Houston METRO Rail Expansion Program

Size: px
Start display at page:

Download "Houston METRO Rail Expansion Program"

Transcription

1 Houston METRO Rail Expansion Program Axle Counter Replacements Presented by: Houston Rapid Transit Jorge L. Estevez, Project Director Capital & Strategic Planning Committee Presentation October 24, 2016

2 1. Executive Summary 2. Selection of the Frauscher RSR180 Agenda a) Solid Performance i. Site Specific Performance in the Houston Environment a. Test Bed 1 b. Test Bed 2 ii. Worldwide applications with stellar manufacturer support 3. Replacement Schedule a) Cutover Schedule b) Alternative Cutover Schedule c) Alternative Cutover Schedule Pro s and Con s d) Risks and Mitigations 4. Questions or Comments 2

3 Executive Summary Over the past few years HRT has worked to mitigate the failures experienced with the Siemens ACM 100 axle counter system. In 2015 HRT recommended the implementation of the on-site testing of two different manufacturers products, Frauscher and Thales Axle Counter Systems. A total of 8 Thales devices and 12 Frauscher devices were installed along Capitol Street in the Downtown Corridor (Test Bed # 1). Over a 6 month period between November 2015 and May 2016 the Frauscher RSR 180 Axle Counter System proved to provide excellent performance. A second test bed was then implemented (Test Bed # 2) at the terminus of the North Corridor (Northline) in June of this location was selected due to the varying train movements and functionality requirements. After initial adjustments we have also experienced excellent performance from the Frauscher devices. Based on the results on both test beds, HRT is recommending to move forward to replace the current system with the Frauscher RSR180 Axle Counter System along all corridors systematically to address Metro, the COH and the traveling publics impacts and concerns. 3

4 Downtown Test Bed # 1 12 Devices Frauscher Diagnostic System (FDS) was not available for installation on Test Bed 1 No recalibrations have been required No temperature drifts have been experienced 4

5 Northline Test Bed # 2 16 Devices 38 disturbances in total 8 disturbances caused by Vehicle Electro Magnetic Interference 17 disturbances had operational impacts 7 caused by incorrect operation 10 are unclear due to missing data 13 disturbances did not impact operations 5

6 Successful Worldwide Implementation Key Projects 6

7 Frauscher Axle Counter Differentiators Stellar On-Site Support Product Adaptability Low Failure Rate Diagnostic System (FDS) Failure of a single axle counter module does not lead to failures of the configured track section Frauscher Axle Counter Differentiators Remote Reset Capabilities (resets initiated by operations) No temperature drifts No Re-Calibration IP68 Rating More than 100,000 units successfully operating in over 70 countries 7

8 Frauscher RSR 180 Axle Counter System Outdoor Equipment Indoor Equipment Wheel Sensor RSR 180 Power Supply Board Evaluation Board Communications Board IP68 Rated (IP) International Protection Marking (6) Rated to be dust tight (8) Rated for up to 1 meter of continuous immersion in water 8

9 Cutover Schedule Activity Name Large Cutover All Corridors Super Bowl Week Downtown Corridors Hobby to Milam Replacements Travis To Hamilton Replacements Harrisburg Overpass Axle Counters Delivered Installations By MEC Commissioning/Systems Integration Testing/ Pre-revenue Ops Testing East Corridor East Corridor Replacements Southeast Corridor Southeast Corridor Replacements North Corridor Melbourne to Rothwell replacements Fannin South Fannin South Installations Start/Finish 30-Jan-17/05-Feb Oct-16/24-Oct Nov-16/13-Nov Nov Nov-16/11-Nov Nov-16/16-Jan Dec-16/18-Dec Jan-17/19-Mar Apr-17/30-Apr-17 05_May-17/07-May-17 Cutover Schedule key points: The Downtown Corridor section between Hobby Center and Milam was completed successfully this weekend Downtown Corridor, East Corridor and the Harrisburg Overpass are revenue ready prior to Super Bowl LI East Corridor is completed by 12/18/16 Southeast Corridor work is completed by 03/19/2017 North Corridor is completed by 04/30/2017 The communities have multiple weekend shutdown impacts 9

10 Alternate Cutover Schedule Activity Name Large Cutover All Corridors Super Bowl Week Downtown Corridors Hobby to Milam Replacements Travis To Hamilton Replacements Harrisburg Overpass Axle Counters Delivered Installation By MEC Commissioning/Systems Integration Testing/ Pre-revenue Ops Testing East Corridor East Corridor Replacements Southeast Corridor 4a Chartres to Nagle Replacements 4b Griggs to McKinney Replacements North Corridor Melbourne to Rothwell replacements Fannin South Fannin South Installations Start/Finish 30-Jan-17/05-Feb Oct-16/24-Oct Nov-16/11-Nov Nov Nov-16/11-Nov Nov-16/16-Jan Nov-16/20-Nov Dec-16/11-Dec Dec-16/23-Dec Jan-17/14-Jan Feb-17/12-Feb-17 Alternate Cutover Schedule key points: The Downtown Corridor section between Hobby Center and Milam was completed successfully this weekend The Harrisburg Overpass is completed in time to allow for Commissioning, Systems Integration Testing and Pre-Revenue Operations to be completed mid January. East Corridor is completed by 11/20/2016 Southeast Corridor is completed before Christmas 2016 North Corridor is completed in mid January 2017 All System Replacements are completed prior to Super Bowl LI, 5 months ahead of the Cutover Schedule 10

11 Cutover Alternative Schedule- Pros and Cons Pros Improve on-time performance of service for customers Improve traffic reliability with positive impacts to motorist (i.e. fewer gates down) Replacements of the Southeast Line between Univ. of Houston semesters Completes all corridors before Super Bowl LI, the Houston Livestock Show and Rodeo, and Spring Break Lessons learned will be applied as the replacements progress Cons Short term impacts to daily riders 11

