1 January 25, 2006 Page 1 of 5 TEO Work Zone Safety Committee Meeting January 25, 2006 Minutes Committee Members Present: Oliver Kendall, District 4 Mike Engh, Metro Sue Lorentz, Metro Ken Nelson, CO Maintenance Bill Servatius, CO Construction Ken Wenkel, District 7 Dave Buss, District 3 Jeff Rieder, District 6 Jim Miles, District 1 Craig Mittelstadt, CO Construction Jon Jackels, CO Traffic Guests: Jeff Perkins, D4 Construction Steve Kordosky, Metro Construction Pat Faltersack, Metro Maintenance Note: Committee members, please review the minutes and report corrections to Marv Sohlo Channelizing Devices There were detailed discussions regarding the applications of various channelizing devices on construction and maintenance operations. Details contained in the handout (attached) were discussed and revisions and additions were made. There was a discussion on who would decide which type of channelizer was to be used. It was decided that the specific Type (A or B) and/or the specific channelizer (drum, cone, weighted channelizer, tubular marker, etc.) would be specified for all construction projects by including this information on the plan or in the special provisions. The new guideline for channelizer application guideline for Mn/DOT operations should be included in the TEM. These guidelines should be based on the following parameters: Urban or rural Duration of work (Short term, Intermediate term or long term) Type of work (surfacing, excavation, concrete repair, etc.) Traffic volumes It was decided to remove all references to 5000 ADT for the application of tubular markers for drop-off delineation.

2 January 25, 2006 Page 2 of 5 In general the new guideline will detail the channelizer applications as allowed in the MN MUTCD. There should not be a need to make any revisions to the MN MUTCD for these guidelines. However, Marv we need to check this in detail. There was a discussion regarding the use of Direction Indicator Barricades as used by night maintenance. It was determined that the use of DIB in the lane closure extension every 1000 feet or as needed would be allowed in attended work zones only. This would require modification of the MN MUTCD but is allowed in the federal MUTCD. The use of DIB in the tapers by Metro maintenance is being worked on and the final standard will be included in the new Field Manual section for night work. Night Work Section in Field Manual It was decided that a section should be added to the Field Manual detailing night work temporary traffic control. This would be based on the experiences and practices of Metro s night maintenance operations. Sue Lorentz will lead the initial effort by meeting with night maintenance workers and developing sketches of the various layouts used. Some of these will be based on recent efforts with Metro Traffic Engineering and CO Traffic Engineering. Sue will invite Marv Sohlo to these meetings. The final artwork for this section of the Field Manual will be developed by CO Traffic Engineering. Warning Lights on Devices The introduction of high performance sheeting, wet reflective pavement markings, portable changeable message signs, intelligent work zone applications, etc. has reduced the need for the application of warning lights on advance warning signs and channelizing devices. After some discussion regarding the application of warning lights the following guideline was developed: Type A flashers will be shown and used on ROAD CLOSURE advance warning signs and barricades. They will also be shown as optional red flashers on STOP signs added for short and intermediate term work zones such as on Layout 16 of the Field Manual (this may require revision to Part 6 of the MN MUTCD). Most of the layouts in the Field Manual will be modified to remove the flashers from the signs and barricades and the notes related to the flashers will be removed or modified as necessary. Marv Sohlo will make the appropriate changes to the Field Manual Layouts and Part 6 MN MUTCD section(s). TTC Plan Templet Sheets After a brief discussion it was agreed that all TEO TTC Committee members will keep Marv Sohlo informed of problems or revisions needed to the layouts. Members also

3 January 25, 2006 Page 3 of 5 agreed to assist CO Traffic Engineering by revising the layouts as needed for posting on the website. All TEO TTC Committee members will forward concerns to Marv as they are discovered. Marv will coordinate revisions and postings. Your Speed Is Signs It was decided that a separate section should be added to the tech memo detailing work zone applications. Comments regarding the use of these signs in work zones included: the signs should only be activated while working in work zones the signs can be use independently of regulatory or advisory speed sign the sign background color must be orange in a work zone signs mounted on trailers would be Category IV devices and no compliance date for crashworthiness Jeff Rieder will forward District 6 comments regarding this to Marv Sohlo. Marv will coordinate incorporation of these comments into the tech memo with the TEO Signing Committee. Field Manual 2007 Update The following is a list of discussion items and changes to the Field Manual: Flashing Arrowboards should be shown/used for all lane closures and highspeed multi-lane roadways. Layout 39 and others that show and FAB or Type III should be clarified that either a FAB OR a Type III are required. We should consider the addition of a layout for a mobile operation for the installation and maintenance of crosswalks. It would be advantageous to discuss this with city and county officials. Layout 18, remove NPZ pennant. It is in the wrong location and is not used for any other similar short/intermediate term layouts. Layout 47 generates a majority of the questions and concerns and needs some additional details including: o Remove 3G channelizer spacing o Show an option of 3 drums in place of a Type III o Show previously discussed DIB in closure with note for attended worksites only Moving Layouts should be added for: o Shouldering operations o Rumble strip installations o Profilagraph o Sweeping Mobile Layouts should be added for: o Sweeping o Coring

4 January 25, 2006 Page 4 of 5 We should eliminate any reference to 1500 ADT as low volume since the new definition is 400 ADT. The only layouts that mention 1500 ADT are the AFAD and single flagger layouts, these should remain at 1500 ADT. Should put pictures of channelizers in the Field Manual together. (Marv, I discussed your idea of putting Type A, Type B and Type C channelizers on separate drawings/tables and everyone agreed) Marv Sohlo will incorporate these comments into the revisions of the Field Manual. There was a long discussion on the use of G in the Field Manual and S in Part 6 for channelizer spacing requirements. It was agreed that spacing of channelizers in transition areas (tapers, shifts, etc.) should be based on the posted speed limit before construction and the spacing of channelizers in tangent areas be based on the posted speed limit during construction. This change would have to be incorporated into the entire Part 6 and Field Manual. Jon Jackels will prepare a detailed guideline for this application. It was also determined that channelizer spacing shown on Tables 6F-3 and 6F-4 are inconsistent with the text in Part 6 Marv Sohlo will research these and make recommendations for correction (i.e. change the table or change the text). TEM Update There was mixed reaction to not printing the TEM. In general the construction field personnel were more accepting of having the TEM on the web since they do not keep paper manuals current. The office and Traffic Engineering personnel wanted a hard copy. Ken Nelson informed the group that CO Maintenance has decided on a limited printing of the Maintenance Manual and the web or CD version distribution. Committee members thought this may be a good plan since everyday users of the TEM will probably print it anyway. Jon Jackels and Marv Sohlo will discuss this with Ken Schroepfer. Closing Cross-overs There was only one consensus regarding the closing of cross-overs and that was to install NO U-TURN signs if vehicles can readily use the cross-over. The methods that committee members thought would be used based on site specific conditions were: barrier, curb with yellow delineators, post mounted delineators or object markers, Type III barricades. It was agreed this was a designer s option. Cross-over Design Everyone agreed that guidance is needed for uniform cross over designs. This discussion was tabled until either Dave Buss or Jon Jackels can find the memo developed and published in District 3 regarding cross over design.

