1 6.10 Cable Installation Purpose This field instruction outlines the minimum cable installation requirements for all Horizon Power Workers, including Workers operating, servicing, and/ or maintaining (MPS) Micro Power Systems electrical equipment (inclusive of all generating methodologies) for the following activities; laying cable pulling cable bedding cable backfilling cable trenches Note: This work practice must be read in conjunction with the following: Main Roads Western Australia - Utility Providers Code of Practice for Western Australia (1 February 2010) Underground Distribution Schemes Manual (UDS) Underground Cable Installation Manual (UCIM) Familiarity with the above manuals is essential for personnel undertaking cable laying activities on behalf of Horizon Power. Safety Before commencement of work, a risk assessment must be carried out using the Risk Analysis Procedure (OSH ), to identify and document the hazards and risks associated with the task and ensure appropriate control measures are implemented. It is important that, appropriate control measures must be identified, documented and implemented in order to control hazards to As Low as Reasonable Practicable (ALARP). Authorisation Personnel performing cable installation work on Horizon Power worksites must conform to field instruction 1.3 Construction site access minimum requirements. The person in charge of cable installation at the worksite must, in addition to the above, have a Cable Layer authorisation. In order to achieve this authority, personnel must have attended and passed: Any registered training organisation UETTDRCJ21A Lay ESI electrical cables. Before commencing work: Ensure that all personnel comply with the minimum personal protective equipment (PPE) requirements when handling, loading, excavating, laying or pulling cables (see FI 2.6 Worksite Clothing / PPE Requirements) CS# FI 6.10 Cable Installation Page 1 of 10
2 Conduct a risk assessment and job briefing to consider the following: shoring excavations confined spaces vehicle and pedestrian traffic management using machinery (for pulling cable) work near other underground and overhead services stability of any structure near excavations public safety additional PPE requirements Note: Livestock behind fences must be kept secure. Private property must not be damaged. Services must not be damaged. If trees in the road verge must be pruned, the pruned limbs must be sealed and left in a reasonable condition. Instruction Planning All work planning must take place before excavation begins. The following must be notified at least five days before work commences: Main Roads WA Railway services Local shires Councils and affected public Use the Dial before You Dig service to obtain information from all utilities about the location of existing underground services within the proposed area of work. When planning to install new cable, the following site access requirements and limitations must be considered: Environmental impact Private property or utilities (gas, telecom, rail, etc.). Other Horizon Power services (overhead, underground). CS# FI 6.10 Cable Installation Page 2 of 10
3 For more information go to: Main Roads Western Australia - Utility Providers Code of Practice for Western Australia (1 February 2010) AS Installation of underground utility services and pipelines within railway boundaries Note: Pavement or any constructed portions of any road reserve must not be broken to any extent without prior approval. For more on this, see the Underground Cable Installation Manual (UCIM), Section 16.4 Restoration of Surface: Excavation and Directional Drilling The requirements for excavation and directional drilling are covered in FI 6.4 Excavation Work and Directional Drilling, and the Underground Cable Installation Manual (UCIM) Ploughing Ploughing technology allows cables to be ploughed into the ground with an envelope of clean backfill sand. Ploughing equipment has the capability of installing cables in the following arrangements: o o Three single core cables (not twisted) in flat or trefoil (triangular) formation. As a minimum, cores must be transposed at every drum change. Triplex (twisted) The cable configuration must be surrounded with clean sand that is free of rocks and other hard formations: o o o 150 mm underneath the cable 50 mm on either side of the cable 300 mm above the cable Lay orange marker tape over the clean sand, as described in the Marking the ploughed cable route section, below. Fill the trench and compact to ground level with remaining material (ensure that stones and rocks have been removed) CS# FI 6.10 Cable Installation Page 3 of 10
4 Marking the ploughed cable route Permanent above-ground cable markers must be installed along a cable route as described in Table 1 below. Table 1 Cable Marking Requirements Alignment category Description Marker tape required? (300 mm above cables) Above ground cable markers required? A Cable within the standard mm alignment Install cable at a depth of 850 mm. Use orange marker tape above cable. Yes No B Cable within the m alignment Install cable at a depth of 850 mm. Use orange marker tape above cable. Yes No C Cable outside road reserve (in remote area where there are no other services or infrastructure in the vicinity) Install cable at a depth of 1200 mm. Use orange marker tape above cables and above ground cable markers. Yes Yes When markers are required (per Table 1, above), they must be placed: on either side of the road at the crossing point wherever a cable crosses a boundary (e.g. road reserve property boundary, etc) and as close as possible to the cable installation For cables in paddocks and open spaces: place markers so that the impact or damage to agriculture (including livestock) is kept to a minimum place markers at the boundaries if a cable has to cross a paddock Markers should also be placed: to signify a change in direction of the cable route so that adjacent markers are visible from each other at a maximum distance of 150 m apart Cable Alignments If cables are placed on alignment marker tape must be placed above the clean sand. The marker tape must be wide enough to cover the cables. If cables are placed off alignment (outside the mm alignment or the m alignment) prior approval from Horizon Power and any other affected utilities must be obtained. CS# FI 6.10 Cable Installation Page 4 of 10
