DIVISION 800 INCIDENTAL CONSTRUCTION. 804 MAINTENANCE AND RESTORATION OF HAUL ROAD Record of Restoration and Maintenance of Haul Roads (Set) 804-1

Size: px
Start display at page:

Download "DIVISION 800 INCIDENTAL CONSTRUCTION. 804 MAINTENANCE AND RESTORATION OF HAUL ROAD Record of Restoration and Maintenance of Haul Roads (Set) 804-1"

Transcription

1 DIVISION 800 INCIDENTAL CONSTRUCTION 801 MOBILIZATION Payment of Mobilization (DBE) CONTRACTOR CONSTRUCTION STAKING Recapitulation of Construction Staking Checking of Contractor Construction Staking 802-1a Payment of Right-of-Way Survey Monuments FIELD OFFICE AND LABORATORY Recapitulation of Field Office and Laboratory MAINTENANCE AND RESTORATION OF HAUL ROAD Record of Restoration and Maintenance of Haul Roads (Set) WORK ZONE TRAFFIC CONTROL AND SAFETY Recapitulation of const. sign (*), Const. Barricade (**) and const warning lights Work Zone Sign Special (**) Recapitulation of drums,arrows,and tubular markers Recapitulation of Pavement Marking Paint (*) (**) Flagger (Set) Recapitulation of Temporary Traffic Signals Recapitulation of Pavement Marking Temporary Raised Pavement Marker (**) Recapitulation of Traffic Control (Lump Sum) Traffic Control (Initial Setup) DURABLE PAVEMENT MARKING Recapitulation of Durable Pavement Marking (*) (**) Recapitulation of Pavement Marking (Plowable Pavement Marker) (**) Recapitulation of Durable Pavement Marking (*) (**)(***) PAINTED PAVEMENT MARKING Recapitulation of Pavement Marking Paint (*) (**) Recapitulation of Pavement Marking Paint Symbols REMOVAL OF EXISTING PAVEMENT MARKINGS Removal of Existing Pavement Markings Removal of Plowable Raised Markers CONCRETE SAFETY BARRIER Recapitulation of Concrete Safety Barrier (*) (**) INERTIAL BARRIER SYSTEM Recapitulation of Inertial Barrier System Recapitulation of Modules (*) 810-2

2 811 IMPACT ATTENUATOR Impact Attenuator (*) PERMANENT SIGNING Recapitulation of Signs Recapitulation of Wood Post (**) Recapitulation of Steel Posts (*) Recapitulation of Sign Posts (* U Steel) Recapitulation of (*) Recapitulation of (*) Diameter Concrete Footings Sign (Removal and Reset) RUMBLE (Milled) and RUMBLE STRIPS (Milled) (Centerline) Recapitulation of Rumble Strips (*) (**) ELECTRIC LIGHTING SYSTEMS AND TRAFFIC SIGNALS Record of Electric Lighting System Record of Electric Conduit (**) Record of Electrical Service Boxes Traffic Signal Installation Traffic Signal Interconnect CATCH BASINS, INLETS, OUTLETS, MANHOLES, JUNCTION BOXES Recapitulation of (*) (**) ADJUSTMENT OF INLETS, MANHOLES AND OTHER STRUCTURES Recapitulation of Adjusted Drainage Structures Structural Steel Tested Material Received Used and On Hand 816-2a PIPE CULVERTS, EROSION PIPE, STORM SEWERS SANITARY Installation of Pipe and Other Material Record of Pipe Received and Used Recapitulation of Fly Ash Slurry Grout ENCASEMENT PIPE Encasement Pipe (Linear Foot) BORED, JACKED OR TUNNELED Pipe Measurement (linear Foot) FLUME INLETS AND SLOPE DRAINS Recapitulation of Flume Inlets (*) and Slope Drains FLAPGATES Recapitulation of Flapgates 821-1

3 822 UNDERDRAINS Recapitulation of (*) Pipe Underdrains (Type**) Recapitulation of Aggregate for Blanket Underdrains Recapitulation of (*) Pipe Underdrains (Type**) PREFABRICATED INTERCEPTION DEVICE AND SLOTTED DRAIN Prefabricated Interception Device (*) Slotted Drain CONCRETE SIDEWALK, STEPS AND RAMPS Recapitulation of Sidewalk Recapitulation of Sidewalk Ramps Recapitulation of Grade 3.0 Concrete (Misc) and Reinforcing Steel for Steps CURB AND GUTTER Recapitulation (*) SHOT-CRETE CONCRETE Recapitulation of Shot-Crete GUARDRAIL AND GUIDEPOSTS Recapitulation of Guard Fend (*) and Guard fence post Recapitulation of Guideposts(*) FENCING Recapitulation of Fence(*) Removal of Fence and Reset Recapitulation of Post (*)(**) Recapitulation of Gates (*) and Floodgates RIPRAP Recapitulation of Riprap SLOPE PROTECTION Recapitulation of Bedding for Slope Protection Recapitulation of Slope Protection Recapitulation of Geotextile DITCH LINING Recapitulation of Ditch Lining Measurement of Ditch Lining GABIONS Recapitulation of Cubic Yards of Stone for (*) 832-1

4 833 PAVEMENT PATCHING Recapitulation of Aggregate for HMA (*) course (**) Patching Recapitulation of Portland Cement Concrete Pavement (*) Patching (**) Recapitulation of Extra Work Saw Cut UNDERSEALING Fly Ash (Undersealing) Injection Holes RESEALING JOINTS AND SEALING CRACKS IN EXISTING PCCP Sealing PCCP Joints (Longitudinal) Material Received, Used and On Hand 835-1a 836 SURFACING FOR SIDE ROADS AND ENTRANCES Recapitulation of (*) PAVEMENT WIDENING, SHOULDERING AND PAVEMENT EDGE Recapitulation of (*) Sta Recapitulation of (*) Tons Water for Earthwork Compaction (Set) GRINDING REHAB CONCRETE PAVEMENT Grinding Concrete Surface RUBBLIZING PORTLAND CEMENT CONCRETE PAVEMENT Crushed Stone for Backfill Removal of Asphalt Material TEMPORARY SURFACING Temporary Surfacing Material (Aggregate)(Set Price) LIGHT TYPE SURFACING Light Type Surface (Use this template) DRILLING AND GROUTING Recapitulation of Drilling and Grouting (*) FLOWABLE FILL Recapitulation of Flowable Fill SLURRY GROUT Slurry Grout (Use this template) CLEANING EXISTING STRUCTURES AND UNDERDRAINS Cleaning Existing Structures Cleaning Existing Underdrains 845-2

5 846 TRANSPORTING SALVAGEABLE MATERIALS Recapitulation of Transporting Salvageable Material (*) MAILBOX ADJUSTMENTS Recapitulation of Mailbox Installation 847-1

6 Payment of Mobilization (DBE) Quantity amount of accum enter percent % into DBE request Date Lsum LSUM CMS Contractor Date Remarks Insp Mobilization will be paid with the CMS and no enter need in a book. Mobilization (DBE) will be enter as showed above. The contractor has to submit a written request (s) requesting partial payment on the behalf of the DBE. The amount requested shall be limited to the amount of mobilization necessary to begin work.

7 Recapitulation of construction staking Work Comp.= Started 5% 25% 50% 70% 100% Date Pay Pay Pay Pay Pay Pay enter Date 25% 40% 60% 80% 95% 100% CMS Remarks Insp The Engineer may adjust the payment schedule if the contractor fails to accomplish the expected work. When 5 % of the contract is completed the expected work completed shall be as follows: set reference tie to endangered PLSS corners, verify all right-of-way survey monuments and set all reference points to center line points. When 25 % of the contract is completed the expected work completed should be the following: provide all construction survey. When 50 % of the contract completed the expected work that should be completed as follows: provide standard bound field notebooks with legible field notes. When 70 % of the contract is completed the expected work to be completed is the follows: Verify or reset the project centerline and references, establish and verify project benchmarks and provide the Engineer as built plans. When completed project received a certification from contractor that states all the requirements have been met. The contractor shall use two survey party. The first survey party will stake and the other survey shall check the first survey party.

8 Checking of Contractor Construction Staking Date Date First Second Item checked Checked Found Insp. Checked Found Remarks Insp a This plate is set up to check the first survey party stakes with another survey party using separate books.

9 Payment of Right-of-Way Survey Monuments Quantity Date Point Pay Accum Enter Date No. Sta. Location Distance Side Quantity Quantity CMS Remarks Insp When the monument has been set it should be enter on this plate. This material will be accept on the bases of visual inspection and compliance with dimensional set forth in the contract.

10 Recapitulation of Field Office and Laboratory Quantity 2 Pay Pay Pay enter CMS 40% 70% 100% Accum into Date Number Add.4 Add.3 Add.3 CMS Remarks Insp On intermediate estimates, forty percent of the lump sum price of the laboratory is allowed on the first estimate after it is furnished for state use. Seventy percent of the lump sum is paid three months later. One-hundred percent is when the lab is released to the contractor. Write a test report on the Field Office and Laboratory when paid for on the first estimate based on Section 803.