5 January 25, 2006 Page 5 of 5 Regulatory Speed in TLTWO It was agreed that we should encourage the use of a 60 mph temporary speed limit on all rural TLTWO. Dan Comments: In regards to the regulatory speed limit notes - you are recommending 60 MPH on TLTWO - this should have clarification that - that should be for bypass operation on a freeway only- since normal TLTWO is only 55. I would not encourage 60 MPH limits on an expressway with at grade intersections either, those should be 55. Districts will work with Dan Brannan on the authorization of a 60 mph on these projects. Future Meetings It was discussed that two meetings a year did not allow this committee to be as effective as it could and that in the near future the work load (Field Manual, TEM, etc.) would indicate meeting four times per year. The next meeting will be scheduled in late April or early May. Marv Sohlo will schedule the next meeting.

Brief History of the MUTCD

Brief History of the MUTCD Brief History of the MUTCD 1930s 1920s 1960s Early 1950s Today Gene Hawkins Texas Transportation Institute 1940s The MUTCD There have been 8 editions of the MUTCD 1935 1942 1948 1961 1971 1978 1988 2000

More information

The MUTCD: Where It s. Gene Hawkins

The MUTCD: Where It s. Gene Hawkins The MUTCD: Where It s Been and Where It s Going 1930s 1920s 1960s Early 1950s Today Gene Hawkins Texas A&M University 1940s The MUTCD: Where It s Been There have been 9 editions of the MUTCD 1935 1942

More information

Brief History of the MUTCD

Brief History of the MUTCD Brief History of the MUTCD 1930s 1920s 1960s Early 1950s Today Gene Hawkins Texas Transportation Institute 1940s The MUTCD There have been 9 editions of the MUTCD 1935 1942 1948 1961 19711978 1988 2000

More information

Back to the MUTCD Future

Back to the MUTCD Future Back to the MUTCD Future 1930s 1920s 1960s 1950s 2000s Gene Hawkins, Ph.D., P.E. Texas A&M University 1940s Part 1: MUTCD Past There have been 10 National MUTCDs 1935 1942 1948 1961 1971 1978 1988 2000

More information

The MUTCD: Its History and Future

The MUTCD: Its History and Future The MUTCD: Its History and Future 1930s 1920s 1960s 1950s 2000s Gene Hawkins, Ph.D., P.E. Texas A&M University 1940s Manual on Uniform Traffic Control Devices Known as the MUTCD Contains basic principles

More information

SECTION 5900 TRAFFIC SIGNALS CITY OF LEE S SUMMIT, MISSOURI DESIGN CRITERIA

SECTION 5900 TRAFFIC SIGNALS CITY OF LEE S SUMMIT, MISSOURI DESIGN CRITERIA SECTION 5900 TRAFFIC SIGNALS CITY OF LEE S SUMMIT, MISSOURI DESIGN CRITERIA TABLE OF CONTENTS Section Title Page 5901 GENERAL... 2 5902 DESIGN CRITERIA... 2 5902.1 Codes and Standards... 2 5902.2 Signal

More information

Old Business. TEO Signal Committee Meeting Minutes Waters Edge Conf. Room C September 16, 2004

Old Business. TEO Signal Committee Meeting Minutes Waters Edge Conf. Room C September 16, 2004 Attendees: Jerry Kotzenmacher Ray Star Mike Wolf Marlin Reinardy Kevin Schwartz Greg Gruber Roger Sowder Mike Gerbenski Jim Deans Tom Dumont Kile Holm Ben Osemenam Old Business TEO Signal Committee Meeting

More information

Work Type Definition and Submittal Requirements. Work Type Definition: Traffic Signal Design

Work Type Definition and Submittal Requirements. Work Type Definition: Traffic Signal Design The first section, Work Type Definition, provides a detailed explanation of the work type. The second section, Work Type Submittal Requirements, identifies the requirements a firm must meet to become pre-qualified

More information

Evaluation of Construction Zone Pavement Marking Materials

Evaluation of Construction Zone Pavement Marking Materials Transportation Kentucky Transportation Center Research Report University of Kentucky Year 1985 Evaluation of Construction Zone Pavement Marking Materials Kenneth R. Agent Jerry G. Pigman University of

More information

Findings from Indiana Flashing Yellow Arrow Study. Robert A. Rescot, Ph.D., P.E.

Findings from Indiana Flashing Yellow Arrow Study. Robert A. Rescot, Ph.D., P.E. Findings from Indiana Flashing Yellow Arrow Study Robert A. Rescot, Ph.D., P.E. 1 Other Project Staff Shou Qu Graduate research assistant Rebecca Noteboom Undergraduate research assistant Ahmad Nafakh

More information

TRAFFIC SIGNAL DESIGN GUIDELINES

TRAFFIC SIGNAL DESIGN GUIDELINES TRAFFIC SIGNAL DESIGN GUIDELINES January, 2006 INDEX PLAN APPROVAL PROCESS 1 1. Designer Prequalification 1 2. Items Available from the County 1 3. Plan Submittals 1 4. Final Submittal 1 5. Checklist for

More information

TEO Signal Committee Meeting Minutes Meeting Date: 05/19/2009 Waters Edge Conference Rm 176 Meeting Time: 9:00am - Noon

TEO Signal Committee Meeting Minutes Meeting Date: 05/19/2009 Waters Edge Conference Rm 176 Meeting Time: 9:00am - Noon TEO Signal Committee Meeting Minutes Meeting Date: 05/19/2009 Waters Edge Conference Rm 176 Meeting Time: 9:00am - Noon Meeting Attendees: Kile Holm Sue Zarling Curt Krohn Mike Schroeder Tim Bangsund Jeff

More information

In the proposed amendment below, text shown with underline is proposed to be added and text shown with strikethrough is proposed to be removed.

