Justifying the Proactive Replacement of Cable

Size: px
Start display at page:

Download "Justifying the Proactive Replacement of Cable"

Transcription

1 1 Justifying the Proactive Replacement of Cable Le Xu, Member, IEEE and Richard E. Brown, Fellow, IEEE Abstract Many utilities have aging underground cable systems that are failing at an increasing rate. Unfortunately, aggressive underground cable replacement programs are often difficult to justify since it is difficult to know whether any specific cable section will fail in the near future. This paper presents a simulation based methodology to justify a proactive cable replacement program. Its application at a large US utility is demonstrated. This methodology involves the sampling of representative circuits, the development of cable failure rate models and system reliability models that can track expected reliability over a twenty year period, and the sequential simulation of system reliability. Three proactive cable replacement scenarios are examined and their economics are compared, considering the integration of other reliability improvement projects. Index Terms aging infrastructure, cost-benefit analysis, proactive cable replacement, reliability, time value of money. M I. INTRODUCTION ANY utilities face the aging infrastructure issue. A large amount of equipment is approaching the end of its useful life; in addition, the amount of old equipment is increasing every year. This will result in increased equipment failures, more customer interruptions, and higher restoration costs. If nothing is done, age-related failures will continue to increase and eventually cause customer reliability to dramatically worsen. Much of the issue is related to underground distribution cable, much of which has approached or exceeded its expected lifetime. Utilities typically use reactive cable replacement strategies. However, reactive replacement results in unplanned customer interruptions, worsening reliability indices, and more expensive replacement costs (due to overtime wages and fault location costs). If relying exclusively on reactive cable replacement, utilities can expect a very large number of in-service failures in the near future, given the large population of aging cable. Eventually, there will be more in-service cable failures than a utility can effectively manage with pure reactive replacement. For these reasons and others (such as safety), the prudent approach for utilities is to have a proactive replacement program. Replacing old but still in service cable will prevent future outages due to in-service cable failures. However, proactive replacement requires that money to be spent earlier, effectively accruing the interest amount over the period of advancement. As a result, proactive underground replacement programs are often considered difficult to justify since it is L. Xu and R.E. Brown are with Quanta Technology, 4020 Westchase Blvd. Raleigh NC USA ( lxu@quanta-technology.com; rbrown@quanta-technology.com) /11/$26.00 IEEE difficult to know whether the replaced cable section will actually fail in the near future. Various studies such as [1] and [2] have been carried out to estimate the remaining life of underground cable. Typical existing distribution reliability studies do not cope with the temporal factor, such as [3] and [4]; instead, they assume component failure rates to be constant and investigate the effectiveness of various reliability improvement options. When aging infrastructure is a prominent factor of a study, this approach becomes insufficient. This paper examines the impact of aging underground cable to system reliability and proposes a simulation based methodology to investigate the costs associated with proactive underground cable replacement so as to justify its effectiveness economically. The application of the proposed method at a large US utility study is presented in this article as an example. Some proprietary information has been processed to be suitable for public demonstration. Section II of this paper briefly presents a representative circuit approach that selects a set of distribution circuits on which the study implemented can be extrapolated to the entire system in a statistically sound way. Section III examines the impact of aging underground cable to system reliability, with only reactive cable program. Section IV demonstrates the simulation approach that studies the affect of proactive cable replacement program to system reliability. Section V assesses the cost-effectiveness of proactive cable programs, followed by the conclusions of the paper in Section VI. II. REPRESENTATIVE CIRCUIT APPROACH A typical distribution system consists of hundreds to thousands of circuits. Their characteristics such as age, customer base, and configurations may vary substantially. It is prohibitively expensive and inefficient, also unnecessary, to study every circuit in order to understand the impact of a certain aspect to the system. The proposed representative circuit approach uses a statistical assessment of circuit data to select a small set of representative circuits for a study. The study of a representative circuit can be used to approximate the results of its associated circuit group, further allowing the result of the entire system to be estimated. The representative circuit set is selected using statistical clustering methods. The most commonly used algorithm is k- mean clustering. This article is not intended to restate mathematical derivations of the algorithm, which can be found in many textbooks such as [5] or online resources such as [6]. Instead, three practical aspects that can affect the representativeness of the circuit set are discussed.

2 2 A. Feature Selection In cluster analysis, similar circuits are grouped into the same subset while dissimilar circuits are separated into different ones. The degree of similarity is determined based on circuit features. The selection of circuit features is studydependent. For example, underground cable age is important for a reliability study, but may not be as critical for a load forecasting study. On the other hand, not all the relevant features are equally important to a study. For example, the peak load should be weighed more than the feeder length for a Plug-in Electric Vehicle impact study. The feature selection can rely on engineering judgment or statistical methods such as correlation analysis or regression analysis. As a reliability study, a stepwise regression with Customer Minutes of Interruption (CMI) as the dependent variable and other circuit features as independent variables is utilized for feature selection and weight determination. The stepwise regression calculates the capability of different features explaining the variation in CMI values, presented by the sample coefficient of determination (R 2 ), and chooses the relevant variables for the study. The incremental R 2 values are used as the weighting factors for the selected features. Features with higher weight have more influence in determining the similarity of two circuits than those with lower weight. B. Cluster Number Determination Typically, more circuit groups lead to better representativeness. If each circuit, as an individual cluster, only represents itself, then the system level result can be aggregated from circuit studies and there exists no approximation. However, more circuit groups result in more study effort and cost. Therefore, finding the best number of clusters requires a balance between the representativeness and the effort. The marginal benefit gained in the system representativeness generally decreases with the number of groups. The relationship between the marginal benefit and the group number can be studied by a series run of analysis with different cluster numbers. This study selects 25 representative circuits to represents a system with a few thousands of circuits. C. System Extrapolation With the representative circuit approach, system characteristics are represented by different circuit groups and each group of similar circuits is represented by a typical circuit. The study of aging underground cable is conducted on the representative circuits. Since a representative circuit represents the most common reliability relevant characteristics of the group, the impact of cable replacement, reactive or proactive, to this circuit is similar to other circuits in the same cluster. Therefore, the study can be extrapolated to the cluster level, and then the system level results can be aggregated from different clusters. There are various system extrapolation approaches such as optimization. The most straightforward method is to weigh the study conducted on any representative circuit by the number of circuits within its cluster. This approach generates the weighting factors that are easy to understand and interpolate; and has the widest acceptance among utility engineers. III. IMPACT OF AGING UNDERGROUND CABLE In order to analyze the impact of aging cable to system reliability, it is critical to understand the trend of underground cable failures against its age. Some studies like [7] proposed practical method to develop cable failure rate models. Fig.1 presents the probability of failure for four main types of underground cables at different ages. These failure rate models are developed by the utility according to its cable installation data and outage history. Probability of Failure 80% 60% 40% 20% 0% Fig.1. Underground cable failure rate model As shown in the figure, the probability of underground cable failure increases exponentially with the cable age, regardless of type. With the underground cable failure rate increasing, customers will experience more interruptions and system reliability will become worse. A 20-year simulation (from 2010 to ) is implemented to examine the change of system reliability indices with underground cable aging. In the simulation, no reliability improvement projects other than regular replacement upon failures, or reactive cable replacement, are considered. During the simulation, all the underground cable sections in the circuit models are scanned and the in-service failure events are generated based on the age dependent failure rates of different cable types. The average cable length replaced per inservice failure for this particular utility is 0.3 conductor miles. Therefore, approximately this length of cable section will be replaced in the simulation once a failure event is generated. In addition, the simulated cable replacement follows the actual replacement practice. For example, HMW and XLPE cables are generally replaced by new TR-XLPE cable. It is understood that the randomness in generating cable failure events may cause the calculated circuit reliability indices to vary from simulation to simulation. For a pure numerical study, multiple simulations are typically implemented to derive an expected outcome. However, this study needs a base model, instead of just a base case result, to compare various reliability improvement options. Therefore, a model resulted from one single simulation is kept as the base case model. Since there are thousands of cable sections included in the circuit models, the failure event simulation among cable sections has already mitigated some of the variation, to some extent. Experiment has shown that the variance of the calculated Age PILC HMW XLPE TR-XLPE