5 If cable is out of the nominal mm or m alignment use heavy duty ducts to provide mechanical protection. If off alignment cables are buried direct cable cover slabs must be placed on top of 75 mm clean sand above the cable so that they overlap the width of the cables. This is followed by a further layer of clean sand to a depth of 300 mm above the cable and then marker tape. Note: For more information, see: Main Roads Western Australia - Utility Providers Code of Practice for Western Australia (1 February 2010). Underground Cable Installation Manual (UCIM), Section 10 Cables on and off Alignment Underground Distribution Schemes (UDS) Manual, Section 5 General Design Policies Handling Cable Drums Cable drums and cable are easily damaged through poor handling. Drums must be carefully loaded and handled using either: A forklift (with tines long enough to reach under both drum flanges) A crane (use spindles through the drum centre holes in conjunction with crane slings, lifting beams or spreader bars to prevent side pressure on the drum flanges) Never drop cable drums off a vehicle. The rolling of cable drums must be kept to a minimum. On delivery, visually inspect the cable drum for damage. Ensure that the cable end seals are intact. Cables must be returned to the supplier if the armouring, serving or sheath is: damaged corroded Positioning the drum Align the drum in the direction of the cable pull. Suitably mount the drum on purpose-built jacks, trailer or stands (a stable base must be provided for the drum during pulling). Spool the cable off the top of the drum. Check the drum flanges and remove any protrusions such as nails and splinters that could pierce the cable sheath. Ensure that the cable does not rub against the drum flange. Ensure that the drum is level and rotates freely and evenly. CS# FI 6.10 Cable Installation Page 5 of 10
6 Provide adequate barricading around the drum to prevent unauthorised access. Note: Cable may be pulled off the bottom of the drum if there are space restrictions. Ensure that the reason for doing this is recorded on the risk assessment. Laying Cable Laying or pulling cable into trenches or ducts presents a risk of damage to the outer sheath of the cable. Also, bending a cable beyond a certain limit can damage the insulation which may result in shortened life or faults (see the cable manufacturer s instructions for minimum bend radii). Ensure that there is someone monitoring the drum during the pull to prevent overrun (two-way communications must be in place). When pulling cables, cable rollers must be used as they will: provide protection from abrasion assist with pulling cable around corners reduce friction and pulling tension In all instances, cables that are being drawn into place must be kept clear of abrasive surfaces by suitable means (e.g. rollers) to prevent any damage to the cable sheath. The cable must be placed in the trench without sustaining abrasion damage and without allowing rocks, etc. to fall into the trench and onto the cable. During cable installation, ensure that no twists, knots or kinks are formed. If the cable is being flaked directly into its final position in the trench and is not being pulled (i.e. the drum is moving) then rollers, etc. are not necessary. The cable must still be laid onto the required 150 mm of clean sand bedding (see the Bedding cable section, below). Pulling cable through ducts The cable outer sheath must not be damaged when pulling cables through ducts. A flared or belled entry must be used at the entry end of ducts during pulling to prevent damage to cable. For more information, see Underground Cable Installation Manual (UCIM), Section 13 Conduits Note: When pulling cable into a duct: It is recommended that personnel use specialised conduit rollers or flutes. Use a suitable lubricant to reduce friction between the cable and the duct. CS# FI 6.10 Cable Installation Page 6 of 10
7 CS# FI 6.10 Cable Installation Page 7 of 10
8 Pulling Tension Pulling tension must be regulated according to the size and type of cable. See the cable manufacturer s instructions for maximum pulling tensions. Pulling tensions can be limited using: breakaway swivel rated to the cable (pulling fuse) pre-set winch tension rated to the cable dynamometer (must be monitored) force gauge (must be monitored) Pulling speed must be limited to avoid drum overruns and damage to the cable. Pulling Methods When using power winches, there are four methods of attaching cable to the winch rope. The most suitable depends on the following: type of cable size length construction Armour pulling Uses the armour wires extended beyond the end of the cable and formed into a pulling eye. Stocking pulling Common for cables up to 33 kv. Care must be taken to not apply too much tension and stretch the cable sheath. Nose pulling For long cables and large cross section cables. Uses pulling eyes attached to the cable conductors. Used when stocking pulling exceeds sheath strength. Bond pulling Cable is lashed to steel wire rope to distribute pulling tension throughout its length (bonded). This method is only used when end pulling tensions for the cable are exceeded. Bend Radii Use rollers to reduce friction and provide an adequate bend radius when pulling cable around corners. Trenches must be wide enough to allow for the minimum installing bend radius (see the cable manufacturer s instructions for minimum bend radii). Cable sealing Cable that is not going to be terminated immediately must be re-sealed if the seal is damaged after pulling and/or removing any pulling eyes. Bedding cable The minimum cover for cables is 850 mm. This will ensure that a depth of 750 mm at the joints is maintained. CS# FI 6.10 Cable Installation Page 8 of 10
