1 The TESLA RF System S. Choroba for the TESLA Collaboration DESY Notkestr. 85, D Hamburg, Germany Abstract. The TESLA project proposed by the TESLA collaboration in 2001 is a 500 to 800GeV e+/e- linear collider with integrated free electron laser facility. The accelerator is based on superconducting cavity technology. Approximately superconducting cavities operated at 1.3GHz with a gradient of 23.4MV/m or 35MV/m will be required to achieve the energy of 500GeV or 800GeV respectively. For 500GeV ~600 RF stations each generating 10MW of RF power at 1.3GHz at a pulse duration of 1.37ms and a repetition rate of 5 or 10Hz are required. The original TESLA design was modified in 2002 and now includes a dedicated 20GeV electron accelerator in a separate tunnel for free electron laser application. The TESLA XFEL will provide XFEL radiation of unprecedented peak brilliance and full transverse coherence in the wavelength range of 0.1 to 6.4nm at a pulse duration of 100fs. The technology of both accelerators, the TESLA linear collider and the XFEL, will be identical, however the number of superconducting cavities and RF stations for the XFEL will be reduced to 936 and 26 respectively. This paper describes the layout of the entire RF system of the TESLA linear collider and the TESLA XFEL and gives an overview of its various subsystems and components. INTRODUCTION The TESLA project proposed by the TESLA collaboration in 2001 is a 33km long 500 to 800GeV e+/e- linear collider with integrated free electron laser facility. In contrast to other linear collider concepts it is based on superconducting RF structures. Details can be found in the TESLA Technical Design Report [1]. In the year 2002 the Technical Design Report Supplement was published describing a dedicated 20GeV electron accelerator for free electron laser application [2]. A detailed paper on the RF system for the TESLA 500GeV collider was presented at the modulator klystron workshop in Geneva in 2001 [3]. The TESLA RF system provides RF power at a frequency of 1.3GHz for the superconducting cavities of the TESLA linear collider and the TESLA XFEL. The 500GeV linear collider requires 572 RF stations. For the 800GeV upgrade the number of stations must to be doubled and in both cases 12 stations for the injectors must be added. The dedicated electron linac for the free electron laser requires 26 stations plus 4 for the injector.

2 Although the requirements of the different accelerators, the 500GeV accelerator, the 800GeV upgrade and the 20GeV linac for the XFEL, differ in certain points, many of the main parameters of the RF systems are almost identical. Therefore the RF system layout will be presented for the example of the 500GeV accelerator. Major differences will be mentioned. For the 500GeV linear collider an accelerating gradient of 23.4MV/m is required. Since the maximum beam current is 9.5mA, 231kW of RF power will be needed for each 1.038m long superconducting cavity. Each particle beam pulse consists of 2820 bunches with a spacing of 337ns and has a length of 950µs. The filling time of each cavity is 420µs and therefore the total RF pulse length is 1.37ms. The repetition rate is 5Hz. At 800GeV center of mass energy the gradient must be increased to 35MV/m, the filling time increases to 510µs, the beam pulse length and the repetition rate decrease to 860µs and 4Hz respectively. The linac for the XFEL operates at a gradient up to 23.4MV/m at a repetition rate of 10Hz. Since the particle beam current is 5mA up to 122kW are required per cavity. The XFEL beam pulse duration is 800µs and the cavity filling time 570µs. BASIC RF STATION LAYOUT It is possible to use one independent RF source per superconducting cavity or to use a more powerful RF source and connect several cavities to one source instead. The latter results in a smaller number of sources and therefore promises higher reliability. At TESLA 36 cavities, 3 times 12 cavities per cryogenic module, will be connected to one 10MW klystron by a RF waveguide distribution system. For the 500GeV linear collider 8.3MW are required by the cavities. Taking into account 6% losses in the waveguide distribution system and a regulation reserve of 10% for phase and amplitude control the klystron must provide up to 9.7MW. For the 800GeV upgrade the number of klystrons will be doubled, thus 18 cavities will be connected to one klystron. For the XFEL only 5.2MW must be generated by the klystron including the reserve for waveguide losses and for regulation. Each klystron is part of one RF station consisting of the klystron, a HV modulator, which transforms the AC line power to pulsed HV power, the waveguide distribution system, a low level RF system, which controls shape, amplitude and phase of the RF, several auxiliary power supplies for the klystron and the pulse transformer and an interlock and control system, which protects the station and the linac. The RF stations will be installed in the accelerator tunnel with a separation of 50m (25m for the 800GeV upgrade) with the exception of the modulators high voltage power supplies and pulse generating units which will be installed in access halls on top of the accelerator tunnel. The access halls have a separation of about 5km. High voltage pulse cables and additional cables for the interlock system connect the components of each station in and outside the tunnel. The number of modulators per hall will be up to 100 for the 500GeV linear collider, up to 200 for the 800GeV upgrade and 30 for the XFEL.

3 THE 10MW MULTIBEAM KLYSTRON The RF power source for TESLA is a 10MW multibeam klystron. Investigations of different klystrons have shown that klystrons with low microperveance have higher efficiency than klystrons with high microperveance [4, 5]. Since low microperveance beams have higher voltage and lower current than high microperveance beams of the same beam power, space charge forces are smaller, bunching of the beam becomes easier and hence the efficiency is higher. Unfortunately low microperveance results in higher voltage, which in case of long pulse klystrons might lead to higher breakdown probability and hence reduced reliability. By using many small low perveance beams in parallel in one klystron both the beam voltage and the space charge forces become smaller compared to a single beam klystron of the same power. For a multibeam klystron an efficiency up to 70% or more seems theoretically feasible, whereas a standard single beam klystron of microperveance 2.0 has only an efficiency of 45%. FIGURE 1. The THALES TH1801 Multibeam Klystron. Figure 1 shows the multibeam klystron TH1801 produced by Thomson Tubes Electroniques, now THALES Electron Devices [6]. Seven beams of a microperveance of 0.5 are produced by the cathode and accelerated by the klystron gun. The beams

4 have independent drift tube sections but common cavities. After RF extraction in the output cavity, the spent electron beams are absorbed in one collector. Two output waveguides are required to handle the RF power of 2 times 5MW in the output windows. The total height of the klystron is 2.5m. The multibeam klystron was successfully tested and operated at the TESLA test facility (TTF) at DESY. It achieved an output power of 10MW with an efficiency of 65%. Table 1 summarizes the design parameters and the parameters achieved with the prototype. The repetition rate and average power during test of the prototype was limited by main power restrictions. Later a series klystron was operated at full repetition rate and full average power. More detailed information can be found in [7]. Since the gain of the klystron is 48dB the drive power is below 160W and solid state amplifiers can be used. They will be installed near to the klystrons inside the collider tunnel. The klystrons will be mounted in the horizontal or the vertical position depending on which accelerator tunnel layout will be finally selected (see figure 4). TABLE 1. Design and Measured Parameters of the THALES TH1801 Multibeam Klystron. Design Measurement Operation Frequency 1300MHz 1300MHz RF Pulse Duration 1.5ms 1.5ms Repetition Rate 10Hz 5Hz Cathode Voltage 110kV 117kV Beam Current 130A 131A HV Pulse Duration 1.7ms 1.7ms No. of Beams 7 7 Microperveance No. of Cavities 6 6 RF Peak Power 10MW 10MW RF Average Power 150kW 75kW Efficiency 70% goal 65% Gain 48dB 48.2dB Solenoid Power 4kW 6kW Other klystron vendors have started to develop multibeam klystrons for TESLA too. The following tables and pictures show the parameter and outline of the CPI and the TOSHIBA multibeam klystron for TESLA respectively. The CPI prototype is being assembled and test is foreseen for autumn Development of the TOSHIBA klystron has just started in cooperation with KEK, Japan.

5 TABLE 2. Typical Operating Parameters of the CPI VKL Ave. Power Output 150 kw (min) Beam Voltage 114 kv (typ) Beam Current 131 A (typ) Efficiency % (typ-goal) Frequency 1.3 GHz Pulse Duration 1.5 ms (min) Saturated Gain 47 db (min) Number of Beams 6 Number of Cavities HOM, fund., harmonic Focusing CFF Cathode loading <2.5 A/cm2 (typ) Solenoid Power 4 kw (typ) Length 2300 mm (typ) Diameter 560 mm (typ, gun) FIGURE 2. The CPI VKL-8301 Multibeam Klystron.

