AREMA 2015 ANNUAL CONFERENCE. NYSDOT / Amtrak. Hudson Line Improvement Program. David W. Emerich, PE CHA. Minneapolis, MN October 4-7, 2015

Size: px
Start display at page:

Download "AREMA 2015 ANNUAL CONFERENCE. NYSDOT / Amtrak. Hudson Line Improvement Program. David W. Emerich, PE CHA. Minneapolis, MN October 4-7, 2015"

Transcription

1 NYSDOT / Amtrak Hudson Line Improvement Program Craig O. Weed A Amtrak David W. Emerich, PE CHA

2 Project Partners

3 NYSDOT High Speed Intercity Passenger Rail Program Sustained Effort to Secure Funding Total NY Project Funding (approximate): $551M Federal Funds $130M State & Local Matching Funds Progress around $65M expended including: 2 completed projects 9 projects in construction 4 projects in design

4 NYSDOT High Speed Intercity Passenger Rail Program Sustained Effort to Secure Funding

5 Hudson Line Projects Under Construction

6 Hudson Line Projects Overview Stakeholder Management: NYSDOT and Amtrak are partners in improving the Hudson Line Amtrak s role as the responsible entity for the maintenance and operation of passenger rail service along the Empire Corridor is facilitated by support from NYSDOT NYSDOT is the Engineer of Record dfor all of the Hudson Line projects Affiliated Stakeholders include: FRA, CSX, Canadian Pacific, CHA, HNTB, Jacobs, Baker & Local Municipalities / Utilities

7 Hudson Line Projects Overview Stakeholder khld Management:

8 Hudson Line Projects Overview Stakeholder Management:

9 Hudson Line Projects Overview

10 Hudson Line Projects Overview Project Benefits Albany Schenectady Double Track, Federal Funding $ 91.2M Adds 17 miles of second main track between Albany and Schenectady, allowing for train travel in both directions. i Empire Corridor Capacity Improvements Federal Funding $ 58.1M, State 4.9M 4th Track at Rensselaer Station Adds additional capacity for trains to pull into the platforms at Rensselaer Station, replaces obsolete 30 year old signal equipment with new state of the art system. Hudson Line Signal Wire Relocation Rl Phase 2 Replaces and buries signal wire between Rdh Redhook and Rensselaer making signal system more reliable. Track and Platform Improvements at Schenectady Station Constructs new track and platforms at Schenectady Station, waterproofs under tracks preventing leaks into future station. Hudson Line Signal Improvements Phase 1 Fd Federal lfunding $ 79M 7.9M, State t $1.9M Replaces and buries signal wire between Redhook and Poughkeepsie making signal system more reliable. Hudson Line Grade Crossing Improvements $ 2.45M, State $0 Improves safety at 12 highway h rail grade crossing along the Hudson Line by upgrading warning devices

11 Hudson Line Capital Maintenance Update

12 Hudson Line Capital Maintenance Update Territory Limits under a 50 year long term lease with CSX are from MP 75.0 Poughkeepsie NY to MP Hoffman's, NY Operated, Dispatched and maintained by Amtrak for four years September 2011 Over $10M in State of Good Repair Projects by Amtrak Forces 2015 construction season including: $5.6M Tie and Timber Replacement $0.2M Roadbed d Stabilization ti $2.8M Curve Patching $1.3M Bridge Work $0.1M Culvert Work

13 Hudson Line Capital Maintenance Tie & Timber Replacement Projects

14 Hudson Line Capital Maintenance Update

15 Hudson Line Signal & Crossing Improvements Overall Program Highlights The $42M Hudson Line Signal Upgrade Projects Reliability, quality and overall functionality of the signal system will be greatly enhanced. Project Limits: Poughkeepsie MP 75 to Rensselaer MP 138 Also included in these projects are safety and warning device upgrades at 13 at grade crossings of local roads on this stretch of the Hudson Line. A continuous Fiber and Power Backbone as building block for future PTC and Signal System Improvements. Last, but not to be shadowed by the other improvements, the removal of the pole line will greatly add to the aesthetics of these 63 miles along the shore of the Hudson River for residents, travelers, and visitors alike.

16 Hudson Line Signal & Crossing Improvements 2015 Construction Season Highlights Combined: Hudson Line Signals Phases 1 and 2 and Grade Crossing Work from Rensselaer to Poughkeepsie work continues Includes burying of power and signal cable & conduit Installation & termination i of fiber Termination of underground power Upgrade of 8 existing crossings with new mechanisms Complete Installation of new Ice House Road Crossing The contractor portion of the Signals Projects is due to be substantiallycomplete this construction season at a cost of about $21M.

17 Hudson Line Signal & Crossing Improvements

18 Hudson Line Signal & Crossing Improvements

19 Hudson Line Construction Projects 4th Track at Rensselaer Station Albany Schenectady Double Track Schenectady StationTrack Work Combined into one contract! Projects Include: Earthwork and Grading 16 bridge rehabilitations 22 culvert repairs New interlockings New signal system from Rensselaer to Schenectady Platform extensions at Rensselaer Station Track work for new Schenectady Station New 4 quadrant gates at three grade crossings in Colonie, NY

20 Albany Rensselaer Station Fourth Platform Track

21 Albany Rensselaer Station Fourth Platform Track

22 Albany Rensselaer Station Fourth Platform Track Projects Include: Earthwork and Grading New 4th Track at Platform A New closed drainage system New power services 1 bridge rehabilitation 3 culvert repairs 6 New interlockings New signal system including fiber backbone for PTC Signal system changing from Wayside to Cab signals Extension of both platforms, longest one will be 1050 FT 4 new storage tracks with 480v standby power and water services

23 Albany Rensselaer Station Fourth Platform Track Project Milestones Interlocking/CP s are the critical path and must be consecutively cutintoservice. CP 138 in service August 2015 (first one) CP LAB (Last One) to be cut into service February Platform extensions A & B open for service Late Spring New Storage Tracks Completed Fall 2015 Substantially Complete December 2016

