KEKB INJECTOR LINAC AND UPGRADE FOR SUPERKEKB

Size: px
Start display at page:

Download "KEKB INJECTOR LINAC AND UPGRADE FOR SUPERKEKB"

Transcription

1 KEKB INJECTOR LINAC AND UPGRADE FOR SUPERKEKB S. Michizono for the KEK electron/positron Injector Linac and the Linac Commissioning Group KEK KEKB injector linac Brief history of the KEK electron linac Continuous injection (CI) scheme Maintenance and R&D at CI scheme Upgrade for SuperKEKB Schematic MOP31 S.Ohsawa et al. Rf source (rf window) THP58 S. Michizono et al. SKIP THP61 T.Sugimura et al. Acceleration structure THP29 T.Kamitani et al. Dummy load Summary Linac Conference 2004 (Aug.,18,2004) 1/32

2 Superconduct ing cavities (HER) Each length: KEKB B-Factory e- ARES copper cavities (HER) 3018 m e+ Belle detector KEKB schematic ARES copper cavities (LER) 8 GeV e- ->HER 3.5 GeV e+ ->LER TRISTAN tunnel e+ target Linac Conference 2004 (Aug.,18,2004) 2/32

3 Operation Statistics PF PF PF/ AR run TRISTAN TRISTAN- AR KEKB const KEKB 2.5GeVe- e+ 8GeVe- / 3.5GeVe+ 8,000 6,000 4,000 2, (1) operation time (hour) (2 ) failure (%) (3) hum an resources year Linac Conference 2004 (Aug.,18,2004) 3/32

4 100,000 hours operation since 1982 Many of them are still working for accelerator physics! Linac Conference 2004 (Aug.,18,2004) 4/32

5 Operation status Total operation time reached 100,000 hours on March,2003. Machine failure is limited less than 5 %. Linac Conference 2004 (Aug.,18,2004) 5/32

6 Continuous Injection (CI) Scheme traditional CI since Jan.,2004 Effective luminosity increases ~20% Linac Conference 2004 (Aug.,18,2004) 6/32

7 Beam on time after CI scheme Careful beam tuning and short maintenance are required at CI. KEKB CI Linac Conference 2004 (Aug.,18,2004) 7/32

8 Dip test In order to find out the emission decrease of the klystrons, dip tests are applied to all the klystrons. Deeper dip -> operation near the shoulder. heater off time: 60 sec. Total measurements: within 10 min. Example of emission decrease 2.00 micro-perviance Sep.,2003 Dec.,2003 Mar.,2004 May, Time [sec.] Linac Conference 2004 (Aug.,18,2004) 8/32

9 Dip test Periodical measurements of the dip -> find out the emission decrease with time D ip tests at klystron gallery /09 12 KLY rem oval 03/12 K LY rem oval % /03 04/ A1 A2 A3 A4 B1 B2 B3 B4 B5 B6 B7 B8 C1 C2 C3 C4 C5 C6 C7 C Klystron gallery unit Linac Conference 2004 (Aug.,18,2004) 9/32

10 Energy spread feedback Feedback systems Energy feedback -> done Position feedback -> done Energy spread feedback -> tested with 8 electrodes BPM Linac Conference 2004 (Aug.,18,2004) 10/32

11 KEKB INJECTOR LINAC AND UPGRADE FOR SUPERKEKB S. Michizono for the KEK electron/positron Injector Linac and the Linac Commissioning Group KEK KEKB injector linac Brief history of the KEK electron linac Continuous injection (CI) scheme Maintenance and R&D at CI scheme Upgrade for SuperKEKB Schematic Rf source SKIP Acceleration structure Dummy load Summary Linac Conference 2004 (Aug.,18,2004) 11/32

12 Schematic of SuperKEKB 8 GeV positron 4.1 A New collision point design 3.5 GeV electron 9.6 A Energy exchange: e-: 8 GeV -> 3.5 GeV e+; 3.5 GeV -> 8 GeV Linac Conference 2004 (Aug.,18,2004) 12/32

13 Upgrade of the injector linac 8 GeV e- / 3.5 GeV e+ 8 GeV e+ / 3.5GeV e- Two-bunch operation kicker ~80 m S-band (2856 MHz) C-band(5712 MHz) (#3 ~ #5 sectors) Linac Conference 2004 (Aug.,18,2004) 13/32

14 Linac Accelerator module (From S-band To C-band) MOP31 S.Ohsawa et al. Present S-band accelerator module New C-band accelerator module Wave guide Pulse Modulator S-band SLED 41 MW 4 µs S-band Klystron Wave guide 40 MW 2 µs C-band compressor Pulse Modulator C-band Klystron Wave guide C-band compressor Pulse Modulator C-band Klystron 40 MW 2 µs S-band accelerating sections C-band accelerating sections Accel. field gradient = 21 MV/m Accel. field gradient = 42 MV/m Linac Conference 2004 (Aug.,18,2004) 14/32

15 Overview of C-band rf system C-band rf system from #3 to #5 sector Forty eight klystrons are installed (instead of 24 S-band klystrons) RFSystem Diagram C-band Plan(example) 10kW AMP. e- 100m 114 MHz SHB1 ElectronGun 100m 571 MHz SHB2 High Power ATT/Phase Shifter 1kW Amp. System Trigger System 20m MR Prebuncher Buncher ACC Guide SB-A 10 MHz 508 MHz 40m 5m SectorA Counter CW 571 MHz 5m SB-B Ref. Signal Generator 114 MHz (FMD-30) Coaxial Lines 30m 80m Sector B MAINDRIVE LINE SB-C 571 MHz SB MHz 30m Optical Lines 15m E/O 1kW Amp. System O/E Driver 60kW S-band Klystron SUB DRIVELINE(39D) IΦA C-band Waveguide Driving Line SUB-BOOSTER 2 50MW S-band Klystron SLED IΦA SUB-BOOSTER kWC-band Klystron SUB DRIVE LINE(WG) 50MC-band Klystron Target ACC ACC Sector C Sector 1 e+ e- Sector 2 Sector 3-1 Sector 3-2 Sector 4-1 Sector4-2 Sector 5-1 Sector MHz SLED Linac Conference 2004 (Aug.,18,2004) 15/32 SB3-2 SB4-1 SB4-2 SB5-1 SB C-band klystrons