9 The cable configuration must be surrounded with clean sand that is free of rocks and other hard formations: 150 mm underneath the cable 50 mm on either side of the cable 300 mm above the cable For cables vertically above one another, the sand filling between them must be 200 mm and the top cable must be covered with a further 300 mm of soft sand. Backfilling When backfilling a cable trench, ensure that: the backfill material is free of stones, rocks and paving material rubbish, pipe or cable off-cuts are not buried in the trench the backfilled material is compacted in layers to the same density as the surrounding soil the backfill is the same level as the original, unexcavated land all surplus spoil is removed from site Surface restoration Any pavement or constructed surfaces that are damaged during excavation must be restored in accordance with the Restoration and Reinstatement Specification for Local Governments in Western Australia (see the References section, below). Restoration of surface includes restoration of footpath of all type of materials (e.g. bitumen, brick paving, liquid limestone) Where cement footpath slabs have been removed to allow cable trench excavation, they must be reinstated in accordance with the local council's requirements. All damage to private property must be repaired (within reason) to the landowner s satisfaction, this may include: trees (limbs cut, sealed and debris removed) fences and walls (protected from damage) structures (protected from damage) paving (restored back to former condition) reticulation systems (repaired) underground services (repaired) For more on this, see Underground Cable Installation Manual (UCIM), Section 16 Reinstatement, and Section 17 Damage to Property CS# FI 6.10 Cable Installation Page 9 of 10
10 References Occupational Safety & Heath Act 1984 Occupational Safety & Health Regulations 1996 SHMS OSH Job Risk Analysis (JRA) Procedure SHMS OSH Personal Protective Equipment 1.3 Construction Site Access Minimum Requirements 2.5 Other Personal Protective Equipment 2.6 Worksite Clothing / Personal Protective Equipment Requirements 2.23 Job Hazard and Risk Management (JRA) 6.1 Working Adjacent to Gas Mains 6.4 Excavation Work and Directional Drilling Section 9 of the Horizonpower s Instruction Manual Environmental UETTDRCJ21A Lay ESI electrical cables - Registered RTO Training AS (Installation of underground utility services and pipelines within railway boundaries) Main Roads Western Australia - Utility Providers Code of Practice for Western Australia (1 February 2010) Restoration and Reinstatement Specification for Local Governments in Western Australia 5E PDF Underground Cable Installation Manual Underground Distribution Schemes (UDS) Manual CS# FI 6.10 Cable Installation Page 10 of 10
All Dielectric Self Supporting (ADSS) Fiber Optic Cable Installation
All Dielectric Self Supporting (ADSS) Fiber Optic Cable Installation Underground Installation M P - 1012 Issue #3 March 2011 DISCLAIMER OF WARRANTIES AND LIMITATION OF LIABILITIES The practices contained
More informationCable installation guidelines
The Quality Connection Cable installation guidelines Business Unit Industrial Projects 2 Cable installation guidelines www.leoni-industrial-projects.com GENERAL Installation methods Many different methods
More informationAerial Cable Installation Best Practices
Aerial Cable Installation Best Practices Panduit Corp. 2007 BEST PRACTICES Table of Contents 1.0 General... 3 2.0 Introduction... 3 3.0 Precautions... 4 4.0 Pre-survey... 5 5.0 Materials and Equipment...
More informationIdentification - electrical services
Identification - electrical services Aesthetic All live phase cable sheathing to be brown coloured and neutral phase cable sheathing to be blue coloured, all labelled L1, L2, L3 & N respectively in accordance
More informationTab 10 - The NESC and Underground Applications. Restricted Siemens Industry, Inc All rights reserved.
Tab 10 - The NESC and Underground Applications Restricted Siemens Industry, Inc. 2017 All rights reserved. siemens.com/poweracademy The National Electric Safety Code (NESC) The NESC provides guidelines
More informationPreparing a home for TransACT fibre-to-the-premise (FTTP) services
Preparing a home for TransACT fibre-to-the-premise (FTTP) services A guide for builders, telecommunications cablers and home owners transact.com.au For more information call TransACT s FTTP Sales Manager,
More informationUnderground Installation of Optical Fiber Cable by Pulling
Application Notes Underground Installation of Optical Fiber Cable by Pulling Authors Prasanna Pardeshi and Sudipta Bhaumik Issued July 2015 Abstract This application note discusses underground fiber optic
More informationHigh Voltage Cables kv. Handling and Operating Instructions
High Voltage Cables 52 145 kv Handling and Operating Instructions 1 (24) HANDLING AND OPERATING DRYREX High voltage cables 52 145 kv Contents Scope of application...3 General...3 Professional skills, tools
More informationTriax TechInfo. Installing and pulling Fibre Optic cables
Installation methods for both wire cables and Fibre Optical cables are similar. Fibre cable can be pulled with much greater force than copper wire if you pull it correctly. Just remember these rules: 1)
More informationINSTRUCTION DE SÉCURITÉ SAFETY INSTRUCTION Mandatory as defined in SAPOCO/42 FIRE PREVENTION FOR CABLES, CABLE TRAYS AND CONDUITS
CERN INSTRUCTION DE SÉCURITÉ SAFETY INSTRUCTION Mandatory as defined in SAPOCO/42 Edms 335813 TIS IS 48 Edited by: TIS/GS Publication Date: June 2001 Original: English FIRE PREVENTION FOR CABLES, CABLE
More informationAPPLICATION OF POWER SWITCHING FOR ALTERNATIVE LAND CABLE PROTECTION BETWEEN CABLE LANDING STATION AND BEACH MAN HOLE IN SUBMARINE NETWORKS
APPLICATION OF POWER SWITCHING FOR ALTERNATIVE LAND PROTECTION BETWEEN LANDING STATION AND BEACH MAN HOLE IN SUBMARINE NETWORKS Liyuan Shi (Huawei Marine Networks) Email: Huawei
More information3M Scotchcast Mine and Portable Cable Splice and Jacket Repair Kit M-40
3M Scotchcast Mine and Portable Cable Splice and Jacket Repair Kit M-40 Instructions 1 & 2 For Jacket Repair (pages 2 & 7) Supplemental Instructions for: Insulation Repair (page 12) Conductor Repair (page
More informationInstallation of Optical Fiber
Application Notes Installation of Optical Fiber Author Mr. Prasanna Pardesi This procedure describes general information for installation of optical fiber cable pulled or blown in HDPE ducts. Keywords
More informationIdentification of LV Cables
Identification of LV Cables Owner Name Title Peter Vujanic Head of Health Safety and Environment Signature Date 09 July 2018 Authoriser Name Title Dudley Sparks Operational Safety Manager Signature Date
More informationMedium Voltage 12/20 (24)kV NF C cable system. Xavier Brosse Luanda May 2009
Medium Voltage 12/20 (24)kV NF C 33-226 cable system Xavier Brosse Luanda May 2009 1 Evolution of French standard for MV cables Late 70 s : NF C 33-223 Cable Standard in France result of the move from
More informationIndyGo Facility Upgrades Project 35671EE
SECTION 260553 IDENTIFICATION FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Identification for raceways. 2. Identification of power and control cables. 3. Identification for
More informationTrack Work Authority ANWT 306. Applicability. Publication Requirement. Document Status NSW SMS. External Only October 2015.