In the proposed amendment below, text shown with underline is proposed to be added and text shown with strikethrough is proposed to be removed. ZOA-13-07 AN ORDINANCE TO AMEND, REENACT AND RECODIFY ARTICLES 13 AND 18 OF THE ARLINGTON COUNTY ZONING ORDINANCE TO DEFINE LARGE MEDIA SCREENS AS AUTOMATIC CHANGEABLE COPY SIGNS LARGER THAN 12 SQUARE

More information

SPEED LIMIT YOUR SPEED SPEED LIMIT YOUR SPEED SPEED LIMIT YOUR SPEED SCHOOL YOUR SPEED. Information Display Company WHEN CHILDREN ARE PRESENT

SPEED LIMIT YOUR SPEED SPEED LIMIT YOUR SPEED SPEED LIMIT YOUR SPEED SCHOOL YOUR SPEED. Information Display Company WHEN CHILDREN ARE PRESENT Active Traffic Safety Displays SCHOOL 20 WHEN CHILDREN ARE PRESENT 20 Information Display Company Permanently mounted Active Traffic Safety signs are ideal for areas where speed compliance is a serious

More information

Public Opinion and Understanding of Advance Warning Arrow Displays Used in Short-Term, Mobile, and Moving Work Zones

Public Opinion and Understanding of Advance Warning Arrow Displays Used in Short-Term, Mobile, and Moving Work Zones KU: STE45110 Public Opinion and Understanding of Advance Warning Arrow Displays Used in Short-Term, Mobile, and Moving Work Zones Technical Report 45110-1 The Civil, Environmental, and Architectural Engineering

More information

Traffic Sign Life Expectancy Investigation LAB943

Traffic Sign Life Expectancy Investigation LAB943 Traffic Sign Life Expectancy Investigation LAB943 Project Tap Meeting #1 02/19/2013 Project Team Matt Lebens, MnDOT PI Howard Preston Co-PI Jim McGraw, MnDOT Maureen Jensen, MnDOT Agenda Introductions

More information

Table 6.1: Level of Service Thresholds for Basic Freeway Segments. Density Range LOS (pc/mi/ln) A 0 11 B >11 18 C >18 26 D > E >35 45 F > 45

Table 6.1: Level of Service Thresholds for Basic Freeway Segments. Density Range LOS (pc/mi/ln) A 0 11 B >11 18 C >18 26 D > E >35 45 F > 45 6.0 FREEWAY ANALYSIS 6.1 FREEWAY LEVEL OF SERVICE METHODOLOGY Two CMP freeway monitoring stations in the vicinity of the study area were identified for freeway analysis. The first station is located on

More information

A.D. Engineering International Pty Ltd - Product Range

A.D. Engineering International Pty Ltd - Product Range A.D. Engineering International Pty Ltd - Product Range Over the last thirty five years A.D. Engineering International has specialised in the design and manufacture of high quality electronic equipment

More information

September 28, 2018 CITY OF BERKELEY JOHN MUIR SCHOOL CROSSING IMPROVEMENTS SPECIFICATION NO C ADDENDUM NO. 2

September 28, 2018 CITY OF BERKELEY JOHN MUIR SCHOOL CROSSING IMPROVEMENTS SPECIFICATION NO C ADDENDUM NO. 2 Department of Public Works Transportation Division September 28, 2018 CITY OF BERKELEY JOHN MUIR SCHOOL CROSSING IMPROVEMENTS ADDENDUM NO. 2 Dear Bidder: The following amendments are hereby made to the

More information

MASSACHUSETTS DEPARTMENT OF TRANSPORTATION

MASSACHUSETTS DEPARTMENT OF TRANSPORTATION MASSACHUSETTS DEPARTMENT OF TRANSPORTATION FED. AID PROJ. NO. HIGHWAY DIVISION PLAN AND PROFILE OF COLUMBIA GREENWAY RAIL TRAIL WESTFIELD COLUMBIA GREENWAY RAIL TRAIL STATE MA PROJECT FILE NO. SHEET NO.

More information

Questions and Comments to Discuss with Staff

Questions and Comments to Discuss with Staff Questions and Comments to Discuss with Staff Specific Items in the Draft Revised Noise Code Page 12 1. Noting the definition that Impulsive noise means noise characterized by brief bursts (usually less

More information

Rooftop RF Signage - reducing risk or creating mass confusion?

Rooftop RF Signage - reducing risk or creating mass confusion? Rooftop RF Signage - reducing risk or creating mass confusion? Authored by Jeff Ebihara Introduction As building owners and property management companies continue to lease rooftop space to wireless service

More information

Implementation of LED Roadway Lighting

Implementation of LED Roadway Lighting Implementation of LED Roadway Lighting Ken Taillon, Principal Investigator Short Elliot Hendrickson, Inc. (SEH ) May 2016 Research Project Final Report 2016-17 To request this document in an alternative

More information

CHIEF BROADCAST ENGINEER

CHIEF BROADCAST ENGINEER PERSONNEL COMMISSION Class Code: 5150 Salary Range: 45 (M2) CHIEF BROADCAST ENGINEER JOB SUMMARY Under general direction, plan, organize, manage and participate in the on-air/technical operations and maintenance

More information

Postings, Decorations, Electronic Campus Display and Information Distribution Standards

Postings, Decorations, Electronic Campus Display and Information Distribution Standards Postings, Decorations, Electronic Campus Display and Information Distribution Standards SCOPE This document covers guidelines for posting of fliers and advertisements, use of other decorations, displays

More information

TEO Signal Committee Meeting Minutes Meeting Date: 10/6/2016 Water s Edge Conference Rm A Meeting Time: 9:00am Noon

TEO Signal Committee Meeting Minutes Meeting Date: 10/6/2016 Water s Edge Conference Rm A Meeting Time: 9:00am Noon TEO Signal Committee Meeting Minutes Meeting Date: 10/6/2016 Water s Edge Conference Rm A Meeting Time: 9:00am Noon Meeting Attendees: Jerry Kotzenmacher Sue Zarling Robin Delage Peter Skweres Chris Bosak