12 Risks, Mitigation and Coordination requirements for Large Cutovers Risks Pre-Work not completed due to track access and availability Adjustment period for the replaced devices impacting OTP Messaging to the community Public not having access to transportation Service Interruptions during the adjustment period Resources Risk Schedule risk Mitigation Work with Metro Ops for daytime track allocation on Southeast and North Corridors Mass Electric Company (MEC) and Frauscher will be onsite to address issues in real time Work with Metro to provide real time updates Institute Bus Bridges and work with Metro to provide real time updates to the community Work with Metro to provide real time updates HRT, MEC, Frauscher, ISIS and Metro Ops must address issues in real time Large cutovers will impact traffic patterns and must have COH participation to avoid delays * Coordination is required with Metro, MEC and the City of Houston 12

13 QUESTIONS OR COMMENTS? 13

Mosaic 1.1 Progress Report April, 2010

Mosaic 1.1 Progress Report April, 2010 1 Milestones Achieved Mosaic 1.1 Progress Report April, 2010 A final design review was held for the electrical component of the project. The test Dewar is complete and e2v devices have been installed for

More information

RELIABILITY REASON FOR A COMMERCIAL INADVERTENT-INTERCHANGE SETTLEMENT STANDARD.

RELIABILITY REASON FOR A COMMERCIAL INADVERTENT-INTERCHANGE SETTLEMENT STANDARD. RELIABILITY REASON FOR A COMMERCIAL INADVERTENT-INTERCHANGE SETTLEMENT STANDARD. Attached are 2 graphs of monthly average frequency error on the Eastern Interconnection back to 1994. The error is the deviation

More information

Welcome to the MST Subscriber Handbook!

Welcome to the MST Subscriber Handbook! Welcome to the MST Subscriber Handbook! We want this information to be useful to you, so please let us know if we have missed anything, or if there is anything more you would like included. REMEMBER: Main

More information

Versatile EMS and EMI measurements for the automobile sector

Versatile EMS and EMI measurements for the automobile sector EMC/FIELD STRENGTH EMC Measurement Software R&S EMC32-A Versatile EMS and EMI measurements for the automobile sector EMC Measurement Software R&S EMC32-A (automotive) from Rohde & Schwarz is a powerful

More information

AN302 Anconda 3BR 3BA

AN302 Anconda 3BR 3BA AN302 Anconda 3BR 3BA Summary 3 BR 3 Bath Condo - sleeps up to 8 Description AN302 Anconda 3BR 3BA -- Short Walk to Super B Chairlift -- Shared Heated Garage -- Outdoor Hot Tub and Laundry -- Gas Fireplace

More information

The Construction Status of CSNS Linac

The Construction Status of CSNS Linac The Construction Status of CSNS Linac Sheng Wang Dongguan branch, Institute of High Energy Physics, CAS Sep.2, 2014, Geneva Outline The introduction to CSNS accelerators The commissoning of ion source

More information

Andrei Seryi, Toshiaki Tauchi. December 15-18, 2008

Andrei Seryi, Toshiaki Tauchi. December 15-18, 2008 ATF2 milestones for discussion Andrei Seryi, Toshiaki Tauchi December 15-18, 2008 7th ATF2 Project Meeting What are natural milestones for ATF2? ATF2 design: Nominal IP β y* =0.1 mm & L * =1 m this give

More information

Satellite Interference The Causes, Effects and Mitigation. Steve Good Global Director, Customer Solutions Engineering

Satellite Interference The Causes, Effects and Mitigation. Steve Good Global Director, Customer Solutions Engineering Satellite Interference The Causes, Effects and Mitigation Steve Good Global Director, Customer Solutions Engineering Agenda The Causes The Effects Tools Overview of I³ and Satellite Operator Initiative

More information

CASE STUDY. Smart Motorways Project. Temporary CCTV Monitoring Systems for England s Motorway network.

CASE STUDY. Smart Motorways Project. Temporary CCTV Monitoring Systems for England s Motorway network. CASE STUDY Smart Motorways Project. Temporary CCTV Monitoring Systems for England s Motorway network. OVERVIEW The Strategic Road Network in England covers over 2,200 miles (3,500Km) and facilitates more

More information

A SMART, SAFE AND SMOOTH FUTURE TELESTE FOR CITY TRANSPORT. Video security and passenger information solution for city transport

A SMART, SAFE AND SMOOTH FUTURE TELESTE FOR CITY TRANSPORT. Video security and passenger information solution for city transport A SMART, SAFE AND SMOOTH FUTURE TELESTE FOR CITY TRANSPORT Video security and passenger information solution for city transport CREATE A SMOOTH PASSENGER EXPERIENCE Urban mobility is rapidly changing.