6 TABLE 3. Design Parameter of the TOSHIBA E-3736 Multibeam Klystron. Peak Output Power 10 MW Average Output Power 150 kw Cathode Voltage 115 kv Beam Current 132 A Efficiency > 65 % Saturated Gain 47 db Number of Beams 6 Number of Cavities 6 Cathode Loading < 3 A/cm Solenoid Power < 4 kw Operation Frequency 1300 MHz RF Pulse Duration 1.5 ms Repetition Rate 10 Hz FIGURE 3. The TOSHIBA E-3736 Multibeam Klystron.

7 FIGURE 4. Old (top) and new (bottom) accelerator tunnel layout. THE MODULATOR The modulator generates 120kV HV pulses of almost rectangular shape. The pulse duration is 1.57ms and the rise and fall time 200µs. Already during the leading edge of the high voltage pulse when the voltage has reached 80% of the flat top level the klystron can start to generate RF power. Although this part of the RF pulse does not meet the requirements regarding phase and amplitude stability for particle beam acceleration in the accelerator it can be used to fill the superconducting cavities with RF. The phase change of 320 between 80% and 100% of the klystron voltage can be compensated by the low level RF control. The flat top ripple should not exceed ±0.5% in order to limit phase and amplitude variations of the klystron RF output during beam acceleration. The pulse-to-pulse stability must be better than ±0.5%. In case of klystron gun sparking the energy deposited in the spark must be limited to a maximum of 20J. The modulator requirements are summarized in Table 4.

8 TABLE 4. Modulator Requirements. Typical Maximum Klystron Gun Voltage 115kV 130kV Klystron Gun Current 130A 150A High Voltage Pulse Duration (70% to 70%) <1.7ms 1.7ms High Voltage Rise and Fall Time (0 to 99%) <0.2ms 0.2ms High Voltage Flat Top (99% to 99%) 1.37ms 1.5ms Pulse Flatness during Flat Top < ±0.5% ±0.5% Pulse-to-Pulse Voltage fluctuation < ±0.5% ±0.5% Energy Deposit in Klystron in Case of Gun Spark <20J 20J Pulse Repetition Rate for the Linear Collider 5Hz 5Hz Pulse Repetition Rate for the XFEL 10Hz 10Hz Transformer Ratio 1:12 1:12 Different types of modulators were investigated. Finally the bouncer modulator consisting of a HV power supply, a pulse generating unit and a pulse transformer was selected. It promised low cost and high reliability compared to alternative layouts [8]. The basic idea of the bouncer modulator is to use a capacitor discharge and compensate the voltage droop by the linear part of the oscillation of a bouncer circuit. The circuit diagram of the bouncer modulator is sketched in Figure 5. A HV power supply keeps the 1.4mF main capacitor C1 charged to the 10kV level. By closing the switch S1 the capacitor C1 starts to discharge via the pulse transformer into the klystron. The 1:12 transformer converts the 10kV voltage of the capacitor to the klystron level of 120kV. After 1.57ms switch S1 opens and terminates the pulse. Since the capacitor voltage drops during the pulse no flat top would be achieved unless a huge capacitor bank storing a big amount of energy would be used. For a droop of 1% a capacitor bank of 29mF would be required. In order to overcome the disadvantage of a huge capacitor bank the bouncer circuit was added. A circuit consisting of a choke, a capacitor and another switch is connected to the low end of the primary winding of the pulse transformer. By triggering this switch shortly before the main pulse begins this circuit starts to oscillate. The linear part of the 5ms long oscillation is then used to compensate the droop of the main capacitor C1. By this the 19% droop of the 1.4mF capacitor can be reduced to 1%. A very detailed description of the modulator is given in [9, 10, 11, 12]. Several modulators of the bouncer type were built and are in use at the TESLA test facility. The first modulators were built and assembled by Fermilab, USA, and then shipped completely to DESY. The others were assembled at DESY in cooperation with industrial companies from units manufactured by the companies. The first modulators made by Fermilab use GTOs and IGBTs as main switches in the pulse generating unit, whereas the newer version of the pulse generating unit built by industry use IGCTs instead. The size of the pulse generating unit is 2.8m(L) x 1.6m(W) x 2.0m(H). The pulse transformer transforms the 10kV pulses of the pulse generating unit to 120kV required by the klystron. The transformers leakage inductance determines the rise time of the HV pulse. The first transformers have a leakage inductance of more than 300µH whereas the newer have less than 200µH. This allows to meet the specification of rise time of less than 200µs. The size of the transformer is 3.2m(L) x 1.2m(W) x 1.4m(H), its weight is 6.5t.

9 FIGURE 5. Circuit diagram of the modulator (schematic). Since the pulse forming units of the modulators will be installed in the access halls on top of the accelerator tunnel whereas the pulse transformers will be installed inside the tunnel, pulse cables with a length of up to 2.8km must be used for the connection. In order to limit the ohmic power loss to 2% on average a current lead of 300mm 2 is required. The wave impedance of the cable must match the impedance of the klystron transformed to the transformers primary side to avoid distortion of the pulse shape. In addition the skin affect must be minimized. Therefore four cables in parallel, each of 75mm 2 cross section, 25Ω impedance and an outer diameter of 30mm, will be used. The cables are of triaxial type to minimize electromagnetic interference. The inner lead is at high potential (12kV), the middle cylindrical lead at the potential of the bouncer circuit (±2kV) and the outer cylindrical lead at ground potential. As insulation material VPE will be used. Additional line matching to the pulse transformer will be done via a RC network. Simulation results and further information on the cable can be found in [13]. A special high voltage power supply for charging the pulse generating units capacitor is required. It has to charge the main capacitor to an accurate value of voltage in order to obtain the same voltage at the klystron from pulse to pulse, and it has to suppress the repetition frequency (up to 10Hz) load of the mains in order to avoid disturbances of the mains. The input connection of each power supply is three phase grid and the output voltage is 12kV. One power supply is foreseen for each modulator. In order to ensure a high reliability the power supplies will be built in modules of switch mode buck converters or alternatively of series resonant converters. The power supply regulation is a digital self-learning regulation of the input power, made possible by the high regulation dynamic of the converter supply. In addition the voltage at the capacitor bank at the firing time of the pulse will be regulated within 0.5% accuracy. The size of a high voltage power supply is 1.2m(L) x 1.6m(W) x 2.0m(H). Further information about the power supplies can be found in [14]. Several additional auxiliary power supplies are required for the operation of the klystron and the modulator, e.g. for the klystron focusing solenoid, for the klystron

10 filament, the klystron vacuum pump and the pulse transformer core bias. The auxiliary power supplies will be installed together in a rack near to the klystron and the pulse transformer. RF SYSTEM EFFICIENCY Taking into account losses of 6% in the waveguide distribution system the klystron has to provide 8.7MW for the linear collider. This power must be generated below saturation because of the required regulation reserve of 10% for fast phase and amplitude control. Thus the klystron will be operated at a voltage of 117kV, sufficient to generate 10MW of RF power. The efficiency at this voltage level is 65%. It is necessary that the voltage stays constant within 1% during the pulse flat top, when the accelerator particle beam is accelerated. However the power in the leading edge of the applied HV pulse is not wasted completely, most of it is used to fill the superconducting cavities with RF. When the klystron voltage reaches 80% of the flat top voltage, the RF output power is already 4MW. During the last 20% of the voltage rise to the flat top the RF power increases, but the RF phase changes by 320. The phase change can be compensated by the low level RF system. Then the rise time efficiency of the modulator, defined as the ratio of the energy per high voltage pulse used for RF generation to the total energy per high voltage pulse, reaches 96%. Taking into account the modulators electronic efficiency of 90% and the ohmic losses of 2% of the HV pulse cables, the total modulator efficiency is 85%. At 5Hz repetition rate an average AC power from the wall plug of 120kW per RF station is required. In addition 14kW for the auxiliary power supplies must be added. The total average AC power required for 560 active RF stations is therefore 75MW. Table 5 summarizes the power requirements for RF generation in the main linac of the 500GeV linear collider. For the XFEL the particle beam current is decreased to 5mA. Thus the klystron peak RF output power is only 5.2MW. The repetition rate is doubled to 10Hz. This results in an average AC power of approximately 160kW per RF station. The auxiliary power stays unchanged at 14kW. TABLE 5. Efficiency and Power Requirements of the RF System for the Linear Collider. RF peak power per RF station 9.7MW Duty cycle 0.685% Average RF power available per RF station 66kW Klystron efficiency 65% Modulator efficiency 85% Total efficiency 55% AC power per RF station 120kW Auxiliary power per RF station incl. LLRF and 14kW waveguide tuner Total wall plug power per station 134kW Number of active stations 560 Total wall plug power 75MW

