Status of the SiW-ECAL prototype

Size: px
Start display at page:

Download "Status of the SiW-ECAL prototype"

Transcription

1 Status of the SiW-ECAL prototype Vincent Boudry École polytechnique, Palaiseau CALICE meeting Kyushu Universty 07/03/2016 TNA support + WP14

2 Analyses from 2015 BT Preparation of 2016 BT Long Term Plans ILD Studies Thermal studies SK2A Long SLAB tests Title Meeting, Place Date 2/28

3 Beam test at CERN nov th of november 3/28

4 Side running Paolo Meridiani (Milano): test of prototype MicroChannel Plates with MgO coating in a small vacuum chamber Since 11th November HI muon beam Taikan Suehara (Kyushu U., CALICE) Test of alternative Guard Ring design on babywafers (3 3cm²) Noise pbms HI muons beam 4/28

5 Running conditions 4 layers ready for TB on test plates and put in the setup, the last layer was not operational (faulty HV) and was not used. Position of layers: beam DIF1, DIF2, DIF0 Each layer had 4 x 256 pixels / channels. All layers were always power pulsed. Spills: Several settings tried, mainly long spills (eg msec = data taking + readout/dead time) to increase statistics with SPS spills of a few seconds, so, effectively corresponding to quasi-continuous mode. Also, some special runs with short spills msec (no BX clock cycling) DAQ: No problems with configuration of the setup. High Gain: All data have been taken with feedback C=1.2 pf (nominal value is 6 pf) 5 times higher gain and better S/N (unexpected), but lower dynamic range Selected trigger threshold = 230 after suppression of noisy cells much better than in cosmic runs one year ago (~290) but 220 (used for 2013 cosmic runs PCB (FEV8) ). Special runs with a few triggering cells in showers 5/28

6 Very smooth running DAQ: single crash (due to unchecked scripting) Many many data taken (but only ~85 GB) Beam structure + ACQ for ILC (bursts of 50ms 4Hz) Muons runs Calibation high threshold variation of threshold, and angles (49, 90 ) Masking : 2.2% of all channels Electrons of 15, 30, 50, 100, 150 GeV with 8.5 X0 with mini-cal option this WE Pions of 50 and 150 GeV with 1.75 λ Check non un-conventionnal events Muon beam spots (X-Y distribution of N triggers, requiring ADC-pedestal>10) from typical muon run 361 as example 6/28

7 Analyses 1st : verification of behaviour with simple events SK2 response was a priority for SK2A prod Filtering Noise and establishing clean events Examples given here analyses from V. Balagura, K. Shpak 2nd : check of collective response Correlation between plates Modelling of shower response G4 MC being written by A. Psallidas (National Taiwan University, CMS) 7/28

8 Triggered Noise by Vladislav Balagura (ADC pedestal) in DIF 2 and DIF 0 for comparison (DIF 1 is even better), all channels combined, Distribution of Number of successive BX by classes (of 10) of Max(ADC-pedestal) for All Chips or Single Chips red and blue retrigger in common. This is the case for peak at zero Not seen in DIF0 thr. lowering limit due to retriggering. even in clean DIF0&1: 25% of events have RT for 50% of SK2 memory 8/28

9 Threshold level scans by Vladislav Balagura 9/28

10 Threshold level scans by Vladislav Balagura efficiency at MPV=60: eff ~ 96%, eff=50% at about 30 ADC counts. 10/28

11 Features of SK2 by Vladislav Balagura Retrigger pattern: Chain of re-triggers until Nch=64 due to global ped. shift resetted ch by ch. until all have triggered (best expl.) pedestals shift seen in ADC Pedestal splitting is channel and layer dependant Shift doesn t affect physics signal (mip here) 11/28

12 Square events by Kostya Shpak Normal event 90 5 squares in 4 events 4 Sq in 1 event Tools ready for statistical caracterisation 12/28

13 Others (not devoppeled here) Masking verification: some issues Pedestal width: S(MIP) / RMS(pedestal) = Data corruption in case readout time wasn t sufficient corrected by DAQ settings Good even for short spills with real power pulsing and drift effects Negative signal (ADC=4) located near the DIF connectors Pedestal stability Slow drift after power one on long period Splitted and delayed triggers Chip full events Un-operationnal chips if SCA=15 in ACQ-1 13/28

14 BT in 2016 and beyond 14/28

15 Beam test in 2016 Real calorimetric tests with 7 12 SLAB s in coordination with SDHCAL 7 ASU ready; production should resume in april real SLAB s (no more test plates) prod (will) start(ed) this month: see Roman s talk improved S/N ratio, robustness dependant on beam period (still under discussion) eventually could re-use some the CMS time in sept/oct. Flexible structure to accommodate variable number of SLAB s be in real conditions for PFA tests: 24 X0 of W + 3 cm hgap before SDHCAL 15/28

16 Test of HW: long slab Long slabs: what can t be done with a small RA source? perf in strong B field, with PP. Title Meeting, Place Date 16/28

17 Test of PFA s ECAL standalone separation of showers studies (γ s, e s) tracking in front? e+γ beam (thick target with a magnet in front ~10 m) ECAL + HCAL SW superposition of showers γ/e + h Physical superposition of showers (h+γ?) Test of PFA in B field Tracking, B effect in RPC s (?) on mechanics with PP, Reduction in size of the SHDCAL (last 10 layers) to fit in the M1 magnet in H2B? (~30 cm missing)?