More information

COE Group plc. Contents

COE Group plc. Contents CWDM Supplement COE Group plc COE develops and supplies analogue and digital video surveillance (CCTV) systems for complex and robust applications. These end to end systems include fibre transmission,

More information

City of Lafayette. Advanced Transportation Management System (ATMS) Active Traffic Signal Management December 13 th, Agency Case Studies

City of Lafayette. Advanced Transportation Management System (ATMS) Active Traffic Signal Management December 13 th, Agency Case Studies City of Lafayette Advanced Transportation Management System (ATMS) Active Traffic Signal Management December 13 th, 2011 Agency Case Studies Fred Koning Lafayette Traffic Foreman Tom Vandenberg, PE, PTOE

More information

Risk. Sedco Express DGPS Operations Five Years of Lessons Learned

Risk. Sedco Express DGPS Operations Five Years of Lessons Learned Risk Sedco Express DGPS Operations Five Years of Lessons Learned Lew Weingarth and Stephane Angue Transocean, Inc. October 17-18, 2006 Return to Session Directory SEDCO EXPRESS DGPS OPERATIONS Five years

More information

POSITION DESCRIPTION

POSITION DESCRIPTION POSITION DESCRIPTION Ref: HRF013 Issue No.:5 Date: Mar 2018 Position Title: Divison: Department: Assistant Producer OzAsia Festival Programming OzAsia Festival Programming, Development and Venue Sales

More information

Federal Transit Administration s New Starts Process. Circle Line Alternatives Analysis Study

Federal Transit Administration s New Starts Process. Circle Line Alternatives Analysis Study Federal Transit Administration s New Starts Process Circle Line Alternatives Analysis Study September, 26 Tonight s Speakers Darud Akbar Moderator Chicago Transit Authority Jeffrey Sriver Project Manager

More information

Digital Delivery of IEEE Spectrum & The Institute for IEEE Student and Graduate Student Members

Digital Delivery of IEEE Spectrum & The Institute for IEEE Student and Graduate Student Members Digital Delivery of IEEE Spectrum & The Institute for IEEE Student and Graduate Student Members Volunteer Fact Sheet Overview MGA Board approved moving Student and Graduate Student members to digital delivery

More information

Library. Summary Report

Library. Summary Report Library Summary Report 215-216 Prepared by: Library Staff March 217 Table of Contents Introduction..1 New Books.2 Print Circulation.3 Interlibrary Loan 4 Information Literacy 5-6 Reference Statistics.7

More information

802DN Series A DeviceNet Limit Switch Parameter List

802DN Series A DeviceNet Limit Switch Parameter List 802DN Series A DeviceNet Limit Switch Parameter List EDS file Version 2.01 1. Operate Mode 1 (Sensor Output #1) Normally Open Normally Closed 2. Operate Mode 2 (Sensor Output #2) Normally Open Normally

More information

CP316 Screencast mini-project

CP316 Screencast mini-project CP316 Screencast mini-project Wilfrid Laurier University January 23, 2013 Some MPLABX features are easier to show than to explain Some MPLABX features are easier to show than to explain screencast, about

More information

The LEP Superconducting RF System

The LEP Superconducting RF System The LEP Superconducting RF System K. Hübner* for the LEP RF Group CERN The basic components and the layout of the LEP rf system for the year 2000 are presented. The superconducting system consisted of

More information

HDMI 2.0 Overview. HDMI Licensing, LLC. Q2/2015

HDMI 2.0 Overview. HDMI Licensing, LLC. Q2/2015 HDMI 2.0 Overview HDMI Licensing, LLC. Q2/2015 HDMI Adopter Overview Total HDMI Adopters (2011-2015) 1,800 1,600 1,400 1,200 1,000 800 600 400 200 0 1320 1382 1435 1472 1517 1569 1600 1614 1146 1166 1196

More information

1 Feb Grading WB PM Low power Wireless RF Transmitter for Photodiode Temperature Measurements

1 Feb Grading WB PM Low power Wireless RF Transmitter for Photodiode Temperature Measurements 1 Jan 21 2015341 Practice WB119 6 9PM Low power Wireless RF Transmitter for Photodiode Temperature Measurements 1 Jan 21 2015377 Practice WB119 6 9PM Gloovy 1 Jan 21 2015405 Practice WB119 6 9PM Machine

More information

KPI and SLA regime: August 2015 performance summary Ref Jun 15 Jul 15 Aug 15 Target Description KPI A 100% 100% 99.87% 99% green

KPI and SLA regime: August 2015 performance summary Ref Jun 15 Jul 15 Aug 15 Target Description KPI A 100% 100% 99.87% 99% green OB30 paper 07 KPI Report (August 2015) KPI and SLA regime: August 2015 performance summary Ref Jun 15 Jul 15 Aug 15 Target Description KPI A 100% 100% 99.87% 99% green 98% amber Service Restoration within

More information

report L.M. Fraile, CERN PH/IS Impact of technical issues Running statistics 2006 Planning for 2007

report L.M. Fraile, CERN PH/IS Impact of technical issues Running statistics 2006 Planning for 2007 ISOLDE ISOLDE scientific scientific coordinator s s report report ISOLDE ISOLDE Collaboration Collaboration Committee, Committee, 15 15 February February 2007 2007 L.M. Fraile, CERN PH/IS Impact of technical

More information

200$ 186$ 189$ 196$ 198$ Jul.$2012$ Jun.$2012$ Dec.$2012$ Aug.$2012$ Jan.$2013$ Sep.$2012$ Oct.$2012$ Mar.$2013$ Feb.$2013$ Nov.$2012$ Apr.

200$ 186$ 189$ 196$ 198$ Jul.$2012$ Jun.$2012$ Dec.$2012$ Aug.$2012$ Jan.$2013$ Sep.$2012$ Oct.$2012$ Mar.$2013$ Feb.$2013$ Nov.$2012$ Apr. Agenda Welcome, VESA Update - VESA/VTM MyDP Technology Analogix MyDP, edp Test & Measurement Agilent Lunch HBR2 Measurements Tektronix Link Layer Testing Unigraf/SYMH Understanding Multi-Stream VTM & Allion

More information

Dimming actuators GDA-4K KNX GDA-8K KNX

Dimming actuators GDA-4K KNX GDA-8K KNX Dimming actuators GDA-4K KNX GDA-8K KNX GDA-4K KNX 108394 GDA-8K KNX 108395 Updated: May-17 (Subject to changes) Page 1 of 67 Contents 1 FUNCTIONAL CHARACTERISTICS... 4 1.1 OPERATION... 5 2 TECHNICAL DATA...