11 INTERLOCK AND CONTROL SYSTEM The interlock system protects the accelerator and the RF stations in case of malfunction and allows a fast localization of faults. In case of klystron gun sparking the modulators IG(B)CT switch must be opened fast and reliable to limit the energy deposited in the klystron spark to less than 20J. The energy stored in the transformer leakage inductance and in the power transmission cable will be dissipated in two passive networks, one at the cable end near the IG(B)CT consisting of a reverse diode and a resistor and a second one made up by an 80Ω resistor across the transformer primary and by a 100µF capacitor which limits the peak inverse voltage at the primary to 800V when the IG(B)CT is opened. In case the IG(B)CT does not open when the klystron arcs, a crowbar is fired. More internal signals controlled by the interlock system are e.g. cooling water flow and temperature, klystron focusing solenoid current, klystron vacuum interlock, sparks in the RF distribution system, reflected RF power or RF leaks. External interlock conditions result from e.g. cavity power coupler or cryogenics faults. The technical interlock, which protects the linac and the RF station under fault conditions, will be based on programmable electronic circuits. Programmable logic devices have the advantage that the interlock logic can be modified easily if required. Today electronic boards based on these devices are fast enough to react within µs. Therefore no additional hard wired systems for fast interlocks are necessary. Besides system protection and providing start up and shut down procedures for the RF stations, the control and interlock system will offer a comprehensive diagnostics of the RF systems. It will allow to measure and to diagnose actual parameters as well as to adjust set points within certain limits for each RF station and its subsystems and to react to different fault conditions in a flexible manner. Communication with the accelerators main control can be accomplished by different protocols. Since each RF station consists of two parts, one in the tunnel and one in the access hall, there will be two interlock units connected to each other by glass fiber cables. Interlock conditions are summarized into categories, each starting a certain action in the other unit, thus only a limited number of fibers is required. RF WAVEGUIDE DISTRIBUTION SYSTEM Instead of a treelike RF waveguide distribution system a linear system is foreseen for TESLA. It is similar to the waveguide distribution system used for the superconducting cavities in the HERA tunnel and similar to the one already in use for the TESLA test facility. From each of the two output arms of the multibeam klystron equal amounts of RF power are branched off by hybrid couplers of different coupling ratio. Circulators between the hybrid couplers and the cavity input couplers protect the klystron from reflected power at the start of the RF pulse during the filling time of the cavity and at the end of the pulse. Their load resistors together with the cavity input coupler and the three stub waveguide transformers between circulator and input coupler determine the loaded cavity impedance as seen by the beam. The waveguide transformers provide an impedance matching range from 1/3Z W to 3.0Z W and the

12 possibility of ±50 o phase adjustment. Each stub will be equipped with a motor, which will be controlled by the low level RF system. The transformers will also be used to adjust the phase deviations of 6 and 12 resulting from thermal expansion of the distribution system at 5Hz and 10Hz repetition rate respectively. The average power loss in the distribution is 6% including 2% in the circulators. Cryomodule 1 Cryomodule 2 Cryomodule 3 cavity input coupler Hybrid C oupl er RF Distributi on waveguide transformer RF from Kl ystron load circulator DETAIL hybrid c oupler Figure 6. RF waveguide distribution of one RF station. Several waveguide components have been developed at DESY and in industry within the last years, especially to mention, the high power circulators and loads, phase shifters and transformers and the hybrid couplers. Additional information on the design criteria of the waveguide distribution system can be found in [15]. LOW LEVEL RF The low level RF system of each of the RF stations is a digital system which controls amplitude and phase of the vector sum of the fields in the superconducting cavities connected to this station. Perturbations of the accelerating fields result from fluctuations of the beam current and fluctuations of the cavity resonance frequency due to mechanical vibrations and due to Lorentz force detuning. Since the energy spread must be kept below a maximum tolerable level of 5x10-4, amplitude and phase errors of the order of 5% and 20 o respectively as a result of the Lorentz force detuning and mechanical vibrations must be suppressed by a factor of at least 10. Fast variations are counteracted by a fast amplitude and phase modulation of the incident RF power whereas long term variations (on the timescale minutes or longer) are counteracted by the use of cavity frequency tuners. Most of the perturbations can be counteracted by a fast feed forward system because they are repetitive from pulse to pulse. For nonrepetitive pulse-to-pulse and intra-pulse variations a feed back system is required. The RF modulator for the incident wave is designed as an I/Q modulator to control the inphase (I) and quadrature (Q) component of the cavity field. More detailed information of the LLRF system can be found in [16, 17, 18, 19, 20].

13 XFEL ACCELERATOR PARAMETER In the TESLA Technical Design Report Supplement the XFEL is described in detail. Its technology is the same as for the linear collider. Hence the RF system layout for the XFEL is the same as for the linear collider in principle. Table 6 summarizes the parameters of the XFEL accelerator. The layout of the 26 RF stations will be as for the 500GeV linear collider. TABLE 6. TESLA XFEL Parameter. Final energy GeV Accelerating gradient MV/m Total length 1380 m Active length m Modules 78 Cavities 936 Klystrons 26 Bunch charge 1 nc Bunch spacing 200 ns Bunch train length 800 µs Repetition rate 10 Hz Average beam power 600 kw Photon pulse length Photon energy Wavelength Number of photons per bunch Peak brilliance Peak power 100 fs kev nm x x GW THE FUTURE OF TESLA In February 2003 the German Federal Research Minister announced that the TESLA XFEL is to be built at DESY in Hamburg [21]. Germany will cover half of the investment costs of 673million. Negotiations with European partners will start soon so that the construction of the XFEL could start in two years. The total construction time will be approximately six years. No site for the TESLA linear collider was proposed at that time. Since a linear collider can be built only in an international collaboration further international developments must be taken into account. The TESLA collaboration will continue the research work on the linear collider. REFERENCES 1. TESLA, The Superconducting Electron-Positron Linear Collider with Integrated X-Ray Laser Laboratory, Technical Design Report, DESY , ECFA , TESLA Report , TESLA-FEL , March TESLA XFEL, First Stage of the X-Ray Laser Laboratory, Technical Design Report Supplement, DESY , TESLA-FEL , October 2002

