LH Systems International Status and Prospects

Size: px
Start display at page:

Download "LH Systems International Status and Prospects"

Transcription

1 LH Systems International Status and Prospects Liang Liu, Jiangang Li, Fukun Liu, Jiafang Shan, Bojiang Ding, Hua Jia, Miaohui Li, Mao Wang, Lianmin Zhao Institute of Plasma Physics, Chinese Academy of Sciences 15 th -18 th, Nov. 2016, KIT, Karlsruhe, Germany

2 Outline Introduction Current status and future plan of LH systems Some consideration for Demo LHCD Summary 2

3 Function of LHCD for DEMO LHCD is a powerful tool for DEMO To drive far off-axis current and to save the volt-second during the current ramp-up phase To suppress or mitigate ELMs and to optimize the heat load distribution on the divertor plates Demonstration of the effect of LHCD on ELM behavior by modulating LH power in a series of target H-mode plasmas produced by ICRH with different q 95 IR image of the outer lower divertor plate in a toroidal range of φ=1.3π-1.5π rad during the application of LHW. J. Li et al., Nature Physics 9, (2013) Y. Liang et al., PRL 110, (2013) 3

4 Defects of LHCD for DEMO Poor accessibility Deficiency of LHCD for DEMO CD efficiency could be degraded sharply with density increasing, due to PI, CA, and SDF. CD efficiency would be affected by high temperature. Including the effects of collisional damping Without ne~0.9 x10 20 m -3 (black), ne~1.1x10 20 m -3 (Red) PI measured by Langmuir Probes in C-mod PI occurs at higher density PI can occur in either HFS or LFS S G Baek, et al., PPCF 55 (2013) CA in SOL may decrease CD efficiency (GENRY/C3QLD) G M Wallace et al., Phys. of Plasmas 17 (2010)

5 Outline Introduction Current status and future plan of LH systems Tore Supra LH system FTU LH system C-Mod LH system KSTAR LH system EAST LH system ITER LH system Some consideration for Demo LHCD Summary 5

6 Tore Supra LHCD system Designed for long pulse operation 1996: 2 minutes long pulses 2003: World record 6 min,1 GJ injected 2011: 6.3 MW/150s, 1 GJ injected Generator: 16 CW klystrons, f = 3.7GHz PAM n // = TH2103C klystron FAM n // = MW available / 1000 s Klystron efficiency: 37.4% Launchers: Fully Active Multi-junction (FAM) First operation in MW - 25MW/m s Passive Active Multi-junction (PAM) First operation in 2009, ITER relevant design 2.7MW - 25MW/m s 6

7 Tore Supra current experimental results ITER-relevant power density on PAM Long pulse operation # E LHCD = 220MJ 2.75MW (25MW/m 2 ) coupled with PAM for 78 seconds Low RC (< 2%) at large plasmalauncher gap (> 10cm) E Total = 960MJ 5.3MW LHCD combined with 1MW ICRH Ip=0.7MA; >150s ne= m -3 Higher LHCD power widens operational space (n e, I P ) for long pulse operation. 7

8 Tore Supra LH research plan Development of oversized components for transmission line of a reactor-relevant LH system CEA ENEA IPR Collaboration F=3.7GHz Rectangular / Circular Convertor Over-sized waveguides low RF losses Corrugated waveguides to avoid spurious modes in bends R&D for the slotted waveguide antenna Low power prototype has been manufactured First test will be carried out on the Compass tokamak 5GHz / low field side Limiter fixing structure Corrugated Bend Rectangular / Circular Convertor Transition to WR187 SWA 8

9 Outline Introduction Current status and future plan of LH systems Tore Supra LH system FTU LH system C-Mod LH system KSTAR LH system EAST LH system ITER LH system Some consideration for Demo LHCD Summary 9

10 FTU LHCD system 8 GHz, 6 MW, 1 s LHCD system, aiming at studying high density plasmas B Tmax =8T Density max = m -3 8GHz gyrotron assembly, TE 0 51 output mode Oversized C18 WG transmitting TE 0 01 mode 2 classical grill Power splitter - Mode convertor Using gyrotron as RF sources Circular WG => Rec WG Classical grill Gyrotron 8GHz 1MW 1s TE 01 => TE 10 LHCD Module 10

11 FTU LHCD PAM launcher Demonstrate coupling characteristics of the launcher No cooling (1s pulse length) PAM (R.C 2%) Vs CG (R.C~15%) PAM (Dp~65%) Vs CG (Dp~80%) The very first prototype of a PAM launcher has been tested To demonstrate the optimum coupling characteristics in presence of the expected really harsh ignited plasma s characteristics of the future fusion machines PAM and CG performances PAM performance FTU PAM layout PAM experiment on FTU (EX/5-5) - 20 th FEC.Villamoura 1-6 Nov, V. Pericoli Ridolfini et al FTU PAM view 11

12 Outline Introduction Current status and future plan of LH systems Tore Supra LH system FTU LH system C-Mod LH system KSTAR LH system EAST LH system ITER LH system Some consideration for Demo LHCD Summary 12

13 Alcator C-Mod LHCD system Investigate LH physics with ITER-like parameters Source: 250kW 4.6GHz klystrons Power: 4MW Antenna: 16 four-way splitters Mid-plane launcher LH2 CPI VKC-7849 klystron Above mid-plane launcher LH3 design Parasitic edge power losses are considered to cause unexpectedly large degradation of LH efficiency at high density LH3 aims to minimize parasitic edge power losses by enhancing strong single pass power absorption LH3 is designed to maximize synergistic effects between LH2, by placing the launcher off-midplane and selecting N// higher than LH2 S. Shiraiwa et al, Plasma and Fusion Research, Vol 8, (2013) 13

14 Outline Introduction Current status and future plan of LH systems Tore Supra LH system FTU LH system C-Mod LH system KSTAR LH system EAST LH system ITER LH system Some consideration for Demo LHCD Summary 14

15 Current status of KSTAR LH system Control q profile aiming for high beta plasmas Generator: E3762 klystron - Toshiba Electron Tubes and Devices 5GHz 0.5MW CW with matched load Transmission line: Oversized rectangular WR-284 (80m, ~34% loss) Launcher: Grill type with 4-way splitter 8 N // ~ 2.0 P LH ~ 100 kw (15% reflection) [#11145] Grill type antenna R=1.78m R=1.35m ECE P FWD [kw] P REV [kw] <ne> [x10 19 /m 3 ] Observation of plasma response by 100 kw LH power Changes of ECE radiation spectrum were observed Measurement of deposition profile using HXR camera will be tried 15

16 KSTAR LH research plan Minor upgrade of current system before 2021 Prototype of Mid-plane PAM launcher is under development Basic RF design was completed Mock-up construction is planned KSTAR new mid-plane PAM launcher # P2.32, J. Kim, Development of 4-MW KSTAR LHCD system, SOFT 2016 # P2.33, T. Seong, Mode Converters for Low-loss Transmission-line of KSTAR LHCD system, SOFT 2016 Test of low loss transmission line system propagating circular TE 01 mode Cold model developed for TE 10 to TE 01 mode converter MW - Antenna & system ~ Study on launching position and N // Antenna Design & Development System Development Experiment LHCD upgrade is planned after 2021 Mid-plane, off mid-plane, or high field side launching are under consideration 5GHz 4MW with low loss transmission line 16

