Workshop on Accelerator Operations August 6-10, 2012 Glen D. Johns Accelerator Operations Manager

Size: px
Start display at page:

Download "Workshop on Accelerator Operations August 6-10, 2012 Glen D. Johns Accelerator Operations Manager"

Transcription

1 HWDB: Operations at the Spallation Neutron Source Workshop on Accelerator Operations August 6-10, 2012 Glen D. Johns Accelerator Operations Manager

2 Outline Facility overview Organization Shift schedule Operating schedule Availability 2 Managed by UT-Battelle

3 Where is SNS? Eastern Tennessee as part of Oak Ridge National Lab 3 Managed by UT-Battelle

4 What is SNS? World s highest power pulsed spallation neutron source Consists of a 1 GeV superconducting linear accelerator, accumulator ring, and a flowing liquid mercury target Operates as a National User Facility for conducting neutron scattering research 13 instruments in User Program 6 in commissioning or under construction Funded by the Department of Energy s Office of Basic Energy Sciences (~$181M/year) 4 Managed by UT-Battelle

5 Main office building -CCR Support buildings -CHL -RFTF -CUB Klystron gallery Linac tunnel Ring Instrument hall / Target building 5 Managed by UT-Battelle

6 SNS Accelerator Complex Front-End: Produce a 1- msec long, chopped, H- beam LINAC: Accelerates the beam to 1 GeV Accumulator Ring: Compress 1 msec long pulse to 700 nsec H- stripped to protons 2.5 MeV 87 MeV 186 MeV 387 MeV 1000 MeV Ion Source RFQ DTL CCL SRF, =0.61 SRF, =0.81 Deliver beam to Target MHz 805 MHz Recent 1 MW operating parameters 925 MeV beam energy 1.14E14 protons per pulse 60 Hz pulse rep rate 1.1 ma average current to target 6 Managed by UT-Battelle

7 SNS Accelerator Complex Front-End: Produce a 1- msec long, chopped, H- beam LINAC: Accelerates the beam to 1 GeV Accumulator Ring: Compress 1 msec long pulse to 700 nsec H- stripped to protons 2.5 MeV 87 MeV 186 MeV 387 MeV 1000 MeV Ion Source RFQ DTL CCL SRF, =0.61 SRF, =0.81 Deliver beam to Target MHz 805 MHz Recent 1 MW operating parameters 925 MeV beam energy 1.14E14 protons per pulse 60 Hz pulse rep rate 1.1 ma average current to target 7 Managed by UT-Battelle

8 SNS Accelerator Complex Front-End: Produce a 1- msec long, chopped, H- beam LINAC: Accelerates the beam to 1 GeV Accumulator Ring: Compress 1 msec long pulse to 700 nsec H- stripped to protons 2.5 MeV 87 MeV 186 MeV 387 MeV 1000 MeV Ion Source RFQ DTL CCL SRF, =0.61 SRF, =0.81 Deliver beam to Target MHz 805 MHz Recent 1 MW operating parameters 925 MeV beam energy 1.14E14 protons per pulse 60 Hz pulse rep rate 1.1 ma average current to target 8 Managed by UT-Battelle

9 SNS Accelerator Complex Front-End: Produce a 1- msec long, chopped, H- beam LINAC: Accelerates the beam to 1 GeV Accumulator Ring: Compress 1 msec long pulse to 700 nsec H- stripped to protons 2.5 MeV 87 MeV 186 MeV 387 MeV 1000 MeV Ion Source RFQ DTL CCL SRF, =0.61 SRF, =0.81 Deliver beam to Target MHz 805 MHz Recent 1 MW operating parameters 925 MeV beam energy 1.14E14 protons per pulse 60 Hz pulse rep rate 1.1 ma average current to target 9 Managed by UT-Battelle

10 SNS Accelerator Complex Front-End: Produce a 1- msec long, chopped, H- beam LINAC: Accelerates the beam to 1 GeV Accumulator Ring: Compress 1 msec long pulse to 700 nsec H- stripped to protons 2.5 MeV 87 MeV 186 MeV 387 MeV 1000 MeV Ion Source RFQ DTL CCL SRF, =0.61 SRF, =0.81 Deliver beam to Target MHz 805 MHz Recent 1 MW operating parameters 925 MeV beam energy 1.14E14 protons per pulse 60 Hz pulse rep rate 1.1 ma average current to target 10 Managed by UT-Battelle

11 Research Accelerator Division (~370) Facility Operations (70) Data Operations (72) Instrument Operations (46) Accelerator and Target Operations (157) Facility Maintenance Control Systems Instrument Support Electrical and RF Site Services Instrument Data Acquisition and Controls Scientific Support Superconducting Linac Systems Radiological Control Information Technology Sample Environment Accelerator Physics, Beam Instrumentation, Ion Source Mechanical Systems and Operations Accelerator Operations 11 Managed by UT-Battelle

12 Accelerator Operations Group (18) Operations Manager Machine Specialist Operations Coordinator Maintenance & Operability Coordinator Control Room Shift Supervisor (10) Control Room Accelerator Specialist (4) 12 Managed by UT-Battelle

13 Shift Schedules 13 Managed by UT-Battelle

14 FY12 Operating Schedule 14 Managed by UT-Battelle

15 How are we doing? Hrs. delivered MWh delivered to target Downtime 85.6% 92.1% 93.6% Availability 80.7% % % Managed by UT-Battelle FY07 FY08 FY09 FY10 FY11 FY12 Presentation_name 60

Oak Ridge Spallation Neutron Source Proton Power Upgrade Project and Second Target Station Project