More information

John Stankey President and CEO AT&T Operations

John Stankey President and CEO AT&T Operations John Stankey President and CEO AT&T Operations Bank of America Media, Communications, & Entertainment Conference September 9, 2009 Cautionary Language Concerning Forward-Looking Statements Information

More information

BURNLEY GROUP OPERATING PROCEDURES

BURNLEY GROUP OPERATING PROCEDURES The Operating Procedures contained in this document titled Burnley Group Operating Procedures refer to the area bounded by Richmond, Glen Waverley, Alamein, Belgrave & Lilydale. Approval Amendment Record

More information

SCALE & WEIGHT DISPLAYS

SCALE & WEIGHT DISPLAYS The MICRO SERIES SCALE & WEIGHT DISPLAYS LARGE DIGIT MODELS Mighty-5S DPM MODELS Micro-S & Mighty-1S Mighty-1S Micro-S ELECTRO-NUMERICS, INC. Introduction The Electro-Numerics family of Digital Panel Meters

More information

OB35 Paper 06 KPI Report

OB35 Paper 06 KPI Report OB35 Paper 06 KPI Report KPI and SLA regime: January 2016 performance summary Ref Nov 15 Dec 15 Jan 16 Target Description KPI A 99.90% 100% 99.87% 99% green 98% amber Service Restoration within 10 working

More information

Quality products from a single source

Quality products from a single source Velocity sensors Quality products from a single source For more than 50 years, Brüel & Kjær Vibro has been a leading manufacturer of vibration measuring instruments and machine condition monitoring systems.

More information

Environmental Impact Statement (EIS)/ Section 106 Public Meeting Level 1 Concept Screening. May 16, 2017

Environmental Impact Statement (EIS)/ Section 106 Public Meeting Level 1 Concept Screening. May 16, 2017 Environmental Impact Statement (EIS)/ Section 106 Public Meeting Level 1 Concept Screening May 16, 2017 Today s Agenda Project Overview Project Schedule Purpose and Need Level 1 Concept Screening Results

More information

KPI and SLA regime: October 2014 performance summary Reference Outcome Result Target Description KPI A Green 100% 99% green

KPI and SLA regime: October 2014 performance summary Reference Outcome Result Target Description KPI A Green 100% 99% green Paper 06 OB20 KPI Report KPI and SLA regime: October 2014 performance summary Reference Outcome Result Target Description KPI A Green 100% 99% green 98% amber Service Restoration within 10 working days

More information

SP-10. Sports Perimeter (SP) solution - optimized for Broadcast

SP-10. Sports Perimeter (SP) solution - optimized for Broadcast SP-10 Sports Perimeter (SP) solution - optimized for Broadcast No other company is so well placed to provide a complete Sports Perimeter Solution than Barco. The SP-10 consists of cutting-edge visualization

More information

Finding aid for the Grand Rapids Public Library underground newspapers collection Collection 256

Finding aid for the Grand Rapids Public Library underground newspapers collection Collection 256 Finding aid for the Grand Rapids Public Library underground newspapers collection Collection 256 This finding aid was produced using ArchivesSpace on April 26, 2016. Describing Archives: A Content Standard

More information

DB-x20 Digital Billboard

DB-x20 Digital Billboard DB-x20 Digital Billboard Out-of-Home Media LED screen Key Benefits 7,200 nits brightness 1 4,000:1 contrast ratio 16-bit color processing System Color Signature 100,000-hour lifetime Field-replaceable

More information

Siemens Industry Online Support

Siemens Industry Online Support MICROMASTER (MM4): What are the possible causes of F0070 on MICROMASTER 4, and how do I avoid them? FAQ November 2013 Siemens Industry Online Support Answers for industry. Table of contents Table of contents

More information

M4000 Diagnostic Test System For Power Apparatus Condition Assessment

M4000 Diagnostic Test System For Power Apparatus Condition Assessment Knowledge Is Power SM The World Leader in Diagnostic Test Instruments and Knowledge Services for Electric Power M4000 Diagnostic Test System For Power Apparatus Condition Assessment The world s most advanced

More information

Presented by: David J. Crain, GeoMetWatch ITSC-18, Meteo France, Toulouse, March 21,

Presented by: David J. Crain, GeoMetWatch ITSC-18, Meteo France, Toulouse, March 21, Presented by: David J. Crain, GeoMetWatch ITSC-18, Meteo France, Toulouse, March 21, 2012 435-757-6257 1 ITSC Acknowledgement GeoMetWatch is a true child of the ITSC The leadership, fellowship and support

More information

Risk Risk Title Severity (1-10) Probability (0-100%) I FPGA Area II Timing III Input Distortion IV Synchronization 9 60

Risk Risk Title Severity (1-10) Probability (0-100%) I FPGA Area II Timing III Input Distortion IV Synchronization 9 60 Project Planning Introduction In this section, the plans required for completing the project from start to finish are described. The risk analysis section of this project plan will describe the potential

More information

Aqua Turf International, Inc.