24 Albany Rensselaer Station Fourth Platform Track

25 Double Track Project Albany to Schenectady NY

26 Double Track Project Albany to Schenectady NY Projects Include: Earthwork and Grading 16 miles of double track capacity, 12 miles of new main line track New power services 15 bridge rehabilitation 19 culvert repairs 6 New interlockings High speed Crossover at New CP 149 Interlocking 3 New Quad Gate at grade highway crossings New signal system including fiber conduit for future fiber & PTC Signal system changing from Wayside to Cab signals Relocated CSX Sidings

27 Double Track Project Albany to Schenectady NY Project Milestones Interlocking/CP are the critical path and consecutively cut into service. CP 145 in service April 2016 (first one) CP 161 (Last One) to be cut into service December Civil work from CP145 to CP156 to be completed by Dec 2015 TLM schedule for Aprilthru May2016 Bridge rehabilitations substantially completed Fall 2015 Culvert rehabilitations completed summer 2016 Overall Project to be substantially completed Dec 2016

28 Double Track Project Albany to Schenectady NY

29 Double Track Project Albany to Schenectady NY

30 Schenectady Station Existing Station 1,022 square feet New Station 2,000 square feet

31 Schenectady Station Work to be completed under Albany Schenectady Sh td Double Track

32 Hudson Line Projects Questions / Answers

33

Environmental Impact Statement (EIS)/ Section 106 Public Meeting Level 1 Concept Screening. May 16, 2017

Environmental Impact Statement (EIS)/ Section 106 Public Meeting Level 1 Concept Screening. May 16, 2017 Environmental Impact Statement (EIS)/ Section 106 Public Meeting Level 1 Concept Screening May 16, 2017 Today s Agenda Project Overview Project Schedule Purpose and Need Level 1 Concept Screening Results

More information

Request for Proposals Fiber Optic Network Backbone Upgrades

Request for Proposals Fiber Optic Network Backbone Upgrades Introduction Request for Proposals Fiber Optic Network Backbone Upgrades RFP Released on February 18, 2015 The Dexter R-11 Public School District is seeking proposals from qualified service providers to

More information

SIGNALING PRACTICES ON PROTOTYPE AND MODEL RAILROADS

SIGNALING PRACTICES ON PROTOTYPE AND MODEL RAILROADS SIGNALING PRACTICES ON PROTOTYPE AND MODEL RAILROADS Bill Ataras September 30, 2013 PROTOTYPE SIGNALING PRACTICE 1. Many different types of signals A. Block signals B. Interlocking signals C. Whistles

More information

>> By Jason R. Kack, LS

>> By Jason R. Kack, LS hen the Utah Department of Transportation (UDOT) set out to rebuild Interstate 15 south of Salt Lake City, the department needed accurate one-foot contour interval mapping and a digital terrain model (DTM).

More information

Mediacom Upgrade/Splicing Procedures (based on original document from Corporate dated 4/16/98)

Mediacom Upgrade/Splicing Procedures (based on original document from Corporate dated 4/16/98) Mediacom Upgrade/Splicing Procedures (based on original document from Corporate dated 4/16/98) 1. Splicing specifications are provided by Mediacom, but due to resplice conditions, many locations become

More information

AltaLink Management Ltd.

AltaLink Management Ltd. Decision 21317-D01-2016 Central Alberta Underground Fibre Optic Build July 12, 2016 Alberta Utilities Commission Decision 21317-D01-2016 Central Alberta Underground Fibre Optic Build Proceeding 21317 Application

More information

SUMMARY REPORT. Consultation Summary Report. January 2016

SUMMARY REPORT. Consultation Summary Report. January 2016 SUMMARY REPORT BC Hydro Public Consultation: Transmission Line Relocation George Massey Tunnel November 2 20, 2015 Consultation Summary Report January 2016 Prepared by Kirk & Co. Consulting Ltd. About

More information

KCRT. Prepared by: Sue Hartman, Director. Assisted by: Cecily McMahan

KCRT. Prepared by: Sue Hartman, Director. Assisted by: Cecily McMahan Prepared by: Sue Hartman, Director Assisted by: Cecily McMahan Television MISSION: Get Richmond s Voice Heard throughout Richmond, throughout the East Bay, and around the world. The Cable Television Division

More information

CHAPTER 98: CABLE TELEVISION Tampering with city cable system prohibited Fees

CHAPTER 98: CABLE TELEVISION Tampering with city cable system prohibited Fees CHAPTER 98: CABLE TELEVISION Section 98.01 Tampering with city cable system prohibited 98.02 Fees 98.99 Penalty Cross-reference: Compensation for cable television employees, see 31.46 98.01 TAMPERING WITH

More information

RAILWAY INVESTIGATION REPORT R12D0063 UNPROTECTED OVERLAP OF AUTHORITY

RAILWAY INVESTIGATION REPORT R12D0063 UNPROTECTED OVERLAP OF AUTHORITY RAILWAY INVESTIGATION REPORT R12D0063 UNPROTECTED OVERLAP OF AUTHORITY AGENCE MÉTROPOLITAINE DE TRANSPORT TRAINS AMT 94 AND AMT 93 MILE 40.8, ADIRONDACK SUBDIVISION ADIRONDACK JUNCTION MONTRÉAL, QUEBEC

More information

ATV-HD Project Executive Summary & Project Overview

ATV-HD Project Executive Summary & Project Overview ATV-HD Project Executive Summary & Project Overview Introduction & Statement of Need Since 2002, ATV has filmed nearly all of its shows in a small television studio attached to the station s offices in

More information

EXHIBIT A Zones Zone 1 (Urban): Zone 2 (Suburban): Zone 3 (Exurban) Blended Rates/Multiple Zones:

EXHIBIT A Zones Zone 1 (Urban): Zone 2 (Suburban): Zone 3 (Exurban) Blended Rates/Multiple Zones: EXHIBIT A Zones Zones are based on density of population, volume of business activity (measured by size of buildings, numbers of business parks, hospitals, etc.) that is likely to demand higher bandwidth

More information

A SMART, SAFE AND SMOOTH FUTURE TELESTE FOR CITY TRANSPORT. Video security and passenger information solution for city transport

A SMART, SAFE AND SMOOTH FUTURE TELESTE FOR CITY TRANSPORT. Video security and passenger information solution for city transport A SMART, SAFE AND SMOOTH FUTURE TELESTE FOR CITY TRANSPORT Video security and passenger information solution for city transport CREATE A SMOOTH PASSENGER EXPERIENCE Urban mobility is rapidly changing.

