1 RF PERFORMANCE AND OPERATIONAL ISSUES A. Butterworth, L. Arnaudon, P. Baudrenghien, O. Brunner, E. Ciapala, W. Hofle, J. Molendijk, CERN, Geneva, Switzerland Abstract During the 2009 LHC run, a number of difficulties were encountered in the operation of the RF system and transverse damper. The main operational issues are presented, along with proposed or implemented solutions. The readiness of both systems for operation in 2010 is presented, including the preparations necessary for running with unsafe beam. switched off, reducing the klystron cathode current and the collector power to around 100kW. KLYSTRON COLLECTOR POWER The nominal scheme for cavity operation requires that the cavity external quality factor is changed before acceleration using the moveable main power coupler. The parameters at injection and top energy are shown in Table 1. Cavity voltage/mv Cavity Q ext RF power/kw Injection Physics Table 1. Nominal RF power parameters at injection and physics [1]. The nominal klystron working point is 58 kv cathode voltage and 9 A beam current, giving a DC power of 520 kw, and a peak RF power of approximately 300 kw. However in 2008/9, for operational simplicity, it was decided to use a fixed Q ext of at injection and top energy. At injection, with 1 MV per cavity, this requires only 45 kw of RF power. In a klystron, the residual DC power not consumed as RF output power is dissipated in the collector, and with the low RF power required in this operational configuration, the collector power was close to the rated maximum, which raised worries of potential overheating of the collector. Traces of overheating were indeed observed when several klystrons were checked in January 2010 (Fig.1). In order to reduce the collector power, it was decided in 2009 to run with fewer cavities, with higher voltage per cavity. The higher RF power demanded per klystron results in reduced collector power. Initially an attempt was made to use 4 cavities at 2 MV per cavity. However this resulted in many RF trips from helium pressure as the cavities had de-conditioned during 2 weeks of running at injection level. Eventually a configuration was found which was more or less reliable using 5 cavities at 1.6 MV per cavity. Another measure to reduce collector heating was to modify the front-end software to automatically switch the power system to the READY state when the RF was Fig. 1. Klystron collector opened January 2010 showing traces of overheating Choices for 2010 running Three possible scenarios are identified for operation in 2010: 1. Reduce the number of cavities used. With the beam intensities expected in 2010, there is no limit from the impedance of the unused cavities, assuming they are detuned by 100 khz. However, we cannot reach the nominal 16 MV per beam in physics with the standard Q ext of A possibility might be to go to higher Q ext. 2. Use all cavities, but work at lower DC power. There is still very little headroom for feedback at 2MV during physics. We would have to accept a reduction in cavity voltage. 3. Commission the nominal scheme, using the movable coupler to change the Q ext after injection. Approximately 2 additional weeks would be needed before startup to fine-tune the cavity low level loop parameters at different Q ext values. However, this is clearly the only long-term solution for higher intensities, and is the choice strongly preferred by the RF group. HARDWARE ISSUES: SPURIOUS INTERLOCKS Slow interlocks Some trips due to slow control interlocks were encountered, related to waveguide and coupler blowers, water flows, etc., and associated interlock thresholds and detection times were adjusted in the PLCs.

2 A number of trips due to RF reflected power interlocks (Wattcher) were observed, and the integration time was adjusted on some of the Wattchers. The RF voltage ramp-up rate at switch-on was reduced, which in addition helps the cryogenic regulation stability. Helium pressure Some He pressure interlocks were seen when increasing the cavity voltages above 1MV, assumed to be due to de-conditioning of the cavities when running for a prolonged period at the injection voltage. Crowbar triggers A significant number of crowbar thyratron triggers were observed when starting and raising the high voltage on the power converters. These were diagnosed as spurious triggers, since no signals were seen on the diagnostic channels associated with the individual klystrons. An initial solution was to reduce the HV power converter ramp rate, which improved but did not completely eliminate the problem. A possible source of spurious triggers is the thyratron heater adjustment: the 4 heater voltages must be regulated to within 0.05V out of 4.5V, and any drifts will cause auto-triggers. This will be checked during the technical stop. Another potential source of triggers is earth noise. The earth for the HV bunkers is connected in the RB, far from the bunkers themselves. This makes the system more sensitive to earth perturbations when the machine is running: magnet power converter trips have sometimes been seen to trigger the crowbars. This will be investigated and possible changes to the earth layout will be considered. POWER SYSTEM SWITCH-ON PROBLEMS HV trips Occasionally it was difficult to restart an RF line due to repeated HV trips from crowbars. In this case the power converter post-mortem procedure blocks the communications for around a minute, and the RF application did not inform of this. This will be rectified before the 2010 startup. Several times the 18kV was switched on with the converters on, which in one case damaged some 5V power supplies in HV bunker. This is a dangerous situation and a safety interlock on the 18kV has been requested from EN/EL. Alarms Sometimes the alarm diagnostics failed to display a correct fault. This is due to a bug in the FESA class which will be rectified before startup. In addition, the alarms are level 2 (yellow), so are generally ignored by the operators. They should be level 3 (red); thus will be rectified with the LASER team. Software issues The RF power application was found to block from time to time, due to crashes of FESA classes running on cfc-ccr-cgplrf. This was traced to a hitherto undetected bug in the FESA framework, where an internal message queue used for notification of CMW subscriptions overflowed and resulted in a crash of the server process. The problem has been fully solved in the January maintenance release of FESA [2]. SYNCHRONISATION PROBLEMS If for any reason the synchro loop unlocks, a desynchronisation of the master revolution frequency with the revolution frequency program will occur. This causes the beam to be subsequently injected into the wrong bucket. This occurred repeatedly in the first weeks of operation and was traced to several causes: Coarse frequency program mismatch: The coarse frequency program is used as a reference frequency for the master oscillator (VCXO). With the frequency programs of the two rings locked together, which is the normal mode of operation, the ring 1 coarse f prog should be used for both rings. This had been overlooked, and the ring 2 reference used. In the case of a large trim, the incorrect reference would make the synchro loop unlock (Fig. 2). New FGC channels were added and modifications made to the sequencer to allow use of ring1 coarse f prog for both rings. Phase loop problem with beam but RF off: Injecting beam with RF off gives a random phase in the phase loop, and the resulting phase loop transient kicks the synchro loop out of lock (Fig. 3). A similar effect occurs when when switching the RF off with beam (e.g. for debunching). A threshold on cavity voltage was added in the firmware to disable the phase loop when RF is off. Beam control clock generators: A resynchronisation of the 40MHz sampling clock had been left out of the synchro initialisation sequence. This clock is used for sampling of the beam phase measurement. It comes up with random phase if not properly resynchronised. A sequencer task was added to resynchronise the 40 MHz to f rev. Additional diagnostics were installed (TDC measurements) in the beam control VME crates (f rev master vs f rev prog) and in the synchro system ( cogging between f rev prog 1 and f rev prog 2).