Aqua Turf International, Inc. Satellite Versus Decoder Control System During the irrigation design process a decision must be made whether to chose a satellite or decoder style control system. The decision must be made soon after the

More information

Before the FEDERAL COMMUNICATIONS COMMISSION Washington, D.C

Before the FEDERAL COMMUNICATIONS COMMISSION Washington, D.C Before the FEDERAL COMMUNICATIONS COMMISSION Washington, D.C. 20554 In the Matter of ) ) WT Docket 11-79 Wireless Telecommunications Bureau Seeks ) DA 11-838 Comment on Spectrum Needs for the ) Implementation

More information

RSSL1:1-KuXER. Outdoor Unit (ODU) Ku Ext Ref LNB Redundancy System with external 10 MHz Reference System. Mux/Tee. Coax cable

RSSL1:1-KuXER. Outdoor Unit (ODU) Ku Ext Ref LNB Redundancy System with external 10 MHz Reference System. Mux/Tee. Coax cable RSSL1:1-KuXER Ku Ext Ref LNB Redundancy System with external 10 MHz Reference System Outdoor Unit (ODU) Waveguide Switch & Status LNB 1 Coax cable Interface Terminal LNB 2 Indoor Unit Outdoor Unit Indoor

More information

CAPITAL METRO TRANSIT ADVERTISING

CAPITAL METRO TRANSIT ADVERTISING CAPITAL METRO TRANSIT ADVERTISING We drive more people to your business. 2018 RATES & INFORMATION OVERVIEW CONNECTING MILLIONS OF PEOPLE TO THE BEST OF AUSTIN. Culture, the Capitol, cafés, UT and the art,

More information

BE108 Pet-friendly Very Spacious!

BE108 Pet-friendly Very Spacious! BE108 Petfriendly Very Spacious! Summary 1 BR 1 Bath Condo sleeps up to 8 Description BE108 Bridge End PetFriendly Large 1Bedroom with Bonus Room Amazing Views of the Ski Slopes Wood Burning FireplaceThis

More information

LSD Review December 2012 Schedule, Re-Baseline, & Resource Analysis

LSD Review December 2012 Schedule, Re-Baseline, & Resource Analysis LSD Review December 2012 Schedule, Re-Baseline, & Resource Analysis Dianne Napier Outline Part II Review Charges Addressed in this Presentation: Issues raised in Part I Review Report adequately addressed

More information

FY 2012 Website Visits Up 19% over previous year

FY 2012 Website Visits Up 19% over previous year 1 Visits to CBL website cumula2ve 400,000 350,000 300,000 250,000 200,000 150,000 100,000 50,000 FY 2012 Website Visits Up 19% over previous year 0 April May June July Aug Sept Oct Nov Dec Jan Feb March

More information

Before the Federal Communications Commission Washington, D.C

Before the Federal Communications Commission Washington, D.C Before the Federal Communications Commission Washington, D.C. 20554 In the Matter of ) ) Spectrum Bridge, Inc. and Meld Technologies, Inc. ) ET Docket No. 13-81 Request for Waiver of Sections 15.711(b)(2)

More information

In November, the Federal

In November, the Federal Update New Rules Of The Wireless Road Final FCC ruling includes protection for wireless microphones By Chris Lyons In November, the Federal Communications Commission released the full text of its Second

More information

Traffic Sign Life Expectancy Investigation LAB943

Traffic Sign Life Expectancy Investigation LAB943 Traffic Sign Life Expectancy Investigation LAB943 Project Tap Meeting #1 02/19/2013 Project Team Matt Lebens, MnDOT PI Howard Preston Co-PI Jim McGraw, MnDOT Maureen Jensen, MnDOT Agenda Introductions

More information

Coding Productivity & Audit. Laura Dornsife Director, Coding & Revenue Cycle Support

Coding Productivity & Audit. Laura Dornsife Director, Coding & Revenue Cycle Support Coding Productivity & Audit Laura Dornsife Director, Coding & Revenue Cycle Support 2 Ohio State University Wexner Medical Center University Hospital Ross Heart Hospital James University Hospital East

More information

Quality products from a single source

Quality products from a single source Velocity sensors Quality products from a single source For more than 50 years Brüel & Kjær Vibro has been a leading manufacturer of vibration measuring instruments and machine condition monitoring systems.

More information

KPI and SLA regime: June 2015 performance summary Ref Apr 15 May 15 Jun 15 Target Description KPI A 100% 100% 100% 99% green

KPI and SLA regime: June 2015 performance summary Ref Apr 15 May 15 Jun 15 Target Description KPI A 100% 100% 100% 99% green KPI and SLA regime: June 2015 performance summary Ref Apr 15 May 15 Jun 15 Target Description KPI A 100% 100% 100% 99% green 98% amber Service Restoration within 10 working days where household is a primary

More information

Dimming actuators of the FIX series DM 4-2 T, DM 8-2 T

Dimming actuators of the FIX series DM 4-2 T, DM 8-2 T Dimming actuators of the FIX series DM 4-2 T, DM 8-2 T DM 4-2 T 4940280 DM 8-2 T 4940285 Updated: Jun-16 (Subject to change) Page 1 of 70 Contents 1 FUNCTIONAL CHARACTERISTICS... 4 1.1 OPERATION... 5 2

More information

Guidelines for Wiring, Electronic Timing and Scoring Systems Table of Contents

Guidelines for Wiring, Electronic Timing and Scoring Systems Table of Contents Guidelines for Wiring, Electronic Timing and Scoring Systems Table of Contents 1. INTRODUCTION PAGE 2 2. VELORESULTS PAGE 2 3. 250 METER TRACK PAGE 2 4. STARTERS STAND PAGE 2-3 5. JUDGES STAND PAGE 3 6.