More information

ADDENDUM #3. SPECIAL NOTE: Addendum #3 information shall supersede the information contained in the Contract Documents

ADDENDUM #3. SPECIAL NOTE: Addendum #3 information shall supersede the information contained in the Contract Documents WESLEYAN U N I V E R S I T Y Facilities 170 Long Lane Middletown, Connecticut 06457 (860) 685-3476 FAX (860) 685-3101 ADDENDUM #3 Date: March 4, 2013 Project: To: CFA A Rehearsal Hall AHU Replacement Annual

More information

ADDENDUM NO. 6 PORT OF NOME SECURITY CAMERA PROJECT RFP

ADDENDUM NO. 6 PORT OF NOME SECURITY CAMERA PROJECT RFP P.O. Box 281 o Nome, Alaska 99762 ADDENDUM NO. 6 DATE: May 22, 2017 TO: Proposers FROM: Joy Baker, Project Manager RE: PORT OF NOME SECURITY CAMERA PROJECT RFP NOTES TO PROPOSERS: The Proposal submittal

More information

FIRST ADDENDUM TO THE MEMORANDUM OF UNDERSTANDING Fiber Optic Network Agreement

FIRST ADDENDUM TO THE MEMORANDUM OF UNDERSTANDING Fiber Optic Network Agreement ADDENDUM 1 FIRST ADDENDUM TO THE MEMORANDUM OF UNDERSTANDING Fiber Optic Network Agreement Between The City of Lawrence, Kansas ( The City ) and The University of Kansas, a public educational institution

More information

Telecommunications, Pay Television, and Related Services 119

Telecommunications, Pay Television, and Related Services 119 www.revenue.state.mn.us Telecommunications, Pay Television, and Related Services 119 Sales Tax Fact Sheet 119 Fact Sheet What s new in 2017 Starting July 1, 2017, purchases of fiber and conduit used to

More information

CASE STUDY. Smart Motorways Project. Temporary CCTV Monitoring Systems for England s Motorway network.

CASE STUDY. Smart Motorways Project. Temporary CCTV Monitoring Systems for England s Motorway network. CASE STUDY Smart Motorways Project. Temporary CCTV Monitoring Systems for England s Motorway network. OVERVIEW The Strategic Road Network in England covers over 2,200 miles (3,500Km) and facilitates more

More information

General Questions. Q: What s the big deal about fiber? Why is it better than what I have today? Q: How is the fiber going to be installed to my home?

General Questions. Q: What s the big deal about fiber? Why is it better than what I have today? Q: How is the fiber going to be installed to my home? General Questions Frequently Asked Questions Q: What s the big deal about fiber? Why is it better than what I have today? A: Let s start by defining what Hotwire means when we say fiber verses when another

More information

REQUEST FOR QUOTE: TELECOMMUNICATIONS CABLING Library/Classroom Building, Beltline Campus

REQUEST FOR QUOTE: TELECOMMUNICATIONS CABLING Library/Classroom Building, Beltline Campus REQUEST FOR QUOTE: TELECOMMUNICATIONS CABLING Library/Classroom Building, Beltline Campus PART 1: GENERAL REQUIREMENTS A. Contractor Work 1. Provide and install (except as noted in this document), cable,

More information

Tab 10 - The NESC and Underground Applications. Restricted Siemens Industry, Inc All rights reserved.

Tab 10 - The NESC and Underground Applications. Restricted Siemens Industry, Inc All rights reserved. Tab 10 - The NESC and Underground Applications Restricted Siemens Industry, Inc. 2017 All rights reserved. siemens.com/poweracademy The National Electric Safety Code (NESC) The NESC provides guidelines

More information

Town Hall Meeting Fiber to Home Q&A January 28, 2016

Town Hall Meeting Fiber to Home Q&A January 28, 2016 Town Hall Meeting Fiber to Home Q&A January 28, 2016 **Answers are summarized and may not be verbatim. Please refer to audio for full responses. QUESTION ANSWER RESPONSE GIVEN BY 1) What all do we get

More information

A Discussion with Neighborhood Representatives RPI 3/13/2017-1

A Discussion with Neighborhood Representatives RPI 3/13/2017-1 A Discussion with Neighborhood Representatives RPI 3/13/2017-1 Committee Overview IT S ALL ABOUT HIGH SPEED INTERNET High speed internet enables future technology Wi-Fi connected devices: Mobile phones,

More information

MACOMB COUNTY DEPARTMENT OF ROADS TRAFFIC OPERATIONS CENTER

MACOMB COUNTY DEPARTMENT OF ROADS TRAFFIC OPERATIONS CENTER MACOMB COUNTY DEPARTMENT OF ROADS TRAFFIC OPERATIONS CENTER To provide and maintain a reliable real-time traffic operations system, in coordination with county stakeholders, that enables a safe, efficient,

More information

Huawei AT815SN Brochure-Detailed

Huawei AT815SN Brochure-Detailed Huawei AT815SN Brochure-Detailed Huawei AT815SN Brochure-Detailed Huawei AT815SN is a standard outdoor access terminal (AT) that provides excellent remote access performance and enhanced protection. It