3 cavities are connected to the master reference before injection. Revolution frequency synchronisation interlock The TDC measurements of the f rev synchronisation (see the previous section) should be interlocked to prevent injection if a desynchronisation is detected. Fig. 2. Synchro loop error (blue) during an 855Hz trim. The excursion of 150 degrees causes the loop to unlock. Fig. 3. Synchro loop unlocking at injection READINESS FOR UNSAFE BEAM RF voltage interlock No beam interlocks on RF voltage or RF trips are currently connected. At half nominal intensity, the beam can survive 1 cavity trip [3], but ultimately we will need an interlock on the RF switch for each cavity controller. This is currently not implemented, but for now, we will add an interlock on the cavity voltage sum to generate a beam dump if the total RF voltage is below threshold. RF frequency interlocks A coarse interlock on the cavity controllers 40MHz clock (which corresponds to +/- 10 khz at the RF frequency) is currently active. An additional fine interlock (+/- 200Hz at the RF frequency) will be installed. The frequency will be measured behind the distribution point in UX45 every 50ms and compared with a central frequency derived from the beam energy distributed via the Safe Machine Parameters system. This system will also allow a ring1/ring2 inversion check before each fill, by trimming the frequency on each ring and measuring the frequencies of the RF in point 4 and the revolution frequencies at the beam dump in point 6. A software interlock should ideally be implemented on the cavities remote/local clock status to ensure the LOW LEVEL RF DEVELOPMENTS FOR 2010 Cavity controller Variable coupler: The use of the variable power coupler for changing the cavity Q will be commissioned before the startup. 1-turn feedback: The 1-turn feedback will be put into operation during 2010, giving a further impedance reduction for increased intensity [4]. This should be transparent for operation. Beam control Injection transients in the phase and synchro loop error signals: A fixed display of these signals is already available in the CCC. An automatic adjustment procedure for the injection phase could be developed based on these signals. A reliable adjustment from injection to injection would reduce the need for longitudinal feedback. Longitudinal feedback: The longitudinal feedback gives bunch by bunch damping of injection errors [4]. Firmware development is still needed and the system is foreseen to be installed in the second half of Optical fibre cabling is in progress, and some short accesses will be needed after the startup for equipment installation. Emittance blowup by controlled noise: The hardware and firmware is in place, and the software development is in progress. Some MDs will be needed to commission the system. TRANSVERSE DAMPER: READINESS FOR 2010 RUNNIN NG accumulated more The ADT power system has now than 2000 hours of operating time. The damper Low Level hardware was already complete and available in The feedback has not yet been closed, since no time was yet allocated for commissioning. The application software for the power system has been tested and used operationally. The Low Level software (function generators, expert software, abort gap cleaning) has been tested in dry-runs and during beam operation. The abort gap cleaning functionality has been tested with beam. The software and firmware to generate the cleaning pulses worked very well, and data analysis is ongoing. Further optimization of the cleaning pulse will

4 be necessary in order not to touch the beam outside the abort gap. Noise issues A reduction of beam lifetime by unwanted excitation through the damper has been observed. The influence of the damper level 3 (signal drive) on/off status on the beam lifetime and beam spectra has been observed by R. Steinhagen [5]. Signal level (dbm) Frequency (khz) BI input enabled BI input disabled Fig. 4. Measured noise injected from the BI excitation input confirmed in 2010 when the SR4 and UX45 UPSs were switched off. The mechanism by which the 8 khz perturbation enters the damper equipment is thought to be via ground loops between the surface and underground areas. The grounding scheme needs to be looked at, and possibly improved. For 2010 a scheme to suppress the noise is to install common mode chokes at the input of the damper equipment in UX45. Using this scheme a 10 db suppression has already been shown (Fig. 5). Chokes with more windings will be constructed for better suppression. If the problem persists, another solution would be to move some equipment from the surface to UX45, which would be a considerable investment in time, and only justifiable if it is really proven necessary. Pickup cable problems There is an issue with the long cables running from the pick-ups to SR4. 7/8 Flexwell cable is known to have some ripple in the impulse response due to the corrugation. However, the 16 ADT pick up cables have a larger than expected variation of the ripple from cable to cable when excited by the bunch passing the pick up (Fig. 6). A periodic perturbation is visible in reflectometry measurements, with a peak at around 200Mhz. This results in crosstalk between the measurements of adjacent bunches. It is thought that the degradation is due to cable damage during installation. The worst two cables will be replaced. The performance for multi-bunch operation will need to be checked after the 2010 startup. Fig. 5. Reduction of damper noise at 8 khz by common mode choke in UX45 Investigations of the noise spectra at the damper equipment by the RF group led to the identification of different contributions: 1. A contribution from the Beam Instrumentation input signal used for tune measurement, which is found to have a triangular shaped noise spectrum from 50 khz to 250 khz. A solution to suppress this using filtering is underway for 2010 from the BI group. The fix in 2009 was to attenuate the excitation signal (Fig. 4). 2. Lines at 8 khz and multiples were identified as coming from the UPS power supplies. This has been Fig. 6. Signal from single bunch as measured on the surface; the large ripple is due to a periodic perturbation on the cable RF CONCLUSIONS Minor hardware problems with the power system have been understood and addressed. However there is a possible concern over the cooling of the klystron collectors, and the klystron operating mode for 2010

5 needs to be defined. Time will be needed to commission the variable cavity Q. Some serious operational problems were encountered with front-end software for the power system, and these have now been solved. Various causes for synchronisation problems have been understood and resolved. In order to be ready for unsafe beam, a number of interlocks will be added for the total RF voltage, RF frequency and the revolution frequency synchronisation. A number of developments are still outstanding in the Low Level RF, including the 1-turn feedback, longitudinal feedback and longitudinal emittance blowup. ADT Commissioning of the ADT system with beam has started, and will need dedicated time in The noise spectrum needs attention. Measures have been taken to remove ground loops by common mode chokes, but improvement of the grounding between the surface and underground areas may be necessary. Two pick-up cables (7/8 Flexwell) will be replaced during the technical stop, and performance for multibunch operation will need to be checked due to residual ripple from the cables. Abort gap cleaning has been shown to be promising, but further optimization of the pulse shape will be required. REFERENCES [1] Hardware and Initial Beam Commissioning of the LHC RF Systems, T. Linnecar et al., LHC Project Report 1172, CERN, Geneva, 2008 [2] Controls issues, Wojtek Sliwinski, these proceedings. [3] Consequences of RF system failures during LHC beam commissioning, T. Linnecar, LHC Project Workshop, CERN, Geneva, 2005 [4] The LHC Low Level RF, P. Baudrenghien et al., European Particle Accelerator Conference, EPAC 2006, Edinburgh, UK. [5] Tune, chromaticity, feed forward and feed back, R. Steinhagen, these proceedings.

