Rihua Zeng. LLRF Overview and Development in Other Labs

Size: px
Start display at page:

Download "Rihua Zeng. LLRF Overview and Development in Other Labs"

Transcription

1 Accelerator Division ESS AD Technical Note ESS/AD/0013 Rihua Zeng LLRF Overview and Development in Other Labs 29 March 2011

2 ""#$%&'(&)'*+,-.'&'/012',3),%34'("+56 Rihua Zeng March 29, 2011 Outline "#$%&'(&)'*$+,-$.'&'/012',3$),$%34'($ $ 9,3(0-:;3)0, <$.'&'/012',3$),$%34'($ =$ A02'$"#$"'N:)('2',3$;0,6)-'(+3)0, O$ 966:'6$),$A:5$K0-:/' O$ IP1'()',;'6$+,-$'660, Q$ A02'$IP1'()',;'$),$9BIF R$ 8V$ "'W'(',;' V$ 8V$ ADA $ 88$ #'(2)/ <$ GI"D =$ JD =$ 8=$ 1

3 7,3(0-893)0, Generally, LLRF system can be broken into sub-modules by functionality as shown in the figure below. The LLRF System can run well only if all sub-modules have the good performances. First of all, one should identify the tasks and challenges in each module. By the experience of other labs, for example, there are some: phase noise in Frequency Generation, drift in Phase Reference Distribution, noise and drift in Frequency Conversion, Lorentz detuning and microphonics in Cavity Field and Resonance Control, nonlinearity and noise in RF Control Hardware, and automated operation of large scale LLRF stations. ESS will suffer most of them, and probably some more: spoke cavity, longer pulse, higher current and larger scale. Therefore, it would be helpful to firstly investigate the solutions that have been taken in other labs and learn from them. Below I will introduce the development of LLRF in other labs. 2

4 .'&'/012',3),%34'("+56 LLRF R&D in FLASH is evolved from the development in TTF (Tesla Test Facility) RF digital control system started about 15 years ago, and will continue to be developed for the new European XFEL in DESY. Their achievements and expertise in pulsed SRF control are well known in the LLRF community, and more important they are well documented in TESLA Reports. SNS LLRF system has been going through the accelerator commissioning and operation over 5 year, and therefore the experience and lessons achieved will be good reference for us. There are a lot in common between SNS and ESS. JPARC Linac LLRF System s experience during their 181MeV linac development (RFQ, Bunch, Rebunch Cavities, DTL, SDTL) and 400MeV linac upgrade (adding ACS) is good reference for our normal-conducting cavity s LLRF R&D. These three lab s LLRF parameters and sub modules implemented are listed in table1. The rests are the labs whose LLRF systems are not very similar with ESS (CERN), or under development (Fermilab, LBNL), or at the beginning (MYRRHA). The sub modules realized in these labs are given in table 2. CERN LHC has 8 superconducting cavities (signal cell, CW mode, ring) per ring. Although different with ESS (pulse, multi-cell, linac), it is still valuable to look through their RF feed back, Klystron Polar loop and the Tuner loop. Moreover, there is Open Hardware Repository at CERN, a place for collaborating on open hardware designs, much valuable information. And there is also other digital LLRF developing at CERN, such as LEIR, Linac 4 LLRF [4~7, CERN] In Fermilab, there are going on different kinds of the LLRF system for ILC, Project X, HITS, NML [13, Fermilab], based on the hardware platform MFC, newly developed in Fermilab (33 channels). And the spoke cavities might be taken in Project X (already having the test stand for spoke cavities). LBNL has developed the FPGA programming for SNS (many new ideas in algorithms), and developed the 4 th generation evaluation LLRF board to test concepts for ILC with low noise (Open verilog codes and hardware designs Then the next generation board design and fabrication will be carried out. MYRRHA has a similar linac with ESS (same frequencies, normal conducting, spoke cavity, low beta, high beat), and desires more extreme reliability, with some LLRF prototypes under development in Orsay. And more interest is their proposal of fault tolerance LLRF. The other more information about the LLRF developments worldwide can be found in the LLRF Workshop held every two years since 2005: LLRF Workshop 2005, LLRF Workshop 2007, LLRF Workshop 2009, LLRF Workshop 2011, it is coming in October. 3

5 FLASH SNS JPARC Main Linac Length ~200m[1,2] 311m [1] 248m[1] LLRF Stations 6[3] Beam Pulse 800 us [4] 1000us 500us RF Pulse 1300us 1300us[1~3] 650us Beam Current (average dc) 9 ma 26mA 50mA Repetition Rate 5Hz~10Hz 60Hz 50Hz Bunch Frequency 1MHz~40kHz Beam Power N/A 1.4MW(on target) 1.0MW[1,2] Beam Energy 1.2Gev (electron) 1.0Gev 400MeV[3] Energy Spread <510-5 <±0.15%, 0.033%(rms) <±0.1% Arrival Time Jitter Required RF Amplitude/Phase Stability <30fs 0.01%, 0.1 [6,7] (achieved with FB only) ±0.5 ±0.5 ±1%, ±1 [1, 4, 5] Klystron Work Point K2~20% of 5MW, K3~62% of 5MW, K4~53% of 10MW, K5~60% of 5MW. [8][4] RFQ, DTL: 2.5MW CCL: 5MW SRF linac: 0.55MW (Klystron peak power) RFQ: 0.53MW, saturation 3.0MW DTL: 5.7 MW for 3 tanks SDTL: 23.6 MW (total) ACS: 43.8 MW (total) 324MHz, 24 in total, 3.0/2.5MW 972MHz, 26 in total, 3.0/2.5 MW Gradient 25MV/m [9] DTL: 1.58~2.777(ave. EoT) CCL: 1.98~2.143 Med beta: 13.4~16.4 (E0) High beta: 17.9~24.4 DTL: MV/m SDTL: ACS: MV/m Cavity Beta /0.81(Med/High) Load Q Cavity Half Bandwidth Expected Microphonics 3e6 DTL: 23554~30863 CCL: 12309~13975 Med beta: 7.3e05 High beta: 7.0e05 (variation 20%) DTL, SDTL: ~20000 ACS: ~8000 [6,7] 220Hz Med beta, High beta: 550, 575Hz 8.1kHz(DTL, SDTL), 61kHz(ACS) 3-7Hz [10] ±100Hz(six sigma, amplitude limit) Not important Lorentz Detuning 1 Hz/(MV/m) 2 Med beta, 2300Hz; High, 1000Hz <470Hz (with piezo, max.) (Without piezo, klystron power limit) Not important Dominant Mechanical modes 280(20) Hz 160/230/2000 Hz [10,7] N/A R/Q 1036[11] Med, High beta: , ; Cavities Per Klystron RF Frequency 8, 16, 1(RF gun) 1 2[1,8,9] 1.3GHz, 3.9GHz[12] (3rd harmonic cavities) 402.5MHz, 805MHz 324, 976MHz[10,11] IF Frequency 250kHz, 54MHz 50MHz 12MHz Sample Frequency 1MHz and 81MHz[13] both IQ and non-iq 40MHz (non-iq) 48MHz (IQ) 4