More information

ADF-2 Production Readiness Review

ADF-2 Production Readiness Review ADF-2 Production Readiness Review Presented by D. Edmunds 11-FEB-2005 The ADF-2 circuit board is part of the new Run IIB Level 1 Calorimeter Trigger. The purpose of this note is to provide the ADF-2 Production

More information

Marc Segar Director of Technology NEP Australia

Marc Segar Director of Technology NEP Australia Marc Segar Director of Technology NEP Australia RESOURCES BRANDS & SOLUTIONS WHO IS NEP? Americas U.K., Ireland & EUROPE Australia Asia Middle East 60+ HD OBs 7 Mobile LED Screen Trucks 9 Studios As Well

More information

Images for life. Nexxis for video integration in the operating room

Images for life. Nexxis for video integration in the operating room Images for life Nexxis for video integration in the operating room A picture perfect performance Nexxis stands for video integration done right. Intuitive, safe, and easy to use, it is designed to meet

More information

VERWER TRAINING AND CONSULTANCY LTD Supporting the PROFIBUS Group UK & PROFIBUS International

VERWER TRAINING AND CONSULTANCY LTD Supporting the PROFIBUS Group UK & PROFIBUS International VERWER TRAINING AND CONSULTANCY LTD Supporting the PROFIBUS Group UK & PROFIBUS International Web: www.verwertraining.com, Email: enquiries@verwertraining.com Tutorial What can I do with ProfiTrace 2?

More information

Breckenridge Peak Seven 3 Bedroom Home

Breckenridge Peak Seven 3 Bedroom Home Breckenridge Peak Seven 3 Bedroom Home Summary This 3 Bedroom home with room for 11 is located in a quiet neighborhood near Peak 7. The home is 2 miles to Breckenridge Ski Area and downtown in a quiet

More information

CITY OF ISSAQUAH CABLE COMMISSION

CITY OF ISSAQUAH CABLE COMMISSION CITY OF ISSAQUAH CABLE COMMISSION December 4, 2014 Police Facility 6:00 Coho Room MEMBERS PRESENT Max Emrick, Vice Chair Ed Authier Open Robert Gonzales Robert Stephens, Chair (phone) ADMINISTRATIVE STAFF

More information

SITOP power supply. Technical data, April SITOP Power Supply. Answers for industry.

SITOP power supply. Technical data, April SITOP Power Supply. Answers for industry. SITOP power supply Technical data, April 2010 SITOP Power Supply Answers for industry. SITOP reliable power supply Efficient operation of a machine or plant requires a reliable, constant power supply.

More information

Innovative Rotary Encoders Deliver Durability and Precision without Tradeoffs. By: Jeff Smoot, CUI Inc

Innovative Rotary Encoders Deliver Durability and Precision without Tradeoffs. By: Jeff Smoot, CUI Inc Innovative Rotary Encoders Deliver Durability and Precision without Tradeoffs By: Jeff Smoot, CUI Inc Rotary encoders provide critical information about the position of motor shafts and thus also their

More information

CEBAF Accelerator Update. Michael Tiefenback CASA Accelerator Physics Experimental Liaison June 14, 2017

CEBAF Accelerator Update. Michael Tiefenback CASA Accelerator Physics Experimental Liaison June 14, 2017 CEBAF Accelerator Update Michael Tiefenback CASA Accelerator Physics Experimental Liaison June 14, 2017 CLAS12 Collaboration Meeting, June 13-16, 2017 1 Accelerator Division Leadership On April 30 Andrew

More information

Crossing the. Diplex Chasm. to 85 MHz. Author: Todd Gingrass Cable & Media Solutions

Crossing the. Diplex Chasm. to 85 MHz. Author: Todd Gingrass Cable & Media Solutions Crossing the Diplex Chasm to 85 MHz Author: Todd Gingrass Cable & Media Solutions The DOCSIS 3.1 specifications have re-ignited the conversation about moving to 85 MHz and many operators are now starting

More information

Prospects of Digital Broadcasting and Convergence Services. - The Essential and Expanding Role of Broadcasting September 02, 2010

Prospects of Digital Broadcasting and Convergence Services. - The Essential and Expanding Role of Broadcasting September 02, 2010 Prospects of Digital Broadcasting and Convergence Services - The Essential and Expanding Role of Broadcasting September 02, 2010 Keiya Motohashi Purpose of Digitalization Japan s Nation-wide IT Promotions

More information

Configuring the Stack ST8961 VS Module when used in conjunction with a Stack ST81xx series display.

Configuring the Stack ST8961 VS Module when used in conjunction with a Stack ST81xx series display. Configuring the Stack ST8961 VS Module when used in conjunction with a Stack ST81xx series display. Your Stack ST8961 VS module allows you to synchronize, overlay, and record data available on your Stack

More information

Intelsat-29e Interference Mitigation Testing Interference Scenarios and Mitigation Techniques Enabled by the Intelsat Epic NG Class Satellites

Intelsat-29e Interference Mitigation Testing Interference Scenarios and Mitigation Techniques Enabled by the Intelsat Epic NG Class Satellites Intelsat-29e Interference Mitigation Testing Interference Scenarios and Mitigation Techniques Enabled by the Intelsat Epic NG Class Satellites 7922-Inteference-Mitigation Introduction Networks are constantly

More information

Siemens Industry Online Support

Siemens Industry Online Support SINAMICS G120 (CU240x DP): What are the possible causes of F0070 at G120, and how do I avoid them? CU240S DP, CU240D DP FAQ November/2013 Siemens Industry Online Support Answers for industry. Table of

More information

H SERIES INDOOR FINE PIXEL PITCH LED DISPLAY. Yaham Optoelectronics Co., Ltd

H SERIES INDOOR FINE PIXEL PITCH LED DISPLAY.   Yaham Optoelectronics Co., Ltd H SERIES INDOOR FINE PIXEL PITCH LED DISPLAY www.yaham.com Yaham Optoelectronics Co., Ltd H2 Indoor high presicion Fine pixel pitch LED display Pixel pitch availability : P1.27 P1.58 P1.9 HD High gray

More information

Unsealed Metaling Trials in the Mackenzie District SCOTT MCKENZIE ROADING MANAGER

Unsealed Metaling Trials in the Mackenzie District SCOTT MCKENZIE ROADING MANAGER 2017 Unsealed Metaling Trials in the Mackenzie District SCOTT MCKENZIE ROADING MANAGER Mackenzie District Overview - Road classifications - Network size. - Wide range of conditions. - Changing land use.