Applicability NSW SMS Publication Requirement External Only Document Status Issue/Revision # Effective from 2.0 11 October 2015 Australian Rail Track Corporation Limited (ARTC) Disclaimer This document
More informationDISCLAIMER. This document is current at the date of downloading. Hunter Water may update this document at any time.
DISCLAIMER This Standard Technical Specification was developed by Hunter Water to be used for construction or maintenance of water and/or sewerage works that are to become the property of Hunter Water.
More informationVITALink Taped Splice Straight Through Crimp
A Marmon Wire & Cable Berkshire Hathaway Company VITALink Taped Splice Straight Through Crimp 2 Hour Fire-Rated Splice VITALink MC Cables, UL FHIT 120 Installation Instructions Description The VITALink
More informationFIBER OPTIC CABLE PULLING
C H A P T E R 15 FIBER OPTIC CABLE PULLING THOMAS A. DOOLEY AND JERALD R. ROUNDS (with hints from Northern Lights Cable) Electrical wire installers know how to pull cable. The basic approach to pulling
More informationAll Dielectric Self Supporting (ADSS) Fiber Optic Cable Installation
All Dielectric Self Supporting (ADSS) Fiber Optic Cable Installation Underground Installation Install 22 June 23, 2017 DISCLAIMER OF WARRANTIES AND LIMITATION OF LIABILITIES The practices contained herein
More informationSPECIAL SPECIFICATION 6559 Telecommunication Cable
2004 Specifications CSJ 0015-09-147, etc. SPECIAL SPECIFICATION 6559 Telecommunication Cable 1. Description. This specification governs the materials, installation, termination, splicing, testing, training,
More informationNetwork Safeworking Rules and Procedures
Network Safeworking Rules and Procedures Fixed Signals Rule Number: 6005 Version 1.0, 31 March 2016 Fixed Signals Rule Number: 6005 Document Control Identification Document title Number Version Date 6005
More informationSPECIAL SPECIFICATION 8540 Telecommunication Cable
2004 Specifications CSJ 0914-00-307 & CSJ 0914-25-003 SPECIAL SPECIFICATION 8540 Telecommunication Cable 1. Description. This specification governs the materials, installation, termination, splicing, testing,
More informationELECTRICAL SAFETY INSPECTION REPORT. MTM Garments Ltd.
ELECTRICAL SAFETY INSPECTION REPORT MTM Garments Ltd. 15934/16004, Chanpara, Medical Road, Uttarkhan, Dhaka, Bangladesh. Factory List MTM Garments Ltd. Inspected by: Hemlal Dahal Report Generated by: Hemlal
More informationPower cable accessories catalogue
Power cable accessories catalogue Cable Pulling Equipment Extensive Range of Stock Available Across the UK Jointing Tech is the leading distributor of power cable and accessories supplying products and
More informationCHAPTER 14 WIRING SIGNALS AND LIGHTING FIELD GUIDE Wiring Requirements WIRING
WIRING CHAPTER 14 WIRING The installation of all wiring, including electrical cables and conductors, must conform to the National Electrical Code (NEC). The Code represents the minimum required standard.
More information2178-L/S Series Fiber Optic Splice Case with Gasket
2178-L/S Series Fiber Optic Splice Case with Gasket Instructions for: 2178-S Splice Case 2178-LS Splice Case 2178-LL Splice Case 2181-LS Cable Addition Kit May 1997 34-7041-9949-5-A 1 Table of Contents
More informationSCREEN WINCH SYSTEM INSTALLATION MANUAL FOR SCREENS FROM 300 cm. UP TO 450 cm. of width
SCREEN WINCH SYSTEM INSTALLATION MANUAL FOR SCREENS FROM 300 cm. UP TO 450 cm. of width Before installing the screen winch system, please read the following instructions carefully: The screen winch system
More informationSupport Frame STB Technical Instruction Manual
Support Frame STB Technical Instruction Manual Fig. 2.1: Support frame STB 450 Fig. 2.2: Support frame STB 300 Fig. 2.3: Brace bracket SK 150 Product Characteristics The support frames are mainly used
More informationSUMITOMO PRODUCT SPECIFICATION. FutureFLEX. TCxxMSOS-2 HIGH PERFORMANCE OSP TUBE CABLE SERIES WITH GALVANIZED STEEL INTERLOCKED ARMORING
SUMITOMO PRODUCT SPECIFICATION FutureFLEX TCxxMSOS-2 HIGH PERFORMANCE OSP TUBE CABLE SERIES WITH GALVANIZED STEEL INTERLOCKED ARMORING SUMITOMO ELECTRIC LIGHTWAVE CORP. 201 South Rogers Lane, Suite 100,
More informationOCC Installation Round Messenger Guidelines Excerpt from Optical Cable Corporation s INSTALLATION GUIDE
Installation Round Messenger Guidelines Excerpt from Optical Cable Corporation s INSTALLATION GUIDE Round Messenger (ADSS) A round messenger fiber optic cable is designed for use in aerial installations
More informationAerial Installation Guidelines for Fiber Optic Cable
Installation Practice IP-003 April 2018 Aerial Installation Guidelines for Fiber Optic Cable Contents Section Scope.. 1 General Description of OFS Cables. 2 Aerial Design Information.. 3 Span Rules....