11 Record of Restoration and Maintenance of Haul Road First Final Restore Inspection Inspection to Existing Date Location of Haul Road Condition Insp. Date Condition Condition insp All the haul roads will be listed at the beginning of the project excluding state highways. The list will be listed above as to the condition at the start of the project and check as the project progress. This bid item will be pay for at the completion of the project.

12 Recapitulation of const. sign(*),const Barricade(**) and const warning lights. Const. Sign (*) Const. Barricades (**) Const. warning (light Type B) enter into Date Location each accum each accum each accum CMS Insp (*) denotes the sign size: (0 to 9.25 sq ft), (9.26 to sq ft.), and (16.26 sq ft and over) (**) denotes (Type I or II), (Type III-4 to 8 lin ft), or (Type III-9 to 14 lin ft.)

13 Work Zone Sign Special (**) Plan Quantity Line Number Date Location Work Zone Sign Special (**) Each Accum Enter CMS Estimate # Insp ** Size

14 Recapitulation of drums, arrows, and tubular markers Reflectorized Sequencing Tubular enter Drum Arrow Markers into Date Location each accum each accum each accum CMS Insp * Use for Portable Changeable Signs, Channelizer (Fixed), Channelizer (Portable)

15 Recapitulation of Pavement Marking (Paint) (*) (**) accum enter into Date Sta. to Sta length length CMS Insp (*) Denotes White or Yellow (**) denotes width (***) denotes length.

16 Flagger (Set) Line Number Date # of Flaggers Time Began Time Completed Hours Accum Hours Location Remarks Est. # Entered to CMS Insp (Pay to nearest hour)

17 Recapitulation of Temporary Traffic Signals Bid Item Quantity 1st Last enter Payment Payment into Date Location 75% 100% CMS Insp First payment made when lights are put in use Last payment made when lights are removed from project.

18 Recapitulation of Pavement Marking (Plowable Raised Pavement Marker) (**) Enter into Date Sta to Sta. Each Accum CMS Insp (**) denotes the color

19 Recapitulation of traffic Control (Lump Sump) Bid Item Quantity Contract Quantity when When When 10% contract 80 % contract Completed completed completed All Work Pay either Pay either Pay enter 50% 5% 100% 10% 100% into Date Location T C contract T C Contract T C CMS Insp T C is the abbreviation for Traffic Control. Always pay whichever is lesser of the traffic control or contract. When computing the percentage of the original contract amount completed, do not include monies earning for mobilization, material stored, traffic control (when bid as lump sum) and contractor construction staking.

20 Traffic Control (Initial Setup) Plan Quantity - Lump Sum Line Number Date Started Date Completed Date Entered in CMS Insp

21 Recapitulation of Durable Pavement Marking (*) (**) (***) Accum Enter into Date Sta to Sta. length length CMS Insp 10/01/ RDD 10/02/ RDD 10/15/03 estimate no LLM (*) denotes the type of pavement marking : Cold Plastic, Patterned Cold Plastic, Epoxy, High Durability Tape, Thermoplastic, Thermoplastic-Preformed, Thermoplastic-spray, Multi-Component, or Polymer-Modified Cementations (**) denotes the color (***) denotes the width of pavement marking.

22 Recapitulation of Pavement Marking (Plowable Raised Pavement Marker)(**) Enter into Date Sta to Sta. Each Accum CMS Insp (**) denotes the color.

23 Recapitulation of Durable Pavement Marking (*) (white) (****) Symbol (****) Enter into Date Sta each accum CMS Insp 10/01/ RDD 10/02/ RDD 10/15/03 estimate no. 7 4 LLM (*) denotes the type of pavement marking : Cold Plastic, Patterned Cold Plastic, Epoxy, High Durability Tape, Thermoplastic, Thermoplastic-Preformed, Thermoplastic-spray, Multi-Component, or Polymer-Modified Cementations (****) denotes the type of Symbo

24 Recapitulation of Pavement Marking (*) (**)(Paint) Accum Enter into Date Sta to Sta. length length CMS Insp * Color ** Width

25 Recapitulation of Pavement Marking (Paint) Symbols Symbol Symbol Symbol Lt Arrow Rt Arrow "ONLY" enter into Date Sta. Each Accum Each Accum Each Accum CMS Insp

26 Removal of Existing Pavement Marking Quantity Accum Date Sta to Sta. Side Type Location Length Length Remarks Insp 808-1

27 Removal of Existing Pavement Marking (Plowable Raised Marker) Quantity Accum Date Sta to Sta. Side Type Location Each Each Remarks Insp 808-1

28 Recapitulation of Concrete Safety Barrier (*) (**) Quantity enter Accum into Date Sta to Sta. Side Location length Length Remarks CMS Insp (*) denotes Type and (**) denotes (Permanent), (Temporary), (Temporary-Installation Only) or (Temporary-Relocate) The Inspector will make remarks on the bottom of this sheet to explain why more of less was needed.

29 Recapitulation of Inertial Barrier System Date Sta Side Location Each accum CMS Insp. enter into Inertial barrier system shall be measured per each completed in place.

30 Recapitulation of Modules (*) enter Used Accum into Date Sta Side Location (*) (*) Remarks CMS Insp (*) denotes (F-200), (F-400), (F-700), (F-1400), or (F-2100)

31 Impact Attenuator (*) Plan Quantity Line Number Impact Attenuator Date Location Each (*) Accum Remarks Insp * Type

32 Recapitulation of Signs (*) Daily accum Date Sta Location Side Sq Ft Sq Ft Remarks Insp (*)Flat Sheet, Reinforcing Panel of Overlay

33 Recapitulation of (4x6) wood Posts (**). Daily accum Date Sta Location Side lin ft lin ft. Remarks Insp 12/2/ K-32 Lt 5 5 RDD 12/4/ K-32 Rt 3 8 RDD 12/5/02 estimate no. 3 RCB (**) denotes designate for flat signs or for structural panels signs.

34 Recapitulation of Steel Beam Posts. * Daily accum Date Sta Location Side lin ft lin ft. Remarks Insp * Size and weight of post.

35 Recapitulation of Sign Posts (* U Steel) Daily accum Date Sta Location Side lin ft lin ft. Remarks Insp * 2 or 3 Lbs. per Foot.

36 Recapitulation of (*) accum Date Sta Location Side Each each Remarks Insp (*) denotes(**) Steel beam posts, (**) steel beam stub Post with breakaway Base Plate, (***) Breakaway Base Plates. (**) denotes size and weight and (***) denotes size Can be used for all line items paid and recorded by "Each".

37 Recapitulation of (*) Diameter Concrete Footings (**) Accum Linear Linear Date Sta Location Side Feet Feet Remarks Insp (*) denotes size and (**) denotes designate for Wood Post or Steel Post

38 Sign (Remove and Reset) Plan Quantity - Lump Sum Line Number Accum Signs Removed Signs Reset % % Date Location Quantity Accum Quantity Accum Complete Complete Remarks Insp

39 Recapitulation of Rumble Strips (*) (**) Date end Start Accum Enter Date Sta Start Side Location Sta Sta CMS Remarks Insp * Asphalt or Concrete ** Edge or Centerline

40 Record of Electric Lighting System Quantity Quantity Quantity Quantity Accum Accum Accum Accum Length Length Lumin- Lumin- Light Light Found- Found- Date Conduit Conduit aire aire St'ds St'ds ations ations Remarks Insp Electric lighting - Record for Partial Payment of Lump Sum Items This plate is a worksheet used for keeping a record of the work to determine the percent of contract price completed for progress of payment purposes. Items completed are multiplied by unit cost supplied by the contractor The sum of the unit cost calculations are divided into the lump sum bid to obtain percent complete.

41 Record of Electric Conduit ** Quantity Quantity Quantity Size * Size * Size * Accum Accum Accum Location Meas Meas Meas Meas Meas Meas Date Sta. Side Length Length Length Length Length Length Remarks Insp * Denotes the size of the conduit. This item is paid as lump sum or linear feet or meters. This plate is a record of the linear feet of meters of the electrical conduit used and will be used as accepted material. ** Metallic or Non Metallic

42 Record of Electrical Service Boxes Quantity Accum Location Number Number enter in Date Sta. Side of Boxes of Boxes CMS Remarks Insp This plate is a record of the electric service boxes placed on the project. The junction boxes can be kept track on the same way.

43 Traffic Signal Installation Plan Quantity - Lump Sum Line Number Date Location Foundation Traffic Signal Poles Traffic Signal Pedestals Traffic Signal Head Wire Ln Ft % Complete Accum % Complete Estimate # Insp

44 Traffic Signal Interconnect Plan Quantity - Lump Sum Line Number Date % Complete Accum % Complete Estimate # Insp This template t can be used for Emergency Vehicle System.

45 Recapitulation of (*) (**) (*) (**) Date Sta Location Side each accum Remarks Insp (*) denotes Catch Basin, Inlet, Outlet, Manhole, Junction Box. (**) denotes type of drainage structures

46 Recapitulation of adjusted drainage structures adjusted structure* Date Sta location Side each accum Remarks Insp * denotes the type of adjusted structures such as Manhole, Catch basins, or Curb inlets

47 Structural Steel Plan Quantity Line Number Date Location Quantity Used Accum Quantity Insp This template t can be used for Cast Steel and Cast Iron.