More information

Federal Transit Administration s New Starts Process. Circle Line Alternatives Analysis Study

Federal Transit Administration s New Starts Process. Circle Line Alternatives Analysis Study Federal Transit Administration s New Starts Process Circle Line Alternatives Analysis Study September, 26 Tonight s Speakers Darud Akbar Moderator Chicago Transit Authority Jeffrey Sriver Project Manager

More information

Minimum qualifications for the Telecommunications Engineer are: A. Texas Licensed Profession Engineer (PE)

Minimum qualifications for the Telecommunications Engineer are: A. Texas Licensed Profession Engineer (PE) PART 1: GENERAL 1.01 Telecommunications Engineer Minimum qualifications for the Telecommunications Engineer are: A. Texas Licensed Profession Engineer (PE) B. Registered Communications Distribution Designer

More information

GLX Project Green Line Extension Project. March 2, 2016 Public Meeting

GLX Project Green Line Extension Project. March 2, 2016 Public Meeting GLX Project Green Line Extension Project Presentation Overview Project Status Redesign Constraints Key Areas of Redesign Focus Q&A - Discussion Past Future Present 2 The Clock is Ticking... Day 36 and

More information

*** no equipment put on roofs or buildings. Dish must be put in ground 3 feet from building to allow for mowing. ***

*** no equipment put on roofs or buildings. Dish must be put in ground 3 feet from building to allow for mowing. *** 6/14/18 What is your policy on residents and TV Satellite dishes? They can have satellite dish on their own. They may not attach the dish to the building or covered car port. The dish must be on a pole

More information

Metrotown Station and Exchange Upgrades

Metrotown Station and Exchange Upgrades Metrotown Station and Exchange Upgrades Welcome to the Metrotown Station and Exchange Upgrade Open House Purpose of the Open House: Inform neighbours, businesses and customers about: the conceptual design

More information

Smooth Media Production Internet T.V / Internet Radio

Smooth Media Production Internet T.V / Internet Radio Date: Client Name Client Address City State Zip Phone # ( ) ( ) Email Myspace.com Website Name of Artist / Group Name of Album Track (s) 1. 2. 3. Track # Broadcast Date Do Not Fill Schedule Portion Out

More information

Statement of Work. Falcon Stadium Locker Room Audio-Visual & Telecommunications Package. 3 May 2018

Statement of Work. Falcon Stadium Locker Room Audio-Visual & Telecommunications Package. 3 May 2018 Statement of Work Falcon Stadium Locker Room Audio-Visual & Telecommunications Package 3 May 2018 Table of Contents: 1. Project Description 1.1. Overview 1.2. Background 1.3. Project Scope 1.4. Stakeholders,

More information

Transportation Engineering -II Dr. Rajat Rastogi Department of Civil Engineering Indian Institute of Technology - Roorkee

Transportation Engineering -II Dr. Rajat Rastogi Department of Civil Engineering Indian Institute of Technology - Roorkee Transportation Engineering -II Dr. Rajat Rastogi Department of Civil Engineering Indian Institute of Technology - Roorkee Lecture - 22 Signals part - 1 Dear students, I welcome you back to the lecture

More information

Selecting the correct cable type for Outside Plant Application

Selecting the correct cable type for Outside Plant Application Application Notes Selecting the correct cable type for Outside Plant Application Issued December 2012 Abstract Organized selection methodology of optical cable for a specific application is important.

More information

Tucker Theatre Policies and Procedures MTSU Department of Theatre 205 Boutwell Dramatic Arts Murfreesboro, TN 37132

Tucker Theatre Policies and Procedures MTSU Department of Theatre 205 Boutwell Dramatic Arts Murfreesboro, TN 37132 Tucker Theatre Policies and Procedures MTSU Department of Theatre 205 Boutwell Dramatic Arts Murfreesboro, TN 37132 GENERAL INFORMATION Tucker Theatre is a proscenium theatre with two side stages. Auditorium

More information

FIFTH ADDENDUM TO THE MEMORANDUM OF UNDERSTANDING Fiber Optic Network Agreement

FIFTH ADDENDUM TO THE MEMORANDUM OF UNDERSTANDING Fiber Optic Network Agreement ADDENDUM 5 FIFTH ADDENDUM TO THE MEMORANDUM OF UNDERSTANDING Fiber Optic Network Agreement Between The City of Lawrence, Kansas ( The City ) and Douglas County, Kansas ( The County ) Dated: December, 2015

More information

Proposal Endorsement Signatures

Proposal Endorsement Signatures 2006-2007 Learning Technologies Grants Proposal (COVER PAGE) Project Information Interactive MIDI Workstations for Class Piano and Music Technology Instruction Project Title Dr. Peter Jutras Project Director

More information

HONEYWELL VIDEO SYSTEMS HIGH-RESOLUTION COLOR DOME CAMERA

HONEYWELL VIDEO SYSTEMS HIGH-RESOLUTION COLOR DOME CAMERA Section 00000 SECURITY ACCESS AND SURVEILLANCE HONEYWELL VIDEO SYSTEMS HIGH-RESOLUTION COLOR DOME CAMERA PART 1 GENERAL 1.01 SUMMARY The intent of this document is to specify the minimum criteria for the

More information

APPLICATIONS typical application: Lighting automation Other applications of the SO and SI line of controllers: HVAC automation Industrial automation OVERVIEW The S Series are microprocessor based I/O controllers

More information

THEATRE DIRECTOR, Beck Theatre

THEATRE DIRECTOR, Beck Theatre THEATRE DIRECTOR, Beck Theatre JOB DESCRIPTION HQ Theatres & Hospitality (HQT&H), the venue management division of the Qdos Entertainment Group, is the UK s second largest theatre operator, with a portfolio

More information

Appendix 6 St. Bernard Basin

Appendix 6 St. Bernard Basin Appendix 6 St. Bernard Basin The St. Bernard (STB) basin is defined by the protection system along the GIWW to the north, MRGO to the east, Caernarvon Canal to the south, and the Mississippi River and