Oak Ridge Spallation Neutron Source Proton Power Upgrade Project and Second Target Station Project Oak Ridge Spallation Neutron Source Proton Power Upgrade Project and Second Target Station Project Workshop on the future and next generation capabilities of accelerator driven neutron and muon sources

More information

The ESS Accelerator. For Norwegian Industry and Research. Oslo, 24 Sept Håkan Danared Deputy Head Accelerator Division Group Leader Beam Physics

The ESS Accelerator. For Norwegian Industry and Research. Oslo, 24 Sept Håkan Danared Deputy Head Accelerator Division Group Leader Beam Physics The ESS Accelerator For Norwegian Industry and Research Oslo, 24 Sept 2013 Håkan Danared Deputy Head Accelerator Division Group Leader Beam Physics The Hadron Intensity Frontier Courtesy of M. Seidel (PSI)

More information

Commissioning of Accelerators. Dr. Marc Munoz (with the help of R. Miyamoto, C. Plostinar and M. Eshraqi)

Commissioning of Accelerators. Dr. Marc Munoz (with the help of R. Miyamoto, C. Plostinar and M. Eshraqi) Commissioning of Accelerators Dr. Marc Munoz (with the help of R. Miyamoto, C. Plostinar and M. Eshraqi) www.europeanspallationsource.se 6 July, 2017 Contents General points Definition of Commissioning

More information

ESS: The Machine. Bucharest, 24 April Håkan Danared Deputy Head Accelerator Division. H. Danared Industry & Partner Days Bucharest Page 1

ESS: The Machine. Bucharest, 24 April Håkan Danared Deputy Head Accelerator Division. H. Danared Industry & Partner Days Bucharest Page 1 ESS: The Machine Bucharest, 24 April 2014 Håkan Danared Deputy Head Accelerator Division H. Danared Industry & Partner Days Bucharest Page 1 2025 ESS construction complete 2009 Decision: ESS will be built

More information

Upgrading LHC Luminosity

Upgrading LHC Luminosity 1 Upgrading LHC Luminosity 2 Luminosity (cm -2 s -1 ) Present (2011) ~2 x10 33 Beam intensity @ injection (*) Nominal (2015?) 1 x 10 34 1.1 x10 11 Upgraded (2021?) ~5 x10 34 ~2.4 x10 11 (*) protons per

More information

PRESENT STATUS OF J-PARC

PRESENT STATUS OF J-PARC PRESENT STATUS OF J-PARC # F. Naito, KEK, Tsukuba, Japan Abstract Japan Proton Accelerator Research Complex (J-PARC) is the scientific facility with the high-intensity proton accelerator aiming to realize

More information

The Construction Status of CSNS Linac

The Construction Status of CSNS Linac The Construction Status of CSNS Linac Sheng Wang Dongguan branch, Institute of High Energy Physics, CAS Sep.2, 2014, Geneva Outline The introduction to CSNS accelerators The commissoning of ion source

More information

A Fifteen Year Perspective on the Design and Performance of the SNS Accelerator

A Fifteen Year Perspective on the Design and Performance of the SNS Accelerator A Fifteen Year Perspective on the Design and Performance of the SNS Accelerator S. Cousineau (On behalf of the SNS project) HB2016, Sweden July 04, 2016 ORNL is managed by UT-Battelle for the US Department

More information

2 Work Package and Work Unit descriptions. 2.8 WP8: RF Systems (R. Ruber, Uppsala)

2 Work Package and Work Unit descriptions. 2.8 WP8: RF Systems (R. Ruber, Uppsala) 2 Work Package and Work Unit descriptions 2.8 WP8: RF Systems (R. Ruber, Uppsala) The RF systems work package (WP) addresses the design and development of the RF power generation, control and distribution

More information

ESS Linac WP8 Radio Frequency Systems and Test Facilities

ESS Linac WP8 Radio Frequency Systems and Test Facilities ESS Linac WP8 Radio Frequency Systems and Test Facilities ESS/SPL Collaboration Meeting Lund, 29 June 2010 Roger Ruber (Uppsala University) for the ESS Linac RF Team ESS Linac WP8: RF Systems Outline Work

More information

Proton Engineering Frontier Project

Proton Engineering Frontier Project Proton Engineering Frontier Project OECD Nuclear Energy Agency Fifth International Workshop on the Utilisation and Reliability of High Power Proton Accelerators (HPPA5) (6-9 May 2007, Mol, Belgium) Yong-Sub

More information

RF plans for ESS. Morten Jensen. ESLS-RF 2013 Berlin

RF plans for ESS. Morten Jensen. ESLS-RF 2013 Berlin RF plans for ESS Morten Jensen ESLS-RF 2013 Berlin Overview The European Spallation Source (ESS) will house the most powerful proton linac ever built. The average beam power will be 5 MW which is five

More information

A New High Intensity Proton Source. The SCRF Proton Driver. (and more!) at Fermilab. July 15, Bill Foster SRF2005

A New High Intensity Proton Source. The SCRF Proton Driver. (and more!) at Fermilab. July 15, Bill Foster SRF2005 The SCRF Proton Driver A New High Intensity Proton Source (and more!) at Fermilab Bill Foster SRF2005 July 15, 2005 Outline The Concept Fermilab Strategic Context Proton Driver SRF Linac Design Ferrite

More information

The Spallation Neutron Source Project Geneva December 8, 2006

The Spallation Neutron Source Project Geneva December 8, 2006 The Spallation Neutron Source Project Geneva December 8, 2006 Norbert Holtkamp ITER International Organization 13108 St Paul lez Durance Norbert.Holtkamp@iter.org The Spallation Neutron Source SNS is funded

More information

The PEFP 20-MeV Proton Linear Accelerator

The PEFP 20-MeV Proton Linear Accelerator Journal of the Korean Physical Society, Vol. 52, No. 3, March 2008, pp. 721726 Review Articles The PEFP 20-MeV Proton Linear Accelerator Y. S. Cho, H. J. Kwon, J. H. Jang, H. S. Kim, K. T. Seol, D. I.