48 Tested Material Received, Used and On Hand Material: Structural Steel Date Checked Test Report Data Field Data Distribution of Materials CMS ID Ident. Quantity Ident. Quantity Insp. Received Date Used On Hand Insp a This template t can be used for Cast Steel and Cast Iron.

49 Installation of Pipe and other material accum quantity enter Date Number length actual Accum end end paid in into Accum. Installed Sections section Length Length section section CMS CMS Headwall Headwall Insp May be used for all types of pipe paid for by linear foot. This plate is the inspector record of the actual material used at this location.

50 Record of Pipe (*-**-***) Received and used Marked Test Number Accum Accum ID on Report of Length of Total Total Total Date pipe Number Section section Received Received Used Used on hand Remarks Insp * denotes size of Pipe. ** BC denotes HMA - coated No entry denotes without HMA - Coating. *** Denotes types: CMP, CSP, CAP, CMMAC CSMAC etc. A field record of tested material is necessary to eliminate the possibility of using untested material or cause unnecessary delays due to performing checks of the office records. This plate supplies the field inspector with a complete record of the amount of material received, tested, and when it was used. The erosion pipe can be mark when it has been inventoried.

51 Recapitualtion of Fly Ash Slurry Grout( *) Cu Yd Accum enter Used Cu Yd into Date Sta Side Location Daily Used Remarks CMS Insp (*) denotes Low Strength of High Strength

52 Pipe Measurement (Linear Foot) Plan Quantity Date Location Sta. length accum Insp 828-1

53 Pipe Measurement (Linear Foot) Plan Quantity Date Location Sta. length accum Insp 828-1

54 Recapitulation of Flume Inlets (*) and slope drains (**) Plan Quantity Inlet Flumes (*) Slope Drains (**) into Date sta to sta side Location each accum each accum CMS Insp (*) denotes AE (air entrained) or no entry means with out air (**) denotes AE (air entrained), no entry means without air, or asphaltic concrete. The asphaltic concrete shall be BM-2 or BM-3

55 Recapitulation of Flapgates (*) Plan Quantity Accum Enter Daily Daily into Date Sta. Side Location Placed Total CMS Insp (*) Denotes the size.

56 Recapitulation of (*) Pipe Underdrains (Type **) Plan Quantity Accum enter Daily Daily Ref Ref into Date Sta Side Location (*) (**) (*) (**) Bk Pg Remarks CMS Insp (*) denotes the size, Diameter (**) denotes type [B], [F], [H], or [L] for underdrain Pipe and [A], [E], [G], [K] or Special for underdrain Outlet Pipe

57 Recapitulation of Aggregate for Blanket Underdrains Plan Quantity Accum Daily Daily Date Sta Side Location Ton(*) Tons (*) Remarks Insp (*) denotes Tons or Cu Yd.

58 Recapitulation of (*) Pipe Underdrains (Type **) at Station Station Plan Quantity of (*) Pipe Underdrain (type**) Lt US 36 Plan Quantity of (*) Pipe Underdrain Outlet Pipe Plan quantity of (Ton or Cu Yd ) of Aggregate for Blanket Underdrain Test Test Test Under drain Pipe Report Outlet Pipe Report Aggregate Report Date length Total No. length Total No. Ton (***) Total No. Insp (*) denotes the size, Diameter (**) denotes type [B], [F], [H], or [L] for underdrain Pipe and [A], [E], [G], [K] or Special for underdrain Outlet Pipe (***) denotes that the aggregate will be paid for as tons or cu yds.

59 Prefabricated Interception Device (*) Plan Quantity Line Number Date Location Each Quantity Accum Quantity Insp * Type

60 Slotted Drain (**) Plan Quantity Line Number Date Location Ln Ft Quantity Accum Ln Ft Quantity Insp ** Diameter of CMP

61 Recapitulation of Sidewalks Date Sta to Sta Side Location Width Length Sq. Yd. Sq. Yd Quantity Insp Total Plan Explain why there is a increase or decrease at the bottom of the quantity.

62 Recapitulation of Sidewalk Ramps Plan quantity enter into Date Sta. to Sta Side width Length Sq. Yd Remarks CMS Insp The sidewalk ramp will be calculated to the nearest 0.1 sq. yd.

63 Recapitulation of Grade 3.0 Concrete (Misc) and Reinforcing Steel for steps Quantity Quantity Accum Accum Daily Total Daily Total Date Sta Side Location Cu Yd Cu Yd Lbs Lbs Remarks Insp This plate show how to keep track of cubic yard of concrete and pounds of reinforcing steel used on steps.

64 Recapitulation of (*) Quantity Accum daily Total Date Sta to Sta Side Location length length Insp (*) denotes [Curb, Edge (**)(***)], [ Curb, Heater(***)], [Curb and Gutter, Combined (***)], [Gutter(***), [Curb, Protection (**)(***)],[Curbs, Asphaltic Concrete, [Gutters, Asphaltic Concrete] or [Curb and Gutters, Asphltic Concrete]. (**) denotes size, height or special (***) denotes AE for air entrained No entry denotes without air.

65 Recapitulation of Shot-Crete Plan quantity Units Date Sta. to Sta Length width in Place Remarks Insp * Unit designated in contract documents

66 Recapitulation of Guard Fence (*) and Guard fence post Guard Fence Guard fence post enter daily accum into Date sta to sta side Location Length Length each accum CMS Insp (*) Denotes the type of guard fence Steel Plate, Cable, Removal of Steel Plate, Removal of Cable, Removal of Timber, Reconstruction of Steel Plate, Reconstruction of Cable, Removal and Reconstruction of Steel Plate and Removal and Reconstruction of Cable, and End Terminals.

67 Recapitulation of Guideposts (*) Guard Fence Guard fence post daily accum Date sta to sta side Location Length Length each accum Insp (*) Denotes Setting of, Removal of, Resetting of, Removal and Resetting of

68 Recapitulation of Fence (*) Fence (*) Date Location Sta. to Sta length accum Insp (*) Denotes (Woven Wire (**) (Chain Link), or (Barbed Wire) (**) Denotes Type A or B means either Type A or Type B is permissible, Type A means only Type A is permissible, Type B means type B is permissible.

69 Recapitulation of Fence (*) Fence (*) Date Location Sta. to Sta length accum Insp (*) denotes (Removal and resetting wire) (Removal and Resetting ChainLink) (Removal of existing) or (Single Wire Cable)

70 Recapitulation of post (*) (**) Plan Quantity Corner post end post pull post Date Location each accum each accum each accum Insp (*) denotes Corner, End or Pull post (**) denotes type of fence woven wire or chain link. Note: You need to keep track of all the line post for test report.

71 Recapitulation of Gates (*) and Floodgates Plan Quantity Gate Floodgates Date Location each accum each accum Insp (*) denotes the size of the gates

72 Recapitulation of Riprap (*) Plan Quantity Accum Date Sta Side Location SqYd SqYd Remarks Insp 829-1

73 Recapitulation of Bedding for Slope Protection Plan Quantity Daily Accum Date Sta Side Location CuYd CuYd Remarks Insp (*) denotes ton or cubic yard Use 150 mm filter Course (Type I)

74 Recapitulation of Slope Protection Plan Quantity Daily Accum Date Sta Side location CuYd CuYd Remarks Insp (*) denotes ton or cubic yard

75 Recapitulation of Pavement Interlayer Geotextile Plan quantity Sq Yd Accum % Date Sta. to Sta Length width Used Sq Yd Comp Remarks Insp The Engineer will measure the geotextile placed and accepted by the square yard (measure to the nearest 0.1 sq yd, pay to the nearest sq yd.)

76 Recapitulation of Ditch Lining Plan Quantity Accum Ref Ref. Date Sta to Sta Side * * Book Page Remarks Insp * Quantity in units of tons or square yards for concrete or aggregate ditch lining. This plate is used to enter into CMS

77 Measurement of Ditch Lining Plan Quantity Date Sta to Sta. side location length width 1 width 2 Yd Remarks Insp. Sq The plate show the measurement of the ditch lining or backslope ditch lining at different location. Circle area equal x d 2

78 Recapitulation of Cubic Yards of Stone for (*) Plan Quantity ** Accum Used ** Date Sta to Sta Side Location Daily Used Remarks Insp ** Units could be square or cubic yards (*) denotes Gabions or Revet Mattresses.

79 Recapitulation of Aggregate for HMA (*) course (**) Patching Plan Quantity Used accum Date Sta to Sta Side Location Tons Tons Remarks Insp (*) denotes whether it is Base of Surface and (**) denotes the type and grade.

80 Recapitulation of Portland Cement Concrete Pavement (*) Patching (**) Plan Quantity Date Sta to Sta Side Location length width Sq Yd Remarks Insp This template can also be used for PCCP Edge Joint Patching, PCCP Joint Patching (Full Depth) and PCCP Joint and Crack Patching.