16 KEKB INJECTOR LINAC AND UPGRADE FOR SUPERKEKB S. Michizono for the KEK electron/positron Injector Linac and the Linac Commissioning Group KEK KEKB injector linac Brief history of the KEK electron linac Continuous injection (CI) scheme Maintenance and R&D at CI scheme Upgrade for SuperKEKB Schematic Rf source (LLRF, Modulator, high-power klystron, rf window) SKIP Acceleration structure Dummy load Summary Linac Conference 2004 (Aug.,18,2004) 16/32

17 Driver klystron Retune the existing C-band 200 kw klystron for weather observation station (MELCO). Driver klystron (SB) can deliver >100 kw (35 kv). Same modulator and HV supply to S-band system is used. Klystron and magnet kV m ag:22.3a/22.3a/22.3a 35kV m ag:17.0a/17.0a/17.5a 27kV m ag 15.6A/16.8A/11.7A SBK modulator P out[kw ] Pin=0.16W mag:22.3a /22.3A /22.3A 50 P out[kw ] Pin[W ] Linac Conference 2004 (Aug.,18,2004) 17/32 V[kV]

18 Compact modulator By using invertor P.S., the modulator size can be 1/3 (4.7 m->1.8 m). Present PFN and Thyratron are reused at new modulator. Present modulator Compact modulator Thyratron Linac Conference 2004 (Aug.,18,2004) 18/32

19 C-band klystron C-band 50 MW klystron is commercially available. (developed by KEK for linear collider) Y. Ohkubo, H. Yonezawa, T. Shintake, H. Matsumoto and N. Akasaka, HighTHE C-BAND 50MW KLYSTRON USING TRAVELING-WAVE OUTPUT STRUCTURE, Linac98, Chicago, p.932. Linac Conference 2004 (Aug.,18,2004) 19/32

20 R&D of c-band rf window Requirements: 50 MW 2 µs ( S-band 50 MW 4 µs) About Sixty S-band rf windows are successfully operated in KEKB linac. (MTBF > 40,000 h.) Electric fileds should be less than rf windows used in S-band linac. Mix-mode window (TE11+TM11) enables to lower the edge electric field. Electric field at center of the ceramics [MV/m@50MW] Electric field at edge of the ceramics [MV/m@50MW] Maximum electric field on the ceramics [MV/m@50MW] S-band C-band Band width [MHz](VSWR<1.2) VSWR M Hz frequency [GHz] THP58 S. Michizono et al. Linac Conference 2004 (Aug.,18,2004) 20/32

21 Mix-mode rf window 4-Rc1/8 ネジ 4-1/4"SWL FLANGE- MALE FLANGE- FEMALE ( ) ( ) ( ) THP58 S. Michizono et al. Linac Conference 2004 (Aug.,18,2004) 21/32

22 Resonant ring in the shield High power tests of the window was carried out by resonant ring. Rough tuning: spacer Fine tuning: operation frequency (5712-> MHz) RF window THP58 S. Michizono et al. Linac Conference 2004 (Aug.,18,2004) 22/32

23 Results at resonant ring Maximum operation power of 300 MW (2μs), corresponding to 6-times larger than specification (50 MW). Only 3-times rf trips during 8 hours operation at 300 MW. Rf power (300 MW) THP58 S. Michizono et al. Linac Conference 2004 (Aug.,18,2004) 23/32

24 SKIP (SuperKEKB Injector Pulse compressor) Mode: TE015(SLED)-> TE038(LIPS) Similar cavity size to present S-band SLED. Higher Q value. Output 200 MW input Power magnification:4.7 (lower than calculated value(5.5) due to slower switching time) THP61 T.Sugimura et al. Q 0 =13200 coupling β = 6.6 Linac Conference 2004 (Aug.,18,2004) 24/32

25 KEKB INJECTOR LINAC AND UPGRADE FOR SUPERKEKB S. Michizono for the KEK electron/positron Injector Linac and the Linac Commissioning Group KEK KEKB injector linac Brief history of the KEK electron linac Continuous injection (CI) scheme Maintenance and R&D at CI scheme Upgrade for SuperKEKB Schematic Rf source (LLRF, Modulator, high-power klystron, rf window) SKIP Acceleration structure Dummy load Summary Linac Conference 2004 (Aug.,18,2004) 25/32

26 C-band accel. section (First prototype) 54 regular cells 1m-long iris diameter 2a: ~ mm Based on present S-band acceleration structure THP29 T.Kamitani et al. Filling Time t F = 234 nsec Linac Conference 2004 (Aug.,18,2004) 26/32

27 C-band accel. section installed in KEKB linac (2003 September) S-band section C-band section THP29 T.Kamitani et al. Linac Conference 2004 (Aug.,18,2004) 27/32

28 Beam acceleration study Energy gain measured by changing acceleration phase with 43.8 MW x 0.5 µs RF pulse ~80 MV THP29 T.Kamitani et al. Linac Conference 2004 (Aug.,18,2004) 28/32

29 Inside of the acceleration structure Discharge every 10 min. even after conditioning. It took place around input coupler (rf wave analysis). Discharge traces observed input coupler and first disk. output input THP29 T.Kamitani et al. Discharge location analyzed by rf waves. Coupler from inside Coupler iris from outside First disk (2a) Linac Conference 2004 (Aug.,18,2004) 29/32

30 Second acceleration structure Thicker iris Wider coupler 2 nd acceleration structure High power Aug., st coupler 2 nd coupler THP29 T.Kamitani et al. Linac Conference 2004 (Aug.,18,2004) 30/32

31 Dummy load Newly designed 2kW Matsumoto-type dummy load 26 SiC cylinders SiC diameter 12 mm High power test OK up to 2 kw (100 MW peak) heat distribution (norm alized by peak) Heat distribution C -band dummy load heat distribution dum m y N o.1 dum m y N o.3 design value Linac Conference 2004 (Aug.,18,2004) 31/32 distance from a bottom (mm)

32 Summary S-band linac has been operated > 100,000 hours. The failure rate is about 5% and it contributes to the stable KEKB operation. C-band R & D is in progress. High power test of the prototype C-band accelerator module has been performed since October Most of the components are working well. (Remaining issues) Breakdown at input coupler -> 2 nd acc. structure inverter P.S. troubles -> long term operation (related presentations tomorrow) Rf window : THP58 S. Michizono et al. SKIP: THP61 T.Sugimura et al. Acc. structure THP29 T.Kamitani et al. Linac Conference 2004 (Aug.,18,2004) 32/32