6 Frequency Conversion Downconvet and Vector Modulator New: low-noise 9/54MHz IF Multichannel Downconverter [14] Down/ Up convert in one board [Drift problem later] New: Temperature controlled board [5,6] Downconvert, Vector Modulator [10~14] Hardware VME Crates (ATCA based system will be taken for future XFEL): 1. DSP, ADC, DAC as a VME card 2. Latest generation (SimconDSP) [Virtex II Pro Xilinx FPGA+DSP, 10channel 14bit 105MS/s ADCs] 3. SPARC VME CPUs module running Solaris OS 3. A function generator with VME interface [6,7,15] VXI Crates: [2,3,4] 1. Field Control module (FPGA Xilinx XC2S150) 2. Slot-zero controller (IOC) running vxworks system 3. High Power RF protection module 4. Timing Module 5. Utility Module Compact PCI [10~14] 1. DSP and FPGA (14bit ADC, DAC) 2. General purpose Pentium CPU module with Widows OS system, ACU-128-1, PentiumM 1.6GHz 3. RF and Clock Generator Module 4. Mixer and I/Q modulator module 5. Control I/O FPGA: Vertex-E XCV 600E. One for the real time FB, another for tuner control Cavity Field Control 1. IQ Sampling; Calibrations; Vector-sum; Kalman filter; P gain control; adding adaptive feed forward; FB P gain ~ Klystron linearization; Work near the performance limit 3. Upgrade: New learning feedforward algorithm. Beam load compensation, new feedback controller; [6,7,13, 3~5] 1. SISO real-time PI control; [7~9] 2. 1KByte for set point curve Feedback gain 50~100 for SRF cavity, ~10 for normal cavity. [13] 3. CORDIC-based phasor rotator; AFF for cavity filling (8-Kbyte buffer), the other AFF for beam loading compensation (8K) 4. PID type AFF for proton [20] [10~14] 1. IQ sampling, Calibration, LPF, PI, Feedforward (behind FB switch), IQ output control (offset, limit). Block RAM (after LPF, to fill the I/Q read table) communicates with DSP 2. FB gain ~5, instability [11,15] 3. Feedforward for cavity filling [5] 4. Beam chopped compensation, macro beam compensation [16,10] Cavity Resonance Control 1. Two piezo, one for control, the other for sensor 2. Feed forward and find proper excitation signal for piezo tuner. 3. Cavity tuning is determined from forward, reflected and probe signal 4. Reduce detuning to less than a tenth of bandwidth 5. Microphonics control [16~23,13] The Piezo actuator is designed as part of the cavity mechanical tuning system, and becomes the weakest link of the mechanical system [10,11] 1. Normal conducting cavity pine tuner 2. 3 DTLs and 15 SDTLs controlled by feedback through a cavity tuner. 3. The I/Q components of klystron (after circulator) are measured, stored in DSP. 4. Once the tuning error (cavity to klystron) is larger than a set value, the DSP starts to control the cavity tuner [14] 5. F0 setting. Improved way to adjust tuning position [18] Diagnostics 1.Measurement and Calibration of reflect/forward power; 2. Calibration of vector sum; Beam based cavity gradient calibration; 3. Decay curve measurement; parameters calculation [6,7,13] 1. Registers map: 2 bytes (PRO I&Q, FW I&Q, REF I&Q, Decay I&Q, DAC I&Q, DIAG I&Q) 2. From firmware to EPICS directly, not via Labview 3. Interlocks. [12~13] 1. Set tables update every 1us during pulse. Measured data stored in FPGA Memory. DSP for data processing and communication (FW/REF/PRO) [10~12] 2. Detuning ("#) detected from phase decay curve, then "# used for FF filling. Variable FB gains [5] 3. Set Values of exponential pattern [13] 4. Q value calculation 5. Interlock in other module [17] Control system Server DOOCS (C++) 1. Sun SPARC platforms and Linux 2. Operation is automated by DOOCS finite state machine Server 3. The data accessed by DOOCS API (Matlab, Labview) 4. DSP state and Start/Reconnect; Load and Start program; Firmware control 5. Feed forward table upgrade according to beam current varies [6,7,13,24] EPICS; 1. Automated operation of each and all FCMs 2. One button starts up LLRF system: auto-run sequencer ramps up cavity field in open loop. Auto-run sequencer maintains cavity frequency. Auto-close loop [12~14] EPICS; PLC [17], touch Panel 1. Field control, high power protection, analog and status monitor and klystron 2. PLC is used as the main system controller. PLC will be locally operated by a touch panel on PLC LAN and remotely by an EPICS Operator Interface on EPICS LAN 3. PLC control through the control I/O board 4. Practical operation, the half number of gain margin (Kp=4~5), is considered to be stable [11] Frequency Generation 1. MO system. By phasing locking 81MHz VCXO to 9MHz OCXO to get the best phase stability. Time jitter: 78fs (integrating measurement bandwidth from 10Hz to 10MHz) 2. All other frequencies come from 81 MHz signal by division and multiplication [25] 1. MO provides 6 outputs at 2.5, 10, 352.5, 402.5, 755 and 805 MHz (directly synthesized from a single 10MHz low noise SC-cut quartz crystal oscillator), by Wenzel Associates in Austin, TX, USA 2. Output signal power +20dBm 3. The MO is located in the klystron gallery in between the DTL (402.5MHz) and CCL (805MHz) sections [15] 1. 12MHz master oscillator at the central room and distributed this frequency to each LLRF station; But later is changed to 312MHz due to temperature drift 2. Other frequencies are generated in LLRF Local station y VCXO with PLL synchronizing 312MHz [18,4] Phase Reference Distribution 1. Short term (phase noise): 1ms 0.1ps ms 0.3ps Long term (drift): 1s 1ps hour 2ps day 10ps A temperature-stabilized coaxial line is employed for RF power distribution. Stabilization of ±0.5 C was applied to improve long-term phase stability 4. Optic fiber used for monitoring drifts along coaxial line [25] 1. Reference RF transport ±0.3 C 2. RF reference Lines are 3-1/8"rigid copper coaxial lines with temperature and pressure regulated 3. Temperature zones are maintained at 100±0.1 F 4. RF line phase stability is ±0.1 C between adjacent cavities and ±2.0 C the whole linac [15,13] 1. Goal of Phase stability of reference: ±0.3 at 972MHz 2. PSOF (phase stabilized optical fiber, 0.4ppm/ C, 0.2 /300m/ C@972MHz) 3. Temperature controlled by cooling water (Temp. stability ±0.1 C) to control temperature of the fiber to be ±0.5 C 4. O/E in master oscillator; E/O in each LLRF station; jitter and temperature dependency from O/E to E/O should be considered [18,4] 5

7 Cavities/klystron Fermilab CERN LBNL MYRRHA 8(In one crymodule) 1(spoke cavity) 1[1~3] Evaluation board testing new concepts [1,2] CW mode [1~2] RF Frequency 1300, 325, MHz [1~3] 400MHz(CW) 1.3GHz 352, 704MHz IF Frequency 13MHz 20MHz MHz 10MHz[3,4] Sample Freq , 56.33MHz(non-IQ)[4,5] 80MHz(IQ) MHz(non-IQ) 40MHz(IQ) Frequency Conversion 8 channel down conversion upconvert (IF IQ drive). [5] New: 96 channels receive, 12 boards; 8 channel/board, built on aluminum plate with heaters and sensors regulated by temperature controller. [6] FB gain upto 1000, test? [7,8] Downconvert and IQ modulator Analogue modulator and demodulator Downconvert and upconvert integrated into the FPGA board; Compact but some problems in LO distribution; [3,4] Drift, channel isolation? Downconvert, IQ vector modulator Hardware VXI crates: [8,9] 1.MFC board (Altera Cyclone II FPGA. 4 8-channel 12 bit 65MHz ADC, 2 dual channel 14bit 260Hz DAC; another channel with 14bit 105MHz ADC used for fast Klystron feedback) 2. Slot0 CPU Host Two VME creates: (Cavity control) 1. High gain RF feedback 2.A tuner loop module 3. A klystron Ripple loop 4.Conditioning system USB based (no crates): All clock distribution, up/down convert, ADC/DAC/FPGA are in one board, four RF/IF input, LTC2249 ADC, XC3S 1000 FPGA. [3~5] NI Labview PXI crates customer fabricated FPGA board Cavity Field Control 1.Serial data to parallel data. 2.Digital downconvert, Vector sum 3.Klystron linearization 4. Feedback, feedforward, fast klystron loop 5. Reference signals for beam and cavity phase 6.Digital upconvert to IF 7. Drift calibration [3,5,7~9] 1. Digital feedback paralleled with analogue feedback for transient (low delay, 10ns) 2. Feedback gain must be changed to keep impedance constant 3. Feedforward for bunch; 4. The klystron polar loop, klystron limiter Non IQ, Calibration, Cordic, Filters, DC reject, Rotation, Integrator, Bit-serial arithmetic; hard core or soft core CPU on chip.[5~8] Fault tolerance control in case of a RF cavity failure. 1. Fast detect RF fault and trigger beam shut down. 2. New correcting field and phase set points update; 3. Failed cavity quickly detuned, 4. Beam reinjection when reached steady state, recovery at max 1s. [3~5] Cavity Resonance Control 1. Slow and piezo tuner for 1.3GHz SRF CCII cavity [4] 2. Identify the mechanical resonance (165Hz) 3. Optimize the voltage and delay of excite signal to piezo 4. Compensation reduce detuning 275Hz to 20Hz [10] 5. Microphonics control for 3.9GHz cavity [11] 6.Spoke cavity freq. track [5] 1.Step motor control, based phase difference between cavity drive and probe 2.Digital demodulator (IQ sample), CIC filter 3.It can track minute fluctuations; with 25Hz resolution N/A Fast cold tuning system for microphonics and Lorentz detuning, simulation.[5~7] Quick detuned the failed cavity by 1kHz and more slow but bigger detune with stepper motor. And the adjacent cavity is retuned. (20deg. 50Hz, 20% in amp.)[3] Diagnostics 1. Cosine/sine table; Gain table; Set point table; FIFO; diagnostics buffer used by DSP / CPU; 2. Data transferred to the SDRAM. Both FPGA and DSP have SDRAM for waveform, data storage; [7~9] 3.Vacc, Q0, Ql measurement. [5] 1.Automatic measurements for cavity tune and transient response and so on... in FPGA and DSP 2.Tune command sweeps the tuner through its range, measuring and storing values in buffer. System on chip, CPU communicates with SDRAM, use network to communicate with external devices [5~7] 1. Fast diagnostics to detect the failure 2. Fast update the setpoints in fault recovery 3. Calibration cavity field and phase, etc. 4. Other dedicated diagnostics, interlocks [4] Control System Server EPICS, DOOCS; 1.Drives and software build in CERN's Front End Software Architecture (FESA) 2. The memory map is used to build the driver and application 3. Remote diagnostics 4. Labview/Matlab application USB to a PC; Network communicate based afterwards, UDP protocol developing; [5~7] LABVIEW windows (prototype testing) Frequency Generation 1.10 MHz crystal oscillator from Wenzel Associates used as phase reference, 1300 MHz dielectric resonator oscillator (DRO) from Poseidon Scientific Instruments locked on crystal reference via PLL 2. All other frequencies are divided by 1.3GHz[12] 1. Direct digital synthesizer generates a 400MHz reference 2. A master 400MHz is generated by VCXO, sent to the cavity controller 3. VCXO is loop locked on DDS output 4. LO 380MHz; All clocks are phase locked Only LO distributed over coax; Clock distribution on the board [1] 704.4, 694.4, 40MHz [3] Phase Reference Distribution N/A The two Master 400MHz signals are sent to cavity controller by fiber optic links; A fs level sync. system for LCLS. Optical interferometer to measure length change, active feedback [9,10] N/A 6