6

ANKA RF System - Upgrade Strategies

ANKA RF System - Upgrade Strategies ANKA RF System - Upgrade Strategies Vitali Judin ANKA Synchrotron Radiation Facility 2014-09 - 17 KIT University of the State Baden-Wuerttemberg and National Laboratory of the Helmholtz Association www.kit.edu

More information

LHC Nominal injection sequence

LHC Nominal injection sequence LHC Nominal injection sequence Mike Lamont Acknowledgements: Reyes Alemany Fernandez, Brennan Goddard Nominal injection Overall injection scheme Pilot R1, Pilot R2, Intermediate R1 Optimise Intermediate

More information

PEP-I1 RF Feedback System Simulation

PEP-I1 RF Feedback System Simulation SLAC-PUB-10378 PEP-I1 RF Feedback System Simulation Richard Tighe SLAC A model containing the fundamental impedance of the PEP- = I1 cavity along with the longitudinal beam dynamics and feedback system

More information

LHC Beam Instrumentation Further Discussion

LHC Beam Instrumentation Further Discussion LHC Beam Instrumentation Further Discussion LHC Machine Advisory Committee 9 th December 2005 Rhodri Jones (CERN AB/BDI) Possible Discussion Topics Open Questions Tune measurement base band tune & 50Hz

More information

2008 JINST 3 S LHC Machine THE CERN LARGE HADRON COLLIDER: ACCELERATOR AND EXPERIMENTS. Lyndon Evans 1 and Philip Bryant (editors) 2

2008 JINST 3 S LHC Machine THE CERN LARGE HADRON COLLIDER: ACCELERATOR AND EXPERIMENTS. Lyndon Evans 1 and Philip Bryant (editors) 2 PUBLISHED BY INSTITUTE OF PHYSICS PUBLISHING AND SISSA RECEIVED: January 14, 2007 REVISED: June 3, 2008 ACCEPTED: June 23, 2008 PUBLISHED: August 14, 2008 THE CERN LARGE HADRON COLLIDER: ACCELERATOR AND

More information

Detailed Design Report

Detailed Design Report Detailed Design Report Chapter 4 MAX IV Injector 4.6. Acceleration MAX IV Facility CHAPTER 4.6. ACCELERATION 1(10) 4.6. Acceleration 4.6. Acceleration...2 4.6.1. RF Units... 2 4.6.2. Accelerator Units...

More information

North Damping Ring RF

North Damping Ring RF North Damping Ring RF North Damping Ring RF Outline Overview High Power RF HVPS Klystron & Klystron EPICS controls Cavities & Cavity Feedback SCP diagnostics & displays FACET-specific LLRF LLRF distribution

More information

PoS(EPS-HEP2015)525. The RF system for FCC-ee. A. Butterworth CERN 1211 Geneva 23, Switzerland

PoS(EPS-HEP2015)525. The RF system for FCC-ee. A. Butterworth CERN 1211 Geneva 23, Switzerland CERN 1211 Geneva 23, Switzerland E-mail: andrew.butterworth@cern.ch O. Brunner CERN 1211 Geneva 23, Switzerland E-mail: olivier.brunner@cern.ch R. Calaga CERN 1211 Geneva 23, Switzerland E-mail: rama.calaga@cern.ch

More information

beam dump from P2 losses this morning

beam dump from P2 losses this morning beam dump from P2 losses this morning Some observations on the beam dump from P2 losses this morning 29.10.10 at 01:26:39: - single bunch intensity (average) was ~1.3e11 - significantly higher than previous

More information

The ESRF Radio-frequency Data Logging System for Failure Analysis

The ESRF Radio-frequency Data Logging System for Failure Analysis The ESRF Radio-frequency Data Logging System for Failure Analysis Jean-Luc REVOL Machine Division European Synchrotron Radiation Facility Accelerator Reliability Workshop 4-6 February 2002 Impact of the

More information

The LEP Superconducting RF System

The LEP Superconducting RF System The LEP Superconducting RF System K. Hübner* for the LEP RF Group CERN The basic components and the layout of the LEP rf system for the year 2000 are presented. The superconducting system consisted of

More information

Synchrotron Light Facility. Operation of ALBA RF. Angela Salom on behalf of RF team: Francis Perez, Bea Bravo and Jesus Ocampo

Synchrotron Light Facility. Operation of ALBA RF. Angela Salom on behalf of RF team: Francis Perez, Bea Bravo and Jesus Ocampo Operation of ALBA RF Angela Salom on behalf of RF team: Francis Perez, Bea Bravo and Jesus Ocampo Outline ALBA RF Overview: Booster and SR RF Operation with beam Statistics of first year operation Cavities

More information

Status of SOLARIS. Paweł Borowiec On behalf of Solaris Team

Status of SOLARIS. Paweł Borowiec On behalf of Solaris Team Status of SOLARIS Paweł Borowiec On behalf of Solaris Team e-mail: pawel.borowiec@uj.edu.pl XX ESLS-RF Meeting, Villingen 16-17.11.2016 Outline 1. Timeline 2. Injector 3. Storage ring 16-17.11.2016 XX

More information

2 Work Package and Work Unit descriptions. 2.8 WP8: RF Systems (R. Ruber, Uppsala)

2 Work Package and Work Unit descriptions. 2.8 WP8: RF Systems (R. Ruber, Uppsala) 2 Work Package and Work Unit descriptions 2.8 WP8: RF Systems (R. Ruber, Uppsala) The RF systems work package (WP) addresses the design and development of the RF power generation, control and distribution

More information

Development of an Abort Gap Monitor for High-Energy Proton Rings *

Development of an Abort Gap Monitor for High-Energy Proton Rings * Development of an Abort Gap Monitor for High-Energy Proton Rings * J.-F. Beche, J. Byrd, S. De Santis, P. Denes, M. Placidi, W. Turner, M. Zolotorev Lawrence Berkeley National Laboratory, Berkeley, USA

More information

1. General principles for injection of beam into the LHC

1. General principles for injection of beam into the LHC LHC Project Note 287 2002-03-01 Jorg.Wenninger@cern.ch LHC Injection Scenarios Author(s) / Div-Group: R. Schmidt / AC, J. Wenninger / SL-OP Keywords: injection, interlocks, operation, protection Summary

More information

Phase (deg) Phase (deg) Positive feedback, 317 ma. Negative feedback, 330 ma. jan2898/1638: beam pseudospectrum around 770*frev.