14 3. S. Choroba, The TESLA RF System, Proceedings of the Modulator Klystron Workshop MDK 2001, CERN, Geneva, April C. Bearzatto, M. Bres, G. Faillon, Advantages of Multiple Beam Klystrons, ITG Garmisch- Partenkirchen, May 4 to 5, R. Palmer, Introduction to Cluster Klystrons, Proceedings of the International Workshop on Pulsed RF Power Sources For Linear Colliders, RF93, Dubna, Protvino, Russia, July 5-9,1993, p A. Beunas, G. Faillon, 10 MW/1.5 ms, L-band multi-beam klystron, Proc. Conf. Displays and Vacuum Electronics, Garmisch-Partenkirchen, Germany, April A. Beunas, G. Faillon, S. Choroba, A. Gamp, A High Efficiency Long Pulse Multi Beam Klystron for the TESLA Linear Collider, TESLA Report W. Bothe, Pulse Generation for TESLA, a Comparison of Various Methods, TESLA Report 94-21, July H. Pfeffer, C.Jensen, S. Hays, L.Bartelson, The TESLA Modulator, TESLA Report The TESLA TEST FACILITY LINAC-Design Report, Ed. D.A. Edwards, Tesla Report H. Pfeffer, L. Bartelson, K. Bourkland, C. Jensen, Q. Kerns, P. Prieto, G. Saewert. D. Wolff, A Long Pulse Modulator for Reduced Size and Cost, Fourth European Particle Accelerator Conference, London H. Pfeffer, L. Bartelson, K. Bourkland, C. Jensen, P. Prieto, G. Saewert. D. Wolff, A Second Long Pulse Modulator For TESLA Using IGBTs, Proceedings of the Fifth European Particle Accelerator Conference, EPAC96, Sitges (Barcelona), June 1996, p H.-J. Eckoldt, Pulse Cables for TESLA, TESLA Report H.-J. Eckoldt, N. Heidbrook, Constant Power Power Supllies for the TELSA Modulator, TESLA Report Conceptual Design Report of a 500 GeV e+ e- Linear Collider with Integrated X-ray Laser Facility, DESY , ECFA , edited by R. Brinkmann, G. Materlik, J. Rossbach, A. Wagner (1997). 16. Liepe, S.N. Simrock, "Adaptive Feed Forward for Digital RF Control System for the TESLA Test Facility", European Particle Accelerator Conference, EPAC 98, Stockholm, Sweden, June 22-26, 1998, in print. 17. M. Hüning, S.N. Simrock, "System Identification for the digital RF Control for the TESLA Test Facility", European Particle Accelerator Conference EPAC 98, Stockholm, Sweden, June 22-26, 1998, in print. 18. S.N. Simrock, I. Altmann, K. Rehlich, T. Schilcher, "Design of the Digital RF Control System for the TESLA Test Facility", European Particle Accelerator Conference, EPAC 96, Sitges (Barcelona), Spain, June 10-14, 1996, p S.N. Simrock, T. Schilcher, "Transient Beam Loading based Calibration of the Vector-Sum for the TESLA Test Facility", European Particle Accelerator Conference, EPAC 96, Sitges (Barcelona), Spain, June 10-14, 1996, p B. Aune, et al., THE SUPERCONDUCTING TESLA CAVITIES, Published in Phys. Rev. ST Accel. Beams 3:092001, Bundesministerium für Bildung und Forschung, Pressemitteilung 16/2003,

XFEL High Power RF System Recent Developments

XFEL High Power RF System Recent Developments XFEL High Power RF System Recent Developments for the XFEL RF Group Outline XFEL RF System Requirements Overview Basic Layout RF System Main Components Multibeam Klystrons Modulator RF Waveguide Distribution

More information

INFN School on Electron Accelerators. RF Power Sources and Distribution

INFN School on Electron Accelerators. RF Power Sources and Distribution INFN School on Electron Accelerators 12-14 September 2007, INFN Sezione di Pisa Lecture 7b RF Power Sources and Distribution Carlo Pagani University of Milano INFN Milano-LASA & GDE The ILC Double Tunnel

More information

A HIGH POWER LONG PULSE HIGH EFFICIENCY MULTI BEAM KLYSTRON

A HIGH POWER LONG PULSE HIGH EFFICIENCY MULTI BEAM KLYSTRON A HIGH POWER LONG PULSE HIGH EFFICIENCY MULTI BEAM KLYSTRON A.Beunas and G. Faillon Thales Electron Devices, Vélizy, France S. Choroba DESY, Hamburg, Germany Abstract THALES ELECTRON DEVICES has developed

More information

Detailed Design Report

Detailed Design Report Detailed Design Report Chapter 4 MAX IV Injector 4.6. Acceleration MAX IV Facility CHAPTER 4.6. ACCELERATION 1(10) 4.6. Acceleration 4.6. Acceleration...2 4.6.1. RF Units... 2 4.6.2. Accelerator Units...

More information

DESIGN AND PERFORMANCE OF L-BAND AND S-BAND MULTI BEAM KLYSTRONS

DESIGN AND PERFORMANCE OF L-BAND AND S-BAND MULTI BEAM KLYSTRONS DESIGN AND PERFORMANCE OF L-BAND AND S-BAND MULTI BEAM KLYSTRONS Y. H. Chin, KEK, Tsukuba, Japan. Abstract Recently, there has been a rising international interest in multi-beam klystrons (MBK) in the

More information

RF Systems & Components

RF Systems & Components 5 th Modulator Klystron Workshop MDK2001 Session 1-1 Chairman : H. Braun (CERN) RF Systems & Components REVIEW OF SESSION 1.1 - RF SYSTEMS & COMPONENTS H. Braun (Chairman) CERN List of talks Stefan Choroba

More information

IOT OPERATIONAL EXPERIENCE ON ALICE AND EMMA AT DARESBURY LABORATORY

IOT OPERATIONAL EXPERIENCE ON ALICE AND EMMA AT DARESBURY LABORATORY IOT OPERATIONAL EXPERIENCE ON ALICE AND EMMA AT DARESBURY LABORATORY A. Wheelhouse ASTeC, STFC Daresbury Laboratory ESLS XVIII Workshop, ELLETRA 25 th 26 th November 2010 Contents Brief Description ALICE

More information

RF plans for ESS. Morten Jensen. ESLS-RF 2013 Berlin

RF plans for ESS. Morten Jensen. ESLS-RF 2013 Berlin RF plans for ESS Morten Jensen ESLS-RF 2013 Berlin Overview The European Spallation Source (ESS) will house the most powerful proton linac ever built. The average beam power will be 5 MW which is five

More information

RF Power Generation II

RF Power Generation II RF Power Generation II Klystrons, Magnetrons and Gyrotrons Professor R.G. Carter Engineering Department, Lancaster University, U.K. and The Cockcroft Institute of Accelerator Science and Technology Scope

More information

3 cerl. 3-1 cerl Overview. 3-2 High-brightness DC Photocathode Gun and Gun Test Beamline

3 cerl. 3-1 cerl Overview. 3-2 High-brightness DC Photocathode Gun and Gun Test Beamline 3 cerl 3-1 cerl Overview As described before, the aim of the cerl in the R&D program includes the development of critical components for the ERL, as well as the construction of a test accelerator. The

More information

5 Project Costs and Schedule

5 Project Costs and Schedule 93 5 Project Costs and Schedule 5.1 Overview The cost evaluation for the integrated version of the XFEL with 30 experiments and 35 GeV beam energy as described in the TDR-2001 yielded 673 million EUR for

More information

RF considerations for SwissFEL

RF considerations for SwissFEL RF considerations for H. Fitze in behalf of the PSI RF group Workshop on Compact X-Ray Free Electron Lasers 19.-21. July 2010, Shanghai Agenda Introduction RF-Gun Development C-band development Summary

More information

CERN EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH. A 50 Hz LOW-POWER SOLID-STATE KLYSTRON-MODULATOR

CERN EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH. A 50 Hz LOW-POWER SOLID-STATE KLYSTRON-MODULATOR CERN EUROPEAN ORGANIZATION FOR NUCLEAR REEARCH CTF3 Note 051(Tech.) (IGCT witch) A 50 Hz LOW-POWER OLID-TATE KLYTRON-MODULATOR P. Pearce, L. ermeus, L. hen Abstract A solid-state klystron-modulator has

More information

L-Band RF R&D. SLAC DOE Review June 15 th, Chris Adolphsen SLAC

L-Band RF R&D. SLAC DOE Review June 15 th, Chris Adolphsen SLAC L-Band RF R&D SLAC DOE Review June 15 th, 2005 Chris Adolphsen SLAC International Linear Collider (ILC) RF Unit (TESLA TDR Layout) Gradient = 23.4 MV/m Bunch Spacing = 337 ns Fill Time = 420 µs Train Length

More information

2 Work Package and Work Unit descriptions. 2.8 WP8: RF Systems (R. Ruber, Uppsala)

2 Work Package and Work Unit descriptions. 2.8 WP8: RF Systems (R. Ruber, Uppsala) 2 Work Package and Work Unit descriptions 2.8 WP8: RF Systems (R. Ruber, Uppsala) The RF systems work package (WP) addresses the design and development of the RF power generation, control and distribution

More information

ILC-LNF TECHNICAL NOTE

ILC-LNF TECHNICAL NOTE IL-LNF EHNIAL NOE Divisione Acceleratori Frascati, July 4, 2006 Note: IL-LNF-001 RF SYSEM FOR HE IL DAMPING RINGS R. Boni, INFN-LNF, Frascati, Italy G. avallari, ERN, Geneva, Switzerland Introduction For

More information

Pulsed Klystrons for Next Generation Neutron Sources Edward L. Eisen - CPI, Inc. Palo Alto, CA, USA

Pulsed Klystrons for Next Generation Neutron Sources Edward L. Eisen - CPI, Inc. Palo Alto, CA, USA Pulsed Klystrons for Next Generation Neutron Sources Edward L. Eisen - CPI, Inc. Palo Alto, CA, USA Abstract The U.S. Department of Energy (DOE) Office of Science has funded the construction of a new accelerator-based

More information

STATUS OF THE SWISSFEL C-BAND LINEAR ACCELERATOR

STATUS OF THE SWISSFEL C-BAND LINEAR ACCELERATOR Proceedings of FEL213, New York, NY, USA STATUS OF THE SWISSFEL C-BAND LINEAR ACCELERATOR F. Loehl, J. Alex, H. Blumer, M. Bopp, H. Braun, A. Citterio, U. Ellenberger, H. Fitze, H. Joehri, T. Kleeb, L.