17 Outline Introduction Current status and future plan of LH systems Tore Supra LH system FTU LH system C-Mod LH system KSTAR LH system EAST LH system ITER LH system Some consideration for Demo LHCD Summary 17

18 Overview of EAST LHCD system EAST aims at high performance long pulse operations 4.6GHz 6MW LHCD Consists of two LH systems 2.45GHz LH 4.6GHz LH EAST Hall RF Source 200kW kW 24 Transmission WR430 WR229 Line ~15% loss ~25% loss Active WG = Active WG = 2.45GHz 4MW LHCD Launcher Passive WG = Passive WG = Location of EAST LHCD system Top view Play a key role concerning the controllability of shaping plasma current profile rather than plasma heating 2.45GHz 2MW LH: Start of operation in 2008 Upgraded 2.45GHz 4MW LH: Start of operation in GHz 6MW LH: Start of operation in GHz and 2.45GHz LH antenna spectrum (ALOHA code) 18

19 Two LH systems on EAST Transmission line Antenna Klystron EAST Output power: 6MW Frequency: 4600±5MHz Pulse length: CW Power spectrum: 1.79~2.23 VKC-7849A klystron 4.6GHz Multi-junction 576A+84P The framework of 2.45GHz LHCD system for EAST KU-2.45B klystron parameters Parameters Value Units Frequency 2.45 GHz Output power 200 kw Input power 0.3~1.0 W Gain 53 db Input HV power Max.420 kw Beam voltage -40~-46 kv Beam current 10 A Efficiency 50 % Klystrons and Transmission lines 19

20 LHCD experiments on EAST 4.6GHz LHCD Long pulse discharge with LH (1.8MW) + EC (0.4MW), 0.4MA for 102s, ne~ m -3, Te 0 ~5keV 2.45GHz LHCD Minute-scale H-mode operation with LH (2.5MW) + IC (0.8MW) + EC (0.3MW), 0.45MA for 61s, ne~ m -3 20

21 Outline Introduction Current status and future plan of LH systems Tore Supra LH system FTU LH system C-Mod LH system KSTAR LH system EAST LH system ITER LH system Some consideration for Demo LHCD Summary 21

22 ITER LHCD programme ITER is an important step towards DEMO 20MW 5GHz system N // = for all scenarios ITER main parameters Parameters ITER To drive far off-axis current, at ρ= current profile control in advanced regimes To save volt-second during the current ramp-up phase Report of the EFDA Task, WP09-HCD LH4IT Summary of the main results from LHCD calculations for ITER Toroidal field (plasma center) 5.3 T Major radius 6.2 m Minor radius 2.0 m Elongation (95%) 1.7 Plasma current (MA) 15.0 <n e > [10 19 ] 6.7 m -3 β N 3.0 Scenario Steady-state (4) Inductive (2) Hybird Ramp-up Optimum n // <1.75 Corresponding I LH 0.70 MA 0.45 MA 0.60 MA >3.0 MA Corresponding r/a <0.50 I LH for n // = MA 0.40 MA 0.60 MA 2.40 MA A scan in the injected N// was systematically performed also accounting for variations in the temperature and density profiles in order to characterize the performance and robustness of the scheme 22

23 ITER PAM launcher Nuclear heating on PAM components Nuclear Heating (due to neutron and secondary gamma) Component Plasma facing components (PFC) MW PAM 4 WG 1.31 PAM 2 WG HFSS model for ITER PAM-B launcher (DDD-2001) 20MW/5GHz/CW 1.5 times the cut-off density 3.1x10 17 m -3 PAM 1 WG Mode converter + Tapers Shield Secondary Window Frame 1.71 Stainless steel CuCrZr Overall nuclear load ~ 3MW Mostly deposited on the PAM 4 WG region Various materials for PAM front copper or copper alloy, for thermal and electrical conductivity Be PAM front thermal analysis stainless-steel, for mechanical strength and reduce Foucault currents beryllium (Be), facing the plasma, to prevent pollution of the plasma with high z materials 23

24 ITER LH installation 2 x 48 RF windows (500kW/CW) 48 rectangular T-Lines (or 24 circular T-Lines) 48 Klystrons 500kW / CW To minimize the interaction with the ICRH antenna and to improve the power coupling in ELMy plasmas Foreseen distance between the klystrons and the launcher, could be reduced at about 40m for minimum RF losses Report of the EFDA Task, WP09-HCD LH4IT Side view of LH system near Port # 11 Port # 11 24

25 Outline Introduction Current status and future plan of LH systems Some consideration for Demo LHCD Summary 25

26 The choice of LH frequency is determined by complicated trade-off between manifold counteracting elements Technological viability of RF sources Alpha particle absorption High power RF source for DEMO Accessibility requirements and multipactor effect Several tens of MW coupled power is required by DEMO Comparison between different operation frequency 3.7GHz 4.6GHz 5GHz Klystron TH2103C VKC-7849A E3762 Output power ~700kW/CW 250kW/CW 500kW/CW Manufacturer Thales Electron Devices Communications & Power Industries Conclusion Alpha particle can absorb a significant part of the coupled power Limited output power, requiring a higher number of klystron Toshiba Electron Tubes & Devices Maybe best choice 26

27 High field side launcher HFS launching offers significant advantages over LFS launching ADX Main parameters Major/Minor Radius Magnetic Field Plasma Current P AUX (net) 0.73 / 0.2 m 6.5 Tesla (8 Tesla) 1.5 MA 8 MW ICRF 2 MW LHCD J LH [A/cm 2 ] LFS launch 0.5 MA / 10 MW HFS launch 0.7 MA / 10 MW Advanced Divertor and RF Experiment Divertor and firstwall material Pulse Length Tungsten/Molybdenum 3s, with 1s flat-top Lower N // of the waves yields a higher CD efficiency Higher B opens the window between wave accessibility and the condition for strong ELD, allowing LH waves from the HFS to penetrate into the core of burning plasma, while waves launched from the LFS are restricted to the periphery of the plasma G.M. Wallace, SOFE

28 High field side launcher High field side launch is highly favorable for LHCD Transport in tokamak sends heat and particles to LFS SOL Quiescent SOL eliminates the need to couple LH waves across a long distance to the separatrix Measurements show impurities penetration is 10 times smaller on HFS HFS mid-plane has 25% lower neutron wall loading than LFS HFS location gives space at LFS for tritium breeding < 10 cm ADX HFS LH launcher The engineering of HFS launcher seems more difficult simply due to the smaller area on the inside of the torus Transportation in LFS SOL Simulated ITER neutron flux VULCAN Podpaly, et al., FED 87 (2012) 215. G.M. Wallace, SOFE

29 More effective CD HFS LH + Top EC LFS I LH =1.43MA f=4.6ghz P=30MW N//=1.8 I LH =1.83MA f=4.6ghz P=30MW N//=1.8 HFS CFETR (Chinese Fusion Engineering Test Reactor) Simulation Results HFS power injection has a higher CD efficiency than LFS injection The synergy of both HFS LH and top EC has a significant higher CD efficiency than LFS LH & LFS EC HFS LHCD TOP ECCD I = 0.3MA I CD =4.0MA LFS LHCD LFS ECCD I = 0.34MA I CD =2.49MA 29

30 Passive Active Multi-junction PAM launcher is a good candidate for Demo LHCD Conventional grill Multi-junction PAM C-Mod KSTAR EAST JET JT-60 Tore Supra FTU ITER Heavy heat load and different plasma configurations In the H mode plasma, the edge density will decrease rapidly enough Long distance coupling (>10cm) Powerful water cooling capacity Good mechanical stiffness Less radiating surface PAM Structure 30