18 ILD related studies

19 Integration in ILD: thermal studies by Denis GRONDIN / Julien GIRAUD (LPSC) 19/28

20 Integration in ILD: thermal studies by Denis GRONDIN / Julien GIRAUD (LPSC) 15 -SLAB s in EUDET module Heat exchanger assembly Insulation 20/28

21 Integration in ILD: thermal studies by Denis GRONDIN / Julien GIRAUD (LPSC) 3 day period 8 day period Power without cooling Conclusion: P= W Efficiency of ex. isolation Peaks in external temp due to direct sunlight Thermal test takes time Ready for cooling tests... 21/28

22 Simulation modifications Slide from Sept 2014 Cleaning & adapatation of ECAL Mokka drivers: [D. Jeans + J. Marshall + E. Becheva + V. Boudry + Dan Yu] Many cleaning made by D. Jeans SECal05 Bugs, improved GEAR output, handling of pre-shower Documentation being reviewed s Statu pt e S f o TBD: Implementation of SEcal05 in DDHEP (based on S. Lu implementation of SEcal04 + tests) Done for CLICdp by D. Protopopescu & M. Petric Needs to be review / adapted for ILD vs SECal04 New ECAL Driver (SEcal06) to correct defects (mostly in Endcaps). Missing dead materials, corners Consistant treatment of Barrel/Endcaps Better handling of Layers, optionnal pre-shower ILD SiW-ECAL optiminsation ILD SW & Optim WS 25/02/ /28

23 Extras Title Meeting, Place Date 23/28

24 Final prototype test (2016+) Tower of cm² (2 2 wafers) 14 Short SLABs 1 Long SLAB 2 2.1mm/lay 2 4.2mm/lay 24/28

25 7-Slab for Test beam 2015 The goal: 7.3 Testing the response of the short SLAB with 4 wafers! - TB position to be tested DAC Testing and surprises!!! Windows of 15 mm for W Cover shielding 4 short SLAB 1 Aluminium plate Cable panel Led panel position Frotin CALICE meeting 17/09/

26 A word about names «ILD SiW-ECAL technological prototype» more of less recently : EUDET prototype CALICE SiW-ECAL technological prototype ILD SiW-ECAL (in conferences) SiLC in recent project call in Paris-Saclay The prototoype is clearly being designed for the ILC, and ILD. from requirements for CLIC-SiW-ECAL, CMS-HGCAL, ATLAS-HGTD, FCC/CEPC CALICE is the structure to make this : e.g. recognised for this by CMS (and others) A high granularity calorimeter system optimised for the particle flow measurement of multi-jet final states at the ILC running, with centre-of-mass energy between 90 GeV and ~1 TeV open it up for other applications?

27 Physics program Physics commissioning: Check proper running with high intensity μ s (X-check of cosmics) Thr. adjustment vs noise environment. (Maybe require shielding). In parasitic mode: test of Babywafers (Kyushu, LLR) EM-Core Set-up: All slabs after 5 X0 of W Strong correlation between SLAB s Response at the core of a EM shower: Explore the full dynamic range ( mips) using shower profile (for all mem depth). e runs of all energies, beam rates linearity Check the responses at the wafers edges with types of wafers (square events) Scan in positions HAD-Core set-up: same as EM-core or with 1λ of W / SS Response to HE hadrons: look for SEU Mini-ECAL set-up: Sampling with X0 and X0 Study of theoretical resolution & simulation tuning. Scan in energy, position (and angle).

28 Chip initialissation pbm

Jean-Claude Brient Laboratoire Leprince-Ringuet

Jean-Claude Brient Laboratoire Leprince-Ringuet Jean-Claude Brient Laboratoire Leprince-Ringuet Collaboration between IN2P3 laboratories (LLR LAL LPSC LPNHE Omega) & Japan institutes (University of Kyushu, KEK ) More specific thanks to M.Anduze, V.Boudry,

More information

The CALICE test beam programme

The CALICE test beam programme Journal of Physics: Conference Series The CALICE test beam programme To cite this article: F Salvatore 2009 J. Phys.: Conf. Ser. 160 012064 View the article online for updates and enhancements. Related

More information

Sensors for the CMS High Granularity Calorimeter

Sensors for the CMS High Granularity Calorimeter Sensors for the CMS High Granularity Calorimeter Andreas Alexander Maier (CERN) on behalf of the CMS Collaboration Wed, March 1, 2017 The CMS HGCAL project ECAL Answer to HL-LHC challenges: Pile-up: up

More information

and progress report first mip measurement with a complete chain of detector slab Silicon wafers for the prototype Mechanics PCB for prototype

and progress report first mip measurement with a complete chain of detector slab Silicon wafers for the prototype Mechanics PCB for prototype progress report Silicon wafers for the prototype Mechanics PCB for prototype VFE electronics DAQ Simulation and analysis and first mip measurement with a complete chain of detector slab Report prepared

More information

HARDROC, Readout chip of the Digital Hadronic Calorimeter of ILC

HARDROC, Readout chip of the Digital Hadronic Calorimeter of ILC HARDROC, Readout chip of the Digital Hadronic Calorimeter of ILC S. Callier a, F. Dulucq a, C. de La Taille a, G. Martin-Chassard a, N. Seguin-Moreau a a OMEGA/LAL/IN2P3, LAL Université Paris-Sud, Orsay,France

More information

Realization and Test of the Engineering Prototype of the CALICE Tile Hadron Calorimeter

Realization and Test of the Engineering Prototype of the CALICE Tile Hadron Calorimeter Realization and Test of the Engineering Prototype of the CALICE Tile Hadron Calorimeter Mark Terwort on behalf of the CALICE collaboration arxiv:1011.4760v1 [physics.ins-det] 22 Nov 2010 Abstract The CALICE

More information

The ATLAS Tile Calorimeter, its performance with pp collisions and its upgrades for high luminosity LHC

The ATLAS Tile Calorimeter, its performance with pp collisions and its upgrades for high luminosity LHC The ATLAS Tile Calorimeter, its performance with pp collisions and its upgrades for high luminosity LHC Tomas Davidek (Charles University), on behalf of the ATLAS Collaboration Tile Calorimeter Sampling

More information

IPRD06 October 2nd, G. Cerminara on behalf of the CMS collaboration University and INFN Torino

IPRD06 October 2nd, G. Cerminara on behalf of the CMS collaboration University and INFN Torino IPRD06 October 2nd, 2006 The Drift Tube System of the CMS Experiment on behalf of the CMS collaboration University and INFN Torino Overview The CMS muon spectrometer and the Drift Tube (DT) system the

More information

Status of GEM-based Digital Hadron Calorimetry

Status of GEM-based Digital Hadron Calorimetry Status of GEM-based Digital Hadron Calorimetry Snowmass Meeting August 23, 2005 Andy White (for the GEM-DHCAL group: UTA, U.Washington, Tsinghua U., Changwon National University, KAERI- Radiation Detector

More information

The CMS Detector Status and Prospects

The CMS Detector Status and Prospects The CMS Detector Status and Prospects Jeremiah Mans On behalf of the CMS Collaboration APS April Meeting --- A Compact Muon Soloniod Philosophy: At the core of the CMS detector sits a large superconducting