More informationTELECOMMUNICATIONS V S WATER UTILITIES NATURE STRIP CONGESTION. Leigh Trevaskis. Riverina Water County Council
TELECOMMUNICATIONS V S WATER UTILITIES NATURE STRIP CONGESTION Paper Presented by: Leigh Trevaskis Author: Leigh Trevaskis, Works Supervisor, Riverina Water County Council 7 th Annual WIOA NSW Water Industry
More informationSECTION MEDIUM VOLTAGE CABLE INSTALLATION. 1. Section Underground Ducts and Manholes.
SECTION 33 71 49.23 MEDIUM VOLTAGE CABLE INSTALLATION PART 1 GENERAL 1.1 SCOPE A. Work included in this Section: Medium Voltage Cable (4 kv and 12 kv) Installation and Termination. Removal and return of
More informationInstrumentation Cables
Instrumentation Cables 9 KEWBERG manufactures and supplies a wide range of Instrumentation cables, which are made using superior raw materials. These are extensively used in data acquisition systems, process
More informationTruePlate Structural Plate
TruePlate Structural Plate Galvanized Steel and Aluminum Alloy Sizes, Shapes and Height of Cover Tables TrueNorthSteel.com info@truenorthsteel.com 866-82-511 TruePlate Structural Plate Many drainage and
More informationACADEMIC SUCCESS CENTER THE COLLEGE AT BROCKPORT STATE UNIVERSITY OF NEW YORK PROJECT NO
SECTION 270536 - CABLE TRAYS FOR COMMUNICATIONS SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division
More informationTRANSMISSION ENGINEERING STANDARD TES-P , Rev. 0 TABLE OF CONTENTS 1.0 SCOPE 2.0 CABLES SPLICES
1.0 SCOPE TABLE OF CONTENTS 2.0 CABLES SPLICES 2.1 Definitions 2.2 Scope of Specifications and Drawings 2.3 General Requirements 2.4 Routing Cables 2.5 Connectors 2.6 Conductor Connections 2.7 Heat Shrinkable
More informationSCREEN WINCH SYSTEM INSTALLATION MANUAL FOR SCREENS UP TO 300 cm. of width
SCREEN WINCH SYSTEM INSTALLATION MANUAL FOR SCREENS UP TO 300 cm. of width Before installing the screen winch system, please read the following instructions carefully: The screen winch system must be used
More informationSUMITOMO PRODUCT SPECIFICATION. FutureFLEX. TCxxMSOS DIELECTRIC HIGH PERFORMANCE OSP TUBE CABLE SERIES
SUMITOMO PRODUCT SPECIFICATION FutureFLEX TCxxMSOS DIELECTRIC HIGH PERFORMANCE OSP TUBE CABLE SERIES SUMITOMO ELECTRIC LIGHTWAVE CORP. 201 South Rogers Lane, Suite 100, Raleigh, NC 27610 (919) 541-8100
More informationSCREEN WINCH SYSTEM INSTALLATION MANUAL FOR SCREENS UP TO 300 cm. of width
SCREEN WINCH SYSTEM INSTALLATION MANUAL FOR SCREENS UP TO 300 cm. of width Before installing the screen winch system, please read the following instructions carefully: The screen winch system must be used
More informationSUMITOMO PRODUCT SPECIFICATION. FutureFLEX. TCxxTOX / TOD DIELECTRIC OSP TUBE CABLE SERIES
SUMITOMO PRODUCT SPECIFICATION FutureFLEX TCxxTOX / TOD DIELECTRIC OSP TUBE CABLE SERIES SUMITOMO ELECTRIC LIGHTWAVE CORP. 201 South Rogers Lane, Suite 100, Raleigh, NC 27610 (919) 541-8100 or 1-800-358-7378
More informationAustralian/New Zealand Standard
AS/NZS 4026:2008 AS/NZS 4026:2008 Australian/New Zealand Standard Electric cables For underground residential distribution systems AS/NZS 4026:2008 This Joint Australian/New Zealand Standard was prepared
More informationINTERNATIONAL TELECOMMUNICATION UNION DIGITAL SECTIONS AND DIGITAL LINE SYSTEMS DEFINITION OF TERMS RELEVANT TO OPTICAL FIBRE SUBMARINE CABLE SYSTEMS
INTERNATIONAL TELECOMMUNICATION UNION ITU-T G.972 TELECOMMUNICATION (03/93) STANDARDIZATION SECTOR OF ITU DIGITAL SECTIONS AND DIGITAL LINE SYSTEMS DEFINITION OF TERMS RELEVANT TO OPTICAL FIBRE SUBMARINE
More informationInstructions. Cable with Armor F CAUTION. October Rev A
3M Single Conductor Accessory Breakout Kits (BOK's) for use with 3M Cable Accessories (Terminations, T-Bodies and Push-On Elbows) For Use With Single Conductor Accessories On Three-Core Conductor Cables
More informationLaying of cables and lines in electrical installations and data networks
Technical bulletin Laying of cables and lines in electrical installations and data networks Date: 08/2006 This technical bulletin provides you with information on specific technical subjects. It is based
More informationOCC Installation Figure 8 Guidelines Excerpt from Optical Cable Corporation s INSTALLATION GUIDE
Installation Figure 8 Guidelines Excerpt from Optical Corporation s INSTALLATION GUIDE Figure 8 A figure 8 fiber optic cable design incorporates a steel or dielectric messenger into the fiber optic cable
More informationELECTRICAL SAFETY FOLLOW UP INSPECTION REPORT (8th) Factory Name Address Factory ID
Factory Name Address Factory ID Shirir Chala, Bagherbazar 11705 Electrical Safety dates Initial Date 09/07/2014 30/10/2016 Date of 5 th Follow Up Report Received Date 24/08/2014 02/01/2017 Date of 6 th
More informationCables: Positive Identification and Spiking. Approval: EO Production Revision: A
Clean Green & Safe SP24-75 Cables: Positive Identification and Spiking Process Authority: Area Manager Lower Tumut Approval: EO Production Version Date: 14/03/2011 Revision: A 1. Purpose This procedure