3 3 reliability indices is less than 5%. So it can be assumed that the simulation results from the selected base case model are statistically representative. Fig.2 shows how the system reliability, measured by SAIFI and SAIDI, will deteriorate over the next twenty years due to aging cable, given only reactive cable replacement. These normalized system level indices are extrapolated from the simulation results for the representative circuits. 170% 160% 150% 140% 130% 120% 110% 2010 SAIFI Year SAIDI Fig.2. System reliability with aging cable and reactive replacement SAIFI is a measure of how many sustained interruptions an average customer will experience over the course of a year, while SAIDI is a measure of how many interruption hours an average customer will experience over the course of a year. As can be seen, aging cable will result in an increase in SAIDI and SAIDI of about 50% over the next twenty years. This is not likely to be acceptable to customers and other stakeholders. The total amount of cable that will fail over the next twenty year can be estimated according to the cable failure rate models and the age distribution of the underground cable of the utility. This amount of cable will have to be replaced, either reactively when it fails in service or proactively in a planned manner. The prudent approach for the utility is to include proactive replacement in its planning. The only question is to the amount, the approach, and the timing. IV. PROACTIVE CABLE REPLACEMENT PROGRAM Proactively cable program replaces the most failure-prone underground cable so that future outages due to in-service failures can be avoided. This program typically comes hand in hand with the traditional reactive cable replacement program. The relationship between the amount of reactive cable replacement and the amount of proactive cable replacement has to be carefully determined. A large portion of proactive replacement may not be cost-effective since cable sections with relatively long expected remaining life will be replaced before needed; on the other hand, a small portion of proactive replacement results in more in-service cable failures and worse system reliability. Based on its cable population and the corresponding age distribution, the utility in this study is particularly interested in investigating three scenarios, i.e., proactively replacing 150, 415, and 700 conductor miles of underground cable each year. The impact of different proactive cable replacement programs is studied through a simulation approach, in which the same 20-year period (2010-) is sequentially simulated. In each simulation year, both reactive and proactive cable programs are implemented. The simulation of reactive cable replacement follows the similar approach as described in section II: cable failure events are probabilistically generated to determine the to-be-replaced cable sections. The proactive cable program aims to replace the most failure-prone sections, which are the ones with the highest failure rate. In the simulation, this population is typically consistent with the oldest cable sections in the circuit models, even though different cable types may have certain variance in its failure rate as shown in Fig.1. According to the total conductor miles of cable to be proactively replaced throughout the system, a proportionally scaled amount for 25 representative circuits is computed. The simulation then follows the utility s cable practice to replace the designated amount of failure-prone cable sections. More proactive cable replacement will lead to less reactive cable replacement over the years. The simulated system reliability indices, SAIFI and SAIDI, under three proposed proactive cable replacement scenarios are shown in Fig. 3 and Fig. 4, respectively. 170% 160% 150% 140% 130% 120% 110% 2010 Reactive Only Proactive: 415 Mile/Year Proactive: 150 Mile/Year Proactive: 700 Mile/Year Fig. 3. SAIFI trend under various cable replacement programs 160% 150% 140% 130% 120% 110% 2010 Reactive Only Proactive: 415 Mile/Year Proactive: 150 Mile/Year Proactive: 700 Mile/Year Fig. 4. SAIDI trend under various cable replacement programs It is observed from the simulation records that approximately the same amount of cable has been replaced, reactively and proactively, under different scenarios. In other words, more cable is proactively replaced and less cable is replaced upon

4 4 in-service failures in the 700-mile/year scenario, comparing with the other two. The difference of total amount of cable replacement between the 415-mile/year scenario and the 150- mile/year scenario is less than 1%, while the 700-mile/year scenario replaces 6.5% more. This observation ensures that the system reliabilities in different scenarios are compared on the same ground. As shown in Fig. 3 and Fig. 4, the system reliability in terms of SAIFI and SAIDI gets worse due to aging underground cable over the next 20 years, however, integrating proactive cable replacement can significantly lessen the degree of performance deterioration. The SAIFI values at are reduced by 8%, 20%, and 33% in three scenarios, respectively; The SAIDI values at are reduced by 10%, 23%, and 36%, respectively. It is of no surprise that the 150 mile/year scenario has the least improvement and the 700 mile/year scenario has the most. It is worthy to point out that the trend of SAIDI values in the 700 mile/year scenario becomes steady towards the end of the 20-year simulation period, which implies that the impact of cable aging starts to be compensated by the proactive cable replacement. The steady stage of the system reliability can be expected to occur earlier if more cable is proactively replaced every year. V. COST-BENEFIT ANALYSIS OF PROACTIVE CABLE REPLACEMENT PROGRAM As the simulation results show, replacing cable before inservice failures occur can prevent some of the outages and improve system reliability. However, since the cable replacement expenditure takes place earlier, which accrues additional cost that is effectively the interest amount over the period of advancement. As a result, it is important to carefully select the amount of proactive cable replacement based on the assessment of its costs and benefits. SAIDI reduction is typically a utility s main goal of system reliability improvement, thus it is used as the main driver for evaluating the cost-effectiveness of each alternative, even though SAIFI reduction is also monitored during the analysis. Typically, the cost-effectiveness of a reliability improvement project is defined as the ratio of the cost of implementing it to its corresponding reliability benefits in terms of Customer Minutes of Interruption (CMI) reduction, which is proportional to SAIDI reduction. Different from a traditional reliability improvement project in which the total expense is the cost considered in the economic analysis; the cost associated with proactive cable replacement for an economic analysis is the incremental cost comparing to reactive cable replacement. When a cable section is approaching the end of its useful life, it will be replaced, sooner or later. If it is replaced after the in-service failure, then no reliability benefit is gained from the cost of replacement. However, the outage due to the in-service failure can be avoided with proactive replacement, so some reliability benefit is gained. This benefit is because of the spending of the incremental cost. As a result, the cost-effectiveness of a proactive cable replacement program is effectively the ratio of its associated borrowing cost to its contribution to CMI reduction. The concept of the time value of money is critical for understanding the borrowing cost. The time value of money is the value of money figuring in a given amount of interest earned over a given amount of time [8]. For example, 105 dollars next year has a present value of 100 dollars to the recipient who assumes 5% interest. Assuming a non-inflatable expense of 105 dollars for one task, if the task is to be implemented next year, then the task cost has a present value of 100 dollars; however, if the task is pursued this year, then the present value of the task cost is 105 dollars. The borrowing cost, or the incremental cost, of implementing the task one year earlier is 5 dollars. According to the utility s finance department, a 10% pre-tax weighted average cost of capital (WACC), that represents the average annual borrowing cost from all sources of debt and equity financing, and a constant cable replacement cost are assumed in this study. Due to the impact of compound interest, the critical factor of achieving a cost-effective proactive cable program is the timing of replacement. Replacing a cable section too early accrues more interest and leads to low cost-effectiveness. But it is not always possible to identify a failing cable and replace it right before its failure so as to achieve a very cost-effective project. The remaining useful life of a cable section can be estimated based on its failure rate. For instance, an in-service cable that has a failure rate of 0.5 failures per year is expected to fail in two years on average. If this section is replaced today as part of a proactive cable program, the money that otherwise would have been spent in two years is spent today. The cost to the utility is equal to the amount of interest for borrowing the money for two years. During the simulation, when a cable section is identified for proactive replacement, its expected remaining life is first estimated as the recipient of its failure rate and then the borrowing cost is calculated based on its expected life. The total cost for the representative circuits and then throughout the system can be estimated for the cost-effectiveness analysis. Fig. 5 and Fig. 6 show the average age and the average expected remaining life of proactively replaced cable every year in three scenarios. Average Age of Replaced Cable (yr) mile/year 415-mile/year 700-mile/year Fig. 5. Average ages of replaced cable As shown in Fig. 5, the age of replaced cable is generally increases over the simulation years, implying that the pace of cable replacement is behind the aging of cable. The average age of replaced cable in the 150-mile/year scenario is higher