More information

Report from the 2015 AHCAL beam test at the SPS. Katja Krüger CALICE Collaboration Meeting MPP Munich 10 September 2015

Report from the 2015 AHCAL beam test at the SPS. Katja Krüger CALICE Collaboration Meeting MPP Munich 10 September 2015 Report from the 2015 AHCAL beam test at the SPS Katja Krüger CALICE Collaboration Meeting MPP Munich 10 September 2015 Goals and Preparation > first SPS test beam with 2nd generation electronics and DAQ

More information

Beam test of the QMB6 calibration board and HBU0 prototype

Beam test of the QMB6 calibration board and HBU0 prototype Beam test of the QMB6 calibration board and HBU0 prototype J. Cvach 1, J. Kvasnička 1,2, I. Polák 1, J. Zálešák 1 May 23, 2011 Abstract We report about the performance of the HBU0 board and the optical

More information

Commissioning and Performance of the ATLAS Transition Radiation Tracker with High Energy Collisions at LHC

Commissioning and Performance of the ATLAS Transition Radiation Tracker with High Energy Collisions at LHC Commissioning and Performance of the ATLAS Transition Radiation Tracker with High Energy Collisions at LHC 1 A L E J A N D R O A L O N S O L U N D U N I V E R S I T Y O N B E H A L F O F T H E A T L A

More information

An extreme high resolution Timing Counter for the MEG Upgrade

An extreme high resolution Timing Counter for the MEG Upgrade An extreme high resolution Timing Counter for the MEG Upgrade M. De Gerone INFN Genova on behalf of the MEG collaboration 13th Topical Seminar on Innovative Particle and Radiation Detectors Siena, Oct.

More information

Study of the performances of the ALICE muon spectrometer

Study of the performances of the ALICE muon spectrometer Study of the performances of the ALICE muon spectrometer Blanc Aurélien, December 2008 PhD description Study of the performances of the ALICE muon spectrometer instrumentation/detection. Master Physique

More information

Test beam data analysis for the CMS CASTOR calorimeter at the LHC

Test beam data analysis for the CMS CASTOR calorimeter at the LHC 1/ 24 DESY Summerstudent programme 2008 - Course review Test beam data analysis for the CMS CASTOR calorimeter at the LHC Agni Bethani a, Andrea Knue b a Technical University of Athens b Georg-August University

More information

LHC Physics GRS PY 898 B8. Trigger Menus, Detector Commissioning

LHC Physics GRS PY 898 B8. Trigger Menus, Detector Commissioning LHC Physics GRS PY 898 B8 Lecture #5 Tulika Bose Trigger Menus, Detector Commissioning Trigger Menus Need to address the following questions: What to save permanently on mass storage? Which trigger streams

More information

Glast beam test at CERN

Glast beam test at CERN Glast beam test at CERN Glast Collaboration Meeting 2005 R. Bellazzini 1 LAT beam test at CERN Main goals LAT-TD-02152, see Steve slides Required beam types and related measurements 1. tagged-photon beam

More information

ALICE Muon Trigger upgrade

ALICE Muon Trigger upgrade ALICE Muon Trigger upgrade Context RPC Detector Status Front-End Electronics Upgrade Readout Electronics Upgrade Conclusions and Perspectives Dr Pascal Dupieux, LPC Clermont, QGPF 2013 1 Context The Muon

More information

Monolithic Thin Pixel Upgrade Testing Update. Gary S. Varner, Marlon Barbero and Fang Fang UH Belle Meeting, April 16 th 2004

Monolithic Thin Pixel Upgrade Testing Update. Gary S. Varner, Marlon Barbero and Fang Fang UH Belle Meeting, April 16 th 2004 Monolithic Thin Pixel Upgrade Testing Update Gary S. Varner, Marlon Barbero and Fang Fang UH Belle Meeting, April 16 th 2004 Basic Technology: Standard CMOS CMOS Camera Because of large Capacitance, need

More information

Drift Tubes as Muon Detectors for ILC

Drift Tubes as Muon Detectors for ILC Drift Tubes as Muon Detectors for ILC Dmitri Denisov Fermilab Major specifications for muon detectors D0 muon system tracking detectors Advantages and disadvantages of drift chambers as muon detectors

More information

ILC requirements Review on CMOS Performances: state of the art Progress on fast read-out sensors & ADC Roadmap for the coming years Summary

ILC requirements Review on CMOS Performances: state of the art Progress on fast read-out sensors & ADC Roadmap for the coming years Summary Status on CMOS sensors Auguste Besson on behalf of DAPNIA/Saclay, LPSC/Grenoble, LPC/Clermont-F., DESY, Uni. Hamburg, JINR-Dubna & IPHC/Strasbourg contributions from IPN/Lyon, Uni. Frankfurt, GSI-Darmstadt,

More information

Note on the preliminary organisation for the design, fabrication and test of a prototype double-sided ladder equipped with MAPS

Note on the preliminary organisation for the design, fabrication and test of a prototype double-sided ladder equipped with MAPS Note on the preliminary organisation for the design, fabrication and test of a prototype double-sided ladder equipped with MAPS J.Baudot a, J.Goldstein b, A.Nomerotski c, M.Winter a a IPHC - Université

More information

ATLAS Pixel Subsystem and Simulation

ATLAS Pixel Subsystem and Simulation ATLAS Pixel Subsystem and Simulation Charles Young On behalf of the SLAC ATLAS Team Annual DOE HEP Program Review (June 2007) 6/13/07 C. Young (Pixels and Simulation in ATLAS) 1 The Pixel Subsystem Basic

More information

A flexible FPGA based QDC and TDC for the HADES and the CBM calorimeters TWEPP 2016, Karlsruhe HADES CBM

A flexible FPGA based QDC and TDC for the HADES and the CBM calorimeters TWEPP 2016, Karlsruhe HADES CBM A flexible FPGA based QDC and TDC for the HADES and the CBM calorimeters TWEPP 2016, Karlsruhe + + + = PaDiWa-AMPS front-end Adrian Rost for the HADES and CBM collaborations PMT Si-PM (MPPC) 27.09.2016

More information

The Alice Silicon Pixel Detector (SPD) Peter Chochula for the Alice Pixel Collaboration

The Alice Silicon Pixel Detector (SPD) Peter Chochula for the Alice Pixel Collaboration The Alice Silicon Pixel Detector (SPD) Peter Chochula for the Alice Pixel Collaboration The Alice Pixel Detector R 1 =3.9 cm R 2 =7.6 cm Main Physics Goal Heavy Flavour Physics D 0 K π+ 15 days Pb-Pb data

More information

Review of the CMS muon detector system

Review of the CMS muon detector system 1 Review of the CMS muon detector system E. Torassa a a INFN sez. di Padova, Via Marzolo 8, 35131 Padova, Italy The muon detector system of CMS consists of 3 sub detectors, the barrel drift tube chambers

More information

Paul Dauncey For the CALICE-UK electronics group. A. Baird, D. Bowerman, P. Dauncey, R. Halsall, M. Postranecky, M.Warren, O.