81 Recapitulation of Extra Work Saw Cut Plan Quantity Accum Date Sta. to Sta Side Location Length Length Remarks Insp 833-3

82 Reinforced Concrete Box (*) (Pre Cast) Plan Quantity Line Number Date Location Station to Station Tons Used Accum Tons Used Insp

83 Injection holes Plan Quantity Line Number Date Location Station to Station Quantity Accum Quantity Remarks Insp

84 Sealing PCCP Joints (Longitudinal) Plan Quantity Line Number Date Location Station to Station Ln Ft Cleaned Ln Ft Sealed Accum Ln Ft Sealed Remarks Insp This template t can be used for Sealing PCCP Joints (Tranverse), Sealing PCCP Cracks (>1/8" <2"), Sealing Spalled PCCP Joints & Cracks (>2" 3"), Sealing Spalled PCCP Joints & Cracks, Type A of B (>2" 3"), Sealing Asphalt Cracks (>1/8" 1/2"), Sealing Asphalt Cracks (>1/2" <2"), and Sealing Longitudinal Asphalt Shoulder Joint.

85 Material Received, Used, On Hand Material: Hot Joint Sealing Compound Test Report Data Field Data Date CMS ID Ident. Quantity Ident. Quantity Insp. Received Date Used On Hand Insp A This template t can be used for the Rapid Set Concrete Patching Material and the Polypropylene l fibers.

86 Recapitulation of * Plan Quantity Aggregate Daily Accum Date Sta. to Sta. Side Location Unit Unit Remarks Insp This plate is used to keep track of surfacing material. * Temporary Surfacing, Surfacing for Side Roads and Entrances.

87 Recapitulation of (*) Plam Quantity Daily Accum Date Sta to Sta Side Location Station Station Remarks Insp (*) denotes Bid Items: Shoulders Earth (HMA Widening), Shoulder Rock (HMA Widening), Pavement Edge Wedge (Earth), or Pavement Edge Wedge (RAP)

88 Recapitulation of (*) Plan Quantity Daily Accum Date Sta to Sta Side Location Ton Ton Remarks Insp (*) denotes Bid Items: Aggregate for Shoulders (AS-1) or Pavement Edge Wedge (Rock)

89 Water for Earthwork Compaction(Set) Plan Quantity Line Number Date Tank Number Pay MGAL per Load Number of Loads Pay MGAL Accum Pay MGAL Location Station to Station Remarks Insp This template t should be used in conjunction with template t 'Water Hauling Equipment Data."

90 Grinding Concrete Surface Plan Quantity Line Number Location Length Width Accum Date Side Station to Station Ln Ft Ln Ft Sq Ft Sq Yds Sq Yds Remarks Insp

91 Crushed Stone for Backfill Plan Quantity Line Number Patch Size Date Location Length Width Depth Station Ln Ft Ln Ft Inches Cu Ft Cu Yds Accum Cu Yds Remarks Insp Conversion Factor feet per inch Conversion Factor - 27 cubic feet per cubic yard Note - Cu. Ft. = Length (Ft) x Width (Ft) x Depth (inches) x ft / inch

92 Removal of Asphalt Material Plan Quantity Line Number Location Length Width Accum Date Side Station to Station Ln Ft Ln Ft Sq Ft Sq Yds Sq Yds Remarks Insp This template t can be used for 'Rubblized Concrete.'

93 Temporary Surfacing Material (Aggregate) (Set Price) Line Number Date Station to Station Side Location Daily Unit Bit Material Accum Unit Daily Unit Aggregate Accum Unit Date Enter CMS Remarks Insp

94 Recapitulation of Drilling and Grouting (*) Plan Quantity Accum Date Sta. Side Location Each Each Remarks Insp (*) denotes repair or new.

95 Recapitulation of Flowable Fill Plan Quantity Accum Date Sta. Side location CuYd CuYd Remarks Insp Use this material to backfill open excavation where soil or aggregate is not called for of is impractical to used This material will be accepted on the basis of approved mix design. This template can be used for slurry grout also.

96 Cleaning Existing Structures Plan Quantity - Lump Sum Line Number Accum Location Structures % % Date to be Cleaned Structures Cleaned Complete Complete Est Date Est # Entered to CMS Insp

97 Cleaning Existing Underdrains Plan Quantity Line Number Cleaned Video Inspected Date Location Ln Ft Accum Ln Ft Ln Ft Accum Ln Ft Remarks Insp

98 Recapitulation of Transporting Salvageable Material (*) Quantity of material to be hauled Accum Date Sta. Side Location to Location Sta Side * * Remarks Insp This plate is used to pay for hauling salvageable material off the project at a location designated on the plans. The salvageable material will be measured at the stockpiled location to be used later. * Units are in contract documents.

99 Recapitulation of Mailbox Installation Plan Quantity Accum Mail box Mail box Date Sta. Side Location Unit Unit Remarks Insp Acceptable mailbox supports shall be commercially available units intended for this purpose and will be accepted on the basis of visual inspection

Page Number Official Detail Name Contact Title Primary Contact E mail Secondary Contact E mail

Page Number Official Detail Name Contact Title Primary Contact E mail Secondary Contact E mail MANHOLE SPECIFIC STR 11 1 Control Manhole Metered Program Manager Anne.Marie.Smrchek@cityoffortwayne.org Kristen.Buell@cityoffortwayne.org STR 11 2 Control Manhole Non Metered Program Manager Anne.Marie.Smrchek@cityoffortwayne.org

More information

SECTION 5900 TRAFFIC SIGNALS CITY OF LEE S SUMMIT, MISSOURI DESIGN CRITERIA

SECTION 5900 TRAFFIC SIGNALS CITY OF LEE S SUMMIT, MISSOURI DESIGN CRITERIA SECTION 5900 TRAFFIC SIGNALS CITY OF LEE S SUMMIT, MISSOURI DESIGN CRITERIA TABLE OF CONTENTS Section Title Page 5901 GENERAL... 2 5902 DESIGN CRITERIA... 2 5902.1 Codes and Standards... 2 5902.2 Signal

More information

TruePlate Structural Plate

TruePlate Structural Plate TruePlate Structural Plate Galvanized Steel and Aluminum Alloy Sizes, Shapes and Height of Cover Tables TrueNorthSteel.com info@truenorthsteel.com 866-82-511 TruePlate Structural Plate Many drainage and

More information

CHAPTER 14 WIRING SIGNALS AND LIGHTING FIELD GUIDE Wiring Requirements WIRING

CHAPTER 14 WIRING SIGNALS AND LIGHTING FIELD GUIDE Wiring Requirements WIRING WIRING CHAPTER 14 WIRING The installation of all wiring, including electrical cables and conductors, must conform to the National Electrical Code (NEC). The Code represents the minimum required standard.

More information

TRAFFIC SIGNAL DESIGN GUIDELINES

TRAFFIC SIGNAL DESIGN GUIDELINES TRAFFIC SIGNAL DESIGN GUIDELINES January, 2006 INDEX PLAN APPROVAL PROCESS 1 1. Designer Prequalification 1 2. Items Available from the County 1 3. Plan Submittals 1 4. Final Submittal 1 5. Checklist for

More information

Structural Plate Design Guide. 5 th Edition MULTI-PLATE. Aluminum Structural Plate. Aluminum Box Culvert SUPER-SPAN SUPER-PLATE.

Structural Plate Design Guide. 5 th Edition MULTI-PLATE. Aluminum Structural Plate. Aluminum Box Culvert SUPER-SPAN SUPER-PLATE. ENGINEERED SOLUTIONS Structural Plate Design Guide 5 th Edition MULTI-PLATE Aluminum Structural Plate SUPER-SPAN SUPER-PLATE BridgeCor Table of Contents Steel and Aluminum Structural Plate design guide.

More information

CONSTRUCTION SPECIFICATION FOR CLOSED CIRCUIT TELEVISION INSPECTION OF PIPELINES

CONSTRUCTION SPECIFICATION FOR CLOSED CIRCUIT TELEVISION INSPECTION OF PIPELINES ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 409 APRIL 1999 CONSTRUCTION SPECIFICATION FOR CLOSED CIRCUIT TELEVISION INSPECTION OF PIPELINES TABLE OF CONTENTS 409.01 SCOPE 409.02 REFERENCES 409.03

More information

AMENDMENTS TO OPSS 409 (APR 99) CONSTRUCTION SPECIFICATION FOR CLOSED CIRCUIT TELEVISION INSPECTION OF PIPELINES

AMENDMENTS TO OPSS 409 (APR 99) CONSTRUCTION SPECIFICATION FOR CLOSED CIRCUIT TELEVISION INSPECTION OF PIPELINES Works and Emergency Services CITY OF TORONTO WATER AND WASTEWATER SERVICES STANDARD CONSTRUCTION SPECIFICATIONS TS 409 November 2010 AMENDMENTS TO OPSS 409 (APR 99) CONSTRUCTION SPECIFICATION FOR CLOSED

More information

SECTION [ ] [02730] WAX-COATED DECOMPOSED GRANITE SURFACING

SECTION [ ] [02730] WAX-COATED DECOMPOSED GRANITE SURFACING SECTION [32 15 40] [02730] WAX-COATED DECOMPOSED GRANITE SURFACING NexPave wax-coated decomposed granite provides beautiful and natural-looking surfacing for footpaths, horse trails, landscaping, and light

More information

Standard Method of Test for Random Method of Sampling Hot Mix Asphalt (HMA) SCDOT Designation: SC-T-101 (08/13)

Standard Method of Test for Random Method of Sampling Hot Mix Asphalt (HMA) SCDOT Designation: SC-T-101 (08/13) Standard Method of Test for Random Method of Sampling Hot Mix Asphalt (HMA) SCDOT Designation: SC-T-101 (08/13) 1. Scope 1.1 This test method outlines the procedure for randomly sampling Hot Mix Asphalt

More information

Public Works Division Lighting District Fiber Optic Specifications April 2009

Public Works Division Lighting District Fiber Optic Specifications April 2009 Public Works Division Lighting District Fiber Optic Specifications April 2009 7000 Florida Street Punta Gorda, Florida 33950 Tele: 941.575.3600 Fax : 941.637.9265 www.charlottecountyfl.com/publicworks

More information

CONSTRUCTION SPECIFICATION FOR CLOSED-CIRCUIT TELEVISION INSPECTION OF PIPELINES

CONSTRUCTION SPECIFICATION FOR CLOSED-CIRCUIT TELEVISION INSPECTION OF PIPELINES ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 409 NOVEMBER 2009 CONSTRUCTION SPECIFICATION FOR CLOSED-CIRCUIT TELEVISION INSPECTION OF PIPELINES TABLE OF CONTENTS 409.01 SCOPE 409.02 REFERENCES

More information

Sample: A small part of a lot or sublot which represents the whole. A sample may be made up of one or more increments or test portions.