5 5 than the 415-mile/year scenario, and then the 715-mile/year scenario. Since proactive cable program aims at clearing the oldest cable that is most prone to in-service failures, replacing more cable will inevitably include some younger cable that otherwise would not be replaced and consequently lower the average age of the population. Average Expected Remaining Lifetime of Replaced Cable (yr) Fig. 6. Average expected remaining life of replaced cable Older cable has higher failure rates and its expected remaining life is consequently shorter. As shown in Fig. 6, the average expected remaining life of replaced cable is generally getting shorter over the simulation years. With 150 conductor miles of cable being replaced each year, the expected remaining life of the replaced cable is less than 2 years towards the end of the simulation period. In other words, this cable is being replaced about 2 years earlier than it would have been in the reactive mode. With 415 miles of cable replaced each year, the average expected remaining life of the replaced cable is around 2.5 years at year. With 715 miles of cable replaced each year, the average expected remaining life of the replaced cable is around 3.5 years at year. It has been demonstrated that more proactively replaced cable every year will improve the system reliability but also cost more because the average remaining life of the replaced cable is longer and accrues more borrowing cost. Fig. 7 presents the cost-effectiveness of the proactive cable program over the 20 simulated years for three studied scenarios. $/CMI Reduction mile/year 415-mile/year 700-mile/year 150-Mile/Year 415-Mile/Year 700-Mile/Year Fig. 7. Cost-effectiveness of proactive cable replacement $/CMI-reduction is used as the measure; its value indicates the cost needed for reducing one customer minute of interruption. Apparently a lower value is preferred. For a clearer presentation, Fig. 7 shows smoothed curves of the actual simulated $/CMI-reduction values. The comparison shows that the 150- mile/year scenario is the most cost-effective throughout the simulation period and the 700-mile/year scenario is the least. The difference between the 415-mile/year scenario and the 700-mile/year scenario is not significant, except the first three years. For all scenarios, the $/CMI-reduction value decreases over years. Examining the total costs of proactive cable program and the total reliability benefits over the 20 years gives an estimate of the average cost-effectiveness of the program. The 150-mile/year scenario has a value of 2.1 dollars per CMI reduction, i.e., it costs on average $2.10 to reduce one customer minute of interruption if 150 conductor miles of old cable is proactively replaced every year. The 415-mile/year scenario and the 700-mile/year scenario have an average value of $2.83/CMI-reduction and $3.40/CMI-reduction, respectively. For proactive cable program itself, a larger scale of replacement typically is not as cost effective as a smaller one. But proactively replacing too little cable will result in more cable that has to be replaced upon in-service failures, which will eventually put the utility in a position where there is more aging cable than it can effectively manage, especially given the implication from Fig. 5 that the pace of cable replacement is behind the aging of cable even with a big portion of the 700- mile/year scenario. As a result, the proactive replacement efforts should be integrated with reactive cable replacement program which assumes no reliability benefit and other programs such as worst performing circuit projects which focus on relatively poor reliability and equity of service among customers. A broad range of reliability improvement projects have been considered according to the utility practice and simulated in the study. These tactics include distribution automation, lateral fuse addition, 3-phase recloser addition, fault indicator installation, and manual sectionalizaiton. Different from the proactive cable program, all the expenditure of these projects are spent for the gained reliability benefit. The overall costeffectiveness of these worst performing circuit projects is calculated as the ratio of the total reliability improvement in terms of CMI reduction to the total project cost. Generally, the most cost-effective projects will be implemented first and then the less cost-effective ones. The sequence of these reliability projects is a complex matter; this study utilizes the average value, which is $9.15/CMI-reduction over the 20 simulation years, for comparisons with the proactive cable program. With the integration of the worst performing circuit program as well as the reactive cable replacement program, the 150-mile/year proactive cable replacement scenario has a costeffectiveness of $5.06/CMI-reduction, the 415-mile/year scenario has a value of $4.57/CMI-reduction, and the 700- mile/year scenario has a value of $4.77/CMI-reduction. The 415-mile/year scenario now becomes the most cost-effective case. Considering proactive cable replacement alone, smaller scale is more cost effective. However, less proactive cable replacement will lead to more reactive cable replacement which has no reliability benefit. In addition, the worse performing circuit is much less cost effective than any of the proactive cable replacement scenarios. When three parts considered together, the contribution of the proactive cable pro-

6 6 gram increases with the program scale. Since the 150- mile/year program has less cost and less benefits, even though the program itself is very cost-effective, the overall reliability programs is not as effective as the 415-mile/year scenario, in which enough cable is being replaced but not too much to lower the overall cost effectiveness as the 700-mile/year scenario. Fig. 8 shows the estimated cost-effectiveness of the integrated reliability programs over years. The smoothed curves of the actual simulated $/CMI-reduction values are presented. $/CMI Reduction Miles/Year 415 Miles/Year 700 Miles/Year Fig. 8. Cost-effectiveness of integrated reliability programs Even though the program cost-effectiveness increases over years, it does not mean that the proactive cable program should be postponed to a later time. First of all, about the same amount of cable will have to be replaced each year as aforementioned, either reactively or reactively. Second, due to the expensive cable replacement cost and the significant amount of old in-service cable, it is not possible to solve the issue in a short period. Instead, a long term plan should be made in order to effectively manage this problem. In three studied scenarios, a constant amount of cable is proactively replaced annually for the next 20 years. 415 conductor miles every year is considered as an appropriate and cost-justified amount for the utility. But eventually, the amount of proactive cable replacement will likely have to be changed. This depends on various factors such as the age distribution of utility s cable population and reliability performance target. VI. CONCLUSIONS Many utilities have aging underground cable systems. If nothing is done, age-related failures will continue to increase and eventually cause customer reliability to dramatically worsen. Proactively replacement old but still in service cable will prevent future outages. However, proactive cable replacement requires additional borrowing cost comparing with reactive replacement and is often considered difficult to justify since it is difficult to know whether the replaced cable will actually fail in the near future. This paper presents a methodology to justify proactive cable programs. First of all, a statistical cluster analysis is adopted to sample representative circuits so that a credible system analysis can be done on a small set of circuits. Then the impact of aging underground cable to the system reliability, under reactive cable program only and with the integration of proactive cable program, is examined. Three specific proactive cable replacement scenarios that interest the utility to which the method is applied are studied. There is always a trade-off in a well-managed system between customer reliability and cost; the proactive portion of cable replacement should be carefully chosen based on the program cost-effectiveness as well as other reliability improvement programs. The cost-effectiveness of three proposed scenarios are assessed and compared in this article. VII. REFRENCES [1] W. Li, J. Zhou, J. Lu, and W. Yan, A Probabilistic Analysis Approach to Making Decision on Retirement of Aged Equipment in Transmission Systems, IEEE Trans on Power Delivery, Vol. 22, No. 3, pp , 2007 [2] N. van Schaik, M.G. Kruithor, and E.F. Steennis, Estimation of risk of operation (remaining life) of underground MV power cable systems, 18th International Conference and Exhibition on Electricity Distribution (CIRED), Turin, Italy, [3] J.R. Aguero, J. Spare, E. Phillips, C. O'Meally, J. Wang, and R.E. Brown, Distribution system reliability improvement using predictive models, IEEE Power & Energy Society General Meeting, Calgary, AB, Canada, [4] A.A. Chowdhury and D.E. Custer, Reliability cost-benefit assessments in urban distribution systems planning, IEEE PES Power Systems Conference and Exposition, [5] Jiawei Han and Micheline Kamber, Data Mining: Concepts and Techniques. San Francisco: Academic Press, Morgan Kaufmann Publishers, [6] [7] Y. Zhou and R.E. Brown, A Practical Method for Cable Failure Rate Modeling, IEEE Transmission and Distribution Conference and Exhibition, Dallas, TX, 2006 [8] VIII. BIOGRAPHIES Le Xu (S 01-M 07) received the B.Eng. degree in 2001 from Tsinghua University, Beijing, China, and the M.S and Ph.D. degree in 2003 and 2006, respectively, from North Carolina State University, Raleigh, NC. He is a principal engineer at Quanta Technology, Raleigh, NC. His areas of expertise include data mining and its utility applications including PEV and PV impact, distribution reliability, storm hardening, load forecasting, and associated risk analysis. Richard E. Brown (F 07) is the Senior Vice President of Operations for Quanta Technology. He has published more than 80 technical papers related to distribution system reliability and asset management; is a regular instructor on these topics; is author of the book Electric Power Distribution Reliability; and is a registered professional engineer. He is an IEEE Fellow. Dr. Brown earned his BSEE, MSEE, and PhD from the University of Washington in Seattle, and his MBA from the University of North Carolina at Chapel Hill.