More information

TEO Signal Committee Meeting Minutes Meeting Date: 10/29/2013 Water s Edge Conference Rm 176 Meeting Time: 9:00am Noon

TEO Signal Committee Meeting Minutes Meeting Date: 10/29/2013 Water s Edge Conference Rm 176 Meeting Time: 9:00am Noon TEO Signal Committee Meeting Minutes Meeting Date: 10/29/2013 Water s Edge Conference Rm 176 Meeting Time: 9:00am Noon Meeting Attendees: Jerry Kotzenmacher Sue Zarling Nicole Flint Peter Skweres Jesse

More information

CHAPTER 14 WIRING SIGNALS AND LIGHTING FIELD GUIDE Wiring Requirements WIRING

CHAPTER 14 WIRING SIGNALS AND LIGHTING FIELD GUIDE Wiring Requirements WIRING WIRING CHAPTER 14 WIRING The installation of all wiring, including electrical cables and conductors, must conform to the National Electrical Code (NEC). The Code represents the minimum required standard.

More information

Golden Empire Transit District Addendum #3 to Request for Proposals # G061 On-Board Video Surveillance System

Golden Empire Transit District Addendum #3 to Request for Proposals # G061 On-Board Video Surveillance System Golden Empire Transit District Addendum #3 to Request for Proposals # G061 On-Board Video Surveillance System Golden Empire Transit District is issuing this Addendum to respond to questions raised by parties

More information

>> By Jason R. Kack, LS

>> By Jason R. Kack, LS hen the Utah Department of Transportation (UDOT) set out to rebuild Interstate 15 south of Salt Lake City, the department needed accurate one-foot contour interval mapping and a digital terrain model (DTM).

More information

Attendees: First Name Last Name Company Attended. Marguerite Carnell Archaeological and Historical Services, Inc.

Attendees: First Name Last Name  Company Attended. Marguerite Carnell Archaeological and Historical Services, Inc. Route 7-15 Norwalk Route 7-15 Interchange State Proj. No. 102-358 Subject: Date/Time: Location: 06:30 PM Norwalk City Hall- Community Room Attendees: First Name Last Name Email Company Attended Yolanda

More information

Facilities Use Fees TYPE OF FEE OR CHARGE

Facilities Use Fees TYPE OF FEE OR CHARGE Facilities Use Fees RESIDENT RESIDENT Greystone Estate Use Fees (Meeting s) (exterior areas beyond the terrace, and events that are not meetings are subject to rates listed above) Non Monday - Friday,

More information

MACOMB COUNTY DEPARTMENT OF ROADS TRAFFIC OPERATIONS CENTER

MACOMB COUNTY DEPARTMENT OF ROADS TRAFFIC OPERATIONS CENTER MACOMB COUNTY DEPARTMENT OF ROADS TRAFFIC OPERATIONS CENTER To provide and maintain a reliable real-time traffic operations system, in coordination with county stakeholders, that enables a safe, efficient,

More information

New Structure 7050 W. Palmetto Park Road #15-652

New Structure 7050 W. Palmetto Park Road #15-652 State of Georgia 7050 W. Palmetto Park Road #15-652 Boca Raton, FL 33433-3483 Phone: 877-438-2851 Fax: 887-220-4593 Mr. John Butler Project Planner Metropolitan Planning Commission 110 East State Street

More information

VELCO Operating Committee 11 a.m. MINUTES FINAL. October 18, 2012, 11 a.m. 3 p.m. GMP Colchester Office

VELCO Operating Committee 11 a.m. MINUTES FINAL. October 18, 2012, 11 a.m. 3 p.m. GMP Colchester Office VELCO Operating Committee 11 a.m. MINUTES FINAL October 18, 2012, 11 a.m. 3 p.m. GMP Colchester Office Participating members: Ellen Burt (Town of Stowe Electric), Ken Couture (Green Mountain Power), Tom

More information

VISSIM Tutorial. Starting VISSIM and Opening a File CE 474 8/31/06

VISSIM Tutorial. Starting VISSIM and Opening a File CE 474 8/31/06 VISSIM Tutorial Starting VISSIM and Opening a File Click on the Windows START button, go to the All Programs menu and find the PTV_Vision directory. Start VISSIM by selecting the executable file. The following

More information

HDBaseT RECEIVER B-520-RX-330-IR INSTALLATION MANUAL

HDBaseT RECEIVER B-520-RX-330-IR INSTALLATION MANUAL HDBaseT RECEIVER B-520-RX-330- INSTALLATION MANUAL IMPORTANT SAFETY INSTRUCTIONS To reduce the risk of fire or electric shock, read and follow all instructions and warnings in this manual. Keep this manual

More information

ACADEMIC SUCCESS CENTER THE COLLEGE AT BROCKPORT STATE UNIVERSITY OF NEW YORK PROJECT NO

ACADEMIC SUCCESS CENTER THE COLLEGE AT BROCKPORT STATE UNIVERSITY OF NEW YORK PROJECT NO SECTION 270536 - CABLE TRAYS FOR COMMUNICATIONS SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

Sample: A small part of a lot or sublot which represents the whole. A sample may be made up of one or more increments or test portions.

Sample: A small part of a lot or sublot which represents the whole. A sample may be made up of one or more increments or test portions. 5.2.2.2. RANDOM SAMPLING 1. SCOPE This method covers procedures for securing random samples from a lot by the use of random numbers obtained from tables or generated by other methods. Nothing in this method

More information

Network Safeworking Rules and Procedures

Network Safeworking Rules and Procedures Network Safeworking Rules and Procedures Fixed Signals Rule Number: 6005 Version 1.0, 31 March 2016 Fixed Signals Rule Number: 6005 Document Control Identification Document title Number Version Date 6005

More information

Aerial Cable Installation Best Practices

Aerial Cable Installation Best Practices Aerial Cable Installation Best Practices Panduit Corp. 2007 BEST PRACTICES Table of Contents 1.0 General... 3 2.0 Introduction... 3 3.0 Precautions... 4 4.0 Pre-survey... 5 5.0 Materials and Equipment...