31 Local gas puffing improving coupling Density and density gradient determining wave-plasma coupling Operation with large plasma-launcher gap H-mode edge 4.6GHz LHCD Local gas puffing Gas puffing is utilized to improve coupling(e.g., CD 4, D 2 ) JT-60U, ASDEX, JET, Tore-supra, EAST Local gas puffing 2.45GHz LHCD Top view P LHCD (MW) RC (%) Good LH coupling obtained at plasma-launcher distance up to 15cm, using local gas injection in H-mode plasmas. A. Ekedahl et al., PPCF, 51 (2009) JET H-mode plasmas 12-13cm -2cm Da Gas puffing is efficient to improve LHW-plasma coupling, especially from electron-side R.C EAST plasmas with / without local gas puffing 31

32 RAMI Analysis RAMI is an acronym of Reliability, Availability, Maintainability, Inspectability Indispensable for Demo tokamak and its auxiliary systems Assuring continuous operations in specified conditions Reliability: Assuring lowest failure rate during system operation. Availability: Determined by reliability and maintainability of the whole system. Functional relation between RAMI elements Maintainability: Prompting restoration of the full performance of the system Inspectability: Directly affecting the maintainability for inspection and replacement of faulty items. If λ i is the failure rate of the i th subsystem, the failure rate λ S of the whole LHCD module is: LHCD Module Block Schematic S i i 32

33 Definition of RAMI elements Reliability, survival probability R t e t Maintainability, probability to be repaired with λ = failure rate defined as: t 1 N dn dt [no. of failures 10 6 hours] Availability, probability to be in operation The inherent availability is defined as: A MTTF MTTF MTTR M t 1 e t with μ = repair rate of the item. Inspectability, not time dependant It depends only on the experience of the designers. Take ITER for example to analyze Klystron Sub-assembly Unit Failure Rate [h -1 ] Klystron (500 kw CW) Anode HVPS Focusing Coils Sub-assembly HV Thank Total The 48 klystrons must be considered a series structure from reliability point of view To have a high availability of the LHCD system, at least 10 spare klystrons must be stored at the system site 33

34 R&D needed for Demo LHCD Key components of Transmission line: RF window (500kW/CW), Mode filters, Mode converter Be adapted to Demo, in terms of minimization of the number of the TL Antenna front: R&D a new front end to LH launcher exposed to Demo harsh environment RF source development: Higher frequency (>=5GHz) & higher power (>=500kW/CW) klystron 34

35 Outline Introduction Current status and future plan of LH systems Some consideration for Demo LHCD Summary 35

36 Summary Corrugated oversized waveguides should be used for transmission lines to reduce RF loss and to avoid spurious modes, and try to shorten the distance between the RF source and the launcher. 5GHz maybe the best choice for DEMO LH operation frequency. The mechanisms affecting CD efficiency show that edge parameters play an important role, how to effectively control the edge parameters is a challenge. LHW-plasma coupling can be improved by local gas puffing, and grill density feedback-control is necessary. Complex systems must be carefully split into self consistency elementary functional units, for each unit a reasonable number of spare units must be adequately stored. Real-time protection of antenna during long pulses and survey of the erosion of the front face are key points in view of application of LHCD on a reactor. Some components such as high power klystron, new front to launcher, key transmission line devices need urgently R&D. 36

37 Acknowledge Specially thank: F Mirizzi (FTU), M Goniche (Tore Supra), A Ekedahl (Tore Supra), S Shiraiwa (C-Mod), J Kim (KSTAR) Thank: Tore Supra LH group, FTU team and LHCD staff, Alcator C-Mod LHCD group, KSTAR LH group We acknowledge: J Hillairet, T Hoang, J-M Bernard, L Delpech, W Helou, M Prou, S Ceccuzzi, P K Sharma, G Wallace, R Parker, O Meneghini, Y.S. Bae, S. Wang 37

A New 4MW LHCD System for EAST

A New 4MW LHCD System for EAST 1 EXW/P7-29 A New 4MW LHCD System for EAST Jiafang SHAN 1), Yong YANG 1), Fukun LIU 1), Lianmin ZHAO 1) and LHCD Team 1) 1) Institute of Plasma Physics, Chinese Academy of Sciences, Hefei, China E-mail

More information

A HIGH POWER LONG PULSE HIGH EFFICIENCY MULTI BEAM KLYSTRON

A HIGH POWER LONG PULSE HIGH EFFICIENCY MULTI BEAM KLYSTRON A HIGH POWER LONG PULSE HIGH EFFICIENCY MULTI BEAM KLYSTRON A.Beunas and G. Faillon Thales Electron Devices, Vélizy, France S. Choroba DESY, Hamburg, Germany Abstract THALES ELECTRON DEVICES has developed

More information

Detailed Design Report

Detailed Design Report Detailed Design Report Chapter 4 MAX IV Injector 4.6. Acceleration MAX IV Facility CHAPTER 4.6. ACCELERATION 1(10) 4.6. Acceleration 4.6. Acceleration...2 4.6.1. RF Units... 2 4.6.2. Accelerator Units...

More information

Development of high power gyrotron and EC technologies for ITER

Development of high power gyrotron and EC technologies for ITER 1 Development of high power gyrotron and EC technologies for ITER K. Sakamoto 1), K.Kajiwara 1), K. Takahashi 1), Y.Oda 1), A. Kasugai 1), N. Kobayashi 1), M.Henderson 2), C.Darbos 2) 1) Japan Atomic Energy

More information

Pulsed Klystrons for Next Generation Neutron Sources Edward L. Eisen - CPI, Inc. Palo Alto, CA, USA

Pulsed Klystrons for Next Generation Neutron Sources Edward L. Eisen - CPI, Inc. Palo Alto, CA, USA Pulsed Klystrons for Next Generation Neutron Sources Edward L. Eisen - CPI, Inc. Palo Alto, CA, USA Abstract The U.S. Department of Energy (DOE) Office of Science has funded the construction of a new accelerator-based

More information

Experimental Results of the Coaxial Multipactor Experiment. T.P. Graves, B. LaBombard, S.J. Wukitch, I.H. Hutchinson PSFC-MIT

Experimental Results of the Coaxial Multipactor Experiment. T.P. Graves, B. LaBombard, S.J. Wukitch, I.H. Hutchinson PSFC-MIT Experimental Results of the Coaxial Multipactor Experiment T.P. Graves, B. LaBombard, S.J. Wukitch, I.H. Hutchinson PSFC-MIT Summary A multipactor discharge is a resonant condition for electrons in an

More information

Investigation of Radio Frequency Breakdown in Fusion Experiments

Investigation of Radio Frequency Breakdown in Fusion Experiments Investigation of Radio Frequency Breakdown in Fusion Experiments T.P. Graves, S.J. Wukitch, I.H. Hutchinson MIT Plasma Science and Fusion Center APS-DPP October 2003 Albuquerque, NM Outline Multipactor

More information

TEST RESULTS OF THE 84 GHZ / 200 KW / CW GYROTRON

TEST RESULTS OF THE 84 GHZ / 200 KW / CW GYROTRON TEST RESULTS OF THE 84 GHZ / 200 KW / CW GYROTRON V.I. Belousov, A.A.Bogdashov, G.G.Denisov, V.I.Kurbatov, V.I.Malygin, S.A.Malygin, V.B.Orlov, L.G.Popov, E.A.Solujanova, E.M.Tai, S.V.Usachov Gycom Ltd,