Phase (deg) Phase (deg) Positive feedback, 317 ma. Negative feedback, 330 ma. jan2898/1638: beam pseudospectrum around 770*frev. Commissioning Experience from PEP-II HER Longitudinal Feedback 1 S. Prabhakar, D. Teytelman, J. Fox, A. Young, P. Corredoura, and R. Tighe Stanford Linear Accelerator Center, Stanford University, Stanford,

More information

LEP OPERATION AND PERFORMANCE WITH ELECTRON-POSITRON COLLISIONS AT 209 GEV

LEP OPERATION AND PERFORMANCE WITH ELECTRON-POSITRON COLLISIONS AT 209 GEV LEP OPERATION AND PERFORMANCE WITH ELECTRON-POSITRON COLLISIONS AT 29 GEV R. W. Aßmann, CERN, Geneva, Switzerland Abstract The Large Electron-Positron Collider (LEP) at CERN completed its operation in

More information

CONTROL OF THE LOW LEVEL RF SYSTEM OF THE LARGE HADRON COLLIDER

CONTROL OF THE LOW LEVEL RF SYSTEM OF THE LARGE HADRON COLLIDER 10th ICALEPCS Int. Conf. on Accelerator & Large Expt. Physics Control Systems. Geneva, 10-14 Oct 2005, PO1.028-1 (2005) CONTROL OF THE LOW LEVEL RF SYSTEM OF THE LARGE HADRON COLLIDER A. Butterworth 1,

More information

18 GHz, 2.2 kw KLYSTRON GENERATOR GKP 24KP 18GHz WR62 3x400V

18 GHz, 2.2 kw KLYSTRON GENERATOR GKP 24KP 18GHz WR62 3x400V 18 GHz, 2.2 kw KLYSTRON GENERATOR GKP 24KP 18GHz WR62 3x400V With its characteristics of power stability whatever the load, very fast response time when pulsed (via external modulated signal), low ripple,

More information

The Elettra Storage Ring and Top-Up Operation

The Elettra Storage Ring and Top-Up Operation The Elettra Storage Ring and Top-Up Operation Emanuel Karantzoulis Past and Present Configurations 1994-2007 From 2008 5000 hours /year to the users 2010: Operations transition year Decay mode, 2 GeV (340mA)

More information

LHC TRANSVERSE DAMPER OBSERVATIONS VERSUS EXPECTATIONS

LHC TRANSVERSE DAMPER OBSERVATIONS VERSUS EXPECTATIONS LHC TRANSVERSE DAMPER OBSERVATIONS VERSUS EXPECTATIONS W. Höfle, L. Arnaudon, A. Butterworth, E. Ciapala, G. Cipolla, F. Dubouchet, D. Glenat, G. Hagmann, M. Jaussi, F. Killing, G. Kotzian, R. Louwerse,

More information

RF Upgrades & Experience At JLab. Rick Nelson

RF Upgrades & Experience At JLab. Rick Nelson RF Upgrades & Experience At JLab Rick Nelson Outline Background: CEBAF / Jefferson Lab History, upgrade requirements & decisions Progress & problems along the way Present status Future directions & concerns

More information

14 GHz, 2.2 kw KLYSTRON GENERATOR GKP 22KP 14GHz WR62 3x400V

14 GHz, 2.2 kw KLYSTRON GENERATOR GKP 22KP 14GHz WR62 3x400V 14 GHz, 2.2 kw KLYSTRON GENERATOR GKP 22KP 14GHz WR62 3x400V With its characteristics of power stability independent of the load, very fast response time when pulsed (via external modulated signal), low

More information

RF Power Generation II

RF Power Generation II RF Power Generation II Klystrons, Magnetrons and Gyrotrons Professor R.G. Carter Engineering Department, Lancaster University, U.K. and The Cockcroft Institute of Accelerator Science and Technology Scope

More information

Digital BPMs and Orbit Feedback Systems

Digital BPMs and Orbit Feedback Systems Digital BPMs and Orbit Feedback Systems, M. Böge, M. Dehler, B. Keil, P. Pollet, V. Schlott Outline stability requirements at SLS storage ring digital beam position monitors (DBPM) SLS global fast orbit

More information

Fast Orbit Feedback at the SLS. Outline

Fast Orbit Feedback at the SLS. Outline Fast Orbit Feedback at the SLS 2nd Workshop on Beam Orbit Stabilisation (December4-6, 2002, SPring-8) T. Schilcher Outline Noise Sources at SLS Stability / System Requirements Fast Orbit Feedback Implementation

More information

The basic parameters of the pre-injector are listed in the Table below. 100 MeV

The basic parameters of the pre-injector are listed in the Table below. 100 MeV 3.3 The Pre-injector The high design brightness of the SLS requires very high phase space density of the stored electrons, leading to a comparatively short lifetime of the beam in the storage ring. This,

More information

A Fast Magnet Current Change Monitor for Machine Protection in HERA and the LHC

A Fast Magnet Current Change Monitor for Machine Protection in HERA and the LHC 10th ICALEPCS Int. Conf. on Accelerator & Large Expt. Physics Control Systems. Geneva, 10-14 Oct 2005, PO2.042-4 (2005) A Fast Magnet Current Change Monitor for Machine Protection in HERA and the LHC M.Werner

More information

REVIEW OF LHC OPERATION

REVIEW OF LHC OPERATION REVIEW OF LHC OPERATION M. Lamont, CERN, Geneva, Switzerland Abstract LHC beam commissioning re-started on the 20 th November 2009 and continued for three and a half weeks. A summary of the progress made

More information

Experience with the Cornell ERL Injector SRF Cryomodule during High Beam Current Operation

Experience with the Cornell ERL Injector SRF Cryomodule during High Beam Current Operation Experience with the Cornell ERL Injector SRF Cryomodule during High Beam Current Operation Matthias Liepe Assistant Professor of Physics Cornell University Experience with the Cornell ERL Injector SRF

More information

Control of Intra-Bunch Vertical Motion in the SPS with GHz Bandwidth Feedback

Control of Intra-Bunch Vertical Motion in the SPS with GHz Bandwidth Feedback Journal of Physics: Conference Series PAPER OPEN ACCESS Control of Intra-Bunch Vertical Motion in the SPS with GHz Bandwidth Feedback To cite this article: J. Fox et al 2018 J. Phys.: Conf. Ser. 1067 072024

More information

Low Level RF for PIP-II. Jonathan Edelen LLRF 2017 Workshop (Barcelona) 16 Oct 2017

Low Level RF for PIP-II. Jonathan Edelen LLRF 2017 Workshop (Barcelona) 16 Oct 2017 Low Level RF for PIP-II Jonathan Edelen LLRF 2017 Workshop (Barcelona) 16 Oct 2017 PIP-II LLRF Team Fermilab Brian Chase, Edward Cullerton, Joshua Einstein, Jeremiah Holzbauer, Dan Klepec, Yuriy Pischalnikov,