More information

Before the FEDERAL COMMUNICATIONS COMMISSION Washington, D.C

Before the FEDERAL COMMUNICATIONS COMMISSION Washington, D.C Before the FEDERAL COMMUNICATIONS COMMISSION Washington, D.C. 20554 In the Matter of ) ) WT Docket 11-79 Wireless Telecommunications Bureau Seeks ) DA 11-838 Comment on Spectrum Needs for the ) Implementation

More information

ORDINANCE NO

ORDINANCE NO ORDINANCE NO. 2017-05 AN ORDINANCE OF THE CITY OF WILLIAMSTOWN, KENTUCKY AMENDING 2015-01 AND PREVIOUSLY ADOPTED ORDINANCES OF THE CITY OF WILLIAMSTOWN AND THE CITY OF WILLIAMSTOWN CODE OF ORDINANCES ESTABLISHING

More information

Colorado River Union High School District 1004 Hancock Rd Bullhead City, AZ (928)

Colorado River Union High School District 1004 Hancock Rd Bullhead City, AZ (928) Colorado River Union High School District 1004 Hancock Rd Bullhead City, AZ 86442 (928) 758-3961 NOTICE OF REQUEST FOR PROPOSAL RFP NAME: 2018 MHS Office Low Voltage. MATERIAL OR SERVICE: CRUHSD is seeking

More information

City of Palm Coast 2016 Capital Projects Timeline - 1st Quarter

City of Palm Coast 2016 Capital Projects Timeline - 1st Quarter CAPITAL PROJECTS FUND Seminole Woods Path Sesame-Seminole to Selma Tr (south) Design, Permits, Env. Clearance, CDBG Release TIMELINE TIMELINE TIMELINE PROJECTED Q1-3 Q1-3 Sesame - Selma Tr (south) to Citation/Seminole

More information

DOLORES COUNTY BROADCASTING NETWORK D C B N. Development Progression

DOLORES COUNTY BROADCASTING NETWORK D C B N. Development Progression DOLORES COUNTY BROADCASTING NETWORK D C B N Development Progression By Dan Fernandez Dolores County DCBN Manager Through the CSUCE Communities in Economic Transition program (Nov. 1995), a community business

More information

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY THIS PRINT COVERS CALENDAR ITEM NO. : 10.2 SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY DIVISION: Capital Programs & Construction BRIEF DESCRIPTION: Authorizing the award of San Francisco Municipal Transportation

More information

Brunswick Town Council Workshop with Rail Officials Town Council Chambers, Brunswick Town Hall Monday, October 30, 2017, 7:00-9:00 PM

Brunswick Town Council Workshop with Rail Officials Town Council Chambers, Brunswick Town Hall Monday, October 30, 2017, 7:00-9:00 PM Brunswick Town Council Workshop with Rail Officials Town Council Chambers, Brunswick Town Hall Monday, October 30, 2017, 7:00-9:00 PM AGENDA Noise from Train Operations Objectives: Identify existing safety

More information

Smart Communities Using GIS

Smart Communities Using GIS Smart Communities Using GIS Building a Smarter City with the Internet of Things Ashley Riggs, GISP Assistant Director of IT ariggs@auburnwa.gov City of Auburn, Washington 30 square miles 450 full-time

More information

California Polytechnic State University ITS Telecommunications PART 1 GENERAL SECTION AUDIO VISUAL STATION CABLES 1.

California Polytechnic State University ITS Telecommunications PART 1 GENERAL SECTION AUDIO VISUAL STATION CABLES 1. PART 1 GENERAL 1.01 DESCRIPTION A. The work covered by this section of the Specifications includes all labor necessary to perform and complete such construction, all materials and equipment incorporated

More information

COST SHARING POLICY FOR COMCAST CABLE SYSTEM CONSTRUCTION FOR STREETS WHICH DO NOT MEET MINIMUM DENSITY REQUIREMENTS

COST SHARING POLICY FOR COMCAST CABLE SYSTEM CONSTRUCTION FOR STREETS WHICH DO NOT MEET MINIMUM DENSITY REQUIREMENTS AGENDA ITEM #6.B TOWN OF LOS ALTOS HILLS Staff Report to the City Council August 18, 2016 SUBJECT: FROM: COST SHARING POLICY FOR COMCAST CABLE SYSTEM CONSTRUCTION FOR STREETS WHICH DO NOT MEET MINIMUM

More information

WM2013 Conference, February 24 28, 2013, Phoenix, Arizona USA

WM2013 Conference, February 24 28, 2013, Phoenix, Arizona USA Remediation of Centre Pier, Port Hope, Ontario: Historical, Logistical, Regulatory and Technical Challenges 13118 Andrea Ferguson Jones, P.Geo.*, Glenn Case, P, Eng.** and Dave Lawrence, P.Eng.*** * MMM

More information

Based on our maintenance efforts, during the second quarter of 2018, Comcast s plant was 99.9% reliable.