Skip Length and Inter-Starvation Distance as a Combined Metric to Assess the Quality of Transmitted Video

Skip Length and Inter-Starvation Distance as a Combined Metric to Assess the Quality of Transmitted Video Skip Length and Inter-Starvation Distance as a Combined Metric to Assess the Quality of Transmitted Video Mohamed Hassan, Taha Landolsi, Husameldin Mukhtar, and Tamer Shanableh College of Engineering American

More information

Set-Top-Box Pilot and Market Assessment

Set-Top-Box Pilot and Market Assessment Final Report Set-Top-Box Pilot and Market Assessment April 30, 2015 Final Report Set-Top-Box Pilot and Market Assessment April 30, 2015 Funded By: Prepared By: Alexandra Dunn, Ph.D. Mersiha McClaren,

More information

INSULATION CONDITION OF DRY-CURED XLPE CABLES MEASURED OVER A PERIOD OF 13 YEARS

INSULATION CONDITION OF DRY-CURED XLPE CABLES MEASURED OVER A PERIOD OF 13 YEARS 2 rd International Conference on Electricity Distribution Lyon, -8 June Paper 47 INSULATION CONDITION OF DRY-CURED XLPE CABLES MEASURED OVER A PERIOD OF YEARS ABSTRACT Jens Zoëga HANSEN Danish Energy Association

More information

Mitigation of Cascading Outages and Prevention of Blackouts:System-Wide Corrective Control

Mitigation of Cascading Outages and Prevention of Blackouts:System-Wide Corrective Control 10th Mediterranean Conference on Power Generation, Transmission, Distribution and Energy Conversion 6-9 November 2016 Belgrade, Serbia Mitigation of Cascading Outages and Prevention of Blackouts:System-Wide

More information

Implementation of a High-Speed Distribution Network Reconfiguration Scheme by Greg Hataway, Ted Warren, and Chris Stephens.

Implementation of a High-Speed Distribution Network Reconfiguration Scheme by Greg Hataway, Ted Warren, and Chris Stephens. The following technical papers supporting this presentation are available at www.selinc.com: Trip and Restore Distribution Circuits at Transmission Speeds by Jeff Roberts and Karl Zimmerman International

More information

SWITCHED INFINITY: SUPPORTING AN INFINITE HD LINEUP WITH SDV

SWITCHED INFINITY: SUPPORTING AN INFINITE HD LINEUP WITH SDV SWITCHED INFINITY: SUPPORTING AN INFINITE HD LINEUP WITH SDV First Presented at the SCTE Cable-Tec Expo 2010 John Civiletto, Executive Director of Platform Architecture. Cox Communications Ludovic Milin,

More information

Simple motion control implementation

Simple motion control implementation Simple motion control implementation with Omron PLC SCOPE In todays challenging economical environment and highly competitive global market, manufacturers need to get the most of their automation equipment

More information

Peak Dynamic Power Estimation of FPGA-mapped Digital Designs

Peak Dynamic Power Estimation of FPGA-mapped Digital Designs Peak Dynamic Power Estimation of FPGA-mapped Digital Designs Abstract The Peak Dynamic Power Estimation (P DP E) problem involves finding input vector pairs that cause maximum power dissipation (maximum

More information

Other funding sources. Amount requested/awarded: $200,000 This is matching funding per the CASC SCRI project

Other funding sources. Amount requested/awarded: $200,000 This is matching funding per the CASC SCRI project FINAL PROJECT REPORT Project Title: Robotic scout for tree fruit PI: Tony Koselka Organization: Vision Robotics Corp Telephone: (858) 523-0857, ext 1# Email: tkoselka@visionrobotics.com Address: 11722

More information

Understanding Compression Technologies for HD and Megapixel Surveillance

Understanding Compression Technologies for HD and Megapixel Surveillance When the security industry began the transition from using VHS tapes to hard disks for video surveillance storage, the question of how to compress and store video became a top consideration for video surveillance

More information

Modeling memory for melodies

Modeling memory for melodies Modeling memory for melodies Daniel Müllensiefen 1 and Christian Hennig 2 1 Musikwissenschaftliches Institut, Universität Hamburg, 20354 Hamburg, Germany 2 Department of Statistical Science, University

More information

Research Topic. Error Concealment Techniques in H.264/AVC for Wireless Video Transmission in Mobile Networks

Research Topic. Error Concealment Techniques in H.264/AVC for Wireless Video Transmission in Mobile Networks Research Topic Error Concealment Techniques in H.264/AVC for Wireless Video Transmission in Mobile Networks July 22 nd 2008 Vineeth Shetty Kolkeri EE Graduate,UTA 1 Outline 2. Introduction 3. Error control

More information

LED driver architectures determine SSL Flicker,

LED driver architectures determine SSL Flicker, LED driver architectures determine SSL Flicker, By: MELUX CONTROL GEARS P.LTD. Replacing traditional incandescent and fluorescent lights with more efficient, and longerlasting LED-based solid-state lighting

More information

NAA ENHANCING THE QUALITY OF MARKING PROJECT: THE EFFECT OF SAMPLE SIZE ON INCREASED PRECISION IN DETECTING ERRANT MARKING

NAA ENHANCING THE QUALITY OF MARKING PROJECT: THE EFFECT OF SAMPLE SIZE ON INCREASED PRECISION IN DETECTING ERRANT MARKING NAA ENHANCING THE QUALITY OF MARKING PROJECT: THE EFFECT OF SAMPLE SIZE ON INCREASED PRECISION IN DETECTING ERRANT MARKING Mudhaffar Al-Bayatti and Ben Jones February 00 This report was commissioned by

More information

IMPLEMENTATION OF SIGNAL SPACING STANDARDS

IMPLEMENTATION OF SIGNAL SPACING STANDARDS IMPLEMENTATION OF SIGNAL SPACING STANDARDS J D SAMPSON Jeffares & Green Inc., P O Box 1109, Sunninghill, 2157 INTRODUCTION Mobility, defined here as the ease at which traffic can move at relatively high

More information

in the Howard County Public School System and Rocketship Education

in the Howard County Public School System and Rocketship Education Technical Appendix May 2016 DREAMBOX LEARNING ACHIEVEMENT GROWTH in the Howard County Public School System and Rocketship Education Abstract In this technical appendix, we present analyses of the relationship

More information

Don t Judge a Book by its Cover: A Discrete Choice Model of Cultural Experience Good Consumption

Don t Judge a Book by its Cover: A Discrete Choice Model of Cultural Experience Good Consumption Don t Judge a Book by its Cover: A Discrete Choice Model of Cultural Experience Good Consumption Paul Crosby Department of Economics Macquarie University North American Workshop on Cultural Economics November

More information

Quantify. The Subjective. PQM: A New Quantitative Tool for Evaluating Display Design Options

Quantify. The Subjective. PQM: A New Quantitative Tool for Evaluating Display Design Options PQM: A New Quantitative Tool for Evaluating Display Design Options Software, Electronics, and Mechanical Systems Laboratory 3M Optical Systems Division Jennifer F. Schumacher, John Van Derlofske, Brian

More information

data and is used in digital networks and storage devices. CRC s are easy to implement in binary

data and is used in digital networks and storage devices. CRC s are easy to implement in binary Introduction Cyclic redundancy check (CRC) is an error detecting code designed to detect changes in transmitted data and is used in digital networks and storage devices. CRC s are easy to implement in