Sample: A small part of a lot or sublot which represents the whole. A sample may be made up of one or more increments or test portions. 5.2.2.2. RANDOM SAMPLING 1. SCOPE This method covers procedures for securing random samples from a lot by the use of random numbers obtained from tables or generated by other methods. Nothing in this method

More information

TEO Work Zone Safety Committee Meeting January 25, 2006 Minutes

TEO Work Zone Safety Committee Meeting January 25, 2006 Minutes January 25, 2006 Page 1 of 5 TEO Work Zone Safety Committee Meeting January 25, 2006 Minutes Committee Members Present: Oliver Kendall, District 4 Mike Engh, Metro Sue Lorentz, Metro Ken Nelson, CO Maintenance

More information

CONSTRUCTION SPECIFICATION FOR CLOSED-CIRCUIT TELEVISION (CCTV) INSPECTION OF PIPELINES

CONSTRUCTION SPECIFICATION FOR CLOSED-CIRCUIT TELEVISION (CCTV) INSPECTION OF PIPELINES ONTARIO PROVINCIAL STANDARD SPECIFICATION OPSS.MUNI 409 NOVEMBER 2017 CONSTRUCTION SPECIFICATION FOR CLOSED-CIRCUIT TELEVISION (CCTV) INSPECTION OF PIPELINES TABLE OF CONTENTS 409.01 SCOPE 409.02 REFERENCES

More information

U-verse Outside Plant Cabinets AT&T Knowledge Ventures. All rights reserved. AT&T and the AT&T logo are trademarks of AT&T Knowledge Ventures.

U-verse Outside Plant Cabinets AT&T Knowledge Ventures. All rights reserved. AT&T and the AT&T logo are trademarks of AT&T Knowledge Ventures. U-verse Outside Plant s U-verse Outside Plant (OSP) Certifications AT&T certifies that Lightspeed cabinets, wiring and equipment have been inspected for and are compliant to the following industry standards:

More information

SPECIAL SPECIFICATION 6559 Telecommunication Cable

SPECIAL SPECIFICATION 6559 Telecommunication Cable 2004 Specifications CSJ 0015-09-147, etc. SPECIAL SPECIFICATION 6559 Telecommunication Cable 1. Description. This specification governs the materials, installation, termination, splicing, testing, training,

More information

SPECIAL SPECIFICATION 8540 Telecommunication Cable

SPECIAL SPECIFICATION 8540 Telecommunication Cable 2004 Specifications CSJ 0914-00-307 & CSJ 0914-25-003 SPECIAL SPECIFICATION 8540 Telecommunication Cable 1. Description. This specification governs the materials, installation, termination, splicing, testing,

More information

CONSTRUCTION SPECIFICATION FOR CLOSED-CIRCUIT TELEVISION (CCTV) INSPECTION OF PIPELINES

CONSTRUCTION SPECIFICATION FOR CLOSED-CIRCUIT TELEVISION (CCTV) INSPECTION OF PIPELINES ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 409 NOVEMBER 2013 CONSTRUCTION SPECIFICATION FOR CLOSED-CIRCUIT TELEVISION (CCTV) INSPECTION OF PIPELINES TABLE OF CONTENTS 409.01 SCOPE 409.02 REFERENCES

More information

IndyGo Facility Upgrades Project 35671EE

IndyGo Facility Upgrades Project 35671EE SECTION 260553 IDENTIFICATION FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Identification for raceways. 2. Identification of power and control cables. 3. Identification for

More information

DISCLAIMER. This document is current at the date of downloading. Hunter Water may update this document at any time.

DISCLAIMER. This document is current at the date of downloading. Hunter Water may update this document at any time. DISCLAIMER This Standard Technical Specification was developed by Hunter Water to be used for construction or maintenance of water and/or sewerage works that are to become the property of Hunter Water.

More information

THE CITY OF WATERLOO SPECIFICATION FOR THE INVESTIGATION OF SANITARY SEWER LATERALS USING CLOSED CIRCUIT TELEVISION CAMERA (CCTV) 2016

THE CITY OF WATERLOO SPECIFICATION FOR THE INVESTIGATION OF SANITARY SEWER LATERALS USING CLOSED CIRCUIT TELEVISION CAMERA (CCTV) 2016 THE CITY OF WATERLOO SPECIFICATION FOR THE INVESTIGATION OF SANITARY SEWER LATERALS USING CLOSED CIRCUIT TELEVISION CAMERA (CCTV) 2016 TABLE OF CONTENT 1.0 SCOPE OF WORK... 3 1.1 GENERAL... 3 1.2 OBJECTIVES:...

More information

ACADEMIC SUCCESS CENTER THE COLLEGE AT BROCKPORT STATE UNIVERSITY OF NEW YORK PROJECT NO

ACADEMIC SUCCESS CENTER THE COLLEGE AT BROCKPORT STATE UNIVERSITY OF NEW YORK PROJECT NO SECTION 270536 - CABLE TRAYS FOR COMMUNICATIONS SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

September 28, 2018 CITY OF BERKELEY JOHN MUIR SCHOOL CROSSING IMPROVEMENTS SPECIFICATION NO C ADDENDUM NO. 2

September 28, 2018 CITY OF BERKELEY JOHN MUIR SCHOOL CROSSING IMPROVEMENTS SPECIFICATION NO C ADDENDUM NO. 2 Department of Public Works Transportation Division September 28, 2018 CITY OF BERKELEY JOHN MUIR SCHOOL CROSSING IMPROVEMENTS ADDENDUM NO. 2 Dear Bidder: The following amendments are hereby made to the

More information

Field Instruction. Any registered training organisation UETTDRCJ21A Lay ESI electrical cables. Before commencing work:

Field Instruction. Any registered training organisation UETTDRCJ21A Lay ESI electrical cables. Before commencing work: 6.10 Cable Installation Purpose This field instruction outlines the minimum cable installation requirements for all Horizon Power Workers, including Workers operating, servicing, and/ or maintaining (MPS)

More information

1. The contractor shall ensure that: c) Contractor or sub-contractor has at least 5 years experience

1. The contractor shall ensure that: c) Contractor or sub-contractor has at least 5 years experience Black text from standard FAA spec Strikeout text deletions from FAA standard spec Blue text additions to FAA standard spec Red text notes to the Engineer/won t appear in spec I. DESCRIPTION A. GENERAL

More information

Site Installation Model MP-8433

Site Installation Model MP-8433 Site Installation Model MP- Rev. //0 SCOREBOARD SITE INSTALLATION INSTRUCTIONS CAUTION: All American Scoreboards (AAS) recommends the sign be installed by a licensed contractor, and must meet all local

More information

ULTRA-TRAC APL INSTRUCTION MANUAL. Read and understand instructions before use. Patented. 851 Transport Drive Valparaiso, IN

ULTRA-TRAC APL INSTRUCTION MANUAL. Read and understand instructions before use. Patented. 851 Transport Drive Valparaiso, IN ULTRA-TRAC APL A C O U S T I C P I P E L O C A T O R INSTRUCTION MANUAL Read and understand instructions before use. Patented MADE IN USA 851 Transport Drive Valparaiso, IN 46383-8432 Phone: 888 4SENSIT

More information

Fiberglass - Technical Data

Fiberglass - Technical Data - Technical Data Cable Tray Thermal Contraction and Expansion X : Denotes hold-down clamp (anchor) at support. _ : Denotes expansion guide clamp at support. It is important that thermal contraction and

More information

Tab 10 - The NESC and Underground Applications. Restricted Siemens Industry, Inc All rights reserved.