Linac upgrade plan using a C-band system for SuperKEKB

Linac upgrade plan using a C-band system for SuperKEKB Linac upgrade plan using a C-band system for SuperKEKB S. Fukuda, M. Akemono, M. Ikeda, T. Oogoe, T. Ohsawa, Y. Ogawa, K. Kakihara, H. Katagiri, T. Kamitani, M. Sato, T. Shidara, A. Shirakawa, T. Sugimura,

More information

Present Status and Future Upgrade of KEKB Injector Linac

Present Status and Future Upgrade of KEKB Injector Linac Present Status and Future Upgrade of KEKB Injector Linac Kazuro Furukawa, for e /e + Linac Group Present Status Upgrade in the Near Future R&D towards SuperKEKB 1 Machine Features Present Status and Future

More information

First Simultaneous Top-up Operation of Three Different Rings in KEK Injector Linac

First Simultaneous Top-up Operation of Three Different Rings in KEK Injector Linac First Simultaneous Top-up Operation of Three Different Rings in KEK Injector Linac Masanori Satoh (Acc. Lab., KEK) for the injector upgrade group 2010/9/16 1 Overview of Linac Beam Operation 2010/9/16

More information

Detailed Design Report

Detailed Design Report Detailed Design Report Chapter 4 MAX IV Injector 4.6. Acceleration MAX IV Facility CHAPTER 4.6. ACCELERATION 1(10) 4.6. Acceleration 4.6. Acceleration...2 4.6.1. RF Units... 2 4.6.2. Accelerator Units...

More information

Trigger-timing signal distribution system for the KEK electron/positron injector linac

Trigger-timing signal distribution system for the KEK electron/positron injector linac Trigger-timing signal distribution system for the KEK electron/positron injector linac T. Suwada, 1 K. Furukawa, N. Kamikubota, and M. Satoh, Accelerator Laboratory, High Energy Accelerator Research Organization

More information

Diamond RF Status (RF Activities at Daresbury) Mike Dykes

Diamond RF Status (RF Activities at Daresbury) Mike Dykes Diamond RF Status (RF Activities at Daresbury) Mike Dykes ASTeC What is it? What does it do? Diamond Status Linac Booster RF Storage Ring RF Summary Content ASTeC ASTeC was formed in 2001 as a centre of

More information

Status of KEK X-band Test Facility and its future plans

Status of KEK X-band Test Facility and its future plans Status of KEK X-band Test Facility and its future plans Shuji Matsumoto Accelerator Lab., KEK 5/30/2007 US High Field Gradient Collaboration Workshop, SLAC. 1 Contents The New X-band Test Facility (XTF)

More information

PEP II Design Outline

PEP II Design Outline PEP II Design Outline Balša Terzić Jefferson Lab Collider Review Retreat, February 24, 2010 Outline General Information Parameter list (and evolution), initial design, upgrades Collider Ring Layout, insertions,

More information

3 cerl. 3-1 cerl Overview. 3-2 High-brightness DC Photocathode Gun and Gun Test Beamline

3 cerl. 3-1 cerl Overview. 3-2 High-brightness DC Photocathode Gun and Gun Test Beamline 3 cerl 3-1 cerl Overview As described before, the aim of the cerl in the R&D program includes the development of critical components for the ERL, as well as the construction of a test accelerator. The

More information

Current status of XFEL/SPring-8 project and SCSS test accelerator

Current status of XFEL/SPring-8 project and SCSS test accelerator Current status of XFEL/SPring-8 project and SCSS test accelerator Takahiro Inagaki for XFEL project in SPring-8 inagaki@spring8.or.jp Outline (1) Introduction (2) Key technology for compactness (3) Key

More information

INFN School on Electron Accelerators. RF Power Sources and Distribution

INFN School on Electron Accelerators. RF Power Sources and Distribution INFN School on Electron Accelerators 12-14 September 2007, INFN Sezione di Pisa Lecture 7b RF Power Sources and Distribution Carlo Pagani University of Milano INFN Milano-LASA & GDE The ILC Double Tunnel

More information

THE NEXT LINEAR COLLIDER TEST ACCELERATOR: STATUS AND RESULTS * Abstract

THE NEXT LINEAR COLLIDER TEST ACCELERATOR: STATUS AND RESULTS * Abstract SLAC PUB 7246 June 996 THE NEXT LINEAR COLLIDER TEST ACCELERATOR: STATUS AND RESULTS * Ronald D. Ruth, SLAC, Stanford, CA, USA Abstract At SLAC, we are pursuing the design of a Next Linear Collider (NLC)

More information

Status of BESSY II and berlinpro. Wolfgang Anders. Helmholtz-Zentrum Berlin for Materials and Energy (HZB) 20th ESLS-RF Meeting

Status of BESSY II and berlinpro. Wolfgang Anders. Helmholtz-Zentrum Berlin for Materials and Energy (HZB) 20th ESLS-RF Meeting Status of BESSY II and berlinpro Wolfgang Anders Helmholtz-Zentrum Berlin for Materials and Energy (HZB) 20th ESLS-RF Meeting 16.-17.11.2016 at PSI Outline BESSY II Problems with circulators Landau cavity

More information

LCLS RF Reference and Control R. Akre Last Update Sector 0 RF and Timing Systems

LCLS RF Reference and Control R. Akre Last Update Sector 0 RF and Timing Systems LCLS RF Reference and Control R. Akre Last Update 5-19-04 Sector 0 RF and Timing Systems The reference system for the RF and timing starts at the 476MHz Master Oscillator, figure 1. Figure 1. Front end

More information

FIRST SIMULTANEOUS TOP-UP OPERATION OF THREE DIFFERENT RINGS IN KEK INJECTOR LINAC

FIRST SIMULTANEOUS TOP-UP OPERATION OF THREE DIFFERENT RINGS IN KEK INJECTOR LINAC FIRST SIMULTANEOUS TOP-UP OPERATION OF THREE DIFFERENT RINGS IN KEK INJECTOR LINAC M. Satoh #, for the IUC * Accelerator Laboratory, High Energy Accelerator Research Organization (KEK) 1-1 Oho, Tsukuba,

More information

reported by T. Shintake KEK / RIKEN Japan Summary of C-band R&D for Linear Collider at KEK New soft-x-ray FEL Project at RIKEN/SPring-8

reported by T. Shintake KEK / RIKEN Japan Summary of C-band R&D for Linear Collider at KEK New soft-x-ray FEL Project at RIKEN/SPring-8 C-band RF System R&D reported by T. Shintake KEK / RIKEN Japan Summary of C-band R&D for Linear Collider at KEK New soft-x-ray FEL Project at RIKEN/SPring-8 Project was funded in 2001 April Material Science