Based on our maintenance efforts, during the second quarter of 2018, Comcast s plant was 99.9% reliable. December XX, 2018 Comcast Cable 253 Najoles Road Millersville,MD 21108 Terry Shannon County Administrator 175 Main Street Prince Frederick, MD 20678 Dear Mrs. Shannon, The purpose of this letter is to

More information

OCC Installation Conduit Guidelines Excerpt from Optical Cable Corporation s INSTALLATION GUIDE

OCC Installation Conduit Guidelines Excerpt from Optical Cable Corporation s INSTALLATION GUIDE Installation Conduit Guidelines Excerpt from Optical Cable Corporation s INSTALLATION GUIDE Conduit Installation A conduit cable installation involves placement of one or more optical cables inside a preinstalled

More information

Cable Broadband Premises Installation and Service

Cable Broadband Premises Installation and Service Hands-On Cable Broadband Premises Installation and Service Course Description This Hands-On Broadband Premises Installation and Service for Cable Telecommunications course covers the knowledge needed to

More information

Loco or Train No. Device that Failed Location Collision or Derailment? Cause /25/1995 SP CTC Amtrak No. 6 Signal 7274 East Riverton, UT N

Loco or Train No. Device that Failed Location Collision or Derailment? Cause /25/1995 SP CTC Amtrak No. 6 Signal 7274 East Riverton, UT N IronWood Technologies Railroad Accident Reconstruction Federal Railroad Administration False Proceed Signal Database January 1, 1995 through May 3, 2004 All Reports - State of Utah s 508 8/25/1995 SP CTC

More information

Addendum: Rain Dial Installation and Programming Guide Update

Addendum: Rain Dial Installation and Programming Guide Update Addendum: Rain Dial Installation and Programming Guide Update Your Rain Dial controller has been updated with several new features making it faster to program, easier to maintain, compliant with water

More information

Escorting / Supervision of service providers and contractors

Escorting / Supervision of service providers and contractors Escorting / Supervision of service providers and contractors PIN020 Operations Directorate 8 The Director of Operations 29/01/14 See Section 5 of this document - - 29/01/2016 29/01/2014 IPS Policy for

More information

File: /2018- Director, Arts, Culture and Heritage Services Vol 01

File: /2018- Director, Arts, Culture and Heritage Services Vol 01 City of Richmond Report to Committee To: From: Re: Parks, Recreation and Cultural Services Committee Date: March 7, 2018 Jane Fernyhough File: 08-4150-09-01/2018- Director, Arts, Culture and Heritage Services

More information

CITY OF LOS ANGELES CIVIL SERVICE COMMISSION CLASS SPECIFICATION POSTED JUNE VIDEO TECHNICIAN, 6145

CITY OF LOS ANGELES CIVIL SERVICE COMMISSION CLASS SPECIFICATION POSTED JUNE VIDEO TECHNICIAN, 6145 CITY OF LOS ANGELES CIVIL SERVICE COMMISSION CLASS SPECIFICATION POSTED JUNE 1999 04-26-96 VIDEO TECHNICIAN, 6145 Summary of Duties: Operates municipal access equipment for City departments, City Council

More information

SECTION MEDIUM VOLTAGE CABLE INSTALLATION. 1. Section Underground Ducts and Manholes.

SECTION MEDIUM VOLTAGE CABLE INSTALLATION. 1. Section Underground Ducts and Manholes. SECTION 33 71 49.23 MEDIUM VOLTAGE CABLE INSTALLATION PART 1 GENERAL 1.1 SCOPE A. Work included in this Section: Medium Voltage Cable (4 kv and 12 kv) Installation and Termination. Removal and return of

More information

RATE INCREASE FAQs. Can you tell me what one TV station/network costs?

RATE INCREASE FAQs. Can you tell me what one TV station/network costs? RATE INCREASE FAQs 1 Why are rates going up? 2 Can you tell me what one TV station/network costs? 3 Your services are too expensive...i am going to switch to a different provider. 4 I refuse to pay more

More information

Honorable Mayor and Members of the City Council. Submitted by: Scott Ferris, Acting Director, Parks, Recreation & Waterfront

Honorable Mayor and Members of the City Council. Submitted by: Scott Ferris, Acting Director, Parks, Recreation & Waterfront Office of the City Manager CONSENT CALENDAR November 27, 2012 To: From: Honorable Mayor and Members of the City Council Christine Daniel, City Manager Submitted by: Scott Ferris, Acting Director, Parks,

More information

APPENDIX D TECHNOLOGY. This Appendix describes the technologies included in the assessment

APPENDIX D TECHNOLOGY. This Appendix describes the technologies included in the assessment APPENDIX D TECHNOLOGY This Appendix describes the technologies included in the assessment and comments upon some of the economic factors governing their use. The technologies described are: coaxial cable

More information

2178-L/S Series Fiber Optic Splice Case with Gasket

2178-L/S Series Fiber Optic Splice Case with Gasket 2178-L/S Series Fiber Optic Splice Case with Gasket Instructions for: 2178-S Splice Case 2178-LS Splice Case 2178-LL Splice Case 2181-LS Cable Addition Kit May 1997 34-7041-9949-5-A 1 Table of Contents

More information

PURCHASING DEPARTMENT. Project # Addendum # # of pages Original Issue Date Request Doc # April 15, see text below

PURCHASING DEPARTMENT. Project # Addendum # # of pages Original Issue Date Request Doc # April 15, see text below PURCHASING DEPARTMENT The bid listed below has had addenda issued. Documents are available over the Internet at http://www.norwalkct.org Adobe Acrobat reader is required to view this document. If you do

More information

Licensing & Regulation #379

Licensing & Regulation #379 Licensing & Regulation #379 By Anita Gallucci I t is about three years before your local cable operator's franchise is to expire and your community, as the franchising authority, receives a letter from

More information

APPLICATION OF POWER SWITCHING FOR ALTERNATIVE LAND CABLE PROTECTION BETWEEN CABLE LANDING STATION AND BEACH MAN HOLE IN SUBMARINE NETWORKS

APPLICATION OF POWER SWITCHING FOR ALTERNATIVE LAND CABLE PROTECTION BETWEEN CABLE LANDING STATION AND BEACH MAN HOLE IN SUBMARINE NETWORKS APPLICATION OF POWER SWITCHING FOR ALTERNATIVE LAND PROTECTION BETWEEN LANDING STATION AND BEACH MAN HOLE IN SUBMARINE NETWORKS Liyuan Shi (Huawei Marine Networks) Email: Huawei

More information

800 MHz Band Reconfiguration

800 MHz Band Reconfiguration 800 MHz Band Reconfiguration NSMA Spectrum Management 2009 May 19, 2009 1 Agenda Reconfiguration Status Border Region Update Licensing Regional Plans Implementation Planning Session Schedule Management