More information

Multipactor-induced induced neutral pressure limits on Alcator C-Mod ICRF Performance

Multipactor-induced induced neutral pressure limits on Alcator C-Mod ICRF Performance Multipactor-induced induced neutral pressure limits on Alcator C-Mod ICRF Performance T. P. Graves, B. LaBombard, S. J. Wukitch, I. H. Hutchinson MIT Plasma Science and Fusion Center American Physical

More information

45 MW, 22.8 GHz Second-Harmonic Multiplier for High-Gradient Tests*

45 MW, 22.8 GHz Second-Harmonic Multiplier for High-Gradient Tests* US High Gradient Research Collaboration Workshop. SLAC, May 23-25, 2007 45 MW, 22.8 GHz Second-Harmonic Multiplier for High-Gradient Tests* V.P. Yakovlev 1, S.Yu. Kazakov 1,2, and J.L. Hirshfield 1,3 1

More information

RF plans for ESS. Morten Jensen. ESLS-RF 2013 Berlin

RF plans for ESS. Morten Jensen. ESLS-RF 2013 Berlin RF plans for ESS Morten Jensen ESLS-RF 2013 Berlin Overview The European Spallation Source (ESS) will house the most powerful proton linac ever built. The average beam power will be 5 MW which is five

More information

RF Power Generation II

RF Power Generation II RF Power Generation II Klystrons, Magnetrons and Gyrotrons Professor R.G. Carter Engineering Department, Lancaster University, U.K. and The Cockcroft Institute of Accelerator Science and Technology Scope

More information

Low Frequency Gyrotrons for Fusion

Low Frequency Gyrotrons for Fusion 13th Joint Workshop on Electron Cyclotron Emission and Electron Cyclotron Resonance Heating Nizhny Novgorod, Russia May 17-20, 2004 РАН Low Frequency Gyrotrons for Fusion НПП ГИКОМ V.E. Zapevalov, Yu.K.

More information

Experimental results and recent developments on the EU 2 MW 170 GHz coaxial cavity gyrotron for ITER

Experimental results and recent developments on the EU 2 MW 170 GHz coaxial cavity gyrotron for ITER Experimental results and recent developments on the EU 2 MW 170 GHz coaxial cavity gyrotron for ITER S. Kern 1, J.-P. Hogge 2, S. Alberti 2, K. Avramides 3, G. Gantenbein 1, S. Illy 1, J. Jelonnek 1, J.

More information

DEVELOPMENT OF A 10 MW SHEET BEAM KLYSTRON FOR THE ILC*

DEVELOPMENT OF A 10 MW SHEET BEAM KLYSTRON FOR THE ILC* DEVELOPMENT OF A 10 MW SHEET BEAM KLYSTRON FOR THE ILC* D. Sprehn, E. Jongewaard, A. Haase, A. Jensen, D. Martin, SLAC National Accelerator Laboratory, Menlo Park, CA 94020, U.S.A. A. Burke, SAIC, San

More information

Budget and Schedule. Alcator C Mod. DoE Review Co-Operative Agreement Renewal May 13-14, 2003

Budget and Schedule. Alcator C Mod. DoE Review Co-Operative Agreement Renewal May 13-14, 2003 Budget and Schedule DoE Review 2003-2008 Co-Operative Agreement Renewal May 13-14, 2003 presented by E. S. Marmar on behalf of the C-Mod Group National Budget Profiles Guidance 5 Year Proposal Institution

More information

Evaluation of Performance, Reliability, and Risk for High Peak Power RF Sources from S-band through X-band for Advanced Accelerator Applications

Evaluation of Performance, Reliability, and Risk for High Peak Power RF Sources from S-band through X-band for Advanced Accelerator Applications Evaluation of Performance, Reliability, and Risk for High Peak Power RF Sources from S-band through X-band for Advanced Accelerator Applications Michael V. Fazio C. Adolphsen, A. Jensen, C. Pearson, D.

More information

IOT RF Power Sources for Pulsed and CW Linacs

IOT RF Power Sources for Pulsed and CW Linacs LINAC 2004 Lübeck, August 16 20, 2004 IOT RF Power Sources H. Bohlen, Y. Li, Bob Tornoe Communications & Power Industries Eimac Division, San Carlos, CA, USA Linac RF source property requirements (not

More information

CPI Gyrotrons For Fusion EC Heating

CPI Gyrotrons For Fusion EC Heating CPI Gyrotrons For Fusion EC Heating H. Jory, M. Blank, P. Borchard, P. Cahalan, S. Cauffman, T. S. Chu, and K. Felch CPI, Microwave Power Products Division 811 Hansen Way, Palo Alto, CA 94303, USA e-mail:

More information

Recent ITER-Relevant Gyrotron Tests

Recent ITER-Relevant Gyrotron Tests Journal of Physics: Conference Series Recent ITER-Relevant Gyrotron Tests To cite this article: K Felch et al 2005 J. Phys.: Conf. Ser. 25 13 View the article online for updates and enhancements. Related

More information

INFN School on Electron Accelerators. RF Power Sources and Distribution

INFN School on Electron Accelerators. RF Power Sources and Distribution INFN School on Electron Accelerators 12-14 September 2007, INFN Sezione di Pisa Lecture 7b RF Power Sources and Distribution Carlo Pagani University of Milano INFN Milano-LASA & GDE The ILC Double Tunnel

More information

Experience with the Cornell ERL Injector SRF Cryomodule during High Beam Current Operation

Experience with the Cornell ERL Injector SRF Cryomodule during High Beam Current Operation Experience with the Cornell ERL Injector SRF Cryomodule during High Beam Current Operation Matthias Liepe Assistant Professor of Physics Cornell University Experience with the Cornell ERL Injector SRF

More information

DESIGN AND PERFORMANCE OF L-BAND AND S-BAND MULTI BEAM KLYSTRONS

DESIGN AND PERFORMANCE OF L-BAND AND S-BAND MULTI BEAM KLYSTRONS DESIGN AND PERFORMANCE OF L-BAND AND S-BAND MULTI BEAM KLYSTRONS Y. H. Chin, KEK, Tsukuba, Japan. Abstract Recently, there has been a rising international interest in multi-beam klystrons (MBK) in the

More information

TOSHIBA Industrial Magnetron E3328

TOSHIBA Industrial Magnetron E3328 TOSHIBA E3328 is a fixed frequency continuous wave magnetron intended for use in the industrial microwave heating applications. The average output power is 3kW in the frequency range from 2450 to 2470

More information

18 GHz, 2.2 kw KLYSTRON GENERATOR GKP 24KP 18GHz WR62 3x400V

18 GHz, 2.2 kw KLYSTRON GENERATOR GKP 24KP 18GHz WR62 3x400V 18 GHz, 2.2 kw KLYSTRON GENERATOR GKP 24KP 18GHz WR62 3x400V With its characteristics of power stability whatever the load, very fast response time when pulsed (via external modulated signal), low ripple,

More information

Development of High Power Vacuum Tubes for Accelerators and Plasma Heating

Development of High Power Vacuum Tubes for Accelerators and Plasma Heating Development of High Power Vacuum Tubes for Accelerators and Plasma Heating Vishnu Srivastava Microwave Tubes Division, CSIR-Central Electronics Engineering Research Institute, Pilani-333031, Rajasthan,