More information

Experience with the Cornell ERL Injector SRF Cryomodule during High Beam Current Operation

Experience with the Cornell ERL Injector SRF Cryomodule during High Beam Current Operation Experience with the Cornell ERL Injector SRF Cryomodule during High Beam Current Operation Matthias Liepe Assistant Professor of Physics Cornell University Experience with the Cornell ERL Injector SRF

More information

Low Level RF for PIP-II. Jonathan Edelen LLRF 2017 Workshop (Barcelona) 16 Oct 2017

Low Level RF for PIP-II. Jonathan Edelen LLRF 2017 Workshop (Barcelona) 16 Oct 2017 Low Level RF for PIP-II Jonathan Edelen LLRF 2017 Workshop (Barcelona) 16 Oct 2017 PIP-II LLRF Team Fermilab Brian Chase, Edward Cullerton, Joshua Einstein, Jeremiah Holzbauer, Dan Klepec, Yuriy Pischalnikov,

More information

RF Solutions for Science.

RF Solutions for Science. RF Solutions for Science www.thalesgroup.com State-of-the-art RF sources for your scientific needs High-power klystrons HIGH KLYSTRONS WITH RF LONG PULSE above 50 μs Thales has been one of the leading

More information

Current status of XFEL/SPring-8 project and SCSS test accelerator

Current status of XFEL/SPring-8 project and SCSS test accelerator Current status of XFEL/SPring-8 project and SCSS test accelerator Takahiro Inagaki for XFEL project in SPring-8 inagaki@spring8.or.jp Outline (1) Introduction (2) Key technology for compactness (3) Key

More information

Karin Rathsman, Håkan Danared and Rihua Zeng. Report from RF Power Source Workshop

Karin Rathsman, Håkan Danared and Rihua Zeng. Report from RF Power Source Workshop Accelerator Division ESS AD Technical Note ESS/AD/0020 Karin Rathsman, Håkan Danared and Rihua Zeng Report from RF Power Source Workshop 10 July 2011 Report on the RF Power Source Workshop K. Rathsman,

More information

WG2 Group Summary. Chris Adolphsen Terry Garvey Hitoshi Hayano

WG2 Group Summary. Chris Adolphsen Terry Garvey Hitoshi Hayano WG2 Group Summary Chris Adolphsen Terry Garvey Hitoshi Hayano Linac Options Fest On Thursday afternoon, various experts summarized the linac baseline options. Although hard choices have yet to be made,

More information

The PEFP 20-MeV Proton Linear Accelerator

The PEFP 20-MeV Proton Linear Accelerator Journal of the Korean Physical Society, Vol. 52, No. 3, March 2008, pp. 721726 Review Articles The PEFP 20-MeV Proton Linear Accelerator Y. S. Cho, H. J. Kwon, J. H. Jang, H. S. Kim, K. T. Seol, D. I.

More information

Introduction: CW SRF linac types, requirements and challenges High power RF system architecture

Introduction: CW SRF linac types, requirements and challenges High power RF system architecture RF systems for CW SRF linacs S. Belomestnykh Cornell University Laboratory for Elementary-Particle Physics LINAC08, Victoria, Canada October 1, 2008 Outline L band Introduction: CW SRF linac types, requirements

More information

Status of RF Power and Acceleration of the MAX IV - LINAC

Status of RF Power and Acceleration of the MAX IV - LINAC Status of RF Power and Acceleration of the MAX IV - LINAC Dionis Kumbaro ESLS RF Workshop 2015 MAX IV Laboratory A National Laboratory for synchrotron radiation at Lunds University 1981 MAX-lab is formed

More information

Design and Simulation of High Power RF Modulated Triode Electron Gun. A. Poursaleh

Design and Simulation of High Power RF Modulated Triode Electron Gun. A. Poursaleh Design and Simulation of High Power RF Modulated Triode Electron Gun A. Poursaleh National Academy of Sciences of Armenia, Institute of Radio Physics & Electronics, Yerevan, Armenia poursaleh83@yahoo.com

More information

Karin Rathsman. Calculations on the RF Source and Distribution

Karin Rathsman. Calculations on the RF Source and Distribution Accelerator Division ESS AD Technical Note ESS/AD/0002 Karin Rathsman Calculations on the RF Source and Distribution 26 March 2010 Calculations on the rf source and distribution system for the ESS elliptical

More information

ANKA RF System - Upgrade Strategies

ANKA RF System - Upgrade Strategies ANKA RF System - Upgrade Strategies Vitali Judin ANKA Synchrotron Radiation Facility 2014-09 - 17 KIT University of the State Baden-Wuerttemberg and National Laboratory of the Helmholtz Association www.kit.edu

More information

Towards an X-Band Power Source at CERN and a European Structure Test Facility

Towards an X-Band Power Source at CERN and a European Structure Test Facility Towards an X-Band Power Source at CERN and a European Structure Test Facility Erk Jensen and Gerry McMomagle CERN The X-Band Accelerating Structure Design and Test-Program Workshop Day 2: Structure Testing

More information

THE NEXT LINEAR COLLIDER TEST ACCELERATOR: STATUS AND RESULTS * Abstract

THE NEXT LINEAR COLLIDER TEST ACCELERATOR: STATUS AND RESULTS * Abstract SLAC PUB 7246 June 996 THE NEXT LINEAR COLLIDER TEST ACCELERATOR: STATUS AND RESULTS * Ronald D. Ruth, SLAC, Stanford, CA, USA Abstract At SLAC, we are pursuing the design of a Next Linear Collider (NLC)

More information

Next Linear Collider. The 8-Pack Project. 8-Pack Project. Four 50 MW XL4 X-band klystrons installed on the 8-Pack

Next Linear Collider. The 8-Pack Project. 8-Pack Project. Four 50 MW XL4 X-band klystrons installed on the 8-Pack The Four 50 MW XL4 X-band klystrons installed on the 8-Pack The Demonstrate an NLC power source Two Phases: 8-Pack Phase-1 (current): Multi-moded SLED II power compression Produce NLC baseline power: 475

More information

The LEP Superconducting RF System

The LEP Superconducting RF System The LEP Superconducting RF System K. Hübner* for the LEP RF Group CERN The basic components and the layout of the LEP rf system for the year 2000 are presented. The superconducting system consisted of

More information

PULSED POWER FOR FUTURE LINEAR ACCELERATORS

PULSED POWER FOR FUTURE LINEAR ACCELERATORS PULSED POWER FOR FUTURE LINEAR ACCELERATORS Peter D. Pearce High-energy accelerators High-energy accelerators enable us to collide particle beams together and create conditions believed to be similar to

More information

The Elettra Storage Ring and Top-Up Operation

The Elettra Storage Ring and Top-Up Operation The Elettra Storage Ring and Top-Up Operation Emanuel Karantzoulis Past and Present Configurations 1994-2007 From 2008 5000 hours /year to the users 2010: Operations transition year Decay mode, 2 GeV (340mA)

More information

4.4 Injector Linear Accelerator

4.4 Injector Linear Accelerator 4.4 Injector Linear Accelerator 100 MeV S-band linear accelerator based on the components already built for the S-Band Linear Collider Test Facility at DESY [1, 2] will be used as an injector for the CANDLE

More information

Solid State Modulators for X-Band Accelerators

Solid State Modulators for X-Band Accelerators Solid State Modulators for X-Band Accelerators John Kinross-Wright Diversified Technologies, Inc. Bedford, Massachusetts DTI X-Band Experience Developed and built two completely different NLC-class modulator

More information

ADVANCED HIGH-POWER MICROWAVE VACUUM ELECTRON DEVICE DEVELOPMENT

ADVANCED HIGH-POWER MICROWAVE VACUUM ELECTRON DEVICE DEVELOPMENT ADVANCED HIGH-POWER MICROWAVE VACUUM ELECTRON DEVICE DEVELOPMENT H. P. Bohlen, Inc., Palo Alto, CA Abstract The microwave 1 power requirements of particle accelerators have been growing almost exponentially

More information

SUMMARY OF THE ILC R&D AND DESIGN

SUMMARY OF THE ILC R&D AND DESIGN SUMMARY OF THE ILC R&D AND DESIGN B. C. Barish, California Institute of Technology, USA Abstract The International Linear Collider (ILC) is a linear electron-positron collider based on 1.3 GHz superconducting

More information

Evaluation of Performance, Reliability, and Risk for High Peak Power RF Sources from S-band through X-band for Advanced Accelerator Applications

Evaluation of Performance, Reliability, and Risk for High Peak Power RF Sources from S-band through X-band for Advanced Accelerator Applications Evaluation of Performance, Reliability, and Risk for High Peak Power RF Sources from S-band through X-band for Advanced Accelerator Applications Michael V. Fazio C. Adolphsen, A. Jensen, C. Pearson, D.