More information

Impacts on Cable HFC Networks

Impacts on Cable HFC Networks Copyright 2014, Technology Futures, Inc. 1 Impacts on Cable HFC Networks Robert W Harris Senior Consultant, Technology Futures, Inc. rharris@tfi.com TFI Communications Technology Asset Valuation Conference

More information

Powerful 2x2 MIMO airmax BaseStation. Datasheet. Models: RM2-Ti, RM5-Ti. Rugged Weatherproof Die-Cast Aluminum Enclosure

Powerful 2x2 MIMO airmax BaseStation. Datasheet. Models: RM2-Ti, RM5-Ti. Rugged Weatherproof Die-Cast Aluminum Enclosure Powerful 2x2 MIMO airmax BaseStation Models: RM2-Ti, RM5-Ti Rugged Weatherproof Die-Cast Aluminum Enclosure High Throughput Gigabit Ethernet Port Incredible 50+ km Range and 150+ Mbps Speed Powerful airmax

More information

U-verse Outside Plant Cabinets AT&T Knowledge Ventures. All rights reserved. AT&T and the AT&T logo are trademarks of AT&T Knowledge Ventures.

U-verse Outside Plant Cabinets AT&T Knowledge Ventures. All rights reserved. AT&T and the AT&T logo are trademarks of AT&T Knowledge Ventures. U-verse Outside Plant s U-verse Outside Plant (OSP) Certifications AT&T certifies that Lightspeed cabinets, wiring and equipment have been inspected for and are compliant to the following industry standards:

More information

Cambria County Association for the Blind and Handicapped 175 Industrial Park Road Ebensburg, PA Prepared for: Prepared by:

Cambria County Association for the Blind and Handicapped 175 Industrial Park Road Ebensburg, PA Prepared for: Prepared by: Cable Management in Solar PV Arrays: A Review of Requirements in the National Electrical Code and how CAB Cable Rings and Saddles Meet These Requirements Prepared for: Cambria County Association for the

More information

GATOR PATCH. The ultimate fiber distribution terminal

GATOR PATCH. The ultimate fiber distribution terminal The ultimate fiber distribution terminal PRODUCT OVERVIEW Rugged, Fast, Reliable! Trust the original Gator Patch for all your fiber distribution needs The Gator Patch is a unique, rugged, factory terminated

More information

Bravo AV s Structured or Whole-House Wiring Approach

Bravo AV s Structured or Whole-House Wiring Approach Custom Audio & Video Systems: Design and Installation Bravo AV s Structured or Whole-House Wiring Approach THE QUALITY OF THE CABLE YOU USE IS CRITICALLY IMPORT TO THE PERFORMANCE OF YOUR SYSTEM Introduction

More information

Verizon Transition Update December 5, Process

Verizon Transition Update December 5, Process Verizon Transition Update December 5, 2017 Information Contained in this Document is not for Public Distribution. The information and document are for Hershey s Mill Home Owners personal use only. Process

More information

Identification - electrical services

Identification - electrical services Identification - electrical services Aesthetic All live phase cable sheathing to be brown coloured and neutral phase cable sheathing to be blue coloured, all labelled L1, L2, L3 & N respectively in accordance

More information

FROM: CITY MANAGER DEPARTMENT: ADMINISTRATIVE SERVICES SUBJECT: COST ANALYSIS AND TIMING FOR INTERNET BROADCASTING OF COUNCIL MEETINGS

FROM: CITY MANAGER DEPARTMENT: ADMINISTRATIVE SERVICES SUBJECT: COST ANALYSIS AND TIMING FOR INTERNET BROADCASTING OF COUNCIL MEETINGS TO: HONORABLE CITY COUNCIL FROM: CITY MANAGER DEPARTMENT: ADMINISTRATIVE SERVICES DATE: FEBRUARY 3, 2003 CMR: 131:03 SUBJECT: COST ANALYSIS AND TIMING FOR INTERNET BROADCASTING OF COUNCIL MEETINGS RECOMMENDATION

More information

RECENT FRANCHISE RENEWAL PEG ACCESS OUTCOMES (re HD, VOD, EPG, Funding)

RECENT FRANCHISE RENEWAL PEG ACCESS OUTCOMES (re HD, VOD, EPG, Funding) RECENT FRANCHISE RENEWAL PEG ACCESS OUTCOMES (re HD, VOD, EPG, Funding) City/PEG Entity PEG Channels in HD PEG VOD Electronic Program Guide PEG Capital & Operations Borough of Bronx, NY (2011) (vision)

More information

Brief History of the MUTCD

Brief History of the MUTCD Brief History of the MUTCD 1930s 1920s 1960s Early 1950s Today Gene Hawkins Texas Transportation Institute 1940s The MUTCD There have been 8 editions of the MUTCD 1935 1942 1948 1961 1971 1978 1988 2000

More information

STATE OF VERMONT PUBLIC SERVICE BOARD

STATE OF VERMONT PUBLIC SERVICE BOARD STATE OF VERMONT PUBLIC SERVICE BOARD In Re: Renewal of the Certificate of Public ) Good of The Helicon Group, L.P., d/b/a ) Docket No. 7820 Charter Communications, to provide cable ) television service

More information

Upgrade of 450/550 MHz Cable Systems to 600 MHz Using a Phase Area Approach. Robb Balsdon Vice President, Engineering Services Rogers Engineering

Upgrade of 450/550 MHz Cable Systems to 600 MHz Using a Phase Area Approach. Robb Balsdon Vice President, Engineering Services Rogers Engineering Upgrade of 45/55 MHz Cable Systems to 6 MHz Using a Phase Area Approach Robb Balsdon Vice President, Engineering Services Rogers Engineering ABSTRACT This paper reviews the issues that Rogers considered

