television Switchover. Michael Starks for Jamaica Broadcasting Commission

Digital Television Switchover. Michael Starks for Jamaica Broadcasting Commission Digital Television Switchover Michael Starks for Jamaica Broadcasting Commission 1. Outline What is digital television? Why have a switchover policy? Pioneers & common principles Research and feasibility

More information

31st Voorburg Group Meeting Croatia September, 2016 Mini-presentation

31st Voorburg Group Meeting Croatia September, 2016 Mini-presentation 31st Voorburg Group Meeting Croatia September, 2016 Mini-presentation CPA 59 Motion picture, video and television programme production, sound recording and music publishing services Presenter Rohan Draper

More information

Honorable Mayor and Members of the City Council. Submitted by: Scott Ferris, Acting Director, Parks, Recreation & Waterfront

Honorable Mayor and Members of the City Council. Submitted by: Scott Ferris, Acting Director, Parks, Recreation & Waterfront Office of the City Manager CONSENT CALENDAR November 27, 2012 To: From: Honorable Mayor and Members of the City Council Christine Daniel, City Manager Submitted by: Scott Ferris, Acting Director, Parks,

More information

European Agenda for Music: AEC, EAS and EMU members Feedback Joint Overview

European Agenda for Music: AEC, EAS and EMU members Feedback Joint Overview European Agenda for Music:, and members Feedback Joint Overview FUlfiLLing the Skills, COmpetences and know-how Requirements of cultural and creative players in the European music sector Introduction The

More information

Before the Federal Communications Commission Washington, D.C

Before the Federal Communications Commission Washington, D.C Before the Federal Communications Commission Washington, D.C. 20554 In the Matter of ) ) Amendment of Parts 73 and 74 of the ) MB Docket No. 08-253 Commission s Rules to Establish Rules for ) Replacement

More information

Objectives and Methodology for the Over-the-air Television Transition

Objectives and Methodology for the Over-the-air Television Transition January 2017 Spectrum Management and Telecommunications Objectives and Methodology for the Over-the-air Television Transition Aussi disponible en français DGGPN-002-017 Contents 1. Intent... 3 2. Background...

More information

This paper describes BBC Wales creative partnership with S4C, and clarifies the direct funding relationship between the BBC Trust and S4C Authority.

This paper describes BBC Wales creative partnership with S4C, and clarifies the direct funding relationship between the BBC Trust and S4C Authority. Cynulliad Cenedlaethol Cymru / National Assembly for Wales Pwyllgor Diwylliant, y Gymraeg a Chyfathrebu / The Culture, Welsh Language and Communications Committee Dyfodol S4C / The Future of S4C CWLC(5)

More information

Kaba Clock Time Collection Device Update. onesource.uga.edu

Kaba Clock Time Collection Device Update. onesource.uga.edu Kaba Clock Time Collection Device Update Agenda 1. Site Surveys 2. Clock Awareness 3. Installation Update 4. Device Groups 5. Kaba Clock Training 6. Questions/Concerns? n Site Surveys- Complete! Thank

More information

Australian Broadcasting Corporation. Screen Australia s. Funding Australian Content on Small Screens : A Draft Blueprint

Australian Broadcasting Corporation. Screen Australia s. Funding Australian Content on Small Screens : A Draft Blueprint Australian Broadcasting Corporation submission to Screen Australia s Funding Australian Content on Small Screens : A Draft Blueprint January 2011 ABC submission to Screen Australia s Funding Australian

More information

Commonwealth Digital Broadcasting Caribbean Forum

Commonwealth Digital Broadcasting Caribbean Forum Commonwealth Digital Broadcasting Caribbean Forum Knutsford Court Hotel, Kingston, Jamaica Presenter: Gary Allen President, Caribbean Broadcasting Union Chief Executive Officer RJRGLEANER Communications

More information

Australian Broadcasting Corporation. submission to. National Cultural Policy Consultation

Australian Broadcasting Corporation. submission to. National Cultural Policy Consultation Australian Broadcasting Corporation submission to National Cultural Policy Consultation February 2010 Introduction The Australian Broadcasting Corporation (ABC) welcomes the opportunity to provide a submission

More information

City Council Report 915 I Street, 1 st Floor

City Council Report 915 I Street, 1 st Floor Meeting Date: 12/8/2015 Report Type: Consent Report ID: 2015-01084 07 City Council Report 915 I Street, 1 st Floor www.cityofsacramento.org Title: Contract: Council Chamber Audio Video Broadcast Equipment

More information

Annex J: Outline for Bhutan DTV Road Map

Annex J: Outline for Bhutan DTV Road Map Annex J: Outline for Bhutan DTV Road Map A Guide for the Working Committee This is an outline of a possible form of a final report of the Working Committee, which could then easily be converted to the

More information

August 7, Legal Memorandum

August 7, Legal Memorandum Brooks, Pierce, McLendon, Humphrey & Leonard, LLP Counsel to VAB (919) 839-0300 250 West Main Street, Suite 100 Charlottesville, VA 22902 (434) 977-3716 August 7, 2015 Legal Memorandum In this issue, link

More information

Board Meeting Broadcast Project Preliminary Report August 02, 2017

Board Meeting Broadcast Project Preliminary Report August 02, 2017 Board Meeting Broadcast Project Preliminary Report August 02, 2017 OVERVIEW July 10, 2017: Members of the Galesburg Board of Education expressed a desire to explore broadcasting Board Meetings. District

More information

REFURBISHMENT OF SECONDARY SYSTEMS IN HIGH VOLTAGE SUBSTATIONS LESSONS LEARNED IN VENEZUELA

REFURBISHMENT OF SECONDARY SYSTEMS IN HIGH VOLTAGE SUBSTATIONS LESSONS LEARNED IN VENEZUELA 21, rue d'artois, F-75008 Paris http://www.cigre.org B3-110 Session 2004 CIGRÉ REFURBISHMENT OF SECONDARY SYSTEMS IN HIGH VOLTAGE SUBSTATIONS LESSONS LEARNED IN VENEZUELA by E. PADILLA * L. CEDEÑO E. PELAYO

More information