Tab 10 - The NESC and Underground Applications. Restricted Siemens Industry, Inc All rights reserved. Tab 10 - The NESC and Underground Applications Restricted Siemens Industry, Inc. 2017 All rights reserved. siemens.com/poweracademy The National Electric Safety Code (NESC) The NESC provides guidelines

More information

Support Frame STB Technical Instruction Manual

Support Frame STB Technical Instruction Manual Support Frame STB Technical Instruction Manual Fig. 2.1: Support frame STB 450 Fig. 2.2: Support frame STB 300 Fig. 2.3: Brace bracket SK 150 Product Characteristics The support frames are mainly used

More information

SECTION 25 CLOSED CIRCUIT TELEVISION INSPECTION OF SEWER LINES

SECTION 25 CLOSED CIRCUIT TELEVISION INSPECTION OF SEWER LINES 2017 - SECTION 25 CLOSED CIRCUIT TELEVISION INSPECTION OF SEWER LINES 25.1 GENERAL This section of the specifications shall form a part of the contract documents and should be read in conjunction with

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 26 0553 - IDENTIFICATION FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

Specifications For CCTV Inspection Of Sanitary & Storm Sewers (Revised Aug. 2018)

Specifications For CCTV Inspection Of Sanitary & Storm Sewers (Revised Aug. 2018) Specifications For CCTV Inspection Of Sanitary & Storm Sewers (Revised Aug. 2018) 1.0 INTENT It is the intent of this Specification to describe the services to be provided. 1) The Closed-Circuit Television

More information

MINNEHAHA COUNTY ON-SITE WASTEWATER TREATMENT SITE EVALUATION WORKSHEET Form #1. Land Owner. Legal Description

MINNEHAHA COUNTY ON-SITE WASTEWATER TREATMENT SITE EVALUATION WORKSHEET Form #1. Land Owner. Legal Description MINNEHAHA COUNTY ON-SITE WASTE TREATMENT SITE EVALUATION WORKSHEET Form #1 Land Owner Legal Description Type of Structure (check one): Residence Commercial Industrial Accessory Building Other If Residence:

More information

ICS Digital Menu. Installation Guide Version 1.1

ICS Digital Menu. Installation Guide Version 1.1 ICS Digital Menu Installation Guide Version 1.1 Installation Overview This document was written to assist technicians and electricians in installing the ICS Digital Menu. A thorough understanding of electrical

More information

CASS TL-3 (Utilizing C-Shaped Post) Maintenance and Repair Manual

CASS TL-3 (Utilizing C-Shaped Post) Maintenance and Repair Manual CASS TL-3 (Utilizing C-Shaped Post) Maintenance and Repair Manual Part No. 620290B Revision March 2007 INDEX Page Introduction 3 General CASS TM Maintenance 3 Pre-stretched Cable 3 Non Pre-stretched Cable

More information

SECTION 3 SPECIFICATIONS FOR TELEVISION INSPECTION OF SANITARY AND STORM SEWER 0053

SECTION 3 SPECIFICATIONS FOR TELEVISION INSPECTION OF SANITARY AND STORM SEWER 0053 SECTION 3 SPECIFICATIONS FOR TELEVISION INSPECTION OF SANITARY AND STORM SEWER 0053 3.1 INTENT It is the intent of this Specification to describe the services to be provided. 1) The Closed Circuit Television

More information

SECTION 683 VIDEO OPTICAL TRANSCEIVER WITH BI-DIRECTIONAL DATA CHANNEL DESCRIPTION

SECTION 683 VIDEO OPTICAL TRANSCEIVER WITH BI-DIRECTIONAL DATA CHANNEL DESCRIPTION 683 SECTION 683 VIDEO OPTICAL TRANSCEIVER WITH BI-DIRECTIONAL DATA CHANNEL DESCRIPTION 683.01.01 GENERAL A. The Contractor shall furnish the designated quantity of Video Optical Transceiver (VOTR) pairs

More information

Work Type Definition and Submittal Requirements. Work Type Definition: Traffic Signal Design

Work Type Definition and Submittal Requirements. Work Type Definition: Traffic Signal Design The first section, Work Type Definition, provides a detailed explanation of the work type. The second section, Work Type Submittal Requirements, identifies the requirements a firm must meet to become pre-qualified

More information

AREMA 2015 ANNUAL CONFERENCE. NYSDOT / Amtrak. Hudson Line Improvement Program. David W. Emerich, PE CHA. Minneapolis, MN October 4-7, 2015

AREMA 2015 ANNUAL CONFERENCE. NYSDOT / Amtrak. Hudson Line Improvement Program. David W. Emerich, PE CHA. Minneapolis, MN October 4-7, 2015 NYSDOT / Amtrak Hudson Line Improvement Program Craig O. Weed A Amtrak David W. Emerich, PE CHA Project Partners NYSDOT High Speed Intercity Passenger Rail Program Sustained Effort to Secure Funding Total

More information

ATTACHMENT 2: SPECIFICATION FOR SEWER CCTV VIDEO INSPECTION

ATTACHMENT 2: SPECIFICATION FOR SEWER CCTV VIDEO INSPECTION ATTACHMENT 2: SPECIFICATION FOR SEWER CCTV VIDEO INSPECTION 1.0 General 1.1 The work covered by this section consists of providing all labor, equipment, insurance, accessories, tools, transportation, supplies,

More information

Office of Traffic Operations Signal Design Reference Packet

Office of Traffic Operations Signal Design Reference Packet Office of Traffic Operations Signal Design Reference Packet Rev-2 04/17/2015 Contents The purpose of this packet is to provide guidance on designing and reviewing traffic signal plans. The format, legends,

More information

Pulp and Paper Screens

Pulp and Paper Screens Pulp and Paper Screens A brand of Aqseptence Group Global Footprint Johnson Screens has been engineering and manufacturing screens since 1904 and has a storied history of innovation and problem solving

More information

UNIVERSITY of NORTH DAKOTA LOW VOLTAGE COMMUNICATIONS STANDARDS FOR CABLING, PATHWAYS, AND SPACE

UNIVERSITY of NORTH DAKOTA LOW VOLTAGE COMMUNICATIONS STANDARDS FOR CABLING, PATHWAYS, AND SPACE UNIVERSITY of NORTH DAKOTA LOW VOLTAGE COMMUNICATIONS STANDARDS FOR CABLING, PATHWAYS, AND SPACE Prepared in cooperation and approval from BICSI Building Industry Consulting Services International and

More information

Site Installation Model MP-8424

Site Installation Model MP-8424 Site Installation Model MP- Rev. //0 SCOREBOARD SITE INSTALLATION INSTRUCTIONS CAUTION: All American Scoreboards (AAS) recommends the sign be installed by a licensed contractor, and must meet all local

More information

1.0 DESCRIPTION. This specification covers roll-up signs to be used in temporary traffic control zones.

1.0 DESCRIPTION. This specification covers roll-up signs to be used in temporary traffic control zones. (Page 1 of 10) ROLL-UP SIGNS (MGS-04-01O) 1.0 DESCRIPTION. This specification covers roll-up signs to be used in temporary traffic control zones. 2.0 MATERIAL. 2.1 SIGNS AND OVERLAYS. 2.1.1 SUBSTRATES.

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS M9700 RGB SERIES Installation should be performed by a qualified electrician in accordance with the National Electrical Code and relevant local codes. Hydrel's M9700 Series of

More information

CONSTRUCTION SPECIFICATION FOR TRAFFIC SIGNAL EQUIPMENT

CONSTRUCTION SPECIFICATION FOR TRAFFIC SIGNAL EQUIPMENT ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 620 APRIL 2017 CONSTRUCTION SPECIFICATION FOR TRAFFIC SIGNAL EQUIPMENT TABLE OF CONTENTS 620.01 SCOPE 620.02 REFERENCES 620.03 DEFINITIONS 620.04

More information

Aerial Cable Installation Best Practices

Aerial Cable Installation Best Practices Aerial Cable Installation Best Practices Panduit Corp. 2007 BEST PRACTICES Table of Contents 1.0 General... 3 2.0 Introduction... 3 3.0 Precautions... 4 4.0 Pre-survey... 5 5.0 Materials and Equipment...

More information

*** no equipment put on roofs or buildings. Dish must be put in ground 3 feet from building to allow for mowing. ***

*** no equipment put on roofs or buildings. Dish must be put in ground 3 feet from building to allow for mowing. *** 6/14/18 What is your policy on residents and TV Satellite dishes? They can have satellite dish on their own. They may not attach the dish to the building or covered car port. The dish must be on a pole

More information

TITLE: FIBER OPTIC SHOCK FIXTURES

TITLE: FIBER OPTIC SHOCK FIXTURES ENGINEERING PRACTICE STUDY TITLE: FIBER OPTIC SHOCK FIXTURES 18 January 2007 STUDY PROJECT 60GP-2006-019 FINAL REPORT Study Conducted By Dave Leight DSCC-VAT Fiber Optic Group Prepared by: Dave Leight

More information

>> By Jason R. Kack, LS

>> By Jason R. Kack, LS hen the Utah Department of Transportation (UDOT) set out to rebuild Interstate 15 south of Salt Lake City, the department needed accurate one-foot contour interval mapping and a digital terrain model (DTM).

More information

SECTION FIVE COBB COUNTY TRAFFIC SIGNAL SPECIFICATIONS

SECTION FIVE COBB COUNTY TRAFFIC SIGNAL SPECIFICATIONS SECTION FIVE COBB COUNTY TRAFFIC SIGNAL SPECIFICATIONS COBB COUNTY DOT TRAFFIC SIGNAL SPECIFICATIONS OCTOBER 2017 Table of Contents Section 647 Traffic Signal Installation 4 Section 687 Signal Timing 35

More information

WIRE AND CABLE FIRE TESTS

WIRE AND CABLE FIRE TESTS TEST CSA C22.2 No 2556-13 Section 9.4 (FV-2/VW-1) (Small Scale Vertical) # OF VALUES REPORTED FOOTAGE REQUIRED 3 3 pieces: 24 each 5 7 days PERFORMANCE TIME CSA-FT1 (Small Scale Vertical) 3 5 pieces: 24

More information

Electrical Services. The MCCA offers a variety of electrical services through our experienced in-house team of electricians.