More information

Examples of Successful Collaboration Between CPI and DOE Labs. Todd Treado CPI December 2013

Examples of Successful Collaboration Between CPI and DOE Labs. Todd Treado CPI December 2013 Examples of Successful Collaboration Between CPI and DOE Labs Todd Treado CPI December 2013 Overview CPI has successfully collaborated with US DOE labs to develop and / or manufacture products for DOE

More information

The European Spallation Source

The European Spallation Source The European Spallation Source Roger Ruber Uppsala University NIKHEF industriemiddag 21 september 2011 The European Spallation Source Roger Ruber - The European Spallation Source NIKHEF, 21-Sep-2011 page

More information

ESS Linac WP8 Radio Frequency Systems and Test Facilities

ESS Linac WP8 Radio Frequency Systems and Test Facilities ESS Linac WP8 Radio Frequency Systems and Test Facilities ESS TAC Lund, 8 July 2010 Roger Ruber (Uppsala University) for the ESS Linac RF Team Outline Work Package description Objectives Organization Technical

More information

OPERATIONAL EXPERIENCE AT J-PARC

OPERATIONAL EXPERIENCE AT J-PARC OPERATIONAL EXPERIENCE AT J-PARC Hideaki Hotchi, ) for J-PARC commissioning team ), 2), ) Japan Atomic Energy Agency (JAEA), Tokai, Naka, Ibaraki, 39-95 Japan, 2) High Energy Accelerator Research Organization

More information

A HIGH-POWER SUPERCONDUCTING H - LINAC (SPL) AT CERN

A HIGH-POWER SUPERCONDUCTING H - LINAC (SPL) AT CERN A HIGH-POWER SUPERCONDUCTING H - LINAC (SPL) AT CERN E. Chiaveri, CERN, Geneva, Switzerland Abstract The conceptual design of a superconducting H - linear accelerator at CERN for a beam energy of 2.2 GeV

More information

COMMISSIONING SCENARIOS FOR THE J-PARC ACCELERATOR COMPLEX

COMMISSIONING SCENARIOS FOR THE J-PARC ACCELERATOR COMPLEX COMMISSIONING SCENARIOS FOR THE J-PARC ACCELERATOR COMPLEX T. Koseki, M. Ikegami, M. Tomizawa, Accelerator Laboratory, KEK, Tsukuba, Japan F. Noda, JAEA, Tokai, Japan Abstract The J-PARC (Japan Proton

More information

SNS Target Imaging and Related Developments

SNS Target Imaging and Related Developments SNS Target Imaging and Related Developments Tom Shea (ORNL) ESS Seminar Lund, Sweden January 28, 2011 T. J. Shea, T. McManamy, G. Bancke, W. Blokland, A. Brunson, M. Dayton, R. Fiorito, K. C. Goetz, J.

More information

TOWARDS THE COMMISSIONING OF J-PARC

TOWARDS THE COMMISSIONING OF J-PARC 10th ICALEPCS Int. Conf. on Accelerator & Large Expt. Physics Control Systems. Geneva, 10-14 Oct 2005, MO3.5-1O (2005) TOWARDS THE COMMISSIONING OF J-PARC T. Katoh 1, K. Furukawa 1, N. Kamikubota 1, H.

More information

HIGH-INTENSITY PROTON BEAMS AT CERN AND THE SPL STUDY

HIGH-INTENSITY PROTON BEAMS AT CERN AND THE SPL STUDY HIGH-INTENSITY PROTON BEAMS AT CERN AND THE STUDY E. Métral, M. Benedikt, K. Cornelis, R. Garoby, K. Hanke, A. Lombardi, C. Rossi, F. Ruggiero, M. Vretenar, CERN, Geneva, Switzerland Abstract The construction

More information

Linac 4 Instrumentation K.Hanke CERN

Linac 4 Instrumentation K.Hanke CERN Linac 4 Instrumentation K.Hanke CERN CERN Linac 4 PS2 (2016?) SPL (2015?) Linac4 (2012) Linac4 will first inject into the PSB and then can be the first element of a new LHC injector chain. It will increase

More information

Design of the linear accelerator for the MYRRHA project

Design of the linear accelerator for the MYRRHA project MYRRHA Multipurpose hybrid Research Reactor for High-tech Applications Design of the linear accelerator for the MYRRHA project Roberto Salemme ADT - Outline What is MYRRHA? MYRRHA accelerator: requirements

More information

DELIVERY RECORD. Location: Ibaraki, Japan

DELIVERY RECORD. Location: Ibaraki, Japan DELIVERY RECORD Client: Japan Atomic Energy Agency (JAEA) High Energy Accelerator Research Organization (KEK) Facility: J-PARC (Japan Proton Accelerator Research Complex) Location: Ibaraki, Japan 1 October

More information

The SPL at CERN. slhc. 1. Introduction 2. Description. 3. Status of the SPL study. - Stage 1: Linac4 - Stage 2: LP-SPL - Potential further stages

The SPL at CERN. slhc. 1. Introduction 2. Description. 3. Status of the SPL study. - Stage 1: Linac4 - Stage 2: LP-SPL - Potential further stages The SPL at CERN 1. Introduction 2. Description - Stage 1: Linac4 - Stage 2: LP-SPL - Potential further stages 3. Status of the SPL study slhc Roa Garoby for the SPL team 1. Introduction Motivation for

More information

Upgrade of CEBAF to 12 GeV

Upgrade of CEBAF to 12 GeV Upgrade of CEBAF to 12 GeV Leigh Harwood (for 12 GeV Accelerator team) Page 1 Outline Background High-level description Schedule Sub-system descriptions and status Summary Page 2 CEBAF Science Mission

More information

Beam Loss Detection for MPS at FRIB

Beam Loss Detection for MPS at FRIB Beam Loss Detection for MPS at FRIB Zhengzheng Liu Beam Diagnostics Physicist This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC0000661.