More information

RF considerations for SwissFEL

RF considerations for SwissFEL RF considerations for H. Fitze in behalf of the PSI RF group Workshop on Compact X-Ray Free Electron Lasers 19.-21. July 2010, Shanghai Agenda Introduction RF-Gun Development C-band development Summary

More information

4.4 Injector Linear Accelerator

4.4 Injector Linear Accelerator 4.4 Injector Linear Accelerator 100 MeV S-band linear accelerator based on the components already built for the S-Band Linear Collider Test Facility at DESY [1, 2] will be used as an injector for the CANDLE

More information

SuperTRISTAN. A possibility of ring collider for Higgs factory. 13 Feb K. Oide (KEK)

SuperTRISTAN. A possibility of ring collider for Higgs factory. 13 Feb K. Oide (KEK) A possibility of ring collider for Higgs factory 13 Feb. 2012 K. Oide (KEK) Inspired by A. Blondel and F. Zimmermann, A High Luminosity e+e- Collider in the LHC tunnel to study the Higgs Boson, V2.1 -

More information

ABORT DIAGNOSTICS AND ANALYSIS DURING KEKB OPERATION

ABORT DIAGNOSTICS AND ANALYSIS DURING KEKB OPERATION ABORT DIAGNOSTICS AND ANALYSIS DURING KEKB OPERATION H. Ikeda*, J. W. Flanagan, T. Furuya, M. Tobiyama, KEK, Tsukuba, Japan M. Tanaka, MELCO SC,Tsukuba, Japan Abstract KEKB has stopped since June 2010

More information

RF Power Generation II

RF Power Generation II RF Power Generation II Klystrons, Magnetrons and Gyrotrons Professor R.G. Carter Engineering Department, Lancaster University, U.K. and The Cockcroft Institute of Accelerator Science and Technology Scope

More information

Experience with the Cornell ERL Injector SRF Cryomodule during High Beam Current Operation

Experience with the Cornell ERL Injector SRF Cryomodule during High Beam Current Operation Experience with the Cornell ERL Injector SRF Cryomodule during High Beam Current Operation Matthias Liepe Assistant Professor of Physics Cornell University Experience with the Cornell ERL Injector SRF

More information

North Damping Ring RF

North Damping Ring RF North Damping Ring RF North Damping Ring RF Outline Overview High Power RF HVPS Klystron & Klystron EPICS controls Cavities & Cavity Feedback SCP diagnostics & displays FACET-specific LLRF LLRF distribution

More information

Jae-Young Choi On behalf of PLS-II Linac team

Jae-Young Choi On behalf of PLS-II Linac team PLS-II Linac 2015. 4. 8. Jae-Young Choi On behalf of PLS-II Linac team Accelerators in Pohang Accelerator Laboratory XFEL (under construction) 400 M$ Machines under installation PLS-II PAL : Chronology

More information

Dark current and multipacting trajectories simulations for the RF Photo Gun at PITZ

Dark current and multipacting trajectories simulations for the RF Photo Gun at PITZ Dark current and multipacting trajectories simulations for the RF Photo Gun at PITZ Introduction The PITZ RF Photo Gun Field simulations Dark current simulations Multipacting simulations Summary Igor Isaev

More information

IOT OPERATIONAL EXPERIENCE ON ALICE AND EMMA AT DARESBURY LABORATORY

IOT OPERATIONAL EXPERIENCE ON ALICE AND EMMA AT DARESBURY LABORATORY IOT OPERATIONAL EXPERIENCE ON ALICE AND EMMA AT DARESBURY LABORATORY A. Wheelhouse ASTeC, STFC Daresbury Laboratory ESLS XVIII Workshop, ELLETRA 25 th 26 th November 2010 Contents Brief Description ALICE

More information

Next Linear Collider. The 8-Pack Project. 8-Pack Project. Four 50 MW XL4 X-band klystrons installed on the 8-Pack

Next Linear Collider. The 8-Pack Project. 8-Pack Project. Four 50 MW XL4 X-band klystrons installed on the 8-Pack The Four 50 MW XL4 X-band klystrons installed on the 8-Pack The Demonstrate an NLC power source Two Phases: 8-Pack Phase-1 (current): Multi-moded SLED II power compression Produce NLC baseline power: 475

More information

Status of RF Power and Acceleration of the MAX IV - LINAC

Status of RF Power and Acceleration of the MAX IV - LINAC Status of RF Power and Acceleration of the MAX IV - LINAC Dionis Kumbaro ESLS RF Workshop 2015 MAX IV Laboratory A National Laboratory for synchrotron radiation at Lunds University 1981 MAX-lab is formed

More information

STATUS OF THE INTERNATIONAL LINEAR COLLIDER

STATUS OF THE INTERNATIONAL LINEAR COLLIDER STATUS OF THE INTERNATIONAL LINEAR COLLIDER K. Yokoya, KEK, Tsukuba, Japan Abstract The International Linear Collider (ILC) is the nextgeneration electron-positron collider. Since the publication of the

More information

The LEP Superconducting RF System

The LEP Superconducting RF System The LEP Superconducting RF System K. Hübner* for the LEP RF Group CERN The basic components and the layout of the LEP rf system for the year 2000 are presented. The superconducting system consisted of

More information

SUMMARY OF THE ILC R&D AND DESIGN

SUMMARY OF THE ILC R&D AND DESIGN SUMMARY OF THE ILC R&D AND DESIGN B. C. Barish, California Institute of Technology, USA Abstract The International Linear Collider (ILC) is a linear electron-positron collider based on 1.3 GHz superconducting

More information

XFEL High Power RF System Recent Developments

XFEL High Power RF System Recent Developments XFEL High Power RF System Recent Developments for the XFEL RF Group Outline XFEL RF System Requirements Overview Basic Layout RF System Main Components Multibeam Klystrons Modulator RF Waveguide Distribution

More information

Status and Plans for PEP-II

Status and Plans for PEP-II Status and Plans for PEP-II John Seeman SLAC Particle and Particle-Astrophysics DOE HEPAP P5 Review April 21, 2006 Topics Luminosity records for PEP-II in October 2005 Fall shut-down upgrades Run 5b turn

More information

Status of CTF3. G.Geschonke CERN, AB

Status of CTF3. G.Geschonke CERN, AB Status of CTF3 G.Geschonke CERN, AB CTF3 layout CTF3 - Test of Drive Beam Generation, Acceleration & RF Multiplication by a factor 10 Drive Beam Injector ~ 50 m 3.5 A - 2100 b of 2.33 nc 150 MeV - 1.4