Paul Dauncey For the CALICE-UK electronics group. A. Baird, D. Bowerman, P. Dauncey, R. Halsall, M. Postranecky, M.Warren, O. ECAL Readout Paul Dauncey For the CALICE-UK electronics group A. Baird, D. Bowerman, P. Dauncey, R. Halsall, M. Postranecky, M.Warren, O. Zorba 8 December 2004 Paul Dauncey 1 CALICE Readout (ECAL) Card

More information

Muon Forward Tracker. MFT Collaboration

Muon Forward Tracker. MFT Collaboration Muon Forward Tracker MFT Collaboration QGP France 2013 Introduction Summary of what «physically» MFT looks like: - Silicon detector - Data flow - Mechanical aspects - Power supplies - Cooling - Insertion/Extraction

More information

DEPFET Active Pixel Sensors for the ILC

DEPFET Active Pixel Sensors for the ILC DEPFET Active Pixel Sensors for the ILC Laci Andricek for the DEPFET Collaboration (www.depfet.org) The DEPFET ILC VTX Project steering chips Switcher thinning technology Simulation sensor development

More information

HAPD and Electronics Updates

HAPD and Electronics Updates S. Nishida KEK 3rd Open Meeting for Belle II Collaboration 1 Contents Frontend Electronics Neutron Irradiation News from Hamamtsu 2 144ch HAPD HAPD (Hybrid Avalanche Photo Detector) photon bi alkali photocathode

More information

MAPS Beam Test: preliminary results and book keeping

MAPS Beam Test: preliminary results and book keeping MAPS Beam Test: preliminary results and book keeping MAPS Group Meeting, RAL Jamie Ballin HEP, Imperial College, London j.ballin06@ic.ac.uk 18th January 2008 A Christmas Tale Starring the staff of the

More information

Test Beam Wrap-Up. Darin Acosta

Test Beam Wrap-Up. Darin Acosta Test Beam Wrap-Up Darin Acosta Agenda Darin/UF: General recap of runs taken, tests performed, Track-Finder issues Martin/UCLA: Summary of RAT and RPC tests, and experience with TMB2004 Stan(or Jason or

More information

The field cage for a large TPC prototype

The field cage for a large TPC prototype EUDET The field cage for a large TPC prototype T.Behnke, L. Hallermann, P. Schade, R. Diener December 7, 2006 Abstract Within the EUDET Programme, the FLC TPC Group at DESY in collaboration with the Department

More information

The Large TPC Prototype: Infrastructure/ Status/ Plans

The Large TPC Prototype: Infrastructure/ Status/ Plans The Large TPC Prototype: Infrastructure/ Status/ Plans Takeshi Matsuda, KEK/ DESY Ties Behnke, DESY For the LC-TPC collaboration Status of the test beam infrastructure Status of the Large Prototype Field

More information

Trigger Report. Wesley H. Smith CMS Trigger Project Manager Report to Steering Committee February 23, 2004

Trigger Report. Wesley H. Smith CMS Trigger Project Manager Report to Steering Committee February 23, 2004 Trigger Report Wesley H. Smith CMS Trigger Project Manager Report to Steering Committee February 23, 2004 Outline: Calorimeter Triggers Muon Triggers Global Triggers The pdf file of this talk is available

More information

HaRDROC performance IN2P3/LAL+IPNL+LLR IN2P3/IPNL LYON. M. BOUCHEL, J. FLEURY, C. de LA TAILLE, G. MARTIN-CHASSARD, N. SEGUIN-MOREAU IN2P3/LAL ORSAY

HaRDROC performance IN2P3/LAL+IPNL+LLR IN2P3/IPNL LYON. M. BOUCHEL, J. FLEURY, C. de LA TAILLE, G. MARTIN-CHASSARD, N. SEGUIN-MOREAU IN2P3/LAL ORSAY HaRDROC performance IN2P3/LAL+IPNL+LLR R. GAGLIONE, I. LAKTINEH, H. MATHEZ IN2P3/IPNL LYON M. BOUCHEL, J. FLEURY, C. de LA TAILLE, G. MARTIN-CHASSARD, N. SEGUIN-MOREAU IN2P3/LAL ORSAY V. BOUDRY, J.C. BRIENT,

More information

Digital Hadron Calorimetry for the Linear Collider using GEM based Technology University of Texas at Arlington, University of Washington

Digital Hadron Calorimetry for the Linear Collider using GEM based Technology University of Texas at Arlington, University of Washington Digital Hadron Calorimetry for the Linear Collider using GEM based Technology University of Texas at Arlington, University of Washington Personnel and Institutions requesting funding Andrew Brandt, Kaushik

More information

First evaluation of the prototype 19-modules camera for the Large Size Telescope of the CTA

First evaluation of the prototype 19-modules camera for the Large Size Telescope of the CTA First evaluation of the prototype 19-modules camera for the Large Size Telescope of the CTA Tsutomu Nagayoshi for the CTA-Japan Consortium Saitama Univ, Max-Planck-Institute for Physics 1 Cherenkov Telescope

More information

DAQ Systems in Hall A

DAQ Systems in Hall A CODA Users Workshop Data Acquisition at Jefferson Lab Newport News June 7, 2004 DAQ Systems in Hall A Overview of Hall A Standard Equipment: HRS, Beamline,... Parity Experiments Third Arms: BigBite, RCS