More information

ANALYSIS OF FAILURE IN POWER CABLES FOR PREVENTING POWER OUTAGE IN ALEXANDRIA ELECTRICITY DISTRIBUTION COMPANY IN EGYPT

ANALYSIS OF FAILURE IN POWER CABLES FOR PREVENTING POWER OUTAGE IN ALEXANDRIA ELECTRICITY DISTRIBUTION COMPANY IN EGYPT 24 th International Conference on Electricity Distribution Glasgow, 2- June 27 Paper 89 ANALYSIS OF FAILURE IN POWER CABLES FOR PREVENTING POWER OUTAGE IN ALEXANDRIA ELECTRICITY DISTRIBUTION COMPANY IN

More information

Understanding the True Cost of Cable Cuts

Understanding the True Cost of Cable Cuts Understanding the True Cost of Cable Cuts This paper examines the various direct and indirect costs incurred by cable manufacturers and distributors when a length of Outside Plant cable is cut at the request

More information

A. Introduction 1. Title: Automatic Underfrequency Load Shedding Requirements

A. Introduction 1. Title: Automatic Underfrequency Load Shedding Requirements DRAFT 6 V4 Standard PRC-006- RFC-01 01/11/11 A. Introduction 1. Title: Automatic Underfrequency Load Shedding Requirements Deleted: Deleted: 10 Deleted: 20 9 2. Number: PRC 006 RFC 01. Purpose: To establish

More information

A combination of approaches to solve Task How Many Ratings? of the KDD CUP 2007

A combination of approaches to solve Task How Many Ratings? of the KDD CUP 2007 A combination of approaches to solve Tas How Many Ratings? of the KDD CUP 2007 Jorge Sueiras C/ Arequipa +34 9 382 45 54 orge.sueiras@neo-metrics.com Daniel Vélez C/ Arequipa +34 9 382 45 54 José Luis

More information

Reconstruction of Ca 2+ dynamics from low frame rate Ca 2+ imaging data CS229 final project. Submitted by: Limor Bursztyn

Reconstruction of Ca 2+ dynamics from low frame rate Ca 2+ imaging data CS229 final project. Submitted by: Limor Bursztyn Reconstruction of Ca 2+ dynamics from low frame rate Ca 2+ imaging data CS229 final project. Submitted by: Limor Bursztyn Introduction Active neurons communicate by action potential firing (spikes), accompanied

More information

Reciprocating Machine Protection

Reciprocating Machine Protection Reciprocating Machine Protection Why You Should Be Monitoring the Needle Instead of the Haystack By: John Kovach, President, Riotech Instruments Ltd LLP Frank Fifer, Director of Operations, Peerless Dynamics,

More information

On Figure of Merit in PAM4 Optical Transmitter Evaluation, Particularly TDECQ

On Figure of Merit in PAM4 Optical Transmitter Evaluation, Particularly TDECQ On Figure of Merit in PAM4 Optical Transmitter Evaluation, Particularly TDECQ Pavel Zivny, Tektronix V1.0 On Figure of Merit in PAM4 Optical Transmitter Evaluation, Particularly TDECQ A brief presentation

More information

from ocean to cloud ADAPTING THE C&A PROCESS FOR COHERENT TECHNOLOGY

from ocean to cloud ADAPTING THE C&A PROCESS FOR COHERENT TECHNOLOGY ADAPTING THE C&A PROCESS FOR COHERENT TECHNOLOGY Peter Booi (Verizon), Jamie Gaudette (Ciena Corporation), and Mark André (France Telecom Orange) Email: Peter.Booi@nl.verizon.com Verizon, 123 H.J.E. Wenckebachweg,

More information

TAKE-TWO INTERACTIVE INTERACTIVE SOFTWARE QUIZ

TAKE-TWO INTERACTIVE INTERACTIVE SOFTWARE QUIZ TAKE-TWO INTERACTIVE INTERACTIVE SOFTWARE QUIZ Points Assigned Points Scored Problem 1 8 Problem 2 20 Problem 3 19 Problem 4 10 Problem 5 18 Total Score 75 Problem 1. Business Strategy Analysis What are

More information

Pitch correction on the human voice

Pitch correction on the human voice University of Arkansas, Fayetteville ScholarWorks@UARK Computer Science and Computer Engineering Undergraduate Honors Theses Computer Science and Computer Engineering 5-2008 Pitch correction on the human

More information

Why You Need a Nathan Or How to Avoid the Pitfalls of Synchrophasor Integration

Why You Need a Nathan Or How to Avoid the Pitfalls of Synchrophasor Integration 1 Why You Need a Nathan Or How to Avoid the Pitfalls of Synchrophasor Integration 2016 IEEE PES General Meeting Tutorial Use of Synchrophasors in Grid Operations Tuesday, July 19, 2016 Kevin D. Jones,

More information

Experiences of CESC in Smart Grid Initiatives LT Network Automation. Anjan Mitra / Arka Ghosh

Experiences of CESC in Smart Grid Initiatives LT Network Automation. Anjan Mitra / Arka Ghosh Experiences of CESC in Smart Grid Initiatives LT Network Automation Anjan Mitra / Arka Ghosh CESC An Overview About 120 year old fully Integrated Energy Utility Oldest private electricity utility in India

More information

Improved Synchronization System for Thermal Power Station

Improved Synchronization System for Thermal Power Station Improved Synchronization System for Thermal Power Station Lokeshkumar.C 1, Logeshkumar.E 2, Harikrishnan.M 3, Margaret 4, Dr.K.Sathiyasekar 5 UG Students, Department of EEE, S.A.Engineering College, Chennai,

More information

FIM INTERNATIONAL SURVEY ON ORCHESTRAS

FIM INTERNATIONAL SURVEY ON ORCHESTRAS 1st FIM INTERNATIONAL ORCHESTRA CONFERENCE Berlin April 7-9, 2008 FIM INTERNATIONAL SURVEY ON ORCHESTRAS Report By Kate McBain watna.communications Musicians of today, orchestras of tomorrow! A. Orchestras

More information

University of Bristol - Explore Bristol Research. Peer reviewed version. Link to published version (if available): /ISCAS.2005.

University of Bristol - Explore Bristol Research. Peer reviewed version. Link to published version (if available): /ISCAS.2005. Wang, D., Canagarajah, CN., & Bull, DR. (2005). S frame design for multiple description video coding. In IEEE International Symposium on Circuits and Systems (ISCAS) Kobe, Japan (Vol. 3, pp. 19 - ). Institute

More information

Flicker Caused by Operation of Industrial Technology

Flicker Caused by Operation of Industrial Technology Flicker Caused by Operation of Industrial Technology Martin KASPIREK 1, Petr KREJCI 2, Pavel SANTARIUS 3, Karel PROCHAZKA 4 1 Management of Grid, E.ON, F. A. Gerstnera 2151/6, 37001 Ceske Budejovice, Czech

More information

SIMULATION OF PRODUCTION LINES INVOLVING UNRELIABLE MACHINES; THE IMPORTANCE OF MACHINE POSITION AND BREAKDOWN STATISTICS

SIMULATION OF PRODUCTION LINES INVOLVING UNRELIABLE MACHINES; THE IMPORTANCE OF MACHINE POSITION AND BREAKDOWN STATISTICS SIMULATION OF PRODUCTION LINES INVOLVING UNRELIABLE MACHINES; THE IMPORTANCE OF MACHINE POSITION AND BREAKDOWN STATISTICS T. Ilar +, J. Powell ++, A. Kaplan + + Luleå University of Technology, Luleå, Sweden

More information

Broken Wires Diagnosis Method Numerical Simulation Based on Smart Cable Structure

Broken Wires Diagnosis Method Numerical Simulation Based on Smart Cable Structure PHOTONIC SENSORS / Vol. 4, No. 4, 2014: 366 372 Broken Wires Diagnosis Method Numerical Simulation Based on Smart Cable Structure Sheng LI 1*, Min ZHOU 2, and Yan YANG 3 1 National Engineering Laboratory