More information

ABORT DIAGNOSTICS AND ANALYSIS DURING KEKB OPERATION

ABORT DIAGNOSTICS AND ANALYSIS DURING KEKB OPERATION ABORT DIAGNOSTICS AND ANALYSIS DURING KEKB OPERATION H. Ikeda*, J. W. Flanagan, T. Furuya, M. Tobiyama, KEK, Tsukuba, Japan M. Tanaka, MELCO SC,Tsukuba, Japan Abstract KEKB has stopped since June 2010

More information

TRANSVERSE DAMPING AND FAST INSTABILITIES

TRANSVERSE DAMPING AND FAST INSTABILITIES TRANSVERSE DAMPING AND FAST INSTABILITIES Abstract The characteristics of the LHC beams in the SPS, protons and ions, pose stringent requirements on the SPS damper (feedback system). The boundary conditions

More information

A HIGH POWER LONG PULSE HIGH EFFICIENCY MULTI BEAM KLYSTRON

A HIGH POWER LONG PULSE HIGH EFFICIENCY MULTI BEAM KLYSTRON A HIGH POWER LONG PULSE HIGH EFFICIENCY MULTI BEAM KLYSTRON A.Beunas and G. Faillon Thales Electron Devices, Vélizy, France S. Choroba DESY, Hamburg, Germany Abstract THALES ELECTRON DEVICES has developed

More information

IOT OPERATIONAL EXPERIENCE ON ALICE AND EMMA AT DARESBURY LABORATORY

IOT OPERATIONAL EXPERIENCE ON ALICE AND EMMA AT DARESBURY LABORATORY IOT OPERATIONAL EXPERIENCE ON ALICE AND EMMA AT DARESBURY LABORATORY A. Wheelhouse ASTeC, STFC Daresbury Laboratory ESLS XVIII Workshop, ELLETRA 25 th 26 th November 2010 Contents Brief Description ALICE

More information

New Filling Pattern for SLS-FEMTO

New Filling Pattern for SLS-FEMTO SLS-TME-TA-2009-0317 July 14, 2009 New Filling Pattern for SLS-FEMTO Natalia Prado de Abreu, Paul Beaud, Gerhard Ingold and Andreas Streun Paul Scherrer Institut, CH-5232 Villigen PSI, Switzerland A new

More information

Review of Diamond SR RF Operation and Upgrades

Review of Diamond SR RF Operation and Upgrades Review of Diamond SR RF Operation and Upgrades Morten Jensen on behalf of Diamond Storage Ring RF Group Agenda Stats X-ray and LN2 pressure results Cavity Failure Conditioning in the RFTF Cavity Simulations

More information

COMMISSIONING OF THE ALBA FAST ORBIT FEEDBACK SYSTEM

COMMISSIONING OF THE ALBA FAST ORBIT FEEDBACK SYSTEM COMMISSIONING OF THE ALBA FAST ORBIT FEEDBACK SYSTEM A. Olmos, J. Moldes, R. Petrocelli, Z. Martí, D. Yepez, S. Blanch, X. Serra, G. Cuni, S. Rubio, ALBA-CELLS, Barcelona, Spain Abstract The ALBA Fast

More information

Beam systems without failures what can be done?

Beam systems without failures what can be done? Acknowledgements: T.Baer, C.Bracco, G.Bregliozzi, G.Lanza, L.Ponce, S.Redaelli, A.Butterworth Beam systems without failures what can be done? After LS1 Session 07-09 th February 2012 M.Solfaroli/J.Uythoven

More information

3 cerl. 3-1 cerl Overview. 3-2 High-brightness DC Photocathode Gun and Gun Test Beamline

3 cerl. 3-1 cerl Overview. 3-2 High-brightness DC Photocathode Gun and Gun Test Beamline 3 cerl 3-1 cerl Overview As described before, the aim of the cerl in the R&D program includes the development of critical components for the ERL, as well as the construction of a test accelerator. The

More information

Modeling and simulation of longitudinal dynamics for Low Energy Ring-High Energy Ring at the Positron-Electron Project 1

Modeling and simulation of longitudinal dynamics for Low Energy Ring-High Energy Ring at the Positron-Electron Project 1 SLAC-PUB-12374 February, 27 Modeling and simulation of longitudinal dynamics for Low Energy Ring-High Energy Ring at the Positron-Electron Project 1 C. Rivetta, T. Mastorides, J. D. Fox, D. Teytelman,

More information

Spear3 RF System Sam Park 11/06/2003. Spear3 RF System. High Power Components Operation and Control. RF Requirement.

Spear3 RF System Sam Park 11/06/2003. Spear3 RF System. High Power Components Operation and Control. RF Requirement. Spear3 RF System RF Requirement Overall System High Power Components Operation and Control SPEAR 3 History 1996 Low emittance lattices explored 1996 SPEAR 3 proposed 11/97 SPEAR 3 design study team formed

More information

The PEFP 20-MeV Proton Linear Accelerator

The PEFP 20-MeV Proton Linear Accelerator Journal of the Korean Physical Society, Vol. 52, No. 3, March 2008, pp. 721726 Review Articles The PEFP 20-MeV Proton Linear Accelerator Y. S. Cho, H. J. Kwon, J. H. Jang, H. S. Kim, K. T. Seol, D. I.

More information

LHC COMMISSIONING PLANS

LHC COMMISSIONING PLANS LHC COMMISSIONING PLANS R. Alemany Fernández, CERN, Geneva, Switzerland Abstract Operating the Large Hadron Collider (LHC) at design performance is not going to be easy. The machine is complex and with

More information

What can be learned from HERA Experience for ILC Availability

What can be learned from HERA Experience for ILC Availability What can be learned from HERA Experience for ILC Availability August 17, 2005 F. Willeke, DESY HERA Performance Critical Design Decisions What could be avoided if HERA would have to be built again? HERA

More information

Precise Digital Integration of Fast Analogue Signals using a 12-bit Oscilloscope

Precise Digital Integration of Fast Analogue Signals using a 12-bit Oscilloscope EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH CERN BEAMS DEPARTMENT CERN-BE-2014-002 BI Precise Digital Integration of Fast Analogue Signals using a 12-bit Oscilloscope M. Gasior; M. Krupa CERN Geneva/CH

More information

RF upgrade program in LHC injectors and LHC machine

RF upgrade program in LHC injectors and LHC machine RF upgrade program in LHC injectors and LHC machine E r k J e n s e n, o n b e h a l f o f B E - RF Many thanks to M. E. Angoletta, O. Brunner, R. Calaga, E. Ciapala, H. Damerau, W. Höfle, E. Montesinos,

More information

PEP-II longitudinal feedback and the low groupdelay. Dmitry Teytelman

PEP-II longitudinal feedback and the low groupdelay. Dmitry Teytelman PEP-II longitudinal feedback and the low groupdelay woofer Dmitry Teytelman 1 Outline I. PEP-II longitudinal feedback and the woofer channel II. Low group-delay woofer topology III. Why do we need a separate