More information

A prototype of fine granularity lead-scintillating fiber calorimeter with imaging read-out

A prototype of fine granularity lead-scintillating fiber calorimeter with imaging read-out A prototype of fine granularity lead-scintillating fiber calorimeter with imaging read-out P.Branchini, F.Ceradini, B.Di Micco, A. Passeri INFN Roma Tre and Dipartimento di Fisica Università Roma Tre and

More information

A fast and precise COME & KISS* QDC and TDC for diamond detectors and further applications

A fast and precise COME & KISS* QDC and TDC for diamond detectors and further applications A fast and precise COME & KISS* QDC and TDC for diamond detectors and further applications 3 rd ADAMAS Collaboration Meeting (2014) Trento, Italy *use commercial elements and keep it small & simple + +

More information

Commissioning and Initial Performance of the Belle II itop PID Subdetector

Commissioning and Initial Performance of the Belle II itop PID Subdetector Commissioning and Initial Performance of the Belle II itop PID Subdetector Gary Varner University of Hawaii TIPP 2017 Beijing Upgrading PID Performance - PID (π/κ) detectors - Inside current calorimeter

More information

Prospect and Plan for IRS3B Readout

Prospect and Plan for IRS3B Readout Prospect and Plan for IRS3B Readout 1. Progress on Key Performance Parameters 2. Understanding limitations during LEPS operation 3. Carrier02 Rev. C (with O-E-M improvements) 4. Pre-production tasks/schedule

More information

Update on DAQ for 12 GeV Hall C

Update on DAQ for 12 GeV Hall C Update on DAQ for 12 GeV Hall C Brad Sawatzky Hall C Winter User Group Meeting Jan 20, 2017 SHMS/HMS Trigger/Electronics H. Fenker 2 SHMS / HMS Triggers SCIN = 3/4 hodoscope planes CER = Cerenkov(s) STOF

More information

FRONT-END AND READ-OUT ELECTRONICS FOR THE NUMEN FPD

FRONT-END AND READ-OUT ELECTRONICS FOR THE NUMEN FPD FRONT-END AND READ-OUT ELECTRONICS FOR THE NUMEN FPD D. LO PRESTI D. BONANNO, F. LONGHITANO, D. BONGIOVANNI, S. REITO INFN- SEZIONE DI CATANIA D. Lo Presti, NUMEN2015 LNS, 1-2 December 2015 1 OVERVIEW

More information

THE TIMING COUNTER OF THE MEG EXPERIMENT: DESIGN AND COMMISSIONING (OR HOW TO BUILD YOUR OWN HIGH TIMING RESOLUTION DETECTOR )

THE TIMING COUNTER OF THE MEG EXPERIMENT: DESIGN AND COMMISSIONING (OR HOW TO BUILD YOUR OWN HIGH TIMING RESOLUTION DETECTOR ) THE TIMING COUNTER OF THE MEG EXPERIMENT: DESIGN AND COMMISSIONING (OR HOW TO BUILD YOUR OWN HIGH TIMING RESOLUTION DETECTOR ) S. DUSSONI FRONTIER DETECTOR FOR FRONTIER PHYSICS - LA BIODOLA 2009 Fastest

More information

AIDA Advanced European Infrastructures for Detectors at Accelerators. Presentation. Second generation DAQ for CALICE beam tests

AIDA Advanced European Infrastructures for Detectors at Accelerators. Presentation. Second generation DAQ for CALICE beam tests AIDA-SLIDE-2015-029 AIDA Advanced European Infrastructures for Detectors at Accelerators Presentation Second generation DAQ for CALICE beam tests Boudry, V (CNRS) 29 September 2011 The research leading

More information

Commissioning of the ATLAS Transition Radiation Tracker (TRT)

Commissioning of the ATLAS Transition Radiation Tracker (TRT) Commissioning of the ATLAS Transition Radiation Tracker (TRT) 11 th Topical Seminar on Innovative Particle and Radiation Detector (IPRD08) 3 October 2008 bocci@fnal.gov On behalf of the ATLAS TRT community

More information

li, o p a f th ed lv o v ti, N sca reb g s In tio, F, Z stitu e tests o e O v o d a eters sin u i P r th e d est sezio tefa ectro lity stem l su

li, o p a f th ed lv o v ti, N sca reb g s In tio, F, Z stitu e tests o e O v o d a eters sin u i P r th e d est sezio tefa ectro lity stem l su Design and prototype tests of the system for the OPERA spectrometers Stefano Dusini INFN sezione di Padova Outline OPERA Detector Inner Tracker Design Mechanical support Gas & HV Production and Quality

More information

Outline. GEM R&D and assembly facilities at UVa. Cosmic test results. Update on the cm 2 GEM prototype

Outline. GEM R&D and assembly facilities at UVa. Cosmic test results. Update on the cm 2 GEM prototype Uva GEM R&D Update Kondo Gnanvo, Nilanga Liyanage, Vladimir Nelyubin, Kiadtisak Saenboonruang, Taylor Scholz and Adarsh Ramakrishnan In Collaboration with Evaristo Cisbani and Paolo Musico Outline GEM

More information

arxiv:hep-ex/ v1 27 Nov 2003

arxiv:hep-ex/ v1 27 Nov 2003 arxiv:hep-ex/0311058v1 27 Nov 2003 THE ATLAS TRANSITION RADIATION TRACKER V. A. MITSOU European Laboratory for Particle Physics (CERN), EP Division, CH-1211 Geneva 23, Switzerland E-mail: Vasiliki.Mitsou@cern.ch

More information

Status of the CUORE Electronics and the LHCb RICH Upgrade photodetector chain

Status of the CUORE Electronics and the LHCb RICH Upgrade photodetector chain Status of the CUORE Electronics and the LHCb RICH Upgrade photodetector chain Lorenzo Cassina - XXIX cycle MiB - Midterm Graduate School Seminar Day Outline Activity on LHCb MaPTM qualification RICH Upgrade

More information

PIXEL2000, June 5-8, FRANCO MEDDI CERN-ALICE / University of Rome & INFN, Italy. For the ALICE Collaboration