Electrical Services. The MCCA offers a variety of electrical services through our experienced in-house team of electricians. 3 Electrical Services The MCCA offers a variety of electrical services through our experienced in-house team of electricians. special connections (208 volt & 480 volt power) discount standard standard

More information

Cable Installation Tips

Cable Installation Tips Cable Installation Tips Campus Network Design & Operations Workshop These materials are licensed under the Creative Commons Attribution-NonCommercial 4.0 International license (http://creativecommons.org/licenses/by-nc/4.0/)

More information

32 LCD Overhead Video Display Support Specifications (No Electrical required on rear curtain wall)

32 LCD Overhead Video Display Support Specifications (No Electrical required on rear curtain wall) 32 LCD Overhead Video Display Support Specifications (No Electrical required on rear curtain wall) NOTE: All of these documents are in PDF format located at www.steltronicusa.com To install the 32 LCD

More information

Customer-Owned Outside Plant

Customer-Owned Outside Plant Customer Premises Products (Enterprise) 3 Customer-Owned Outside Plant Fiber Optic Splice Case 2178 Series and Accessories 372 Fiber Optic Dome Splice Closure FD Series 376 Fibrlok II Universal Optical

More information

42 LCD Overhead Video Display Support Specifications (No Electrical required on rear curtain wall)

42 LCD Overhead Video Display Support Specifications (No Electrical required on rear curtain wall) 42 LCD Overhead Video Display Support Specifications (No Electrical required on rear curtain wall) NOTE: All of these documents are in PDF format located at www.steltronicusa.com To install the 42 LCD

More information

Appendix 1 CLOSED-CIRCUIT TELEVISION INSPECTION

Appendix 1 CLOSED-CIRCUIT TELEVISION INSPECTION Appendix 1 CLOSED-CIRCUIT TELEVISION INSPECTION GENERAL 1.1 SUMMARY A. The Vendor shall f urnish all labor, materials, equipment, transportation, and incidentals as shown, specified or require d for closed-circuit

More information

Wireless Box Permit Block:3783 Lot: 009 Zip: 94103

Wireless Box Permit Block:3783 Lot: 009 Zip: 94103 15WR-0244 Wireless Box Permit Address : 650 TOWNSEND ST Cost: $1,002.50 Block:3783 Lot: 009 Zip: 94103 Name: Verizon Wireless Permittee MANDATORY COORDINATION WITH CONFLICTING PERMITS IS REQUIRED. PERMIT

More information

REQUEST FOR QUOTE: TELECOMMUNICATIONS CABLING Library/Classroom Building, Beltline Campus

REQUEST FOR QUOTE: TELECOMMUNICATIONS CABLING Library/Classroom Building, Beltline Campus REQUEST FOR QUOTE: TELECOMMUNICATIONS CABLING Library/Classroom Building, Beltline Campus PART 1: GENERAL REQUIREMENTS A. Contractor Work 1. Provide and install (except as noted in this document), cable,

More information

WINEGARD INSTALLATION MANUAL. Model GM Carryout Ladder Mount for mounting pipes with outer diameters between 1 to 1-1/8

WINEGARD INSTALLATION MANUAL. Model GM Carryout Ladder Mount for mounting pipes with outer diameters between 1 to 1-1/8 WINEGARD INSTALLATION MANUAL Model GM-3000 Carryout Ladder Mount for mounting pipes with outer diameters between 1 to 1-1/8 WARNING: DO NOT USE THE LADDER MOUNT AS A STEP! NOT INTENDED FOR USE WITH THE

More information

Ecoline S series. Precision solutions for quality production. Innovations for a better world.

Ecoline S series. Precision solutions for quality production. Innovations for a better world. Ecoline S series. Precision solutions for quality production. Innovations for a better world. Precision solutions for quality production. Die casting with confidence. The Ecoline S is a series of cold-chamber

More information

STRAND LIGHTING 200F 7-INCH TUNGSTEN LED TELEVISION FRESNEL SPECIFICATION.

STRAND LIGHTING 200F 7-INCH TUNGSTEN LED TELEVISION FRESNEL SPECIFICATION. STRAND LIGHTING 200F 7-INCH TUNGSTEN LED TELEVISION FRESNEL SPECIFICATION. GENERAL. A.) Overview. 1) The Television Fresnel fixture shall be purpose designed for television and studio lighting applications.

More information

TECHNICAL SPECIFICATION

TECHNICAL SPECIFICATION ISSUED : OCT. 02, 2006 PAGE : 1 OF 9 REV. : 1 TECHNICAL SPECIFICATION FOR GST 2006-043A LOOSE TUBE DRY CORE CABLE SINGLE JACKET/SINGLE ARMOR (SJSA CABLE) Prepared By : Oh-Heoung Kwon Engineer Optical Technical

More information

3 Locating and Marking Products DOCUMENT OBSOLETE

3 Locating and Marking Products DOCUMENT OBSOLETE 3 Locating and Marking Products This was Wall Street, 1921 2 Imagine what it s like down there today. 3 Spotting the target with Dynatel Cable/Fault Locators. The opening photos in this brochure show the

More information

42 LCD Overhead Video Display Support Specifications Electricity required on the rear curtain wall

42 LCD Overhead Video Display Support Specifications Electricity required on the rear curtain wall 42 LCD Overhead Video Display Support Specifications Electricity required on the rear curtain wall NOTE: All of these documents are in PDF format located at www.steltronicusa.com To install the 42 LCD

More information

Coastal Carolina University RE-BID WILLIAMS BRICE RENOVATION AND REPAIR October 19, 2018 Construction Documents

Coastal Carolina University RE-BID WILLIAMS BRICE RENOVATION AND REPAIR October 19, 2018 Construction Documents PART 1 - GENERAL 1.1 SUMMARY SECTION 271500 COMMUNICATIONS HORIZONTAL CABLING A. Section Includes: 1. UTP cabling. 2. Telecommunications outlet/connectors. 3. Cabling system identification products. 1.2

More information

Optical Distribution Box 300 Installation Guide. Version : R0.0

Optical Distribution Box 300 Installation Guide. Version : R0.0 Optical Distribution Box 300 Installation Guide Document No. : OD16-546-L-01 Version : R0.0 Date: 21-Mar-2018 IMPORTANT INSTRUCTIONS When using fiber optic equipment, basic precautions should always be

More information

Tender Report for Supply and installation of LAN in *Biomedical Imaging and Bioinformatics Lab*

Tender Report for Supply and installation of LAN in *Biomedical Imaging and Bioinformatics Lab* Tender Report for Supply and installation of LAN in *Biomedical Imaging and Bioinformatics Lab* General Scope of Work: Supply and installation of Computer Laboratory setup in MIU Location of Installation:

More information

Mediacom Upgrade/Splicing Procedures (based on original document from Corporate dated 4/16/98)

Mediacom Upgrade/Splicing Procedures (based on original document from Corporate dated 4/16/98) Mediacom Upgrade/Splicing Procedures (based on original document from Corporate dated 4/16/98) 1. Splicing specifications are provided by Mediacom, but due to resplice conditions, many locations become

More information

Cable Installation Tips

Cable Installation Tips Cable Installation Tips Campus Network Design & Operations Workshop These materials are licensed under the Creative Commons Attribution-NonCommercial 4.0 International license (http://creativecommons.org/licenses/by-nc/4.0/)

More information

PERFORMANCE SPECIFICATION SHEET CONNECTORS, PLUGS, ELECTRICAL, COAXIAL, RADIO FREQUENCY (SERIES SMA (CABLED) - PLUG, PIN CONTACT, CLASS 2)

PERFORMANCE SPECIFICATION SHEET CONNECTORS, PLUGS, ELECTRICAL, COAXIAL, RADIO FREQUENCY (SERIES SMA (CABLED) - PLUG, PIN CONTACT, CLASS 2) INCH-POUND MIL-PRF-39012/55G 6 February 2008 SUPERSEDING MIL-PRF-39012/55G 6 January 2006 PERFORMANCE SPECIFICATION SHEET CONNECTORS, PLUGS, ELECTRICAL, COAXIAL, RADIO FREQUENCY (SERIES SMA (CABLED) -

More information

NC-1000 INSTALLATION MANUAL NC-1000 FIBRE OPTIC CROSS-CONNECTION SYSTEM

NC-1000 INSTALLATION MANUAL NC-1000 FIBRE OPTIC CROSS-CONNECTION SYSTEM NC-1000 INSTALLATION MANUAL NC-1000 FIBRE OPTIC CROSS-CONNECTION SYSTEM Content 1. General 5 2. The products of NC-1000 system 6 3. Mounting of the frame 8 4. Earthing of the frame 8 NC-1000 FIBRE OPTIC