More information

LIGHT PROTON THERAPY PROJECT

LIGHT PROTON THERAPY PROJECT 17 th of MAY 2018 LIGHT PROTON THERAPY PROJECT Yevgeniy Ivanisenko on behalf of ADAM team FORM-01040-A AVO-ADAM Advanced Oncotherapy (AVO) is a public company ADAM is R&D center of AVO ~ 100 employees

More information

RUNNING EXPERIENCE OF FZD SRF PHOTOINJECTOR

RUNNING EXPERIENCE OF FZD SRF PHOTOINJECTOR RUNNING EXPERIENCE OF FZD SRF PHOTOINJECTOR Rong Xiang On behalf of the BESSY-DESY-FZD-MBI collaboration and the ELBE team FEL 2009, Liverpool, United Kingdom, August 23 ~ 28, 2009 Outline Introduction

More information

DESIGN OF 1.2-GEV SCL AS NEW INJECTOR FOR THE BNL AGS*

DESIGN OF 1.2-GEV SCL AS NEW INJECTOR FOR THE BNL AGS* DESIGN OF 1.2-GEV SCL AS NEW INJECTOR FOR THE BNL AGS* A. G. Ruggiero, J. Alessi, M. Harrison, M. Iarocci, T. Nehring, D. Raparia, T. Roser, J. Tuozzolo, W. Weng. Brookhaven National Laboratory, PO Box

More information

Concept and R&D Plans for Project X

Concept and R&D Plans for Project X Concept and R&D Plans for Project X Giorgio Apollinari 9 th ICFA Seminar SLAC, Oct. 2008 HB2008 Project X for Intensity Frontier Physics 1 Introduction Intensity Frontier: Needs and Physics Justification

More information

Preparations for Installation, Testing and Commissioning based on Experience at CERN, SNS and Siemens

Preparations for Installation, Testing and Commissioning based on Experience at CERN, SNS and Siemens Preparations for Installation, Testing and Commissioning based on Experience at CERN, SNS and Siemens Eugène Tanke FRIB / MSU ESS Seminar, Lund, 6 March 2013 Outline Project Goal for the Accelerator Path

More information

Status of the SNS Linac: An Overview N. Holtkamp for the SNS Collaboration ORNL, Oak Ridge, TN 37830, USA

Status of the SNS Linac: An Overview N. Holtkamp for the SNS Collaboration ORNL, Oak Ridge, TN 37830, USA Lübeck, August 20, 2004 Status of the SNS Linac: An Overview N. Holtkamp for the SNS Collaboration ORNL, Oak Ridge, TN 37830, USA SNS is the Forefront Facility for Future High Beam Power Accelerators Highest

More information

The Beam Test Facility at the SNS

The Beam Test Facility at the SNS The Beam Test Facility at the SNS R.F. Welton, A. Aleksandrov, B.X. Han, Y.W. Kang, M.M. Middendorf, S.N. Murray, M. Piller, T.R. Pennisi, V. Peplov, R. Saethre, M. Santana, C. Stinson, M.P. Stockli and

More information

SNS TR0001-R00. Conceptual Design Report for the Spallation Neutron Source Power Upgrade MIE Project

SNS TR0001-R00. Conceptual Design Report for the Spallation Neutron Source Power Upgrade MIE Project SNS-300000000-TR0001-R00 Conceptual Design Report for the Spallation Neutron Source Power Upgrade MIE Project This report was prepared as an account of work sponsored by an agency of the United States

More information

LENS Operating Experience

LENS Operating Experience Available online at www.sciencedirect.com Physics Procedia 26 (2012 ) 161 167 Union of Compact Accelerator-driven Neutron Sources I & II LENS Operating Experience T. Rinckel *a, David V. Baxter a,b, J.

More information

Pulsed Klystrons for Next Generation Neutron Sources Edward L. Eisen - CPI, Inc. Palo Alto, CA, USA

Pulsed Klystrons for Next Generation Neutron Sources Edward L. Eisen - CPI, Inc. Palo Alto, CA, USA Pulsed Klystrons for Next Generation Neutron Sources Edward L. Eisen - CPI, Inc. Palo Alto, CA, USA Abstract The U.S. Department of Energy (DOE) Office of Science has funded the construction of a new accelerator-based

More information

Production of quasi-monochromatic MeV photon in a synchrotron radiation facility

Production of quasi-monochromatic MeV photon in a synchrotron radiation facility Production of quasi-monochromatic MeV photon in a synchrotron radiation facility Presentation at University of Saskatchewan April 22-23, 2010 Yoshitaka Kawashima Brookhaven National Laboratory NSLS-II,

More information

Empirical Model For ESS Klystron Cathode Voltage

Empirical Model For ESS Klystron Cathode Voltage Empirical Model For ESS Klystron Cathode Voltage Dave McGinnis 2 March 2012 Introduction There are 176 klystrons in the superconducting portion of ESS linac. The power range required spans a factor of