More information

REDUCING DYNAMIC POWER BY PULSED LATCH AND MULTIPLE PULSE GENERATOR IN CLOCKTREE

REDUCING DYNAMIC POWER BY PULSED LATCH AND MULTIPLE PULSE GENERATOR IN CLOCKTREE Available Online at www.ijcsmc.com International Journal of Computer Science and Mobile Computing A Monthly Journal of Computer Science and Information Technology IJCSMC, Vol. 3, Issue. 5, May 2014, pg.210

More information

Design of Fault Coverage Test Pattern Generator Using LFSR

Design of Fault Coverage Test Pattern Generator Using LFSR Design of Fault Coverage Test Pattern Generator Using LFSR B.Saritha M.Tech Student, Department of ECE, Dhruva Institue of Engineering & Technology. Abstract: A new fault coverage test pattern generator

More information

On the Characterization of Distributed Virtual Environment Systems

On the Characterization of Distributed Virtual Environment Systems On the Characterization of Distributed Virtual Environment Systems P. Morillo, J. M. Orduña, M. Fernández and J. Duato Departamento de Informática. Universidad de Valencia. SPAIN DISCA. Universidad Politécnica

More information

Chapter 10 Basic Video Compression Techniques

Chapter 10 Basic Video Compression Techniques Chapter 10 Basic Video Compression Techniques 10.1 Introduction to Video compression 10.2 Video Compression with Motion Compensation 10.3 Video compression standard H.261 10.4 Video compression standard

More information

Fast MBAFF/PAFF Motion Estimation and Mode Decision Scheme for H.264

Fast MBAFF/PAFF Motion Estimation and Mode Decision Scheme for H.264 Fast MBAFF/PAFF Motion Estimation and Mode Decision Scheme for H.264 Ju-Heon Seo, Sang-Mi Kim, Jong-Ki Han, Nonmember Abstract-- In the H.264, MBAFF (Macroblock adaptive frame/field) and PAFF (Picture

More information

Smart Traffic Control System Using Image Processing

Smart Traffic Control System Using Image Processing Smart Traffic Control System Using Image Processing Prashant Jadhav 1, Pratiksha Kelkar 2, Kunal Patil 3, Snehal Thorat 4 1234Bachelor of IT, Department of IT, Theem College Of Engineering, Maharashtra,

More information

Comparison of Mixed-Effects Model, Pattern-Mixture Model, and Selection Model in Estimating Treatment Effect Using PRO Data in Clinical Trials

Comparison of Mixed-Effects Model, Pattern-Mixture Model, and Selection Model in Estimating Treatment Effect Using PRO Data in Clinical Trials Comparison of Mixed-Effects Model, Pattern-Mixture Model, and Selection Model in Estimating Treatment Effect Using PRO Data in Clinical Trials Xiaolei Zhou, 1,2 Jianmin Wang, 1 Jessica Zhang, 1 Hongtu

More information

TV + Google YouTube. Complementary in a Cross Media Campaign Strategy

TV + Google YouTube. Complementary in a Cross Media Campaign Strategy TV + Google YouTube Complementary in a Cross Media Campaign Strategy Executive Summary 1 Light TV viewers are not reached effectively on TV but they are watching online 2 3 4 Light TV viewers are valuable

More information

Technical Appendices to: Is Having More Channels Really Better? A Model of Competition Among Commercial Television Broadcasters

Technical Appendices to: Is Having More Channels Really Better? A Model of Competition Among Commercial Television Broadcasters Technical Appendices to: Is Having More Channels Really Better? A Model of Competition Among Commercial Television Broadcasters 1 Advertising Rates for Syndicated Programs In this appendix we provide results

More information

WITH the rapid development of high-fidelity video services

WITH the rapid development of high-fidelity video services 896 IEEE SIGNAL PROCESSING LETTERS, VOL. 22, NO. 7, JULY 2015 An Efficient Frame-Content Based Intra Frame Rate Control for High Efficiency Video Coding Miaohui Wang, Student Member, IEEE, KingNgiNgan,

More information

LabView Exercises: Part II

LabView Exercises: Part II Physics 3100 Electronics, Fall 2008, Digital Circuits 1 LabView Exercises: Part II The working VIs should be handed in to the TA at the end of the lab. Using LabView for Calculations and Simulations LabView

More information

Powerful Software Tools and Methods to Accelerate Test Program Development A Test Systems Strategies, Inc. (TSSI) White Paper.

Powerful Software Tools and Methods to Accelerate Test Program Development A Test Systems Strategies, Inc. (TSSI) White Paper. Powerful Software Tools and Methods to Accelerate Test Program Development A Test Systems Strategies, Inc. (TSSI) White Paper Abstract Test costs have now risen to as much as 50 percent of the total manufacturing

More information

LOUDNESS EFFECT OF THE DIFFERENT TONES ON THE TIMBRE SUBJECTIVE PERCEPTION EXPERIMENT OF ERHU

LOUDNESS EFFECT OF THE DIFFERENT TONES ON THE TIMBRE SUBJECTIVE PERCEPTION EXPERIMENT OF ERHU The 21 st International Congress on Sound and Vibration 13-17 July, 2014, Beijing/China LOUDNESS EFFECT OF THE DIFFERENT TONES ON THE TIMBRE SUBJECTIVE PERCEPTION EXPERIMENT OF ERHU Siyu Zhu, Peifeng Ji,

More information

1. INTRODUCTION. Index Terms Video Transcoding, Video Streaming, Frame skipping, Interpolation frame, Decoder, Encoder.

1. INTRODUCTION. Index Terms Video Transcoding, Video Streaming, Frame skipping, Interpolation frame, Decoder, Encoder. Video Streaming Based on Frame Skipping and Interpolation Techniques Fadlallah Ali Fadlallah Department of Computer Science Sudan University of Science and Technology Khartoum-SUDAN fadali@sustech.edu

More information

Controlling Peak Power During Scan Testing

Controlling Peak Power During Scan Testing Controlling Peak Power During Scan Testing Ranganathan Sankaralingam and Nur A. Touba Computer Engineering Research Center Department of Electrical and Computer Engineering University of Texas, Austin,

More information

APPLICATION OF MULTI-GENERATIONAL MODELS IN LCD TV DIFFUSIONS

APPLICATION OF MULTI-GENERATIONAL MODELS IN LCD TV DIFFUSIONS APPLICATION OF MULTI-GENERATIONAL MODELS IN LCD TV DIFFUSIONS BI-HUEI TSAI Professor of Department of Management Science, National Chiao Tung University, Hsinchu 300, Taiwan Email: bhtsai@faculty.nctu.edu.tw

More information

Chapter 2. Analysis of ICT Industrial Trends in the IoT Era. Part 1

Chapter 2. Analysis of ICT Industrial Trends in the IoT Era. Part 1 Chapter 2 Analysis of ICT Industrial Trends in the IoT Era This chapter organizes the overall structure of the ICT industry, given IoT progress, and provides quantitative verifications of each market s

More information

An Empirical Analysis of Macroscopic Fundamental Diagrams for Sendai Road Networks

An Empirical Analysis of Macroscopic Fundamental Diagrams for Sendai Road Networks Interdisciplinary Information Sciences Vol. 21, No. 1 (2015) 49 61 #Graduate School of Information Sciences, Tohoku University ISSN 1340-9050 print/1347-6157 online DOI 10.4036/iis.2015.49 An Empirical

More information

Detection and demodulation of non-cooperative burst signal Feng Yue 1, Wu Guangzhi 1, Tao Min 1

Detection and demodulation of non-cooperative burst signal Feng Yue 1, Wu Guangzhi 1, Tao Min 1 International Conference on Applied Science and Engineering Innovation (ASEI 2015) Detection and demodulation of non-cooperative burst signal Feng Yue 1, Wu Guangzhi 1, Tao Min 1 1 China Satellite Maritime

More information

Circuit Reliability Review

Circuit Reliability Review Circuit Reliability Review Rancho Santa Margarita January 2018 Building a Smarter Grid for Southern California Southern California Edison is developing an electric grid to support California s transition