8 >02'""#$#'J8)('2',390,6)-'(+3)0,6 1. Cavity field phase and amplitude stability. 2. Cavity frequency control Automated cavity tuning (normal conducting); piezo (superconducting) 3. Reliable (minimize LLRF induced downtime, maximize availability), exception handling (recovery from quench ) Redundant subsystem; modularity design 4. Support Automated operation Exp. Automated start, run, and close loop; Fault detected and recovery. 5. Build in Diagnostics (also providing remote access for diagnostics and control) 6. Minimize the RF power needed for control (work near the saturation of klystron, piezo tuner, overshoot control ) 7. LLRF modeling (cavity, klystron, detuning ) 8. Interlock 7668'6),>85H0-8/'6 1. Cavity Control Perturbations: Beam loading, phase noise from MO, Klystron ripple, Thermal drift, Lorentz detuning, microphonics, etc (know to what extent they can be controlled, identify those out of the feedback close loop control, drift in LO, downconvert, high frequency noise etc ) Feedback: Loop gain limitation, loop bandwidth, loop phase, delay and Instability; Beam based feedbacks? Feedforward: Cavity filling; Beam loading compensation; Piezo tuning; Klystron Linearization algorithms; 2. Frequency Generation Low phase noise stable reference master oscillator; Phase locked to low frequency (10MHz?) 3. Reference Phase Distribution (and time system) Drift caused by temperature changed; Fiber or coaxial cable? How frequencies generated? Distribute all or major frequencies? Where the MO located? Temperature stabilization. Power distribute to each LLRF station; Phase stability monitoring and correction? 4. Frequency conversion Low noise, Drift control for mixers, amplifier, and splitters 5. Diagnostics Forward/reflected power calibration, and calculation for tuning control (redundant). Drift calibration; IQ to phase & amplitude transfer; Loop phase rotation matrix; field calibration rotation matrix (based on rf, beam based transients, spectrometer?); Cavity detuning (average during pulse, detuning curve during pulse, by measuring probe or reflected power decay curve); load Q calculation; Beam phase measurement; 6. Cavity Frequency control Slow tuner (step motor)(maintain average resonance frequency, pre-detuning, maximize tuner lifetime); Faster tuner (piezo), dynamic Lorentz detuning compensation; microphonics control; Minimize RF power; System identification (beam phase and current, loaded Q, incident phase); 7. Control System server Automated fault recovery; Automated operation for all LLRF stations (remote, local?); Finite state machine; Interface to control system; RF system Database (calibration coefficients, subsystem characteristics). 8. Hardware Low noise; Fast high resolution ADC/DAC; Power convert switching noise; Nonlinearity, Signal integrity. 7

9 FK1'()',9'6+,-"'660,6 FLASH: Diagnostics for beam energy at many points along the linac are always a great help for setting up the RF, Slow drifts of resonance frequency was an issue High closed loop bandwidth (30kHz - 60KHz), G>150. [Brian Chase, Lessons Learned from the 9 ma Test ] SNS: The piezo tuner has not used for some failures. To compensate, about 15% more RF power is consumed to achieve the designed phase & amp stability [11]. The high voltage converter modulator system is below the design, so that beam pulse length only reaches 0.8 ms in a 60Hz production. [11,17,18] Acceleration gradients of several cavities are limited by HOM couplers;[11,17,18] Temperature dependences in downconvert; [6] Klystron circulator mismatch [16]; Modulator droop (causing phase margin degrade) and 20kHz ripple [16,19]; JPARC: Temperature dependency of the PLL-VCXO was larger than the expectation by multiplying 12 MHz reference frequency to get RF, LO. Instead, in new design the 312-MHz LO is directly distributed as reference [5]. There are also HVPS ripples induced klystron amplitude droop and phase modulation, but they were controlled down to the required stability accuracy [8]. 8

10 >02'FK1'()',9'),7?FC Good hardware platform is essential to make design easy. DC/DC power convert 120kHz switching frequency noise and harmonics; 120 khz and harmonics DAC output clock jitter dependence on frequency; Downconvert and upconvert on the same board with low isolation; Strong interference between RF and low IF Loop bandwidth (try to lower delay, try simple algorithms); >822+(L By dividing the LLRF system into sub-modules, it would be a bit clearer to identify the tasks and challenges in LLRF system. It is valuable to learn that how the other labs dealt with these problems and then find out the proper solutions for ESS. But there are still some challenges: 1.Work near the saturation of klystron to improve efficiency (80% or higher? about 60% in existing accelerators) 2. Automation of Operation for larger scale LLRF stations (at ESS, ~200 stations) 3. Field and resonance control (feedback, feedforward, tuner, etc. optimization for perturbations suppression) 4. Availability and reliability. 5. Spoke cavity. 6. Longer pulse, higher current, higher power 9

11 =9M,0*/'-N'2',36 I would like to acknowledge the help and suggestions received from J. Anders and P. Steve during writing this notes. #'O'(',9' $"=>? 1. LLRF System Components Development. TESLA Report Editor: R.Romaniuk LLRF Operation Experience at FLASH. Valeri Ayvazyan, DESY. LLRF workshop 2009; 4. LLRF Development at DESY. Simrock S. LLRF workshop %20LLRF%20Development%20at%20DESY%20-%20Simrock.pdf. 5. DESY LLRF. Markus Hoffmann. LLRF workshop DESIGN OF THE DIGITAL RF CONTROL SYSTEM FOR THE TESLA TEST FACILITY. S. Simrock, V. Ayvazyan et al., Digital RF Control System for The DESY FLASH Linear Accelerator, in EUROCON, The International Conference on" Computer as a Tool", 2007, LLRF Control: Operational Issues, Wojciech Cichalewski et.al T. Schilcher. Vector Sum Control of Pulsed Accelerating Fields in Lorentz Force Detuned Superconducting Cavities. Ph. D. Thesis of DESY, S. N. Simrock, Achieving phase and amplitude stability in pulsed superconducting cavities, in Proceedings of the 2001 Particle Accelerator Conference, Chicago. 11. M. Pekeler, Experience with superconducting cavity operation in the TESLA Test Facility, in Particle Accelerator Conference, Proceedings of the 1999, vol. 1, 1999, RECENT LLRF MEASUREMENTS OF THE 3RD HARMONIC SYSTEM FOR FLASH. C. Schmidt et al. IPAC LLRF CONTROL SYSTEM UPGRADE AT FLASH. V. Ayvazyan et al. PCaPAC M. Hoffmann. Development of A Multichannel RF Field Detector for the Low-Level RF Control of the Free-Electron Laser at Hamburg. Ph.D. Thesis of DESY, Evaluation of an ATCA Based LLRF System at FLASH. Simrock S., Grzegorz Jabáoski, et al. 16th International Conference Mixed Design of Integrated Circuits and Systems, LORENTZ FORCE DETUNING COMPENSATION SYSTEM FOR ACCELERATING FIELD GRADIENTS UP TO 35 MV/M FOR SUPERCONDUCTING XFEL AND TESLA NINE-CELL CAVITIES. P. SEKALSKI et al. 17. S.N.Simrock, Lorentz Force Compensation of Pulsed SRF Cavities, Proceedings of LINAC 2002, Gyeongju, Korea 18. M. Liepe, W.D.-Moeller, S.N. Simrock, Dynamic Lorentz Force Compensation with a Fast Piezoelectric Tuner, Proceedings of the 2001 Particle Accelerator Conference, Chicago 19. L. Lilje, S. Simrock, D. Kostin, M. Fouaidy, Characteristics of a fast Piezo-Tuning Mechanism for Superconducting Cavities, Proceedings of EPAC 2002, Paris, France. 20. Field Stabilization in a Superconducting Cavity Powered in Pulsed Mode. Alban Mosnier. 21. PIEZOELECTRIC TUNER COMPENSATION OF LORENTZ DETUNING IN SUPERCONDUCTING CAVITIES. G. K. Davis, J. R. Delayen. PAC FIRST DEMONSTRATION OF MICROPHONIC CONTROL OF A SUPERCONDUCTING CAVITY WITH A FAST PIEZOELECTRIC TUNER. Simrock. S.N. PAC MEASUREMENT AND COMPENSATION OF MICROPHONICS IN CW-OPERATED TESLA- TYPE CAVITIES. Oliver Kugeler et al. Proceedings of ERL07. 10

12 23. ADAPTIVE FEEDFORWARD CANCELLATION OF SINUSOIDAL DISTURBANCES IN SUPERCONDUCTING RF CAVITIES. T. Kandil. Linac K. Rehlich, Status of the FLASH Free Electron Laser Control System, DESY, Hamburg, Germany. ICALEPCS PERFORMANCE OF THE NEW MASTER OSCILLATOR AND PHASE REFERENCE SYSTEM AT FLASH. Simrock S. PAC07. >A> 1. sns_parameters_list_june05.pdf, 2. M. Champion et al., Overview of the Spallation Neutron Source Linac Low-Level RF Control System, in Particle Accelerator Conference, PAC Proceedings of the, M. Champion et al., The Spallation Neutron Source Accelerator Low Level RF Control System, in Particle Accelerator Conference, PAC 2003, H. Ma et al., Digital Control of Cavity Fields in the Spallation Neutron Source Superconducting Linac, in Linac 2006, A. Regan et al., Newly designed field control module for the SNS, in Particle Accelerator Conference, PAC Proceedings of the, vol. 5, M. Crofford et al., SPALLATION NEUTRON SOURCE LLRF TEMPERATURE DEPENDENCE AND SOLUTION, in Linac 2010, Hengjie Ma et al., Low-level rf control of Spallation Neutron Source: System and characterization, Physical Review Special Topics - Accelerators and Beams 9, no. 3 (3, 2006), 8. H. Ma et al., SNS low-level RF control system: Design and performance, in Particle Accelerator Conference, PAC Proceedings of the, 2005, K. Kasemir et al., Adaptive Feed Forward Beam-Loading Compensation Experience at the Spallation Neutron Source Linac, in Particle Accelerator Conference, PAC Proceedings of the, 2005, J. R. Delayen and G. K. Davis, Microphonics and Lorentz transfer function measurements on the SNS cryomodules, in The Proceedings of the 11th Workshop on RF Superconductivity, Travemunde, Germany, Y. Zhang, Experience and Lessons with the SNS Superconducting Linac, Procs. of IPAC01, Kyoto, Japan (2010): M. Crofford et al., Operational Experience with the Spallation Neutron Source High Power Protection Module, in Particle Accelerator Conference, PAC Proceedings of the, 2005, M. Champion, SNS RF System Performance and Operation. PAC 07 talk. 14. Hengjie Ma, Progress in RF Controls at SNS, LLRF workship M. Piller et al., The Spallation Neutron Source RF Reference System, in Particle Accelerator Conference, PAC Proceedings of the, 2005, M. McCarthy, M. Crofford, and S. K ORNL, SPALLATION NEUTRON SOURCE SUPERCONDUCTING LINAC KLYSTRON TO CAVITY MISMATCH EFFECTS AND COMPENSATION. Linac Sang-ho Kim, Operational Aspects and Experiences of the SNS LLRF System, LLRF Workshop S. H. Kim et al., SNS SUPERCONDUCTING LINAC POWER RAMP-UP STATUS AND PLAN, PAC2009, Vancouver, CANADA (2009): D.E. Anderson et al., Operational Performance of the Spallation Neutron Source High Voltage Converter Modulator and System Enhancements, in Power Modulator Symposium, Conference Record of the 2006 Twenty-Seventh International, 2006, S. Kwon et al., SNS Superconducting Cavity Modeling-Iterative Learning Control, Arxiv preprint physics/ (2000). BC=#D 1. JPARC Main Linac Parameters.pdf. 2. Y. Yamazaki and M. Kinsho, Discussion on RCS versus AR on the Basis of J-PARC Beam Commissioning for Pulsed Spallation Neutron Source, in Proceedings of the 11th European Particle Accelerator Conference (EPAC08),