More information

Towards an X-Band Power Source at CERN and a European Structure Test Facility

Towards an X-Band Power Source at CERN and a European Structure Test Facility Towards an X-Band Power Source at CERN and a European Structure Test Facility Erk Jensen and Gerry McMomagle CERN The X-Band Accelerating Structure Design and Test-Program Workshop Day 2: Structure Testing

More information

CLIC Feasibility Demonstration at CTF3

CLIC Feasibility Demonstration at CTF3 CLIC Feasibility Demonstration at CTF3 Roger Ruber Uppsala University, Sweden, for the CLIC/CTF3 Collaboration http://cern.ch/clic-study LINAC 10 MO303 13 Sep 2010 The Key to CLIC Efficiency NC Linac for

More information

The FAIR plinac RF Systems

The FAIR plinac RF Systems The FAIR plinac RF Systems Libera Workshop Sep. 2011 Gerald Schreiber Gerald Schreiber, GSI RF Department 2 (1) Overview GSI / FAIR (2) FAIR Proton Linear Accelerator "plinac" (3) plinac RF Systems (4)

More information

PEP-II Overview & Ramp Down Plan. J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007

PEP-II Overview & Ramp Down Plan. J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007 PEP-II Overview & Ramp Down Plan J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007 Topics Overview of the PEP-II Collider PEP-II turns off September 30, 2008. General list of components and buildings

More information

CERN S PROTON SYNCHROTRON COMPLEX OPERATION TEAMS AND DIAGNOSTICS APPLICATIONS

CERN S PROTON SYNCHROTRON COMPLEX OPERATION TEAMS AND DIAGNOSTICS APPLICATIONS Marc Delrieux, CERN, BE/OP/PS CERN S PROTON SYNCHROTRON COMPLEX OPERATION TEAMS AND DIAGNOSTICS APPLICATIONS CERN s Proton Synchrotron (PS) complex How are we involved? Review of some diagnostics applications

More information

A Brief History of High Power RF Proton Linear Accelerators

A Brief History of High Power RF Proton Linear Accelerators e A Brief History of High Power RF Proton Linear Accelerators John C. Browne Los Alamos National Laboratory Introduction The first mention of linear acceleration was in a paper by G. Ising in 1924 (Ref

More information

APT Accelerator Technology

APT Accelerator Technology APT Accelerator Technology J. David Schneider LER/APT, Los Alamos National Laboratory Los Alamos, New Mexico 87545 U.S. Abstract The proposed accelerator production of tritium (APT) project requires an

More information

First Simultaneous Top-up Operation of Three Different Rings in KEK Injector Linac

First Simultaneous Top-up Operation of Three Different Rings in KEK Injector Linac First Simultaneous Top-up Operation of Three Different Rings in KEK Injector Linac Masanori Satoh (Acc. Lab., KEK) for the injector upgrade group 2010/9/16 1 Overview of Linac Beam Operation 2010/9/16

More information

THE OPERATION EXPERIENCE AT KOMAC*

THE OPERATION EXPERIENCE AT KOMAC* THAM2X01 Proceedings of HB2016, Malmö, Sweden THE OPERATION EXPERIENCE AT KOMAC* Yong-Sub Cho, Kye-Ryung Kim, Kui Young Kim, Hyeok-Jung Kwon, Han-Sung Kim, Young-Gi Song Korea Atomic Energy Research Institute,

More information

Current status of XFEL/SPring-8 project and SCSS test accelerator

Current status of XFEL/SPring-8 project and SCSS test accelerator Current status of XFEL/SPring-8 project and SCSS test accelerator Takahiro Inagaki for XFEL project in SPring-8 inagaki@spring8.or.jp Outline (1) Introduction (2) Key technology for compactness (3) Key

More information

The Elettra Storage Ring and Top-Up Operation

The Elettra Storage Ring and Top-Up Operation The Elettra Storage Ring and Top-Up Operation Emanuel Karantzoulis Past and Present Configurations 1994-2007 From 2008 5000 hours /year to the users 2010: Operations transition year Decay mode, 2 GeV (340mA)

More information

Karin Rathsman, Håkan Danared and Rihua Zeng. Report from RF Power Source Workshop

Karin Rathsman, Håkan Danared and Rihua Zeng. Report from RF Power Source Workshop Accelerator Division ESS AD Technical Note ESS/AD/0020 Karin Rathsman, Håkan Danared and Rihua Zeng Report from RF Power Source Workshop 10 July 2011 Report on the RF Power Source Workshop K. Rathsman,

More information

LCLS RF Reference and Control R. Akre Last Update Sector 0 RF and Timing Systems

LCLS RF Reference and Control R. Akre Last Update Sector 0 RF and Timing Systems LCLS RF Reference and Control R. Akre Last Update 5-19-04 Sector 0 RF and Timing Systems The reference system for the RF and timing starts at the 476MHz Master Oscillator, figure 1. Figure 1. Front end

More information

Diamond RF Status (RF Activities at Daresbury) Mike Dykes

Diamond RF Status (RF Activities at Daresbury) Mike Dykes Diamond RF Status (RF Activities at Daresbury) Mike Dykes ASTeC What is it? What does it do? Diamond Status Linac Booster RF Storage Ring RF Summary Content ASTeC ASTeC was formed in 2001 as a centre of

More information

HIGH POWER BEAM DUMP AND TARGET / ACCELERATOR INTERFACE PROCEDURES *

HIGH POWER BEAM DUMP AND TARGET / ACCELERATOR INTERFACE PROCEDURES * HIGH POWER BEAM DUMP AND TARGET / ACCELERATOR INTERFACE PROCEDURES * J. Galambos, W. Blokland, D. Brown, C. Peters, M. Plum, Spallation Neutron Source, ORNL, Oak Ridge, TN 37831, U.S.A. Abstract Satisfying