More information

LCLS RF Reference and Control R. Akre Last Update Sector 0 RF and Timing Systems

LCLS RF Reference and Control R. Akre Last Update Sector 0 RF and Timing Systems LCLS RF Reference and Control R. Akre Last Update 5-19-04 Sector 0 RF and Timing Systems The reference system for the RF and timing starts at the 476MHz Master Oscillator, figure 1. Figure 1. Front end

More information

The 2011 LHC Run - Lessons in Beam Diagnostics

The 2011 LHC Run - Lessons in Beam Diagnostics The 2011 LHC Run - Lessons in Beam Diagnostics LHC Performance Workshop Chamonix 2012 6 th 10 th February Rhodri Jones on behalf of the CERN Beam Instrumentation Group Outline This Presentation will focus

More information

A New 4MW LHCD System for EAST

A New 4MW LHCD System for EAST 1 EXW/P7-29 A New 4MW LHCD System for EAST Jiafang SHAN 1), Yong YANG 1), Fukun LIU 1), Lianmin ZHAO 1) and LHCD Team 1) 1) Institute of Plasma Physics, Chinese Academy of Sciences, Hefei, China E-mail

More information

PEP II Design Outline

PEP II Design Outline PEP II Design Outline Balša Terzić Jefferson Lab Collider Review Retreat, February 24, 2010 Outline General Information Parameter list (and evolution), initial design, upgrades Collider Ring Layout, insertions,

More information

ILC-LNF TECHNICAL NOTE

ILC-LNF TECHNICAL NOTE IL-LNF EHNIAL NOE Divisione Acceleratori Frascati, July 4, 2006 Note: IL-LNF-001 RF SYSEM FOR HE IL DAMPING RINGS R. Boni, INFN-LNF, Frascati, Italy G. avallari, ERN, Geneva, Switzerland Introduction For

More information

Operation and Performance of a Longitudinal Feedback System Using Digital Signal Processing*

Operation and Performance of a Longitudinal Feedback System Using Digital Signal Processing* SLAC-PUB-6675 LBL-36174 November 22, 1994 Operation and Performance of a Longitudinal Feedback System Using Digital Signal Processing* D. Teytelman, J. Fox, H. Hindi, J. Hoeflich, I. Linscott, J. Olsen,

More information

RF considerations for SwissFEL

RF considerations for SwissFEL RF considerations for H. Fitze in behalf of the PSI RF group Workshop on Compact X-Ray Free Electron Lasers 19.-21. July 2010, Shanghai Agenda Introduction RF-Gun Development C-band development Summary

More information

Design and Simulation of High Power RF Modulated Triode Electron Gun. A. Poursaleh

Design and Simulation of High Power RF Modulated Triode Electron Gun. A. Poursaleh Design and Simulation of High Power RF Modulated Triode Electron Gun A. Poursaleh National Academy of Sciences of Armenia, Institute of Radio Physics & Electronics, Yerevan, Armenia poursaleh83@yahoo.com

More information

Bunch-by-bunch feedback and LLRF at ELSA

Bunch-by-bunch feedback and LLRF at ELSA Bunch-by-bunch feedback and LLRF at ELSA Dmitry Teytelman Dimtel, Inc., San Jose, CA, USA February 9, 2010 Outline 1 Feedback Feedback basics Coupled-bunch instabilities and feedback Beam and feedback

More information

ANKA Status Report. N.Smale, on behalf of all ANKA colleagues, Directors : A.-S. Müller, C Heske, T Baumbach.

ANKA Status Report. N.Smale, on behalf of all ANKA colleagues, Directors : A.-S. Müller, C Heske, T Baumbach. ANKA Status Report N.Smale, on behalf of all ANKA colleagues, Directors : A.-S. Müller, C Heske, T Baumbach. Institute for Synchrotron Radiation KIT - University of the State of Baden-Wuerttemberg and

More information

GA A26497 SOLID-STATE HIGH-VOLTAGE CROWBAR UTILIZING SERIES-CONNECTED THYRISTORS

GA A26497 SOLID-STATE HIGH-VOLTAGE CROWBAR UTILIZING SERIES-CONNECTED THYRISTORS GA A26497 SOLID-STATE HIGH-VOLTAGE CROWBAR by J.F. Tooker, P. Huynh, and R.W. Street JUNE 2009 DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government.

More information

SPEAR 3: Operations Update and Impact of Top-Off Injection

SPEAR 3: Operations Update and Impact of Top-Off Injection SPEAR 3: Operations Update and Impact of Top-Off Injection R. Hettel for the SSRL ASD 2005 SSRL Users Meeting October 18, 2005 SPEAR 3 Operations Update and Development Plans Highlights of 2005 SPEAR 3

More information

WHAT WE WILL DO FOR BEAM PREPARATION IN 2009 : BEAM INTERLOCKS

WHAT WE WILL DO FOR BEAM PREPARATION IN 2009 : BEAM INTERLOCKS WHAT WE WILL DO FOR BEAM PREPARATION IN 2009 : BEAM INTERLOCKS J. Wenninger, CERN, Geneva Abstract A large fraction of the LHC Machine Protection System was commissioned in 2008 in view of the first LHC

More information

Accelerator Controls Part2: CERN central timing system

Accelerator Controls Part2: CERN central timing system Accelerator Controls Part2: CERN central timing system CAS 2009@Divonne Hermann Schmickler Outline Part 2 Requested Functionality of the CERN timing system Implementation: Hardware Details Software Details:

More information

Session 07 - What did we learn with beam in 2008? LHC Performance Workshop Chamonix Rhodri Jones on behalf of BE/BI & all our collaborators

Session 07 - What did we learn with beam in 2008? LHC Performance Workshop Chamonix Rhodri Jones on behalf of BE/BI & all our collaborators - First Results & Next Steps Session 07 - What did we learn with beam in 2008? LHC Performance Workshop Chamonix 2009 Rhodri Jones on behalf of BE/BI & all our collaborators LHC BTV System All screens

More information

RF plans for ESS. Morten Jensen. ESLS-RF 2013 Berlin

RF plans for ESS. Morten Jensen. ESLS-RF 2013 Berlin RF plans for ESS Morten Jensen ESLS-RF 2013 Berlin Overview The European Spallation Source (ESS) will house the most powerful proton linac ever built. The average beam power will be 5 MW which is five

More information

STATUS OF THE SWISSFEL C-BAND LINEAR ACCELERATOR

STATUS OF THE SWISSFEL C-BAND LINEAR ACCELERATOR Proceedings of FEL213, New York, NY, USA STATUS OF THE SWISSFEL C-BAND LINEAR ACCELERATOR F. Loehl, J. Alex, H. Blumer, M. Bopp, H. Braun, A. Citterio, U. Ellenberger, H. Fitze, H. Joehri, T. Kleeb, L.