More information

Dark current and multipacting trajectories simulations for the RF Photo Gun at PITZ

Dark current and multipacting trajectories simulations for the RF Photo Gun at PITZ Dark current and multipacting trajectories simulations for the RF Photo Gun at PITZ Introduction The PITZ RF Photo Gun Field simulations Dark current simulations Multipacting simulations Summary Igor Isaev

More information

Next Linear Collider. The 8-Pack Project. 8-Pack Project. Four 50 MW XL4 X-band klystrons installed on the 8-Pack

Next Linear Collider. The 8-Pack Project. 8-Pack Project. Four 50 MW XL4 X-band klystrons installed on the 8-Pack The Four 50 MW XL4 X-band klystrons installed on the 8-Pack The Demonstrate an NLC power source Two Phases: 8-Pack Phase-1 (current): Multi-moded SLED II power compression Produce NLC baseline power: 475

More information

Development of Multiple Beam Guns for High Power RF Sources for Accelerators and Colliders

Development of Multiple Beam Guns for High Power RF Sources for Accelerators and Colliders SLAC-PUB-10704 Development of Multiple Beam Guns for High Power RF Sources for Accelerators and Colliders R. Lawrence Ives*, George Miram*, Anatoly Krasnykh @, Valentin Ivanov @, David Marsden*, Max Mizuhara*,

More information

Oak Ridge Spallation Neutron Source Proton Power Upgrade Project and Second Target Station Project

Oak Ridge Spallation Neutron Source Proton Power Upgrade Project and Second Target Station Project Oak Ridge Spallation Neutron Source Proton Power Upgrade Project and Second Target Station Project Workshop on the future and next generation capabilities of accelerator driven neutron and muon sources

More information

14 GHz, 2.2 kw KLYSTRON GENERATOR GKP 22KP 14GHz WR62 3x400V

14 GHz, 2.2 kw KLYSTRON GENERATOR GKP 22KP 14GHz WR62 3x400V 14 GHz, 2.2 kw KLYSTRON GENERATOR GKP 22KP 14GHz WR62 3x400V With its characteristics of power stability independent of the load, very fast response time when pulsed (via external modulated signal), low

More information

Modulator Overview System Design vs. Tunnel Topologies. Snowmass Workshop August 16, 2005 Ray Larsen for the SLAC ILC Group

Modulator Overview System Design vs. Tunnel Topologies. Snowmass Workshop August 16, 2005 Ray Larsen for the SLAC ILC Group Modulator Overview System Design vs. Tunnel Topologies Snowmass Workshop August 16, 2005 Ray Larsen for the SLAC ILC Group Outline! I. Modulator Options vs. Topologies! II. Preliminary Cost Estimates!

More information

Spear3 RF System Sam Park 11/06/2003. Spear3 RF System. High Power Components Operation and Control. RF Requirement.

Spear3 RF System Sam Park 11/06/2003. Spear3 RF System. High Power Components Operation and Control. RF Requirement. Spear3 RF System RF Requirement Overall System High Power Components Operation and Control SPEAR 3 History 1996 Low emittance lattices explored 1996 SPEAR 3 proposed 11/97 SPEAR 3 design study team formed

More information

!"!3

!!3 Abstract A single-mode 500 MHz superconducting cavity cryomodule has been developed at Cornell for the electronpositron collider/synchrotron light source CESR. The Cornell B-cell cavity belongs to the

More information

Partial detachment of high power discharges in ASDEX Upgrade

Partial detachment of high power discharges in ASDEX Upgrade Partial detachment of high power discharges in ASDEX Upgrade Arne Kallenbach, M. Bernert, M. Beurskens, L. Casali, T. Eich, L. Giannone, A. Herrmann, M. Maraschek, S. Potzel, F. Reimold, V. Rohde, J. Schweinzer,

More information

EMC at ITER. D. Beltran Electrical Engineering Division ITER Organization. RF & Hyper Conference Paris, 24 th May 2011

EMC at ITER. D. Beltran Electrical Engineering Division ITER Organization. RF & Hyper Conference Paris, 24 th May 2011 RF & Hyper Conference Paris, 24 th May 2011 EMC at ITER D. Beltran Electrical Engineering Division ITER Organization RF & Hyper Conference, 24 th May 2011, ITER_D_ Page 1 Outline 1. ITER introduction 2.

More information

The Construction Status of CSNS Linac

The Construction Status of CSNS Linac The Construction Status of CSNS Linac Sheng Wang Dongguan branch, Institute of High Energy Physics, CAS Sep.2, 2014, Geneva Outline The introduction to CSNS accelerators The commissoning of ion source

More information

Performance of a DC GaAs photocathode gun for the Jefferson lab FEL

Performance of a DC GaAs photocathode gun for the Jefferson lab FEL Nuclear Instruments and Methods in Physics Research A 475 (2001) 549 553 Performance of a DC GaAs photocathode gun for the Jefferson lab FEL T. Siggins a, *, C. Sinclair a, C. Bohn b, D. Bullard a, D.

More information

650MHz/800kW Klystron Development at IHEP

650MHz/800kW Klystron Development at IHEP 650MHz/800kW Klystron Development at IHEP Shilun Pei, IHEP On behalf of HERSC (High Efficiency RF Source R&D Collaboration) in China Presentation at the IAS Program on High Energy Physics January 22, 2018,

More information

J/NLC Progress on R1 and R2 Issues. Chris Adolphsen

J/NLC Progress on R1 and R2 Issues. Chris Adolphsen J/NLC Progress on R1 and R2 Issues Chris Adolphsen Charge to the International Linear Collider Technical Review Committee (ILC-TRC) To assess the present technical status of the four LC designs at hand,

More information

The PEFP 20-MeV Proton Linear Accelerator

The PEFP 20-MeV Proton Linear Accelerator Journal of the Korean Physical Society, Vol. 52, No. 3, March 2008, pp. 721726 Review Articles The PEFP 20-MeV Proton Linear Accelerator Y. S. Cho, H. J. Kwon, J. H. Jang, H. S. Kim, K. T. Seol, D. I.

More information

ANKA RF System - Upgrade Strategies

ANKA RF System - Upgrade Strategies ANKA RF System - Upgrade Strategies Vitali Judin ANKA Synchrotron Radiation Facility 2014-09 - 17 KIT University of the State Baden-Wuerttemberg and National Laboratory of the Helmholtz Association www.kit.edu

More information

Status of BESSY II and berlinpro. Wolfgang Anders. Helmholtz-Zentrum Berlin for Materials and Energy (HZB) 20th ESLS-RF Meeting

Status of BESSY II and berlinpro. Wolfgang Anders. Helmholtz-Zentrum Berlin for Materials and Energy (HZB) 20th ESLS-RF Meeting Status of BESSY II and berlinpro Wolfgang Anders Helmholtz-Zentrum Berlin for Materials and Energy (HZB) 20th ESLS-RF Meeting 16.-17.11.2016 at PSI Outline BESSY II Problems with circulators Landau cavity

More information

A tapered multi-gap multi-aperture pseudospark-sourced electron gun based X-band slow wave oscillator

A tapered multi-gap multi-aperture pseudospark-sourced electron gun based X-band slow wave oscillator A tapered multi-gap multi-aperture pseudospark-sourced electron gun based X-band slow wave oscillator N. Kumar 1, R. P. Lamba 1, A. M. Hossain 1, U. N. Pal 1, A. D. R. Phelps and R. Prakash 1 1 CSIR-CEERI,

More information

RF Solutions for Science.