More information

Gamma instabus. Technical product information

Gamma instabus. Technical product information Gamma instabus Technical product information Universal dimmer N 554D31, 4 x 300 VA / 1x 1000 VA, AC 230 V Universal dimmer N 554D31 Control of dimmable lamps, including LED without minimum load Output

More information

CADS - Edmonton Zone Volunteer Policy

CADS - Edmonton Zone Volunteer Policy CADS - Edmonton Zone Volunteer Policy CADS participant registration fees are highly subsidized through grants and fundraising events that take place throughout the year. CADS Edmonton is a volunteer run

More information

Tech Support: Customer Service: General Tech Questions: Tech Docs:

Tech Support: Customer Service: General Tech Questions: Tech Docs: Tech Support: 1-800-407-4545 Customer Service: 1-800-523-2462 General Tech Questions: Tech_Services@beainc.com Tech Docs: www.beasensors.com BR3-X Programmable 3 Relay Advanced Logic Module & Restroom

More information

Table of Contents. Section E: Inspection and Acceptance

Table of Contents. Section E: Inspection and Acceptance Table of Contents Section E: Inspection and Acceptance Section Page E.1 52.252-2 Clauses Incorporated by reference (Feb 1998) 1 E.2 Cutover and Acceptance Testing of Services and Systems 1 E.2.1 Cutover

More information

KPI and SLA regime: September 2015 performance summary

KPI and SLA regime: September 2015 performance summary OB31 Paper 07 KPI Report (September) KPI and SLA regime: September 2015 performance summary Ref Jul 15 Aug 15 Sep 15 Target Description KPI A 100% 99.87% 100% 99% green 98% amber Service Restoration within

More information

Case analysis: An IoT energy monitoring system for a PV connected residence

Case analysis: An IoT energy monitoring system for a PV connected residence Case analysis: An IoT energy monitoring system for a PV connected residence Marcus André P. Oliveira, 1, Wendell E. Moura Costa 1, Maxwell Moura Costa 1, 1 IFTO Campus Palmas marcusandre@ifto.edu.br, wendell@ifto.edu.br,

More information

Digital Systems Based on Principles and Applications of Electrical Engineering/Rizzoni (McGraw Hill

Digital Systems Based on Principles and Applications of Electrical Engineering/Rizzoni (McGraw Hill Digital Systems Based on Principles and Applications of Electrical Engineering/Rizzoni (McGraw Hill Objectives: Analyze the operation of sequential logic circuits. Understand the operation of digital counters.

More information

EXECUTIVE SUMMARY. MARKET DYNAMICS CHINA CINEMATIC nd QUARTER

EXECUTIVE SUMMARY. MARKET DYNAMICS CHINA CINEMATIC nd QUARTER Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov EXECUTIVE SUMMARY In the first half year of 2016, box office of Chinese film market was 24.57 billion with year-on-year growth of 21.38%. Of which, box office

More information

ANKA Status Report. N.Smale, on behalf of all ANKA colleagues, Directors : A.-S. Müller, C Heske, T Baumbach.

ANKA Status Report. N.Smale, on behalf of all ANKA colleagues, Directors : A.-S. Müller, C Heske, T Baumbach. ANKA Status Report N.Smale, on behalf of all ANKA colleagues, Directors : A.-S. Müller, C Heske, T Baumbach. Institute for Synchrotron Radiation KIT - University of the State of Baden-Wuerttemberg and

More information

Keyboard Controlled Scoreboard

Keyboard Controlled Scoreboard Universities Research Journal 2011, Vol. 4, No. 4 Keyboard Controlled Scoreboard Kyaw Hlaing 1 and Win Swe 2 Abstract The objective of this research work is to design a keyboard controlled scoreboard that

More information

USER MANUAL Model: A5

USER MANUAL Model: A5 Heads Up Display (HUD) USER MANUAL Model: A5 CONTENTS 1. Introduction to the HUD...3 2. Additional Information...3 3. Unit Display & Switch Functions...4 4. Menu Options...6 5. Specifications...8 6. Troubleshooting...9

More information

TE s AGASTAT relays are available in two basic operating types: On-Delay and Off-Delay.

TE s AGASTAT relays are available in two basic operating types: On-Delay and Off-Delay. TE s AGASTAT relays are available in two basic operating types: On-Delay and Off-Delay. On-Delay: Provides a delay period on energization, at the end of which the switch contacts transfer. De-energizing

More information

Focus of efforts. ILC 2010, Mar/27/10 A. Seryi, BDS: 2

Focus of efforts. ILC 2010, Mar/27/10 A. Seryi, BDS: 2 Beam Delivery System Updates Andrei Seryi for BDS design and ATF2 commissioning teams LCWS 2010 / ILC 2010 March 28, 2010 Plan of the program at ILC2010 Focus of efforts Work on parameter set for a possible

More information

Progress in Scale-up of 2G HTS Wire at SuperPower Part I

Progress in Scale-up of 2G HTS Wire at SuperPower Part I superior performance. powerful technology. Progress in Scale-up of 2G HTS Wire at SuperPower Part I V. Selvamanickam & Y. Xie Y. Chen, X. Xiong, M. Martchevski, Y. Qiao, A. Rar, B. Gogia, R. Schmidt, A.