More information

Status of RF Power and Acceleration of the MAX IV - LINAC

Status of RF Power and Acceleration of the MAX IV - LINAC Status of RF Power and Acceleration of the MAX IV - LINAC Dionis Kumbaro ESLS RF Workshop 2015 MAX IV Laboratory A National Laboratory for synchrotron radiation at Lunds University 1981 MAX-lab is formed

More information

RF considerations for SwissFEL

RF considerations for SwissFEL RF considerations for H. Fitze in behalf of the PSI RF group Workshop on Compact X-Ray Free Electron Lasers 19.-21. July 2010, Shanghai Agenda Introduction RF-Gun Development C-band development Summary

More information

The Texas Petawatt Laser User Program

The Texas Petawatt Laser User Program The Texas Petawatt Laser User Program Texas Center for High Intensity Laser Science Presented By Mike Donovan Associate Director, Texas Petawatt User Program Website http://texaspetawatt.ph.utexas.edu/

More information

Evaluation of Performance, Reliability, and Risk for High Peak Power RF Sources from S-band through X-band for Advanced Accelerator Applications

Evaluation of Performance, Reliability, and Risk for High Peak Power RF Sources from S-band through X-band for Advanced Accelerator Applications Evaluation of Performance, Reliability, and Risk for High Peak Power RF Sources from S-band through X-band for Advanced Accelerator Applications Michael V. Fazio C. Adolphsen, A. Jensen, C. Pearson, D.

More information

Jefferson Lab Experience with Beam Halo, Beam Loss, etc.

Jefferson Lab Experience with Beam Halo, Beam Loss, etc. Jefferson Lab Experience with Beam Halo, Beam Loss, etc. Pavel Evtushenko with a lot of input from many experienced colleagues Steve Benson, Dave Douglas, Kevin Jordan, Carlos Hernandez-Garcia, Dan Sexton,

More information

Suggested ILC Beam Parameter Range Rev. 2/28/05 Tor Raubenheimer

Suggested ILC Beam Parameter Range Rev. 2/28/05 Tor Raubenheimer The machine parameters and the luminosity goals of the ILC were discussed at the 1 st ILC Workshop. In particular, Nick Walker noted that the TESLA machine parameters had been chosen to achieve a high

More information

Low-Energy Electron Linacs and Their Applications in Cargo Inspection

Low-Energy Electron Linacs and Their Applications in Cargo Inspection Low-Energy Electron Linacs and Their Applications in Cargo Inspection Yawei Yang on behalf of Huaibi Chen *,1, Chuanxiang Tang 1 Yaohong Liu 2 *chenhb@tsinghua.edu.cn 1 Department of Engineering Physics,

More information

Development of High Power Vacuum Tubes for Accelerators and Plasma Heating

Development of High Power Vacuum Tubes for Accelerators and Plasma Heating Development of High Power Vacuum Tubes for Accelerators and Plasma Heating Vishnu Srivastava Microwave Tubes Division, CSIR-Central Electronics Engineering Research Institute, Pilani-333031, Rajasthan,

More information

Status of the FAIR Project. Jürgen Henschel FAIR Project Leader / Technical Director GSI & FAIR

Status of the FAIR Project. Jürgen Henschel FAIR Project Leader / Technical Director GSI & FAIR Status of the FAIR Project Jürgen Henschel FAIR Project Leader / Technical Director GSI & FAIR Finland France Germany India Poland Romania Russia Slovenia Sweden UK FAIR Strategic objectives FAIR phase

More information

KEKB INJECTOR LINAC AND UPGRADE FOR SUPERKEKB

KEKB INJECTOR LINAC AND UPGRADE FOR SUPERKEKB KEKB INJECTOR LINAC AND UPGRADE FOR SUPERKEKB S. Michizono for the KEK electron/positron Injector Linac and the Linac Commissioning Group KEK KEKB injector linac Brief history of the KEK electron linac

More information

Detailed Design Report

Detailed Design Report Detailed Design Report Chapter 4 MAX IV Injector 4.6. Acceleration MAX IV Facility CHAPTER 4.6. ACCELERATION 1(10) 4.6. Acceleration 4.6. Acceleration...2 4.6.1. RF Units... 2 4.6.2. Accelerator Units...

More information

Karin Rathsman. Calculations on the RF Source and Distribution

Karin Rathsman. Calculations on the RF Source and Distribution Accelerator Division ESS AD Technical Note ESS/AD/0002 Karin Rathsman Calculations on the RF Source and Distribution 26 March 2010 Calculations on the rf source and distribution system for the ESS elliptical

More information

What can be learned from HERA Experience for ILC Availability

What can be learned from HERA Experience for ILC Availability What can be learned from HERA Experience for ILC Availability August 17, 2005 F. Willeke, DESY HERA Performance Critical Design Decisions What could be avoided if HERA would have to be built again? HERA

More information

BBU threshold current study for 6 GeV beam in 12 GeV beamline setup

BBU threshold current study for 6 GeV beam in 12 GeV beamline setup BBU threshold current study for 6 GeV beam in 12 GeV beamline setup Ilkyoung Shin and Byung C. Yunn JLAB-TN-09-004 January 12, 2009 1. Introduction The study of BBU threshold current is done for a 6 GeV

More information

!"!3

!!3 Abstract A single-mode 500 MHz superconducting cavity cryomodule has been developed at Cornell for the electronpositron collider/synchrotron light source CESR. The Cornell B-cell cavity belongs to the