More informationInstallation Operation Maintenance
Installation Operation Maintenance Rooftop Energy Recovery Module for TKD / TKH / WKD / WKH YKD / YKH / DKD / DKH # 125-155-175-200 250 265-290-340 # 275-300-350-400-500-600 April 2011 RT-SVX42B-E4 General
More informationTFT-150R-G. Tape Shield Cable (page 2) Suggested Installation Equipment (not supplied with kit) Wire Shield Cable (page 7)
TFT-150R-G 5-15kV Cold Applied Indoor (5-8kV Indoor and Outdoor) Termination for Copper Tape, Wire Shield, Lead Sheath, and UniShield Cable Suggested Installation Equipment (not supplied with kit) Cable
More informationDraft for Public Comment
Draft for Public Comment Form 36 Version 6.1 DPC: 03/302646 DC Head Office 389 Chiswick High Road London W4 4AL Telephone: +44(0)20 8996 9000 Fax: +44(0)20 8996 7001 Date: 27 March 2003 Origin: National
More informationELECTRICAL INCIDENT REPORT BUSHFIRE NEAR 22 NUKKLGUP LOOP YALLINGUP WESTERN AUSTRALIA 5 JANUARY Report prepared by: EnergySafety WA EIS
ELECTRICAL INCIDENT REPORT BUSHFIRE NEAR 22 NUKKLGUP LOOP YALLINGUP WESTERN AUSTRALIA 5 JANUARY 2015 Report prepared by: EnergySafety WA EIS2015-0009 12 June 2015 TABLE OF CONTENTS 1. SUMMARY... 3 2. EXAMINATION...
More informationOCC Installation Conduit Guidelines Excerpt from Optical Cable Corporation s INSTALLATION GUIDE
Installation Conduit Guidelines Excerpt from Optical Cable Corporation s INSTALLATION GUIDE Conduit Installation A conduit cable installation involves placement of one or more optical cables inside a preinstalled
More informationELECTRICAL SAFETY INSPECTION REPORT
ELECTRICAL SAFETY INSPECTION REPORT A PLUS INDUSTRIES LIMITED. Plot-28, Milk Vita Rd., Section-07, Mirpur, Dhaka Factory List: 1. A Plus Industries Ltd. Inspected by: Yoon Report Generated by: Nezar Inspected
More informationPOLICY & APPLICATION GUIDE FOR 11kV POLYMERIC CABLES
1. SCOPE This document provides information and guidance on the application of polymeric cables on the SPEN 11kV network. Throughout this document, references to 11kV shall by inference also relate to
More information(1) These Regulations may be called PEMRA Standards for Cable Television Regulations 2003.
PEMRA Cable Television (Operations) Regulations, 2002. Pakistan Electronic Media Regulatory Authority (PEMRA) The Pakistan Electronic Media Regulatory Authority (PEMRA) is pleased to make the Standards
More informationSWA Cable BS6724 Steel Wire Armoured LSZH Eland Product Group A9L
SWA Cable BS6724 Steel Wire Armoured LSZH Eland Product Group A9L Application SWA Cable power and auxiliary control cables for use in power networks, underground, outdoor and indoor applications and for
More information220KV EHV NETWORK AT RELIANCE JAMNAGAR REFINERY COMPLEX
220KV EHV NETWORK AT RELIANCE JAMNAGAR REFINERY COMPLEX JAMNAGAR 220KV CABLE NETWORK: 2 2. DESIGN 2A. NETWORK: 220 KV NETWORK DESIGN IS DESIGNED WITH 100% REDUNDANCY FROM 220 KV BUS TO LOAD. THIS IS ACHIEVED
More informationNewsletter
If you have a problem seeing this email, please click here to view the online version. Newsletter www.mox.com.au ISSUE EIGHT Welcome to the May edition of MOX News. Click to view MOX News online. Topics
More informationSECTION [ ] [02730] WAX-COATED DECOMPOSED GRANITE SURFACING
SECTION [32 15 40] [02730] WAX-COATED DECOMPOSED GRANITE SURFACING NexPave wax-coated decomposed granite provides beautiful and natural-looking surfacing for footpaths, horse trails, landscaping, and light
More informationSJOF-BS604B. Fiber Optic Splice Closure User Manual Rev.1
Fiber Optic Splice Closure 1. Introduction 1.1 General SAMJIN s SJOF-BS604B protects fiber optic splicing point in various installation conditions such as aerial, manholes, ducts, wall and direct buried
More informationCambria County Association for the Blind and Handicapped 175 Industrial Park Road Ebensburg, PA Prepared for: Prepared by:
Cable Management in Solar PV Arrays: A Review of Requirements in the National Electrical Code and how CAB Cable Rings and Saddles Meet These Requirements Prepared for: Cambria County Association for the
More informationSUMITOMO PRODUCT SPECIFICATION. FutureFLEX. TCxxTOX-2 OSP TUBE CABLE SERIES WITH GALVANIZED STEEL INTERLOCKED ARMORING
SUMITOMO PRODUCT SPECIFICATION FutureFLEX TCxxTOX-2 OSP TUBE CABLE SERIES WITH GALVANIZED STEEL INTERLOCKED ARMORING SUMITOMO ELECTRIC LIGHTWAVE CORP. 201 South Rogers Lane, Suite 100, Raleigh, NC 27610
More information3 Cleaning. 4 Technical data
EXC+ EXC- Sig- SIG+ SEN- SEN+ 2.4 Attaching cable to the analog board Attaching cable of the weighing cell to the system solution Connect the cable to the appropriate terminal strip of the Ex1 system solution
More informationSignalling Cable Equivalent Sizes
Signalling Cable Equivalent Sizes Signatures removed from electronic version Submitted by... Jim Harper Nominated Responsible Manager Synopsis This Standard Authorises the use of cables to GS/ES 0872 as
More informationCable Installation Tips