More information

PUBLIC WORKS COMMITTEE MEETING. September 27, 2000

PUBLIC WORKS COMMITTEE MEETING. September 27, 2000 PUBLIC WORKS COMMITTEE MEETING September 27, 2000 The Public Works Committee meeting was called to order at 7:40 p.m. by Mr. Byron C. Loudon, Chairman. The following members were present, constituting

More information

STB Distribution Box Screw or IDC Type Indoor DP Outdoor DP Wall & Pole DP Pillar DP

STB Distribution Box Screw or IDC Type Indoor DP Outdoor DP Wall & Pole DP Pillar DP Distribution Boxes STB Distribution Box Screw or IDC Type Indoor DP Outdoor DP Wall & Pole DP Pillar DP BOOK 1.indd 27 9/22/10 7:22:14 PM STB Distribution Box for Telecommunication 2 Pair Distribution

More information

Twin City Fan & Blower

Twin City Fan & Blower Twin City Fan & Blower BULLETIN 315 August 2000 SERIES 2000 DWDI BACKWARD INCLINED FANS TYPE BAB Series 2000 BAB DWDI Backward Inclined Fans This bulletin features our new BAB Series 2000 DWDI (double

More information

Trends and Challenges of HV Cable Systems

Trends and Challenges of HV Cable Systems Trends and Challenges of HV Cable Systems Bruno Arnold Electrical Engineer FH Global Sales Far East, Latin America and India Pfisterer Business Unit PTS Cable Trends and Challenges of HV Cable Systems

More information

SECTION FIBER OPTIC STATION CABLES

SECTION FIBER OPTIC STATION CABLES PART 1 GENERAL 1.01 DESCRIPTION A. The work covered by this section of the Specifications shall include all labor necessary to perform and complete such construction, all materials and equipment incorporated

More information

OCC Installation Conduit Guidelines Excerpt from Optical Cable Corporation s INSTALLATION GUIDE

OCC Installation Conduit Guidelines Excerpt from Optical Cable Corporation s INSTALLATION GUIDE Installation Conduit Guidelines Excerpt from Optical Cable Corporation s INSTALLATION GUIDE Conduit Installation A conduit cable installation involves placement of one or more optical cables inside a preinstalled

More information

Revision No. 4 Page No. Page 1 of 7

Revision No. 4 Page No. Page 1 of 7 Page No. Page 1 of 7 Single Mode Optical Fibre Cables With Loose Fibres in Stranded Tubes And Corrugated Steel tape Armouring For Duct Applications LITE KABEL SDN. BHD. reserves the right to make changes

More information

FIST-GCOG2-Dx6. Follow all local safety regulations related to optical fiber plant elements.

FIST-GCOG2-Dx6. Follow all local safety regulations related to optical fiber plant elements. FIST-GCOG2 I N S T A L L A T I O N I N S T R U C T I O N TC-986-IP Rev A, Mar 2017 www.commscope.com FIST-GCOG2-Dx6 Content 1 Introduction 2 General 2.1 Abbreviations 2.2 Kit contents 2.3 Tools 2.4 Accessories

More information

API Witness Report Perforator System Registration Page 1 of 5 General Information

API Witness Report Perforator System Registration Page 1 of 5 General Information API Witness Report Perforator System Registration Page 1 of 5 General Information 1. CHARGE SELECTION Mandatory activity to witness, API RP 19B, Section 1.4 6-Quantity of Charges Available for Selection

More information

Pre-bid Supplement #01 Communications Specifications and Additional Scope Project Bid: CM Date: 05/26/2017

Pre-bid Supplement #01 Communications Specifications and Additional Scope Project Bid: CM Date: 05/26/2017 Pre-bid Supplement #01 Communications Specifications and Additional Scope Project Bid: CM-2017-2 Date: 05/26/2017 Additional specification information for data communication to cameras and between Library

More information

Identification - electrical services

Identification - electrical services Identification - electrical services Aesthetic All live phase cable sheathing to be brown coloured and neutral phase cable sheathing to be blue coloured, all labelled L1, L2, L3 & N respectively in accordance

More information

3 Closure preparation 3.1 Work-stand 3.2. Opening FIST-GCOG2-Dx Preparing drop cable with micro-tubes

3 Closure preparation 3.1 Work-stand 3.2. Opening FIST-GCOG2-Dx Preparing drop cable with micro-tubes FIST-GCOG2-Dx24 I N S T A L L A T I O N I N S T R U C T I O N FTTH closure for micro-tubes and micro-cables Content 1 Introduction 2 Kit content 3 Closure preparation 3.1 Work-stand 3.2. Opening FIST-GCOG2-Dx24

More information

CENTRAL BLOWER COMPANY 211 S. 7th Ave. City of Industry, CA (626) Fax (626)

CENTRAL BLOWER COMPANY 211 S. 7th Ave. City of Industry, CA (626) Fax (626) CENTRAL BLOWER COMPANY 211 S. 7th Ave. City of Industry, CA 91746 (626) 330-3182 Fax (626) 330-9406 www.centralblower.com CATALOG REF-11 OCTOBER 2011 Series RE Scoop with Grease Trough Sealed to blower

More information

Astronomy Lab - Lab Notebook and Scaling

Astronomy Lab - Lab Notebook and Scaling Astronomy Lab - Lab Notebook and Scaling In this lab, we will first set up your lab notebook and then practice scaling. Please read this so you know what we will be doing. BEFORE YOU COME TO THIS LAB:

More information

CENTRAL BLOWER COMPANY 211 S. 7th Ave. City of Industry, CA (626) Fax (626)

CENTRAL BLOWER COMPANY 211 S. 7th Ave. City of Industry, CA (626) Fax (626) CENTRAL BLOWER COMPANY 211 S. 7th Ave. City of Industry, CA 91746 (626) 330-3182 Fax (626) 330-9406 www.centralblower.com CATALOG REF - 01 JULY, 2001 Series RE Scoop with Grease Trough Sealed to blower

More information

BILOXI PUBLIC SCHOOL DISTRICT. Biloxi Junior High School

BILOXI PUBLIC SCHOOL DISTRICT. Biloxi Junior High School BILOXI PUBLIC SCHOOL DISTRICT Biloxi Junior High School Request for Proposals E-Rate 2014-2015 - Internal Connections Submit Proposals To: Purchasing Department Attn: Traci Barnett 160 St. Peter Street

More information

Welcome SIGN CODE UPDATE

Welcome SIGN CODE UPDATE Welcome SIGN CODE UPDATE PUBLIC MEETING Aztlan Community Center Thursday, May 24, 2018 Community Room 5:30 7:30 PM 112 E Willow Street, Fort Collins *Brief orientation at 6:00 PM* PROCESS AND HOW TO PARTICIPATE

More information

Student Services & Classroom Addition

Student Services & Classroom Addition SECTION 260513 - MEDIUM-VOLTAGE CABLES PART 1 - GENERAL 1.1 SUMMARY A. Section includes cables and related cable splices, terminations, and accessories for mediumvoltage (2001 to 35,000 V) electrical distribution

More information

VERIFICATION TEST PLAN

VERIFICATION TEST PLAN VERIFICATION TEST PLAN : System Dynamics Filtering Laboratory Release Date: January 22, 2013 Revision: A PURPOSE The purpose of this document is to outline testing procedures to be used in order to properly

More information

ELECTRICAL SAFETY INSPECTION REPORT. MTM Garments Ltd.

ELECTRICAL SAFETY INSPECTION REPORT. MTM Garments Ltd. ELECTRICAL SAFETY INSPECTION REPORT MTM Garments Ltd. 15934/16004, Chanpara, Medical Road, Uttarkhan, Dhaka, Bangladesh. Factory List MTM Garments Ltd. Inspected by: Hemlal Dahal Report Generated by: Hemlal

More information

Bolt-A-Plate. We Support You.

Bolt-A-Plate.   We Support You. Bolt-A-Plate www.ail.ca We Support You. AIL s Bolt-A-Plate product is used to form the outer rings of wind turbine bases. Helical Corrugated Steel Pipe is used for the inner rings of the bases. Our Commitment

More information

ELECTRICAL SAFETY FOLLOW UP INSPECTION REPORT (8th) Factory Name Address Factory ID

ELECTRICAL SAFETY FOLLOW UP INSPECTION REPORT (8th) Factory Name Address Factory ID Factory Name Address Factory ID Shirir Chala, Bagherbazar 11705 Electrical Safety dates Initial Date 09/07/2014 30/10/2016 Date of 5 th Follow Up Report Received Date 24/08/2014 02/01/2017 Date of 6 th

More information

ISS New Audio & Visual installations Design and Physical install guidelines v1.5

ISS New Audio & Visual installations Design and Physical install guidelines v1.5 ISS New Audio & Visual installations Design and Physical install guidelines v1.5 David Neal 11/05/2018 Contents Background... 3 Installation Standards... 3 Display Screen and Projector positioning... 3

More information

MATERIAL SPECIFICATION FOR SIGNAL HEADS

MATERIAL SPECIFICATION FOR SIGNAL HEADS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 2461 NOVEMBER 2007 MATERIAL SPECIFICATION FOR SIGNAL HEADS TABLE OF CONTENTS 2461.01 SCOPE 2461.02 REFERENCES 2461.03 DEFINITIONS 2461.04 DESIGN AND

More information