More information

KARA and FLUTE RF Overview/status

KARA and FLUTE RF Overview/status KARA and FLUTE RF Overview/status Nigel Smale on behalf of IBPT and LAS teams Laboratory for Applications of Synchrotron radiation (LAS) Institute for Beam Physics and Technology (IBPT) KARA KIT The Research

More information

RF Upgrades & Experience At JLab. Rick Nelson

RF Upgrades & Experience At JLab. Rick Nelson RF Upgrades & Experience At JLab Rick Nelson Outline Background: CEBAF / Jefferson Lab History, upgrade requirements & decisions Progress & problems along the way Present status Future directions & concerns

More information

DELIVERY RECORD. Location: Ibaraki, Japan

DELIVERY RECORD. Location: Ibaraki, Japan DELIVERY RECORD Client: Japan Atomic Energy Agency (JAEA) High Energy Accelerator Research Organization (KEK) Facility: J-PARC (Japan Proton Accelerator Research Complex) Location: Ibaraki, Japan 1 October

More information

!"!3

!!3 Abstract A single-mode 500 MHz superconducting cavity cryomodule has been developed at Cornell for the electronpositron collider/synchrotron light source CESR. The Cornell B-cell cavity belongs to the

More information

CLIC Feasibility Demonstration at CTF3

CLIC Feasibility Demonstration at CTF3 CLIC Feasibility Demonstration at CTF3 Roger Ruber Uppsala University, Sweden, for the CLIC/CTF3 Collaboration http://cern.ch/clic-study LINAC 10 MO303 13 Sep 2010 The Key to CLIC Efficiency NC Linac for

More information

NLC - The Next Linear Collider Project NLC R&D. D. L. Burke. DOE Annual Program Review SLAC April 9-11, 2003

NLC - The Next Linear Collider Project NLC R&D. D. L. Burke. DOE Annual Program Review SLAC April 9-11, 2003 DOE Annual Program Review SLAC April 9-11, 2003 NLC Activities for the Past Year Accelerator Design centered around ILC-TRC studies. Technology R&D focused on the RF R&D. Modulator, klystron, SLED-II,

More information

Status of SOLARIS. Paweł Borowiec On behalf of Solaris Team

Status of SOLARIS. Paweł Borowiec On behalf of Solaris Team Status of SOLARIS Paweł Borowiec On behalf of Solaris Team e-mail: pawel.borowiec@uj.edu.pl XX ESLS-RF Meeting, Villingen 16-17.11.2016 Outline 1. Timeline 2. Injector 3. Storage ring 16-17.11.2016 XX

More information

Introduction: CW SRF linac types, requirements and challenges High power RF system architecture

Introduction: CW SRF linac types, requirements and challenges High power RF system architecture RF systems for CW SRF linacs S. Belomestnykh Cornell University Laboratory for Elementary-Particle Physics LINAC08, Victoria, Canada October 1, 2008 Outline L band Introduction: CW SRF linac types, requirements

More information

Spear3 RF System Sam Park 11/06/2003. Spear3 RF System. High Power Components Operation and Control. RF Requirement.

Spear3 RF System Sam Park 11/06/2003. Spear3 RF System. High Power Components Operation and Control. RF Requirement. Spear3 RF System RF Requirement Overall System High Power Components Operation and Control SPEAR 3 History 1996 Low emittance lattices explored 1996 SPEAR 3 proposed 11/97 SPEAR 3 design study team formed

More information

ILC-LNF TECHNICAL NOTE

ILC-LNF TECHNICAL NOTE IL-LNF EHNIAL NOE Divisione Acceleratori Frascati, July 4, 2006 Note: IL-LNF-001 RF SYSEM FOR HE IL DAMPING RINGS R. Boni, INFN-LNF, Frascati, Italy G. avallari, ERN, Geneva, Switzerland Introduction For

More information

STATUS OF THE SWISSFEL C-BAND LINEAR ACCELERATOR

STATUS OF THE SWISSFEL C-BAND LINEAR ACCELERATOR Proceedings of FEL213, New York, NY, USA STATUS OF THE SWISSFEL C-BAND LINEAR ACCELERATOR F. Loehl, J. Alex, H. Blumer, M. Bopp, H. Braun, A. Citterio, U. Ellenberger, H. Fitze, H. Joehri, T. Kleeb, L.

More information

RF plans for ESS. Morten Jensen. ESLS-RF 2013 Berlin

RF plans for ESS. Morten Jensen. ESLS-RF 2013 Berlin RF plans for ESS Morten Jensen ESLS-RF 2013 Berlin Overview The European Spallation Source (ESS) will house the most powerful proton linac ever built. The average beam power will be 5 MW which is five

More information

Towards an X-Band Power Source at CERN and a European Structure Test Facility

Towards an X-Band Power Source at CERN and a European Structure Test Facility Towards an X-Band Power Source at CERN and a European Structure Test Facility Erk Jensen and Gerry McMomagle CERN The X-Band Accelerating Structure Design and Test-Program Workshop Day 2: Structure Testing

More information

Pulses inside the pulse mode of operation at RF Gun

Pulses inside the pulse mode of operation at RF Gun Pulses inside the pulse mode of operation at RF Gun V. Vogel, V. Ayvazyan, K. Floettmann, D. Lipka, P. Morozov, H. Schlarb, S. Schreiber FLASH Seminar, DESY March 29, 2011 Contents Why we need a PiPmode

More information

5 Project Costs and Schedule

5 Project Costs and Schedule 93 5 Project Costs and Schedule 5.1 Overview The cost evaluation for the integrated version of the XFEL with 30 experiments and 35 GeV beam energy as described in the TDR-2001 yielded 673 million EUR for

More information

STATUS OF THE SwissFEL C-BAND LINAC

STATUS OF THE SwissFEL C-BAND LINAC STATUS OF THE SwissFEL C-BAND LINAC F. Loehl, J. Alex, H. Blumer, M. Bopp, H. Braun, A. Citterio, U. Ellenberger, H. Fitze, H. Joehri, T. Kleeb, L. Paly, J.-Y. Raguin, L. Schulz, R. Zennaro, C. Zumbach,

More information

Overview of NLC/JLC Collaboration *

Overview of NLC/JLC Collaboration * SLAC PUB 10117 August 2002 Overview of NLC/JLC Collaboration * K. Takata KEK, Oho, Tsukuba-shi 305-0801, JAPAN On behalf of the NLC Group Stanford Linear Accelerator Center, Stanford, California 94309,