More information

Camera and Communication Systems for hazardous Areas. SAMCON Topical Booklet No. 0001

Camera and Communication Systems for hazardous Areas. SAMCON Topical Booklet No. 0001 Camera and Communication Systems for hazardous Areas SAMCON Topical Booklet No. 0001 See...what cannot be seen. Why use a camera when practically nothing can be seen through an inspection window with the

More information

A.D. Engineering International Pty Ltd - Product Range

A.D. Engineering International Pty Ltd - Product Range A.D. Engineering International Pty Ltd - Product Range Over the last thirty five years A.D. Engineering International has specialised in the design and manufacture of high quality electronic equipment

More information

ACS(Independent) Choir - Calendar of Events for Post Exams 2017 & 2018 Semester 1

ACS(Independent) Choir - Calendar of Events for Post Exams 2017 & 2018 Semester 1 ACS(Independent) Choir - Calendar of Events for Post Exams 17 & 18 Semester 1 All dates, times, and events are subjected to change. So, do keep yourself updated with all possible changes. Take note of

More information

BLOCK OCCUPANCY DETECTOR

BLOCK OCCUPANCY DETECTOR BLOCK OCCUPANCY DETECTOR This Block Occupancy Detector recognises the current drawn by moving trains within a block, and can operate a number of built-in programs in response. When used with DC systems,

More information

Deliverable 2.17 Periodic WP2 Progress Report 3

Deliverable 2.17 Periodic WP2 Progress Report 3 Deliverable 2.17 Periodic WP2 Progress Report 3 1.1 Objectives of WP2 WP2 is the main SKA design activity; it was aimed at producing a costed top-level design for the SKA and a detailed system design for

More information

NC811 UCC Report for January Blue Ridge UCC. Downtown Asheville

NC811 UCC Report for January Blue Ridge UCC. Downtown Asheville NC811 UCC Report for January 2017 Blue Ridge UCC Downtown Asheville 2016 A Year In Review Locate Requests & Transmissions Dec. 2016 vs 2015 Tickets 2016: 138,076 2015: 116,302 Difference: +18.7% Transmissions

More information

MAKE HAZARD ANALYSES BETTER SINGLE-USE DEVICES GAIN PERMANENT PLACE PATH FOR PROCESS SAFETY EMERGES

MAKE HAZARD ANALYSES BETTER SINGLE-USE DEVICES GAIN PERMANENT PLACE PATH FOR PROCESS SAFETY EMERGES MAKE HAZARD ANALYSES BETTER SINGLE-USE DEVICES GAIN PERMANENT PLACE PATH FOR PROCESS SAFETY EMERGES YOU RE READY. Installation is complete. Your distributed control system (DCS) modernization project nears

More information

Troubleshooting EMI in Embedded Designs White Paper

Troubleshooting EMI in Embedded Designs White Paper Troubleshooting EMI in Embedded Designs White Paper Abstract Today, engineers need reliable information fast, and to ensure compliance with regulations for electromagnetic compatibility in the most economical

More information

Networks of Things. J. Voas Computer Scientist. National Institute of Standards and Technology

Networks of Things. J. Voas Computer Scientist. National Institute of Standards and Technology Networks of Things J. Voas Computer Scientist National Institute of Standards and Technology 1 2 Years Ago We Asked What is IoT? 2 The Reality No universally-accepted and actionable definition exists to

More information

Index Contents: 1000 Series Single Channel Multi Mode Fiber Optic Video Solutions Product Overview Product Configurations Product Specifications

Index Contents: 1000 Series Single Channel Multi Mode Fiber Optic Video Solutions Product Overview Product Configurations Product Specifications Welcome Nitek is a Rolling Meadows, Illinois based manufacturing company with a primary focus on design, development and manufacturing of high performance, reliable CCTV video transmission systems. Nitek

More information

ENGINEERING COMMITTEE Interface Practices Subcommittee AMERICAN NATIONAL STANDARD ANSI/SCTE

ENGINEERING COMMITTEE Interface Practices Subcommittee AMERICAN NATIONAL STANDARD ANSI/SCTE ENGINEERING COMMITTEE Interface Practices Subcommittee AMERICAN NATIONAL STANDARD ANSI/SCTE 158 2009 Recommended Environmental Condition Ranges for Broadband Communications Equipment NOTICE The Society

More information

800 MHz Band Reconfiguration

800 MHz Band Reconfiguration 800 MHz Band Reconfiguration RPC Meeting February 13, 2009 1 Agenda Reconfiguration Status Update Implementation Planning Session Schedule Monitoring & Management Change Notice Regional Plans Licensing

More information

MACOMB COUNTY DEPARTMENT OF ROADS TRAFFIC OPERATIONS CENTER

MACOMB COUNTY DEPARTMENT OF ROADS TRAFFIC OPERATIONS CENTER MACOMB COUNTY DEPARTMENT OF ROADS TRAFFIC OPERATIONS CENTER To provide and maintain a reliable real-time traffic operations system, in coordination with county stakeholders, that enables a safe, efficient,

More information

Research on Precise Synchronization System for Triple Modular Redundancy (TMR) Computer

Research on Precise Synchronization System for Triple Modular Redundancy (TMR) Computer ISBN 978-93-84468-19-4 Proceedings of 2015 International Conference on Electronics, Computer and Manufacturing Engineering (ICECME'2015) London, March 21-22, 2015, pp. 193-198 Research on Precise Synchronization

More information

Energy Efficiency with KNX Focus on Lighting Saving Hager

Energy Efficiency with KNX Focus on Lighting Saving Hager Energy Efficiency with KNX Focus on Lighting Saving Hager Date: December 06 th 2017 Agenda Part 1 About KNX Part 2 IoT Controller Presentation 01 KNX Overview 05 02 Why KNX 15 03 Some Use Cases 20 04 Energy

More information