PIXEL2000, June 5-8, FRANCO MEDDI CERN-ALICE / University of Rome & INFN, Italy. For the ALICE Collaboration PIXEL2000, June 5-8, 2000 FRANCO MEDDI CERN-ALICE / University of Rome & INFN, Italy For the ALICE Collaboration CONTENTS: Introduction: Physics Requirements Design Considerations Present development status

More information

Riccardo Farinelli. Charge Centroid Feasibility

Riccardo Farinelli. Charge Centroid Feasibility Riccardo Farinelli Charge Centroid Feasibility Outline Prototype and TB setup Data set studied Analysis approch Results Charge Centroid Feasibility Ferrara July 07, 2015 R.Farinelli 2 Test chambers Conversion

More information

A FOUR GAIN READOUT INTEGRATED CIRCUIT : FRIC 96_1

A FOUR GAIN READOUT INTEGRATED CIRCUIT : FRIC 96_1 A FOUR GAIN READOUT INTEGRATED CIRCUIT : FRIC 96_1 J. M. Bussat 1, G. Bohner 1, O. Rossetto 2, D. Dzahini 2, J. Lecoq 1, J. Pouxe 2, J. Colas 1, (1) L. A. P. P. Annecy-le-vieux, France (2) I. S. N. Grenoble,

More information

Development of beam-collision feedback systems for future lepton colliders. John Adams Institute for Accelerator Science, Oxford University

Development of beam-collision feedback systems for future lepton colliders. John Adams Institute for Accelerator Science, Oxford University Development of beam-collision feedback systems for future lepton colliders P.N. Burrows 1 John Adams Institute for Accelerator Science, Oxford University Denys Wilkinson Building, Keble Rd, Oxford, OX1

More information

The Silicon Pixel Detector (SPD) for the ALICE Experiment

The Silicon Pixel Detector (SPD) for the ALICE Experiment The Silicon Pixel Detector (SPD) for the ALICE Experiment V. Manzari/INFN Bari, Italy for the SPD Project in the ALICE Experiment INFN and Università Bari, Comenius University Bratislava, INFN and Università

More information

with Low Cost and Low Material Budget

with Low Cost and Low Material Budget Gaseous Beam Position Detectors, with Low Cost and Low Material Budget Gyula Bencédi on behalf of the REGaRD group MTA KFKI RMKI, ELTE November 29, 2011, Outline Physics Motivation Newish MWPCs, the Close

More information

A new Scintillating Fibre Tracker for LHCb experiment

A new Scintillating Fibre Tracker for LHCb experiment A new Scintillating Fibre Tracker for LHCb experiment Alexander Malinin, NRC Kurchatov Institute on behalf of the LHCb-SciFi-Collaboration Instrumentation for Colliding Beam Physics BINP, Novosibirsk,

More information

CSC Data Rates, Formats and Calibration Methods

CSC Data Rates, Formats and Calibration Methods CSC Data Rates, Formats and Calibration Methods D. Acosta University of Florida With most information collected from the The Ohio State University PRS March Milestones 1. Determination of calibration methods

More information

Paul Rubinov Fermilab Front End Electronics. May 2006 Perugia, Italy

Paul Rubinov Fermilab Front End Electronics. May 2006 Perugia, Italy Minerva Electronics and the Trip-T Paul Rubinov Fermilab Front End Electronics May 2006 Perugia, Italy 1 Outline Minerva Electronics and the TriP-t Minerva TriP-t The concept for Minerva Overview and status

More information

WBS Calorimeter Trigger. Wesley Smith, U. Wisconsin CMS Trigger Project Manager. DOE/NSF Review April 12, 2000

WBS Calorimeter Trigger. Wesley Smith, U. Wisconsin CMS Trigger Project Manager. DOE/NSF Review April 12, 2000 WBS 3.1.2 - Calorimeter Trigger Wesley Smith, U. Wisconsin CMS Trigger Project Manager DOE/NSF Review April 12, 2000 1 Calorimeter Electronics Interface Calorimeter Trigger Overview 4K 1.2 Gbaud serial

More information

Compact Muon Solenoid Detector (CMS) & The Token Bit Manager (TBM) Alex Armstrong & Wyatt Behn Mentor: Dr. Andrew Ivanov

Compact Muon Solenoid Detector (CMS) & The Token Bit Manager (TBM) Alex Armstrong & Wyatt Behn Mentor: Dr. Andrew Ivanov Compact Muon Solenoid Detector (CMS) & The Token Bit Manager (TBM) Alex Armstrong & Wyatt Behn Mentor: Dr. Andrew Ivanov Part 1: The TBM and CMS Understanding how the LHC and the CMS detector work as a

More information

TPC R&D by LCTPC. Organisation, results, plans. Jan Timmermans NIKHEF & DESY(2009) On behalf of the LCTPC Collaboration TILC09, Tsukuba

TPC R&D by LCTPC. Organisation, results, plans. Jan Timmermans NIKHEF & DESY(2009) On behalf of the LCTPC Collaboration TILC09, Tsukuba TPC R&D by LCTPC Organisation, results, plans Jan Timmermans NIKHEF & DESY(2009) On behalf of the LCTPC Collaboration TILC09, Tsukuba 20 April, 2009 LCTPC Collaboration IIHE ULB-VUB Brussels 2 LCTPC Collaboration

More information

CGEM-IT project update

CGEM-IT project update BESIII Physics and Software Workshop Beihang University February 20-23, 2014 CGEM-IT project update Gianluigi Cibinetto (INFN Ferrara) on behalf of the CGEM group Outline Introduction Mechanical development

More information

Local Trigger Electronics for the CMS Drift Tubes Muon Detector

Local Trigger Electronics for the CMS Drift Tubes Muon Detector Amsterdam, 1 October 2003 Local Trigger Electronics for the CMS Drift Tubes Muon Detector Presented by R.Travaglini INFN-Bologna Italy CMS Drift Tubes Muon Detector CMS Barrel: 5 wheels Wheel : Azimuthal

More information

Trigger Menus and Rates

Trigger Menus and Rates Trigger Menus and Rates Trigger Menu Development Group: Leonard Apanasevich, Anne Fleur Barfuss, Pedram Bargassa, Eric Conte, Sivia Goy Lopez, Jonathan J. Hollar, Chi Nhan Nguyen CMS Physics Week May 13th,