RF Solutions for Science. RF Solutions for Science www.thalesgroup.com State-of-the-art RF sources for your scientific needs High-power klystrons HIGH KLYSTRONS WITH RF LONG PULSE above 50 μs Thales has been one of the leading

More information

Karin Rathsman. Calculations on the RF Source and Distribution

Karin Rathsman. Calculations on the RF Source and Distribution Accelerator Division ESS AD Technical Note ESS/AD/0002 Karin Rathsman Calculations on the RF Source and Distribution 26 March 2010 Calculations on the rf source and distribution system for the ESS elliptical

More information

STATUS OF THE SWISSFEL C-BAND LINEAR ACCELERATOR

STATUS OF THE SWISSFEL C-BAND LINEAR ACCELERATOR Proceedings of FEL213, New York, NY, USA STATUS OF THE SWISSFEL C-BAND LINEAR ACCELERATOR F. Loehl, J. Alex, H. Blumer, M. Bopp, H. Braun, A. Citterio, U. Ellenberger, H. Fitze, H. Joehri, T. Kleeb, L.

More information

Operating Experience and Reliability Improvements on the 5 kw CW Klystron at Jefferson Lab

Operating Experience and Reliability Improvements on the 5 kw CW Klystron at Jefferson Lab Operating Experience and Reliability Improvements on the 5 kw CW Klystron at Jefferson Lab Richard Walker & Richard Nelson Jefferson Lab, Newport News VA Jefferson Lab is a $600M Department of Energy facility

More information

3 cerl. 3-1 cerl Overview. 3-2 High-brightness DC Photocathode Gun and Gun Test Beamline

3 cerl. 3-1 cerl Overview. 3-2 High-brightness DC Photocathode Gun and Gun Test Beamline 3 cerl 3-1 cerl Overview As described before, the aim of the cerl in the R&D program includes the development of critical components for the ERL, as well as the construction of a test accelerator. The

More information

Pseudospark-sourced Micro-sized Electron Beams for High Frequency klystron Applications

Pseudospark-sourced Micro-sized Electron Beams for High Frequency klystron Applications Pseudospark-sourced Micro-sized Electron Beams for High Frequency klystron Applications H. Yin 1*, D. Bowes 1, A.W. Cross 1, W. He 1, K. Ronald 1, A. D. R. Phelps 1, D. Li 2 and X. Chen 2 1 SUPA, Department

More information

THE NEXT LINEAR COLLIDER TEST ACCELERATOR: STATUS AND RESULTS * Abstract

THE NEXT LINEAR COLLIDER TEST ACCELERATOR: STATUS AND RESULTS * Abstract SLAC PUB 7246 June 996 THE NEXT LINEAR COLLIDER TEST ACCELERATOR: STATUS AND RESULTS * Ronald D. Ruth, SLAC, Stanford, CA, USA Abstract At SLAC, we are pursuing the design of a Next Linear Collider (NLC)

More information

4.4 Injector Linear Accelerator

4.4 Injector Linear Accelerator 4.4 Injector Linear Accelerator 100 MeV S-band linear accelerator based on the components already built for the S-Band Linear Collider Test Facility at DESY [1, 2] will be used as an injector for the CANDLE

More information

Empirical Model For ESS Klystron Cathode Voltage

Empirical Model For ESS Klystron Cathode Voltage Empirical Model For ESS Klystron Cathode Voltage Dave McGinnis 2 March 2012 Introduction There are 176 klystrons in the superconducting portion of ESS linac. The power range required spans a factor of

More information

SLAC R&D Program for a Polarized RF Gun

SLAC R&D Program for a Polarized RF Gun ILC @ SLAC R&D Program for a Polarized RF Gun SLAC-PUB-11657 January 2006 (A) J. E. CLENDENIN, A. BRACHMANN, D. H. DOWELL, E. L. GARWIN, K. IOAKEIMIDI, R. E. KIRBY, T. MARUYAMA, R. A. MILLER, C. Y. PRESCOTT,

More information

IOT OPERATIONAL EXPERIENCE ON ALICE AND EMMA AT DARESBURY LABORATORY

IOT OPERATIONAL EXPERIENCE ON ALICE AND EMMA AT DARESBURY LABORATORY IOT OPERATIONAL EXPERIENCE ON ALICE AND EMMA AT DARESBURY LABORATORY A. Wheelhouse ASTeC, STFC Daresbury Laboratory ESLS XVIII Workshop, ELLETRA 25 th 26 th November 2010 Contents Brief Description ALICE

More information

Design Studies For The LCLS 120 Hz RF Gun Injector

Design Studies For The LCLS 120 Hz RF Gun Injector BNL-67922 Informal Report LCLS-TN-01-3 Design Studies For The LCLS 120 Hz RF Gun Injector X.J. Wang, M. Babzien, I. Ben-Zvi, X.Y. Chang, S. Pjerov, and M. Woodle National Synchrotron Light Source Brookhaven

More information

Design and Simulation of High Power RF Modulated Triode Electron Gun. A. Poursaleh

Design and Simulation of High Power RF Modulated Triode Electron Gun. A. Poursaleh Design and Simulation of High Power RF Modulated Triode Electron Gun A. Poursaleh National Academy of Sciences of Armenia, Institute of Radio Physics & Electronics, Yerevan, Armenia poursaleh83@yahoo.com

More information

CEPC Klystron Development

CEPC Klystron Development CEPC Klystron Development Zusheng Zhou On behalf of High Efficiency RF Source R&D Collaboration Institute of High Energy Physics Sep. 26, 2018, HKUST, Hong Kong 1 Outline Strategy and plan 650MHz/800kW

More information

Introduction: CW SRF linac types, requirements and challenges High power RF system architecture

Introduction: CW SRF linac types, requirements and challenges High power RF system architecture RF systems for CW SRF linacs S. Belomestnykh Cornell University Laboratory for Elementary-Particle Physics LINAC08, Victoria, Canada October 1, 2008 Outline L band Introduction: CW SRF linac types, requirements

More information

RF Upgrades & Experience At JLab. Rick Nelson

RF Upgrades & Experience At JLab. Rick Nelson RF Upgrades & Experience At JLab Rick Nelson Outline Background: CEBAF / Jefferson Lab History, upgrade requirements & decisions Progress & problems along the way Present status Future directions & concerns

More information

Commissioning the TAMUTRAP RFQ cooler/buncher. E. Bennett, R. Burch, B. Fenker, M. Mehlman, D. Melconian, and P.D. Shidling

Commissioning the TAMUTRAP RFQ cooler/buncher. E. Bennett, R. Burch, B. Fenker, M. Mehlman, D. Melconian, and P.D. Shidling Commissioning the TAMUTRAP RFQ cooler/buncher E. Bennett, R. Burch, B. Fenker, M. Mehlman, D. Melconian, and P.D. Shidling In order to efficiently load ions into a Penning trap, the ion beam should be

More information

THE DESIGN OF A LEAD-BISMUTH TARGET SYSTEM WITH A DUAL INJECTION TUBE

THE DESIGN OF A LEAD-BISMUTH TARGET SYSTEM WITH A DUAL INJECTION TUBE THE DESIGN OF A LEAD-BISMUTH TARGET SYSTEM WITH A DUAL INJECTION TUBE Chungho Cho, Yonghee Kim, Tae Yung Song, Won Seok Park Korea Atomic Energy Research Institute, Korea Abstract A spallation target system

More information

GA A26497 SOLID-STATE HIGH-VOLTAGE CROWBAR UTILIZING SERIES-CONNECTED THYRISTORS

GA A26497 SOLID-STATE HIGH-VOLTAGE CROWBAR UTILIZING SERIES-CONNECTED THYRISTORS GA A26497 SOLID-STATE HIGH-VOLTAGE CROWBAR by J.F. Tooker, P. Huynh, and R.W. Street JUNE 2009 DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government.