13 3. H. Ao, STATUS OF J-PARC LINAC ENERGY UPGRADE, in LINAC 2010, T. Kobayashi, S. Anami, and S. Yamaguchi, PERFORMANCE OF RF REFERENCE DISTRIBUTION SYSTEM FOR THE J-PARC LINAC, in LINAC 2006, T. Kobayashi et al., AUTOMATIC FREQUENCY MATCHING FOR CAVITY WARMING-UP IN J-PARC LINAC DIGITAL LLRF CONTRO, in PAC2009, Vancouver, CANADA, T. Ito et al., RF Characteristics of the SDTL for the J-PARC, in LINAC 2006, H. Ao et al., Improvement in the ACS Cavity Design for the J-PARC Linac Energy Upgrade, in Proc. of the 2008 Linac Conf, 2008, T. Kobayashi et al., Performance of J-PARC linac RF system, in Particle Accelerator Conference, PAC. IEEE, 2007, S. Yamaguchi et al., An Overview of the Rf System for the JAERI/KEK High Intensity Proton Linac, in Proc. of Linac2002, Pohan, Korea, Z. Fang et al., LLRF CONTROLLER UPGRADE FOR THE J-PARC 400 MeV LINAC, in IPAC 10, S. Michizono et al., Digital RF Control System for 400-MeV Proton Linac of JAERI/KEK Joint Project, in Proceedings of the 2002 Linac Conference, Gyeongju, Korea. 12. S. Michizono et al., Digital Feedback Control for 972-MHz RF System of J-PARC Linac, in Proceedings of the 2009 Particle Accelerator Conference (PAC 2009), Canada, S. Michizono et al., Digital feedback system for JPARC linac RF source, in LINAC 2004, S. Michizono et al., Performance of Digital LLRF Field Control System for the J-PARC Linac, LINAC06, Knoxville (2006): T. Kobayashi, STABILITY EVALUATION FOR LONG FB LOOP DELAY IN THE ACS CAVITY FIELD CONTROL FOR THE J-PARC LINAC 400-MEV UPGRADE, in LINAC 2010, T. Kobayashi et al., PULSE-BY-PULSE SWIT ING OF BEAM LOADING COMPENSATION IN J-PARC LINAC RF CONTROL, in LINAC 08, S. Anami et al., Control of the Low Level RF System for the Jparc Linac, in LINAC 2004, T. Kobayashi et al., RF REFERENCE DISTRIBUTION SYSTEM FOR THE J-PARC LINAC, in LINAC 2004, $'(2)/+5 1. J. Branlard, S. Simrock, and S. Michizono, Survey of LLRF development for the ILC, in Particle Accelerator Conference, PAC. IEEE, 2007, R. C. Webber et al., First high gradient test results of a dressed 325 MHz superconducting single spoke resonator at Fermilab (Fermi National Accelerator Laboratory (FNAL), Batavia, IL, 2010). 3. T. A Butler et al., New LLRF System for Fermilab MHz Linac, in Proc. LINAC 08, vol. 8, J. Branlard et al., Capture cavity II results at FNAL, in Particle Accelerator Conference, PAC. IEEE, J. Branlard et al., LLRF Design for the HINS-SRF Test Facility at Fermilab, in this conference, LINAC10, Tsukuba, U. Mavric et al., A 96 channel receiver for the ILCTA LLRF system at Fermilab, in Particle Accelerator Conference, PAC. IEEE, 2007, U. Mavric et al., DESIGN AND EVALUATION OF THE LOW-LEVEL RF ELECTRONICS FOR THE ILC MAIN LINAC, in LINAC 08, U. Mavric, B. Chase, and M. Vidmar, Design and evaluation of a low-level RF control system analog/digital receiver for the ILC main LINACs, Nuclear Instruments and Methods in Physics Research Section A: Accelerators, Spectrometers, Detectors and Associated Equipment 594, no. 1 (2008): P. Varghese et al., Multichannel vector field control module for LLRF control of superconducting cavities, in Particle Accelerator Conference, PAC. IEEE, 2008, R. Carcagno et al., FIRST FERMILAB RESULTS OF SRF CAVITY LORENTZ FORCE DETUNING COMPENSATION USING A PIEZO TUNER (2007). 12

14 11. R. Carcagno et al., Microphonics detuning compensation in 3.9 GHZ superconducting RF cavities, in Proceedings of the 11th Workshop on RF Superconductivity SRF2003, J. Branlard and B. Chase, Master Oscillator for Fermilab ILC Test Accelerator, in LINAC 2006, B. Chase, LLRF Challenges for ILC, ProjectX, HTS, NML, Achievements, Plans, May 18, DF#A ;P P. Baudrenghien et al., The LHC Low Level RF, in EPAC 2006, J. Molendijk et al., Digital Design of the LHC Low Level RF: The Tuning System for the Superconducting cavities, in Proc. 10th European Particle Accelerator Conf., Edinburgh, United Kingdom, J. Tückmantel, Adaptive RF Transient Reduction for High Intensity Beams with Gaps, in EPAC 2006, M. E. Angoletta et al., CERN s LEIR Digital LLRF: System Overview and Operational Experience, in paper TUPEA057, this conference. 5. M. Vretenar, Status of Linac4 construction at CERN, in Linac conference, CERN_lab_Talk_LLRF09_v2.ppt. LLRF workshop P. Baudrenghien, Low Level RF III. CERN CAS Courses: RF for Accelerators "GA" 1. L. Doolittle, H. Ma, and M. S Champion, Digital low-level RF control using non-iq sampling, in Proc. LINAC, 2006, LLRF4 Board, 4. LLRF Evaluation Board, 5. L. Doolittle, Embedded Networked Front Ends Beyond the Crate, in ICALEPCS 2003, L. Doolittle, Low-Level RF Control System Design and Architecture, in Asian Particle Accelerator Conference, L. Doolittle, Applications of General-Purpose Reconfigurable LLRF Processing Architectures, in PAC 2009, L. Doolittle, Digital Feedback for Cavity Field Control using Near-IQ Sampling, J. M. Byrd et al., Femtosecond synchronization of laser systems for the LCLS, in This conference. 10. J. W. Staples, R. Wilcox, and J. M. Byrd, Demonstration of femtosecond-phase stabilization in 2 km optical fiber, in Particle Accelerator Conference, PAC. IEEE, 2007, HI##?= 1. J. L Biarrotte et al., Accelerator reference design for the MYRRHA European ADS demonstrator, in LINAC 2010, J. L Biarrotte, T. Junquera, and A. C. Mueller, A European Advanced Technology Programme for ADS Accelerator Development, SRF 2005 (2005), 3. F. Bouly and J.L. Biarrotte, LOW LEVEL RADIO-FREQUENCY DEVELOPMENTS TOWARD A FAULT-TOLERANT LINAC SCHEME FOR AN ACCELERATOR DRIVEN, in LINAC 2010, O. Piquet et al, Task final report, EUROTRANS deliverable, D1.66, December F. Bouly et al., DEVELOPMENTS AND TESTS OF A 700 MHz PROTOTYPICAL CRYO- MODULE FOR THE MYRRHA ADS PROTON LINEAR ACCELERATOR, in LINAC 2010, F. Bouly et al., CONSTRUCTION OF A 700 MHz PROTOTYPICAL CRYOMODULE FOR THE EUROTRANS ADS PROTON LINEAR ACCELERATOR. SRF M. Luong and O. Piquet, RF Control System Modeling, EUROTRANS deliverable, D1.40,

15 14

Low Level RF for PIP-II. Jonathan Edelen LLRF 2017 Workshop (Barcelona) 16 Oct 2017

Low Level RF for PIP-II. Jonathan Edelen LLRF 2017 Workshop (Barcelona) 16 Oct 2017 Low Level RF for PIP-II Jonathan Edelen LLRF 2017 Workshop (Barcelona) 16 Oct 2017 PIP-II LLRF Team Fermilab Brian Chase, Edward Cullerton, Joshua Einstein, Jeremiah Holzbauer, Dan Klepec, Yuriy Pischalnikov,

More information

LLRF World Wide. LLRF Lecture Part6 S. Simrock, Z. Geng DESY, Hamburg, Germany

LLRF World Wide. LLRF Lecture Part6 S. Simrock, Z. Geng DESY, Hamburg, Germany LLRF World Wide LLRF Lecture Part6 S. Simrock, Z. Geng DESY, Hamburg, Germany Evolution of Hardware at SNS Stefan Simrock, Zheqiao Geng 4th LC School, Huairou, Beijing, China, 2009 LLRF & HPRF 2 Lesson

More information

Detailed Design Report

Detailed Design Report Detailed Design Report Chapter 4 MAX IV Injector 4.6. Acceleration MAX IV Facility CHAPTER 4.6. ACCELERATION 1(10) 4.6. Acceleration 4.6. Acceleration...2 4.6.1. RF Units... 2 4.6.2. Accelerator Units...