More information

HDBaseT RECEIVER B-520-RX-230-IR INSTALLATION MANUAL

HDBaseT RECEIVER B-520-RX-230-IR INSTALLATION MANUAL HDBaseT RECEIVER B-520-RX-230-IR INSTALLATION MANUAL IMPORTANT SAFETY INSTRUCTIONS To reduce the risk of fire or electric shock, read and follow all instructions and warnings in this manual. Keep this

More information

ULTRA-TRAC APL INSTRUCTION MANUAL. Read and understand instructions before use. Patented. 851 Transport Drive Valparaiso, IN

ULTRA-TRAC APL INSTRUCTION MANUAL. Read and understand instructions before use. Patented. 851 Transport Drive Valparaiso, IN ULTRA-TRAC APL A C O U S T I C P I P E L O C A T O R INSTRUCTION MANUAL Read and understand instructions before use. Patented MADE IN USA 851 Transport Drive Valparaiso, IN 46383-8432 Phone: 888 4SENSIT

More information

Office of Traffic Operations Signal Design Reference Packet

Office of Traffic Operations Signal Design Reference Packet Office of Traffic Operations Signal Design Reference Packet Rev-2 04/17/2015 Contents The purpose of this packet is to provide guidance on designing and reviewing traffic signal plans. The format, legends,

More information

Request for Proposals Fiber Optic Network Backbone Upgrades

Request for Proposals Fiber Optic Network Backbone Upgrades Introduction Request for Proposals Fiber Optic Network Backbone Upgrades RFP Released on February 18, 2015 The Dexter R-11 Public School District is seeking proposals from qualified service providers to

More information

Filmair Cinema Services

Filmair Cinema Services Filmair Cinema Services 36, Stonehouse Lane, Combe Down, Bath, BA2 5DW Tel. 07970 496 014 Cinema Systems and Supporting Notes Cinema System (1) Outdoor Walk-In Unit (audience seated on the grass, with

More information

TEO Signal Committee Meeting Minutes Meeting Date: 3/22/2013 Water s Edge Conference Rm 176 Meeting Time: 9:00am Noon

TEO Signal Committee Meeting Minutes Meeting Date: 3/22/2013 Water s Edge Conference Rm 176 Meeting Time: 9:00am Noon TEO Signal Committee Meeting Minutes Meeting Date: 3/22/2013 Water s Edge Conference Rm 176 Meeting Time: 9:00am Noon Meeting Attendees: Kile Holm Sue Zarling Ben Osemanam Peter Skweres Linda Heath Ed

More information

Flagger Control for Resurfacing or Moving Operation. One-Lane Two-Way Operation

Flagger Control for Resurfacing or Moving Operation. One-Lane Two-Way Operation Flagger Control for esurfacing or Moving Operation 5 DEVICE MINIMUM WOK AEA SET 1 SET SET 3 SET 4 ACTIVE INACTIVE ACTIVE INACTIVE SIGN SETS 1 AND 3 AE ACTIVE AND (I.E., SIGNS FACE ONCOMING TAFFIC). SIGN

More information

RECOMMENDED AMENDMENTS TO OFF-PREMISE SIGN REGULATIONS

RECOMMENDED AMENDMENTS TO OFF-PREMISE SIGN REGULATIONS RECOMMENDED AMENDMENTS TO OFF-PREMISE SIGN REGULATIONS The use of electronic, digital or video technology in signs is permitted and allowed, subject to the following limitations and additional restrictions:

More information

RESEARCH UPDATE. FIELD EVALUATION OF 3MfM SCOTCH-LANE WET REFLECTIVE REMOVABLE TAPE SERIES 750 (Final Report)

RESEARCH UPDATE. FIELD EVALUATION OF 3MfM SCOTCH-LANE WET REFLECTIVE REMOVABLE TAPE SERIES 750 (Final Report) MATERIALS~~ RESEARC H R~viewed by: _,;;/ :/._ ~o~ 1{ rs~~!l Donald H. Lathop, P.E. Materials and Research Engineer RESEARCH UPDATE Prepared by:, /J. /1 k c/jj-?1-v ~ (,. Theresa C. Gilman January 10, 2003

More information

SECTION [ ] [02730] WAX-COATED DECOMPOSED GRANITE SURFACING

SECTION [ ] [02730] WAX-COATED DECOMPOSED GRANITE SURFACING SECTION [32 15 40] [02730] WAX-COATED DECOMPOSED GRANITE SURFACING NexPave wax-coated decomposed granite provides beautiful and natural-looking surfacing for footpaths, horse trails, landscaping, and light

More information

BOOK ARTS & LETTERPRESS: COURSE SYLLABUS

BOOK ARTS & LETTERPRESS: COURSE SYLLABUS BOOK ARTS & LETTERPRESS: COURSE SYLLABUS Instructor: Aaron Cohick Office: The Press at CC, Taylor Hall Office Hours: M F, 1 PM 5 PM Office Phone: 719-389-6376 (x6376) E-mail: aaron.cohick@coloradocollege.edu

More information

INTERSECTION TRAFFIC CONTROL COMMITTEE

INTERSECTION TRAFFIC CONTROL COMMITTEE INTERSECTION TRAFFIC CONTROL COMMITTEE Meeting Minutes April 1st, 2015 ATTENDEES Name Agency Dean Chamberlain (Chair) WSB Mark Wagner (Co-Chair) SEH Jerry Kotzenmacher Matt Allwood (Presenter) Traffic

More information

Traffic Control Device Evaluation Program: FY 2016

Traffic Control Device Evaluation Program: FY 2016 TTI: 9-1001-14 Traffic Control Device Evaluation Program: FY 2016 Technical Report 9-1001-14-3 Cooperative Research Program TEXAS A&M TRANSPORTATION INSTITUTE COLLEGE STATION, TEXAS in cooperation with

More information

All Dielectric Self Supporting (ADSS) Fiber Optic Cable Installation

All Dielectric Self Supporting (ADSS) Fiber Optic Cable Installation All Dielectric Self Supporting (ADSS) Fiber Optic Cable Installation Underground Installation M P - 1012 Issue #3 March 2011 DISCLAIMER OF WARRANTIES AND LIMITATION OF LIABILITIES The practices contained

More information

DIVISION 800 INCIDENTAL CONSTRUCTION. 804 MAINTENANCE AND RESTORATION OF HAUL ROAD Record of Restoration and Maintenance of Haul Roads (Set) 804-1

DIVISION 800 INCIDENTAL CONSTRUCTION. 804 MAINTENANCE AND RESTORATION OF HAUL ROAD Record of Restoration and Maintenance of Haul Roads (Set) 804-1 DIVISION 800 INCIDENTAL CONSTRUCTION 801 MOBILIZATION Payment of Mobilization (DBE) 801-1 802 CONTRACTOR CONSTRUCTION STAKING Recapitulation of Construction Staking 802-1 Checking of Contractor Construction