More information

RF Power Klystrons & 20 Year Look. R. Nelson 7/15/15

RF Power Klystrons & 20 Year Look. R. Nelson 7/15/15 RF Power Klystrons & 20 Year Look R. Nelson 7/15/15 RF Power klystrons 8 x 13 kw klystrons Page 2 Why A klystron? Best (only) choice at the time - 1988 Easy to use: Input (drive), output (to CM), power

More information

DESIGN AND TECHNOLOGICAL ASPECTS OF KLYSTRON DEVELOPMENT

DESIGN AND TECHNOLOGICAL ASPECTS OF KLYSTRON DEVELOPMENT DESIGN AND TECHNOLOGICAL ASPECTS OF KLYSTRON DEVELOPMENT Dr. L M Joshi Emeritus Scientist CSIR-CEERI, PILANI lmj1953@gmail.com 22 February 2017 IPR 1 Schemetic Diagram 22 February 2017 IPR 2 Basic Principle

More information

Design, Fabrication and Testing of Gun-Collector Test Module for 6 MW Peak, 24 kw Average Power, S-Band Klystron

Design, Fabrication and Testing of Gun-Collector Test Module for 6 MW Peak, 24 kw Average Power, S-Band Klystron Available online www.ejaet.com European Journal of Advances in Engineering and Technology, 2014, 1(1): 11-15 Research Article ISSN: 2394-658X Design, Fabrication and Testing of Gun-Collector Test Module

More information

ILC-LNF TECHNICAL NOTE

ILC-LNF TECHNICAL NOTE IL-LNF EHNIAL NOE Divisione Acceleratori Frascati, July 4, 2006 Note: IL-LNF-001 RF SYSEM FOR HE IL DAMPING RINGS R. Boni, INFN-LNF, Frascati, Italy G. avallari, ERN, Geneva, Switzerland Introduction For

More information

Status of RF Power and Acceleration of the MAX IV - LINAC

Status of RF Power and Acceleration of the MAX IV - LINAC Status of RF Power and Acceleration of the MAX IV - LINAC Dionis Kumbaro ESLS RF Workshop 2015 MAX IV Laboratory A National Laboratory for synchrotron radiation at Lunds University 1981 MAX-lab is formed

More information

X-Band Klystron Development at

X-Band Klystron Development at X-Band Klystron Development at SLAC Slide 1 The Beginning X-band klystron work began at SLAC in the mid to late 80 s to develop high frequency (4x SLAC s-band), high power RF sources for the linear collider

More information

Tutorial: Trak design of an electron injector for a coupled-cavity linear accelerator

Tutorial: Trak design of an electron injector for a coupled-cavity linear accelerator Tutorial: Trak design of an electron injector for a coupled-cavity linear accelerator Stanley Humphries, Copyright 2012 Field Precision PO Box 13595, Albuquerque, NM 87192 U.S.A. Telephone: +1-505-220-3975

More information

Upgrading LHC Luminosity

Upgrading LHC Luminosity 1 Upgrading LHC Luminosity 2 Luminosity (cm -2 s -1 ) Present (2011) ~2 x10 33 Beam intensity @ injection (*) Nominal (2015?) 1 x 10 34 1.1 x10 11 Upgraded (2021?) ~5 x10 34 ~2.4 x10 11 (*) protons per

More information

North Damping Ring RF

North Damping Ring RF North Damping Ring RF North Damping Ring RF Outline Overview High Power RF HVPS Klystron & Klystron EPICS controls Cavities & Cavity Feedback SCP diagnostics & displays FACET-specific LLRF LLRF distribution

More information

XFEL High Power RF System Recent Developments

XFEL High Power RF System Recent Developments XFEL High Power RF System Recent Developments for the XFEL RF Group Outline XFEL RF System Requirements Overview Basic Layout RF System Main Components Multibeam Klystrons Modulator RF Waveguide Distribution

More information

2 Work Package and Work Unit descriptions. 2.8 WP8: RF Systems (R. Ruber, Uppsala)

2 Work Package and Work Unit descriptions. 2.8 WP8: RF Systems (R. Ruber, Uppsala) 2 Work Package and Work Unit descriptions 2.8 WP8: RF Systems (R. Ruber, Uppsala) The RF systems work package (WP) addresses the design and development of the RF power generation, control and distribution

More information

OF THIS DOCUMENT IS W8.MTO ^ SF6

OF THIS DOCUMENT IS W8.MTO ^ SF6 fflgh PEAK POWER TEST OF S-BAND WAVEGUIDE SWITCHES A. Nassiri, A. Grelick, R. L. Kustom, and M. White CO/0 ^"^J} 5, t * y ^ * Advanced Photon Source, Argonne National Laboratory» \^SJ ^ ^ * **" 9700 South

More information

Activities on FEL Development and Application at Kyoto University

Activities on FEL Development and Application at Kyoto University Activities on FEL Development and Application at Kyoto University China-Korea-Japan Joint Workshop on Electron / Photon Sources and Applications Dec. 2-3, 2010 @ SINAP, Shanghai Kai Masuda Inst. Advanced

More information

The Elettra Storage Ring and Top-Up Operation

The Elettra Storage Ring and Top-Up Operation The Elettra Storage Ring and Top-Up Operation Emanuel Karantzoulis Past and Present Configurations 1994-2007 From 2008 5000 hours /year to the users 2010: Operations transition year Decay mode, 2 GeV (340mA)

More information

DEVELOPMENT OF X-BAND KLYSTRON TECHNOLOGY AT SLAC

DEVELOPMENT OF X-BAND KLYSTRON TECHNOLOGY AT SLAC DEVELOPMENT OF X-BAND KLYSTRON TECHNOLOGY AT SLAC George Caryotakis, Stanford Linear Accelerator Center P.O. Box 4349 Stanford, CA 94309 Abstract * The SLAC design for a 1-TeV collider (NLC) requires klystrons

More information

Present Status and Future Upgrade of KEKB Injector Linac

Present Status and Future Upgrade of KEKB Injector Linac Present Status and Future Upgrade of KEKB Injector Linac Kazuro Furukawa, for e /e + Linac Group Present Status Upgrade in the Near Future R&D towards SuperKEKB 1 Machine Features Present Status and Future

More information

Status of SOLARIS. Paweł Borowiec On behalf of Solaris Team

Status of SOLARIS. Paweł Borowiec On behalf of Solaris Team Status of SOLARIS Paweł Borowiec On behalf of Solaris Team e-mail: pawel.borowiec@uj.edu.pl XX ESLS-RF Meeting, Villingen 16-17.11.2016 Outline 1. Timeline 2. Injector 3. Storage ring 16-17.11.2016 XX

More information

Linac upgrade plan using a C-band system for SuperKEKB

Linac upgrade plan using a C-band system for SuperKEKB Linac upgrade plan using a C-band system for SuperKEKB S. Fukuda, M. Akemono, M. Ikeda, T. Oogoe, T. Ohsawa, Y. Ogawa, K. Kakihara, H. Katagiri, T. Kamitani, M. Sato, T. Shidara, A. Shirakawa, T. Sugimura,