More information

Robust 3-D Video System Based on Modified Prediction Coding and Adaptive Selection Mode Error Concealment Algorithm

Robust 3-D Video System Based on Modified Prediction Coding and Adaptive Selection Mode Error Concealment Algorithm International Journal of Signal Processing Systems Vol. 2, No. 2, December 2014 Robust 3-D Video System Based on Modified Prediction Coding and Adaptive Selection Mode Error Concealment Algorithm Walid

More information

Introduction. The report is broken down into four main sections:

Introduction. The report is broken down into four main sections: Introduction This survey was carried out as part of OAPEN-UK, a Jisc and AHRC-funded project looking at open access monograph publishing. Over five years, OAPEN-UK is exploring how monographs are currently

More information

Alberta Electric System Operator

Alberta Electric System Operator Decision 21038-D01-2016 Downtown Calgary 138-kV Transmission System Reinforcement June 1, 2016 Alberta Utilities Commission Decision 21038-D01-2016 Downtown Calgary 138-kV Transmission System Reinforcement

More information

South Australian Energy Transformation

South Australian Energy Transformation South Australian Energy Transformation PSCR Supplementary Information Paper ElectraNet Corporate Headquarters 52-55 East Terrace, Adelaide, South Australia 5000 PO Box 7096, Hutt Street Post Office, Adelaide,

More information

Bibliometric evaluation and international benchmarking of the UK s physics research

Bibliometric evaluation and international benchmarking of the UK s physics research An Institute of Physics report January 2012 Bibliometric evaluation and international benchmarking of the UK s physics research Summary report prepared for the Institute of Physics by Evidence, Thomson

More information

High Value-Added IT Display - Technical Development and Actual Products

High Value-Added IT Display - Technical Development and Actual Products High Value-Added IT Display - Technical Development and Actual Products ITAKURA Naoki, ITO Tadayuki, OOKOSHI Yoichiro, KANDA Satoshi, MUTO Hideaki Abstract The multi-display expands the desktop area to

More information

Retiming Sequential Circuits for Low Power

Retiming Sequential Circuits for Low Power Retiming Sequential Circuits for Low Power José Monteiro, Srinivas Devadas Department of EECS MIT, Cambridge, MA Abhijit Ghosh Mitsubishi Electric Research Laboratories Sunnyvale, CA Abstract Switching

More information

An FPGA Implementation of Shift Register Using Pulsed Latches

An FPGA Implementation of Shift Register Using Pulsed Latches An FPGA Implementation of Shift Register Using Pulsed Latches Shiny Panimalar.S, T.Nisha Priscilla, Associate Professor, Department of ECE, MAMCET, Tiruchirappalli, India PG Scholar, Department of ECE,

More information

Circuit Reliability Review

Circuit Reliability Review Circuit Reliability Review La Verne January 2018 Building a Smarter Grid for Southern California Southern California Edison is developing an electric grid to support California s transition to a clean

More information

Simulation Study of the Spectral Capacity Requirements of Switched Digital Broadcast

Simulation Study of the Spectral Capacity Requirements of Switched Digital Broadcast Simulation Study of the Spectral Capacity Requirements of Switched Digital Broadcast Jiong Gong, Daniel A. Vivanco 2 and Jim Martin 3 Cable Television Laboratories, Inc. 858 Coal Creek Circle Louisville,

More information

An Efficient Low Bit-Rate Video-Coding Algorithm Focusing on Moving Regions

An Efficient Low Bit-Rate Video-Coding Algorithm Focusing on Moving Regions 1128 IEEE TRANSACTIONS ON CIRCUITS AND SYSTEMS FOR VIDEO TECHNOLOGY, VOL. 11, NO. 10, OCTOBER 2001 An Efficient Low Bit-Rate Video-Coding Algorithm Focusing on Moving Regions Kwok-Wai Wong, Kin-Man Lam,

More information

Avoiding False Pass or False Fail

Avoiding False Pass or False Fail Avoiding False Pass or False Fail By Michael Smith, Teradyne, October 2012 There is an expectation from consumers that today s electronic products will just work and that electronic manufacturers have

More information

Follow this and additional works at: Part of the Library and Information Science Commons

Follow this and additional works at:   Part of the Library and Information Science Commons University of South Florida Scholar Commons School of Information Faculty Publications School of Information 11-1994 Reinventing Resource Sharing Authors: Anna H. Perrault Follow this and additional works

More information

PERCEPTUAL QUALITY OF H.264/AVC DEBLOCKING FILTER

PERCEPTUAL QUALITY OF H.264/AVC DEBLOCKING FILTER PERCEPTUAL QUALITY OF H./AVC DEBLOCKING FILTER Y. Zhong, I. Richardson, A. Miller and Y. Zhao School of Enginnering, The Robert Gordon University, Schoolhill, Aberdeen, AB1 1FR, UK Phone: + 1, Fax: + 1,

More information

Simulation of DFIG and FSIG wind farms in. MATLAB SimPowerSystems. Industrial Electrical Engineering and Automation.

Simulation of DFIG and FSIG wind farms in. MATLAB SimPowerSystems. Industrial Electrical Engineering and Automation. CODEN:LUTEDX/(TEIE-7235)/1-007/(2009) Industrial Electrical Engineering and Automation Simulation of DFIG and FSIG wind farms in MATLAB SimPowerSystems Francesco Sulla Division of Industrial Electrical

More information

Error Resilient Video Coding Using Unequally Protected Key Pictures

Error Resilient Video Coding Using Unequally Protected Key Pictures Error Resilient Video Coding Using Unequally Protected Key Pictures Ye-Kui Wang 1, Miska M. Hannuksela 2, and Moncef Gabbouj 3 1 Nokia Mobile Software, Tampere, Finland 2 Nokia Research Center, Tampere,

More information

Research Article. ISSN (Print) *Corresponding author Shireen Fathima

Research Article. ISSN (Print) *Corresponding author Shireen Fathima Scholars Journal of Engineering and Technology (SJET) Sch. J. Eng. Tech., 2014; 2(4C):613-620 Scholars Academic and Scientific Publisher (An International Publisher for Academic and Scientific Resources)

More information

Online Control System Migration of Industrial Centrifuge Project Description

Online Control System Migration of Industrial Centrifuge Project Description Canadian Consulting Engineering Awards 2017 Online Control System Migration of Industrial Centrifuge Project Description Category: Natural Resources, Mining, Industry & Energy Fort McMurray, AB Table of

More information

DOWNLOAD PDF BOWKER ANNUAL LIBRARY AND TRADE ALMANAC 2005

DOWNLOAD PDF BOWKER ANNUAL LIBRARY AND TRADE ALMANAC 2005 Chapter 1 : Library and Book Trade Almanac - Google Books The Bowker annual: library and book trade almanac, The Bowker annual: library and book trade almanac, by Bogart, Digitizing sponsor Internet Archive.