More information

CONSTRUCTION AND COMMISSIONING OF BEPCII

CONSTRUCTION AND COMMISSIONING OF BEPCII Abstract CONSTRUCTION AND COMMISSIONING OF BEPCII C. Zhang, J.Q. Wang, L. Ma and G.X.Pei for the BEPCII Team, IHEP, CAS P.O.Box 918, Beijing 100049, China BEPCII is the major upgrade of BEPC (Beijing Electron-

More information

PoS(EPS-HEP2015)525. The RF system for FCC-ee. A. Butterworth CERN 1211 Geneva 23, Switzerland

PoS(EPS-HEP2015)525. The RF system for FCC-ee. A. Butterworth CERN 1211 Geneva 23, Switzerland CERN 1211 Geneva 23, Switzerland E-mail: andrew.butterworth@cern.ch O. Brunner CERN 1211 Geneva 23, Switzerland E-mail: olivier.brunner@cern.ch R. Calaga CERN 1211 Geneva 23, Switzerland E-mail: rama.calaga@cern.ch

More information

The Construction Status of CSNS Linac

The Construction Status of CSNS Linac The Construction Status of CSNS Linac Sheng Wang Dongguan branch, Institute of High Energy Physics, CAS Sep.2, 2014, Geneva Outline The introduction to CSNS accelerators The commissoning of ion source

More information

Overview of the X-band R&D Program

Overview of the X-band R&D Program Overview of the X-band R&D Program SLAC-PUB-9442 August 2002 Abstract T.O. Raubenheimer Stanford Linear Accelerator Center, Stanford University, Stanford, California 94309 USA An electron/positron linear

More information

SRS and ERLP developments. Andrew moss

SRS and ERLP developments. Andrew moss SRS and ERLP developments Andrew moss Contents SRS Status Latest news Major faults Status Energy Recovery Linac Prototype Latest news Status of the RF system Status of the cryogenic system SRS Status Machine

More information

The Elettra Storage Ring and Top-Up Operation

The Elettra Storage Ring and Top-Up Operation The Elettra Storage Ring and Top-Up Operation Emanuel Karantzoulis Past and Present Configurations 1994-2007 From 2008 5000 hours /year to the users 2010: Operations transition year Decay mode, 2 GeV (340mA)

More information

Availability and Reliability Issues for the ILC

Availability and Reliability Issues for the ILC Availability and Reliability Issues for the ILC SLAC Presented at PAC07 26 June 07 Contents Introduction and purpose of studies The availability simulation What was modeled (important assumptions) Some

More information

ARES Status 2004(JFY)

ARES Status 2004(JFY) ARES Status 2004(JFY) Tetsuo Abe for KEKB-RF/ARES-cavity group High Energy Accelerator Research Organization (KEK) Outline 1. Fundamentals of the ARES-cavity system 2. Operation status 3. D04C/ARES multipactoring

More information

ANKA RF System - Upgrade Strategies

ANKA RF System - Upgrade Strategies ANKA RF System - Upgrade Strategies Vitali Judin ANKA Synchrotron Radiation Facility 2014-09 - 17 KIT University of the State Baden-Wuerttemberg and National Laboratory of the Helmholtz Association www.kit.edu

More information

The basic parameters of the pre-injector are listed in the Table below. 100 MeV

The basic parameters of the pre-injector are listed in the Table below. 100 MeV 3.3 The Pre-injector The high design brightness of the SLS requires very high phase space density of the stored electrons, leading to a comparatively short lifetime of the beam in the storage ring. This,

More information

The ESS Accelerator. For Norwegian Industry and Research. Oslo, 24 Sept Håkan Danared Deputy Head Accelerator Division Group Leader Beam Physics

The ESS Accelerator. For Norwegian Industry and Research. Oslo, 24 Sept Håkan Danared Deputy Head Accelerator Division Group Leader Beam Physics The ESS Accelerator For Norwegian Industry and Research Oslo, 24 Sept 2013 Håkan Danared Deputy Head Accelerator Division Group Leader Beam Physics The Hadron Intensity Frontier Courtesy of M. Seidel (PSI)

More information

The PEFP 20-MeV Proton Linear Accelerator

The PEFP 20-MeV Proton Linear Accelerator Journal of the Korean Physical Society, Vol. 52, No. 3, March 2008, pp. 721726 Review Articles The PEFP 20-MeV Proton Linear Accelerator Y. S. Cho, H. J. Kwon, J. H. Jang, H. S. Kim, K. T. Seol, D. I.

More information

Introduction to CTF3. G.Geschonke CERN / PS

Introduction to CTF3. G.Geschonke CERN / PS Introduction to CTF3 G.Geschonke CERN / PS Aim of review: Review the technical solutions are they realistic? Give us technical advice Comment on alternatives Guide our funding bodies: CERN Collaborations

More information

The ALS RF systems, upgrades and ALS-U plans

The ALS RF systems, upgrades and ALS-U plans The ALS RF systems, upgrades and ALS-U plans M. Betz*, K. Baptiste, Q. Du, M. Vinco, S. Virostek 06/27/2018, CWRF2018, Hsinchu, Taiwan * mbetz@lbl.gov Outline Structure of this talk RF systems in the Advanced

More information

The KEKB injector linac

The KEKB injector linac Prog. Theor. Exp. Phys. 2013, 03A002 (38 pages) DOI: 10.1093/ptep/ptt011 KEKB Accelerator The KEKB injector linac Mitsuo Akemoto, Dai Arakawa, Atsushi Enomoto, Shigeki Fukuda, Yoshihiro Funakoshi, Kazuro

More information

Upgrading LHC Luminosity

Upgrading LHC Luminosity 1 Upgrading LHC Luminosity 2 Luminosity (cm -2 s -1 ) Present (2011) ~2 x10 33 Beam intensity @ injection (*) Nominal (2015?) 1 x 10 34 1.1 x10 11 Upgraded (2021?) ~5 x10 34 ~2.4 x10 11 (*) protons per

More information

Evaluation of Performance, Reliability, and Risk for High Peak Power RF Sources from S-band through X-band for Advanced Accelerator Applications

Evaluation of Performance, Reliability, and Risk for High Peak Power RF Sources from S-band through X-band for Advanced Accelerator Applications Evaluation of Performance, Reliability, and Risk for High Peak Power RF Sources from S-band through X-band for Advanced Accelerator Applications Michael V. Fazio C. Adolphsen, A. Jensen, C. Pearson, D.