More information

18 GHz, 2.2 kw KLYSTRON GENERATOR GKP 24KP 18GHz WR62 3x400V

18 GHz, 2.2 kw KLYSTRON GENERATOR GKP 24KP 18GHz WR62 3x400V 18 GHz, 2.2 kw KLYSTRON GENERATOR GKP 24KP 18GHz WR62 3x400V With its characteristics of power stability whatever the load, very fast response time when pulsed (via external modulated signal), low ripple,

More information

RF Upgrades & Experience At JLab. Rick Nelson

RF Upgrades & Experience At JLab. Rick Nelson RF Upgrades & Experience At JLab Rick Nelson Outline Background: CEBAF / Jefferson Lab History, upgrade requirements & decisions Progress & problems along the way Present status Future directions & concerns

More information

TTF / VUV-FEL. Schedule 2005 and Project Management Issues. Schedule 2005 Project Organisation Budget & Controlling

TTF / VUV-FEL. Schedule 2005 and Project Management Issues. Schedule 2005 Project Organisation Budget & Controlling TTF / VUV-FEL Schedule 200 and Project Management Issues Schedule 200 Project Organisation Budget & Controlling Hans Weise / DESY DESY MAC Meeting November 9th, 2004 TTF Linac Start-up After Final Installation

More information

High Brightness Injector Development and ERL Planning at Cornell. Charlie Sinclair Cornell University Laboratory for Elementary-Particle Physics

High Brightness Injector Development and ERL Planning at Cornell. Charlie Sinclair Cornell University Laboratory for Elementary-Particle Physics High Brightness Injector Development and ERL Planning at Cornell Charlie Sinclair Cornell University Laboratory for Elementary-Particle Physics June 22, 2006 JLab CASA Seminar 2 Background During 2000-2001,

More information

KARA and FLUTE RF Overview/status

KARA and FLUTE RF Overview/status KARA and FLUTE RF Overview/status Nigel Smale on behalf of IBPT and LAS teams Laboratory for Applications of Synchrotron radiation (LAS) Institute for Beam Physics and Technology (IBPT) KARA KIT The Research

More information

CLIC Feasibility Demonstration at CTF3

CLIC Feasibility Demonstration at CTF3 CLIC Feasibility Demonstration at CTF3 Roger Ruber Uppsala University, Sweden, for the CLIC/CTF3 Collaboration http://cern.ch/clic-study LINAC 10 MO303 13 Sep 2010 The Key to CLIC Efficiency NC Linac for

More information

STATUS OF THE SwissFEL C-BAND LINAC

STATUS OF THE SwissFEL C-BAND LINAC STATUS OF THE SwissFEL C-BAND LINAC F. Loehl, J. Alex, H. Blumer, M. Bopp, H. Braun, A. Citterio, U. Ellenberger, H. Fitze, H. Joehri, T. Kleeb, L. Paly, J.-Y. Raguin, L. Schulz, R. Zennaro, C. Zumbach,

More information

PoS(EPS-HEP2015)525. The RF system for FCC-ee. A. Butterworth CERN 1211 Geneva 23, Switzerland

PoS(EPS-HEP2015)525. The RF system for FCC-ee. A. Butterworth CERN 1211 Geneva 23, Switzerland CERN 1211 Geneva 23, Switzerland E-mail: andrew.butterworth@cern.ch O. Brunner CERN 1211 Geneva 23, Switzerland E-mail: olivier.brunner@cern.ch R. Calaga CERN 1211 Geneva 23, Switzerland E-mail: rama.calaga@cern.ch

More information

Pulses inside the pulse mode of operation at RF Gun

Pulses inside the pulse mode of operation at RF Gun Pulses inside the pulse mode of operation at RF Gun V. Vogel, V. Ayvazyan, K. Floettmann, D. Lipka, P. Morozov, H. Schlarb, S. Schreiber FLASH Seminar, DESY March 29, 2011 Contents Why we need a PiPmode

More information

!"!3

!!3 Abstract A single-mode 500 MHz superconducting cavity cryomodule has been developed at Cornell for the electronpositron collider/synchrotron light source CESR. The Cornell B-cell cavity belongs to the

More information

14 GHz, 2.2 kw KLYSTRON GENERATOR GKP 22KP 14GHz WR62 3x400V

14 GHz, 2.2 kw KLYSTRON GENERATOR GKP 22KP 14GHz WR62 3x400V 14 GHz, 2.2 kw KLYSTRON GENERATOR GKP 22KP 14GHz WR62 3x400V With its characteristics of power stability independent of the load, very fast response time when pulsed (via external modulated signal), low

More information

Upgrade of CEBAF to 12 GeV

Upgrade of CEBAF to 12 GeV Upgrade of CEBAF to 12 GeV Leigh Harwood (for 12 GeV Accelerator team) Page 1 Outline Background High-level description Schedule Sub-system descriptions and status Summary Page 2 CEBAF Science Mission

More information

TITLE PAGE. Title of paper: PUSH-PULL FEL, A NEW ERL CONCEPT Author: Andrew Hutton. Author Affiliation: Jefferson Lab. Requested Proceedings:

TITLE PAGE. Title of paper: PUSH-PULL FEL, A NEW ERL CONCEPT Author: Andrew Hutton. Author Affiliation: Jefferson Lab. Requested Proceedings: TITLE PAGE Title of paper: PUSH-PULL FEL, A NEW ERL CONCEPT Author: Andrew Hutton Author Affiliation: Jefferson Lab Requested Proceedings: Unique Session ID: Classification Codes: Keywords: Energy Recovery,

More information

North Damping Ring RF

North Damping Ring RF North Damping Ring RF North Damping Ring RF Outline Overview High Power RF HVPS Klystron & Klystron EPICS controls Cavities & Cavity Feedback SCP diagnostics & displays FACET-specific LLRF LLRF distribution

More information

Nick Walker DESY MAC

Nick Walker DESY MAC Nick Walker DESY MAC 4.5.2006 XFEL X-Ray Free-Electron Laser DESY ILC Project Group Accelerator Experimentation Behnke, Elsen, Walker (chair) WP 15, 16 WP 4-7 Accelerator Physics and Design WP 6 High Gradient

More information

ILC RF System R&D. Chris Adolphsen, SLAC. Section of 1.3 GHz SC Linac. June 29, 2007 PAC07 Talk FRYC01

ILC RF System R&D. Chris Adolphsen, SLAC. Section of 1.3 GHz SC Linac. June 29, 2007 PAC07 Talk FRYC01 ILC RF System R&D Chris Adolphsen, SLAC June 29, 2007 PAC07 Talk FRYC01 Section of 1.3 GHz SC Linac ILC Main Linac RF Unit (1 of 560) RF System Gradient = 31.5 MV/m Rep Rate = 5 Hz Beam Current = 9.0 ma

More information

Spear3 RF System Sam Park 11/06/2003. Spear3 RF System. High Power Components Operation and Control. RF Requirement.