More information

III. Proton-therapytherapy. Rome SB - 3/5 1

III. Proton-therapytherapy. Rome SB - 3/5 1 Outline Introduction: an historical review I Applications in medical diagnostics Particle accelerators for medicine Applications in conventional radiation therapy II III IV Hadrontherapy, the frontier

More information

CEBAF Accelerator Update. Michael Tiefenback CASA Accelerator Physics Experimental Liaison June 14, 2017

CEBAF Accelerator Update. Michael Tiefenback CASA Accelerator Physics Experimental Liaison June 14, 2017 CEBAF Accelerator Update Michael Tiefenback CASA Accelerator Physics Experimental Liaison June 14, 2017 CLAS12 Collaboration Meeting, June 13-16, 2017 1 Accelerator Division Leadership On April 30 Andrew

More information

BEAM DYNAMICS AND EXPERIMENT OF CPHS LINAC *

BEAM DYNAMICS AND EXPERIMENT OF CPHS LINAC * BEAM DYNAMICS AND EXPERIMENT OF CPHS LINAC * L. Du #, C.T. Du, X.L. Guan, C.X. Tang, R. Tang, X.W. Wang, Q.Z. Xing, S.X. Zheng, Key Laboratory of Particle & Radiation Imaging (Tsinghua University), Ministry

More information

Report from the 3 rd Meeting of the Accelerator Technical Advisory Committee for the Japan Proton Accelerator Research Complex (J-PARC)

Report from the 3 rd Meeting of the Accelerator Technical Advisory Committee for the Japan Proton Accelerator Research Complex (J-PARC) Report from the 3 rd Meeting of the Accelerator Technical Advisory Committee for the Japan Proton Accelerator Research Complex (J-PARC) March 5-6, 2004 JAERI Tokai, Japan Table of Contents Page Executive

More information

Status and Plans for PEP-II

Status and Plans for PEP-II Status and Plans for PEP-II John Seeman SLAC Particle and Particle-Astrophysics DOE HEPAP P5 Review April 21, 2006 Topics Luminosity records for PEP-II in October 2005 Fall shut-down upgrades Run 5b turn

More information

STATUS AND COMMISSIONING RESULTS OF THE R&D ERL AT BNL*

STATUS AND COMMISSIONING RESULTS OF THE R&D ERL AT BNL* STATUS AND COMMISSIONING RESULTS OF THE R&D ERL AT BNL* D. Kayran #,1,2, Z. Altinbas 1, D. Beavis 1, S. Belomestnykh 1,2, I. Ben-Zvi 1,2, S. Deonarine 1, D.M. Gassner 1, R. C. Gupta 1, H. Hahn 1,L.R. Hammons

More information

TITLE PAGE. Title of paper: PUSH-PULL FEL, A NEW ERL CONCEPT Author: Andrew Hutton. Author Affiliation: Jefferson Lab. Requested Proceedings:

TITLE PAGE. Title of paper: PUSH-PULL FEL, A NEW ERL CONCEPT Author: Andrew Hutton. Author Affiliation: Jefferson Lab. Requested Proceedings: TITLE PAGE Title of paper: PUSH-PULL FEL, A NEW ERL CONCEPT Author: Andrew Hutton Author Affiliation: Jefferson Lab Requested Proceedings: Unique Session ID: Classification Codes: Keywords: Energy Recovery,

More information

Particle Beam Production - A Synchrotron-Based System - Prof. Dr. Thomas Haberer Scientific-technical Director Heidelberg Iontherapy Center

Particle Beam Production - A Synchrotron-Based System - Prof. Dr. Thomas Haberer Scientific-technical Director Heidelberg Iontherapy Center Particle Beam Production - A Synchrotron-Based System - Prof. Dr. Thomas Haberer Scientific-technical Director Heidelberg Iontherapy Center Outline Situation/Rationale Requirements Synchrotron choice Functions

More information

ILC-LNF TECHNICAL NOTE

ILC-LNF TECHNICAL NOTE IL-LNF EHNIAL NOE Divisione Acceleratori Frascati, July 4, 2006 Note: IL-LNF-001 RF SYSEM FOR HE IL DAMPING RINGS R. Boni, INFN-LNF, Frascati, Italy G. avallari, ERN, Geneva, Switzerland Introduction For

More information

RELIABILITY ASSESSMENT OF THE LANSCE ACCELERATOR SYSTEM

RELIABILITY ASSESSMENT OF THE LANSCE ACCELERATOR SYSTEM RELIABILITY ASSESSMENT OF THE LANSCE ACCELERATOR SYSTEM BY MARCUS ERIKSSON STOCKHOLM 1998 RELIABILITY ASSESSMENT OF THE LANSCE ACCELERATOR SYSTEM BY MARCUS ERIKSSON M.SC. THESIS AT THE ROYAL INSTITUTE

More information

Present Status and Future Upgrade of KEKB Injector Linac

Present Status and Future Upgrade of KEKB Injector Linac Present Status and Future Upgrade of KEKB Injector Linac Kazuro Furukawa, for e /e + Linac Group Present Status Upgrade in the Near Future R&D towards SuperKEKB 1 Machine Features Present Status and Future

More information

LSD Review December 2012 Schedule, Re-Baseline, & Resource Analysis

LSD Review December 2012 Schedule, Re-Baseline, & Resource Analysis LSD Review December 2012 Schedule, Re-Baseline, & Resource Analysis Dianne Napier Outline Part II Review Charges Addressed in this Presentation: Issues raised in Part I Review Report adequately addressed

More information

Experience with the Cornell ERL Injector SRF Cryomodule during High Beam Current Operation

Experience with the Cornell ERL Injector SRF Cryomodule during High Beam Current Operation Experience with the Cornell ERL Injector SRF Cryomodule during High Beam Current Operation Matthias Liepe Assistant Professor of Physics Cornell University Experience with the Cornell ERL Injector SRF

More information

PEP II Design Outline

PEP II Design Outline PEP II Design Outline Balša Terzić Jefferson Lab Collider Review Retreat, February 24, 2010 Outline General Information Parameter list (and evolution), initial design, upgrades Collider Ring Layout, insertions,

More information

DISCLAIMER. Portions of this document may be illegible in electronic image products. Images are produced from the best available original document.