More information

High Brightness Injector Development and ERL Planning at Cornell. Charlie Sinclair Cornell University Laboratory for Elementary-Particle Physics

High Brightness Injector Development and ERL Planning at Cornell. Charlie Sinclair Cornell University Laboratory for Elementary-Particle Physics High Brightness Injector Development and ERL Planning at Cornell Charlie Sinclair Cornell University Laboratory for Elementary-Particle Physics June 22, 2006 JLab CASA Seminar 2 Background During 2000-2001,

More information

A KIND OF COAXIAL RESONATOR STRUCTURE WITH LOW MULTIPACTOR RISK. Engineering, University of Electronic Science and Technology of China, Sichuan, China

A KIND OF COAXIAL RESONATOR STRUCTURE WITH LOW MULTIPACTOR RISK. Engineering, University of Electronic Science and Technology of China, Sichuan, China Progress In Electromagnetics Research Letters, Vol. 39, 127 132, 2013 A KIND OF COAXIAL RESONATOR STRUCTURE WITH LOW MULTIPACTOR RISK Xumin Yu 1, 2, Xiaohong Tang 1, Juan Wang 2, Dan Tang 2, and Xinyang

More information

Pulses inside the pulse mode of operation at RF Gun

Pulses inside the pulse mode of operation at RF Gun Pulses inside the pulse mode of operation at RF Gun V. Vogel, V. Ayvazyan, K. Floettmann, D. Lipka, P. Morozov, H. Schlarb, S. Schreiber FLASH Seminar, DESY March 29, 2011 Contents Why we need a PiPmode

More information

GaAs DOUBLE-BALANCED MIXER

GaAs DOUBLE-BALANCED MIXER MM1-3H The MM1-3H is a passive double balanced MMIC mixer. It features excellent conversion loss, superior isolations and spurious performance across a broad bandwidth, in a highly miniaturized form factor.

More information

GaAs DOUBLE-BALANCED MIXER

GaAs DOUBLE-BALANCED MIXER MM1-185H The MM1-185H is a passive double balanced MMIC mixer. It features excellent conversion loss, superior isolations and spurious performance across a broad bandwidth, in a highly miniaturized form

More information

K800 RF AMPLIFIER TUBE UPGRADE

K800 RF AMPLIFIER TUBE UPGRADE R. F. Note 107 John Vincent August 5, 1988 K800 RF AMPLIFIER TUBE UPGRADE Contents: 1. Introduction 2. RCA 4648 Operating Experience and Evaluation. 3. Tube Selection Criteria 4. Cost and Availability

More information

Status and Plans for PEP-II

Status and Plans for PEP-II Status and Plans for PEP-II John Seeman SLAC Particle and Particle-Astrophysics DOE HEPAP P5 Review April 21, 2006 Topics Luminosity records for PEP-II in October 2005 Fall shut-down upgrades Run 5b turn

More information

RF considerations for SwissFEL

RF considerations for SwissFEL RF considerations for H. Fitze in behalf of the PSI RF group Workshop on Compact X-Ray Free Electron Lasers 19.-21. July 2010, Shanghai Agenda Introduction RF-Gun Development C-band development Summary

More information

GaAs MMIC Triple Balanced Mixer

GaAs MMIC Triple Balanced Mixer Page 1 The is a passive MMIC triple balanced mixer. It features a broadband IF port that spans from 2 to 20 GHz, and has excellent spurious suppression. GaAs MMIC technology improves upon the previous

More information

Non-Invasive Energy Spread Monitoring for the JLAB Experimental Program via Synchrotron Light Interferometers

Non-Invasive Energy Spread Monitoring for the JLAB Experimental Program via Synchrotron Light Interferometers Non-Invasive for the JLAB Experimental Program via Synchrotron Light Interferometers P. Chevtsov, T. Day, A.P. Freyberger, R. Hicks Jefferson Lab J.-C. Denard Synchrotron SOLEIL 20th March 2005 1. Energy

More information

Features. = +25 C, IF = 1 GHz, LO = +13 dbm*

Features. = +25 C, IF = 1 GHz, LO = +13 dbm* v.5 HMC56LM3 SMT MIXER, 24-4 GHz Typical Applications Features The HMC56LM3 is ideal for: Test Equipment & Sensors Point-to-Point Radios Point-to-Multi-Point Radios Military & Space Functional Diagram

More information

Karin Rathsman, Håkan Danared and Rihua Zeng. Report from RF Power Source Workshop

Karin Rathsman, Håkan Danared and Rihua Zeng. Report from RF Power Source Workshop Accelerator Division ESS AD Technical Note ESS/AD/0020 Karin Rathsman, Håkan Danared and Rihua Zeng Report from RF Power Source Workshop 10 July 2011 Report on the RF Power Source Workshop K. Rathsman,

More information

CLIC Feasibility Demonstration at CTF3

CLIC Feasibility Demonstration at CTF3 CLIC Feasibility Demonstration at CTF3 Roger Ruber Uppsala University, Sweden, for the CLIC/CTF3 Collaboration http://cern.ch/clic-study LINAC 10 MO303 13 Sep 2010 The Key to CLIC Efficiency NC Linac for

More information

III. Proton-therapytherapy. Rome SB - 3/5 1

III. Proton-therapytherapy. Rome SB - 3/5 1 Outline Introduction: an historical review I Applications in medical diagnostics Particle accelerators for medicine Applications in conventional radiation therapy II III IV Hadrontherapy, the frontier

More information

INTERNATIONAL JOURNAL OF ELECTRONICS AND COMMUNICATION ENGINEERING & TECHNOLOGY (IJECET)

INTERNATIONAL JOURNAL OF ELECTRONICS AND COMMUNICATION ENGINEERING & TECHNOLOGY (IJECET) INTERNATIONAL JOURNAL OF ELECTRONICS AND COMMUNICATION ENGINEERING & TECHNOLOGY (IJECET) International Journal of Electronics and Communication Engineering & Technology (IJECET), ISSN 0976 6464(Print)

More information

GaAs DOUBLE-BALANCED MIXER

GaAs DOUBLE-BALANCED MIXER MM1-124S The MM1-124S is a passive double balanced MMIC mixer. It features excellent conversion loss, superior isolations and spurious performance across a broad bandwidth, in a highly miniaturized form

More information

The field cage for a large TPC prototype

The field cage for a large TPC prototype EUDET The field cage for a large TPC prototype T.Behnke, L. Hallermann, P. Schade, R. Diener December 7, 2006 Abstract Within the EUDET Programme, the FLC TPC Group at DESY in collaboration with the Department

More information

Department of Electronics and Communication Engineering Shrinathji Institute of Technology & Engineering, Nathdwara (Raj.)

Department of Electronics and Communication Engineering Shrinathji Institute of Technology & Engineering, Nathdwara (Raj.) Sensitivity and Misalignment Analysis of MIG for 120 GHz, 3MW Gyrotron Manoj Kumar Sharma 1, Mahesh Kumar Porwal 2 1 M Tech-IV Semester, 2 Associate Professor Department of Electronics and Communication

More information

GaAs MMIC Double Balanced Mixer

GaAs MMIC Double Balanced Mixer Page 1 The is a passive double balanced MMIC mixer. It features excellent conversion loss, superior isolations and spurious performance across a broad bandwidth, in a highly miniaturized form factor. Accurate,

More information