Cable Installation Tips Campus Network Design & Operations Workshop These materials are licensed under the Creative Commons Attribution-NonCommercial 4.0 International license (http://creativecommons.org/licenses/by-nc/4.0/)
More informationBharat Heavy Electricals Limited HIGH PRESSURE BOILER PLANT, TIRUCHIRAPPALLI CONTROLS AND INSTRUMENTATION/FB
Bharat Heavy Electricals Limited HIGH PRESSURE BOILER PLANT, TIRUCHIRAPPALLI 620 014. CONTROLS AND INSTRUMENTATION/FB DATA SHEET FOR MULTICORE, ARMOURED, CONTROL CABLE Project: Ennore Sez, 2 x 660 MW,
More informationPublic Works Division Lighting District Fiber Optic Specifications April 2009
Public Works Division Lighting District Fiber Optic Specifications April 2009 7000 Florida Street Punta Gorda, Florida 33950 Tele: 941.575.3600 Fax : 941.637.9265 www.charlottecountyfl.com/publicworks
More informationPEM1124ENG ENGLISH. STK TERMINATION KIT FOR PLASTIC CABLE WITHOUT ARMOURING 1 kv STKR TERMINATION KIT FOR PLASTIC CABLE WITH ARMOURING 1 kv
INSTALLATION INSTRUCTION PEM1124ENG 2010-05 STK TERMINATION KIT FOR PLASTIC CABLE WITHOUT ARMOURING 1 kv STKR TERMINATION KIT FOR PLASTIC CABLE WITH ARMOURING 1 kv ENGLISH 4 CORE 3+1 CORE 2/8 PEM1124ENG
More informationContact Details. British Transport Police: (24 hours) Crimestoppers: In association with:
Contact Details British Transport Police: 0800 40 50 40 (24 hours) Crimestoppers: 0800 555 111 In association with: 01 GUIDE FOR RAIL CABLE IDNETIFICATION OPERATION DRUM Contents Information for scrap
More informationFiberglass - Technical Data
- Technical Data Cable Tray Thermal Contraction and Expansion X : Denotes hold-down clamp (anchor) at support. _ : Denotes expansion guide clamp at support. It is important that thermal contraction and
More information3 Foam Sealed Closure 2" (50 mm) with Compound Compression
3 Foam Sealed Closure 2" (50 mm) with Compound Compression Instructions 1.0 General 1.1 The 3M Foam Sealed Closure is designed to be used in the construction and maintenance of buried and underground PIC
More informationPhotovoltaic Module Installation Manual (IEC)
Phono Solar Technology Co., Ltd. Add: No. 1 Xinghuo Rd., Nanjing Hi-tech Zone, Nanjing, China Tel: +86 25 5863 8000 Fax: +86 25 5863 8009 E-mail: support@phonosolar.com Website: www.phonosolar.com PHONO
More informationPhotovoltaic Module Installation Manual (IEC)
Phono Solar Technology Co., Ltd. Add: No. 1 Xinghuo Rd., Nanjing Hi-tech Zone, Nanjing, China Tel: +86 25 5863 8000 Fax: +86 25 5863 8009 E-mail: support@phonosolar.com Website: www.phonosolar.com PHONO
More informationCategory 3 Non-Cab Operated Crane Safety Rev-04 Instructor Guide Revisions
Category 3 Non-Cab Operated Crane Safety Rev-04 Instructor Guide Revisions Cover Sheet 1. Modified the course number to include the current revision NCC-C3CS-04 Introduction Module 2. In the Welcome topic,
More informationCLP s first 400kV XLPE cable application
CLP s first 400kV XLPE cable application Chris Cheung CLP Power Hong Kong Limited 9 October 2017 Information Classification : PROPRIETARY Information Classification : PROPRIETARY Project Requirement Due
More informationFlygt Submersible Motor Cables
Flygt Submersible Motor Cables This brochure contains an overview of the Flygt motor cable assortment. The cables are especially designed for submersible use and made of carefully selected materials. The
More information3M Better Buried Compound Compression Closure System
3M Better Buried Compound Compression Closure System Instructions March 2016 78-0015-2948-2-A Contents: 1.0 General...3 2.0 Kit Contents...3 3.0 Closure Selection Guide...4 4.0 LHS End Cap Installation...5
More informationPTS RABKA TRADE AND PRODUCTION COMPANY
PTS RABKA TRADE AND PRODUCTION COMPANY The PTS Rabka Company is a manufacturer of top quality warning and warning-detection tapes for marking telecommunication, gas, sewage and energy systems. The PTS
More informationMESP TECHNICAL SPECIFICATION FOR ELECTRIC CABLE 400mm 2 ALUMINIUM CONDUCTOR 1.9kV XLPE INSULATED WITHOUT METALLIC SCREEN
Engineering Specification Electrical Networks MESP 030000-02 TECHNICAL SPECIFICATION FOR ELECTRIC CABLE 400mm 2 ALUMINIUM CONDUCTOR 1.9kV XLPE INSULATED Version: 1 Issued: March 2014 Owner: Electrical
More informationMediacom Upgrade/Splicing Procedures (based on original document from Corporate dated 4/16/98)
Mediacom Upgrade/Splicing Procedures (based on original document from Corporate dated 4/16/98) 1. Splicing specifications are provided by Mediacom, but due to resplice conditions, many locations become
More informationSWA Cable - BS5467 Steel Wire Armoured PVC Eland Product Group A9S
SWA Cable - BS5467 Steel Wire Armoured PVC Eland Product Group A9S Application SWA Cable - power and auxiliary control cables for use in power networks, underground, outdoor and indoor applications and
More informationSelecting the correct cable type for Outside Plant Application
Application Notes Selecting the correct cable type for Outside Plant Application Issued December 2012 Abstract Organized selection methodology of optical cable for a specific application is important.