More information

2 Work Package and Work Unit descriptions. 2.8 WP8: RF Systems (R. Ruber, Uppsala)

2 Work Package and Work Unit descriptions. 2.8 WP8: RF Systems (R. Ruber, Uppsala) 2 Work Package and Work Unit descriptions 2.8 WP8: RF Systems (R. Ruber, Uppsala) The RF systems work package (WP) addresses the design and development of the RF power generation, control and distribution

More information

LLRF at SSRF. Yubin Zhao

LLRF at SSRF. Yubin Zhao LLRF at SSRF Yubin Zhao 2017.10.16 contents SSRF RF operation status Proton therapy LLRF Third harmonic cavity LLRF Three LINAC LLRF Hard X FEL LLRF (future project ) Trip statistics of RF system Trip

More information

RF considerations for SwissFEL

RF considerations for SwissFEL RF considerations for H. Fitze in behalf of the PSI RF group Workshop on Compact X-Ray Free Electron Lasers 19.-21. July 2010, Shanghai Agenda Introduction RF-Gun Development C-band development Summary

More information

The FLASH objective: SASE between 60 and 13 nm

The FLASH objective: SASE between 60 and 13 nm Injector beam control studies winter 2006/07 talk from E. Vogel on work performed by W. Cichalewski, C. Gerth, W. Jalmuzna,W. Koprek, F. Löhl, D. Noelle, P. Pucyk, H. Schlarb, T. Traber, E. Vogel, FLASH

More information

Basic rules for the design of RF Controls in High Intensity Proton Linacs. Particularities of proton linacs wrt electron linacs

Basic rules for the design of RF Controls in High Intensity Proton Linacs. Particularities of proton linacs wrt electron linacs Basic rules Basic rules for the design of RF Controls in High Intensity Proton Linacs Particularities of proton linacs wrt electron linacs Non-zero synchronous phase needs reactive beam-loading compensation

More information

The PEFP 20-MeV Proton Linear Accelerator

The PEFP 20-MeV Proton Linear Accelerator Journal of the Korean Physical Society, Vol. 52, No. 3, March 2008, pp. 721726 Review Articles The PEFP 20-MeV Proton Linear Accelerator Y. S. Cho, H. J. Kwon, J. H. Jang, H. S. Kim, K. T. Seol, D. I.

More information

Experience with the Cornell ERL Injector SRF Cryomodule during High Beam Current Operation

Experience with the Cornell ERL Injector SRF Cryomodule during High Beam Current Operation Experience with the Cornell ERL Injector SRF Cryomodule during High Beam Current Operation Matthias Liepe Assistant Professor of Physics Cornell University Experience with the Cornell ERL Injector SRF

More information

PROJECT DESCRIPTION. Project Name. Broader Impact. Real Time Simulator for ILC RF and CryoModules

PROJECT DESCRIPTION. Project Name. Broader Impact. Real Time Simulator for ILC RF and CryoModules Project Name PROJECT DESCRIPTION Real Time Simulator for ILC RF and CryoModules Personnel and Institution(s) requesting funding Nigel Lockyer (Professor) University of Pennsylvania Anna Grassellino (1st

More information

Digital BPMs and Orbit Feedback Systems

Digital BPMs and Orbit Feedback Systems Digital BPMs and Orbit Feedback Systems, M. Böge, M. Dehler, B. Keil, P. Pollet, V. Schlott Outline stability requirements at SLS storage ring digital beam position monitors (DBPM) SLS global fast orbit

More information

PEP-II longitudinal feedback and the low groupdelay. Dmitry Teytelman

PEP-II longitudinal feedback and the low groupdelay. Dmitry Teytelman PEP-II longitudinal feedback and the low groupdelay woofer Dmitry Teytelman 1 Outline I. PEP-II longitudinal feedback and the woofer channel II. Low group-delay woofer topology III. Why do we need a separate

More information

ANKA RF System - Upgrade Strategies

ANKA RF System - Upgrade Strategies ANKA RF System - Upgrade Strategies Vitali Judin ANKA Synchrotron Radiation Facility 2014-09 - 17 KIT University of the State Baden-Wuerttemberg and National Laboratory of the Helmholtz Association www.kit.edu

More information

9th ESLS RF Meeting September ALBA RF System. F. Perez. RF System 1/20

9th ESLS RF Meeting September ALBA RF System. F. Perez. RF System 1/20 ALBA RF System F. Perez RF System 1/20 ALBA Synchrotron Light Source in Barcelona (Spain) 3 GeV accelerator 30 beamlines (7 on day one) 50-50 Spanish Government Catalan Government First beam for users

More information

Karin Rathsman, Håkan Danared and Rihua Zeng. Report from RF Power Source Workshop

Karin Rathsman, Håkan Danared and Rihua Zeng. Report from RF Power Source Workshop Accelerator Division ESS AD Technical Note ESS/AD/0020 Karin Rathsman, Håkan Danared and Rihua Zeng Report from RF Power Source Workshop 10 July 2011 Report on the RF Power Source Workshop K. Rathsman,

More information

Intra-train Longitudinal Feedback for Beam Stabilization at FLASH

Intra-train Longitudinal Feedback for Beam Stabilization at FLASH Intra-train Longitudinal Feedback for Beam Stabilization at FLASH Ch. Behrens 1), M.-K. Bock 1), M. Felber 1), P. Gessler 1), K. Hacker 1), W. Koprek 1), H. Schlarb 1), S. Wesch 1), C.Schmidt 1), S. Schulz

More information

CONTROL OF THE LOW LEVEL RF SYSTEM OF THE LARGE HADRON COLLIDER

CONTROL OF THE LOW LEVEL RF SYSTEM OF THE LARGE HADRON COLLIDER 10th ICALEPCS Int. Conf. on Accelerator & Large Expt. Physics Control Systems. Geneva, 10-14 Oct 2005, PO1.028-1 (2005) CONTROL OF THE LOW LEVEL RF SYSTEM OF THE LARGE HADRON COLLIDER A. Butterworth 1,

More information

Oak Ridge Spallation Neutron Source Proton Power Upgrade Project and Second Target Station Project

Oak Ridge Spallation Neutron Source Proton Power Upgrade Project and Second Target Station Project Oak Ridge Spallation Neutron Source Proton Power Upgrade Project and Second Target Station Project Workshop on the future and next generation capabilities of accelerator driven neutron and muon sources

More information

ATCA-based LLRF System for XFEL

ATCA-based LLRF System for XFEL ATCA-based LLRF System for XFEL Demonstration at FLASH Waldemar Koprek, DESY for the XFEL LLRF team Outline Introduction to ATCA LLRF System for the European XFEL Demonstration at FLASH Measurements Introduction

More information

Research and Development on Superconducting Radio-Frequency Technology for Electron Linear Accelerators. Deliverable

Research and Development on Superconducting Radio-Frequency Technology for Electron Linear Accelerators. Deliverable SRF Research and Development on Superconducting Radio-Frequency Technology for Electron Linear Accelerators Deliverable 9.4.2.5 RF GUN CONTROL Elmar Vogel, Waldemar Koprek, Piotr Pucyk, Stefan Simrock

More information

3 cerl. 3-1 cerl Overview. 3-2 High-brightness DC Photocathode Gun and Gun Test Beamline

3 cerl. 3-1 cerl Overview. 3-2 High-brightness DC Photocathode Gun and Gun Test Beamline 3 cerl 3-1 cerl Overview As described before, the aim of the cerl in the R&D program includes the development of critical components for the ERL, as well as the construction of a test accelerator. The

More information

Klystron Lifetime Management System

Klystron Lifetime Management System Klystron Lifetime Management System Łukasz Butkowski Vladimir Vogel FLASH Seminar Outline 2 Introduction to KLM Protection and measurement functions Installation at Klystron test stand FPGA implementation

More information

An Overview of Beam Diagnostic and Control Systems for AREAL Linac

An Overview of Beam Diagnostic and Control Systems for AREAL Linac An Overview of Beam Diagnostic and Control Systems for AREAL Linac Presenter G. Amatuni Ultrafast Beams and Applications 04-07 July 2017, CANDLE, Armenia Contents: 1. Current status of existing diagnostic

More information

RF Upgrades & Experience At JLab. Rick Nelson

RF Upgrades & Experience At JLab. Rick Nelson RF Upgrades & Experience At JLab Rick Nelson Outline Background: CEBAF / Jefferson Lab History, upgrade requirements & decisions Progress & problems along the way Present status Future directions & concerns

More information

2 MHz Lock-In Amplifier

2 MHz Lock-In Amplifier 2 MHz Lock-In Amplifier SR865 2 MHz dual phase lock-in amplifier SR865 2 MHz Lock-In Amplifier 1 mhz to 2 MHz frequency range Dual reference mode Low-noise current and voltage inputs Touchscreen data display

More information

Proton Engineering Frontier Project

Proton Engineering Frontier Project Proton Engineering Frontier Project OECD Nuclear Energy Agency Fifth International Workshop on the Utilisation and Reliability of High Power Proton Accelerators (HPPA5) (6-9 May 2007, Mol, Belgium) Yong-Sub