Spear3 RF System Sam Park 11/06/2003. Spear3 RF System. High Power Components Operation and Control. RF Requirement. Spear3 RF System RF Requirement Overall System High Power Components Operation and Control SPEAR 3 History 1996 Low emittance lattices explored 1996 SPEAR 3 proposed 11/97 SPEAR 3 design study team formed

More information

Operating Experience and Reliability Improvements on the 5 kw CW Klystron at Jefferson Lab

Operating Experience and Reliability Improvements on the 5 kw CW Klystron at Jefferson Lab Operating Experience and Reliability Improvements on the 5 kw CW Klystron at Jefferson Lab Richard Walker & Richard Nelson Jefferson Lab, Newport News VA Jefferson Lab is a $600M Department of Energy facility

More information

The ESS Accelerator. For Norwegian Industry and Research. Oslo, 24 Sept Håkan Danared Deputy Head Accelerator Division Group Leader Beam Physics

The ESS Accelerator. For Norwegian Industry and Research. Oslo, 24 Sept Håkan Danared Deputy Head Accelerator Division Group Leader Beam Physics The ESS Accelerator For Norwegian Industry and Research Oslo, 24 Sept 2013 Håkan Danared Deputy Head Accelerator Division Group Leader Beam Physics The Hadron Intensity Frontier Courtesy of M. Seidel (PSI)

More information

The FLASH objective: SASE between 60 and 13 nm

The FLASH objective: SASE between 60 and 13 nm Injector beam control studies winter 2006/07 talk from E. Vogel on work performed by W. Cichalewski, C. Gerth, W. Jalmuzna,W. Koprek, F. Löhl, D. Noelle, P. Pucyk, H. Schlarb, T. Traber, E. Vogel, FLASH

More information

Status of SOLARIS. Paweł Borowiec On behalf of Solaris Team

Status of SOLARIS. Paweł Borowiec On behalf of Solaris Team Status of SOLARIS Paweł Borowiec On behalf of Solaris Team e-mail: pawel.borowiec@uj.edu.pl XX ESLS-RF Meeting, Villingen 16-17.11.2016 Outline 1. Timeline 2. Injector 3. Storage ring 16-17.11.2016 XX

More information

Status of BESSY II and berlinpro. Wolfgang Anders. Helmholtz-Zentrum Berlin for Materials and Energy (HZB) 20th ESLS-RF Meeting

Status of BESSY II and berlinpro. Wolfgang Anders. Helmholtz-Zentrum Berlin for Materials and Energy (HZB) 20th ESLS-RF Meeting Status of BESSY II and berlinpro Wolfgang Anders Helmholtz-Zentrum Berlin for Materials and Energy (HZB) 20th ESLS-RF Meeting 16.-17.11.2016 at PSI Outline BESSY II Problems with circulators Landau cavity

More information

DEVELOPMENT OF A 10 MW SHEET BEAM KLYSTRON FOR THE ILC*

DEVELOPMENT OF A 10 MW SHEET BEAM KLYSTRON FOR THE ILC* DEVELOPMENT OF A 10 MW SHEET BEAM KLYSTRON FOR THE ILC* D. Sprehn, E. Jongewaard, A. Haase, A. Jensen, D. Martin, SLAC National Accelerator Laboratory, Menlo Park, CA 94020, U.S.A. A. Burke, SAIC, San

More information

Diamond RF Status (RF Activities at Daresbury) Mike Dykes

Diamond RF Status (RF Activities at Daresbury) Mike Dykes Diamond RF Status (RF Activities at Daresbury) Mike Dykes ASTeC What is it? What does it do? Diamond Status Linac Booster RF Storage Ring RF Summary Content ASTeC ASTeC was formed in 2001 as a centre of

More information

FIRST SIMULTANEOUS TOP-UP OPERATION OF THREE DIFFERENT RINGS IN KEK INJECTOR LINAC

FIRST SIMULTANEOUS TOP-UP OPERATION OF THREE DIFFERENT RINGS IN KEK INJECTOR LINAC FIRST SIMULTANEOUS TOP-UP OPERATION OF THREE DIFFERENT RINGS IN KEK INJECTOR LINAC M. Satoh #, for the IUC * Accelerator Laboratory, High Energy Accelerator Research Organization (KEK) 1-1 Oho, Tsukuba,

More information

SRS and ERLP developments. Andrew moss

SRS and ERLP developments. Andrew moss SRS and ERLP developments Andrew moss Contents SRS Status Latest news Major faults Status Energy Recovery Linac Prototype Latest news Status of the RF system Status of the cryogenic system SRS Status Machine

More information

Digital BPMs and Orbit Feedback Systems

Digital BPMs and Orbit Feedback Systems Digital BPMs and Orbit Feedback Systems, M. Böge, M. Dehler, B. Keil, P. Pollet, V. Schlott Outline stability requirements at SLS storage ring digital beam position monitors (DBPM) SLS global fast orbit

More information

IOT RF Power Sources for Pulsed and CW Linacs

IOT RF Power Sources for Pulsed and CW Linacs LINAC 2004 Lübeck, August 16 20, 2004 IOT RF Power Sources H. Bohlen, Y. Li, Bob Tornoe Communications & Power Industries Eimac Division, San Carlos, CA, USA Linac RF source property requirements (not

More information

Present Status and Future Upgrade of KEKB Injector Linac

Present Status and Future Upgrade of KEKB Injector Linac Present Status and Future Upgrade of KEKB Injector Linac Kazuro Furukawa, for e /e + Linac Group Present Status Upgrade in the Near Future R&D towards SuperKEKB 1 Machine Features Present Status and Future

More information

Precision measurements of beam current, position and phase for an e+e- linear collider

Precision measurements of beam current, position and phase for an e+e- linear collider Precision measurements of beam current, position and phase for an e+e- linear collider R. Corsini on behalf of H. Braun, M. Gasior, S. Livesley, P. Odier, J. Sladen, L. Soby INTRODUCTION Commissioning

More information

GA A26497 SOLID-STATE HIGH-VOLTAGE CROWBAR UTILIZING SERIES-CONNECTED THYRISTORS

GA A26497 SOLID-STATE HIGH-VOLTAGE CROWBAR UTILIZING SERIES-CONNECTED THYRISTORS GA A26497 SOLID-STATE HIGH-VOLTAGE CROWBAR by J.F. Tooker, P. Huynh, and R.W. Street JUNE 2009 DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government.

More information

TECHNICAL SPECIFICATION Multi-beam S-band Klystron type BT267

TECHNICAL SPECIFICATION Multi-beam S-band Klystron type BT267 TECHNICAL SPECIFICATION Multi-beam S-band Klystron type BT267 The company was created for the development and manufacture of precision microwave vacuum-electron-tube devices (VETD). The main product areas

More information

Status of CTF3. G.Geschonke CERN, AB

Status of CTF3. G.Geschonke CERN, AB Status of CTF3 G.Geschonke CERN, AB CTF3 layout CTF3 - Test of Drive Beam Generation, Acceleration & RF Multiplication by a factor 10 Drive Beam Injector ~ 50 m 3.5 A - 2100 b of 2.33 nc 150 MeV - 1.4

More information

News from HZB / BESSY Wolfgang Anders at ESLS-RF Meeting September 2010 Trieste

News from HZB / BESSY Wolfgang Anders at ESLS-RF Meeting September 2010 Trieste News from HZB / BESSY Wolfgang Anders at ESLS-RF Meeting September 2010 Trieste Outline Status Klystrons / IOT Modifications of transmitters New LINAC for BESSY II Status BERLinPro HoBiCaT Extension --

More information

J/NLC Progress on R1 and R2 Issues. Chris Adolphsen

J/NLC Progress on R1 and R2 Issues. Chris Adolphsen J/NLC Progress on R1 and R2 Issues Chris Adolphsen Charge to the International Linear Collider Technical Review Committee (ILC-TRC) To assess the present technical status of the four LC designs at hand,

More information

STATUS OF THE EUROPEAN XFEL

STATUS OF THE EUROPEAN XFEL STATUS OF THE EUROPEAN XFEL M. Hüning, DESY, Hamburg, Germany for the European XFEL Accelerator Construction Consortium * Abstract The European XFEL is one of the world's largest accelerators presently

More information

SLS RF operation report 2003

SLS RF operation report 2003 SLS RF operation report 2003 M. Pedrozzi, Jean-Yves Raguin Paul Scherrer Institute, 5232 Villigen PSI, Switzerland SUMMARY LINAC report SR Superconducting Third Harmonic system report SR 500 MHz system