More information

Yorkdale Station Easier Access Project Public Open House

Yorkdale Station Easier Access Project Public Open House Yorkdale Station Easier Access Project Public Open House 1 Easier access program wide Committed to making all stations accessible by 2025 37 stations completed to date Working with the Advisory Committee

More information

CARLISLE AREA SCHOOL DISTRICT Carlisle, PA PORTFOLIO GRADE 12

CARLISLE AREA SCHOOL DISTRICT Carlisle, PA PORTFOLIO GRADE 12 CARLISLE AREA SCHOOL DISTRICT Carlisle, PA 17013 PORTFOLIO GRADE 12 Date of Board Approval: November 17, 2011 CARLISLE AREA SCHOOL DISTRICT PLANNED INSTRUCTION COVER PAGE Title of Course: Portfolio Subject

More information

Expressways Book 3 By Steven J. Molinsky, Bill Bliss READ ONLINE

Expressways Book 3 By Steven J. Molinsky, Bill Bliss READ ONLINE Expressways Book 3 By Steven J. Molinsky, Bill Bliss READ ONLINE Expressways: English for Communication, Book 3: Steven J Molinsky, Bill Bliss: 9780132982740: Books - Amazon.ca. Expressways 3 has 1 rating

More information

REPORT TO THE PLANNING COMMISSION

REPORT TO THE PLANNING COMMISSION REPORT TO THE PLANNING COMMISSION Meeting Date: May 13, 2015 Application: Design Review PDR15-0006 Location / APN: Near 19700 Prospect Road / 386-35-070 Owner / Applicant: Staff Planner: City of Saratoga

More information

THE CITY OF WINNIPEG BY-LAW NO. 36/2013

THE CITY OF WINNIPEG BY-LAW NO. 36/2013 THE CITY OF WINNIPEG BY-LAW NO. 36/2013 A By-law of The City of Winnipeg to amend Winnipeg Zoning By-law No. 200/2006 with respect to digital signs and billboards. THE CITY OF WINNIPEG, in Council assembled,

More information

MINUTES IT Advisory Committee Meeting November 11, :30-10:00 AM

MINUTES IT Advisory Committee Meeting November 11, :30-10:00 AM MINUTES IT Advisory Committee Meeting November 11, 2010 8:30-10:00 AM In Attendance: Stephen Balfour, Andy Bland, Lauri Brender, Bill Chollett, Steve Conway, Jim Culvar, Fred Fisher, Juan Garza, David

More information

CALDECOTT FOURTH BORE

CALDECOTT FOURTH BORE CALDECOTT FOURTH BORE On Friday, November 15, 2013, Contra Costa Transportation Authority (CCTA) and project partners Caltrans, Metropolitan Transportation Commission, and Alameda County Transportation

More information

NOTIFICATION OF A PROPOSAL TO ISSUE A CERTIFICATION MEMORANDUM

NOTIFICATION OF A PROPOSAL TO ISSUE A CERTIFICATION MEMORANDUM EASA NOTIFICATION OF A PROPOSAL TO ISSUE A CERTIFICATION MEMORANDUM EASA CM No.: EASA CM - AS 001 Issue: 01 Issue Date: 15 th of November 2011 Issued by: Avionics System section Approved by: Head of Certification

More information

2211 N. Austin Ave. Georgetown, TX x7184

2211 N. Austin Ave. Georgetown, TX x7184 2211 N. Austin Ave. Georgetown, TX 78626 512.943.5100 x7184 Smithj9@georgetownisd.org poteetb@georgetownisd.org leachj@georgetownisd.org March 22, 2017 Dear Colleagues: It is the pleasure of the Georgetown

More information

Signalling Cable Equivalent Sizes

Signalling Cable Equivalent Sizes Signalling Cable Equivalent Sizes Signatures removed from electronic version Submitted by... Jim Harper Nominated Responsible Manager Synopsis This Standard Authorises the use of cables to GS/ES 0872 as

More information

3WS(Cape Town/Secretariat)1

3WS(Cape Town/Secretariat)1 For IEC use only 3WS(Cape Town/Secretariat)1 2005-10-04 INTERNATIONAL ELECTROTECHNICAL COMMISSION Technical Committee No. 3: Information structures, documentation and graphical symbols Occurrence-related

More information

Copyright Black Box Corporation. All rights reserved.

Copyright Black Box Corporation. All rights reserved. Copyright 2003. Black Box Corporation. All rights reserved. 1000 Park Drive Lawrence, PA 15055-1018 724-746-5500 Fax 724-746-0746 SOHO 6-Port CAT5e 568B Data Module SEPTEMBER 2003 JPM1101A CUSTOMER SUPPORT

More information

Welcome SIGN CODE UPDATE

Welcome SIGN CODE UPDATE Welcome SIGN CODE UPDATE PUBLIC MEETING Aztlan Community Center Thursday, May 24, 2018 Community Room 5:30 7:30 PM 112 E Willow Street, Fort Collins *Brief orientation at 6:00 PM* PROCESS AND HOW TO PARTICIPATE

More information

Roadway/Structure Widening Project MP A30.30 to MP A Lansdale Montgomery County, PA NOISE ANALYSIS REPORT FINAL. August 2006.