More information

3 Locating and Marking Products DOCUMENT OBSOLETE

3 Locating and Marking Products DOCUMENT OBSOLETE 3 Locating and Marking Products This was Wall Street, 1921 2 Imagine what it s like down there today. 3 Spotting the target with Dynatel Cable/Fault Locators. The opening photos in this brochure show the

More information

Ralph Engelstad Arena. PROMOTER S GUIDE Technical Facility Information. REA Technical Facility Information Updated 7/28/14

Ralph Engelstad Arena. PROMOTER S GUIDE Technical Facility Information. REA Technical Facility Information Updated 7/28/14 Ralph Engelstad Arena PROMOTER S GUIDE Technical Facility Information 1 CONTENTS Telephone Directory Building Specifications Seating Capacity Floor Dimensions Ice Floor Covering Stage Dimensions Dressing/Locker

More information

CASS COUNTY, MICHIGAN CASSOPOLIS, MI REQUEST FOR PROPOSAL SPECIFICATIONS

CASS COUNTY, MICHIGAN CASSOPOLIS, MI REQUEST FOR PROPOSAL SPECIFICATIONS CASS COUNTY, MICHIGAN CASSOPOLIS, MI REQUEST FOR PROPOSAL SPECIFICATIONS Cass County, Michigan invites qualified vendors to submit proposals for the purchase, installation, and programming of: a door card

More information

INVITATION TO BID SURVEILLANCE SYSTEM UPGRADE

INVITATION TO BID SURVEILLANCE SYSTEM UPGRADE INVITATION TO BID SURVEILLANCE SYSTEM UPGRADE You are hereby invited to submit a bid to upgrade an existing surveillance system within the City of Compton, as follows: Upgrade an existing City of Compton

More information

The FiberMark1 offers an ideal solution for

The FiberMark1 offers an ideal solution for Large Capacity Fiber Optic Splice Enclosure The Ideal Solution For Large Capacity Voice, Data, and Video Splicing Requirements. The FiberMark1 offers an ideal solution for larger fiber capacity voice,

More information

Modernized Day Sensor Assembly (M-DSA)

Modernized Day Sensor Assembly (M-DSA) Modernized Assembly (M-DSA) October 22, 2013 Matt Hoffman Director, M-TADS/PNVS Missiles and Fire Control LTC Van Riper Apache Sensors Product Manager U.S. Army 2013 Lockheed Martin Corporation. All Rights

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 26 0553 - IDENTIFICATION FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

OCC Installation Figure 8 Guidelines Excerpt from Optical Cable Corporation s INSTALLATION GUIDE

OCC Installation Figure 8 Guidelines Excerpt from Optical Cable Corporation s INSTALLATION GUIDE Installation Figure 8 Guidelines Excerpt from Optical Corporation s INSTALLATION GUIDE Figure 8 A figure 8 fiber optic cable design incorporates a steel or dielectric messenger into the fiber optic cable

More information

2. SUPERPATH Mbps Digital Service 2.1. General

2. SUPERPATH Mbps Digital Service 2.1. General Page 1 Rates and charges for services explained herein are contained in Part M, Section 3, Service Charges referred to herein are explained in Part A, Section 3 and contained in Part M, Section 1. 2.1

More information

Quante BPEO Splice-Protection Closure for Optical Fiber Cables. Features Advantages Benefits

Quante BPEO Splice-Protection Closure for Optical Fiber Cables. Features Advantages Benefits 3 Quante BPEO Splice-Protection Closure for Optical Fiber Cables BPEO: Fully Mechanical, Easy to Install, No Specific Tools BPEO is the newest generation of watertight spliceprotection closures for optical

More information

FIVE FLAGS CENTER FEASIBILITY STUDY REPORT

FIVE FLAGS CENTER FEASIBILITY STUDY REPORT FIVE FLAGS CENTER FEASIBILITY STUDY REPORT The FFCC has long-served as an important community asset for Dubuque and its residents. Its long history can be traced back to the mid-1800 with the opening of

More information

Notice of Copyright. Citing Resources from the Western History Collections

Notice of Copyright. Citing Resources from the Western History Collections Notice of Copyright Published and unpublished materials may be protected by Copyright Law (Title 17, U.S. Code). Any copies of published and unpublished materials provided by the Western History Collections

More information

SECTION TESTING, IDENTIFICATION AND ADMINISTRATION

SECTION TESTING, IDENTIFICATION AND ADMINISTRATION PART 1 - GENERAL 1.1 SUMMARY SCOPE SECTION 25170 TESTING, IDENTIFICATION AND ADMINISTRATION 1. This section includes the minimum requirements for the testing, certification administration and identification

More information

High performance circuit breakers

High performance circuit breakers Series High performance Description The high performance MCB offers a compact solution to circuit protection. The devices are DIN rail mounted. The is available with application-specific trip characteristics

More information

IndyGo Facility Upgrades Project 35671EE

IndyGo Facility Upgrades Project 35671EE SECTION 260553 IDENTIFICATION FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Identification for raceways. 2. Identification of power and control cables. 3. Identification for

More information

GV2P05. Main. Device short name. Device application

GV2P05. Main. Device short name. Device application Product datasheet Characteristics GV2P05 Main Range Product name Device short name Product or component type Device application Trip unit technology TeSys TeSys GV2 GV2P Circuit breaker Motor Thermal-magnetic

More information

Libraries. Goals. The City will:

Libraries. Goals. The City will: Libraries Goals The City will: Provide adequate public facilities and services for all services which the City provides. Coordinate the location and design of all City public facilities with the goals

More information

Operating Manual (Edition 04/2004) sinamics. Line Reactors SINAMICS G130

Operating Manual (Edition 04/2004) sinamics. Line Reactors SINAMICS G130 Operating Manual (Edition 04/2004) sinamics Line Reactors SINAMICS G130 Contents 1. Safety Information 2 2. General 5 3. Mechanical Installation 6 4. Electrical Installation 8 5. Technical Specifications

More information