More information

AR SWORD Digital Receiver EXciter (DREX)

AR SWORD Digital Receiver EXciter (DREX) Typical Applications Applied Radar, Inc. Radar Pulse-Doppler processing General purpose waveform generation and collection Multi-channel digital beamforming Military applications SIGINT/ELINT MIMO and

More information

Design of the linear accelerator for the MYRRHA project

Design of the linear accelerator for the MYRRHA project MYRRHA Multipurpose hybrid Research Reactor for High-tech Applications Design of the linear accelerator for the MYRRHA project Roberto Salemme ADT - Outline What is MYRRHA? MYRRHA accelerator: requirements

More information

Nick Walker DESY MAC

Nick Walker DESY MAC Nick Walker DESY MAC 4.5.2006 XFEL X-Ray Free-Electron Laser DESY ILC Project Group Accelerator Experimentation Behnke, Elsen, Walker (chair) WP 15, 16 WP 4-7 Accelerator Physics and Design WP 6 High Gradient

More information

INFN School on Electron Accelerators. RF Power Sources and Distribution

INFN School on Electron Accelerators. RF Power Sources and Distribution INFN School on Electron Accelerators 12-14 September 2007, INFN Sezione di Pisa Lecture 7b RF Power Sources and Distribution Carlo Pagani University of Milano INFN Milano-LASA & GDE The ILC Double Tunnel

More information

Beam Position Monitor Developments at PSI

Beam Position Monitor Developments at PSI Paul Scherrer Institut V. Schlott for the PSI Diagnostics Section Wir schaffen Wissen heute für morgen Beam Position Monitor Developments at PSI Overview Motivation European XFEL BPM Systems SwissFEL BPM

More information

The FAIR plinac RF Systems

The FAIR plinac RF Systems The FAIR plinac RF Systems Libera Workshop Sep. 2011 Gerald Schreiber Gerald Schreiber, GSI RF Department 2 (1) Overview GSI / FAIR (2) FAIR Proton Linear Accelerator "plinac" (3) plinac RF Systems (4)

More information

ESS Linac WP8 Radio Frequency Systems and Test Facilities

ESS Linac WP8 Radio Frequency Systems and Test Facilities ESS Linac WP8 Radio Frequency Systems and Test Facilities ESS TAC Lund, 8 July 2010 Roger Ruber (Uppsala University) for the ESS Linac RF Team Outline Work Package description Objectives Organization Technical

More information

Bunch-by-bunch feedback and LLRF at ELSA

Bunch-by-bunch feedback and LLRF at ELSA Bunch-by-bunch feedback and LLRF at ELSA Dmitry Teytelman Dimtel, Inc., San Jose, CA, USA February 9, 2010 Outline 1 Feedback Feedback basics Coupled-bunch instabilities and feedback Beam and feedback

More information

The LEP Superconducting RF System

The LEP Superconducting RF System The LEP Superconducting RF System K. Hübner* for the LEP RF Group CERN The basic components and the layout of the LEP rf system for the year 2000 are presented. The superconducting system consisted of

More information

Brilliance. Electron Beam Position Processor

Brilliance. Electron Beam Position Processor Brilliance Electron Beam Position Processor Many instruments. Many people. Working together. Stability means knowing your machine has innovative solutions. For users, stability means a machine achieving

More information

North Damping Ring RF

North Damping Ring RF North Damping Ring RF North Damping Ring RF Outline Overview High Power RF HVPS Klystron & Klystron EPICS controls Cavities & Cavity Feedback SCP diagnostics & displays FACET-specific LLRF LLRF distribution

More information

The ESS Accelerator. For Norwegian Industry and Research. Oslo, 24 Sept Håkan Danared Deputy Head Accelerator Division Group Leader Beam Physics

The ESS Accelerator. For Norwegian Industry and Research. Oslo, 24 Sept Håkan Danared Deputy Head Accelerator Division Group Leader Beam Physics The ESS Accelerator For Norwegian Industry and Research Oslo, 24 Sept 2013 Håkan Danared Deputy Head Accelerator Division Group Leader Beam Physics The Hadron Intensity Frontier Courtesy of M. Seidel (PSI)

More information

RF plans for ESS. Morten Jensen. ESLS-RF 2013 Berlin

RF plans for ESS. Morten Jensen. ESLS-RF 2013 Berlin RF plans for ESS Morten Jensen ESLS-RF 2013 Berlin Overview The European Spallation Source (ESS) will house the most powerful proton linac ever built. The average beam power will be 5 MW which is five

More information

GFT Channel Digital Delay Generator

GFT Channel Digital Delay Generator Features 20 independent delay Channels 100 ps resolution 25 ps rms jitter 10 second range Output pulse up to 6 V/50 Ω Independent trigger for every channel Fours Triggers Three are repetitive from three

More information

KARA and FLUTE RF Overview/status

KARA and FLUTE RF Overview/status KARA and FLUTE RF Overview/status Nigel Smale on behalf of IBPT and LAS teams Laboratory for Applications of Synchrotron radiation (LAS) Institute for Beam Physics and Technology (IBPT) KARA KIT The Research

More information

Implementation of the feed forward correction for the FLASH photo injector laser and future plans for a feedback system

Implementation of the feed forward correction for the FLASH photo injector laser and future plans for a feedback system Implementation of the feed forward correction for the FLASH photo injector laser and future plans for a feedback system Sebastian Schulz 1,2, Vladimir Arsov 2, Patrick Gessler 2, Olaf Hensler 2, Karsten

More information

Progress in Finite State Machine Developments at FLASH. Olaf Hensler MCS

Progress in Finite State Machine Developments at FLASH. Olaf Hensler MCS Progress in Finite State Machine Developments at FLASH Olaf Hensler MCS FLASH-seminar 19.Oct. 2010 Olaf Hensler DESY - MCS Objective of this simple FSM design Start up a system Coupler, klystron, LLRF

More information

XFEL High Power RF System Recent Developments

XFEL High Power RF System Recent Developments XFEL High Power RF System Recent Developments for the XFEL RF Group Outline XFEL RF System Requirements Overview Basic Layout RF System Main Components Multibeam Klystrons Modulator RF Waveguide Distribution

More information

PRESENT STATUS OF J-PARC

PRESENT STATUS OF J-PARC PRESENT STATUS OF J-PARC # F. Naito, KEK, Tsukuba, Japan Abstract Japan Proton Accelerator Research Complex (J-PARC) is the scientific facility with the high-intensity proton accelerator aiming to realize

More information

Commissioning of Accelerators. Dr. Marc Munoz (with the help of R. Miyamoto, C. Plostinar and M. Eshraqi)

Commissioning of Accelerators. Dr. Marc Munoz (with the help of R. Miyamoto, C. Plostinar and M. Eshraqi) Commissioning of Accelerators Dr. Marc Munoz (with the help of R. Miyamoto, C. Plostinar and M. Eshraqi) www.europeanspallationsource.se 6 July, 2017 Contents General points Definition of Commissioning

More information

IOT OPERATIONAL EXPERIENCE ON ALICE AND EMMA AT DARESBURY LABORATORY

IOT OPERATIONAL EXPERIENCE ON ALICE AND EMMA AT DARESBURY LABORATORY IOT OPERATIONAL EXPERIENCE ON ALICE AND EMMA AT DARESBURY LABORATORY A. Wheelhouse ASTeC, STFC Daresbury Laboratory ESLS XVIII Workshop, ELLETRA 25 th 26 th November 2010 Contents Brief Description ALICE

More information

Upgrade of CEBAF to 12 GeV

Upgrade of CEBAF to 12 GeV Upgrade of CEBAF to 12 GeV Leigh Harwood (for 12 GeV Accelerator team) Page 1 Outline Background High-level description Schedule Sub-system descriptions and status Summary Page 2 CEBAF Science Mission

More information

Ensemble QLAB. Stand-Alone, 1-4 Axes Piezo Motion Controller. Control 1 to 4 axes of piezo nanopositioning stages in open- or closed-loop operation

Ensemble QLAB. Stand-Alone, 1-4 Axes Piezo Motion Controller. Control 1 to 4 axes of piezo nanopositioning stages in open- or closed-loop operation Ensemble QLAB Motion Controllers Ensemble QLAB Stand-Alone, 1-4 Axes Piezo Motion Controller Control 1 to 4 axes of piezo nanopositioning stages in open- or closed-loop operation Configurable open-loop

More information

Fast Orbit Feedback at the SLS. Outline

Fast Orbit Feedback at the SLS. Outline Fast Orbit Feedback at the SLS 2nd Workshop on Beam Orbit Stabilisation (December4-6, 2002, SPring-8) T. Schilcher Outline Noise Sources at SLS Stability / System Requirements Fast Orbit Feedback Implementation

More information

Workshop on Accelerator Operations August 6-10, 2012 Glen D. Johns Accelerator Operations Manager

Workshop on Accelerator Operations August 6-10, 2012 Glen D. Johns Accelerator Operations Manager HWDB: Operations at the Spallation Neutron Source Workshop on Accelerator Operations August 6-10, 2012 Glen D. Johns Accelerator Operations Manager Outline Facility overview Organization Shift schedule

More information

TOWARDS THE COMMISSIONING OF J-PARC

TOWARDS THE COMMISSIONING OF J-PARC 10th ICALEPCS Int. Conf. on Accelerator & Large Expt. Physics Control Systems. Geneva, 10-14 Oct 2005, MO3.5-1O (2005) TOWARDS THE COMMISSIONING OF J-PARC T. Katoh 1, K. Furukawa 1, N. Kamikubota 1, H.