More information

Brilliance. Electron Beam Position Processor

Brilliance. Electron Beam Position Processor Brilliance Electron Beam Position Processor Many instruments. Many people. Working together. Stability means knowing your machine has innovative solutions. For users, stability means a machine achieving

More information

Linac 4 Instrumentation K.Hanke CERN

Linac 4 Instrumentation K.Hanke CERN Linac 4 Instrumentation K.Hanke CERN CERN Linac 4 PS2 (2016?) SPL (2015?) Linac4 (2012) Linac4 will first inject into the PSB and then can be the first element of a new LHC injector chain. It will increase

More information

KEKB Accelerator Physics Report

KEKB Accelerator Physics Report KEKB Accelerator Physics Report Y. Funakoshi for the KEKB commissioning group KEK, 1-1 Oho, Tsukuba, Ibaraki 305-0801,Japan Abstract 1 INTRODUCTION The KEKB B-Factory is an electron-positron double ring

More information

KARA and FLUTE RF Overview/status

KARA and FLUTE RF Overview/status KARA and FLUTE RF Overview/status Nigel Smale on behalf of IBPT and LAS teams Laboratory for Applications of Synchrotron radiation (LAS) Institute for Beam Physics and Technology (IBPT) KARA KIT The Research

More information

LHC Machine check out

LHC Machine check out LHC Machine check out R.Giachino / M.Albert 1v1 Be/op 12th March 2012 Hardware Commissioning: M. Pojer, R. Schmidt and M. Solfaroli Summary of week 10 Machine checkout: R. Giachino, M.Albert and J. Wenninger

More information

CERN S PROTON SYNCHROTRON COMPLEX OPERATION TEAMS AND DIAGNOSTICS APPLICATIONS

CERN S PROTON SYNCHROTRON COMPLEX OPERATION TEAMS AND DIAGNOSTICS APPLICATIONS Marc Delrieux, CERN, BE/OP/PS CERN S PROTON SYNCHROTRON COMPLEX OPERATION TEAMS AND DIAGNOSTICS APPLICATIONS CERN s Proton Synchrotron (PS) complex How are we involved? Review of some diagnostics applications

More information

A HIGH-POWER SUPERCONDUCTING H - LINAC (SPL) AT CERN

A HIGH-POWER SUPERCONDUCTING H - LINAC (SPL) AT CERN A HIGH-POWER SUPERCONDUCTING H - LINAC (SPL) AT CERN E. Chiaveri, CERN, Geneva, Switzerland Abstract The conceptual design of a superconducting H - linear accelerator at CERN for a beam energy of 2.2 GeV

More information

SLS RF operation report 2003

SLS RF operation report 2003 SLS RF operation report 2003 M. Pedrozzi, Jean-Yves Raguin Paul Scherrer Institute, 5232 Villigen PSI, Switzerland SUMMARY LINAC report SR Superconducting Third Harmonic system report SR 500 MHz system

More information

A Unique Power Supply for the PEP II Klystron at SLAC*

A Unique Power Supply for the PEP II Klystron at SLAC* I : SLAC-PUB-7591 July 1997 A Unique Power Supply for the PEP II Klystron at SLAC* R. Case1 and M. N. Nguyen Stanford Linear Accelerator Center Stanford University, Stanford, CA 94309 Presented at the

More information

Status of the X-ray FEL control system at SPring-8

Status of the X-ray FEL control system at SPring-8 Status of the X-ray FEL control system at SPring-8 T.Fukui 1, T.Hirono 2, N.Hosoda 1, M.Ishii 2, M.Kitamura 1 H.Maesaka 1,T.Masuda 2, T.Matsushita 2, T.Ohata 2, Y.Otake 1, K.Shirasawa 1,M.Takeuchi 2, R.Tanaka

More information

INTRODUCTION. SLAC-PUB-8414 March 2000

INTRODUCTION. SLAC-PUB-8414 March 2000 SLAC-PUB-8414 March 2 Beam Diagnostics Based on Time-Domain Bunch-by-Bunch Data * D. Teytelman, J. Fox, H. Hindi, C. Limborg, I. Linscott, S. Prabhakar, J. Sebek, A. Young Stanford Linear Accelerator Center

More information

FIR Center Report. Development of Feedback Control Scheme for the Stabilization of Gyrotron Output Power

FIR Center Report. Development of Feedback Control Scheme for the Stabilization of Gyrotron Output Power FIR Center Report FIR FU-120 November 2012 Development of Feedback Control Scheme for the Stabilization of Gyrotron Output Power Oleksiy Kuleshov, Nitin Kumar and Toshitaka Idehara Research Center for

More information

Feedback Control of SPS E-Cloud/TMCI Instabilities

Feedback Control of SPS E-Cloud/TMCI Instabilities Feedback Control of SPS E-Cloud/TMCI Instabilities C. H. Rivetta 1 LARP Ecloud Contributors: A. Bullitt 1, J. D. Fox 1, T. Mastorides 1, G. Ndabashimiye 1, M. Pivi 1, O. Turgut 1, W. Hofle 2, B. Savant

More information

CMS Conference Report

CMS Conference Report Available on CMS information server CMS CR 1997/017 CMS Conference Report 22 October 1997 Updated in 30 March 1998 Trigger synchronisation circuits in CMS J. Varela * 1, L. Berger 2, R. Nóbrega 3, A. Pierce

More information

Pulses inside the pulse mode of operation at RF Gun

Pulses inside the pulse mode of operation at RF Gun Pulses inside the pulse mode of operation at RF Gun V. Vogel, V. Ayvazyan, K. Floettmann, D. Lipka, P. Morozov, H. Schlarb, S. Schreiber FLASH Seminar, DESY March 29, 2011 Contents Why we need a PiPmode

More information

High Brightness Injector Development and ERL Planning at Cornell. Charlie Sinclair Cornell University Laboratory for Elementary-Particle Physics

High Brightness Injector Development and ERL Planning at Cornell. Charlie Sinclair Cornell University Laboratory for Elementary-Particle Physics High Brightness Injector Development and ERL Planning at Cornell Charlie Sinclair Cornell University Laboratory for Elementary-Particle Physics June 22, 2006 JLab CASA Seminar 2 Background During 2000-2001,

More information

Karin Rathsman, Håkan Danared and Rihua Zeng. Report from RF Power Source Workshop

Karin Rathsman, Håkan Danared and Rihua Zeng. Report from RF Power Source Workshop Accelerator Division ESS AD Technical Note ESS/AD/0020 Karin Rathsman, Håkan Danared and Rihua Zeng Report from RF Power Source Workshop 10 July 2011 Report on the RF Power Source Workshop K. Rathsman,