More informationINSTALLATION INSTRUCTIONS FOR
INSTALLATION INSTRUCTIONS FOR MODEL 2240LED www.sportablescoreboards.com 1 Table of Contents 8 X 7 INDOOR SCOREBOARD... 3 THE SCOREBOARD SYSTEM SHOULD INCLUDE THE FOLLOWING PARTS:... 3 INSTRUCTIONS FOR
More informationLANH39 SQA Unit Code H52S 04 Install hard-standing sub-layers
Overview This standards covers the installation of hard-standing sub-layers that are used within the landscaping industries. The standard is suitable for operatives working under limited supervision and
More informationGUIDELINES FOR CABLE LAYING (PEM ELECTRICAL)
GUIDELINES FOR CABLE LAYING (PEM ELECTRICAL) DOCUMENT NUMBER: PE-GL-999-507-E002, Rev. 00 ISSUE DATE: 15.05.14 BHARAT HEAVY ELECTRICALS LIMITED POWER SECTOR PROJECT ENGINEERING MANAGEMENT NOIDA PREFACEE
More information3M Better Buried Closures
3M Better Buried Closures Instructions March 2016 78-0015-2945-8-A Contents: 1.0 General... 3 2.0 Kit Contents... 3 3.0 Closure Selection Guide... 4 4.0 LHS End Cap Installation... 5 5.0 Cable Preparations...
More informationLEGEND POWER SYSTEMS
S HEAT SHRINK JOINT 11kV 3 CORE Armoured XLPE/EPR Copper Wire screens STRAIGHT JOINT LEGEND POWER SYSTEMS Date 11 November 2014 Instruction Number PJJ006-14C PJJ006-14C Page 1 of 10 HEAT SHRINKABLE JOINT
More informationTrends and Challenges of HV Cable Systems
Trends and Challenges of HV Cable Systems Bruno Arnold Electrical Engineer FH Global Sales Far East, Latin America and India Pfisterer Business Unit PTS Cable Trends and Challenges of HV Cable Systems
More informationStudent Services & Classroom Addition
SECTION 260513 - MEDIUM-VOLTAGE CABLES PART 1 - GENERAL 1.1 SUMMARY A. Section includes cables and related cable splices, terminations, and accessories for mediumvoltage (2001 to 35,000 V) electrical distribution
More informationDesign and Manufacture of Video Pipeline Inspection Systems A Full Service Company
Design and Manufacture of Video Pipeline Inspection Systems A Full Service Company www.rstechserv.com Omni III Pan and Tilt Color Camera Modell 10-01610 OPERATIONS MANUAL Made in USA IMPORTANT SAFETY NOTICE
More informationGuide for installers. METTLER TOLEDO MultiRange System solution analog Ex1. Hazardous area. Safe area
Guide for installers METTLER TOLEDO MultiRange System solution analog Ex1 Hazardous area Safe area System solution analog Ex1 Contents Contents Page 1 Safety precautions... 2 2 System overview... 3 2.1
More informationSUMITOMO PRODUCT SPECIFICATION. FutureFLEX. TCxxTP2-1 PLENUM RATED TUBE CABLE SERIES (NFPA 262) WITH GALVANIZED STEEL INTERLOCKED ARMORING
SUMITOMO PRODUCT SPECIFICATION FutureFLEX TCxxTP2-1 PLENUM RATED TUBE CABLE SERIES (NFPA 262) WITH GALVANIZED STEEL INTERLOCKED ARMORING SUMITOMO ELECTRIC LIGHTWAVE CORP. 201 South Rogers Lane, Suite 100,
More informationInstallation instructions Roxtec RM ES B
Installation instructions Roxtec RM ES B Environmental side Termination/ interior side Pipe Cable screen/armor Layers Termination/ interior side Cable sheath Layers Environmental side Vertical screen Plastic
More information2011 The Practicalities of Fibre Deployment Colin Kirkpatrick
2011 The Practicalities of Fibre Deployment Colin Kirkpatrick Background To Emtelle MDU Do It Right First Time Leading supplier of Blown Fibre passive network infrastructure solutions with its Emtelle
More informationATTACHMENT 2: SPECIFICATION FOR SEWER CCTV VIDEO INSPECTION
ATTACHMENT 2: SPECIFICATION FOR SEWER CCTV VIDEO INSPECTION 1.0 General 1.1 The work covered by this section consists of providing all labor, equipment, insurance, accessories, tools, transportation, supplies,
More informationSample Test Project. District / Zonal Skill Competitions. Skill- Electrical Installation. Category: Construction and Building Technology
Sample Test Project District / Zonal Skill Competitions Skill- Electrical Installation Category: Construction and Building Technology Version 1 Dec 2017 Skill- Electrical Installation 1 Table of Contents
More informationPKK PKK CHARACTERISTICS. Dimensions. Travel. Travel speed. Acceleration. Temperature. Special versions APPLICATION AREAS. PLE max.
PKK loa d / (kg/m) PKK 10 8 6 4 2 0 0 P KK 1 20 PKK applications 49 PKK dimensions 50 PKK types 52 PKK sizes 54 PKK parts 55 PKK assembly 56 PKK article numbers 62 LOAD DIAGRAM PKK 2 2 0 2 P KK 2 40 PKK
More information