DISCLAIMER. Portions of this document may be illegible in electronic image products. Images are produced from the best available original document. DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government Neither the United States Government nor any agency thcreof nor any of their employees,

More information

NLC - The Next Linear Collider Project NLC R&D. D. L. Burke. DOE Annual Program Review SLAC April 9-11, 2003

NLC - The Next Linear Collider Project NLC R&D. D. L. Burke. DOE Annual Program Review SLAC April 9-11, 2003 DOE Annual Program Review SLAC April 9-11, 2003 NLC Activities for the Past Year Accelerator Design centered around ILC-TRC studies. Technology R&D focused on the RF R&D. Modulator, klystron, SLED-II,

More information

DESIGN AND PERFORMANCE OF L-BAND AND S-BAND MULTI BEAM KLYSTRONS

DESIGN AND PERFORMANCE OF L-BAND AND S-BAND MULTI BEAM KLYSTRONS DESIGN AND PERFORMANCE OF L-BAND AND S-BAND MULTI BEAM KLYSTRONS Y. H. Chin, KEK, Tsukuba, Japan. Abstract Recently, there has been a rising international interest in multi-beam klystrons (MBK) in the

More information

Linac3 experience for LHC ion runs

Linac3 experience for LHC ion runs Linac3 experience for LHC ion runs G Bellodi for the Linac3 team Keywords: beam performance reliability set up time results of MDs remaining unknowns 1 A year in perspective Source removed: change of main

More information

STATUS OF THE SWISSFEL C-BAND LINEAR ACCELERATOR

STATUS OF THE SWISSFEL C-BAND LINEAR ACCELERATOR Proceedings of FEL213, New York, NY, USA STATUS OF THE SWISSFEL C-BAND LINEAR ACCELERATOR F. Loehl, J. Alex, H. Blumer, M. Bopp, H. Braun, A. Citterio, U. Ellenberger, H. Fitze, H. Joehri, T. Kleeb, L.

More information

DAQ Systems in Hall A

DAQ Systems in Hall A CODA Users Workshop Data Acquisition at Jefferson Lab Newport News June 7, 2004 DAQ Systems in Hall A Overview of Hall A Standard Equipment: HRS, Beamline,... Parity Experiments Third Arms: BigBite, RCS

More information

INFN School on Electron Accelerators. RF Power Sources and Distribution

INFN School on Electron Accelerators. RF Power Sources and Distribution INFN School on Electron Accelerators 12-14 September 2007, INFN Sezione di Pisa Lecture 7b RF Power Sources and Distribution Carlo Pagani University of Milano INFN Milano-LASA & GDE The ILC Double Tunnel

More information

30 GHz Power Production / Beam Line

30 GHz Power Production / Beam Line 30 GHz Power Production / Beam Line Motivation & Requirements Layout Power mode operation vs. nominal parameters Beam optics Achieved performance Problems Beam phase switch for 30 GHz pulse compression

More information

Modulator Overview System Design vs. Tunnel Topologies. Snowmass Workshop August 16, 2005 Ray Larsen for the SLAC ILC Group

Modulator Overview System Design vs. Tunnel Topologies. Snowmass Workshop August 16, 2005 Ray Larsen for the SLAC ILC Group Modulator Overview System Design vs. Tunnel Topologies Snowmass Workshop August 16, 2005 Ray Larsen for the SLAC ILC Group Outline! I. Modulator Options vs. Topologies! II. Preliminary Cost Estimates!

More information

3 cerl. 3-1 cerl Overview. 3-2 High-brightness DC Photocathode Gun and Gun Test Beamline

3 cerl. 3-1 cerl Overview. 3-2 High-brightness DC Photocathode Gun and Gun Test Beamline 3 cerl 3-1 cerl Overview As described before, the aim of the cerl in the R&D program includes the development of critical components for the ERL, as well as the construction of a test accelerator. The

More information

UPGRADES TO THE ISIS SPALLATION NEUTRON SOURCE

UPGRADES TO THE ISIS SPALLATION NEUTRON SOURCE UPGRADES TO THE ISIS SPALLATION NEUTRON SOURCE C.R. Prior, CCLRC Rutherford Appleton Laboratory, Chilton, Didcot, Oxon, U.K. Abstract With studies of a European Spallation Source (ESS) suspended and high-level

More information

Introduction: CW SRF linac types, requirements and challenges High power RF system architecture

Introduction: CW SRF linac types, requirements and challenges High power RF system architecture RF systems for CW SRF linacs S. Belomestnykh Cornell University Laboratory for Elementary-Particle Physics LINAC08, Victoria, Canada October 1, 2008 Outline L band Introduction: CW SRF linac types, requirements

More information

XFEL High Power RF System Recent Developments

XFEL High Power RF System Recent Developments XFEL High Power RF System Recent Developments for the XFEL RF Group Outline XFEL RF System Requirements Overview Basic Layout RF System Main Components Multibeam Klystrons Modulator RF Waveguide Distribution

More information