Roadway/Structure Widening Project MP A30.30 to MP A Lansdale Montgomery County, PA NOISE ANALYSIS REPORT FINAL. August 2006. Roadway/Structure Widening Project Lansdale Montgomery County, PA NOISE ANALYSIS REPORT Prepared for: Pennsylvania Turnpike Commission P.O. Box 67676 Harrisburg, PA 17106-7676 August 2006 FINAL EXECUTIVE

More information

New York State Board of Elections Voting Machine Replacement Project Task List Revised

New York State Board of Elections Voting Machine Replacement Project Task List Revised 1 Pre Election 255 days No Thu 7/27/06 Wed 7/18/07 Wed 7/18/07 2 Voting Machine Procurement OGS 152 days No Tue 8/15/06 Wed 3/14/07 NA 3 Create ordering criteria list for county procurement (Done) OGS

More information

SIGNAL CONTROLLER PEER-TO-PEER COMMUNICATIONS

SIGNAL CONTROLLER PEER-TO-PEER COMMUNICATIONS SIGNAL CONTROLLER PEER-TO-PEER COMMUNICATIONS Using advanced controller features to improve operations Matt Luker, P.E., PTOE Utah Department of Transportation WHY PEER-TO-PEER 2 3 The Problem We re Trying

More information

Environmental Impact Statement (EIS)/ Section 106 Public Meeting Level 1 Concept Screening. May 16, 2017

Environmental Impact Statement (EIS)/ Section 106 Public Meeting Level 1 Concept Screening. May 16, 2017 Environmental Impact Statement (EIS)/ Section 106 Public Meeting Level 1 Concept Screening May 16, 2017 Today s Agenda Project Overview Project Schedule Purpose and Need Level 1 Concept Screening Results

More information

RADIO STATION AUTHORIZATION Current Authorization : FCC WEB Reproduction

RADIO STATION AUTHORIZATION Current Authorization : FCC WEB Reproduction Nature Of Service: Nature Of Service: Class Of Station: Domestic Fixed Satellite Service Fixed Satellite Service Temporary Fixed Earth Station A) Site Location(s) ) Site ID Address Latitude Longitude Elevation

More information

Guide to Interpretation of Traffic Signal Timing Reports Produced by the Miami-Dade County (MDC) Advanced Traffic Management System (ATMS)

Guide to Interpretation of Traffic Signal Timing Reports Produced by the Miami-Dade County (MDC) Advanced Traffic Management System (ATMS) Guide to Interpretation of Traffic Signal Timing Reports Produced by the Miami-Dade County (MDC) Advanced Traffic Management System (ATMS) Miami-Dade county s Traffic Signals and Signs Division started

More information

Non Fouling Monitoring and Performance of Railway Track and Transitions

Non Fouling Monitoring and Performance of Railway Track and Transitions 1/50 Non Fouling Monitoring and Performance of Railway Track and Transitions Timothy D. Stark Stephen T. Wilk University of Illinois 34 th Annual Geotechnical Seminar GEO-Omaha 2017 Friday, February 10,

More information

U-verse Outside Plant Cabinets AT&T Knowledge Ventures. All rights reserved. AT&T and the AT&T logo are trademarks of AT&T Knowledge Ventures.

U-verse Outside Plant Cabinets AT&T Knowledge Ventures. All rights reserved. AT&T and the AT&T logo are trademarks of AT&T Knowledge Ventures. U-verse Outside Plant s U-verse Outside Plant (OSP) Certifications AT&T certifies that Lightspeed cabinets, wiring and equipment have been inspected for and are compliant to the following industry standards:

More information

Ambient Weather WS-01 Intelligent Color Changing Temperature Night Light with Ambient Backlight User Manual

Ambient Weather WS-01 Intelligent Color Changing Temperature Night Light with Ambient Backlight User Manual Ambient Weather WS-01 Intelligent Color Changing Temperature Night Light with Ambient Backlight User Manual Table of Contents 1 Introduction... 1 2 Warnings... 2 3 Getting Started... 2 3.1 Parts List...

More information

METROPOLITAN PLANNING ORGANIZATION SERVING LAS CRUCES, DOÑA ANA, AND MESILLA

METROPOLITAN PLANNING ORGANIZATION SERVING LAS CRUCES, DOÑA ANA, AND MESILLA METROPOLITAN PLANNING ORGANIZATION SERVING LAS CRUCES, DOÑA ANA, AND MESILLA P.O. BOX 20000 LAS CRUCES NM 88004 PHONE (575) 528 3222 FAX (575) 528 3155 http://lcmpoweb.las cruces.org LAS CRUCES METROPOLITAN

More information

HDBaseT EXTENDER B-540-EXT-230-RS INSTALLATION MANUAL

HDBaseT EXTENDER B-540-EXT-230-RS INSTALLATION MANUAL EXTENDER B-540-EXT-230-RS INSTALLATI MANUAL IMPORTANT SAFETY INSTRUCTIS To reduce the risk of fire or electric shock, read and follow all instructions and warnings in this manual. Keep this manual for

More information

Mediacom Upgrade/Splicing Procedures (based on original document from Corporate dated 4/16/98)

Mediacom Upgrade/Splicing Procedures (based on original document from Corporate dated 4/16/98) Mediacom Upgrade/Splicing Procedures (based on original document from Corporate dated 4/16/98) 1. Splicing specifications are provided by Mediacom, but due to resplice conditions, many locations become

More information

Lineside Signal Aspect and Indication Requirements

Lineside Signal Aspect and Indication Requirements Lineside Signal Aspect and Indication Requirements Synopsis This document mandates the appearance of lineside signalling system displays and the information they convey. This document contains one or more

More information

Do not install and/or operate this safety product unless you have read and understand the safety information contained in this manual.

Do not install and/or operate this safety product unless you have read and understand the safety information contained in this manual. Installation and Operation Instructions CD3766 Directional LED Available in various color combinations, the CD3766 Directional LED is a surface mount, dual color warning light that is ideal for a wide

More information

EVALUATION OF PERFORMANCE OF SOLAR POWERED FLASHING BEACONS AT ROOM TEMPERATURE CONDITIONS

EVALUATION OF PERFORMANCE OF SOLAR POWERED FLASHING BEACONS AT ROOM TEMPERATURE CONDITIONS CIVIL ENGINEERING STUDIES Illinois Center for Transportation Series No. 10-069 UILU-ENG-2010-2010 ISSN: 0197-9191 EVALUATION OF PERFORMANCE OF SOLAR POWERED FLASHING BEACONS AT ROOM TEMPERATURE CONDITIONS

More information

Part No./ 型号 : RGB-Controller-101

Part No./ 型号 : RGB-Controller-101 Instructions: Thank you for using RGB-Controller-101 of our company. Before installation, please read this manual carefully to ensure fully understand and proper use in order to avoid unnecessary damages

More information

SOCIETY OF BROADCAST ENGINEERS, INC N. Meridian Street, Suite 150, Indianapolis, IN (317)

SOCIETY OF BROADCAST ENGINEERS, INC N. Meridian Street, Suite 150, Indianapolis, IN (317) SOCIETY OF BROADCAST ENGINEERS, INC. 9102 N. Meridian Street, Suite 150, Indianapolis, IN 46260 (317) 846-9000 A Strategy for Implementing CAP EAS To aid implementation of CAP technology for a revised