More information

Pulses inside the pulse mode of operation at RF Gun

Pulses inside the pulse mode of operation at RF Gun Pulses inside the pulse mode of operation at RF Gun V. Vogel, V. Ayvazyan, K. Floettmann, D. Lipka, P. Morozov, H. Schlarb, S. Schreiber FLASH Seminar, DESY March 29, 2011 Contents Why we need a PiPmode

More information

14 GHz, 2.2 kw KLYSTRON GENERATOR GKP 22KP 14GHz WR62 3x400V

14 GHz, 2.2 kw KLYSTRON GENERATOR GKP 22KP 14GHz WR62 3x400V 14 GHz, 2.2 kw KLYSTRON GENERATOR GKP 22KP 14GHz WR62 3x400V With its characteristics of power stability independent of the load, very fast response time when pulsed (via external modulated signal), low

More information

The TESLA RF System. S. Choroba. for the TESLA Collaboration. DESY Notkestr. 85, D Hamburg, Germany

The TESLA RF System. S. Choroba. for the TESLA Collaboration. DESY Notkestr. 85, D Hamburg, Germany The TESLA RF System S. Choroba for the TESLA Collaboration DESY Notkestr. 85, D-22603 Hamburg, Germany Abstract. The TESLA project proposed by the TESLA collaboration in 2001 is a 500 to 800GeV e+/e- linear

More information

Current status of XFEL/SPring-8 project and SCSS test accelerator

Current status of XFEL/SPring-8 project and SCSS test accelerator Current status of XFEL/SPring-8 project and SCSS test accelerator Takahiro Inagaki for XFEL project in SPring-8 inagaki@spring8.or.jp Outline (1) Introduction (2) Key technology for compactness (3) Key

More information

Trigger-timing signal distribution system for the KEK electron/positron injector linac

Trigger-timing signal distribution system for the KEK electron/positron injector linac Trigger-timing signal distribution system for the KEK electron/positron injector linac T. Suwada, 1 K. Furukawa, N. Kamikubota, and M. Satoh, Accelerator Laboratory, High Energy Accelerator Research Organization

More information

RF PERFORMANCE AND OPERATIONAL ISSUES

RF PERFORMANCE AND OPERATIONAL ISSUES RF PERFORMANCE AND OPERATIONAL ISSUES A. Butterworth, L. Arnaudon, P. Baudrenghien, O. Brunner, E. Ciapala, W. Hofle, J. Molendijk, CERN, Geneva, Switzerland Abstract During the 2009 LHC run, a number

More information

Development of beam-collision feedback systems for future lepton colliders. John Adams Institute for Accelerator Science, Oxford University

Development of beam-collision feedback systems for future lepton colliders. John Adams Institute for Accelerator Science, Oxford University Development of beam-collision feedback systems for future lepton colliders P.N. Burrows 1 John Adams Institute for Accelerator Science, Oxford University Denys Wilkinson Building, Keble Rd, Oxford, OX1

More information

18 GHz, 2.2 kw KLYSTRON GENERATOR GKP 24KP 18GHz WR62 3x400V

18 GHz, 2.2 kw KLYSTRON GENERATOR GKP 24KP 18GHz WR62 3x400V 18 GHz, 2.2 kw KLYSTRON GENERATOR GKP 24KP 18GHz WR62 3x400V With its characteristics of power stability whatever the load, very fast response time when pulsed (via external modulated signal), low ripple,

More information

PEP-I1 RF Feedback System Simulation

PEP-I1 RF Feedback System Simulation SLAC-PUB-10378 PEP-I1 RF Feedback System Simulation Richard Tighe SLAC A model containing the fundamental impedance of the PEP- = I1 cavity along with the longitudinal beam dynamics and feedback system

More information

A HIGH POWER LONG PULSE HIGH EFFICIENCY MULTI BEAM KLYSTRON

A HIGH POWER LONG PULSE HIGH EFFICIENCY MULTI BEAM KLYSTRON A HIGH POWER LONG PULSE HIGH EFFICIENCY MULTI BEAM KLYSTRON A.Beunas and G. Faillon Thales Electron Devices, Vélizy, France S. Choroba DESY, Hamburg, Germany Abstract THALES ELECTRON DEVICES has developed

More information

Features of the 745T-20C: Applications of the 745T-20C: Model 745T-20C 20 Channel Digital Delay Generator

Features of the 745T-20C: Applications of the 745T-20C: Model 745T-20C 20 Channel Digital Delay Generator 20 Channel Digital Delay Generator Features of the 745T-20C: 20 Independent delay channels - 100 ps resolution - 25 ps rms jitter - 10 second range Output pulse up to 6 V/50 Ω Independent trigger for every

More information

CLIC Feasibility Demonstration at CTF3

CLIC Feasibility Demonstration at CTF3 CLIC Feasibility Demonstration at CTF3 Roger Ruber Uppsala University, Sweden, for the CLIC/CTF3 Collaboration http://cern.ch/clic-study LINAC 10 MO303 13 Sep 2010 The Key to CLIC Efficiency NC Linac for

More information

ESS: The Machine. Bucharest, 24 April Håkan Danared Deputy Head Accelerator Division. H. Danared Industry & Partner Days Bucharest Page 1

ESS: The Machine. Bucharest, 24 April Håkan Danared Deputy Head Accelerator Division. H. Danared Industry & Partner Days Bucharest Page 1 ESS: The Machine Bucharest, 24 April 2014 Håkan Danared Deputy Head Accelerator Division H. Danared Industry & Partner Days Bucharest Page 1 2025 ESS construction complete 2009 Decision: ESS will be built

More information

Instrumentation Grade RF & Microwave Subsystems

Instrumentation Grade RF & Microwave Subsystems Instrumentation Grade RF & Microwave Subsystems PRECISION FREQUENCY TRANSLATION SignalCore s frequency translation products are designed to meet today s demanding wireless applications. Offered in small

More information

Agilent E5500 Series Phase Noise Measurement Solutions Product Overview

Agilent E5500 Series Phase Noise Measurement Solutions Product Overview Agilent E5500 Series Phase Noise Measurement Solutions Product Overview E5501A/B E5502A/B E5503A/B E5504A/B 50 khz to 1.6 GHz 50 khz to 6 GHz 50 khz to 18 GHz 50 khz to 26.5 GHz The Agilent E5500 series

More information

FIRST SIMULTANEOUS TOP-UP OPERATION OF THREE DIFFERENT RINGS IN KEK INJECTOR LINAC

FIRST SIMULTANEOUS TOP-UP OPERATION OF THREE DIFFERENT RINGS IN KEK INJECTOR LINAC FIRST SIMULTANEOUS TOP-UP OPERATION OF THREE DIFFERENT RINGS IN KEK INJECTOR LINAC M. Satoh #, for the IUC * Accelerator Laboratory, High Energy Accelerator Research Organization (KEK) 1-1 Oho, Tsukuba,

More information

RUNNING EXPERIENCE OF FZD SRF PHOTOINJECTOR

RUNNING EXPERIENCE OF FZD SRF PHOTOINJECTOR RUNNING EXPERIENCE OF FZD SRF PHOTOINJECTOR Rong Xiang On behalf of the BESSY-DESY-FZD-MBI collaboration and the ELBE team FEL 2009, Liverpool, United Kingdom, August 23 ~ 28, 2009 Outline Introduction

More information

TITLE PAGE. Title of paper: PUSH-PULL FEL, A NEW ERL CONCEPT Author: Andrew Hutton. Author Affiliation: Jefferson Lab. Requested Proceedings:

TITLE PAGE. Title of paper: PUSH-PULL FEL, A NEW ERL CONCEPT Author: Andrew Hutton. Author Affiliation: Jefferson Lab. Requested Proceedings: TITLE PAGE Title of paper: PUSH-PULL FEL, A NEW ERL CONCEPT Author: Andrew Hutton Author Affiliation: Jefferson Lab Requested Proceedings: Unique Session ID: Classification Codes: Keywords: Energy Recovery,

More information

Beam Loss Detection for MPS at FRIB

Beam Loss Detection for MPS at FRIB Beam Loss Detection for MPS at FRIB Zhengzheng Liu Beam Diagnostics Physicist This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC0000661.

More information

TTF / VUV-FEL. Schedule 2005 and Project Management Issues. Schedule 2005 Project Organisation Budget & Controlling

TTF / VUV-FEL. Schedule 2005 and Project Management Issues. Schedule 2005 Project Organisation Budget & Controlling TTF / VUV-FEL Schedule 200 and Project Management Issues Schedule 200 Project Organisation Budget & Controlling Hans Weise / DESY DESY MAC Meeting November 9th, 2004 TTF Linac Start-up After Final Installation

More information

A HIGH-POWER SUPERCONDUCTING H - LINAC (SPL) AT CERN

A HIGH-POWER SUPERCONDUCTING H - LINAC (SPL) AT CERN A HIGH-POWER SUPERCONDUCTING H - LINAC (SPL) AT CERN E. Chiaveri, CERN, Geneva, Switzerland Abstract The conceptual design of a superconducting H - linear accelerator at CERN for a beam energy of 2.2 GeV

More information

Model 7330 Signal Source Analyzer Dedicated Phase Noise Test System V1.02

Model 7330 Signal Source Analyzer Dedicated Phase Noise Test System V1.02 Model 7330 Signal Source Analyzer Dedicated Phase Noise Test System V1.02 A fully integrated high-performance cross-correlation signal source analyzer from 5 MHz to 33+ GHz Key Features Complete broadband

More information

Upgrading LHC Luminosity

Upgrading LHC Luminosity 1 Upgrading LHC Luminosity 2 Luminosity (cm -2 s -1 ) Present (2011) ~2 x10 33 Beam intensity @ injection (*) Nominal (2015?) 1 x 10 34 1.1 x10 11 Upgraded (2021?) ~5 x10 34 ~2.4 x10 11 (*) protons per

More information

Effects of the cryogenics operational conditions on the mechanical stability of the FLASH linac modules