More information

R&D on high performance RPC for the ATLAS Phase-II upgrade

R&D on high performance RPC for the ATLAS Phase-II upgrade R&D on high performance RPC for the ATLAS Phase-II upgrade Yongjie Sun State Key Laboratory of Particle detection and electronics Department of Modern Physics, USTC outline ATLAS Phase-II Muon Spectrometer

More information

Online Monitoring of L1CT in Run IIa. bonus: experience from Run I

Online Monitoring of L1CT in Run IIa. bonus: experience from Run I Online Monitoring of L1CT in Run IIa bonus: experience from Run I Philippe Laurens 20-Feb-2003 L1 Cal Monitoring Monitoring can mean many things Anything related to observation of system s operation Different

More information

Development of an Abort Gap Monitor for High-Energy Proton Rings *

Development of an Abort Gap Monitor for High-Energy Proton Rings * Development of an Abort Gap Monitor for High-Energy Proton Rings * J.-F. Beche, J. Byrd, S. De Santis, P. Denes, M. Placidi, W. Turner, M. Zolotorev Lawrence Berkeley National Laboratory, Berkeley, USA

More information

TORCH a large-area detector for high resolution time-of-flight

TORCH a large-area detector for high resolution time-of-flight TORCH a large-area detector for high resolution time-of-flight Roger Forty (CERN) on behalf of the TORCH collaboration 1. TORCH concept 2. Application in LHCb 3. R&D project 4. Test-beam studies TIPP 2017,

More information

Beam Test Results and ORCA validation for CMS EMU CSC front-end electronics N. Terentiev

Beam Test Results and ORCA validation for CMS EMU CSC front-end electronics N. Terentiev Beam Test Results and ORCA validation for CMS EMU CSC front-end electronics US N. Terentiev Carnegie Mellon University CMS EMU Meeting, CERN June 18, 2005 Outline Motivation. CSC cathode strip pulse shape

More information

Integrating Silicon tracking in ILC detector concepts: solutions & challenges

Integrating Silicon tracking in ILC detector concepts: solutions & challenges Integrating Silicon tracking in ILC detector concepts: solutions & challenges Aurore Savoy Navarro, LPNHE Universite Pierre et Marie Curie/IN2P3 CNRS The work reported here is done within the SiLC R&D

More information

CMS Tracker Synchronization

CMS Tracker Synchronization CMS Tracker Synchronization K. Gill CERN EP/CME B. Trocme, L. Mirabito Institut de Physique Nucleaire de Lyon Outline Timing issues in CMS Tracker Synchronization method Relative synchronization Synchronization

More information

Tests of the boards generating the CMS ECAL Trigger Primitives: from the On-Detector electronics to the Off-Detector electronics system

Tests of the boards generating the CMS ECAL Trigger Primitives: from the On-Detector electronics to the Off-Detector electronics system Tests of the boards generating the CMS ECAL Trigger Primitives: from the On-Detector electronics to the Off-Detector electronics system P. Paganini, M. Bercher, P. Busson, M. Cerutti, C. Collard, A. Debraine,

More information

The Readout Architecture of the ATLAS Pixel System

The Readout Architecture of the ATLAS Pixel System The Readout Architecture of the ATLAS Pixel System Roberto Beccherle / INFN - Genova E-mail: Roberto.Beccherle@ge.infn.it Copy of This Talk: http://www.ge.infn.it/atlas/electronics/home.html R. Beccherle

More information

Highly Accelerated Stress Screening of the Atlas Liquid Argon Calorimeter Front End Boards

Highly Accelerated Stress Screening of the Atlas Liquid Argon Calorimeter Front End Boards Highly Accelerated Stress Screening of the Atlas Liquid Argon Calorimeter Front End Boards K. Benslama, G. Brooijmans, C.-Y. Chi, D. Dannheim, I. Katsanos, J. Parsons, S. Simion Nevis Labs, Columbia University

More information

Precision measurements of beam current, position and phase for an e+e- linear collider

Precision measurements of beam current, position and phase for an e+e- linear collider Precision measurements of beam current, position and phase for an e+e- linear collider R. Corsini on behalf of H. Braun, M. Gasior, S. Livesley, P. Odier, J. Sladen, L. Soby INTRODUCTION Commissioning

More information

Results on 0.7% X0 thick Pixel Modules for the ATLAS Detector.

Results on 0.7% X0 thick Pixel Modules for the ATLAS Detector. Results on 0.7% X0 thick Pixel Modules for the ATLAS Detector. INFN Genova: R.Beccherle, G.Darbo, G.Gagliardi, C.Gemme, P.Netchaeva, P.Oppizzi, L.Rossi, E.Ruscino, F.Vernocchi Lawrence Berkeley National

More information

First LHC Beams in ATLAS. Peter Krieger University of Toronto On behalf of the ATLAS Collaboration

First LHC Beams in ATLAS. Peter Krieger University of Toronto On behalf of the ATLAS Collaboration First LHC Beams in ATLAS Peter Krieger University of Toronto On behalf of the ATLAS Collaboration Cutaway View LHC/ATLAS (Graphic) P. Krieger, University of Toronto Aspen Winter Conference, Feb. 2009 2

More information

Front End Electronics

Front End Electronics CLAS12 Ring Imaging Cherenkov (RICH) Detector Mid-term Review Front End Electronics INFN - Ferrara Matteo Turisini 2015 October 13 th Overview Readout requirements Hardware design Electronics boards Integration

More information

BABAR IFR TDC Board (ITB): requirements and system description

BABAR IFR TDC Board (ITB): requirements and system description BABAR IFR TDC Board (ITB): requirements and system description Version 1.1 November 1997 G. Crosetti, S. Minutoli, E. Robutti I.N.F.N. Genova 1. Timing measurement with the IFR Accurate track reconstruction

More information

Performance of a double-metal n-on-n and a Czochralski silicon strip detector read out at LHC speeds

Performance of a double-metal n-on-n and a Czochralski silicon strip detector read out at LHC speeds Performance of a double-metal n-on-n and a Czochralski silicon strip detector read out at LHC speeds Juan Palacios, On behalf of the LHCb VELO group J.P. Palacios, Liverpool Outline LHCb and VELO performance