More information

TECHNICAL SPECIFICATION Multi-beam S-band Klystron type BT267

TECHNICAL SPECIFICATION Multi-beam S-band Klystron type BT267 TECHNICAL SPECIFICATION Multi-beam S-band Klystron type BT267 The company was created for the development and manufacture of precision microwave vacuum-electron-tube devices (VETD). The main product areas

More information

The FLASH objective: SASE between 60 and 13 nm

The FLASH objective: SASE between 60 and 13 nm Injector beam control studies winter 2006/07 talk from E. Vogel on work performed by W. Cichalewski, C. Gerth, W. Jalmuzna,W. Koprek, F. Löhl, D. Noelle, P. Pucyk, H. Schlarb, T. Traber, E. Vogel, FLASH

More information

CLIC Feasibility Demonstration at CTF3

CLIC Feasibility Demonstration at CTF3 CLIC Feasibility Demonstration at CTF3 Roger Ruber Uppsala University, Sweden, for the CLIC/CTF3 Collaboration http://cern.ch/clic-study LINAC 10 MO303 13 Sep 2010 The Key to CLIC Efficiency NC Linac for

More information

5 Project Costs and Schedule

5 Project Costs and Schedule 93 5 Project Costs and Schedule 5.1 Overview The cost evaluation for the integrated version of the XFEL with 30 experiments and 35 GeV beam energy as described in the TDR-2001 yielded 673 million EUR for

More information

Pulsed Klystrons for Next Generation Neutron Sources Edward L. Eisen - CPI, Inc. Palo Alto, CA, USA

Pulsed Klystrons for Next Generation Neutron Sources Edward L. Eisen - CPI, Inc. Palo Alto, CA, USA Pulsed Klystrons for Next Generation Neutron Sources Edward L. Eisen - CPI, Inc. Palo Alto, CA, USA Abstract The U.S. Department of Energy (DOE) Office of Science has funded the construction of a new accelerator-based

More information

Upgrading LHC Luminosity

Upgrading LHC Luminosity 1 Upgrading LHC Luminosity 2 Luminosity (cm -2 s -1 ) Present (2011) ~2 x10 33 Beam intensity @ injection (*) Nominal (2015?) 1 x 10 34 1.1 x10 11 Upgraded (2021?) ~5 x10 34 ~2.4 x10 11 (*) protons per

More information

Status and Plans for PEP-II

Status and Plans for PEP-II Status and Plans for PEP-II John Seeman SLAC Particle and Particle-Astrophysics DOE HEPAP P5 Review April 21, 2006 Topics Luminosity records for PEP-II in October 2005 Fall shut-down upgrades Run 5b turn

More information

MAXTECH, Inc. BRC-1000 Series. C-Band Redundant LNB Systems. Technology for Communications. System Block Diagrams

MAXTECH, Inc. BRC-1000 Series. C-Band Redundant LNB Systems. Technology for Communications. System Block Diagrams MAXTECH, Inc. Technology for Communications BRC-1000 Series C-Band Redundant LNB Systems Introduction Redundant LNB systems minimize system downtime due to LNB failure by providing a spare LNB and an automatic

More information

TITLE PAGE. Title of paper: PUSH-PULL FEL, A NEW ERL CONCEPT Author: Andrew Hutton. Author Affiliation: Jefferson Lab. Requested Proceedings:

TITLE PAGE. Title of paper: PUSH-PULL FEL, A NEW ERL CONCEPT Author: Andrew Hutton. Author Affiliation: Jefferson Lab. Requested Proceedings: TITLE PAGE Title of paper: PUSH-PULL FEL, A NEW ERL CONCEPT Author: Andrew Hutton Author Affiliation: Jefferson Lab Requested Proceedings: Unique Session ID: Classification Codes: Keywords: Energy Recovery,

More information

OPERATIONAL EXPERIENCE AT J-PARC

OPERATIONAL EXPERIENCE AT J-PARC OPERATIONAL EXPERIENCE AT J-PARC Hideaki Hotchi, ) for J-PARC commissioning team ), 2), ) Japan Atomic Energy Agency (JAEA), Tokai, Naka, Ibaraki, 39-95 Japan, 2) High Energy Accelerator Research Organization

More information

PanelView 1400e CRT Maintenance

PanelView 1400e CRT Maintenance Release Note PanelView 1400e CRT Maintenance Maximizing the life of your PanelView 1400e, CRT Terminals To maximize the life of a CRT, the following is strongly recommended: Adjust the external brightness

More information

Basic rules for the design of RF Controls in High Intensity Proton Linacs. Particularities of proton linacs wrt electron linacs

Basic rules for the design of RF Controls in High Intensity Proton Linacs. Particularities of proton linacs wrt electron linacs Basic rules Basic rules for the design of RF Controls in High Intensity Proton Linacs Particularities of proton linacs wrt electron linacs Non-zero synchronous phase needs reactive beam-loading compensation

More information

LLRF at SSRF. Yubin Zhao

LLRF at SSRF. Yubin Zhao LLRF at SSRF Yubin Zhao 2017.10.16 contents SSRF RF operation status Proton therapy LLRF Third harmonic cavity LLRF Three LINAC LLRF Hard X FEL LLRF (future project ) Trip statistics of RF system Trip

More information

FILLING SCHEMES AND E-CLOUD CONSTRAINTS FOR 2017

FILLING SCHEMES AND E-CLOUD CONSTRAINTS FOR 2017 FILLING SCHEMES AND E-CLOUD CONSTRAINTS FOR 2017 G. Iadarola*, L. Mether, G. Rumolo, CERN, Geneva, Switzerland Abstract Several measures implemented in the 2016-17 Extended Year End Technical Stop (EYETS)

More information

MULTI-BUNCH INSTABILITY DIAGNOSTICS VIA DIGITAL FEEDBACK SYSTEMS AT PEP-II, DAæNE, ALS and SPEAR

MULTI-BUNCH INSTABILITY DIAGNOSTICS VIA DIGITAL FEEDBACK SYSTEMS AT PEP-II, DAæNE, ALS and SPEAR MULTI-BUNCH INSTABILITY DIAGNOSTICS VIA DIGITAL FEEDBACK SYSTEMS AT PEP-II, DAæNE, ALS and SPEAR J. Fox æ R. Larsen, S. Prabhakar, D. Teytelman, A. Young, SLAC y A. Drago, M. Serio, INFN Frascati; W. Barry,

More information

LEP Status and Performance in 2000

LEP Status and Performance in 2000 LEP Status and Performance in 2 R. Assmann, SL/OP for the SL Division Outline: Operational strategy Overview on luminosity and energy performance Energy reach Luminosity performance Other issues Further

More information