More information

Tony Winstead Photo. Dixon Riverfront Event Services. 115 S. Hennepin Ave. Dixon, IL (815)

Tony Winstead Photo. Dixon Riverfront Event Services. 115 S. Hennepin Ave. Dixon, IL (815) Tony Winstead Photo Dixon Riverfront Event Services 115 S. Hennepin Ave. Dixon, IL 61021 (815) 288-2308 riverfrontdixon@gmail.com Dixon s Riverfront - The Perfect Setting For Your Next Event Weddings Reunions

More information

5S Floor Marking Color Standard

5S Floor Marking Color Standard 5S Floor Marking Color Standard www.bradyid.com/toughstripe Government Regulations & Industry Standards While several OSHA regulations dictate that permanent aisles and passageways must be clearly marked,

More information

Report on Comments June 2013 NFPA 70

Report on Comments June 2013 NFPA 70 10-1 Log #1392 NEC-P10 Dennis Darling, Stantec Consulting Ltd. 10-5 Delete text to read as follows: Localization of an overcurrent condition to restrict outages to the circuit or equipment affected, accomplished

More information

A. Section Includes: Division 1 applies to this section. Provide GPS wireless clock system, complete.

A. Section Includes: Division 1 applies to this section. Provide GPS wireless clock system, complete. SPECIFICATIONS GPS Wireless Clock System Section 16730 TIME SYSTEM PART 1 - GENERAL 1.01 SUMMARY A. Section Includes: Division 1 applies to this section. Provide GPS wireless clock system, complete. B.

More information

FY Transportation Improvement Program Funding Summary: Federal Highway Funds

FY Transportation Improvement Program Funding Summary: Federal Highway Funds CMAQ-Flex AMPA Wide Bicycle Facil. Prog. & Activities 100.5 A300705 City of $150,000 $150,000 AMPA Wide Bicycle Facil. Prog. & Activities AMPA Wide Joint TDM-Travel Demand Management AMPA Wide Joint TDM-Travel

More information

Field Instruction. Any registered training organisation UETTDRCJ21A Lay ESI electrical cables. Before commencing work:

Field Instruction. Any registered training organisation UETTDRCJ21A Lay ESI electrical cables. Before commencing work: 6.10 Cable Installation Purpose This field instruction outlines the minimum cable installation requirements for all Horizon Power Workers, including Workers operating, servicing, and/ or maintaining (MPS)

More information

2nd Aesthetics Committee Meeting March 1, Tarpon Springs Yacht Club. Beckett Bridge

2nd Aesthetics Committee Meeting March 1, Tarpon Springs Yacht Club. Beckett Bridge 2nd Aesthetics Committee Meeting March 1, 2017 Tarpon Springs Yacht Club Aesthetics Committee Meetings Meeting Schedule: A total of four meetings is anticipated. 1 st Aesthetics Committee Meeting - December

More information

HDBaseT RECEIVER B-540-RX-330-IR INSTALLATION MANUAL

HDBaseT RECEIVER B-540-RX-330-IR INSTALLATION MANUAL HDBaseT RECEIVER B-540-RX-330-IR INSTALLATION MANUAL IMPORTANT SAFETY INSTRUCTIONS To reduce the risk of fire or electric shock, read and follow all instructions and warnings in this manual. Keep this

More information

CS-200 SOLAR PORTABLE TRAFFIC SIGNAL SYSTEM FIELD MANUAL. 134 Ogilvie Avenue, Echuca 3564 (03)

CS-200 SOLAR PORTABLE TRAFFIC SIGNAL SYSTEM FIELD MANUAL. 134 Ogilvie Avenue, Echuca 3564 (03) CS-200 SOLAR PORTABLE TRAFFIC SIGNAL SYSTEM FIELD MANUAL CS-200 FIELD OPERATING INSTRUCTIONS ONE-WAY OPERATION DESCRIPTION OF CS-200 MODES Flash Manual 1 Auto Normal Both Master and Slave flash yellow.

More information

Table of Contents SECTION 1 INTERPRETATION 1 SECTION 2 ADMINISTRATION 6 SECTION 3 GENERAL RULES FOR ALL SIGNS 9 SECTION 4 REGULATIONS BY SIGN TYPE 12

Table of Contents SECTION 1 INTERPRETATION 1 SECTION 2 ADMINISTRATION 6 SECTION 3 GENERAL RULES FOR ALL SIGNS 9 SECTION 4 REGULATIONS BY SIGN TYPE 12 SCHEDULE B SIGNS Table of Contents SECTION 1 INTERPRETATION 1 1.1 PURPOSE... 1 1.2 DEFINITIONS... 1 SECTION 2 ADMINISTRATION 6 2.1 DEVELOPMENT PERMITS FOR SIGNS... 6 2.2 SIGNS NOT REQUIRING A DEVELOPMENT

More information

Track Work Authority ANWT 306. Applicability. Publication Requirement. Document Status NSW SMS. External Only October 2015.

Track Work Authority ANWT 306. Applicability. Publication Requirement. Document Status NSW SMS. External Only October 2015. Applicability NSW SMS Publication Requirement External Only Document Status Issue/Revision # Effective from 2.0 11 October 2015 Australian Rail Track Corporation Limited (ARTC) Disclaimer This document

More information

Cambria County Association for the Blind and Handicapped 175 Industrial Park Road Ebensburg, PA Prepared for: Prepared by:

Cambria County Association for the Blind and Handicapped 175 Industrial Park Road Ebensburg, PA Prepared for: Prepared by: Cable Management in Solar PV Arrays: A Review of Requirements in the National Electrical Code and how CAB Cable Rings and Saddles Meet These Requirements Prepared for: Cambria County Association for the

More information

Softswitch128TM. SwitchingSystem. Setup and Maintenance Guide

Softswitch128TM. SwitchingSystem. Setup and Maintenance Guide Softswitch128TM SwitchingSystem TM R Setup and Maintenance Guide Believeitornot,thisissupposed to look likeadictionary! Thisiconwascreated by BrentM.Nye,July 6,1995. Believeitornot,thisissupposed to look

More information

Crawley Camera Club Programme

Crawley Camera Club Programme At Crawley Camera Club we offer a warm and friendly welcome to all new and existing members; from complete beginners to more experienced photographers there is something for everyone to be had from one

More information