More information

LCLS RF Reference and Control R. Akre Last Update Sector 0 RF and Timing Systems

LCLS RF Reference and Control R. Akre Last Update Sector 0 RF and Timing Systems LCLS RF Reference and Control R. Akre Last Update 5-19-04 Sector 0 RF and Timing Systems The reference system for the RF and timing starts at the 476MHz Master Oscillator, figure 1. Figure 1. Front end

More information

TOSHIBA Industrial Magnetron E3328

TOSHIBA Industrial Magnetron E3328 TOSHIBA E3328 is a fixed frequency continuous wave magnetron intended for use in the industrial microwave heating applications. The average output power is 3kW in the frequency range from 2450 to 2470

More information

Basic rules for the design of RF Controls in High Intensity Proton Linacs. Particularities of proton linacs wrt electron linacs

Basic rules for the design of RF Controls in High Intensity Proton Linacs. Particularities of proton linacs wrt electron linacs Basic rules Basic rules for the design of RF Controls in High Intensity Proton Linacs Particularities of proton linacs wrt electron linacs Non-zero synchronous phase needs reactive beam-loading compensation

More information

High-power klystrons. The benchmark in scientific research. State-of-the-art RF sources for your accelerator

High-power klystrons.  The benchmark in scientific research. State-of-the-art RF sources for your accelerator > High- klystrons The benchmark in scientific research State-of-the-art RF sources for your accelerator Thales has been one of the leading manufacturers of RF and microwave sources for decades, and is

More information

DEVELOPMENT OF X-BAND KLYSTRON TECHNOLOGY AT SLAC

DEVELOPMENT OF X-BAND KLYSTRON TECHNOLOGY AT SLAC DEVELOPMENT OF X-BAND KLYSTRON TECHNOLOGY AT SLAC George Caryotakis, Stanford Linear Accelerator Center P.O. Box 4349 Stanford, CA 94309 Abstract * The SLAC design for a 1-TeV collider (NLC) requires klystrons

More information

A New High Intensity Proton Source. The SCRF Proton Driver. (and more!) at Fermilab. July 15, Bill Foster SRF2005

A New High Intensity Proton Source. The SCRF Proton Driver. (and more!) at Fermilab. July 15, Bill Foster SRF2005 The SCRF Proton Driver A New High Intensity Proton Source (and more!) at Fermilab Bill Foster SRF2005 July 15, 2005 Outline The Concept Fermilab Strategic Context Proton Driver SRF Linac Design Ferrite

More information

Linac upgrade plan using a C-band system for SuperKEKB

Linac upgrade plan using a C-band system for SuperKEKB Linac upgrade plan using a C-band system for SuperKEKB S. Fukuda, M. Akemono, M. Ikeda, T. Oogoe, T. Ohsawa, Y. Ogawa, K. Kakihara, H. Katagiri, T. Kamitani, M. Sato, T. Shidara, A. Shirakawa, T. Sugimura,

More information

Design Studies For The LCLS 120 Hz RF Gun Injector

Design Studies For The LCLS 120 Hz RF Gun Injector BNL-67922 Informal Report LCLS-TN-01-3 Design Studies For The LCLS 120 Hz RF Gun Injector X.J. Wang, M. Babzien, I. Ben-Zvi, X.Y. Chang, S. Pjerov, and M. Woodle National Synchrotron Light Source Brookhaven

More information

Chapter 4. Rf System Design. 4.1 Introduction Historical Perspective NLC Rf System Overview

Chapter 4. Rf System Design. 4.1 Introduction Historical Perspective NLC Rf System Overview Chapter 4 Rf System Design 4.1 Introduction 4.1.1 Historical Perspective The design of the NLC main linacs is based on the extensive experience gained from the design, construction, and 35 years of operation

More information

45 MW, 22.8 GHz Second-Harmonic Multiplier for High-Gradient Tests*

45 MW, 22.8 GHz Second-Harmonic Multiplier for High-Gradient Tests* US High Gradient Research Collaboration Workshop. SLAC, May 23-25, 2007 45 MW, 22.8 GHz Second-Harmonic Multiplier for High-Gradient Tests* V.P. Yakovlev 1, S.Yu. Kazakov 1,2, and J.L. Hirshfield 1,3 1

More information

A New 4MW LHCD System for EAST

A New 4MW LHCD System for EAST 1 EXW/P7-29 A New 4MW LHCD System for EAST Jiafang SHAN 1), Yong YANG 1), Fukun LIU 1), Lianmin ZHAO 1) and LHCD Team 1) 1) Institute of Plasma Physics, Chinese Academy of Sciences, Hefei, China E-mail

More information

Klystron Lifetime Management System

Klystron Lifetime Management System Klystron Lifetime Management System Łukasz Butkowski Vladimir Vogel FLASH Seminar Outline 2 Introduction to KLM Protection and measurement functions Installation at Klystron test stand FPGA implementation

More information

PEP II Design Outline

PEP II Design Outline PEP II Design Outline Balša Terzić Jefferson Lab Collider Review Retreat, February 24, 2010 Outline General Information Parameter list (and evolution), initial design, upgrades Collider Ring Layout, insertions,

More information

PULSED MODULATOR TECHNOLOGY

PULSED MODULATOR TECHNOLOGY PULSED MODULATOR TECHNOLOGY Hiroshi MATSUMOTO J-PARC/KEK CONTENTS 1. VARIOUS REQUIREMENT OF THE RECENT MODULATORS SHORT PULSE WIDTH (~µsec) LONG PULSE WIDTH (~msec) AND HIGH REP. RATE. (200 Hz) OUTPUT

More information

LLRF at SSRF. Yubin Zhao

LLRF at SSRF. Yubin Zhao LLRF at SSRF Yubin Zhao 2017.10.16 contents SSRF RF operation status Proton therapy LLRF Third harmonic cavity LLRF Three LINAC LLRF Hard X FEL LLRF (future project ) Trip statistics of RF system Trip

More information

* Work supported by Department of Energy contract DE-AC03-76SF RF Pulse Compression. for F'uture Linear Colliders* SLAC-PUB

* Work supported by Department of Energy contract DE-AC03-76SF RF Pulse Compression. for F'uture Linear Colliders* SLAC-PUB SLAC-PUB-95-6755 RF Pulse Compression for F'uture Linear Colliders* PERRY B. WILSON Stanford Linear Accelerator Center Stanford University, Stanford, CA 94309 Presented at the Conference on Pulsed RF Sources

More information

DESIGN OF 1.2-GEV SCL AS NEW INJECTOR FOR THE BNL AGS*

DESIGN OF 1.2-GEV SCL AS NEW INJECTOR FOR THE BNL AGS* DESIGN OF 1.2-GEV SCL AS NEW INJECTOR FOR THE BNL AGS* A. G. Ruggiero, J. Alessi, M. Harrison, M. Iarocci, T. Nehring, D. Raparia, T. Roser, J. Tuozzolo, W. Weng. Brookhaven National Laboratory, PO Box

More information

Development of klystrons with ultimately high - 90% RF power production efficiency

Development of klystrons with ultimately high - 90% RF power production efficiency Development of klystrons with ultimately high - 90% RF power production efficiency A. Baikov (MUFA), I. Syratchev (CERN), C. Lingwood, D. Constable (Lancaster University) Introduction FCC has high power

More information

TESLA FEL-Report

TESLA FEL-Report Determination of the Longitudinal Phase Space Distribution produced with the TTF Photo Injector M. Geitz a,s.schreiber a,g.von Walter b, D. Sertore a;1, M. Bernard c, B. Leblond c a Deutsches Elektronen-Synchrotron,

More information

Jae-Young Choi On behalf of PLS-II Linac team

Jae-Young Choi On behalf of PLS-II Linac team PLS-II Linac 2015. 4. 8. Jae-Young Choi On behalf of PLS-II Linac team Accelerators in Pohang Accelerator Laboratory XFEL (under construction) 400 M$ Machines under installation PLS-II PAL : Chronology

More information

Development of high power gyrotron and EC technologies for ITER

Development of high power gyrotron and EC technologies for ITER 1 Development of high power gyrotron and EC technologies for ITER K. Sakamoto 1), K.Kajiwara 1), K. Takahashi 1), Y.Oda 1), A. Kasugai 1), N. Kobayashi 1), M.Henderson 2), C.Darbos 2) 1) Japan Atomic Energy

More information