Effects of the cryogenics operational conditions on the mechanical stability of the FLASH linac modules Effects of the cryogenics operational conditions on the mechanical stability of the FLASH linac modules Ramila Amirikas, Alessandro Bertolini, Jürgen Eschke, Mark Lomperski XFEL Module Meeting, January

More information

7000 Series Signal Source Analyzer & Dedicated Phase Noise Test System

7000 Series Signal Source Analyzer & Dedicated Phase Noise Test System 7000 Series Signal Source Analyzer & Dedicated Phase Noise Test System A fully integrated high-performance cross-correlation signal source analyzer with platforms from 5MHz to 7GHz, 26GHz, and 40GHz Key

More information

Status of the X-ray FEL control system at SPring-8

Status of the X-ray FEL control system at SPring-8 Status of the X-ray FEL control system at SPring-8 T.Fukui 1, T.Hirono 2, N.Hosoda 1, M.Ishii 2, M.Kitamura 1 H.Maesaka 1,T.Masuda 2, T.Matsushita 2, T.Ohata 2, Y.Otake 1, K.Shirasawa 1,M.Takeuchi 2, R.Tanaka

More information

ESS Linac WP8 Radio Frequency Systems and Test Facilities

ESS Linac WP8 Radio Frequency Systems and Test Facilities ESS Linac WP8 Radio Frequency Systems and Test Facilities ESS/SPL Collaboration Meeting Lund, 29 June 2010 Roger Ruber (Uppsala University) for the ESS Linac RF Team ESS Linac WP8: RF Systems Outline Work

More information

Phase (deg) Phase (deg) Positive feedback, 317 ma. Negative feedback, 330 ma. jan2898/1638: beam pseudospectrum around 770*frev.

Phase (deg) Phase (deg) Positive feedback, 317 ma. Negative feedback, 330 ma. jan2898/1638: beam pseudospectrum around 770*frev. Commissioning Experience from PEP-II HER Longitudinal Feedback 1 S. Prabhakar, D. Teytelman, J. Fox, A. Young, P. Corredoura, and R. Tighe Stanford Linear Accelerator Center, Stanford University, Stanford,

More information

LIGHT PROTON THERAPY PROJECT

LIGHT PROTON THERAPY PROJECT 17 th of MAY 2018 LIGHT PROTON THERAPY PROJECT Yevgeniy Ivanisenko on behalf of ADAM team FORM-01040-A AVO-ADAM Advanced Oncotherapy (AVO) is a public company ADAM is R&D center of AVO ~ 100 employees

More information

Technical Data. HF Tuner WJ-9119 WATKINS-JOHNSON. Features

Technical Data. HF Tuner WJ-9119 WATKINS-JOHNSON. Features May 1996 Technical Data WATKINS-JOHNSON HF Tuner WJ-9119 WJ designed the WJ-9119 HF Tuner for applications requiring maximum dynamic range. The tuner specifically interfaces with the Hewlett-Packard E1430A

More information

GALILEO Timing Receiver

GALILEO Timing Receiver GALILEO Timing Receiver The Space Technology GALILEO Timing Receiver is a triple carrier single channel high tracking performances Navigation receiver, specialized for Time and Frequency transfer application.

More information

PoS(EPS-HEP2015)525. The RF system for FCC-ee. A. Butterworth CERN 1211 Geneva 23, Switzerland

PoS(EPS-HEP2015)525. The RF system for FCC-ee. A. Butterworth CERN 1211 Geneva 23, Switzerland CERN 1211 Geneva 23, Switzerland E-mail: andrew.butterworth@cern.ch O. Brunner CERN 1211 Geneva 23, Switzerland E-mail: olivier.brunner@cern.ch R. Calaga CERN 1211 Geneva 23, Switzerland E-mail: rama.calaga@cern.ch

More information

COMMISSIONING OF THE ALBA FAST ORBIT FEEDBACK SYSTEM

COMMISSIONING OF THE ALBA FAST ORBIT FEEDBACK SYSTEM COMMISSIONING OF THE ALBA FAST ORBIT FEEDBACK SYSTEM A. Olmos, J. Moldes, R. Petrocelli, Z. Martí, D. Yepez, S. Blanch, X. Serra, G. Cuni, S. Rubio, ALBA-CELLS, Barcelona, Spain Abstract The ALBA Fast

More information

Quartzlock Model A7-MX Close-in Phase Noise Measurement & Ultra Low Noise Allan Variance, Phase/Frequency Comparison

Quartzlock Model A7-MX Close-in Phase Noise Measurement & Ultra Low Noise Allan Variance, Phase/Frequency Comparison Quartzlock Model A7-MX Close-in Phase Noise Measurement & Ultra Low Noise Allan Variance, Phase/Frequency Comparison Measurement of RF & Microwave Sources Cosmo Little and Clive Green Quartzlock (UK) Ltd,

More information

The European Spallation Source

The European Spallation Source The European Spallation Source Roger Ruber Uppsala University NIKHEF industriemiddag 21 september 2011 The European Spallation Source Roger Ruber - The European Spallation Source NIKHEF, 21-Sep-2011 page

More information

THE DESIGN OF CSNS INSTRUMENT CONTROL

THE DESIGN OF CSNS INSTRUMENT CONTROL THE DESIGN OF CSNS INSTRUMENT CONTROL Jian Zhuang,1,2,3 2,3 2,3 2,3 2,3 2,3, Jiajie Li, Lei HU, Yongxiang Qiu, Lijiang Liao, Ke Zhou 1State Key Laboratory of Particle Detection and Electronics, Beijing,

More information

TWO BUNCHES WITH NS-SEPARATION WITH LCLS*

TWO BUNCHES WITH NS-SEPARATION WITH LCLS* TWO BUNCHES WITH NS-SEPARATION WITH LCLS* F.-J. Decker, S. Gilevich, Z. Huang, H. Loos, A. Marinelli, C.A. Stan, J.L. Turner, Z. van Hoover, S. Vetter, SLAC, Menlo Park, CA 94025, USA Abstract The Linac

More information

Present Status and Future Upgrade of KEKB Injector Linac

Present Status and Future Upgrade of KEKB Injector Linac Present Status and Future Upgrade of KEKB Injector Linac Kazuro Furukawa, for e /e + Linac Group Present Status Upgrade in the Near Future R&D towards SuperKEKB 1 Machine Features Present Status and Future

More information

Introduction This application note describes the XTREME-1000E 8VSB Digital Exciter and its applications.

Introduction This application note describes the XTREME-1000E 8VSB Digital Exciter and its applications. Application Note DTV Exciter Model Number: Xtreme-1000E Version: 4.0 Date: Sept 27, 2007 Introduction This application note describes the XTREME-1000E Digital Exciter and its applications. Product Description

More information

The Elettra Storage Ring and Top-Up Operation

The Elettra Storage Ring and Top-Up Operation The Elettra Storage Ring and Top-Up Operation Emanuel Karantzoulis Past and Present Configurations 1994-2007 From 2008 5000 hours /year to the users 2010: Operations transition year Decay mode, 2 GeV (340mA)

More information

Trigger synchronization and phase coherent in high speed multi-channels data acquisition system

Trigger synchronization and phase coherent in high speed multi-channels data acquisition system White Paper Trigger synchronization and phase coherent in high speed multi-channels data acquisition system Synopsis Trigger synchronization and phase coherent acquisition over multiple Data Acquisition

More information

1 Digital BPM Systems for Hadron Accelerators

1 Digital BPM Systems for Hadron Accelerators Digital BPM Systems for Hadron Accelerators Proton Synchrotron 26 GeV 200 m diameter 40 ES BPMs Built in 1959 Booster TT70 East hall CB Trajectory measurement: System architecture Inputs Principles of

More information

DESIGN AND PERFORMANCE OF L-BAND AND S-BAND MULTI BEAM KLYSTRONS

DESIGN AND PERFORMANCE OF L-BAND AND S-BAND MULTI BEAM KLYSTRONS DESIGN AND PERFORMANCE OF L-BAND AND S-BAND MULTI BEAM KLYSTRONS Y. H. Chin, KEK, Tsukuba, Japan. Abstract Recently, there has been a rising international interest in multi-beam klystrons (MBK) in the

More information

ILC-LNF TECHNICAL NOTE

ILC-LNF TECHNICAL NOTE IL-LNF EHNIAL NOE Divisione Acceleratori Frascati, July 4, 2006 Note: IL-LNF-001 RF SYSEM FOR HE IL DAMPING RINGS R. Boni, INFN-LNF, Frascati, Italy G. avallari, ERN, Geneva, Switzerland Introduction For

More information

DSA-1. The Prism Sound DSA-1 is a hand-held AES/EBU Signal Analyzer and Generator.

DSA-1. The Prism Sound DSA-1 is a hand-held AES/EBU Signal Analyzer and Generator. DSA-1 The Prism Sound DSA-1 is a hand-held AES/EBU Signal Analyzer and Generator. The DSA-1 is an invaluable trouble-shooting tool for digital audio equipment and installations. It is unique as a handportable,

More information

Advanced Test Equipment Rentals ATEC (2832)

Advanced Test Equipment Rentals ATEC (2832) E stablished 1981 Advanced Test Equipment Rentals www.atecorp.com 800-404-ATEC (2832) Technical Datasheet Scalar Network Analyzer Model 8003-10 MHz to 40 GHz The Giga-tronics Model 8003 Precision Scalar

More information

LCLS RF Reference and Control R. Akre Last Update Sector 0 RF and Timing Systems

LCLS RF Reference and Control R. Akre Last Update Sector 0 RF and Timing Systems LCLS RF Reference and Control R. Akre Last Update 5-19-04 Sector 0 RF and Timing Systems The reference system for the RF and timing starts at the 476MHz Master Oscillator, figure 1. Figure 1. Front end

More information