More information

Timing Error Detection: An Adaptive Scheme To Combat Variability EE241 Final Report Nathan Narevsky and Richard Ott {nnarevsky,

Timing Error Detection: An Adaptive Scheme To Combat Variability EE241 Final Report Nathan Narevsky and Richard Ott {nnarevsky, Timing Error Detection: An Adaptive Scheme To Combat Variability EE241 Final Report Nathan Narevsky and Richard Ott {nnarevsky, tomott}@berkeley.edu Abstract With the reduction of feature sizes, more sources

More information

Constant Bit Rate for Video Streaming Over Packet Switching Networks

Constant Bit Rate for Video Streaming Over Packet Switching Networks International OPEN ACCESS Journal Of Modern Engineering Research (IJMER) Constant Bit Rate for Video Streaming Over Packet Switching Networks Mr. S. P.V Subba rao 1, Y. Renuka Devi 2 Associate professor

More information

MEMORANDUM. TV penetration and usage in the Massachusetts market

MEMORANDUM. TV penetration and usage in the Massachusetts market MEMORANDUM To: MassSave Appliance Rebate Program Administrators (PAs) and Energy Efficiency Advisory Council (EEAC) Consultants From: The Residential Evaluation Team Subject: Program Assessment Tube TV

More information

MPEG has been established as an international standard

MPEG has been established as an international standard 1100 IEEE TRANSACTIONS ON CIRCUITS AND SYSTEMS FOR VIDEO TECHNOLOGY, VOL. 9, NO. 7, OCTOBER 1999 Fast Extraction of Spatially Reduced Image Sequences from MPEG-2 Compressed Video Junehwa Song, Member,

More information

An Improved Fuzzy Controlled Asynchronous Transfer Mode (ATM) Network

An Improved Fuzzy Controlled Asynchronous Transfer Mode (ATM) Network An Improved Fuzzy Controlled Asynchronous Transfer Mode (ATM) Network C. IHEKWEABA and G.N. ONOH Abstract This paper presents basic features of the Asynchronous Transfer Mode (ATM). It further showcases

More information

Study of White Gaussian Noise with Varying Signal to Noise Ratio in Speech Signal using Wavelet

Study of White Gaussian Noise with Varying Signal to Noise Ratio in Speech Signal using Wavelet American International Journal of Research in Science, Technology, Engineering & Mathematics Available online at http://www.iasir.net ISSN (Print): 2328-3491, ISSN (Online): 2328-3580, ISSN (CD-ROM): 2328-3629

More information

Before the Federal Communications Commission Washington, D.C ) ) ) ) ) ) ) ) ) REPORT ON CABLE INDUSTRY PRICES

Before the Federal Communications Commission Washington, D.C ) ) ) ) ) ) ) ) ) REPORT ON CABLE INDUSTRY PRICES Before the Federal Communications Commission Washington, D.C. 20554 In the Matter of Implementation of Section 3 of the Cable Television Consumer Protection and Competition Act of 1992 Statistical Report

More information

Type-2 Fuzzy Logic Sensor Fusion for Fire Detection Robots

Type-2 Fuzzy Logic Sensor Fusion for Fire Detection Robots Proceedings of the 2 nd International Conference of Control, Dynamic Systems, and Robotics Ottawa, Ontario, Canada, May 7 8, 2015 Paper No. 187 Type-2 Fuzzy Logic Sensor Fusion for Fire Detection Robots

More information

MULTI-STATE VIDEO CODING WITH SIDE INFORMATION. Sila Ekmekci Flierl, Thomas Sikora

MULTI-STATE VIDEO CODING WITH SIDE INFORMATION. Sila Ekmekci Flierl, Thomas Sikora MULTI-STATE VIDEO CODING WITH SIDE INFORMATION Sila Ekmekci Flierl, Thomas Sikora Technical University Berlin Institute for Telecommunications D-10587 Berlin / Germany ABSTRACT Multi-State Video Coding

More information

Pattern Smoothing for Compressed Video Transmission

Pattern Smoothing for Compressed Video Transmission Pattern for Compressed Transmission Hugh M. Smith and Matt W. Mutka Department of Computer Science Michigan State University East Lansing, MI 48824-1027 {smithh,mutka}@cps.msu.edu Abstract: In this paper

More information

UNIVERSITY OF CAMBRIDGE INTERNATIONAL EXAMINATIONS General Certificate of Education Ordinary Level

UNIVERSITY OF CAMBRIDGE INTERNATIONAL EXAMINATIONS General Certificate of Education Ordinary Level UNIVERSITY OF CAMBRIDGE INTERNATIONAL EXAMINATIONS General Certificate of Education Ordinary Level *0192736882* STATISTICS 4040/12 Paper 1 October/November 2013 Candidates answer on the question paper.

More information

White Paper. Uniform Luminance Technology. What s inside? What is non-uniformity and noise in LCDs? Why is it a problem? How is it solved?

White Paper. Uniform Luminance Technology. What s inside? What is non-uniformity and noise in LCDs? Why is it a problem? How is it solved? White Paper Uniform Luminance Technology What s inside? What is non-uniformity and noise in LCDs? Why is it a problem? How is it solved? Tom Kimpe Manager Technology & Innovation Group Barco Medical Imaging

More information

Understanding the Limitations of Replaying Relay-Created COMTRADE Event Files Through Microprocessor-Based Relays

Understanding the Limitations of Replaying Relay-Created COMTRADE Event Files Through Microprocessor-Based Relays Understanding the Limitations of Replaying Relay-Created COMTRADE Event Files Through Microprocessor-Based Relays Brett M. Cockerham and John C. Town Schweitzer Engineering Laboratories, Inc. Presented

More information

Reliability Guideline: Generating Unit Operations During Complete Loss of Communications

Reliability Guideline: Generating Unit Operations During Complete Loss of Communications Reliability Guideline: Generating Unit Operations During Complete Loss of Communications Preamble It is in the public interest for the North American Electric Reliability Corporation (NERC) to develop

More information

1C.5.1 Voltage Fluctuation and Flicker

1C.5.1 Voltage Fluctuation and Flicker 2 1 Ja n 1 4 2 1 J a n 1 4 Vo l.1 -Ge n e r a l;p a r tc-p o we r Qu a lity 1. Scope This document contains guidelines regarding maximum acceptable levels of voltage fluctuation and light flicker in the

More information

SATELLITE RELATED SERVICES

SATELLITE RELATED SERVICES SATELLITE RELATED SERVICES Satellite Operations & Consulting Reliability, Experience, and Resources for the Key Phases of the Satellite Lifecycle Intelsat General s Satellite Related Services group provides

More information

BER margin of COM 3dB

BER margin of COM 3dB BER margin of COM 3dB Yasuo Hidaka Fujitsu Laboratories of America, Inc. September 9, 2015 IEEE P802.3by 25 Gb/s Ethernet Task Force Abstract I was curious how much actual margin we have with COM 3dB So,

More information

LOW-COMPLEXITY BIG VIDEO DATA RECORDING ALGORITHMS FOR URBAN SURVEILLANCE SYSTEMS

LOW-COMPLEXITY BIG VIDEO DATA RECORDING ALGORITHMS FOR URBAN SURVEILLANCE SYSTEMS LOW-COMPLEXITY BIG VIDEO DATA RECORDING ALGORITHMS FOR URBAN SURVEILLANCE SYSTEMS Ling Hu and Qiang Ni School of Computing and Communications, Lancaster University, LA1 4WA, UK ABSTRACT Big Video data

More information

CM3106 Solutions. Do not turn this page over until instructed to do so by the Senior Invigilator.

CM3106 Solutions. Do not turn this page over until instructed to do so by the Senior Invigilator. CARDIFF UNIVERSITY EXAMINATION PAPER Academic Year: 2013/2014 Examination Period: Examination Paper Number: Examination Paper Title: Duration: Autumn CM3106 Solutions Multimedia 2 hours Do not turn this

More information

Composer Commissioning Survey Report 2015

Composer Commissioning Survey Report 2015 Composer Commissioning Survey Report 2015 Background In 2014, Sound and Music conducted the Composer Commissioning Survey for the first time. We had an overwhelming response and saw press coverage across

More information

Understanding FICON Channel Path Metrics

Understanding FICON Channel Path Metrics Understanding FICON Channel Path Metrics Dr.H.PatArtis Performance Associates, Inc. PAI/O Driver is a registered trademark of Performance Associates, Inc. Performance Associates, Inc., 2003. Topics Warning

More information

Efficient Trace Signal Selection for Post Silicon Validation and Debug

Efficient Trace Signal Selection for Post Silicon Validation and Debug Efficient Trace Signal Selection for Post Silicon Validation and Debug Kanad Basu and Prabhat Mishra Computer and Information Science and Engineering University of Florida, ainesville FL 32611-6120, USA

More information

Optimization and Emulation Analysis on Sampling Model of Servo Burst

Optimization and Emulation Analysis on Sampling Model of Servo Burst 2011 International Conference on Computer Science and Information Technology (ICCSIT 2011) IPCSIT vol. 51 (2012) (2012) IACSIT Press, Singapore DOI: 10.7763/IPCSIT.2012.V51.35 Optimization and Emulation

More information