More information

Activities on FEL Development and Application at Kyoto University

Activities on FEL Development and Application at Kyoto University Activities on FEL Development and Application at Kyoto University China-Korea-Japan Joint Workshop on Electron / Photon Sources and Applications Dec. 2-3, 2010 @ SINAP, Shanghai Kai Masuda Inst. Advanced

More information

9th ESLS RF Meeting September ALBA RF System. F. Perez. RF System 1/20

9th ESLS RF Meeting September ALBA RF System. F. Perez. RF System 1/20 ALBA RF System F. Perez RF System 1/20 ALBA Synchrotron Light Source in Barcelona (Spain) 3 GeV accelerator 30 beamlines (7 on day one) 50-50 Spanish Government Catalan Government First beam for users

More information

A HIGH-POWER SUPERCONDUCTING H - LINAC (SPL) AT CERN

A HIGH-POWER SUPERCONDUCTING H - LINAC (SPL) AT CERN A HIGH-POWER SUPERCONDUCTING H - LINAC (SPL) AT CERN E. Chiaveri, CERN, Geneva, Switzerland Abstract The conceptual design of a superconducting H - linear accelerator at CERN for a beam energy of 2.2 GeV

More information

Low Level RF for PIP-II. Jonathan Edelen LLRF 2017 Workshop (Barcelona) 16 Oct 2017

Low Level RF for PIP-II. Jonathan Edelen LLRF 2017 Workshop (Barcelona) 16 Oct 2017 Low Level RF for PIP-II Jonathan Edelen LLRF 2017 Workshop (Barcelona) 16 Oct 2017 PIP-II LLRF Team Fermilab Brian Chase, Edward Cullerton, Joshua Einstein, Jeremiah Holzbauer, Dan Klepec, Yuriy Pischalnikov,

More information

Operational experience with the SOLEIL LINAC and Status of the ThomX LINAC project

Operational experience with the SOLEIL LINAC and Status of the ThomX LINAC project Operational experience with the SOLEIL LINAC and Status of the ThomX LINAC project 16/11/2016 20th ELS-RF Workshop Pollina JP 1 and Status of the ThomX LINAC project Operational experience with the SOLEIL

More information

PULSED MODULATOR TECHNOLOGY

PULSED MODULATOR TECHNOLOGY PULSED MODULATOR TECHNOLOGY Hiroshi MATSUMOTO J-PARC/KEK CONTENTS 1. VARIOUS REQUIREMENT OF THE RECENT MODULATORS SHORT PULSE WIDTH (~µsec) LONG PULSE WIDTH (~msec) AND HIGH REP. RATE. (200 Hz) OUTPUT

More information

LLRF at SSRF. Yubin Zhao

LLRF at SSRF. Yubin Zhao LLRF at SSRF Yubin Zhao 2017.10.16 contents SSRF RF operation status Proton therapy LLRF Third harmonic cavity LLRF Three LINAC LLRF Hard X FEL LLRF (future project ) Trip statistics of RF system Trip

More information

High-gradient C-band linac for a compact x-ray free-electron laser facility

High-gradient C-band linac for a compact x-ray free-electron laser facility PHYSICAL REVIEW SPECIAL TOPICS - ACCELERATORS AND BEAMS 17, 080702 (2014) High-gradient C-band linac for a compact x-ray free-electron laser facility T. Inagaki, * C. Kondo, H. Maesaka, T. Ohshima, Y.

More information

KEKB Accelerator Physics Report

KEKB Accelerator Physics Report KEKB Accelerator Physics Report Y. Funakoshi for the KEKB commissioning group KEK, 1-1 Oho, Tsukuba, Ibaraki 305-0801,Japan Abstract 1 INTRODUCTION The KEKB B-Factory is an electron-positron double ring

More information

J/NLC Progress on R1 and R2 Issues. Chris Adolphsen

J/NLC Progress on R1 and R2 Issues. Chris Adolphsen J/NLC Progress on R1 and R2 Issues Chris Adolphsen Charge to the International Linear Collider Technical Review Committee (ILC-TRC) To assess the present technical status of the four LC designs at hand,

More information

Jefferson Lab Experience with Beam Halo, Beam Loss, etc.

Jefferson Lab Experience with Beam Halo, Beam Loss, etc. Jefferson Lab Experience with Beam Halo, Beam Loss, etc. Pavel Evtushenko with a lot of input from many experienced colleagues Steve Benson, Dave Douglas, Kevin Jordan, Carlos Hernandez-Garcia, Dan Sexton,

More information

PULSED POWER FOR FUTURE LINEAR ACCELERATORS

PULSED POWER FOR FUTURE LINEAR ACCELERATORS PULSED POWER FOR FUTURE LINEAR ACCELERATORS Peter D. Pearce High-energy accelerators High-energy accelerators enable us to collide particle beams together and create conditions believed to be similar to

More information

STATUS AND FUTURE PROSPECTS OF CLIC

STATUS AND FUTURE PROSPECTS OF CLIC STATUS AND FUTURE PROSPECTS OF CLIC S. Döbert, for the CLIC/CTF3 collaboration, CERN, Geneva, Switzerland Abstract The Compact Linear Collider (CLIC) is studied by a growing international collaboration.

More information

DESIGN OF 1.2-GEV SCL AS NEW INJECTOR FOR THE BNL AGS*

DESIGN OF 1.2-GEV SCL AS NEW INJECTOR FOR THE BNL AGS* DESIGN OF 1.2-GEV SCL AS NEW INJECTOR FOR THE BNL AGS* A. G. Ruggiero, J. Alessi, M. Harrison, M. Iarocci, T. Nehring, D. Raparia, T. Roser, J. Tuozzolo, W. Weng. Brookhaven National Laboratory, PO Box

More information

What can be learned from HERA Experience for ILC Availability

What can be learned from HERA Experience for ILC Availability What can be learned from HERA Experience for ILC Availability August 17, 2005 F. Willeke, DESY HERA Performance Critical Design Decisions What could be avoided if HERA would have to be built again? HERA

More information

Operational Status of PF-Ring and PF-AR after the Earthquake

Operational Status of PF-Ring and PF-AR after the Earthquake Journal of Physics: Conference Series Operational Status of PF-Ring and PF-AR after the Earthquake To cite this article: T Honda et al 2013 J. Phys.: Conf. Ser. 425 042014 Related content - Design and

More information

PEP II STATUS AND PLANS *

PEP II STATUS AND PLANS * PEP II STATUS AND PLANS * John T. Seeman + Stanford Linear Accelerator Center, Stanford University, Stanford, CA 94309 USA The PEP II B-Factory 1 project is an e + e - colliding beam storage ring complex

More information

RECENT PROGRESS IN UPGRADE OF THE HIGH INTENSITY THzzz zz-fel AT OzSAKzA UNIVERSITYzzzz

RECENT PROGRESS IN UPGRADE OF THE HIGH INTENSITY THzzz zz-fel AT OzSAKzA UNIVERSITYzzzz RECENT PROGRESS IN UPGRADE OF THE HIGH INTENSITY THzzz zz-fel AT OzSAKzA UNIVERSITYzzzz G. Isoyama#, M. Fujimoto, S. Funakoshi, K. Furukawa, A. Irizawa, R. Kato, K. Kawase, A. Tokuchi, R. Tsutsumi, M.