More information

Studies of large dynamic range silicon photomultipliers for the CMS HCAL upgrade

Studies of large dynamic range silicon photomultipliers for the CMS HCAL upgrade Studies of large dynamic range silicon photomultipliers for the CMS HCAL upgrade Yuri Musienko* FNAL(USA) Arjan Heering University of Notre Dame (USA) For the CMS HCAL group *On leave from INR(Moscow)

More information

ILC Detector Work. Dan Peterson

ILC Detector Work. Dan Peterson ILC Detector Work Dan Peterson ** Cornell/Purdue TPC development program Large Detector Concept TPC Detector Response Simulation and Track Reconstruction World Wide Study Detector R&D Panel This project

More information

SciFi A Large Scintillating Fibre Tracker for LHCb

SciFi A Large Scintillating Fibre Tracker for LHCb SciFi A Large Scintillating Fibre Tracker for LHCb Roman Greim on behalf of the LHCb-SciFi-Collaboration 14th Topical Seminar on Innovative Particle Radiation Detectors, Siena 5th October 2016 I. Physikalisches

More information

Hardware Verification after Installation. D0 Run IIB L1Cal Technical Readiness Review. Presented by Dan Edmunds August 2005

Hardware Verification after Installation. D0 Run IIB L1Cal Technical Readiness Review. Presented by Dan Edmunds August 2005 Hardware Verification after Installation D0 Run IIB L1Cal Technical Readiness Review Presented by Dan Edmunds 26-27 August 2005 The purpose of this talk is to describe to the committee how various aspects

More information

AIDA Advanced European Infrastructures for Detectors at Accelerators. Milestone Report. Pixel gas read-out progress

AIDA Advanced European Infrastructures for Detectors at Accelerators. Milestone Report. Pixel gas read-out progress AIDA-MS41 AIDA Advanced European Infrastructures for Detectors at Accelerators Milestone Report Pixel gas read-out progress Colas, P. (CEA) et al 11 December 2013 The research leading to these results

More information

Time Resolution Improvement of an Electromagnetic Calorimeter Based on Lead Tungstate Crystals

Time Resolution Improvement of an Electromagnetic Calorimeter Based on Lead Tungstate Crystals Time Resolution Improvement of an Electromagnetic Calorimeter Based on Lead Tungstate Crystals M. Ippolitov 1 NRC Kurchatov Institute and NRNU MEPhI Kurchatov sq.1, 123182, Moscow, Russian Federation E-mail:

More information

First Simultaneous Top-up Operation of Three Different Rings in KEK Injector Linac

First Simultaneous Top-up Operation of Three Different Rings in KEK Injector Linac First Simultaneous Top-up Operation of Three Different Rings in KEK Injector Linac Masanori Satoh (Acc. Lab., KEK) for the injector upgrade group 2010/9/16 1 Overview of Linac Beam Operation 2010/9/16

More information

Study of the Z resolution with Fit Method for Micromegas TPC

Study of the Z resolution with Fit Method for Micromegas TPC Study of the Z resolution with Fit Method for Micromegas TPC David Attié, Deb Bhattacharya, Paul Colas, Serguei Ganjour CEA-Saclay/IRFU, Gif-sur-Yvette, France LCTPC-Saclay Working Group Meeting Saclay

More information

The ATLAS Pixel Detector

The ATLAS Pixel Detector The ATLAS Pixel Detector Fabian Hügging arxiv:physics/0412138v2 [physics.ins-det] 5 Aug 5 Abstract The ATLAS Pixel Detector is the innermost layer of the ATLAS tracking system and will contribute significantly

More information

Status of CMS and preparations for first physics

Status of CMS and preparations for first physics Status of CMS and preparations for first physics A. H. Ball (for the CMS collaboration) PH Department, CERN, Geneva, CH1211 Geneva 23, Switzerland The status of the CMS experiment is described. After a

More information

A TARGET-based camera for CTA

A TARGET-based camera for CTA A TARGET-based camera for CTA TeV Array Readout with GSa/s sampling and Event Trigger (TARGET) chip: overview Custom-designed ASIC for CTA, developed in collaboration with Gary Varner (U Hawaii) Implementation:

More information

Scintillation Tile Hodoscope for the PANDA Barrel Time-Of-Flight Detector

Scintillation Tile Hodoscope for the PANDA Barrel Time-Of-Flight Detector Scintillation Tile Hodoscope for the PANDA Barrel Time-Of-Flight Detector William Nalti, Ken Suzuki, Stefan-Meyer-Institut, ÖAW on behalf of the PANDA/Barrel-TOF(SciTil) group 12.06.2018, ICASiPM2018 1

More information

Summary of CFS MDI Mini-Workshop

Summary of CFS MDI Mini-Workshop Summary of CFS MDI Mini-Workshop 15/3/16 16/3/16 at KEK http://agenda.linearcollider.org/event/6910/other-view?view=standard 4èmes Journées Collisionneur Linéaire Paris March 2016 Machine Detector Interface

More information

A dedicated data acquisition system for ion velocity measurements of laser produced plasmas

A dedicated data acquisition system for ion velocity measurements of laser produced plasmas A dedicated data acquisition system for ion velocity measurements of laser produced plasmas N Sreedhar, S Nigam, Y B S R Prasad, V K Senecha & C P Navathe Laser Plasma Division, Centre for Advanced Technology,

More information

Update on DAQ for 12 GeV Hall C. Brad Sawatzky

Update on DAQ for 12 GeV Hall C. Brad Sawatzky Update on DAQ for 12 GeV Hall C Brad Sawatzky SHMS/HMS Trigger/Electronics H. Fenker 2 SHMS / HMS Triggers SCIN = 3/4 hodoscope planes CER = Cerenkov(s) STOF = S1 + S2 EL-Hi = SCIN + PSh_Hi EL-Lo = 2/3{SCIN,

More information

A Cylindrical GEM Detector with Analog Readout for the BESIII Experiment. Gianluigi Cibinetto (INFN Ferrara) on behalf of the BESIIICGEM consortium

A Cylindrical GEM Detector with Analog Readout for the BESIII Experiment. Gianluigi Cibinetto (INFN Ferrara) on behalf of the BESIIICGEM consortium A Cylindrical GEM Detector with Analog Readout for the BESIII Experiment Gianluigi Cibinetto (INFN Ferrara) on behalf of the BESIIICGEM consortium Outline The BESIII experiment the Inner tracker The BESIII

More information