More information

X-Band Klystron Development at

X-Band Klystron Development at X-Band Klystron Development at SLAC Slide 1 The Beginning X-band klystron work began at SLAC in the mid to late 80 s to develop high frequency (4x SLAC s-band), high power RF sources for the linear collider

More information

Program Risks Risk Analysis Fallback Plans for the. John T. Seeman DOE PEP-II Operations Review April 26, 2006

Program Risks Risk Analysis Fallback Plans for the. John T. Seeman DOE PEP-II Operations Review April 26, 2006 Program Risks Risk Analysis Fallback Plans for the PEP-II B-FactoryB John T. Seeman DOE PEP-II Operations Review April 26, 2006 OPS Review Topics Are there any PEP-II program risks? Has the laboratory

More information

DEVELOPMENT OF X-BAND KLYSTRON TECHNOLOGY AT SLAC

DEVELOPMENT OF X-BAND KLYSTRON TECHNOLOGY AT SLAC DEVELOPMENT OF X-BAND KLYSTRON TECHNOLOGY AT SLAC George Caryotakis, Stanford Linear Accelerator Center P.O. Box 4349 Stanford, CA 94309 Abstract * The SLAC design for a 1-TeV collider (NLC) requires klystrons

More information

DESIGN AND PERFORMANCE OF L-BAND AND S-BAND MULTI BEAM KLYSTRONS

DESIGN AND PERFORMANCE OF L-BAND AND S-BAND MULTI BEAM KLYSTRONS DESIGN AND PERFORMANCE OF L-BAND AND S-BAND MULTI BEAM KLYSTRONS Y. H. Chin, KEK, Tsukuba, Japan. Abstract Recently, there has been a rising international interest in multi-beam klystrons (MBK) in the

More information

TITLE PAGE. Title of paper: PUSH-PULL FEL, A NEW ERL CONCEPT Author: Andrew Hutton. Author Affiliation: Jefferson Lab. Requested Proceedings:

TITLE PAGE. Title of paper: PUSH-PULL FEL, A NEW ERL CONCEPT Author: Andrew Hutton. Author Affiliation: Jefferson Lab. Requested Proceedings: TITLE PAGE Title of paper: PUSH-PULL FEL, A NEW ERL CONCEPT Author: Andrew Hutton Author Affiliation: Jefferson Lab Requested Proceedings: Unique Session ID: Classification Codes: Keywords: Energy Recovery,

More information

NSLS-II RF Systems James Rose, Radio Frequency Group Leader PAC 2011

NSLS-II RF Systems James Rose, Radio Frequency Group Leader PAC 2011 NSLS-II RF Systems James Rose, Radio Frequency Group Leader PAC 2011 1 BROOKHAVEN SCIENCE ASSOCIATES Introduction Linac RF cavities and klystrons Booster Cavity-Transmitter Storage Ring 500 MHz SRF cavity

More information

PRESENT STATUS OF J-PARC

PRESENT STATUS OF J-PARC PRESENT STATUS OF J-PARC # F. Naito, KEK, Tsukuba, Japan Abstract Japan Proton Accelerator Research Complex (J-PARC) is the scientific facility with the high-intensity proton accelerator aiming to realize

More information

30 GHz Power Production / Beam Line

30 GHz Power Production / Beam Line 30 GHz Power Production / Beam Line Motivation & Requirements Layout Power mode operation vs. nominal parameters Beam optics Achieved performance Problems Beam phase switch for 30 GHz pulse compression

More information

ESS Linac WP8 Radio Frequency Systems and Test Facilities

ESS Linac WP8 Radio Frequency Systems and Test Facilities ESS Linac WP8 Radio Frequency Systems and Test Facilities ESS/SPL Collaboration Meeting Lund, 29 June 2010 Roger Ruber (Uppsala University) for the ESS Linac RF Team ESS Linac WP8: RF Systems Outline Work

More information

A HIGH POWER LONG PULSE HIGH EFFICIENCY MULTI BEAM KLYSTRON

A HIGH POWER LONG PULSE HIGH EFFICIENCY MULTI BEAM KLYSTRON A HIGH POWER LONG PULSE HIGH EFFICIENCY MULTI BEAM KLYSTRON A.Beunas and G. Faillon Thales Electron Devices, Vélizy, France S. Choroba DESY, Hamburg, Germany Abstract THALES ELECTRON DEVICES has developed

More information

2 Work Package and Work Unit descriptions. 2.8 WP8: RF Systems (R. Ruber, Uppsala)

2 Work Package and Work Unit descriptions. 2.8 WP8: RF Systems (R. Ruber, Uppsala) 2 Work Package and Work Unit descriptions 2.8 WP8: RF Systems (R. Ruber, Uppsala) The RF systems work package (WP) addresses the design and development of the RF power generation, control and distribution

More information

Commissioning the TAMUTRAP RFQ cooler/buncher. E. Bennett, R. Burch, B. Fenker, M. Mehlman, D. Melconian, and P.D. Shidling

Commissioning the TAMUTRAP RFQ cooler/buncher. E. Bennett, R. Burch, B. Fenker, M. Mehlman, D. Melconian, and P.D. Shidling Commissioning the TAMUTRAP RFQ cooler/buncher E. Bennett, R. Burch, B. Fenker, M. Mehlman, D. Melconian, and P.D. Shidling In order to efficiently load ions into a Penning trap, the ion beam should be

More information

Operating Experience and Reliability Improvements on the 5 kw CW Klystron at Jefferson Lab

Operating Experience and Reliability Improvements on the 5 kw CW Klystron at Jefferson Lab Operating Experience and Reliability Improvements on the 5 kw CW Klystron at Jefferson Lab Richard Walker & Richard Nelson Jefferson Lab, Newport News VA Jefferson Lab is a $600M Department of Energy facility

More information